China
Prior art keywords
groove
retaining wall
repairing
plate
fastening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022985246.2U
Other languages
Chinese (zh)
Inventor
周建勇
魏永强
肖爱梅
李璇
黎嘉慧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Qingheyuan Construction Co ltd
Original Assignee
Guangzhou Qingheyuan Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Qingheyuan Construction Co ltd filed Critical Guangzhou Qingheyuan Construction Co ltd
Priority to CN202022985246.2U priority Critical patent/CN214005574U/en
Application granted granted Critical
Publication of CN214005574U publication Critical patent/CN214005574U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a be applied to river course section and restore structure, including setting up upright in the retaining wall of river course both sides and appearing the crack on the retaining wall, the crack department of retaining wall sets up vertical setting and runs through the repair groove on retaining wall top and bottom in proper order, repair the inslot and be provided with the installing frame that matches with the repair groove, the installing frame is installed in repairing the inslot through the locking subassembly, be provided with a plurality of box with a net that pile up each other under to in the installing frame, the top of installing frame is provided with the fastening components who is used for fastening the box with a net. This application has and restores the retaining wall that appears the crack to improve the effect of the anti scour resistance ability of retaining wall.

Description

Be applied to river course section and restore structure
Technical Field
The application relates to the technical field of river channel sections, in particular to a river channel section repairing structure.
Background
The cross section of the river channel is the cross section of the river channel vertical to the water flow direction at present; the river channel has the functions of flood running, waterlogging drainage, water diversion, irrigation, shipping, landscape, tourism and the like, and different cross sections of the river channel are designed according to different functional requirements.
At present, the river course in the town usually can adopt the rectangle section as the river course section, and the rectangle section of rule helps improving the discharge that the ability of overflowing of river course and be favorable to sewage, can pour upright dry masonry retaining wall in the both sides of river course usually to form the rectangle section of river course.
With respect to the related art among the above, the inventors consider that the following drawbacks occur: the pouring of the vertical retaining wall can have cracks under the washing of river water which is aged for a long time, and if the cracks are not repaired in time, the collapse of the whole retaining wall can be caused.
SUMMERY OF THE UTILITY MODEL
In order to restore the retaining wall that appears fissured to improve the anti scouring ability of retaining wall, this application provides one kind and is applied to river course section and restores structure.
The application provides a be applied to river course section and restore structure and adopt following technical scheme:
the utility model provides a be applied to river course section and restore structure, includes upright setting up in the retaining wall of river course both sides and the crack that appears on the retaining wall, the crack department of retaining wall sets up vertical setting and runs through the repair groove on retaining wall top and bottom in proper order, repair the inslot be provided with repair the installing frame that the groove matches, the installing frame is installed in repairing the inslot through locking Assembly, be provided with a plurality of box with a net that pile up each other under to in the installing frame, the top of installing frame is provided with the fastening assembly who is used for fastening the box with a net.
Through adopting above-mentioned technical scheme, at the crack department excavation repair groove of retaining wall, then install the installing frame in repairing the inslot through the locking Assembly, pile up a plurality of box with a net again in order to improve the bulk strength of installing frame toward the installing frame, in being fixed in the installing frame with the box with a net through fastening Assembly after that, whole process is restoreed the retaining wall that appears the crack, improves the antiscour ability of retaining wall.
Optionally, the installing frame includes horizontal installation in the bottom plate of repairing the tank bottom portion and two curb plates that extend upwards along the both sides of bottom plate are vertical respectively, two the curb plate back to each other one side respectively with the both sides wall butt of repairing the groove, the one side that deviates from on the curb plate and the notch parallel and level of repairing the groove diapire, the curb plate deviates from one side of repairing the groove diapire and has seted up first dovetail, set up the second dovetail corresponding with first dovetail position on the retaining wall, first dovetail and second dovetail form the locking groove jointly, the locking subassembly includes the joint in the locking piece and with locking groove assorted locking block and peg graft on the locking block and be used for locking the locking piece in the locking anchor pole of locking inslot.
Through adopting above-mentioned technical scheme, with the locking piece joint in locking inslot, realized being fixed in the mounting frame and repairing the inslot, then fix the locking piece of joint in locking inslot through the anchor pole to make the mounting frame more firm be fixed in repair the inslot.
Optionally, the anchoring rod passes through the locking block along one side of the locking block back to the retaining wall, and one end of the anchoring rod passing through the locking block passes through the second dovetail groove and extends into the retaining wall.
Through adopting above-mentioned technical scheme, use the anchor rod to be fixed in locking groove with the locking piece, make the anchor rod peg graft simultaneously and advance in the retaining wall for the mounting frame is fixed in more fastening and repairs the inslot.
Optionally, the first dovetail groove on the side plate is provided with a plurality of first dovetail grooves, and the first dovetail grooves are vertically distributed on one surface of the side plate far away from the bottom wall of the repair groove at equal intervals.
Through adopting above-mentioned technical scheme, the setting up of a plurality of dovetail makes more firm being fixed in of installing frame repair the inslot.
Optionally, vertical ascending standing grooves of notch are all set up at the top of both sides board, and two the standing groove runs through the mutual one side that is close to of both sides board respectively, fastening component includes erects the mounting plate between the board of both sides and sets up the fastener that is used for being fixed in the standing groove with the mounting plate in the top of curb plate through two standing grooves, and when the mounting plate was placed in the standing groove, the top surface of mounting plate and the notch parallel and level of standing groove.
Through adopting above-mentioned technical scheme, erect the both ends of mounting plate in two relative standing grooves to make the both sides board support the mounting plate more firm, use the fastener simultaneously to fasten the mounting plate in the standing groove, this fastening mode is not only firm but also convenient.
Optionally, the fastening piece is a pressing piece, the pressing piece is hinged to the top surface of the side plate and located at the end of the fastening plate, and the bottom of one end, far away from the hinged position, of the pressing piece abuts against the top surface of the fastening plate.
Through adopting above-mentioned technical scheme, rotate to support and press the piece to make to support and press the piece to support and press the top surface of mounting plate to be fixed in the standing groove of curb plate with the mounting plate.
Optionally, a plurality of placing grooves are formed in the same side plate, and the placing grooves are distributed at equal intervals along the length direction of the top surface of the side plate.
Through adopting above-mentioned technical scheme, the setting of a plurality of standing grooves for the box with a net of the top is supported to a plurality of mounting plates more firm, thereby makes the box with a net more firm pile up in the installing frame.
Optionally, the net cage is a metal net cage, and cobblestones are filled in the net cage.
By adopting the technical scheme, the cobblestones are adopted as the filler of the net cage, so that the overall strength of the net cage is improved.
To sum up, the application comprises the following beneficial technical effects:
1. the groove is repaired in the crack department excavation of retaining wall, then installs the installing frame in repairing the inslot through locking Assembly, piles up a plurality of box with a net again in the installing frame in order to improve the bulk strength of installing frame, is fixed in the installing frame through fastening Assembly with the box with a net after that, and whole process is restoreed the retaining wall that appears the crack, improves the antiscour ability of retaining wall.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is a partially enlarged schematic view of a portion a in fig. 1.
Description of reference numerals: 1. a retaining wall; 11. repairing the groove; 12. a second dovetail groove; 2. installing a frame; 21. a base plate; 22. a side plate; 221. a first dovetail groove; 222. a placement groove; 3. a locking assembly; 31. a locking block; 32. an anchoring rod; 4. a metal net cage; 5. a fastening assembly; 51. a fastening plate; 52. a fastener.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses be applied to river course section and restore structure. Referring to fig. 1 and 2, the riverway section repairing structure comprises retaining walls 1 vertically arranged on two sides of a riverway and cracks appearing on the retaining walls 1, wherein repairing grooves 11 are formed in the cracks of the retaining walls 1, and the repairing grooves 11 are vertically arranged and sequentially penetrate through the top ends and the bottom ends of the retaining walls 1; the mounting frame 2 is arranged in the repairing groove 11, and the mounting frame 2 is matched with the repairing groove 11; the mounting frame 2 is mounted in the repair groove 11 by the locking assembly 3. Be provided with a plurality of box with a net that stack up each other under to in the installing frame 2, the top of installing frame 2 is provided with fastening components 5, and the box with a net of the top supports through fastening components 5 and presses in installing frame 2.
Referring to fig. 1 and 2, the mounting frame 2 includes a bottom plate 21 and two side plates 22, the bottom plate 21 is horizontally mounted at the bottom of the repairing groove 11, the two side plates 22 respectively extend upwards along the two sides of the bottom plate 21, one side of the two side plates 22 opposite to each other is abutted against the two side walls of the repairing groove 11, one side of the side plate 22 departing from the bottom wall of the repairing groove 11 is flush with the notch of the repairing groove 11, and the top surface of the side plate 22 is flush with the top surface of the retaining wall 1. Thereby, the mounting frame 2 is fitted to the repair groove 11. In this embodiment, the metal cages 4 are metal cages 4, and each of the metal cages 4 is filled with cobbles. The opposite ends of each metal net cage 4 are respectively abutted against the sides of the two side plates 22 close to each other. Therefore, in the process of repairing the crack of the retaining wall 1, a worker firstly sets the repair groove 11 on the retaining wall 1, then installs the installation frame 2 in the retaining wall 1 through the repair groove 11, and then stacks each metal net cage 4 filled with cobblestones on the bottom plate 21 one by one to repair the crack of the retaining wall 1.
Referring to fig. 1 and 2, in order to lock the mounting frame 2 in the repair groove 11 of the retaining wall 1, a first dovetail groove 221 is formed in one side of the side plate 22 away from the bottom wall of the repair groove 11, a plurality of first dovetail grooves 221 are formed in the same side plate 22, and the plurality of first dovetail grooves 221 are vertically distributed on one side of the side plate 22 away from the bottom wall of the repair groove 11 at equal intervals; the retaining wall 1 is provided with a plurality of second dovetail grooves 12, and the first dovetail grooves 221 and the second dovetail grooves 12 corresponding in position form locking grooves together. Locking subassembly 3 includes locking block 31 and anchor rod 32, locking block 31 and locking groove phase-match, and locking block 31 pass through the locking groove respectively with curb plate 22 and retaining wall 1 joint cooperation, the end of pegging graft of anchor rod 32 is pegged graft into locking block 31 along locking block 31 one side to retaining wall 1 back, and anchor rod 32 passes the one end of locking block 31 and extends to in the retaining wall 1.
Referring to fig. 1 and 2, in order to support each other tightly the metal mesh box 4 stacked in the installation frame 2, the top of each of the two side plates 22 is provided with a vertical upward placing groove 222 of the notch, the two placing grooves 222 respectively penetrate through one side of each of the two side plates 22 close to each other, the placing grooves 222 on the same side plate 22 are provided with a plurality of placing grooves 222, and the plurality of placing grooves 222 are distributed along the length direction of the top surface of the side plate 22 at equal intervals. The fastening assembly 5 includes a fastening plate 51 and a fastening member 52; the opposite ends of the fastening plate 51 are respectively erected between the two side plates 22 through two oppositely arranged placing grooves 222; when the fastening plate 51 is placed in the placement groove 222, the top surface of the fastening plate 51 is flush with the notch of the placement groove 222. In this embodiment, the fastening member 52 is a pressing piece hinged to the top surface of the side plate 22 and located at the end of the fastening plate 51, and the bottom of the end of the pressing piece away from the hinge is abutted to the top surface of the fastening plate 51.
The embodiment of the application is applied to the implementation principle of the riverway cross-section restoration structure and comprises the following steps: when the crack on retaining wall 1 is repaired to needs, the staff repairs groove 11 in the crack department excavation of retaining wall 1, then install installing frame 2 in repairing groove 11, with locking block 31 joint in locking inslot, and pass locking block 31 and retaining wall 1 through the stock, thereby be fixed in with installing frame 2 and repair the inslot 11, then pile up a plurality of metallic mesh box 4 that have the cobblestone of packing up under to by last in installing frame 2, install in standing groove 222 through mounting the mounting plate 51 at last, support the mounting plate 51 through supporting the preforming and press in standing groove 222, thereby accomplish whole repair work.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a be applied to river course section and restore structure, includes upright set up in retaining wall (1) of river course both sides and the crack that appears on retaining wall (1), its characterized in that: the crack department of retaining wall (1) sets up vertical setting and runs through repair groove (11) on retaining wall (1) top and bottom in proper order, be provided with in repair groove (11) and repair groove (11) assorted installing frame (2), installing frame (2) are installed in repairing groove (11) through locking Assembly (3), be provided with a plurality of box with a net that pile up each other under to in installing frame (2), the top of installing frame (2) is provided with fastening Assembly (5) that are used for fastening the box with a net.
2. The riverway cross section repairing structure as claimed in claim 1, wherein: the mounting frame (2) comprises a bottom plate (21) horizontally mounted at the bottom of the repairing groove (11) and two side plates (22) vertically and upwardly extending along two sides of the bottom plate (21) respectively, one side of each side plate (22) which is back to back is abutted against two side walls of the repairing groove (11) respectively, one side of the side plate (22) departing from the bottom wall of the repairing groove (11) is flush with the notch of the repairing groove (11), one side of the side plate (22) departing from the bottom wall of the repairing groove (11) is provided with a first dovetail groove (221), a second dovetail groove (12) corresponding to the first dovetail groove (221) is arranged on the retaining wall (1), the first dovetail groove (221) and the second dovetail groove (12) jointly form a locking groove, the locking assembly (3) comprises a locking block (31) which is clamped in the locking block (31) and matched with the locking groove, and an anchoring rod (32) which is inserted into the locking block (31) and used for locking the locking block (31) in the locking groove.
3. The riverway fracture surface repairing structure of claim 2, wherein: the anchoring rod (32) penetrates through the locking block (31) along one side, back to the retaining wall (1), of the locking block (31), and one end, penetrating through the locking block (31), of the anchoring rod (32) penetrates through the second dovetail groove (12) and extends into the retaining wall (1).
4. The riverway fracture surface repairing structure applied to the riverway fracture surface according to claim 3, is characterized in that: it is same first dovetail groove (221) on curb plate (22) have seted up a plurality ofly, a plurality of first dovetail groove (221) are vertical and equidistant distribution in curb plate (22) keep away from the one side of repairing groove (11) diapire.
5. The riverway fracture surface repairing structure of claim 2, wherein: the top of the two side plates (22) is provided with a placing groove (222) with a vertically upward notch, the two placing grooves (222) respectively penetrate through one side of the two side plates (22) close to each other, the fastening assembly (5) comprises a fastening plate (51) erected between the two side plates (22) through the two placing grooves (222) and a fastening piece (52) arranged at the top of each side plate (22) and used for fixing the fastening plate (51) in the placing groove (222), and when the fastening plate (51) is placed in the placing grooves (222), the top surface of the fastening plate (51) is flush with the notch of the placing grooves (222).
6. The riverway fracture surface repairing structure of claim 5, wherein: the fastening piece (52) is a pressing piece, the pressing piece is hinged to the top surface of the side plate (22) and located at the end of the fastening plate (51), and the bottom of one end, far away from the hinged position, of the pressing piece is abutted to the top surface of the fastening plate (51).
7. The riverway cross section repairing structure as claimed in claim 6, wherein: a plurality of placing grooves (222) are formed in the same side plate (22), and the placing grooves (222) are distributed at equal intervals along the length direction of the top surface of the side plate (22).
8. The riverway cross section repairing structure as claimed in claim 1, wherein: the net cage is a metal net cage (4), and cobblestones are filled in the net cage.
CN202022985246.2U 2020-12-09 2020-12-09 Be applied to river course section and restore structure Active CN214005574U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022985246.2U CN214005574U (en) 2020-12-09 2020-12-09 Be applied to river course section and restore structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022985246.2U CN214005574U (en) 2020-12-09 2020-12-09 Be applied to river course section and restore structure

Publications (1)

Publication Number Publication Date
CN214005574U true CN214005574U (en) 2021-08-20

Family

ID=77311273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022985246.2U Active CN214005574U (en) 2020-12-09 2020-12-09 Be applied to river course section and restore structure

Country Status (1)

Country Link
CN (1) CN214005574U (en)

Similar Documents

Publication Publication Date Title
KR101108269B1 (en) Jig for fixing anchor bolt and construction method of support for solar power plant
US20150200619A1 (en) Solar panel ballasted ground support systems
CN113550325A (en) Building foundation pit supporting device and mounting method thereof
US20150136205A1 (en) Solar panel ballasted ground support systems
CN1468339A (en) Integrated footings
US20070266659A1 (en) Perimeter foundation panel, and method of use
CN114482691B (en) Assembled airport enclosure foundation template and use method thereof
CN214005574U (en) Be applied to river course section and restore structure
KR101414155B1 (en) Self-supported shoring structure using shelf and construction method using the relieving platform
CN210798292U (en) Combined beam bottom dismantling head and beam bottom supporting system
CN212176685U (en) Instrument formula foundation ditch hangs step ladder
CN212866031U (en) Assembled two-stage retaining wall structure
JP2007205142A (en) Built-up fence conduit equipped with single plate sidewall panel
KR20030052871A (en) Retaining wall and its construction method of steel panel
CN100507155C (en) Portable assembling type steel structure temporary water dash device
CN112962429B (en) Underwater stone curtain wall capable of preventing tide and tide impact
CN210217292U (en) Adjustable mechanical parking equipment supporting device
CN215672355U (en) Flood-proof door vertical platform
WO2006096141A1 (en) Prefabricated base element for a covered parking place
CN202401800U (en) A lower bearing frame of a three-dimensional parking place
CN214531318U (en) Cast-in-place partition wall template structure
CN210459120U (en) Ecological bank protection of hydraulic engineering
CN102345399B (en) Lower supporting frame of three-dimensional parking place
CN219527975U (en) Horizontal foundation bolt for mounting automobile ramp
CN214785415U (en) Rainwater drainage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 510000 room 107, No. 9, Zengjiang Avenue, Zengcheng District, Guangzhou, Guangdong

Patentee after: Guangzhou qingheyuan Construction Co.,Ltd.

Address before: Room 401, 16 Shayuan Road, Licheng street, Zengcheng District, Guangzhou, Guangdong 511300