JP3729419B1 - Seismic isolation device mounting table and method of installing the seismic isolation device mounting table - Google Patents
Seismic isolation device mounting table and method of installing the seismic isolation device mounting table Download PDFInfo
- Publication number
- JP3729419B1 JP3729419B1 JP2005214237A JP2005214237A JP3729419B1 JP 3729419 B1 JP3729419 B1 JP 3729419B1 JP 2005214237 A JP2005214237 A JP 2005214237A JP 2005214237 A JP2005214237 A JP 2005214237A JP 3729419 B1 JP3729419 B1 JP 3729419B1
- Authority
- JP
- Japan
- Prior art keywords
- frame
- isolation device
- seismic isolation
- upper frame
- core
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
【課題】
木造建築の基礎に免震装置を配設する際の戴設台を、正確で容易に戴設できる下部の枠体と上部の枠体の取付方法を提供する。
【解決手段】
木造建築の基礎に免震装置50を配設する際の、免震装置50の戴設台及び戴設台の取付方法で、基礎の全面に均しコンクリート19を打設し、該均しコンクリート19の上面に下部の枠体1を正確に容易に取付、均しコンクリート19の上面の所定の高さにベタ基礎コンクリート18を打設し、該ベタ基礎コンクリート18の上面に下部の枠体1のアンカーボルト3が突出した先端に、上部の枠体10を嵌め込み正確に設定した上部の枠体10の上面に免震装置50を載置し、下部の枠体1から伸びているのアンカーボルト3の先端に免震装置50を嵌め込み、二重ナットで締結して設定し、精度が正確で堅牢な戴設台である。
【選択図】 1
【Task】
Provided is a method for attaching a lower frame and an upper frame that can be installed accurately and easily on a mounting table for installing a seismic isolation device on the foundation of a wooden building.
[Solution]
When the seismic isolation device 50 is installed on the foundation of a wooden building, the leveling concrete 19 is placed on the entire surface of the foundation by the mounting base of the base isolation device 50 and the mounting method of the mounting base. The lower frame body 1 is accurately and easily attached to the upper surface of 19 and solid foundation concrete 18 is placed at a predetermined height on the upper surface of the leveling concrete 19, and the lower frame body 1 is placed on the upper surface of the solid foundation concrete 18. An anchor bolt 50 extending from the lower frame 1 is mounted on the upper surface of the upper frame 10 which is accurately set by fitting the upper frame 10 into the tip from which the anchor bolt 3 protrudes. The seismic isolation device 50 is fitted at the tip of 3 and set by fastening with a double nut.
[Selection] 1
Description
本発明は、木造建築の免震装置の戴設台及び免震装置の戴設台の取付方法に関するものである。 The present invention relates to a mounting base for a seismic isolation device for a wooden building and a method for mounting the mounting base for a seismic isolation device.
木造建築の基礎に配置する交換手段を有する転がり免震装置(例えば、特許文献1参照)が開発されているが、この免震装置の戴設方法には免震装置の水平度と位置の正確度と地震の震動に耐える堅固なことが要求される。 Rolling seismic isolation devices (for example, see Patent Document 1) having an exchange means to be placed on the foundation of a wooden building have been developed. It is required to be robust enough to withstand the vibrations of the degree and earthquake.
本発明は、上記免震装置の戴設方法で、木造建築のベタ基礎コンクリートの築造で、基礎の全面に均しコンクリートを打設した後、均しコンクリートの上面に下部の枠体で、正方形の枠体の四隅にアンカーボルトを立設して枠体を通り芯に合わせて水平に設置し、均しコンクリートの上面にベタ基礎コンクリートを打設した後、ベタ基礎コンクリートの上面に下部の枠体のアンカーボルトが突出した先端に上部の枠体のボルト挿通孔を挿嵌し、上部の枠体を通り芯に合わせて水平に設置し、さらに上部の枠体の上部に免震装置を載置し、免震装置の下部プレートのボルト挿通孔に下部の枠体から延長して突出しているボルトを挿嵌し、二重ナットの締結手段で締結し、手間をかけず、しかも確実に手際よく施工が実現することを目的とするものである。 The present invention is a method of installing the above seismic isolation device, in the construction of solid foundation concrete of wooden construction, after leveling concrete is placed on the entire surface of the foundation, and with a lower frame on the upper surface of the leveling concrete, Anchor bolts are erected at the four corners of the frame and installed horizontally with the frame passing through the core. After placing solid foundation concrete on the upper surface of the leveled concrete, the lower frame is placed on the upper surface of the solid foundation concrete. Insert the bolt insertion hole of the upper frame body into the tip where the anchor bolt of the body protrudes, install it horizontally with the core through the upper frame body, and mount the seismic isolation device on the upper frame body Insert the bolt that protrudes from the lower frame into the bolt insertion hole of the lower plate of the seismic isolation device, fasten it with the fastening means of the double nut, and it takes time and effort without fail The purpose is to realize the construction well It is.
上記目的を達成するために、この発明は、木造建築の基礎に免震装置を配設する免震装置の戴設台において、下部の枠体であって、帯状の板材を平にして正方形の平枠を形成し、該平枠の対角線に帯状の板材を平にして十字形の平板体を形成して下部の枠体を構成し、該下部の枠体の四隅に先端が屈折した屈折部分を対角線の内側に向けてアンカーボルトを垂直に立設し、該各アンカーボルトの下部の屈折した先端から対角線に対向する他のアンカーボルトの屈折した先端との間に、前記下部の枠体の十字形の平板体の長手方向の中心に他の帯状の板材を縦にして十字形の縦板体を形成して設け、前記下部の枠体の平枠の各辺の中心に平枠に直交して刻線を設け、前記下部の枠体の平枠の四隅に立設したアンカーボルトの近傍に複数の蝶ネジを設けたことで、前記下部の枠体の正確な位置と水平度を確定することができる。 In order to achieve the above object, the present invention provides a seismic isolation device mounting base in which a seismic isolation device is arranged on the foundation of a wooden building. A refracted portion in which a flat frame is formed, a strip-shaped plate member is formed flat on a diagonal line of the flat frame to form a cross-shaped flat body, and a lower frame is configured, and the tip is refracted at the four corners of the lower frame The anchor bolts are erected vertically with the inner side of the diagonal line facing the inside of the diagonal line, and the lower frame body is bent between the bent bent end of each anchor bolt and the bent bent ends of the other anchor bolts opposite to the diagonal line. At the center in the longitudinal direction of the cross-shaped flat plate, another strip-shaped plate material is vertically formed to form a cross-shaped vertical plate, and is orthogonal to the flat frame at the center of each side of the flat frame of the lower frame A plurality of thumbscrews in the vicinity of anchor bolts erected at the four corners of the flat frame of the lower frame By providing, it is possible to determine the exact position and levelness of the lower part of the frame.
また、木造建築の基礎に免震装置を配設する免震装置の戴設台において、上部の枠体であって、帯状の板材を縦にして正方形の縦の枠を形成し、該縦の枠の下部の四隅の対角線に帯状の板材を平にして十字形の平板体を形成して上部の枠体を構成し、前記十字形の平板体の長手方向の中心に他の板材を縦にして十字形の縦の板体を形成し、該十字形の縦の板体の各先端を隅部分から離して設け、前記上部の枠体の十字形の平板体の各隅の部分の中心にボルト挿通孔を設け、該ボルト挿通孔の近傍に複数の蝶ネジを設け、前記上部の枠体の縦の枠の各面の外側の中心に縦の枠に直交して刻線を設けたことで、前記上部の枠体の正確な位置と水平度を確定することができた。 In addition, in the base of the seismic isolation device in which the seismic isolation device is disposed on the foundation of the wooden building, the upper frame body is formed by vertically forming a square vertical frame with the strip-shaped plate material formed vertically. Flat strips are formed on the diagonals at the four corners at the bottom of the frame to form a cross-shaped flat plate to form the upper frame, and the other plate is placed vertically at the center in the longitudinal direction of the cross-shaped flat plate. Forming a cross-shaped vertical plate body, and providing each tip of the cross-shaped vertical plate body away from the corner portion at the center of each corner portion of the cross-shaped flat plate body of the upper frame body A bolt insertion hole was provided, a plurality of thumb screws were provided in the vicinity of the bolt insertion hole, and a score line was provided perpendicular to the vertical frame at the center of the outer surface of the vertical frame of the upper frame. Thus, it was possible to determine the exact position and level of the upper frame.
さらに、木造建築の基礎に免震装置を配設する免震装置の戴設台の取付方法において、下部の枠体であって、基礎コンクリートの築造で、基礎の全面に均しコンクリートを打設した後、該均しコンクリートの上面に複数の通り芯墨を縦方向に線引きし、該通り芯墨に直交して横方向に複数の通り芯墨を線引きし、該通り芯墨の縦の線及び横の線の内側に双方の通り芯墨に平行して枠体の芯墨を縦の方向及び横の方向に線引きし、前記下部の枠体の平枠の各辺に設けた刻線を双方の前記枠体の芯墨に合わせて下部の枠体を配置して位置を確定し、前記下部の枠体の十字形の縦板体の上端に水準器を交互に載せ、前記下部の枠体の四隅に設けた前記複数の蝶ネジを回して下部の枠体を上げ下げし、下部の枠体の前後左右の高さを調節して水平度を確認して高さを確定し、該下部の枠体の内側及び外側にモルタルを詰めて固定することを特徴とする。 Furthermore, in the installation method of the base for the seismic isolation device that installs the seismic isolation device on the foundation of the wooden building, it is the lower frame and the foundation concrete is built, and the leveled concrete is placed on the entire surface of the foundation Then, a plurality of street inks are drawn in the vertical direction on the upper surface of the leveled concrete, and a plurality of street inks are drawn in a transverse direction perpendicular to the street ink. In addition, the inner core of the frame is drawn in the vertical direction and the horizontal direction in parallel with the inner core, and the engraving provided on each side of the flat frame of the lower frame The lower frames are arranged in accordance with the core marks of both of the frames to determine the position, and a level is alternately placed on the upper ends of the cross-shaped vertical plates of the lower frames. Turn the plurality of thumbscrews provided at the four corners of the body to raise and lower the lower frame, and adjust the level of the front, back, left, and right of the lower frame to adjust the level. And sure to confirm the height, wherein the fixing packed mortar inside and outside of the frame of the lower.
木造建築の基礎に免震装置を配設する免震装置の戴設台の取付方法において、前記上部の枠体であって、前記基礎コンクリートの築造で、前記均しコンクリートの上面の所定の高さにベタ基礎コンクリートを打設して下部の枠体をベタ基礎コンクリートの中に埋め込んだ後、前記ベタ基礎コンクリートの上面に複数の通り芯墨を縦方向に線引きし、該通り芯墨に直交して横方向に複数の通り芯墨を線引きし、該通り芯墨の縦の線及び横の線の内側に双方の通り芯墨に平行して前記枠体の芯墨を縦の方向及び横の方向に線引きし、前記複数の上部の枠体をベタ基礎コンクリートの上面に配置し、前記下部の枠体の複数のアンカーボルトが突出している先端に前記上部の枠体の複数のボルト挿通孔を挿嵌し、前記上部の枠体の十字形の縦板体の上端に水準器を交互に載せて複数の前記蝶ネジを回して上部の枠体を上げ下げし、上部の枠体の前後左右の高さを調節して水平度を確認して高さを確定し、前記双方の枠体の芯墨に上部の枠体の各刻線を合わせて上部の枠体の位置を設定し、前記上部の枠体の内側に複数のラッパ口付配水管を設け、前記上部の枠体の内側及び外側に無収縮モルタルを詰め、前記上部の枠体の内側は周囲の縦の枠の高さに合わせて無収縮モルタルを塗り込んで水平に均し、後に前記上部の枠体の上部に免震装置を載設し、前記免震装置の下部プレートに設けた複数のボルト挿通孔に、前記アンカーボルトの先端を挿嵌して二重ナットの締結手段で締結して戴設したことを特徴とする。 In the mounting method of the seismic isolation device mounting base in which the seismic isolation device is arranged on the foundation of the wooden building, the upper frame body is constructed with the foundation concrete and has a predetermined height on the upper surface of the leveling concrete. Next, after placing solid foundation concrete and embedding the lower frame in the solid foundation concrete, a plurality of core inks are vertically drawn on the upper surface of the solid foundation concrete and perpendicular to the core ink. A plurality of the core inks are drawn in the horizontal direction, and the core ink of the frame body is arranged in the vertical direction and the horizontal in parallel with both the core inks inside the vertical lines and the horizontal lines of the core inks. The plurality of upper frame bodies are arranged on the upper surface of the solid foundation concrete, and the plurality of bolt insertion holes of the upper frame body are arranged at the tips from which the plurality of anchor bolts of the lower frame protrude. On the top of the cross-shaped vertical plate of the upper frame Put the level level alternately on the top and turn the plurality of thumbscrews to raise and lower the upper frame, adjust the height of the upper and lower left and right sides of the upper frame, check the level and confirm the height, The upper frame body position is set by aligning the engravings of the upper frame body with the cores of both the frame bodies, and a plurality of water pipes with trumpet ports are provided inside the upper frame body. Non-shrink mortar is packed inside and outside the frame body, and the inside of the upper frame body is coated with non-shrink mortar according to the height of the surrounding vertical frame and leveled horizontally, and then the upper frame A seismic isolation device is mounted on the upper part of the body, and the ends of the anchor bolts are inserted into a plurality of bolt insertion holes provided in the lower plate of the seismic isolation device and fastened with a fastening means of a double nut. It was set up.
前記上部の枠体の内側に複数のラッパ口付排水管を有する上部の枠体の上部に前記免震装置を戴設し、該免震装置の下部プレートに有する複数の排水孔と、前記上部の枠体のラッパ口付配水管を重ねて床下浸水時に免震装置内に溜まった水を外部に排水するこで、前記上部の枠体の上部に免震装置が精度がよく戴設することができる。 A plurality of drain holes provided in a lower plate of the seismic isolation device; and a plurality of drain holes provided in a lower plate of the seismic isolation device; The seismic isolation device should be installed on the upper part of the upper frame with high accuracy by overlapping the water pipe with the trumpet of the frame and draining the water collected in the seismic isolation device to the outside when the floor is submerged. Can do.
以上説明したように、請求項1に記載の発明によれば、下部の枠体であって、正方形に形成した平枠の四隅にアンカーボルトを立設し、平枠の対角線に十字形の平板体を設け、該十字形の平板体の上面に十字形の縦板体を設け、該十字形の縦板体の上端に交互に水準器を載せて下部の枠体の前後左右の水平度を確認する機能を有し、同時に複数のアンカーボルトが垂直に設定されるので、ベタ基礎コンクリートの上面に突出したアンカーボルトの先端が正確に位置が設定でき、アンカーボルトの先端に上部の枠体のボルト挿通孔を挿通するのが極めて容易にできる下部の枠体の構成である。 As described above, according to the first aspect of the present invention, the anchor frame is erected at the four corners of the flat frame that is the lower frame and formed into a square, and the cross-shaped flat plate is formed on the diagonal of the flat frame. A horizontal plate on the upper surface of the cruciform flat plate, and alternately place a level on the upper end of the cruciform vertical plate to increase the level of front, back, left, and right of the lower frame. Since the multiple anchor bolts are set vertically at the same time, the tip of the anchor bolt protruding from the top surface of the solid foundation concrete can be set accurately, and the upper frame body is positioned at the tip of the anchor bolt. It is the structure of the lower frame which can insert a bolt insertion hole very easily.
請求項2に記載の発明によれば、上部の枠体であって、正方形に形成した縦の枠の対角線に十字形の平板体を設け、該十字形の平板体の平板の四隅にアンカーボルトの挿通孔を設け、十字形の平板体の上面に十字形の縦板体を設け、該十字形の縦板体の上端に交互に水準器を載せて上部の枠体の前後左右の水平度を確認する機能を有し、上部の枠体に免震装置を戴設して正確に固定するのが極めて容易な上部の枠体の構成である。
According to the invention of
請求項3に記載の発明によれば、下部の枠体の取付方法であって、基礎コンクリートの築造で、基礎の全面に均しコンクリートを打設し、均しコンクリートの上面に縦横に建物の通り芯墨を線引きし、該縦横の通り芯墨に平行して通り芯墨の内側に枠体の芯墨を縦横に線引きし、枠体の芯墨に下部の枠体の中心(刻線)を合わせて設定し、下部の枠体の十字形の平板体の四隅に設けた蝶ネジを回し、十字形の縦の枠体の上端に水準器を介して下部の枠体の水平度を正確に確定し、下部の枠体の内外にモルタルを詰めて固定することで正確に取付することができる。
According to the invention described in
請求項4に記載の発明によれば、上部の枠体の取付方法であって、基礎コンクリートの築造で、均しコンクリートの上面にベタ基礎コンクリートを所定の高さに打設し、ベタ基礎コンクリートの上面に建物の通り芯墨を縦横に線引きし、縦横の通り芯墨に平行して枠体の芯墨を縦横に線引きし、枠体の芯墨に上部の枠体の中心(刻線)を合わせて設定し、上部の枠体の十字形の平板体の四隅に設けた蝶ネジを回し、十字形の縦板体の上端に水準器を介して上部の枠体の水平度を正確に確定し、上部の枠体の内側と外側に無収縮モルタルを塗り込み、内側は上部の枠体の周囲の縦の枠に合わせて水平に均して固定し、上部の枠体の上面に免震装置を戴設し、ベタ基礎コンクリートの上面に突出している複数のアンカーボルトの先端を免震装置の下部プレートに有するボルト挿通孔に挿通し、二重ナットで締結することが正確で容易に取付することができる。 According to the invention of claim 4, there is provided a method for mounting the upper frame body, in which the foundation concrete is constructed, and the solid foundation concrete is placed at a predetermined height on the upper surface of the leveled concrete, The core of the building is drawn vertically and horizontally on the upper surface of the building, the core of the frame is drawn vertically and horizontally in parallel with the core of the vertical and horizontal streets, and the center of the upper frame (marked line) on the core of the frame And turn the thumbscrews provided at the four corners of the cruciform plate of the upper frame to accurately adjust the level of the upper frame via a level at the top of the cruciform vertical plate. Apply non-shrink mortar on the inside and outside of the upper frame, and fix the inner side to the vertical frame around the upper frame. Install a seismic device and place the tip of multiple anchor bolts protruding on the top of the solid foundation concrete under the seismic isolation device. It can be attached accurately and easily by being inserted into the bolt insertion hole of the part plate and fastened with the double nut.
請求項5に記載の発明によれば、上部の枠体に免震装置を戴設する免震装置の下部のプレートに有する複数の排水口に、上部の枠体の中に設けた複数のラッパ口付配水管を重ねて設け、床下浸水等で免震装置の中に溜まった水を外部に排出することができる。
According to the invention described in
木造建築の基礎コンクリートの上面に免震装置を戴設するのに、ベタ基礎コンクリートの打設に伴ない、精度の高い戴設台に免震装置を戴設し、正確な位置と正確な水平度の設定を容易にし、しかも堅固に施工できる工法を実現した。 In order to install the seismic isolation device on the upper surface of the foundation concrete of the wooden building, the seismic isolation device was installed on the high-precision installation table in accordance with the placement of the solid foundation concrete, and the exact position and the exact horizontal The construction method that makes it easy to set the degree and can be applied firmly has been realized.
図1は本発明の1実施例の斜視図であって、1は均しコンクリートの上面に配設した下部の枠体である、10はベタ基礎コンクリートの上面に配設した上部の枠体である。 FIG. 1 is a perspective view of an embodiment of the present invention, in which 1 is a lower frame disposed on the upper surface of the leveled concrete, and 10 is an upper frame disposed on the upper surface of the solid foundation concrete. is there.
図1では、1は下部の枠体を示している。帯状の板材を平にして正方形の平枠2を形成し、正方形の平枠2の対角線に帯状の板材を平にして十字形の平板体4を形成して下部の枠体1を構成し、この下部の枠体1の四隅に先端が屈折した屈折部分を対角線の内側に向けてアンカーボルト3を垂直に立設し、このアンカーボルト3の下部の屈折した先端から対角線に対向する他のアンカーボルト3の下部の屈折した先端との間に、下部の枠体1の十字形の平板体4の長手方向の中心に他の帯状の板材を縦にして十字形の縦板体5を形成して設ける。
In FIG. 1, reference numeral 1 denotes a lower frame. A
そして、下部の枠体1の平枠2の各辺の中心に平枠2に直交して刻線6(下部の枠体1の中心)を設け、下部の枠体1の平枠2の四隅に立設したアンカーボルト3の近傍に複数の蝶ネジ2aを設ける、この蝶ネジ2aを回して下部の枠体を上げ下げして下部の枠体1の水平度を確定する。下部の枠体1はステンレス製又は鋼鉄製とし、鋼鉄製のものは亜鉛メッキを施すものである。
Then, a score line 6 (center of the lower frame 1) is provided at the center of each side of the
図1では、10は上部の枠体を示している。帯状の板材を縦にして正方形の縦の枠11を形成し、この正方形の縦の枠11の下部の四隅の対角線に帯状の板材を平にして十字形の平板体12を形成して上部の枠体10を構成し、十字形の平板体12の長手方向の中心に他の帯状の板材を縦にして十字形の縦の板体13を形成し、この十字形の縦の板体13の各先端を隅部分から離して設け、上部の枠体10の十字形の平板体12の各隅の部分の中心にボルト挿通孔15を設け、上部の枠体10の平板体の各隅の部分にボルト挿通孔15を設け、ボルト挿通孔15の近傍に複数の蝶ネジ16を設ける。この蝶ネジ16を回して上部の枠体10を上げ下げして上部の枠体10の水平度を確定する。上部の枠体10の縦の枠11の各面の外側の中心に縦の枠11に直交して刻線14(上部の枠体10の中心)を設けたものである、上部の枠体10はステンレス製又は鋼鉄製とし、鋼鉄製のものは亜鉛メッキを施すものである。
In FIG. 1,
下部の枠体1の設置方法であって、基礎コンクリート24の築造で、基礎の全面に均しコンクリート19を打設した後、均しコンクリート19の上面に複数の通り芯墨20を線引きし、この通り芯墨20の内側に通り芯墨20に平行して枠体の芯墨8を線引きし、該通り芯墨20の直角方向にも他の複数の通り芯墨20を線引きし、該通り芯墨20の内側に通り芯墨20に平行して枠体の芯墨8を線引する。
It is an installation method of the lower frame 1, in the construction of the
そして、双方の枠体の芯墨8に下部の枠体1の平枠2の各辺に設けた刻線6(下部の枠体の中心)を合わせて下部の枠体1を配置し、下部の枠体1の十字形の縦板体5の上端に水準器を交互に載せ、下部の枠体1の四隅に設けた蝶ネジ2aを回して下部の枠体1の前後左右の高さの調節をして水平度を確認して上下方向の所定の高さを確定し、下部の枠体1の内側及び外側にモルタルを詰めて固定するものである。
Then, the lower frame 1 is arranged by aligning the engraving lines 6 (center of the lower frame) provided on each side of the
上部の枠体10の設置方法であって、均しコンクリート19の上面に所定の高さにベタ基礎コンクリート18を打設して下部の枠体1をベタ基礎コンクリートの中へ埋め込んだ後、ベタ基礎コンクリート18の上面に複数の通り芯墨20を線引きし、通り芯墨20の内側に通り芯墨20に平行して枠体の芯墨21を線引きし、通り芯墨20の直角方向にも他の通り芯墨20を線引きし、この通り芯墨20の内側に通り芯墨20に平行して枠体の芯墨21を線引きし、上部の枠体10をベタ基礎コンクリート18の上面に配置する。
A method for installing the
そして、ベタ基礎コンクリート18の上面に下部の枠体1の複数のアンカーボルト3が突出している先端に上部の枠体10のボルト挿通孔15を挿嵌し、上部の枠体10の十字形の縦板体13の上端に水準器を交互に載せて複数の蝶ネジ16を回して上部の枠体10を上げ下げして上部の枠体10の前後左右の高さを調節しながら、上部の枠体10の上下方向の水平度を確認し、ベタ基礎コンクリート18の上面の双方の枠体の芯墨21に上部の枠体10の刻線14(縦板体の中心)を合わせ、枠体の芯墨21に直角方向の他の枠体の芯墨21に上部の枠体10の他の刻線(縦板体の中心)を合わせて上部の枠体10を設定し、上部の枠体10の内側の複数箇所にラッパ口付配水管53を配設し、上部の枠体10の内側及び外側に無収縮モルタルを詰め、上部の枠体10の内側は縦の枠11の周囲の枠の高さに合わせて無収縮モルタル17を水平に均し、後に上部の枠体10の上部に免震装置50(交換手段を有する転がり免震装置)を戴置し、該免震装置50の下部プレート51に設けた複数のボルト挿通孔52に、アンカーボルト3を挿嵌して二重ナット3aの締結手段で締結して免震装置を戴設したものである。
Then, the bolt insertion holes 15 of the
上部の枠体10に免震装置50(1)を戴設し、免震装置50(1)の下部プレート51(10)に有する複数の排水孔(22)と、上部の枠体10の内側に設けた複数のラッパ口付配水管53の位置を重ね合わせて床下浸水時に免震装置50(1)内に溜まった水を外部に排水することができる。
The seismic isolation device 50 (1) is installed on the
従来の免震装置にはメンテナンスの折りに免震装置を取外して交換ができ、時には分解して内部の部品の交換ができるものが少なく、また、床下浸水時に免震装置の中に溜まった水を排水する装置のものもがなく、本免震装置の中には以上の機能が備わっており、従って価格も安く設定ができので、ユーザーの期待に副える精度の高い免震装置の取付方法である。 There are few conventional seismic isolation devices that can be replaced by removing the seismic isolation device during maintenance, and sometimes disassembling and replacing the internal parts. There is no device for draining water, and this seismic isolation device has the above functions, so the price can be set at a low price. It is.
1 下部の枠体
2 平枠
3 アンカーボルト
3a 二重ナット
4 十字形の平板体
5 十字形の縦板体
6 刻線(平板体の中心)
7 モルタル
8 枠体の芯墨
10 上部の枠体
11 縦の枠
12 十字形の平板体
13 十字形の縦板体
14 刻線(縦板体の中心)
15 ボルト挿通孔
16 蝶ネジ
17 無収縮モルタル
18 ベタ基礎コンクリート
19 均しコンクリート
20 通り芯墨
21 枠体の芯墨
50 免震装置
51 下部プレート
52 ボルト挿通孔
53 ラッパ口付配水管
1 Lower frame
2 Flat frame
3 Anchor bolt
3a Double nut
4 Cross-shaped flat plate
5 Cross-shaped vertical plate
6 Marking (center of flat plate)
7 Mortar
8 Frame core ink
10 Upper frame
11 Vertical frame
12 Cross-shaped flat plate
13 Cross-shaped vertical plate
14 engraving (center of vertical plate)
15 Bolt insertion hole
16 thumbscrew
17 Non-shrink mortar
18 Solid foundation concrete
19 Leveling concrete
20 street ink
21 Frame core ink
50 Seismic isolation device
51 Lower plate
52 Bolt insertion hole
53 Water pipe with trumpet mouth
Claims (5)
A plurality of drain holes provided in a lower plate of the seismic isolation device, wherein the seismic isolation device is provided on an upper part of the upper frame having a plurality of drain pipes with trumpet ports inside the upper frame, and the upper part 5. The installation base of the seismic isolation device according to claim 4, wherein water accumulated in the seismic isolation device can be drained to the outside when the water pipe with a trumpet of the frame of the frame is piled up and flooded under the floor. Method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005214237A JP3729419B1 (en) | 2005-07-25 | 2005-07-25 | Seismic isolation device mounting table and method of installing the seismic isolation device mounting table |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005214237A JP3729419B1 (en) | 2005-07-25 | 2005-07-25 | Seismic isolation device mounting table and method of installing the seismic isolation device mounting table |
Publications (2)
Publication Number | Publication Date |
---|---|
JP3729419B1 true JP3729419B1 (en) | 2005-12-21 |
JP2007032004A JP2007032004A (en) | 2007-02-08 |
Family
ID=35588869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2005214237A Expired - Fee Related JP3729419B1 (en) | 2005-07-25 | 2005-07-25 | Seismic isolation device mounting table and method of installing the seismic isolation device mounting table |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3729419B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7429596B2 (en) | 2020-05-08 | 2024-02-08 | 株式会社竹中工務店 | seismic isolation building |
-
2005
- 2005-07-25 JP JP2005214237A patent/JP3729419B1/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2007032004A (en) | 2007-02-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2008144425A (en) | Positioning tool | |
US20070266659A1 (en) | Perimeter foundation panel, and method of use | |
JPH05214731A (en) | Column base fixing device | |
JP4722201B2 (en) | Anchor frame | |
JP3729419B1 (en) | Seismic isolation device mounting table and method of installing the seismic isolation device mounting table | |
CN209891236U (en) | Steel construction buries formula column base's positioner | |
KR20180128245A (en) | Bridge using temporary bridge and construction method | |
JP4523869B2 (en) | Column fixing member installation method and column fixing member installation device for steel pipe foundation pile | |
KR101627159B1 (en) | Concrete placing leveler and installing jig thereof | |
JP2011106203A (en) | Mounting base of outdoor structure | |
AU2010257353B2 (en) | Building foundation structure, foundation construction method, and anchor bolt installation jig | |
CN219864170U (en) | Independent foundation embedded foundation bolt positioning device | |
JP2004019303A (en) | Anchor bolt fixing device | |
CN214005574U (en) | Be applied to river course section and restore structure | |
JPS5920489Y2 (en) | Anchor bolt mounting structure | |
JPH01278620A (en) | Installation method for anchor bolt and anchor bolt supporting device used therefor | |
KR20080057438A (en) | Steel tube footing method for adjustment with a height of calumn | |
CN216973187U (en) | Positioning device is buried underground to highway sound barrier basis built-in fitting | |
JP2821735B2 (en) | Connection hardware for foundation concrete | |
JP2583738B2 (en) | Fence | |
JP2000240068A (en) | Anchor bolt fixing device | |
JP4774268B2 (en) | Column base hardware | |
JPS62102728A (en) | Support structure of housing equipment machineries | |
JPH10147943A (en) | Anchor bolt installation metal fitting | |
JPS6133086Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20050913 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111014 Year of fee payment: 6 |
|
LAPS | Cancellation because of no payment of annual fees |