JP4365742B2 - 電鉄用変電所監視制御装置 - Google Patents
電鉄用変電所監視制御装置 Download PDFInfo
- Publication number
- JP4365742B2 JP4365742B2 JP2004218449A JP2004218449A JP4365742B2 JP 4365742 B2 JP4365742 B2 JP 4365742B2 JP 2004218449 A JP2004218449 A JP 2004218449A JP 2004218449 A JP2004218449 A JP 2004218449A JP 4365742 B2 JP4365742 B2 JP 4365742B2
- Authority
- JP
- Japan
- Prior art keywords
- signal
- train
- processing means
- circuit breaker
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000012544 monitoring process Methods 0.000 title claims description 20
- 238000012545 processing Methods 0.000 claims description 56
- 238000004088 simulation Methods 0.000 claims description 35
- 238000012360 testing method Methods 0.000 claims description 13
- 238000000034 method Methods 0.000 claims description 7
- 238000011990 functional testing Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 2
- 230000011664 signaling Effects 0.000 description 2
- 230000003203 everyday effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
Images
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Description
また、電鉄用変電所監視制御装置には、き電線に事故が発生したときに事故電流により変電所機器が破損したり、車両に電力を供給するトロリ線が溶断したりするのを未然に防止する保護連動機能がある。さらに、車両が電鉄用変電所の近辺を通過するときに車両への電力供給系統を規定時間通りに自動的に切り替える切替個別連動機能が備えられている。
これらの機能は、夜間保線作業等の安全確保のために終電後のき電停止時に、受電用の遮断器が投入できない状態として模擬試験が行われている。
従来の電鉄用変電所監視制御装置においては、受電用の遮断器を模擬した模擬遮断器を電鉄用変電所の配電盤にケーブルで接続して配電盤の動作機能試験が行われている(例えば、特許文献1参照)。
に設置された電鉄用変電所監視制御装置において、電鉄用変電所の受電用遮断器が遮断された状態で、列車信号装置を模擬機器として選択して機器選択信号を出力すると共に、列車信号を出力させるための列車信号を設定可能な設定手段と、設定手段により列車信号が設定され、制御実行信号が入力されると列車信号を出力する模擬処理手段と、機器選択信号により模擬する列車信号装置を認識し、中央指令所から給電用遮断器の動作を指令する制御指令信号が入力されると模擬処理手段に制御実行信号を出力し、模擬処理手段から列車信号が入力されると動作指令信号を出力して給電用遮断器を動作させ、給電用遮断器から動作状態を示す状態信号が入力されると状態信号を出力する制御処理手段と、状態信号が入力されると中央指令所に列車信号を伝達する入出力処理手段とを備え、中央司令所からの給電用遮断器の制御指令により、模擬処理手段と制御処理手段で列車信号装置の列車信号を模擬して給電用遮断器の動作試験を実施可能にしたものである。
図1は、この発明を実施するための実施の形態1における電鉄用変電所監視制御装置を示すブロック図である。図1において、電鉄用変電所1に電力系統から電力を受電し、遮断を行う受電用遮断器2が設置されている。他に断路器3、保護装置4及び変電所内機器5も設置されている。さらに、中央指令所6からの受電用遮断器2の投入制御指令信号により電鉄用変電所1の機能試験を行う電鉄用変電所監視制御装置7が設置されている。そして、電鉄用変電所監視制御装置7は設定手段8、制御処理手段9、模擬処理手段10及び入出力処理手段11で構成されている。
さらに、設定手段8により断路器3、保護装置4及び変電所内機器5の動作接点を模擬する(ステップS7)ことができる。
以上のように、選択された受電用遮断器2の機器制御指令信号が中央指令所6から入力されると、制御処理手段9が模擬処理手段10に制御信号を出力し、模擬処理手段10から受電用遮断器2の動作時間後に動作信号が出力されると受電用遮断器2の状態信号を出力するようにしたことにより、別途準備した模擬遮断器の接続作業を必要とすることなく、受電用遮断器2の動作を模擬して電鉄用変電所1の機能試験を行うことができる。
図3は、この発明を実施するための実施の形態2における電鉄用変電所監視制御装置を示すブロック図である。図3において、6〜11は実施の形態1のものと同様のものである。電力系統から受電用遮断器(図示せず)を介して電力が供給される電鉄用変電所12に給電用遮断器13,14が設置されている。他に、列車の在線位置に応じて列車信号を出力する列車信号装置15が設置されている。さらに、中央指令所6からの各給電用遮断器13,14への制御指令信号により電鉄用変電所12の機能試験を行う電鉄用変電所監視制御装置7が設置されている。この電鉄用変電所監視制御装置7は、設定手段8,制御処理手段9,模擬処理手段10,及び入出力処理手段11で構成されている。
中央指令所6から出力された給電用遮断器13,14の投入指令となる制御指令信号が入出力処理手段11を介して制御処理手段9に入力される。制御処理手段9は設定手段8から模擬処理の通知を受けているので、列車信号を出力させるための制御実行信号を出力する。模擬処理手段10に制御実行信号が入力されると、列車信号が出力される。そして、列車信号が制御処理手段9に入力されると、例えば、列車信号「有」を認識したとき動作指令信号を出力して遮断器13を開放し、300msの無電圧時間を確保した後に給電用遮断器14を投入する。そして、監視制御処理手段9が列車信号「無」を認識すると遮断器14を開放して300msの無電圧時間を確保した後に給電用遮断器13を投入するように切替個別自動連動機能が設定されている。これにより、電鉄用変電所12から列車(図示せず)に給電されていた電源は、他の電鉄用変電所(図示せず)に切り替えられる。
この場合、給電用遮断器13,14は実際に投入されるが、実施の形態1に示した受電用遮断器2が開放されているので、給電用遮断器13,14を介して電圧が印加されることはない。
以上のように、列車信号装置15を模擬することにより列車を走行させることなく給電用遮断器13,14の動作試験を容易に行うことができる。
7 電鉄用変電所監視制御装置、8 設定手段、9 制御処理手段、
10 模擬処理手段、11 入出力処理手段、13,14 給電用遮断器、
15 列車信号装置。
Claims (1)
- 列車に電力を供給し、又は遮断する給電用遮断器が設置され、上記列車の在線位置により列車信号装置から出力される列車信号により上記給電用遮断器の動作が制御される電鉄用変電所の機能試験を行うように、上記電鉄用変電所に設置された電鉄用変電所監視制御装置において、
上記電鉄用変電所の受電用遮断器が遮断された状態で、上記列車信号装置を模擬機器として選択して機器選択信号を出力すると共に、上記列車信号を出力させるための上記列車信号を設定可能な設定手段と、
上記設定手段により上記列車信号が設定され、制御実行信号が入力されると上記列車信号を出力する模擬処理手段と、
上記機器選択信号により模擬する上記列車信号装置を認識し、中央指令所から上記給電用遮断器の動作を指令する制御指令信号が入力されると上記模擬処理手段に上記制御実行信号を出力し、上記模擬処理手段から上記列車信号が入力されると動作指令信号を出力して上記給電用遮断器を動作させ、上記給電用遮断器から動作状態を示す状態信号が入力されると上記状態信号を出力する制御処理手段と、
上記状態信号が入力されると上記中央指令所に上記列車信号を伝達する入出力処理手段とを備え、
上記中央司令所からの上記給電用遮断器の制御指令により、上記模擬処理手段と上記制御処理手段で上記列車信号装置の上記列車信号を模擬して上記給電用遮断器の動作試験を実施可能にした電鉄用変電所監視制御装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004218449A JP4365742B2 (ja) | 2004-07-27 | 2004-07-27 | 電鉄用変電所監視制御装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004218449A JP4365742B2 (ja) | 2004-07-27 | 2004-07-27 | 電鉄用変電所監視制御装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2006042494A JP2006042494A (ja) | 2006-02-09 |
JP4365742B2 true JP4365742B2 (ja) | 2009-11-18 |
Family
ID=35906863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2004218449A Expired - Lifetime JP4365742B2 (ja) | 2004-07-27 | 2004-07-27 | 電鉄用変電所監視制御装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4365742B2 (ja) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5455827B2 (ja) * | 2010-07-14 | 2014-03-26 | 三菱電機株式会社 | 電鉄用変電所監視制御システム、電鉄用変電所監視制御装置、および電鉄用変電所監視制御方法 |
-
2004
- 2004-07-27 JP JP2004218449A patent/JP4365742B2/ja not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP2006042494A (ja) | 2006-02-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3001535B1 (en) | Protection control system for process bus, merging unit, and computation device | |
KR101030771B1 (ko) | Plc를 이용한 전철용 직류 배전반 제어장치 | |
JP2018503237A (ja) | Dc回路遮断器及び断路器 | |
CN101752909B (zh) | 操作回路远程校验方法 | |
KR100347488B1 (ko) | 배전선의정전극소화시스템 | |
CN103616610B (zh) | 一种电网故障线路中监控信号的仿真方法 | |
JP4365742B2 (ja) | 電鉄用変電所監視制御装置 | |
KR20110017573A (ko) | 전기철도의 통합형 직류 보호 계전 시스템 | |
JP2018057130A (ja) | 事故研修補助装置 | |
JP3085007B2 (ja) | 配電線の停電極小化システムおよびその方法 | |
JP4330781B2 (ja) | 監視制御システム及び自動送電方法 | |
JP3767100B2 (ja) | 配電システム | |
JP5455827B2 (ja) | 電鉄用変電所監視制御システム、電鉄用変電所監視制御装置、および電鉄用変電所監視制御方法 | |
CN104175884A (zh) | 一种母线接触器网络控制方法 | |
CN101978456A (zh) | 具有用于连接用电设备支路接线端子的连接装置的控制模块以及用电设备支路 | |
CN112260235B (zh) | 一种母线上接地变的接地方式的控制方法及装置 | |
AU640451B2 (en) | Control scheme for the adaptive protection and the control of feeder circuit breakers on an electric railway | |
CN209608335U (zh) | 一种用于配电网自动化开关的保护测控装置 | |
CN106696770A (zh) | 供电臂发生馈线故障时的供电方法 | |
JPH0347056B2 (ja) | ||
JP3494792B2 (ja) | 電気所設備の自動復旧装置 | |
Ragaini et al. | High Reliability Selective Interlock System for Fault Protection of Critical Power Installations | |
Nenadovic | Electric traction system rationalisation via Integrated Protection and Control IEC 61850 extended station bus solution | |
JPH11348612A (ja) | 電鉄用き電系統の監視システム | |
Walsh et al. | MV controllable fuses installed to reduce ARC flash on transformer secondary |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20061030 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080129 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080327 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080715 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080903 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090331 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090508 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090602 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090713 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20090804 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20090821 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120828 Year of fee payment: 3 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 4365742 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120828 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130828 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
EXPY | Cancellation because of completion of term |