CN219864170U - Independent foundation embedded foundation bolt positioning device - Google Patents
Independent foundation embedded foundation bolt positioning device Download PDFInfo
- Publication number
- CN219864170U CN219864170U CN202320926200.4U CN202320926200U CN219864170U CN 219864170 U CN219864170 U CN 219864170U CN 202320926200 U CN202320926200 U CN 202320926200U CN 219864170 U CN219864170 U CN 219864170U
- Authority
- CN
- China
- Prior art keywords
- embedded
- foundation
- bolt positioning
- anchor bolt
- steel plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 64
- 239000010959 steel Substances 0.000 claims abstract description 64
- 238000009434 installation Methods 0.000 abstract description 5
- 230000009286 beneficial effect Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 15
- 230000008569 process Effects 0.000 description 12
- 230000000694 effects Effects 0.000 description 11
- 230000006872 improvement Effects 0.000 description 10
- 238000010276 construction Methods 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000004140 cleaning Methods 0.000 description 2
- 238000004026 adhesive bonding Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 230000014509 gene expression Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model relates to the technical field of steel structure installation, in particular to an independent foundation embedded foundation bolt positioning device. The positioning device comprises an embedded anchor bolt positioning steel plate (1), wherein the middle part of the embedded anchor bolt positioning steel plate (1) comprises a concrete pouring vibrating hole (4), the embedded anchor bolt positioning steel plate (1) comprises more than one embedded anchor bolt positioning sleeve (3), the embedded anchor bolt (2) can penetrate through the embedded anchor bolt positioning sleeve (3), and the inside of the embedded anchor bolt positioning sleeve (3) is a smooth wall; bolts (5) for fixing the positioning plate are also arranged on the pre-buried anchor bolt positioning steel plate (1); the bolt (5) for fixing the positioning plate is a strip hole. The beneficial effects are that: the independent foundation embedded foundation bolt positioning device is adopted, the distance between embedded bolts, the embedded depth and the embedded leakage length are more accurate, the operation is simple, and the working efficiency is high.
Description
Technical Field
The utility model relates to the technical field of steel structure installation, in particular to an independent foundation embedded foundation bolt positioning device.
Background
An anchor bolt is a tool used to embed one end of a mechanical member into concrete when the mechanical member is mounted on a concrete foundation. When the foundation bolt is installed, the embedded bolt is required to be installed according to the bolt hole distance of the steel column flange plate of the charging greenhouse, the distance between the foundation bolts is accurately adjusted mainly through inconvenience in manual embedding, the embedded depth of the foundation bolt is adjusted, the working operation amount is large, and the accuracy and the working efficiency are low.
Disclosure of Invention
The purpose of the utility model is that: in order to provide the embedded foundation bolt positioning device of the independent foundation with better effect, the specific purpose is to achieve a plurality of substantial technical effects of the specific implementation part.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the positioning device for the embedded foundation bolts of the independent foundation is characterized by comprising an embedded foundation bolt positioning steel plate 1, wherein the middle part of the embedded foundation bolt positioning steel plate 1 comprises a concrete pouring vibrating hole 4, the embedded foundation bolt positioning steel plate 1 comprises more than one embedded foundation bolt positioning sleeve 3, the embedded foundation bolts 2 can penetrate through the embedded foundation bolt positioning sleeve 3, and the inside of the embedded foundation bolt positioning sleeve 3 is a smooth wall; bolts 5 for fixing the positioning plate are also arranged on the pre-buried anchor bolt positioning steel plate 1; the bolt 5 for fixing the positioning plate is a strip hole.
The utility model further adopts the technical scheme that the fixing and positioning plate is connected with the independent basic steel template by bolts 5.
The utility model further adopts the technical scheme that the independent foundation steel template is positioned below the embedded anchor bolt positioning steel plate 1.
The embedded anchor bolt positioning steel plate 1 is rectangular, and the aperture and the pitch of the bolt holes of the flange plate at the bottom of the steel column to be installed are consistent with those of the embedded anchor bolt positioning steel plate 1.
The further technical scheme of the utility model is that the embedded anchor bolt positioning sleeve 3 is a positioning pipe, and the length of the positioning pipe is shorter than the exposed length of the embedded anchor bolt to the concrete by 5cm.
The utility model further adopts the technical scheme that the embedded anchor bolt positioning sleeve 3 and the embedded anchor bolt positioning steel plate 1 are completely vertical.
According to the further technical scheme, the anchor bolt fixing device further comprises temporary nuts, the temporary nuts fix the anchor bolts at the bottom of the positioning steel plate and the top of the positioning short pipe respectively, and the embedded depth and the exposed length of the embedded anchor bolts can be ensured to be consistent.
The utility model further adopts the technical scheme that the embedded anchor bolt positioning sleeve 3 is integrally connected with the embedded anchor bolt positioning steel plate 1.
The utility model further adopts the technical scheme that the bottom of the embedded anchor bolt positioning sleeve 3 comprises a threaded connection part 6, and holes on the embedded anchor bolt positioning steel plate 1 are threaded holes, namely the embedded anchor bolt positioning sleeve 3 can be installed in the threaded holes in a threaded manner so as to adjust the number of the embedded anchor bolt positioning sleeves 3.
The utility model further adopts the technical scheme that the edge of the embedded anchor bolt positioning steel plate 1 comprises scales and a central line.
Compared with the prior art, the utility model adopting the technical scheme has the following beneficial effects: the independent foundation embedded foundation bolt positioning device is adopted, the distance between embedded bolts, the embedded depth and the embedded leakage length are more accurate, the operation is simple, and the working efficiency is high.
Drawings
For further explanation of the utility model, reference is made to the following further description, taken in conjunction with the accompanying drawings:
FIG. 1 is a perspective view of the structure of the utility model;
FIG. 2 is a schematic diagram of a further improvement of the utility model;
FIG. 3 is a top view of the structure of the utility model;
FIG. 4 is a schematic side elevational view;
FIG. 5 is a schematic diagram of a front structure;
FIG. 6 is a block diagram of the threaded connection of the present patent;
FIG. 7 is a further improved schematic of the utility model;
1. embedding anchor bolt positioning steel plates; 2. pre-burying anchor bolts; 3. embedding anchor bolt positioning sleeves; 4. pouring concrete into the vibrating holes; 5. bolt holes for fixing the positioning plate; 6. a threaded connection.
Detailed Description
The present utility model is further illustrated in the following drawings and detailed description, which are to be understood as being merely illustrative of the utility model and not limiting the scope of the utility model. In the description of the present utility model, it should be noted that the positional or positional relationship indicated by the terms such as "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", "top", "bottom", etc. are based on the positional or positional relationship shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the apparatus or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model. Furthermore, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model will be understood in specific cases by those of ordinary skill in the art.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The patent provides a plurality of parallel schemes, and the different expressions belong to an improved scheme based on a basic scheme or a parallel scheme. Each scheme has its own unique features. In addition, the technical features of the different embodiments of the present utility model described below may be combined with each other as long as they do not collide with each other. The fixing manner not described herein may be any fixing manner such as screw fixing, bolt fixing or glue bonding.
Embodiment one: with reference to the entire drawing; the positioning device for the embedded foundation bolts of the independent foundation is characterized by comprising an embedded foundation bolt positioning steel plate 1, wherein the middle part of the embedded foundation bolt positioning steel plate 1 comprises a concrete pouring vibrating hole 4, the embedded foundation bolt positioning steel plate 1 comprises more than one embedded foundation bolt positioning sleeve 3, the embedded foundation bolts 2 can penetrate through the embedded foundation bolt positioning sleeve 3, and the inside of the embedded foundation bolt positioning sleeve 3 is a smooth wall; bolts 5 for fixing the positioning plate are also arranged on the pre-buried anchor bolt positioning steel plate 1; the bolt 5 for fixing the positioning plate is a strip hole. The essential technical effects and the realization process thereof, namely the basic functions, played by the technical proposal are as follows: the adoption pore-forming equipment is accurate positioning and pore-forming on the steel sheet, square macropore is concrete placement vibration hole 4 is for being convenient for later stage concrete placement and vibration, ensures independent basic quality, control rag bolt straightness and pre-buried degree of depth location nozzle stub utilize with wait to install steel column bottom ring flange bolt hole with aperture short steel pipe, adopt the welding mode with locating sleeve and pre-buried rag bolt locating steel sheet welding firmly in locating steel sheet locating hole department, locating nozzle stub length should be shorter than pre-buried rag bolt and expose concrete length about 5cm, locating sleeve and locating steel sheet welding process should strictly control locating sleeve straightness, prevent that locating sleeve straightness is inconsistent with the requirement, lead to pre-buried rag bolt installation accuracy disqualification.
The technical scheme aims to provide a construction method of an independent foundation embedded anchor bolt positioning device, which comprises the following steps:
1. spring line leveling
Measuring and placing the positioning center line of the independent foundation in the longitudinal and transverse directions of the independent foundation according to the design drawing and the control shaft net, and nailing a center line control pile near the independent foundation;
2. independent foundation reinforcement and formwork installation
Installing independent foundation steel bars and independent foundation templates according to the design drawing, and keeping the center lines of the longitudinal and transverse templates consistent with the center lines of the independent foundations when the independent foundation templates are installed;
3. mounting and fixing of embedded foundation bolts
Firstly, an embedded anchor bolt penetrates through an embedded anchor bolt positioning sleeve 3, the anchor bolt is fixed at the bottom of a positioning steel plate and the top of a positioning short pipe respectively by adopting a temporary nut, the embedded depth of the embedded anchor bolt is ensured to be consistent with the exposed length, after the center distance of the embedded bolt is checked to meet the requirement, the embedded anchor bolt positioning device is connected with an independent foundation template by adopting bolts according to the center line of the independent foundation and the center line of the template.
4. Checking and correcting the axial elevation of the embedded foundation bolt
After the pre-buried foundation bolts are installed, checking and correcting the positions, elevation, leakage length and verticality of the foundation bolts;
5. pouring foundation concrete;
6. and (5) removing the embedded anchor bolt positioning device and cleaning.
After the strength of the independent foundation concrete meets the requirement, firstly removing the temporary bolts at the top of the positioning short pipe, removing the embedded anchor bolt positioning device, and cleaning and correcting.
The beneficial effects of this technical scheme are: the method has the characteristics of repeated utilization, simple process, convenient operation, low technical requirement, high positioning precision, stability, reliability and the like, replaces the traditional process of welding and fixing the anchor bolts by utilizing the positioning steel plate and a large number of steel bars in the prior art, ensures the installation quality of the whole steel structure, simplifies the construction process, reduces the construction cost, accelerates the construction progress, and can be widely popularized in building construction enterprises.
Embodiment two: as a further improvement or juxtaposition or alternatively independent solution, the fixed positioning plate is bolted with bolts 5 to the independent base steel forms. The essential technical effects and the realization process thereof, namely the basic functions, played by the technical proposal are as follows: the fixing belongs to a general fixing mode.
Embodiment III: as a further improvement scheme or a parallel scheme or an alternative independent scheme, the independent foundation steel template is positioned below the embedded anchor bolt positioning steel plate 1.
Embodiment four: as a further improvement scheme or a parallel scheme or an alternative independent scheme, the embedded anchor bolt positioning steel plate 1 is rectangular, and the aperture and the hole pitch of the embedded anchor bolt positioning steel plate 1 of the rectangular are consistent with those of the bolt hole of the flange plate at the bottom of the steel column to be installed. The essential technical effects and the realization process thereof, namely the basic functions, played by the technical proposal are as follows: the structure may be modified depending on the specific site conditions.
Fifth embodiment: as a further improvement scheme or a parallel scheme or an alternative independent scheme, the embedded anchor bolt positioning sleeve 3 is a positioning pipe, and the length of the positioning pipe is shorter than the exposed length of the embedded anchor bolts to the concrete by 5cm.
Example six: as a further improvement or juxtaposition or alternatively independent solution, the pre-buried anchor bolt locating sleeve 3 and the pre-buried anchor bolt locating steel plate 1 are completely vertical. The essential technical effects and the realization process thereof, namely the basic functions, played by the technical proposal are as follows: the precision is ensured completely vertically.
Embodiment seven: as a further improvement scheme or a parallel scheme or an alternative independent scheme, the anchor bolt fixing device further comprises temporary nuts, wherein the temporary nuts fix the anchor bolts at the bottom of the positioning steel plate and the top of the positioning short pipe respectively, and the embedded depth and the exposed length of the embedded anchor bolts can be ensured to be consistent.
Example eight: as a further improvement scheme or a parallel scheme or an alternative independent scheme, the embedded anchor bolt positioning sleeve 3 and the embedded anchor bolt positioning steel plate 1 are integrally connected. The essential technical effects and the realization process thereof, namely the basic functions, played by the technical proposal are as follows: the integrated manufacturing is also possible, but the design can also be split. Example nine is a parallel implementation of example eight.
Example nine: as a further improvement scheme or a parallel scheme or an alternative independent scheme, the bottom of the embedded anchor bolt positioning sleeve 3 comprises a threaded connection part 6, holes in the embedded anchor bolt positioning steel plate 1 are threaded holes, namely the embedded anchor bolt positioning sleeve 3 can be installed in the threaded holes in a threaded manner, and the number of the embedded anchor bolt positioning sleeves 3 can be adjusted.
Example ten: as a further improvement scheme or a parallel scheme or an alternative independent scheme, the edge of the embedded anchor bolt positioning steel plate 1 comprises scales and a central line. The essential technical effects and the realization process thereof, namely the basic functions, played by the technical proposal are as follows: can be positioned conveniently.
The effects are independently provided, and the combination of the effects can be achieved by a set of structures.
It should be noted that, the multiple schemes provided in this patent include the basic schemes of itself, are independent of each other and are not restricted to each other, but they can also be combined with each other under the condition of no conflict, so as to achieve multiple effects together.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the foregoing embodiments, which have been described in the foregoing description merely illustrates the principles of the utility model, and that various changes and modifications may be made therein without departing from the spirit and scope of the utility model, which is defined in the appended claims.
Claims (10)
1. The positioning device for the embedded foundation bolts of the independent foundation is characterized by comprising an embedded foundation bolt positioning steel plate (1), wherein a concrete pouring vibrating hole (4) is formed in the middle of the embedded foundation bolt positioning steel plate (1), more than one embedded foundation bolt positioning sleeve (3) is formed in the embedded foundation bolt positioning steel plate (1), an embedded foundation bolt (2) can penetrate through the embedded foundation bolt positioning sleeve (3), and a light wall is arranged inside the embedded foundation bolt positioning sleeve (3); bolts (5) for fixing the positioning plate are also arranged on the pre-buried anchor bolt positioning steel plate (1); the bolt (5) for fixing the positioning plate is a strip hole.
2. An independent foundation embedded foundation bolt positioning device as claimed in claim 1, wherein the fixed positioning plate is connected with the independent foundation steel template by bolts (5).
3. An independent foundation embedded anchor bolt positioning device as claimed in claim 1, wherein the independent foundation steel template is located below the embedded anchor bolt positioning steel plate (1).
4. The embedded foundation bolt positioning device of the independent foundation according to claim 1, wherein the embedded foundation bolt positioning steel plate (1) is rectangular, and the aperture and the pitch of the bolt holes of the flange plate at the bottom of the steel column to be installed are consistent with those of the embedded foundation bolt positioning steel plate (1) of the rectangular.
5. An independent foundation embedded anchor bolt positioning device as claimed in claim 1, wherein the embedded anchor bolt positioning sleeve (3) is a positioning tube, and the length of the positioning tube is shorter than the length of the embedded anchor bolt exposed out of the concrete by 5cm.
6. An independent foundation embedded anchor bolt positioning device as claimed in claim 1, wherein the embedded anchor bolt positioning sleeve (3) and the embedded anchor bolt positioning steel plate (1) are completely vertical.
7. The positioning device for embedded foundation bolts of claim 1, further comprising temporary nuts, wherein the temporary nuts fix the foundation bolts at the bottom of the positioning steel plate and the top of the positioning short pipe respectively, and the embedded depth and the exposed length of the embedded foundation bolts can be ensured to be consistent.
8. An independent foundation embedded anchor bolt positioning device as claimed in claim 1, wherein the embedded anchor bolt positioning sleeve (3) is integrally connected with the embedded anchor bolt positioning steel plate (1).
9. The embedded foundation bolt positioning device of the independent foundation according to claim 1, wherein the bottom of the embedded foundation bolt positioning sleeve (3) comprises a threaded connection part (6), holes in the embedded foundation bolt positioning steel plate (1) are threaded holes, namely the embedded foundation bolt positioning sleeve (3) can be installed in the threaded holes in a threaded mode, and the number of the embedded foundation bolt positioning sleeves (3) can be adjusted.
10. An independent foundation embedded anchor bolt positioning device as claimed in claim 1, wherein the edge of the embedded anchor bolt positioning steel plate (1) comprises scales and a central line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320926200.4U CN219864170U (en) | 2023-04-23 | 2023-04-23 | Independent foundation embedded foundation bolt positioning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202320926200.4U CN219864170U (en) | 2023-04-23 | 2023-04-23 | Independent foundation embedded foundation bolt positioning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN219864170U true CN219864170U (en) | 2023-10-20 |
Family
ID=88346160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202320926200.4U Active CN219864170U (en) | 2023-04-23 | 2023-04-23 | Independent foundation embedded foundation bolt positioning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN219864170U (en) |
-
2023
- 2023-04-23 CN CN202320926200.4U patent/CN219864170U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212375900U (en) | Large-scale equipment mounting base location steel sheet bearing structure | |
CN112727124A (en) | Foundation bolt pre-embedding positioning die and foundation bolt installation method | |
CN214462749U (en) | Embedded positioning die for foundation bolt | |
CN219864170U (en) | Independent foundation embedded foundation bolt positioning device | |
CN215594016U (en) | Mounting structure of shock insulation support | |
CN211499828U (en) | Auxiliary connecting device for butt joint of reinforcement cage | |
CN111549815A (en) | Steel structure foundation bolt pre-embedding construction method | |
CN216156625U (en) | Leveling, assembling and constructing device for large-span equipment frame foundation | |
CN113794430B (en) | Photovoltaic support upright post and prestressed pipe pile connecting system and working method thereof | |
CN209958389U (en) | Foundation bolt positioning device convenient to adjust | |
CN111305103A (en) | Rapid construction method of ETC portal frame | |
CN110943411A (en) | Distribution box mounting bracket and mounting method | |
CN218933893U (en) | Rag bolt positioning tool | |
CN213114270U (en) | Bridge supporting structure | |
CN220058930U (en) | Large wood structure upright post hoisting and positioning device | |
CN217353273U (en) | Position controller for pre-embedded bolts of assembled stairs | |
CN217353644U (en) | Positioning device for mounting support frame | |
CN219436429U (en) | Accurate positioner of block terminal installation | |
CN219757329U (en) | Simple slope construction lofting measuring instrument | |
CN212105195U (en) | Pre-buried device is reserved to accurate location pipeline of building engineering assembled | |
CN210288458U (en) | Prefabricated railway contact net pillar foundation structure | |
CN220768916U (en) | Pre-buried spacing construction structure | |
CN220978579U (en) | Prefabricated tile hanging framework | |
CN206736943U (en) | Temporary building assembling type base | |
CN221682242U (en) | Combined prefabricated wallboard for structural engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |