Building Download PDFInfo
- Publication number
- JP4210312B2 JP4210312B2 JP2007169760A JP2007169760A JP4210312B2 JP 4210312 B2 JP4210312 B2 JP 4210312B2 JP 2007169760 A JP2007169760 A JP 2007169760A JP 2007169760 A JP2007169760 A JP 2007169760A JP 4210312 B2 JP4210312 B2 JP 4210312B2
- Authority
- JP
- Japan
- Prior art keywords
- resin block
- layer
- building
- ground
- resin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011347 resin Substances 0.000 claims description 217
- 229920005989 resin Polymers 0.000 claims description 217
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 85
- 239000002689 soil Substances 0.000 claims description 14
- 230000002093 peripheral effect Effects 0.000 claims description 11
- 230000007774 longterm Effects 0.000 claims description 4
- 239000004576 sand Substances 0.000 claims description 4
- 230000000149 penetrating effect Effects 0.000 claims description 2
- 230000000903 blocking effect Effects 0.000 claims 2
- 238000010276 construction Methods 0.000 description 23
- 230000000694 effects Effects 0.000 description 20
- 239000000463 material Substances 0.000 description 17
- 238000009826 distribution Methods 0.000 description 13
- 238000003780 insertion Methods 0.000 description 11
- 230000037431 insertion Effects 0.000 description 11
- 238000010586 diagram Methods 0.000 description 9
- 239000004575 stone Substances 0.000 description 8
- 230000009471 action Effects 0.000 description 7
- 230000005484 gravity Effects 0.000 description 7
- 230000035699 permeability Effects 0.000 description 6
- 238000002955 isolation Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 4
- 239000007787 solid Substances 0.000 description 4
- 230000007246 mechanism Effects 0.000 description 3
- -1 polypropylene Polymers 0.000 description 3
- 239000004743 Polypropylene Substances 0.000 description 2
- 230000008846 dynamic interplay Effects 0.000 description 2
- 239000006260 foam Substances 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229920001155 polypropylene Polymers 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 239000013585 weight reducing agent Substances 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 239000004698 Polyethylene Substances 0.000 description 1
- 241001314440 Triphora trianthophoros Species 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 229920000122 acrylonitrile butadiene styrene Polymers 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 229920006248 expandable polystyrene Polymers 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 230000002401 inhibitory effect Effects 0.000 description 1
- 238000001746 injection moulding Methods 0.000 description 1
- 229920000573 polyethylene Polymers 0.000 description 1
- 229920000098 polyolefin Polymers 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 230000007480 spreading Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Images
Landscapes
- Foundations (AREA)
Description
本願の発明は、建築物に関するものであり、特に建築物の人工地盤に関するものである。 The invention of the present application relates to a building, and particularly to an artificial ground of a building.
日本は地震の多い国であり、阪神大震災を始めとした大地震の教訓を背景として、免震技術など、地震対策を考慮した建築技術の開発が進められている。また、一連の耐震偽装問題などから、建築物の構造部分についての関心も非常に高くなってきている。
このうち、建築物の地業部構造については、例えば特開平9−275160号公報に開示されているように、発泡樹脂(発泡スチロール)より成る人工地盤材を敷設し、その上にコンクリート材を設けた構造が考案されている。
このような地業部構造は、軽量化された人工地盤材を埋設し、これによってそれより下の地盤にかかる建築物全体の荷重を軽減するものと言える。これは、建築物直下の地盤(土)を軽量の人工地盤材で置換することで接地圧を軽減し、これによって不同沈下等の沈下を防止する技術である。尚、本明細書において単に地盤というときは、人工地盤ではなく、敷地の元々の地盤という意味である。
Among these, as for the geological division structure of a building, for example, as disclosed in JP-A-9-275160, an artificial ground material made of foamed resin (foamed polystyrene) is laid, and a concrete material is provided thereon. The structure has been devised.
It can be said that such a geotechnical part structure embeds lightened artificial ground material, thereby reducing the load of the entire building on the ground below it. This is a technique for reducing ground contact pressure by replacing the ground (soil) directly under the building with a lightweight artificial ground material, thereby preventing subsidence such as uneven settlement. In this specification, the simple ground means not the artificial ground but the original ground of the site.
しかしながら、上記従来の工法では、発泡樹脂人工地盤材を敷き詰めているため、コンクリートのベタ基礎の場合と同様、通水性がない。従って、大雨等で土中水位が上昇した際、せり上がってくる水を地業部が排する状態となり、水位が地表面にまで達して(冠水して)しまうことになり易い。このため、水分の多い軟弱地盤には、この人工地盤は向いていない。
また、発泡樹脂人工地盤材が排水性であることから、降雨により土中水位が上昇すると、人工地盤材に大きな浮力が生ずる。建物部の建築完了後は、建物部の荷重により人工地盤材が押さえつけられるため問題はないが、人工地盤の施工中に降雨があると問題が生ずる。即ち、敷設した発泡樹脂人工地盤材が土中水位上昇により浮き上がってしまい、施工不能になってしまうことがある。このため、排水ポンプで常時排水して土中水位が上がらないようにしたりする等の手間が生じる。
本願の発明は、上記課題を解決するためになされたものであり、建築物の人工地盤構造として、十分な沈下防止効果を持ち、且つ通水性に富む構造を提供することで、軟弱な敷地地盤(以下、軟弱地盤)についても好適に適用することができる人工地盤構造とし、このような構造の人工地盤の上に建物部を構築することで、不同沈下事故の無い信頼性の高い建築物を提供する技術的意義を有するものである。
However, in the conventional construction method, since the foamed resin artificial ground material is spread, there is no water permeability as in the case of the solid solid foundation. Therefore, when the soil water level rises due to heavy rain or the like, the ground industry department is in a state of draining the rising water, and the water level is likely to reach the ground surface (flood). For this reason, this artificial ground is not suitable for soft ground with a lot of moisture.
In addition, since the foamed resin artificial ground material is drainable, when the soil water level rises due to rain, a large buoyancy is generated in the artificial ground material. After the construction of the building part is completed, there is no problem because the artificial ground material is pressed down by the load of the building part, but there is a problem if there is rain during the construction of the artificial ground. That is, there is a case where the foamed resin artificial ground material that has been laid rises due to the rise of the water level in the soil, making the construction impossible. For this reason, troubles, such as always draining with a drainage pump and keeping a soil water level from rising, arise.
The invention of the present application has been made to solve the above-mentioned problems, and provides a structure that has sufficient subsidence prevention effects and is rich in water permeability as an artificial ground structure of a building. (Hereinafter referred to as soft ground) An artificial ground structure that can be suitably applied, and by building a building part on the artificial ground of such a structure, a highly reliable building free from accidental subsidence It has technical significance to provide.
上記課題を解決するため、本願の請求項1記載の発明は、地表面から所定の深さ掘り下げることで形成された凹部内を占めるよう設けられた樹脂ブロック層を含む人工地盤と、人工地盤の上に構築された建物部とから成る建築物であって、
樹脂ブロック層は、樹脂(発泡樹脂を除く)製の樹脂ブロックを多数並べて配置することで形成されたものであり、各樹脂ブロックは通水性の開口を有しており、地中水位が上昇した際に樹脂ブロック層内に地中の水が浸入する構造であり、
前記樹脂ブロックの開口には、上下方向に貫通した開口が含まれていて水が下から上に浸入するようになっており、
前記掘り下げられて形成された凹部の底面と前記樹脂ブロック層との間には捨てコンクリートは設けられておらず、前記樹脂ブロック層の最下面を通して前記樹脂ブロック層の内部に地中の水が浸入する構造であるという構成を有する。
また、上記課題を解決するため、請求項2記載の発明は、前記請求項1の構成において、前記掘り下げられて形成された凹部の底面と前記樹脂ブロック層との間には、前記樹脂ブロック層内に土砂が入らないようにする透水シートが設けられているという構成を有する。
また、上記課題を解決するため、請求項3記載の発明は、地表面から所定の深さ掘り下げることで形成された凹部内を占めるよう設けられた樹脂ブロック層を含む人工地盤と、人工地盤の上に構築された家屋用建物部とから成る家屋用の建築物であって、
樹脂ブロック層は、樹脂(発泡樹脂を除く)製の樹脂ブロックを多数並べて配置することで形成されたものであり、各樹脂ブロックは通水性の開口を有しており、地中水位が上昇した際に樹脂ブロック層内に地中の水が浸入する構造であり、
前記凹部の底面と前記樹脂ブロック層との間には防水層が設けられており、この防水層は、前記凹部の底面の端部において上方に折れ曲がって前記凹部の側壁と前記樹脂ブロック層との間に延びているとともにこの防水層の高さは前記凹部の途中の深さまでであり、防水層の上端部と地表面との間の領域から地中の水が防水層の内側に浸入して防水層の内部に水が溜まるようになっており、
前記樹脂ブロック層及び前記防水層は前記家屋用建物部の直下の位置に設けられていて地中水位が下がった際にも前記家屋用建物部の直下の位置で水が溜まり続ける構造となっており、
前記防水層内に溜められた水を前記家屋用建物部の住人が利用するために取り出す取水管が設けられているという構成を有する。
また、上記課題を解決するため、請求項4記載の発明は、前記請求項1、2又は3の構成において、前記樹脂ブロック層の上面を覆うようにして基準層が設けられており、前記建物部はこの基準層の上に構築されており、基準層の上面は水平な平坦面であり、基準層は、前記樹脂ブロック層を覆うカバー層と、カバー層の上に設けられた捨てコンクリート層とより成っており、捨てコンクリート層は前記樹脂ブロック層から離間して設けられているという構成を有する。
また、上記課題を解決するため、請求項5記載の発明は、前記請求項1乃至4いずれかの構成において、前記樹脂ブロックは、水平な状態とされるベース部と、ベース部から垂直に突出する脚部とを有する形状であり、樹脂ブロックが上下方向に並べられた際、上下のベース部によって開口が形成されるものであり、脚部はベース部の縁よりも内側に設けられており、開口は、上下のベース部の周縁の全周に亘って形成されるという構成を有する。
また、上記課題を解決するため、請求項6記載の発明は、前記請求項5の構成において、前記ベース部は正方形であって、前記脚部は一つの前記ベース部につき四つ設けられていて前記ベース部の正方形の対角線上に位置しているとともに前記ベース部の中心から等距離の位置に設けられているという構成を有する。
また、上記課題を解決するため、請求項7記載の発明は、前記請求項1乃至6いずれかの構成において、前記樹脂ブロック層は、樹脂ブロックを水平方向に並べて配置されることで形成されており、隣り合う樹脂ブロック層を連結する連結具が設けられているという構成を有する。
また、上記課題を解決するため、請求項8記載の発明は、前記請求項1乃至7いずれかの構成において、掘り下げて形成された前記凹部の側壁と前記樹脂ブロック層との間には擁壁層が設けられており、この擁壁層は、通水用の溝又は開口が形成された発泡樹脂ブロックを多数並べて形成したものであるという構成を有する。
また、上記課題を解決するため、請求項9記載の発明は、前記請求項1乃至8いずれかの構成において、前記人工地盤を含む建築物の総重量による接地圧をP、地盤の長期地耐力をqa、地盤の土の単位体積当たりの重量をγとしたとき、前記凹部の深さdは、(P−qa)/γの値以上であるという構成を有する。
また、上記課題を解決するため、請求項10記載の発明は、前記請求項1乃至9いずれかの構成において、前記凹部は、前記建物部の水平方向中央部の直下において深く、水平方向周辺部の直下において浅い形状であり、これに合わせて前記樹脂ブロック層も前記建物部の水平方向中央部の直下において深く、水平方向周辺部の直下において浅い形状であるという構成を有する。
In order to solve the above-mentioned problem, the invention according to
The resin block layer is formed by arranging a large number of resin blocks made of resin (excluding foamed resin) arranged side by side, and each resin block has a water-permeable opening, and the underground water level has increased. When the underground water enters the resin block layer ,
The opening of the resin block includes an opening penetrating in the vertical direction, so that water enters from the bottom to the top,
No discarded concrete is provided between the bottom surface of the recess formed by digging and the resin block layer, and underground water enters the inside of the resin block layer through the bottom surface of the resin block layer. The structure is such that
In order to solve the above problem, the invention according to
Moreover, in order to solve the said subject, invention of
The resin block layer is formed by arranging a large number of resin blocks made of resin (excluding foamed resin) arranged side by side, and each resin block has a water-permeable opening, and the underground water level has increased. When the underground water enters the resin block layer ,
A waterproof layer is provided between the bottom surface of the recess and the resin block layer, and the waterproof layer is bent upward at an end of the bottom surface of the recess and is formed between the side wall of the recess and the resin block layer. The height of the waterproof layer extends to the middle of the recess, and the water in the ground enters the inside of the waterproof layer from the area between the upper end of the waterproof layer and the ground surface. Water is collected inside the waterproof layer,
The resin block layer and the waterproof layer are provided immediately below the building part of the house, and even when the underground water level falls, the water continues to accumulate at a position immediately below the building part of the house. And
It has the structure that the water intake pipe which takes out the water stored in the said waterproof layer in order that the resident of the building part for said houses may use is provided.
In order to solve the above problem, the invention according to
In order to solve the above problem, according to a fifth aspect of the present invention, in the configuration according to any one of the first to fourth aspects, the resin block includes a base portion that is in a horizontal state and a base portion that protrudes vertically from the base portion. to a shape having a leg portion, when the resin blocks are arranged in the vertical direction state, and are not opening is formed by the upper and lower base portion, the leg portion is provided inside the edge of the base portion The opening has a configuration in which the opening is formed over the entire periphery of the upper and lower base portions .
In order to solve the above problem, the invention according to
In order to solve the above problem, the invention according to
In order to solve the above problem, the invention according to
In order to solve the above-mentioned problem, the invention according to
In order to solve the above-mentioned problem, the invention according to
以下に説明する通り、本願の各請求項の発明によれば、先行上載圧を取り除いた部分に、軽量な樹脂ブロックを並べて樹脂ブロック層を形成して地盤置換をしているので、不同沈下などの沈下事故が効果的に防止される。そして、各樹脂ブロックが開口を有していて通水性に富んでいるため、施工中又は施工完了後の建物部未着工の段階で大雨があっても、樹脂ブロックが浮き上がってしまうような事故は無い。従って、ポンプで水を汲み出すような手間は必要無い。 As described below, according to the invention of each claim of the present application, the ground replacement is performed by forming a resin block layer by arranging a lightweight resin block on the portion from which the preceding mounting pressure has been removed. The subsidence accident is effectively prevented. And, since each resin block has an opening and is rich in water permeability, even if there is heavy rain during construction or after the completion of construction, there is an accident that the resin block rises. No. Therefore, there is no need for the trouble of pumping out water with a pump.
次に、本願発明を実施するための最良の形態(以下、実施形態)について説明する。
図1は、第一の実施形態に係る建築物の正面概略図である。図1に示す建築物は、地表面より下に設けられた人工地盤1と、人工地盤1の上に建築された建物部2とより成っている。そして、人工地盤1は、地表面より下の所定の深さの領域を占めるよう設けられた樹脂ブロック層3を備えている。また、樹脂ブロック層3の上には基準層4が設けられており、建物部2は基準層4の上に構築されている。人工地盤1は、建物部2のほぼ直下の領域を占めている。即ち、建物部2が占める水平方向の領域と人工地盤1が占める水平方向の領域はほぼ同じである。
Next, the best mode for carrying out the present invention (hereinafter referred to as an embodiment) will be described.
FIG. 1 is a schematic front view of a building according to the first embodiment. The building shown in FIG. 1 is composed of an
本実施形態の大きな特徴点は、樹脂ブロック層3が、樹脂(発泡樹脂を除く)製の樹脂ブロック5を多数並べることで形成されており、開口を通して内部に水が浸入できる状態とした点である。
図2は、図1に示す樹脂ブロック層3を構成する樹脂ブロック5の概略図であり、(1)が平面概略図、(2)は正面概略図である。樹脂ブロック5は、水平な姿勢とされるベース部51と、ベース部51から垂直に延びるよう形成された脚部52とから成っている。ベース部51は、全体としては正方形の板状である。ベース部51には、軽量化及び通水のため、多くの開口50が形成されている。
A major feature of the present embodiment is that the
FIG. 2 is a schematic view of the
脚部52は、正方形のベース部51の各角の位置に合計4つ設けられている。脚部52の位置は、角の縁から少し内側の位置である。各脚部52は、対角線上に位置し、ベース部51の中心からの距離はすべて同じである。
各脚部52は、全体としてはほぼ角柱状の部位である。但し、各脚部52の内部は軽量化のため空洞になっている。各脚部52は、ベース部51につながった部分で最も断面積が大きく、ベース部51から遠ざかるにしたがって徐々に小さな断面積となっている。即ち、正面から見ると台形状となっている。
各脚部52の高さは皆同じである。各脚部52の上端面には、嵌め込み用の突起(以下、嵌め込み突起)53が形成されている。嵌め込み突起53は、上側に位置させる別の樹脂ブロック5との組み合わせのための部位である。
A total of four
Each
The height of each
図2(1)に示すように、嵌め込み突起53は、各脚部52の上端面に二つずつ形成されている。各嵌め込み突起53は、図2(1)に示すように、各脚部52のほぼ正方形の上端面形状において斜め左上から斜め右下の方向の対角線上に設けられている。
また、各脚部52の上端面には、嵌め込み用の孔(以下、嵌め込み孔)54が形成されている。嵌め込み孔54は、嵌め込み突起53が嵌め込まれる孔である。嵌め込み孔54も、各上端面に二つずつ設けられている。嵌め込み孔54は、平面視で見た場合、斜め右上から斜め左下の方向の対角線上に設けられている。即ち、各脚部52の上端面において、各嵌め込み孔54は各嵌め込み突起53と線対称に配置されている。
As shown in FIG. 2A, two
A fitting hole (hereinafter referred to as a fitting hole) 54 is formed on the upper end surface of each
このような樹脂ブロック5は、人が持ち運んで並べることを想定しているため、人が持ち運べる程度の大きさとされる。一例を示すと、ベース部51は一辺が500〜600mm程度であり、脚部52の長さは200〜500mm程度である。
樹脂ブロック5は、後述するように軽量人工地盤材料として地盤置換に用いられるものであり、必要な強度が確保される範囲でできる限り軽量とされる。また、樹脂ブロック5は、人が持ち運べるという意味でも軽量とされる。具体的には、樹脂ブロック5は、一個につき6kg〜8kg程度の重量である。
Since
As will be described later, the
このような樹脂ブロック5は、全体がポリプロピレン製であり、射出成型により製作されている。このような樹脂ブロック5としては、道路造成等の土木用のものが株式会社林物産(茨城県日立市)からカンカンブロック(商品名)として市販されているので、これを応用しても良い。樹脂ブロック5の材質としては、ポリプロピレンの他、ポリエチレン製、ポリオレフィン製、ABS樹脂製などの樹脂ブロック5を使用しても良い。
Such a
次に、上述した樹脂ブロック5を組み上げて樹脂ブロック層3とする点について説明する。図1に示すように、樹脂ブロック5は、水平方向及び垂直方向に隙間無く並べて敷設される。この際、上下方向では、各嵌め込み突起53を各嵌め込み孔54に嵌め込むことで組み上げを行う。
即ち、図1に示すように、下側の樹脂ブロック5は、脚部52を上に向けて配置される。そして、その上に脚部52を下に向けて別の樹脂ブロック5を配置する。この際、お互いの脚部52を突き合わせ、互いの嵌め込み突起53が互いの嵌め込み孔54に嵌め込まれるようにする。
尚、脚部52を下側に向けて配置された樹脂ブロック5の上には、脚部52を上に向けた別の樹脂ブロック5が積み重ねられるが、この際、ベース部51に設けられた突起(以下、ベース突起)55によって、水平方向のずれが防止されるようになっている。
Next, the point which assembles the
That is, as shown in FIG. 1, the
In addition, another
図2(1)に示すように、ベース突起55は、四つ設けられており、ベース部51の中心と同心円周上に45度間隔で設けられている。また、ベース部51には、相手方のベース突起55が嵌め込まれる孔(以下、ベース孔)56が設けられている。図2(1)に示すように、ベース孔56も、ベース部51と同心の円周上に45度間隔で4つ設けられている。ベース突起55とベース孔56の位置関係は、ベース部51を裏返すと丁度同じ位置になるようずれた位置関係となっている。
従って、二つの樹脂ブロック5をお互いのベース部51を突き合わせた状態で重ね合わせると、一方のベース突起55が他方のベース孔に嵌り込む状態となる。このため、水平方向の位置ずれが防止される。
As shown in FIG. 2A, four
Accordingly, when the two
このような樹脂ブロック5の組み上げについては、水平方向の樹脂ブロック5の連結も行われるようになっている。この点について、図3を使用して説明する。図3は、図2に示す樹脂ブロック5の水平方向の連結構造について示した図であり、(1)は平面概略図、(2)は正面断面概略図である。
水平方向の樹脂ブロック5の連結には、連結具6が用いられる。連結具6は、図3(2)に示すように、プレート部61と、プレート部61から直角に突出するよう設けられた差込突起62とから成る形状である。プレート部61はほぼ方形であり、差込突起62は上下の両面に設けられている。また、上下両面において、差込突起62は四つ設けられており、プレート部61の各対角線上に中心から等距離の位置に設けられている。
As for the assembly of the
A
一方、図2(1)に示すように、樹脂ブロック5の各角部には、差込孔57が形成されている。差込孔57は、差込突起62に断面の形状及び大きさに適合した形状及び大きさのものである。
水平方向に樹脂ブロック5を連結する場合、図3(1)に示すように、各樹脂ブロック5を詰めて並べ、各角部が隣接するようにする。そして、連結具6で各角部を連結する。即ち、隣接した四つの樹脂ブロック5の各差込孔57に差込突起62を差し込む。
尚、図3(2)に示すように、上側に突出した差込突起62は、上側に並べた各樹脂ブロック5の連結に用いられる。各樹脂ブロック5を差込突起62が差込孔57に差し込まれるようにしながら配置することで、水平方向の樹脂ブロック5の連結が行われる。
On the other hand, as shown in FIG. 2 (1), insertion holes 57 are formed at each corner of the
When the resin blocks 5 are connected in the horizontal direction, as shown in FIG. 3A, the resin blocks 5 are packed and arranged so that the corners are adjacent to each other. And each corner | angular part is connected with the
As shown in FIG. 3B, the
このような樹脂ブロック5が組み上げられて形成された樹脂ブロック層3は、軽量であるにもかかわらず建築物の人工地盤1を構成するものとして充分な強度を持つものとなっている。一例として強度を示すと、例えば図2に示すような構成の樹脂ブロック5の場合、一つの樹脂ブロック5としては、0.53t〜3.2tまでの荷重に耐えられるものである。このような樹脂ブロック5を脚部52を突き合わせて重ね合わせ、16t/m2までの荷重に耐えられるようにする。
The
このような樹脂ブロック層3は、建築物が建築される敷地の地表面を所定の深さ掘り下げて形成した凹部に施工される。また、組み上げられた樹脂ブロック層3は、左右の側面と底面が透水シートで覆われ、上面は防水シートで覆われる。
また、図1に示すように、樹脂ブロック層3の周囲には、擁壁層7が設けられている。擁壁層7は、孔あけした発泡樹脂ブロック(有孔発泡樹脂ブロック)71を多数並べて積み上げたものである。
Such a
As shown in FIG. 1, a
図4は、有孔発泡樹脂ブロック71の斜視概略図である。図4に示すように、有孔発泡樹脂ブロック71は、全体としては直方体状である。そして、上面及び下面には、直角に交差する細長い溝72が形成されている。有孔発泡樹脂ブロック71を厚さ方向に貫通する貫通孔73が形成されている。貫通孔73は、溝72の交差部分を含む複数の箇所に設けられている。
また、樹脂ブロック層3の上には、基準層4が設けられている。基準層4は、建物部2を構築する際の基準となる水平面を得るためのものである。本実施形態では、基準層4は、樹脂ブロック層3を覆うカバー層41と、カバー層41の上に設けられた捨てコンクリート層42となり成っている。
FIG. 4 is a schematic perspective view of the perforated foamed
A
カバー層41は、発泡樹脂プレート43を敷き詰めて形成されている。発泡樹脂プレート43は、1820mm×910mm程度の大きさの方形であり、厚さは30〜50mm程度で良い。ここでの発泡樹脂プレート43は、孔あけされたものでなくとも良い。
捨てコンクリート層42は、本実施形態では、ベタ打ちとなっている。捨てコンクリート層42の厚さは、50mm〜100mm程度で良い。基準層4の上面(ここでは捨てコンクリート層42の上面)は、水平な平坦面になるよう施工される。
カバー層41無しに直接捨てコンクリート層42を施工しても良いのであるが、樹脂ブロック5が開口を多く有するため、そのまま捨てコンクリートを施工するのが難しいという事情による。尚、発泡樹脂プレート43に代えて防水シートを用い、防水シートで樹脂ブロック層3の上面を覆った上で捨てコンクリート層を設ける場合もある。
The
The discarded
Although it is possible to construct the
このような基準層4も、人工地盤1を構成するものである。即ち、本実施形態では、樹脂ブロック層3及び基準層4から主に人工地盤1が構成されている。
基準層4の上には、基礎部21が設けられており、その上に建物部2が構築されている。基礎部21は、鉄筋が入ったコンクリートより成る基礎である。基礎部21は、ベタ基礎であったり、布基礎(独立基礎)であったりする。
Such a
A
次に、本実施形態における人工地盤1の作用及び人工地盤1を形成するための敷地の掘り下げ深さについて説明する。
図5は、実施形態の建築物における人工地盤1の作用及び人工地盤1を形成するための敷地の掘り下げ深さについて示した図である。
図5(1)に示すように、建築物が建築された敷地においては、建物部と基礎部とを含めた全体の荷重(以下、総荷重)Wが地盤にかかる。総荷重Wにより地盤にかかる単位面積当たりの重力(圧力)を接地圧と呼ぶ。接地圧(図5中Pで示す)は、建築物全体が地盤に対して圧する力であるから、建築物の最下面における圧力である。
Next, the action of the
FIG. 5 is a diagram illustrating the action of the
As shown in FIG. 5 (1), in the site where the building was built, the entire load (hereinafter referred to as total load) W including the building part and the foundation part is applied to the ground. Gravity (pressure) per unit area applied to the ground by the total load W is called ground pressure. The ground pressure (indicated by P in FIG. 5) is a pressure at the lowermost surface of the building because it is a force that the entire building presses against the ground.
総荷重Wが地盤にかかる場合において、地盤自体も重力バランスに従った力で建築物を受け止めており、接地圧Pがある限度以上にならないと、不同沈下のような沈下事故は発生しない。この地盤が建築物を受け止める圧力を自然地耐力(以下、単に地耐力)と呼び、qaで表す。地耐力qaは、地盤の種類によって異なり、水分を多く含む軟弱地盤ほど弱い。尚、地耐力には、長期地耐力と短期地耐力(地震等による短い期間の急激な振動に耐える力)とがあるが、以下の説明は、長期地耐力を想定している。
例えば三階建て程度までの木造家屋を建築する場合、地耐力qaは30〜50kN/m2程度が必要とされる。しかし、軟弱地盤では30kN/m2を下回るようになる。地耐力qaは、接地圧をPより大きいことが求められ、P>qaであると、沈下事故が生じ得ることになる。
When the total load W is applied to the ground, the ground itself receives the building with a force according to the gravity balance, and if the ground pressure P does not exceed a certain limit, a subsidence accident such as non-uniform subsidence does not occur. The pressure at which the ground receives the building is called natural ground strength (hereinafter simply referred to as ground strength) and is represented by qa. The ground strength qa varies depending on the type of ground, and is weaker in soft ground containing more water. In addition, there are long-term proof strength and short-term proof strength (power that can withstand a rapid vibration in a short period due to an earthquake, etc.), but the following explanation assumes long-term proof strength.
For example, when building a wooden house up to about three stories, the earth strength qa is required to be about 30 to 50 kN / m 2 . However, it becomes less than 30 kN / m 2 in soft ground. The earth bearing strength qa is required to have a ground pressure greater than P. If P> qa, a settlement accident may occur.
図5(1)に示すように、総荷重Wの建築物があったとし、その接地圧がPであるとする。この際、Wの重量になる分量の地表面からの地盤(地中)の領域をSとする。この領域Sの最下面においては、2Wの荷重による接地圧が生じているが、その周囲の地盤中の同じ深さのレベルでは、丁度Wの荷重による接地圧P’,P”が生じており、これを地耐力qaが受け止めている状態である。
ここで、図5(2)に示すように、建築物の下の地盤を掘り下げ、領域Sの分だけ空間(凹部)を作る。この空間に、荷重が実質的にゼロとみなせる支持構造物(即ち、人工地盤)を構築したとする。こうすると、掘り下げて形成した凹部の底面での接地圧は、人工地盤の荷重がゼロであるから、建築物の荷重Wによる接地圧Pのままである。このため、その深さにおける周囲の地盤中の接地圧P’,P”と実質的に等しくなり、従って建築物の総荷重Wによる沈下事故は発生しない。
これは、建築物の下の地盤をその建築物の荷重分だけ取り払って荷重ゼロの空間を作ることで、接地圧を周囲の地盤中の接地圧と等しくし、沈下を防止する技術であると言える。いわば、建築物を船のように浮かべる技術であるとも言える。
As shown in FIG. 5 (1), it is assumed that there is a building with a total load W, and the ground pressure is P. At this time, an area of the ground (underground) from the ground surface in an amount corresponding to the weight of W is defined as S. At the lowermost surface of this region S, the contact pressure is generated by the load of 2W, but at the same depth level in the surrounding ground, the contact pressures P ′ and P ″ due to the load of W are generated. This is a state where the ground strength qa is receiving.
Here, as shown in FIG. 5 (2), the ground below the building is dug down to create a space (concave portion) corresponding to the area S. It is assumed that a support structure (that is, artificial ground) in which the load can be regarded as substantially zero is constructed in this space. If it carries out like this, since the load of the artificial ground is zero, the ground pressure in the bottom face of the recessed part formed by digging down remains the ground pressure P by the load W of the building. For this reason, it becomes substantially equal to the ground contact pressure P ′, P ″ in the surrounding ground at that depth, so that no subsidence accident due to the total load W of the building occurs.
This is a technology that prevents the subsidence by making the ground pressure equal to the ground pressure in the surrounding ground by creating a zero-load space by removing the ground under the building by the load of the building. I can say that. In other words, it can be said to be a technology that floats buildings like ships.
但し、実際には、建築物の荷重分まで取り払わなくても良く、建築物による接地圧Pが地耐力qaを上回る分に見合うだけ取り払えば良い。従って、このような軽量人工地盤材による地盤置換を一般的な式で示すと、以下のようになる。
d=(P−qa)/γ
この式で、dは地盤を掘り下げる深さ(m)、Pは総荷重(人工地盤を含む)Wによる接地圧(kN/m2)、qaはその地盤の地耐力(kN/m2)、γはその地盤の土の単位体積当たりの重力(kN/m3)である。つまり、接地圧が地耐力を上回る分を土の単位体積当たりの重力で割った分だけ掘り下げて軽量人工地盤材で置換しておけば良い。
尚、上記式で、dは最低限の値であり、さらに深く掘れば(dを大きくすれば)、さらに沈下防止の効果が高まる。つまり、上記式は、
d≧(P−qa)/γ
とするのが正しい。
However, in practice, it is not necessary to remove the load of the building, and it is only necessary to remove the amount corresponding to the ground pressure P due to the building exceeding the ground strength qa. Therefore, when the ground replacement by such a lightweight artificial ground material is expressed by a general formula, it is as follows.
d = (P−qa) / γ
In this equation, d is the depth of digging the ground (m), P is the contact pressure (kN / m 2 ) due to the total load (including the artificial ground) W, qa is the ground strength (kN / m 2 ) of the ground, γ is gravity (kN / m 3 ) per unit volume of the soil of the ground. In other words, it is only necessary to dig up the portion of the contact pressure exceeding the earth bearing strength divided by the gravity per unit volume of soil and replace it with lightweight artificial ground material.
In the above formula, d is a minimum value, and if it is dug deeper (d is increased), the effect of preventing settlement is further increased. In other words, the above formula is
d ≧ (P−qa) / γ
Is correct.
上記各式において、dγは、地盤の土の単位体積当たりの重量に掘り下げ深さを掛けたものである。これは、掘り下げて形成した凹部空間において、掘り下げて取り出した土の全量が元々その空間において作用させていた単位面積当たりの重力(圧力)である。このような重力は、先行上載圧と呼ばれる。上記のような軽量人工地盤材による地盤置換は、接地圧が地耐力を上回る分だけ先行上載圧を取り除き、それによって沈下を防止するものに他ならない。 In each of the above formulas, dγ is obtained by multiplying the weight per unit volume of the soil of the ground by the digging depth. This is the gravitational force (pressure) per unit area that the entire amount of soil that has been dug and taken out in the recessed space that has been dug down was originally acting in that space. Such gravity is called pre-loading pressure. The ground replacement by the lightweight artificial ground material as described above is nothing but a method for removing the preceding top-loading pressure by the amount that the ground pressure exceeds the ground strength, thereby preventing the settlement.
実際の基礎設計においては、施工する敷地の地盤の地耐力、土の単位体積当たりの重量を予め調べておく。そして、建物部2の総重量と、樹脂ブロック層3を含む人工地盤1の総重量とを合算して総重量Wを求め、接地圧Pを計算しておく。接地圧Pは、地盤に対し総荷重Wがかかる面積(本実施形態では、人工地盤1の最下部の面積)で総重量Wを割った値である。このようにして求めた各値を上記式に代入して最低限のdの値を求め、その値から余裕を見てある程度大きい値を実際のdとして採用するようにする。
In the actual foundation design, the ground strength of the ground of the construction site and the weight per unit volume of the soil are examined in advance. Then, the total weight W is obtained by adding the total weight of the
次に、上記のような構造を有する基礎の施工方法について、図6を使用して説明する。図6は、図1に示す建築物の人工地盤1の施工方法について示した概略図である。以下の説明により、実施形態の人工地盤1の更に具体的な構造が明らかにされる。
まず、建築物を建築する敷地を掘り下げ、凹部8を形成する(図6(1))。掘り下げる水平方向の領域は、建物部2の施工領域と同じかそれよりより少し広い程度である。掘り下げる深さは、上記計算式に従って適宜決定される。
Next, the foundation construction method having the above structure will be described with reference to FIG. FIG. 6 is a schematic view showing a construction method of the
First, the site where the building is built is dug down to form the recess 8 (FIG. 6 (1)). The horizontal area to be dug is the same as or slightly wider than the construction area of the
次に、掘り下げて形成した凹部8の底面や側面をならして整地し、砕石等により突き固める。透水シート81で凹部8の底面や側面を覆う。次に、底面8には砕石82を敷き詰め、側面にも砕石82を敷き詰める。
次に、砕石82の内側に擁壁層7を施工する。上記の通り、通水用の溝及び孔を有する有孔発泡樹脂ブロック71を積み上げ、擁壁層7とする。擁壁層7を側面に沿って周状に形成した後、その内側に樹脂ブロック層3を施工する。予め、透水シートを底面及び側面に敷き、その内側に樹脂ブロック5を並べていく。即ち、前述したように、樹脂ブロック5を水平に並べて相互に連結した後、その上にさらに樹脂ブロック5を積み上げて組み上げ、樹脂ブロック層3とする(図6(3))。そして、防水シート30で樹脂ブロック層3の上面を覆う。
Next, the bottom surface and side surfaces of the
Next, the retaining
その後、樹脂ブロック層3の上に発泡樹脂プレート43を敷設してカバー層41とし、その上に捨てコンクリート層42を施工する。そして、砕石82等の部分に残っている隙間を埋めるため、砕石や土で埋め戻しを行うと、最終的に人工地盤1が完成する(図6(4))。尚、捨てコンクリート層42は、地表面より低い位置となっているが、捨てコンクリート42の上面が地表面と同じ高さとされたり、地表面よりも高い位置とされることもある。また、地表面から所定の高さまで捨てコンクリート層42が施工される場合もある。
尚、建物部2については、特に限定されるものではなく、従来のものと同様に自由に設計、施工できる。
Thereafter, a foamed
In addition, about the
上述したように、本実施形態の建築物は、先行上載圧を取り除いた部分に、軽量な樹脂ブロック5を並べて組み上げた樹脂ブロック層3を設けて地盤置換をしているので、不同沈下などの沈下事故が抑制される。
また、擁壁層7は、凹部の側面が崩れるのを防止し、土砂が樹脂ブロック層3内に進入しないようにしている。前述したように、上下に積み重ねた樹脂ブロック5の側面は開口であり、このままでは凹部の側面を擁護する作用は弱い。そこで、擁壁層7を設けて側面を擁護している。この場合も、通水性が阻害されないよう、有孔発泡樹脂ブロック71を用いる。
As described above, the building of this embodiment is provided with the
Further, the retaining
また、有孔発泡樹脂ブロック71は軽量であるので、軽量人工地盤の一部として用いることも可能である。即ち、図1に示す実施形態では、擁壁層7に建物部2の荷重が直接かからないようになっているが、擁壁層7が建物部2の直下の位置になるようにして建物部2の荷重がかかるようにしても良い。この場合、有孔発泡樹脂ブロック71より成る擁壁層7は、軽量人工地盤の一部であり、上述したような地盤置換に資することになる。
Moreover, since the perforated foamed
また、樹脂ブロック層3内に自由に水が浸入できる点は、軟弱地盤における施工の点で特に有利な構造となっている。この点について、図7を使用して説明する。図7は、図1に示す人工地盤1の効果について示した概略図である。図7中、(1)は従来のような発泡樹脂ブロック9を多数敷き詰め、積み上げて形成した人工地盤1について示し、(2)は実施形態の人工地盤1について示している。
図7(1)に示すように、発泡樹脂ブロック9を多数敷き詰め、積み上げて形成した人工地盤1では、発泡樹脂ブロック9同士の隙間には水が若干浸入できるものの、発泡樹脂ブロック9自体に通水性が無く、人工地盤1は全体としては排水性(内部に水が浸入することを許さないという意味)である。このため、大雨などで地盤中に大量の水100が浸入して地中水位が上がった場合、水100が地表面にまで達してしまう(冠水してしまう)ことになり易い。
Further, the point that water can freely enter the
As shown in FIG. 7 (1), in the
一方、図7(2)に示すように、実施形態の人工地盤1によれば、樹脂ブロック層3中に水が自由に浸入するので、地盤中の水位上昇が緩和され、冠水にまで達する可能性が低減される。いわば、樹脂ブロック層3を、軽量人工地盤材による地盤置換とともに増水時の貯水層(プール)として利用している。このため、軟弱地盤に施工されるものとして非常に好ましいものとなる。例えば、以前は田圃又は沼地であったような場所は、地中水位が高い場合が多く、大雨により冠水し易いことが多いが、このような場所であっても、実施形態の人工地盤1を施工することで大雨が降っても冠水しないようにすることができる。
On the other hand, as shown in FIG. 7 (2), according to the
また、従来の発泡樹脂ブロック5より成る人工地盤1では、発泡樹脂ブロック9に通水性が無いので、施工中に大雨が降ると、浮き上がり事故が発生し易い。即ち、発泡樹脂ブロック9を並べて敷設した後の建物部2を構築する前の段階で、大雨が降り、掘り下げて形成した凹部内に水が溜まってしまうと、発泡樹脂ブロック9が浮き上がってしまう事故が発生する。これを防止するため、発泡樹脂ブロック9の施工中や、施工完了後の建物部2の施工開始前の段階では、大雨が降るとポンプによる水の汲み出し作業などが必要になる。
一方、本実施形態では、各樹脂ブロック5自体が開口を有していて通水性に富んでいるため、施工中又は施工完了後の建物部2未着工の段階で大雨があっても、樹脂ブロック5が浮き上がってしまうような事故は防ぐことができる。従って、ポンプで水を汲み出すような手間は必要無い。
Moreover, in the
On the other hand, in this embodiment, since each
次に、本願発明の建築物の第二の実施形態について説明する。
図8は、第二の実施形態に係る建築物の正面概略図である。図8に示す実施形態では、人工地盤1を貯水層として利用して渇水時に利用できるようにした点に技術的意義がある。
即ち、図8に示す実施形態では、掘り下げて形成した凹部の底面と側面には、防水層10が設けられている。防水層10は、例えば防水シートを敷設したり、多数の防水プレートを並べて防水性の接着材で接着したりすることで形成できる。
尚、側面における防水層10の高さは、必要に応じて凹部の深さの途中までであり、地表面には達していない。この実施形態では、樹脂ブロック層3の高さの1/3程度である。また、防水層10の内部と地表面とをつなぐようにして、取水管11が設けられており、取水管11には不図示のポンプが設けられている。
Next, a second embodiment of the building of the present invention will be described.
FIG. 8 is a schematic front view of a building according to the second embodiment. The embodiment shown in FIG. 8 is technically significant in that the
That is, in the embodiment shown in FIG. 8, the
In addition, the height of the
この実施形態では、大雨が降って地中水位が上がった際、防水層10の内側に水が浸入する。浸入した水は、水が引いて地中水位が下がった後も防水層10内に溜まり続ける。溜まった水は、渇水時に取水管11を通してポンプで汲み上げ、庭先への散水等に利用することができる。尚、軽量人工地盤材による地盤置換の効果は、前述した実施形態と同様である。
この実施形態によれば、地盤置換をした人工地盤1によって沈下事故が防止できるとともに人工地盤1が増水時の水溜めとして利用でき、さらに防水層10内の水を渇水時に利用することができ、一石三鳥の効果がある。
In this embodiment, when heavy rain falls and the underground water level rises, water enters the inside of the
According to this embodiment, a subsidence accident can be prevented by the
次に、本願発明の建築物に係る第三の実施形態について説明する。
図9は、第三の実施形態の建築物の正面概略図である。この実施形態の人工地盤1は、凹部が建物部2の水平方向中央部の直下において深く、水平方向周辺部の直下において浅い形状であり、これに合わせて樹脂ブロック層3も建物部2の水平方向中央部の直下において厚く、水平方向周辺部の直下において薄い形状となっている。
尚、図9では樹脂ブロック層3の詳細は省略されているものの、前述した説明から解る通り、樹脂ブロック5を並べ方を適宜変更することで、このような形状の樹脂ブロック層3を得ることができる。
Next, 3rd embodiment which concerns on the building of this invention is described.
FIG. 9 is a schematic front view of a building according to the third embodiment. In the
Although details of the
このような人工地盤1の技術的意義について、図10を使用して説明する。図10は、図9に示す建築物の人工地盤1の技術的意義について示した正面概略図である。前述したように、地盤に対しては、建築物の総重量に応じた接地圧がかかり、地耐力がこれに抗して作用している。この際、地中には建築物の総重量に応じた応力(地中応力)が生じている。
地中応力は接地圧によって生ずるから、図10に示すように、地中応力S1〜S4は、建築物の最下部の各点から広がるように分布する。地中において、地表面と平行な面で見た応力Sの分布は、建築物の最下部の各点からの応力S1〜S4を合成したものとなる。従って、図10に示すように、合成応力Sは、建築物の中央部の直下部分において大きく、周辺部において小さい分布となる。
The technical significance of the
Since the underground stress is generated by the ground pressure, as shown in FIG. 10, the underground stresses S1 to S4 are distributed so as to spread from the lowest points of the building. In the ground, the distribution of the stress S seen in a plane parallel to the ground surface is a combination of the stresses S1 to S4 from the lowermost points of the building. Therefore, as shown in FIG. 10, the composite stress S has a large distribution in the portion immediately below the central portion of the building and a small distribution in the peripheral portion.
このような分布の応力が全体として生じている場合に、図1に示すように均一な深さの凹部を形状して樹脂ブロック層3の厚さを均一なものとしても、前述したように充分に沈下事故防止の効果が得られる。しかし、樹脂ブロック層3の厚さの分布を応力の分布に応じたものにしておくと、限られた量の樹脂ブロック5を効率よく利用しつつ沈下事故防止の効果を得ることができる。この第三の実施形態は、この点に技術的意義を有する。
When the stress of such distribution occurs as a whole, as shown in FIG. 1, it is sufficient as described above even if the concave portion having a uniform depth is formed and the thickness of the
即ち、図9に示すように、建物部2の水平方向中央部の直下において地盤を深く掘って先行上載圧を大きく取り去り、水平方向周辺部の直下において浅く掘って先行上載圧を少なく取り去る。そして、建物部2の水平方向中央部の直下において樹脂ブロック層3を厚く(樹脂ブロック5の積み重ね段数を多く)し、水平方向周辺部の直下において樹脂ブロック層3を薄くし(樹脂ブロック5の積み重ね段数を少なく)する。これは、軽量人工地盤材による地盤置換の分布(接地圧緩和の分布)を応力分布に適合させたものである。つまり、図10に示すように、上に凸となる応力Sの分布に合わせて、下に凸となる分布Rで地盤置換を行う。このようにすると、応力の大きな中央部において効率よく接地圧が緩和され、より均一化された地中応力の分布S’が得られる。
このようにすると、樹脂ブロック5の使用効率が向上するので、沈下事故を効果的に防止しつつも全体の樹脂ブロック5の使用量を減らすことができ、施工コストを安く抑えることができる。
That is, as shown in FIG. 9, the ground is deeply dug directly under the central portion in the horizontal direction of the
If it does in this way, since the use efficiency of the
次に、図11を使用して、さらに別の実施形態について説明する。図11は、さらに別の実施形態における樹脂ブロック層3の構成について示した正面概略図である。
まず、図2に示す樹脂ブロック5を用いた場合、前述したように脚部52を突き合わせて重ねるのではなく、脚部52を上に向けた状態で順次重ねていっても良い。この場合、一番上の樹脂ブロック5に蓋をするように設けられるカバー用樹脂ブロックが別に用意される。カバー用樹脂ブロックは、図2に示す樹脂ブロック5のうちの脚部52の無い形状のものである。
また、樹脂ブロック5の形状としては、図11(2)に示すようなものでも良い。図11(2)は正面断面概略図となっているが、ここに示すものは、上端が開口になっている直方体のボックス状で、中央に補強用の脚部52が形成されている形状のものである。ボックスの側面や底面には、同様に開口50が多く設けられ、通水が確保されるとともに軽量化が図られる。
Next, still another embodiment will be described with reference to FIG. FIG. 11 is a schematic front view showing the configuration of the
First, when the
Further, the shape of the
次に、図12を使用して、水平方向において人工地盤1が占める領域と建物部2が占める領域との関係について説明する。図12は、水平方向において人工地盤1が占める領域と建物部2が占める領域との関係について示した図である。
上記実施形態では、水平方向において人工地盤1が占める領域と建物部2の最下部が占める領域とは同じであった。即ち、例えば建物部2の最下部が長方形である場合、人工地盤1も同じ大きさの長方形であり、建物部2の直下の領域を占める。しかし、本願発明の実施に際しては、両者の領域が同じでなくとも良い。即ち、図12(1)に示すように、人工地盤1の領域が建物部2より狭くともよく、図12(2)に示すように、人工地盤1の領域が建物部2より大きくても良い。
Next, the relationship between the area occupied by the
In the said embodiment, the area | region which the
但し、図12(1)に示す場合は、人工地盤1が占めていない建物部2の直下の部分において、先行上載圧は取り去れていない。この部分の土の重力も、計算上は総荷重に入れる必要があり、従って、建物部の荷重が大きい場合とか、地耐力が小さい場合などには、沈下事故防止の効果が充分に得られなくなる場合もあり得る。
また、図12(2)の場合、はみ出し部分の樹脂ブロック層3は、接地圧の緩和には大きくは関与しない。水平方向の樹脂ブロック5が充分に連結されている場合、建物部2の水平方向周辺部の直下に位置で作用する接地圧を分散する効果はあるが、周辺部については、前述したように地中応力が小さいので、接地圧の分散はそれほど必要ではない。従って、必要以上に掘り下げを行い、樹脂ブロック5を使用しているとも言える。
これらの場合と比べると、前述した実施形態は、必要充分な領域を掘り下げて必要充分な量の樹脂ブロック5を使用しており、効果やコストの面で最適であると言える。
However, in the case shown in FIG. 12 (1), the preceding top loading pressure is not removed in the portion directly under the
In the case of FIG. 12 (2), the
Compared to these cases, the above-described embodiment uses a necessary and sufficient amount of the
上述した各実施形態において、降雨時に地中水位が上昇した際、樹脂ブロック層3内に水が浸入して溜まる構成は、耐震性の点でも良好である。樹脂ブロック層3内に水が浸入して溜まると耐震性が向上するメカニズムの一つは、いわゆる動的相互作用と呼ばれる作用に相当するものである。動的相互作用は、剛性の高い地盤の上に軟弱な地盤があり、そこに振動(地震)が伝わった場合、振動に位相差が生じて振動が軽減される作用である。本願発明の各実施形態においても同様な効果があり、樹脂ブロック層3内に水が溜まると、そこでは振動の伝わり方が遅くなり、結果的に免震効果が現れる。
In each of the above-described embodiments, the structure in which water enters and accumulates in the
別の耐震性向上のメカニズムは、水が溜まることによるバラスト効果である。地震により液状化現象が発生した場合、水(地震による過剰間隙水)が樹脂ブロック層3内に入り込み、建築物全体の重心を下げる効果を生ずる。この結果、建築物が安定し、振動が軽減される。この効果は、大型船のバラストタンクやアンチローリングタンクの作用と類似している。
Another mechanism for improving earthquake resistance is the ballast effect caused by water accumulation. When a liquefaction phenomenon occurs due to an earthquake, water (excess pore water due to the earthquake) enters the
さらに別の耐震性向上のメカニズムは、敷地地盤と建築物との共振を阻害する効果である。周知のように、地震が生ずると、敷地地盤はその地点固有の周期で卓越して揺れ、この周期は卓越周期と呼ばれる。そして、建築物自体も固有の周期で揺れる。敷地地盤の卓越周期と建築物の固有周期が近くなってくると、建築物は敷地地盤の揺れに共鳴して揺れることになり、建築物に大きな被害が生じる。
ここで、周知のように、P波(縦揺れ)は水や空気中でも伝わるが、S波(横揺れ)は水や空気中では伝わらない。従って、各実施形態のように建物部2の下に空洞を多く有する人工地盤1を設けたり、人工地盤1中を水が溜まるようにしたりすると、そこではS波は伝わらなくなる。この結果、敷地地盤の卓越周期と建築物の固有周期が近い値であったとして、人工地盤1が共振を阻害する(狂わせる)よう作用し、建物部2の揺れが軽減されることになる。
Yet another mechanism for improving earthquake resistance is the effect of inhibiting the resonance between the site ground and the building. As is well known, when an earthquake occurs, the site ground shakes predominately with a period specific to the site, and this period is called the predominate period. And the building itself sways with its own period. When the prevailing cycle of the site ground and the natural cycle of the building become closer, the building will sway in resonance with the shaking of the site ground, causing significant damage to the building.
Here, as is well known, the P wave (pitch) is transmitted in water and air, but the S wave (roll) is not transmitted in water and air. Therefore, when the
尚、上記各効果において、水の免震作用は、降水時や液状化現象が生じた時などに地中水位が上昇して樹脂ブロック層3内に水が浸入した時に特に得られるが、図8に示す実施形態においても勿論得られる。図8に示す実施形態の場合、地中水位が人工地盤1の最下部よりも下に下がった場合でも水が溜まっているので、この状態の時に地震が起きた場合でも免震効果が得られる。
また、上述した免震効果は、地震による振動に限らず、トラック又は電車の往来、工事等により生ずる振動についても基本的に同様である。
In each of the above effects, the seismic isolation action of water is obtained particularly when the underground water level rises and water enters the
The above-mentioned seismic isolation effect is basically the same not only for vibration caused by earthquakes but also for vibrations caused by traffic or construction of trucks or trains.
本願発明の最も基本的な実施形態は、掘り下げて形成した凹部内に樹脂ブロック5を並べて樹脂ブロック層3を形成した構造であり、図1に示す実施形態のように、基準層4や擁壁層7を備えることは必須の条件ではない。
樹脂ブロック層3の最上面が水平な平坦面であれば、基準層4は不要である。また、図11(2)に示すような側面部分を有する樹脂ブロック5を使用すれば、その側面部分で擁壁ができる場合があり、擁壁ブロックは不要となる。但し、この場合も、開口から土砂が入らないよう、目の細かい透水シートなどを介在させる場合はある。
また、樹脂ブロック5は、水平方向に並べただけ(1段のみの樹脂ブロック5)でも実施できる場合がある。また、建物部2の水平方向の領域が小さい場合、水平方向に樹脂ブロック5を並べる必要はなく(水平方向は1個のみの樹脂ブロック5)、上下方向に並べただけで樹脂ブロック層3が形成できる場合もある。
The most basic embodiment of the present invention is a structure in which a
If the uppermost surface of the
Moreover, the
1 人工地盤
2 建物部
21 基礎部
3 樹脂ブロック層
4 基準層
41 カバー層
42 捨てコンクリート層
5 樹脂ブロック
6 連結具
7 擁壁層
71 有孔発泡樹脂ブロック
81 透水シート
82 砕石
10 防水層
11 取水管
DESCRIPTION OF
Claims (10)
樹脂ブロック層は、樹脂(発泡樹脂を除く)製の樹脂ブロックを多数並べて配置することで形成されたものであり、各樹脂ブロックは通水性の開口を有しており、地中水位が上昇した際に樹脂ブロック層内に地中の水が浸入する構造であり、
前記樹脂ブロックの開口には、上下方向に貫通した開口が含まれていて水が下から上に浸入するようになっており、
前記掘り下げられて形成された凹部の底面と前記樹脂ブロック層との間には捨てコンクリートは設けられておらず、前記樹脂ブロック層の最下面を通して前記樹脂ブロック層の内部に地中の水が浸入する構造であることを特徴とする建築物。 An artificial ground including a resin block layer provided so as to occupy a concave portion formed by digging a predetermined depth from the ground surface, and a building constructed on the artificial ground,
The resin block layer is formed by arranging a large number of resin blocks made of resin (excluding foamed resin) arranged side by side, and each resin block has a water-permeable opening, and the underground water level has increased. When the underground water enters the resin block layer ,
The opening of the resin block includes an opening penetrating in the vertical direction, so that water enters from the bottom to the top,
No discarded concrete is provided between the bottom surface of the recess formed by digging and the resin block layer, and underground water enters the inside of the resin block layer through the bottom surface of the resin block layer. A building characterized by its structure .
樹脂ブロック層は、樹脂(発泡樹脂を除く)製の樹脂ブロックを多数並べて配置することで形成されたものであり、各樹脂ブロックは通水性の開口を有しており、地中水位が上昇した際に樹脂ブロック層内に地中の水が浸入する構造であり、
前記凹部の底面と前記樹脂ブロック層との間には防水層が設けられており、この防水層は、前記凹部の底面の端部において上方に折れ曲がって前記凹部の側壁と前記樹脂ブロック層との間に延びているとともにこの防水層の高さは前記凹部の途中の深さまでであり、防水層の上端部と地表面との間の領域から地中の水が防水層の内側に浸入して防水層の内部に水が溜まるようになっており、
前記樹脂ブロック層及び前記防水層は前記家屋用建物部の直下の位置に設けられていて地中水位が下がった際にも前記家屋用建物部の直下の位置で水が溜まり続ける構造となっており、
前記防水層内に溜められた水を前記家屋用建物部の住人が利用するために取り出す取水管が設けられていることを特徴とする建築物。 And artificial ground containing a resin block layer provided so as to occupy a recess formed by digging a predetermined depth from the ground surface, a building for house consisting of house buildings unit built on artificial ground Because
The resin block layer is formed by arranging a large number of resin blocks made of resin (excluding foamed resin) arranged side by side, and each resin block has a water-permeable opening, and the underground water level has increased. When the underground water enters the resin block layer ,
A waterproof layer is provided between the bottom surface of the recess and the resin block layer, and the waterproof layer is bent upward at an end of the bottom surface of the recess and is formed between the side wall of the recess and the resin block layer. The height of the waterproof layer extends to the middle of the recess, and the water in the ground enters the inside of the waterproof layer from the area between the upper end of the waterproof layer and the ground surface. Water is collected inside the waterproof layer,
The resin block layer and the waterproof layer are provided immediately below the building part of the house, and even when the underground water level falls, the water continues to accumulate at a position immediately below the building part of the house. And
Building, characterized in that the intake pipes for taking out the reservoir was water to the waterproof layer to residents of the house buildings section is utilized is provided.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2007169760A JP4210312B2 (en) | 2007-06-27 | 2007-06-27 | Building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2007169760A JP4210312B2 (en) | 2007-06-27 | 2007-06-27 | Building |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2008150907A Division JP4967105B2 (en) | 2008-06-09 | 2008-06-09 | Seismic isolation method for buildings |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2008231900A JP2008231900A (en) | 2008-10-02 |
JP4210312B2 true JP4210312B2 (en) | 2009-01-14 |
Family
ID=39905031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2007169760A Active JP4210312B2 (en) | 2007-06-27 | 2007-06-27 | Building |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4210312B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4882021B1 (en) * | 2010-12-24 | 2012-02-22 | 春彦 極檀 | Heat exchange system |
JP2016196785A (en) * | 2015-04-06 | 2016-11-24 | 有限会社アルコイハラ | Manufacturing method for improved ground structure, improved ground structure, auxiliary member for ground improvement, and fabrication kit for auxiliary member for ground improvement |
JP2017036609A (en) * | 2015-08-11 | 2017-02-16 | 有限会社アルコイハラ | Ground improvement method and improved ground |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5801599B2 (en) * | 2011-05-09 | 2015-10-28 | 株式会社プラント・ツリース | Building |
JP5953137B2 (en) * | 2012-06-15 | 2016-07-20 | 株式会社サムシング | Foundation structure |
JP6343749B2 (en) * | 2013-03-01 | 2018-06-20 | 株式会社 林物産発明研究所 | Seismic isolation material for liquefied ground |
JP5938454B2 (en) * | 2014-09-11 | 2016-06-22 | 株式会社プラント・ツリース | Seismic isolation structure in structures |
JP6240625B2 (en) * | 2015-02-09 | 2017-11-29 | 株式会社プラント・ツリース | Retaining wall, creation site and creation method of creation site |
JP2021031930A (en) * | 2019-08-22 | 2021-03-01 | フクビ化学工業株式会社 | Method for designing foundation structure of detached building |
JP7326684B2 (en) * | 2019-11-25 | 2023-08-16 | 株式会社竹中工務店 | Vertical dynamic seismic isolation method for structures |
-
2007
- 2007-06-27 JP JP2007169760A patent/JP4210312B2/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4882021B1 (en) * | 2010-12-24 | 2012-02-22 | 春彦 極檀 | Heat exchange system |
JP2016196785A (en) * | 2015-04-06 | 2016-11-24 | 有限会社アルコイハラ | Manufacturing method for improved ground structure, improved ground structure, auxiliary member for ground improvement, and fabrication kit for auxiliary member for ground improvement |
JP2017036609A (en) * | 2015-08-11 | 2017-02-16 | 有限会社アルコイハラ | Ground improvement method and improved ground |
Also Published As
Publication number | Publication date |
---|---|
JP2008231900A (en) | 2008-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4210312B2 (en) | Building | |
JP4967105B2 (en) | Seismic isolation method for buildings | |
KR20150047172A (en) | The water permeable block with rain water storage and comstruction method using it | |
JP4625987B2 (en) | Water storage device and its construction method | |
US6913418B2 (en) | Underwater building unit and methods of installation and application thereof | |
KR101633853B1 (en) | An eco-friendly gabibolck for retaining wall with modular retaining wall | |
JP4958064B2 (en) | Seismic reinforcement structure of quay | |
JP5877482B2 (en) | Structure for reducing liquefaction damage of structures | |
JP2007247151A (en) | Foundation of building and method of constructing foundation of building | |
KR100737331B1 (en) | Slope Reinforcement Block for Landscaping | |
JP2016145500A (en) | Retaining wall, developed land and developing method of developed land | |
JP5801599B2 (en) | Building | |
KR100627628B1 (en) | Connection Structure Construction Method of Harbors at Deep Sea Using with Caisson | |
JP2002115280A (en) | Water storage device | |
JPH11293675A (en) | Light-weighted banking construction method, light-weighted banking construction, and concrete block for light-weighted banking | |
JP2001115508A (en) | Water storage block and rainwater storage structure making use thereof | |
CN216839546U (en) | Ecological retaining wall of hydraulic engineering | |
JP2012046908A (en) | Bank protection retaining wall structure | |
JP3903313B2 (en) | Basic structure of the structure | |
JPH0536044Y2 (en) | ||
JP5067759B2 (en) | Rainwater storage facilities and infiltration facilities | |
JP5620850B2 (en) | Rainwater storage and infiltration facilities | |
KR100708895B1 (en) | Stack-type block, multistage stack-type civil work structure and construction method thereof | |
JP2010209528A (en) | Lateral flow countermeasure structure | |
JP4528176B2 (en) | Lightweight embankment structure with buoyancy countermeasure structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20080708 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080930 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20081024 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 Ref document number: 4210312 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111031 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111031 Year of fee payment: 3 |
|
S201 | Request for registration of exclusive licence |
Free format text: JAPANESE INTERMEDIATE CODE: R314201 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111031 Year of fee payment: 3 |
|
R360 | Written notification for declining of transfer of rights |
Free format text: JAPANESE INTERMEDIATE CODE: R360 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111031 Year of fee payment: 3 |
|
R370 | Written measure of declining of transfer procedure |
Free format text: JAPANESE INTERMEDIATE CODE: R370 |
|
S201 | Request for registration of exclusive licence |
Free format text: JAPANESE INTERMEDIATE CODE: R314201 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111031 Year of fee payment: 3 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111031 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121031 Year of fee payment: 4 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131031 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |