JP3931274B2 - Purification method for heavy metal contaminated soil - Google Patents

Purification method for heavy metal contaminated soil Download PDF

Info

Publication number
JP3931274B2
JP3931274B2 JP2002267506A JP2002267506A JP3931274B2 JP 3931274 B2 JP3931274 B2 JP 3931274B2 JP 2002267506 A JP2002267506 A JP 2002267506A JP 2002267506 A JP2002267506 A JP 2002267506A JP 3931274 B2 JP3931274 B2 JP 3931274B2
Authority
JP
Japan
Prior art keywords
soil
heavy metal
contaminated soil
iron
ferrite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002267506A
Other languages
Japanese (ja)
Other versions
JP2004098032A (en
Inventor
圭介 船石
昌宏 八巻
廣二 関
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiki Ataka Engineering Co Ltd
Original Assignee
Daiki Ataka Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiki Ataka Engineering Co Ltd filed Critical Daiki Ataka Engineering Co Ltd
Priority to JP2002267506A priority Critical patent/JP3931274B2/en
Publication of JP2004098032A publication Critical patent/JP2004098032A/en
Application granted granted Critical
Publication of JP3931274B2 publication Critical patent/JP3931274B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)
  • Soil Conditioners And Soil-Stabilizing Materials (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、重金属で汚染された土壌中の重金属を固定化してこれを分離回収し、重金属汚染土壌を浄化する方法に関する。
【0002】
【従来の技術】
重金属で汚染した土壌中の重金属を固定化する方法としては、土壌に硫化ソーダを添加し土壌中の重金属を硫化物として固定化する硫化ソーダ法、土壌に液体キレート化剤を添加し土壌中の重金属とキレートを生成させることによりこれを固定化する方法、あるいは土壌を直接セメント中に混ぜ込み重金属を固定化する方法などがある。
【0003】
しかし、硫化ソーダ法では土壌のpHにより重金属硫化物の溶出が大きく左右されるため、pHを低下させないように注意する必要がある上に、硫化水素が発生する恐れがある。
【0004】
液体キレート化剤による方法では、液体キレート化剤のコストが高く、微生物による薬剤の分解により硫化水素等が発生する恐れがある。
【0005】
セメント固化法は、固化物の処理にコストがかかり、またセメント固形物は土壌としては利用できないため処分に困る。
【0006】
重金属を簡単に固定化できる方法として発明者らは先に、第一鉄塩溶液に酸化剤を所要量添加し、これを用いて重金属を1工程でフェライト化する方法を提案した(特許文献1参照)。この方法では焼却飛灰では重金属は簡単にフェライト中に取り込まれたが、土壌中の重金属は土壌から溶出しにくく、これを水で溶出させようとしても一部しか溶出せず、溶出重金属しかフェライト化されない。このため、長期的には溶出しなかった大部分の重金属が徐々に溶出して固定化の効果がなくなる場合もある。
【0007】
さらには、この方法では、単に土壌中の重金属類を溶出しないように固定化するのみで、土壌中には依然として重金属は存在している。土壌汚染による健康リスクとして経口摂取によるリスクが大きく、たとえ固定化しても重金属を含有している土壌は被覆等の何らかの措置が必要となり、利用上制限を受けることになる。
【0008】
【特許文献1】
特開平10−99821号公報
【0009】
【発明が解決しようとする課題】
本発明の課題は、上記問題点を解決し、長期に渡って重金属が溶出しない重金属汚染土壌の浄化方法を提供することにある。
【0010】
本発明は、重金属で汚染された土壌に第1鉄塩溶液と第2鉄塩溶液を添加する第1工程と、ついで、生じた含水土壌にアルカリ溶液を添加してフェライトを生成させ、重金属をフェライト中に固定する第2工程とからなり、該第1工程は、第1鉄と第2鉄のモル比が0.4〜0.6:1となる割合で、鉄の総添加量が汚染土壌に対して1.0重量%以上となるように、かつ添加後の含水土壌のpHが5以下となるように第1鉄塩溶液と第2鉄塩を添加する工程であり、鉄の総添加量が汚染土壌に対して3.0重量%未満である場合には、第2工程を行う前に、汚染土壌中の重金属の溶出のための滞留時間(好ましくは10分)をおく、重金属汚染土壌の浄化方法である。
【0011】
まず第1工程では、用いる第1鉄塩溶液および第2鉄塩溶液はともに酸性溶液であり、これらを添加された土壌は酸性となる。第1鉄塩溶液は第1鉄の酸化防止のため通常はpH2以下の酸性状態で保管し、使用に供する。また、第2鉄塩としては塩化第二鉄溶液が一般的であるが、これはpH1以下の酸性溶液である。このため、第1工程では第1鉄塩溶液と第2鉄塩溶液を添加された汚染土壌は酸性状態となり、土壌中に存在する水と接触させただけでは溶出しない重金属が溶出するようになる。第1鉄塩溶液と第2鉄塩溶液の添加により生じた含水土壌を混練しても、含水土壌は酸性状態であるため、第1鉄は第2鉄に酸化されにくく、後述するように第1鉄と第2鉄の効果的な添加比率が変化することもない。
【0012】
つぎに第2工程では、アルカリ溶液の添加により、含水土壌中の第1鉄と第2鉄は下記の反応式に従いフェライトを生成し、土壌から溶出した重金属はフェライトの中に取り込まれることになる。
【0013】
Fe2++2Fe3++8OH →Fe+4H
【0014】
フェライト中に取り込まれた重金属類は長期に渡って安定であり、再度酸性状態に戻しても土壌から溶出しにくく、さらには元の土壌中の重金属のうち酸性で溶出するものはすでに溶出しているので土壌中のほとんどの重金属が不溶化されることになる。
【0015】
このように、操作を第1工程と第2工程に分割してフェライト化を実施することにより、土壌中の重金属は長期に渡り安定し酸性状態でも溶出しない状態にすることができ、土壌の効果的な浄化が図れる。
【0016】
第1工程における第1鉄塩と第2鉄塩は、第1鉄と第2鉄のモル比が好ましくは0.2〜1.5:1、より好ましくは0.4〜0.6:1となる割合で用いられる。第1鉄と第2鉄のモル比が0.2〜1.5:1でもフェライトは生成するが、フェライトを効率よく生成させ重金属を固定化するにはこのモル比は0.4〜0.6:1の間であるのが好ましく、鉄の添加量も少なくなる。
【0017】
鉄の総添加量(第1鉄、第2鉄の合計量)は土壌に対して好ましくは0.3重量%以上、より好ましくは0.5重量%以上で5重量%以下ある。鉄の総添加量が5重量%を越えても薬品費が増えるだけで浄化効果はそれ以上期待できない。効率よくフェライトを生成させるには鉄の総添加量は2〜3重量%であるのが好ましい。
【0018】
土壌中の重金属の溶出量を増やして、重金属のフェライト化を進めるためには第1工程における鉄塩溶液添加後の含水土壌のpHを5以下、好ましくは2以下とする。このように含水土壌を酸性状態とすることにより通常の地下水には溶出しない重金属が溶出し、フェライト化される。このような土壌は、その後どのような遍歴を経ても重金属が溶出することがない安定した土壌である。
【0019】
第2工程で使用するアルカリとしては、苛性ソーダ、消石灰、炭酸ソーダ、重炭酸ソーダ等のアルカリ剤であってよい。アルカリ添加により含水土壌のpHを7.5以上とする。これによりフェライトが生成できる。pHを12以上にするには多量のアルカリが必要であり、Pb等のようにアルカリ性で溶解性となる重金属には実際的ではない。効率よくフェライト化させるにはpH8.5〜10が好ましい。
【0020】
本発明で使用する第1鉄としては硫酸第1鉄、塩化第1鉄が例示され、第2鉄としては硫酸第2鉄、塩化第2鉄が例示される。
【0021】
フェライト化反応は水中で効率よく実施することができる。本発明でも土壌に水を加えてスラリー状態として第1工程と第2工程を実施することにより安定したフェライト化が行える。しかし、スラリー状態で土壌を処理するためには混合や移動に困難を伴い、設備的に過大な装置を必要とする。そこで、本発明では土壌中の含水率40重量%以下の少しべとつく程度の状態で検討を行った。その結果、含水率が25重量%以上であれば十分にフェライト化が可能であることが判明した。しかし、第1鉄塩溶液、第2鉄塩溶液の溶解度から鉄の総添加量として5重量%程度までこれらを添加し、その中和用のアルカリを添加しても含水率は40重量%以下とする必要がある。
【0022】
第2工程の終了後、重金属を固定化したフェライトを含む含水土壌からフェライトを磁力により含水土壌から分離し、汚染土壌中の重金属含有量を低下させることができる。
【0023】
本発明で生成するフェライトは通常の金属と同様に磁石に引かれる性質を持っており、第2工程が終了した含水土壌から磁石により重金属固定化フェライトを取り除くことにより、土壌中の重金属含有量を低減することができる。磁石による回収方法としては水に土壌を懸濁させた状態で回収する方法、土壌を乾燥させた状態で回収する方法などがある。回収したフェライトを含む土壌は廃棄物として処分される。
【0024】
【発明の実施の形態】
本発明を実施例に基づいて具体的に説明する。
【0025】
図1において、重金属で汚染した土壌は掘削され、土壌ピット(1) に蓄えられる。そこから定量フィーダ(2) により一定量の汚染土壌が取り出され、パドル式混連装置(3) の始端部に供給される。第1鉄水溶液と第2鉄水溶液をモル比で1:2に混合してなるフェライト化剤を土壌量に応じてパドル式混練装置(3) の始端部に供給する。フェライト化剤の酸度は、重金属類が溶出しやすい値に硫酸等の無機酸で調整しておく。同混練装置(3) 内では汚染土壌とフェライト化剤が混合され、フェライト化剤が土壌に均一に分散される。
【0026】
土壌はフェライト化剤により酸性状態となり、含水土壌中の重金属類は溶出してくる。パドル式混練装置(3) の終端部から出た汚染土壌はコンベヤ(4) を経て土壌ピット(5) に送られ滞留される。ここである程度の滞留時間をとることにより重金属の溶出が進行する。土壌ピット(5) から出た土壌は定量フィーダ(6) により一定量2段目のパドル式混練装置(7) の始端部に供給される。2段目の混練装置(7) の始端部にはアルカリ溶液が供給される。アルカリの添加量は添加後の含水土壌のpHが7.5以上となるように予めテストにより決定される。ここで中和された含水土壌中の鉄塩類は反応してフェライトを生成する。含水土壌から溶出した重金属類はフェライト中に取り込まれ、固定化する。2段目の混練装置(7) の終端部から出てきた浄化土壌は、一旦土壌貯留槽等に蓄えられ、重金属の溶出試験を行い、浄化させていることがわかってから、埋め戻される。
【0027】
実施例1
カドミウムの含有量が100mg/kgで、溶出試験結果が2.1mg/lであるカドミウム汚染土壌50g(含水率11.7%)に市販の塩化第2鉄溶液(濃度38重量%、比重1.38、0.18gFe/ml)と硫酸第1鉄溶液(0.09gFe/ml、98%硫酸2ml/L)とを1:1の割合で混合してなる溶液(0.135gFe/ml)を、鉄の総添加量で0.3重量%、0.5重量%、1.0重量%、2重量%、3重量%となるように添加し、含水率を揃えるためにそれぞれに蒸留水を9.2ml、8.5ml、6.8ml、3.4ml、0ml添加し、よく攪拌した。添加後の含水土壌のpHは0.3重量%添加では4.3、0.5重量%添加では2.6であったが、1.0重量%以上ではpH2.0以下であった。
【0028】
10分放置後、各液にアルカリ溶液(24%水酸化ナトリウム水溶液、比重1.1)を1.4ml、2.3ml、4.6ml、9.2ml、13.8ml添加し、よく攪拌した。添加後の含水土壌のpHはそれぞれ8.5、8.7、8.9、8.9、9.0であった。
【0029】
終了後、通常の溶出試験を行った。その結果を表1に示す。いずれもフェライト化は進んでいるが、環境基準を達成できたのは鉄の総添加量1.0重量%以上のものであった。
【0030】
終了後の浄化土壌の含水率はいずれも35%以下であり、このような含水率でもフェライト化による重金属の不溶化は可能であった。
【0031】
【表1】

Figure 0003931274
【0032】
鉄の総添加量3.0重量%の含水土壌について、塩酸または水酸化ナトリウムの添加によりpHを2.0、4.0、6.0、8.0、10.0、12.0に変化させて溶出試験を実施した。結果を表2に示す。
【0033】
pH2.0では環境基準を上回ったが、pH4以上ではいずれも環境基準を下回っており、重金属の溶出が生じないことがわかる。これは、鉄塩溶液による第1工程において、含水土壌中の重金属のうち酸に溶出するものは溶出してしまったからである。
【0034】
【表2】
Figure 0003931274
【0035】
実施例2
実施例1と同じ汚染土壌50gに実施例1と同じ塩化第2鉄溶液と硫酸第1鉄溶液の1:1混合液を、鉄の総添加量が0.3重量%、0.5重量%、1.0重量%、2重量%、3重量%となるように添加し、含水率を揃えるためにそれぞれに蒸留水を9.2ml、8.5ml、6.8ml、3.4ml、0ml添加し、よく攪拌した。その後ただちにアルカリ溶液(24%水酸化ナトリウム水溶液、比重1.1)をそれぞれ1.4ml、2.3ml、4.6ml、9.2ml、13.8ml添加し、よく攪拌した。
【0036】
実施例1と同様に溶出試験を行った。この結果を表3に示す。鉄の総添加量3.0重量%では環境基準を達成することができたが、2.0%以下では達成できなかった。
【0037】
【表3】
Figure 0003931274
【0038】
実施例
実施例1と同じ土壌50gに前もってアルカリ溶液(24%水酸化ナトリウム水溶液、比重1.1)を5ml、6ml、7ml、8ml添加したものを用意し、それぞれに塩化第2鉄溶液と硫酸第1鉄溶液の1:1割合液を鉄の総添加量として3.0重量%添加し、含水率を揃えるためにそれぞれに蒸留水を5.1ml、3.4ml、1.7ml、0ml添加し、よく攪拌した。攪拌後のpHはそれぞれ3.7、4.2、4.9、5.6であった。
【0039】
10分放置後、アルカリ溶液をそれぞれ8.8ml、7.8ml、6.8ml、5.8ml添加し、よく攪拌した。
【0040】
実施例1と同様に溶出試験を行った。その結果を表4に示す。鉄添加後のpHが5.6の場合では環境基準を達成できなかったが、それ以外のpHのものでは達成できた。
【0041】
【表4】
Figure 0003931274
【0042】
実施例
実施例1において鉄の総添加量1.0重量%、2重量%、3重量%の場合に、第2工程終了後、処理土壌を風乾させ、磁石により磁気を帯びた土壌を取り除いた。この土壌の除去量と除去後の土壌中のCd含有量を測定した結果を表5に示す。
【0043】
【表5】
Figure 0003931274
【0044】
【発明の効果】
以上の通りで、本発明による浄化方法は、第1鉄と第2鉄を添加して土壌を酸性状態とし、土壌中の重金属を溶出させる第1工程と、つぎにアルカリ溶液を添加して、フェライトを生成させ、溶出した重金属をフェライト中に取り込み不溶化する第2工程からなり、該第1工程は、第1鉄と第2鉄のモル比が0.4〜0.6:1となる割合で、鉄の総添加量が汚染土壌に対して1.0重量%以上となるように、かつ添加後の含水土壌のpHが5以下となるように第1鉄塩溶液と第2鉄塩を添加する工程であり、鉄の総添加量が汚染土壌に対して3.0重量%未満である場合には、第2工程を行う前に、汚染土壌中の重金属の溶出のための滞留時間(好ましくは10分)をおくので、土壌中の重金属を不溶化すると共に酸性でも長期に渡って溶出しないようにすることができる。また、請求項5の発明によれば、第2工程の終了後、重金属を固定化したフェライトを含む土壌からフェライトを磁力により分離することができ、汚染土壌中の重金属含有量を簡単な操作で低下させることができる。
【図面の簡単な説明】
【図1】 本発明のをい例示するフローシートである。
【符号の説明】
(1) (5) :土壌ピット
(2) (6) :定量フィーダ
(3) (7) :パドル式混連装置
(4) :コンベヤ[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method of immobilizing heavy metals in soil contaminated with heavy metals, separating and recovering them, and purifying heavy metal contaminated soil.
[0002]
[Prior art]
As a method of immobilizing heavy metals in soil contaminated with heavy metals, sodium sulfide method in which sodium sulfide is added to the soil and heavy metals in the soil are immobilized as sulfides, liquid chelating agent is added to the soil, and There are a method of immobilizing a heavy metal and a chelate, or a method of immobilizing heavy metal by mixing soil directly into cement.
[0003]
However, in the sodium sulfide method, the elution of heavy metal sulfides is greatly affected by the pH of the soil, so care must be taken not to lower the pH, and hydrogen sulfide may be generated.
[0004]
In the method using a liquid chelating agent, the cost of the liquid chelating agent is high, and hydrogen sulfide or the like may be generated due to decomposition of the drug by microorganisms.
[0005]
The cement solidification method is costly to process the solidified product, and the cement solid material is difficult to dispose because it cannot be used as soil.
[0006]
As a method for easily immobilizing heavy metals, the inventors previously proposed a method of adding a required amount of an oxidizing agent to a ferrous salt solution, and using this to ferritize heavy metals in one step (Patent Document 1). reference). In this method, heavy metals were easily taken into the ferrite in the incinerated fly ash, but the heavy metals in the soil were not easily eluted from the soil, and even if they were to be eluted with water, only some of the eluted heavy metals were eluted. It is not converted. For this reason, most heavy metals that did not elute in the long term may gradually elute and the immobilization effect may be lost.
[0007]
Furthermore, in this method, the heavy metal is still present in the soil simply by immobilizing the heavy metal in the soil so as not to elute. As a health risk due to soil contamination, the risk of oral ingestion is large, and even if it is fixed, soil containing heavy metals requires some measures such as covering and is restricted in use.
[0008]
[Patent Document 1]
Japanese Patent Laid-Open No. 10-99821
[Problems to be solved by the invention]
The subject of this invention is providing the purification method of the heavy metal contaminated soil which solves the said problem and does not elute heavy metal over a long period of time.
[0010]
The present invention includes a first step of adding a ferrous salt solution and a ferric salt solution to soil contaminated with heavy metals, then adding an alkaline solution to the resulting hydrous soil to generate ferrite, And the second step of fixing in ferrite . The first step is a ratio in which the molar ratio of ferrous iron to ferric iron is 0.4 to 0.6: 1, and the total amount of iron added is contaminated. It is a step of adding a ferrous salt solution and a ferric salt so that the pH of the hydrous soil after addition is 5 or less with respect to the soil, and the total amount of iron When the addition amount is less than 3.0% by weight with respect to the contaminated soil, the heavy metal is allowed to have a residence time (preferably 10 minutes) for elution of heavy metal in the contaminated soil before the second step. It is a purification method for contaminated soil.
[0011]
First, in the first step, both the ferrous salt solution and the ferric salt solution to be used are acidic solutions, and the soil to which these are added becomes acidic. The ferrous salt solution is usually stored in an acidic state at a pH of 2 or less for use in preventing oxidation of ferrous iron and used. In addition, a ferric chloride solution is generally used as the ferric salt, but this is an acidic solution having a pH of 1 or less. For this reason, in the first step, the contaminated soil to which the ferrous salt solution and the ferric salt solution are added becomes in an acidic state, and heavy metals that are not eluted only by contacting with water existing in the soil are eluted. . Even if the hydrous soil produced by the addition of the ferrous salt solution and the ferric salt solution is kneaded, the hydrous soil is in an acidic state, so that the ferrous iron is not easily oxidized to ferric iron. The effective addition ratio of ferrous iron and ferric iron does not change.
[0012]
Next, in the second step, by adding an alkaline solution, ferrous iron and ferric iron in the hydrous soil produce ferrite according to the following reaction formula, and heavy metals eluted from the soil are taken into the ferrite. .
[0013]
Fe 2+ + 2Fe 3+ + 8OH → Fe 3 O 4 + 4H 2 O
[0014]
Heavy metals incorporated in ferrite are stable for a long period of time, and even if returned to an acidic state again, it is difficult to elute from the soil. As a result, most heavy metals in the soil are insolubilized.
[0015]
Thus, by dividing the operation into the first step and the second step and carrying out the ferritization, the heavy metals in the soil can be stable for a long period of time and do not elute even in the acidic state. Purification can be achieved.
[0016]
The ferrous salt and the ferric salt in the first step preferably have a molar ratio of ferrous to ferric iron of 0.2 to 1.5: 1, more preferably 0.4 to 0.6: 1. It is used in the ratio which becomes. Ferrite is produced even if the molar ratio of ferrous iron to ferric iron is 0.2 to 1.5: 1. However, this molar ratio is 0.4 to 0. It is preferably between 6: 1 and the amount of iron added is also reduced.
[0017]
The total amount of iron added (total amount of ferrous and ferric iron) is preferably 0.3% by weight or more, more preferably 0.5% by weight or more and 5% by weight or less based on the soil. Even if the total amount of iron exceeds 5% by weight, the cost of chemicals only increases and no further purification effect can be expected. In order to generate ferrite efficiently, the total amount of iron added is preferably 2 to 3% by weight.
[0018]
In order to increase the elution amount of heavy metals in the soil and promote ferritization of the heavy metals, the pH of the hydrous soil after addition of the iron salt solution in the first step is set to 5 or less, preferably 2 or less. Thus, by making a hydrous soil into an acidic state, the heavy metal which does not elute in normal groundwater will elute, and it will be ferritized. Such a soil is a stable soil in which heavy metals are not eluted through any itinerary thereafter.
[0019]
The alkali used in the second step may be an alkaline agent such as caustic soda, slaked lime, sodium carbonate, or sodium bicarbonate. The pH of the hydrous soil is adjusted to 7.5 or more by adding an alkali. Thereby, ferrite can be generated. A large amount of alkali is required to increase the pH to 12 or more, and it is not practical for heavy metals that are alkaline and soluble, such as Pb. A pH of 8.5 to 10 is preferred for efficient ferritization.
[0020]
Examples of the ferrous iron used in the present invention include ferrous sulfate and ferrous chloride, and examples of the ferric iron include ferric sulfate and ferric chloride.
[0021]
The ferritization reaction can be carried out efficiently in water. Also in the present invention, stable ferritization can be performed by adding water to the soil to form a slurry and performing the first and second steps. However, in order to treat soil in a slurry state, mixing and movement are difficult, and equipment that is excessive in terms of equipment is required. Therefore, in the present invention, the examination was performed in a slightly sticky state with a moisture content of 40% by weight or less in the soil. As a result, it was found that if the water content is 25% by weight or more, sufficient ferritization is possible. However, even if these are added from the solubility of the ferrous salt solution and the ferric salt solution to a total addition amount of iron of about 5% by weight, and the neutralizing alkali is added, the water content is 40% by weight or less. It is necessary to.
[0022]
After the end of the second step, ferrite can be separated from the water-containing soil by magnetic force from the water-containing soil containing ferrite immobilizing heavy metals, and the heavy metal content in the contaminated soil can be reduced.
[0023]
The ferrite produced in the present invention has the property of being attracted to a magnet in the same way as a normal metal, and by removing heavy metal-fixed ferrite with a magnet from the hydrous soil after the second step, the content of heavy metal in the soil is reduced. Can be reduced. As a recovery method using a magnet, there are a method in which the soil is suspended in water, a method in which the soil is dried, and a method in which the soil is dried. The soil containing the collected ferrite is disposed of as waste.
[0024]
DETAILED DESCRIPTION OF THE INVENTION
The present invention will be specifically described based on examples.
[0025]
In Fig. 1, soil contaminated with heavy metals is excavated and stored in the soil pit (1). From there, a fixed amount of contaminated soil is taken out by the quantitative feeder (2) and supplied to the starting end of the paddle type mixing device (3). A ferritizing agent prepared by mixing a ferrous aqueous solution and a ferric aqueous solution in a molar ratio of 1: 2 is supplied to the starting end of the paddle type kneader (3) according to the amount of soil. The acidity of the ferritizing agent is adjusted with an inorganic acid such as sulfuric acid so that heavy metals can be easily eluted. In the kneading apparatus (3), the contaminated soil and the ferritizing agent are mixed, and the ferritizing agent is uniformly dispersed in the soil.
[0026]
The soil is acidified by the ferritic agent, and heavy metals in the hydrous soil are eluted. The contaminated soil coming out from the end of the paddle type kneader (3) is sent to the soil pit (5) through the conveyor (4) and stays there. Here, elution of heavy metals proceeds by taking a certain residence time. The soil discharged from the soil pit (5) is supplied to the starting end of the second-stage paddle type kneading device (7) by the quantitative feeder (6). An alkaline solution is supplied to the starting end of the second stage kneading device (7). The addition amount of the alkali is determined in advance by a test so that the pH of the hydrous soil after the addition is 7.5 or more. The iron salts in the water-containing soil neutralized here react to produce ferrite. Heavy metals eluted from the hydrous soil are taken into the ferrite and immobilized. The purified soil coming out from the end of the second-stage kneading device (7) is temporarily stored in a soil storage tank or the like, and is subjected to an elution test for heavy metals, and then backfilled.
[0027]
Example 1
Commercially available ferric chloride solution (concentration 38% by weight, specific gravity 1.50) on 50 g of cadmium contaminated soil (water content 11.7%) having a cadmium content of 100 mg / kg and a dissolution test result of 2.1 mg / l. 38, 0.18 g Fe / ml) and a ferrous sulfate solution (0.09 g Fe / ml, 98% sulfuric acid 2 ml / L) mixed at a ratio of 1: 1 (0.135 g Fe / ml), The total amount of iron added is 0.3 wt%, 0.5 wt%, 1.0 wt%, 2 wt%, 3 wt%, and distilled water is added to each in order to adjust the water content. .2 ml, 8.5 ml, 6.8 ml, 3.4 ml, 0 ml were added and stirred well. The pH of the hydrous soil after addition was 4.3 when 0.3 wt% was added and 2.6 when 0.5 wt% was added, but pH was 2.0 or less when 1.0 wt% or more.
[0028]
After standing for 10 minutes, 1.4 ml, 2.3 ml, 4.6 ml, 9.2 ml, and 13.8 ml of an alkaline solution (24% aqueous sodium hydroxide solution, specific gravity 1.1) were added to each solution and stirred well. The pH of the hydrous soil after addition was 8.5, 8.7, 8.9, 8.9, and 9.0, respectively.
[0029]
After completion, a normal dissolution test was performed. The results are shown in Table 1. In all cases, ferritization has progressed, but the environmental standards were achieved when the total amount of iron added was 1.0% by weight or more.
[0030]
The water content of the purified soil after the completion was 35% or less, and even with such a water content, insolubilization of heavy metals by ferritization was possible.
[0031]
[Table 1]
Figure 0003931274
[0032]
For water-containing soil with a total iron addition of 3.0% by weight, the pH was changed to 2.0, 4.0, 6.0, 8.0, 10.0, 12.0 by adding hydrochloric acid or sodium hydroxide. The dissolution test was carried out. The results are shown in Table 2.
[0033]
Although it exceeded the environmental standard at pH 2.0, it was found that all of them were below the environmental standard at pH 4 or higher, and elution of heavy metals did not occur. This is because, in the first step with the iron salt solution, the heavy metals in the hydrous soil that have been eluted into the acid have been eluted.
[0034]
[Table 2]
Figure 0003931274
[0035]
Example 2
The same amount of ferric chloride solution and ferrous sulfate solution 1: 1 as in Example 1 was added to 50 g of the same contaminated soil as in Example 1, and the total amount of iron added was 0.3 wt% and 0.5 wt%. 1.0% by weight, 2% by weight, and 3% by weight, and 9.2 ml, 8.5 ml, 6.8 ml, 3.4 ml, and 0 ml of distilled water were added to adjust the water content. And stirred well. Immediately thereafter, 1.4 ml, 2.3 ml, 4.6 ml, 9.2 ml, and 13.8 ml of an alkaline solution (24% aqueous sodium hydroxide solution, specific gravity 1.1) were added and stirred well.
[0036]
A dissolution test was conducted in the same manner as in Example 1. The results are shown in Table 3. Environmental standards could be achieved with a total iron addition of 3.0% by weight, but not with 2.0% or less.
[0037]
[Table 3]
Figure 0003931274
[0038]
Example 3
Prepare 5 ml, 6 ml, 7 ml and 8 ml of an alkaline solution (24% aqueous sodium hydroxide solution, specific gravity 1.1) in advance in 50 g of the same soil as in Example 1, and ferric chloride solution and sulfuric acid first Add 3.0% by weight of a 1: 1 ratio solution of iron solution as the total amount of iron added, and add 5.1 ml, 3.4 ml, 1.7 ml, 0 ml of distilled water to equalize the water content, Stir well. The pH after stirring was 3.7, 4.2, 4.9, and 5.6, respectively.
[0039]
After leaving for 10 minutes, 8.8 ml, 7.8 ml, 6.8 ml, and 5.8 ml of the alkaline solution were added and stirred well.
[0040]
A dissolution test was conducted in the same manner as in Example 1. The results are shown in Table 4. When the pH after addition of iron was 5.6, environmental standards could not be achieved, but with other pH values, it could be achieved.
[0041]
[Table 4]
Figure 0003931274
[0042]
Example 4
In Example 1, when the total amount of iron added was 1.0 wt%, 2 wt%, and 3 wt%, the treated soil was air-dried after the second step, and the magnetized soil was removed by a magnet. Table 5 shows the results of measuring the amount of soil removed and the Cd content in the soil after removal.
[0043]
[Table 5]
Figure 0003931274
[0044]
【The invention's effect】
As described above, the purification method according to the present invention adds ferrous iron and ferric iron to make the soil acidic, and first elutes heavy metals in the soil, and then adds an alkaline solution, It consists of a second step of producing ferrite and incorporating the eluted heavy metal into the ferrite to insolubilize, the first step being a ratio in which the molar ratio of ferrous iron to ferric iron is 0.4 to 0.6: 1 Then, the ferrous salt solution and the ferric salt are added so that the total addition amount of iron is 1.0% by weight or more with respect to the contaminated soil and the pH of the hydrous soil after the addition is 5 or less. If the total addition amount of iron is less than 3.0% by weight with respect to the contaminated soil, the residence time for elution of heavy metals in the contaminated soil (step 2) is performed before the second step. since preferably put 10 minutes), for a long time even in an acidic as well as insoluble heavy metals in the soil soluble It is possible to so as not to. In addition, according to the invention of claim 5, after completion of the second step, the ferrite can be separated from the soil containing the ferrite to which the heavy metal is immobilized by magnetic force, and the heavy metal content in the contaminated soil can be easily operated. Can be reduced.
[Brief description of the drawings]
FIG. 1 is a flow sheet exemplifying the present invention.
[Explanation of symbols]
(1) (5): Soil pit
(2) (6) : Quantitative feeder
(3) (7): Paddle type mixed device
(4): Conveyor

Claims (5)

重金属で汚染された土壌に第1鉄塩溶液と第2鉄塩溶液を添加する第1工程と、ついで、生じた含水土壌にアルカリ溶液を添加してフェライトを生成させ、重金属をフェライト中に固定する第2工程とからなり、
該第1工程は、第1鉄と第2鉄のモル比が0.4〜0.6:1となる割合で、鉄の総添加量が汚染土壌に対して1.0重量%以上となるように、かつ添加後の含水土壌のpHが5以下となるように第1鉄塩溶液と第2鉄塩を添加する工程であり、
鉄の総添加量が汚染土壌に対して3.0重量%未満である場合には、第2工程の前に、汚染土壌中の重金属の溶出のための滞留時間をおく、重金属汚染土壌の浄化方法。
First step of adding ferrous salt solution and ferric salt solution to soil contaminated with heavy metal, and then adding alkaline solution to the resulting hydrous soil to produce ferrite, fixing heavy metal in ferrite The second step to
In the first step, the molar ratio of ferrous iron to ferric iron is 0.4 to 0.6: 1, and the total amount of iron added is 1.0% by weight or more based on the contaminated soil. And adding the ferrous salt solution and the ferric salt so that the pH of the hydrous soil after the addition is 5 or less,
When the total amount of iron added is less than 3.0% by weight with respect to the contaminated soil, the residence time for elution of heavy metals in the contaminated soil is set before the second step , and the heavy metal-contaminated soil is purified. Method.
前記滞留時間は10分である、請求項1に記載の重金属汚染土壌の浄化方法。 The method for purifying heavy metal-contaminated soil according to claim 1, wherein the residence time is 10 minutes . 第2工程におけるアルカリが苛性ソーダ、苛性カリ、消石灰、炭酸ソーダおよび/または重炭酸ソーダであり、含水土壌のpHを7.5以上にする請求項1または2に記載の重金属汚染土壌の浄化方法。  The method for purifying heavy metal-contaminated soil according to claim 1 or 2, wherein the alkali in the second step is caustic soda, caustic potash, slaked lime, sodium carbonate and / or sodium bicarbonate, and the pH of the hydrous soil is 7.5 or more. 第1工程と第2工程における土壌中の含水率を40%以下とする請求項1〜3のいずれかに記載の重金属汚染土壌の浄化方法。  The method for purifying heavy metal-contaminated soil according to any one of claims 1 to 3, wherein the moisture content in the soil in the first step and the second step is 40% or less. 第2工程の終了後、重金属を固定化したフェライトを含む土壌からフェライトを磁力により分離し、汚染土壌中の重金属含有量を低下させる請求項1〜4のいずれかに記載の重金属汚染土壌の浄化方法。  The purification of heavy metal-contaminated soil according to any one of claims 1 to 4, wherein after completion of the second step, ferrite is separated from the soil containing ferrite to which heavy metal is immobilized by magnetic force to reduce the heavy metal content in the contaminated soil. Method.
JP2002267506A 2002-09-13 2002-09-13 Purification method for heavy metal contaminated soil Expired - Fee Related JP3931274B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002267506A JP3931274B2 (en) 2002-09-13 2002-09-13 Purification method for heavy metal contaminated soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002267506A JP3931274B2 (en) 2002-09-13 2002-09-13 Purification method for heavy metal contaminated soil

Publications (2)

Publication Number Publication Date
JP2004098032A JP2004098032A (en) 2004-04-02
JP3931274B2 true JP3931274B2 (en) 2007-06-13

Family

ID=32265978

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002267506A Expired - Fee Related JP3931274B2 (en) 2002-09-13 2002-09-13 Purification method for heavy metal contaminated soil

Country Status (1)

Country Link
JP (1) JP3931274B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014033988A (en) * 2012-08-08 2014-02-24 Takenaka Doboku Co Ltd Method for reducing heavy metal content in heavy metal polluted soil, using ferritization treatment
JP7116952B2 (en) * 2018-05-02 2022-08-12 広島県公立大学法人 Method and apparatus for preparing object to be processed and method and apparatus for treating object to be processed
JP7390652B2 (en) * 2019-02-08 2023-12-04 広島県公立大学法人 Method for preparing objects to be processed, method and apparatus for processing powder and granular materials
CN111871605B (en) * 2020-07-29 2022-07-26 杭州石炭纪环保科技有限公司 Method for removing heavy metal in fly ash
CN114682621A (en) * 2022-03-21 2022-07-01 曹创斌 Soil remediation device and remediation method for heavy metal pollution

Also Published As

Publication number Publication date
JP2004098032A (en) 2004-04-02

Similar Documents

Publication Publication Date Title
US5304710A (en) Method of detoxification and stabilization of soils contaminated with chromium ore waste
JP3931274B2 (en) Purification method for heavy metal contaminated soil
JP2005288378A (en) Treatment method of contaminated medium including heavy metals and treatment agent
JP4567344B2 (en) How to remove arsenic
JP3402535B2 (en) Treatment of alkaline fly ash
JP3271534B2 (en) Method for treating ash containing lead, hexavalent chromium, arsenic and selenium
JP2004209372A (en) Heavy metal elution inhibitor and heavy metal elution inhibiting method
JP2003334510A (en) Chlorine removing treatment method for molten fly ash
JP2000199018A (en) Method for processing sludge containing chlorine
JP2923212B2 (en) Wastewater treatment method
JP4231935B2 (en) Effective use of fly ash
JPH0679254A (en) Treating method to make fly ash harmless
JP4806796B2 (en) Method for insolubilizing arsenic-containing soil
JP3802264B2 (en) Detoxification method for soil contaminated with arsenic
JP2721740B2 (en) Chemical cleaning waste liquid treatment method
JP2003334509A (en) Volume reducing treatment method for molten fly ash
JP2005089563A (en) Heavy metal-immobilizing treatment agent and method for immobilizing heavy metal in solid substance
JP3565359B2 (en) Treatment method of fly ash of city garbage incinerator
JP2005089564A (en) Heavy metal-immobilizing treatment agent and method for immobilizing heavy metal in solid substance
JP2003211144A (en) Heavy metal insolubilizing agent and method for insolubilizing heavy metal
JP3470594B2 (en) Processing method of molten fly ash
JPH10265861A (en) Method for recovering valuable material from secondary fly ash
JP3728807B2 (en) Processing method for heavy metal-containing ash
JP3850046B2 (en) Treatment method for waste containing heavy metals
Maree et al. Limestone neutralization of Iron (II) rich acid water

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050113

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061024

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061031

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061222

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070130

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070226

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100323

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160323

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees