KR101627159B1 - Concrete placing leveler and installing jig thereof - Google Patents

Concrete placing leveler and installing jig thereof Download PDF

Info

Publication number
KR101627159B1
KR101627159B1 KR1020130158444A KR20130158444A KR101627159B1 KR 101627159 B1 KR101627159 B1 KR 101627159B1 KR 1020130158444 A KR1020130158444 A KR 1020130158444A KR 20130158444 A KR20130158444 A KR 20130158444A KR 101627159 B1 KR101627159 B1 KR 101627159B1
Authority
KR
South Korea
Prior art keywords
height
concrete
reinforcing bars
reinforcing bar
block
Prior art date
Application number
KR1020130158444A
Other languages
Korean (ko)
Other versions
KR20150071417A (en
Inventor
김광식
Original Assignee
김광식
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김광식 filed Critical 김광식
Priority to KR1020130158444A priority Critical patent/KR101627159B1/en
Publication of KR20150071417A publication Critical patent/KR20150071417A/en
Application granted granted Critical
Publication of KR101627159B1 publication Critical patent/KR101627159B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/10Devices for levelling, e.g. templates or boards

Abstract

본 발명은 콘크리트 타설 높이 기준기 및 그 설치 지그에 관한 것으로 건축물 시공시 슬라브를 형성하기 위한 수평 거푸집 상에 매트릭스 형상으로 수평으로 배근된 제 1 철근과 수직되어 벽체를 형성하기 위해 수직으로 배근되는 1쌍의 제 2 철근에 접촉되게 배치되고 상기 1쌍의 제 2 철근이 각각 가운데에 위치되도록 1쌍의 볼트공이 형성되며 수직면 하부 단부를 구부려진 부분을 갖는 고정 브라켓과, 상기 고정 브라켓에 접촉되게 배치된 상기 제 2 철근을 수용하는 철근수용홈이 형성되고 상기 볼트공과 체결하여 고정되도록 체결 볼트가 구비되어 상기 제 2 철근에 상기 고정 브라켓을 고정하도록 체결하는 클램프와, 상기 고정 브라켓의 하부 단부의 구부려진 부분에 끼움 안착되어 콘크리트의 타설 높이를 육안으로 식별할 수 있도록 상기 고정 브라켓의 길이 보다 더 길게 형성된 레벨봉을 포함한다.
따라서, 작업자가 수평하는 제 1 철근 상에서 작업하므로 콘크리트 타설 높이 기준기는 수직하는 제 2 철근의 일정한 높이에 용이하게 체결할 수 있어 작업시간을 감소할 수 있을 뿐만 아니라 인건비가 낮은 초심자라도 용이하게 고정되게 체결할 수 있으므로 시공비를 절감할 수 있으며, 또한, 벽체를 형성하기 위한 수직 배열되는 제 2 철근에 의해 고정되게 체결되는 콘크리트 타설 높이 기준기에 의해 이 제 2 철근의 간격이 변하는 것을 방지할 수 있다.
[0001] The present invention relates to a concrete piling height reference device and a mounting jig thereof, and more particularly, to a concrete piling height reference device and a mounting jig thereof, which are vertically arranged to form a wall perpendicular to a first reinforcing bar horizontally disposed in a matrix form on a horizontal form for forming a slab A fixing bracket disposed in contact with the second reinforcing bars of the pair and having a pair of bolt holes formed therein so that the pair of second reinforcing bars are positioned at the center of the fixing bracket and having a bent portion at the lower end of the vertical plane, A clamp for fastening the fixing bracket to the second reinforcing bar so that the fixing bracket is fastened to the fixing bracket so that the reinforcing bar accommodating groove for receiving the second reinforcing bar is fastened and fixed to the bolt hole; In order to visually identify the height of the concrete pouring, Lt; RTI ID = 0.0 > length < / RTI >
Therefore, since the worker operates on the horizontal first reinforcing bar, the concrete piling height reference can be easily fastened to a certain height of the vertical second reinforcing bar so that the working time can be reduced, and even a beginner having a low labor cost can be easily fixed And the spacing of the second reinforcing bars can be prevented from being changed by the concrete placement height reference unit fixed by the vertically arranged second reinforcing bars for forming the wall.

Description

콘크리트 타설 높이 기준기 및 그 설치 지그{Concrete placing leveler and installing jig thereof}Concrete placement leveler and installing jig,

본 발명은 콘크리트 타설 높이 기준기 및 그 설치 지그에 관한 것으로서, 특히, 수직 하는 철근에 설치되어 콘크리트를 균일한 높이로 타설할 수 있도록 하는 콘크리트 타설 높이 기준기 및 그 설치 지그에 관한 것이다.
[0001] The present invention relates to a concrete placement height reference device and a mounting jig thereof, and more particularly, to a concrete placement height reference device and a mounting jig thereof, which are installed in a vertical reinforcing bar so that concrete can be installed at a uniform height.

일반적으로 다층주택등의 콘크리트 건축물을 시공(施工)함에 있어서는, 초기에 거푸집을 설치하고, 이 거푸집의 내부와 바닥면에 필요한 철근을 배근한 후 콘크리트를 충진시켜서 건축물 축조(築造)하게 된다. 이를 좀더 상세히 설명하면, 초기에 상층의 바닥 콘크리트를 구축하고, 이 콘크리트면 위에 실내의 크기 및 수평을 맞추기 위한 먹줄 표시선을 표시한다. 그리고 각재 및 합판 등을 먹줄 표시선을 따라 수평 및 수직으로 설치하고 이를 고정수단 예컨대 못등을 통해 고정 설치한 다음 각재에 맞추어 미리 짜여진 수평 및 수직의 거푸집을 설치하였다.Generally, when constructing a concrete structure such as a multi-storeyed house, it is necessary to install a formwork at an early stage, to reinforce the inner and lower surfaces of the formwork, to fill the concrete, and to build the building. More specifically, initially, an upper floor concrete is constructed, and an indentation line is displayed on the concrete surface to align the size and the horizontal of the room. Then, the wood and plywood are installed horizontally and vertically along the feed lines, fixed by fixing means such as a nail, and then horizontally and vertically formed in accordance with the wood.

그러나 이와 같은 거푸집의 설치 방법에 있어서는 바닥 콘크리트가 고르지 못하여 정밀하게 평면을 맞추기 어려운데, 특히 수평과 높이 조절이 까다롭고 복잡하여 고도의 숙련을 요하는 인력이 필요로 하였다. 또한 건축시공의 정밀도가 떨어지는 문제점과 거푸집의 설치시 작업시간이 오래 걸려 공사지연 원인의 요인이 되어왔으며 콘크리트 타설 후 거푸집을 제거하기 어렵다.However, in the method of installing such a formwork, the floor concrete is uneven and it is difficult to precisely align the plane. Especially, the horizontal and the height adjustment are complicated and complicated, requiring a highly skilled manpower. Also, it is difficult to remove the form after the concrete is poured because the accuracy of the construction is poor and the work time is long when the formwork is installed.

이러한 문제점을 해결하기 위한 종래의 기술이 특허 등록 제 10-0794617 호(발명의 명칭 : 콘크리트 타설 높이 기준기)에 개시되어 있다. A conventional technique for solving such a problem is disclosed in Japanese Patent Laid-Open No. 10-0794617 entitled "Concrete placement height reference standard".

종래의 콘크리트 타설 높이 기준기는 슬래브에 수평방향으로 설치되는 철근에 끼워 몸체를 고정되게 하는 끼움부와, 끼움부에 설치되어 콘크리트 타설 높이를 표시하는 표시부로 구성되고, 끼움부가 자의로 회동되는 것을 방지하기 위하여 끼움부에 회동방지부를 설치하고, 표시부에 충격흡수부를 형성시키며, 표시부가 나사막대와 이에 결합되는 암나사부를 가지는 표지로 구성된 것에 있어서, 표지에 구멍을 형성시켜서 된 것이다.The conventional concrete placement height reference unit is composed of a fitting portion for fixing the body to be fitted to a reinforcing bar provided horizontally on the slab and a display portion for indicating the height of the concrete installation height to prevent the fitting portion from rotating A shock absorber is formed on the display portion, and the display portion is formed of a label having a threaded rod and a female threaded portion to be engaged with the threaded rod, and a hole is formed in the label.

즉, 슬래브의 강도를 보강하도록 격자 형태로 배근한 철근을 끼워 콘크리트 타설 높이를 표시하는 구멍이 형성된 표지를 나사체결로 승,하강시켜 콘크리트의 적정한 타설 높이를 설정하는 것이다.That is, a reinforced concrete reinforced with a lattice is inserted so as to reinforce the strength of the slab, and a mark having a hole for indicating the height of the concrete pouring is raised and lowered by screwing to set an appropriate pouring height of the concrete.

그러나 상기와 같은 종래 기술에 따른 콘크리트 타설 높이 기준기는 콘크리트를 타설하기 위해 많은 갯수가 고정되게 체결되는데 이를 일일이 작업자가 높이를 조절하여 체결하여야 하므로 작업시간이 증가할 뿐만 아니라 일정한 콘크리트 타설 높이를 제공하기 위해서 나사 체결되는 표지의 높이를 맞춰야 하기 때문에 인건비가 높은 숙련된 작업자의 필요로 시공비가 상승하는 문제점이 있었다. 또한, 작업자가 수평 방향으로 배열되는 철근에 올라가 작업을 하므로 이 철근의 상하로 움직이거나 변형되어 표지의 높이를 정밀하게 맞추기가 어려운 문제점이 있었다. 그리고, 벽체를 형성하기 위한 수직 배열되는 철근의 간격이 변하는 것을 방지하기 위한 별도의 스페이서가 필요한 문제점이 있었다.
However, the conventional concrete pouring height reference device as described above has a problem in that a large number of pouring concrete is fixed in order to pour concrete, and since the worker must tighten the pouring pipe by adjusting the height thereof, not only the working time is increased but also a constant concrete pouring height is provided There is a problem that the construction cost rises due to the need of a skilled worker having a high labor cost. Further, since the worker moves up and down on the reinforcing bar arranged in the horizontal direction, there is a problem in that it is difficult to precisely match the height of the cover by moving or deforming the reinforcing bar up and down. Further, there is a problem that a separate spacer is required to prevent the spacing of reinforcing bars vertically arranged for forming a wall from changing.

따라서 본 발명의 목적은 작업자가 일정한 높이에 용이하게 고정되게 체결할 수 있어 작업시간을 감소할 수 있으며 인건비가 낮은 초심자라도 용이하게 고정되게 체결할 수 있으므로 시공비를 절감할 수 있는 콘크리트 타설 높이 기준기를 제공함에 있다.Accordingly, it is an object of the present invention to provide a concrete pile height reference device capable of reducing work time because a worker can be easily fixed at a certain height, thereby reducing work time and fastening even a beginner having a low labor cost. .

본 발명의 다른 목적은 수직 배열되는 철근에 설치되어 작업자가 수평 방향으로 배열되는 철근 상에서 작업을 하여도 타설 높이를 일정하게 조절하는 표시부의 높이를 정밀하게 맞출 수 있는 콘크리트 타설 높이 기준기를 제공함에 있다.Another object of the present invention is to provide a concrete placement height reference device which is mounted on a vertically arranged reinforcing bar so that an operator can precisely adjust the height of a display portion that constantly adjusts a height of a placement even if the user operates on a reinforcing bar arranged in a horizontal direction .

본 발명의 또 다른 목적은 별도의 스페이서를 사용하지 않고도 벽체를 형성하기 위한 수직 배열되는 철근의 간격이 변하는 것을 방지할 수 있는 콘크리트 타설 높이 기준기를 제공함에 있다.It is another object of the present invention to provide a concrete placement height reference device capable of preventing the spacing of vertically arranged reinforcing bars from changing to form a wall without using a separate spacer.

본 발명의 또 다른 목적은 수직 배열되는 철근에 콘크리트 타설 높이 기준기를 표시부가 균일한 높이를 갖도록 고정되게 체결할 수 있도록 하는 콘크리트 타설 높이 기준기의 설치 지그를 제공함에 있다.It is still another object of the present invention to provide a mounting jig for a concrete placement height reference device that allows a concrete placement height reference unit to be fixed to a vertically arranged reinforcing bar so that the display unit can be fixedly fixed with a uniform height.

본 발명의 또 다른 목적은 콘크리트 타설 높이 기준기를 초심자라도 용이하게 고정되게 체결할 수 있도록하는 콘크리트 타설 높이 기준기의 설치 지그를 제공함에 있다.
It is still another object of the present invention to provide an installation jig for a concrete placement height reference device that allows a concrete placement height reference device to be easily fixed even for a beginner.

상기 목적들을 달성하기 위한 본 발명에 따른 콘크리트 타설 높이 기준기는 건축물 시공시 슬라브를 형성하기 위한 수평 거푸집 상에 매트릭스 형상으로 수평으로 배근된 제 1 철근과 수직되어 벽체를 형성하기 위해 수직으로 배근되는 1쌍의 제 2 철근에 접촉되게 배치되고 상기 1쌍의 제 2 철근이 각각 가운데에 위치되도록 1쌍의 볼트공이 형성되며 수직면 하부 단부를 구부려진 부분을 갖는 고정 브라켓과, 상기 고정 브라켓에 접촉되게 배치된 상기 제 2 철근을 수용하는 철근수용홈이 형성되고 상기 볼트공과 체결하여 고정되도록 체결 볼트가 구비되어 상기 제 2 철근에 상기 고정 브라켓을 고정하도록 체결하는 클램프와, 상기 고정 브라켓의 하부 단부의 구부려진 부분에 끼움 안착되어 콘크리트의 타설 높이를 육안으로 식별할 수 있도록 상기 고정 브라켓의 길이 보다 더 길게 형성된 레벨봉을 포함한다.In order to achieve the above objects, a concrete pouring height reference device according to the present invention comprises a first reinforcing bar horizontally disposed in a matrix form on a horizontal form to form a slab at the time of construction, A fixing bracket disposed in contact with the second reinforcing bars of the pair and having a pair of bolt holes so that the pair of second reinforcing bars are positioned at the center of the fixing bracket and having a bent portion at the lower end of the vertical plane, A clamp for fastening the fixing bracket to the second reinforcing bar so that the fixing bracket is fastened to the fixing bracket so that the reinforcing bar accommodating groove for receiving the second reinforcing bar is fastened and fixed to the bolt hole; And the height of the concrete is visually recognized so that the height of the concrete can be visually recognized It includes a level rod is formed longer than the length of the bracket.

상기에서 1쌍의 볼트공은 상기 1쌍의 제 2 철근의 간격 변화를 모두 수용할 수 있도록 수평 방향으로 길게 형성된 장공으로 이루어진다.The pair of bolt holes are formed as elongated holes extending in the horizontal direction so as to accommodate the variation of the interval between the pair of second reinforcing bars.

상기에서 레벨봉은 직경이 상기 고정 브라켓의 하부 단부의 구부려진 부분에 끼워지는 부분과 나머지 노출된 부분을 포함하는 모든 부분이 동일한 직경을 갖거나 또는 상기 고정 브라켓의 일측 끝단의 구부러진 부분에 끼워지는 부분이 상기 나머지 노출된 부분 보다 작은 직경을 갖도록 형성된다.Wherein the level bar has a diameter equal to or greater than a diameter of the portion of the lower bracket that is fitted to the bent portion of the lower end portion of the fixing bracket, Is formed to have a smaller diameter than the remaining exposed portions.

상기 또 다른 목적들을 달성하기 위한 본 발명에 따른 콘크리트 타설 높이 기준기 설치 지그는 건축물 시공시 슬라브를 형성하기 위한 수평 거푸집 상에 매트릭스 형상으로 수평으로 배근된 제 1 철근과 수직되어 벽체를 형성하기 위해 수직으로 배근되는 1쌍의 제 2 철근과 대응하는 부분에 "┗┛"자 형상을 갖는 홈이 형성되며 양측 끝 부분에 상부 면에서 하부 면까지 관통하는 제 1 관통홀과 이 제 1 관통홀 사이에 제 2 관통홀을 갖는 사각봉으로 형성된 고정 블럭과, 상기 제 1 관통홀에 끼워져 하부로 일정 길이가 노출된 끝단이 상기 수평 거푸집의 표면에 접촉되어 고정 블럭의 높이를 조절하는 고정 볼트와, 상기 제 2 관통홀에 끼워져 상부로 일정 길이가 노출된 높이 조절 볼트와, 상기 1쌍의 제 2 철근과 대응하는 부분에 "┗┛"자 형상을 갖는 홈이 형성되며 상기 높이 조절 볼트의 노출된 끝단에 콘크리트 타설 높이 기준기를 상기 1쌍의 제 2 철근의 동일한 높이에 설치할 수 있도록 상부 표면이 수평되게 실장되는 기준 블럭과, 상기 고정 블럭 및 기준 블럭의 상기 "┗┛"자 형상을 갖는 홈의 각각에 형성된 제 1 및 제 2 자석을 포함한다.To achieve these and other advantages and in accordance with the purpose of the present invention, as embodied and broadly described herein, there is provided a method of manufacturing a slab, comprising the steps of: Grooves having a "┛" -shaped shape are formed at portions corresponding to a pair of second reinforcing bars arranged vertically, and a first through hole penetrating from the upper surface to the lower surface at both ends, And a fixing bolt which is inserted into the first through-hole and has an end exposed to a predetermined length at the bottom thereof to contact the surface of the horizontal mold to adjust a height of the fixing block, A height adjustment bolt which is inserted into the second through hole and is exposed to a predetermined length, and a groove having a "┛" shape at a portion corresponding to the pair of second reinforcing bars A reference block mounted on the exposed end of the height adjusting bolt such that the upper surface is horizontally mounted so that the concrete placement height reference can be installed at the same height of the pair of second reinforcing bars; And comprises first and second magnets formed in each of the grooves having a shape of?

상기에서 기준 블럭의 상부 표면에 형성된 수준기를 더 포함한다.And a leveler formed on the upper surface of the reference block.

상기에서 고정 블럭 및 기준 블럭이 자석에 붙는 철 또는 페라이트계 스테인레스로 형성된다.In this case, the fixed block and the reference block are formed of iron or ferritic stainless steel adhered to the magnets.

상기에서 높이 조절 볼트의 노출된 헤드 부분이 돔 형상으로 형성된다.
The exposed head portion of the height adjusting bolt is formed into a dome shape.

따라서, 본 발명은 작업자가 수평하는 제 1 철근 상에서 작업하므로 콘크리트 타설 높이 기준기는 수직하는 제 2 철근의 일정한 높이에 용이하게 체결할 수 있어 작업시간을 감소할 수 있을 뿐만 아니라 인건비가 낮은 초심자라도 용이하게 고정되게 체결할 수 있으므로 시공비를 절감할 수 있는 이점이 있다. 또한, 벽체를 형성하기 위한 수직 배열되는 제 2 철근에 의해 고정되게 체결되는 콘크리트 타설 높이 기준기에 의해 이 제 2 철근의 간격이 변하는 것을 방지할 수 있는 이점이 있다.
Therefore, since the worker operates on the horizontal first reinforcing bars, the concrete piling height reference can be easily fastened to a certain height of the vertical second reinforcing bars, which can reduce the working time, So that the construction cost can be reduced. In addition, there is an advantage that it is possible to prevent the spacing of the second reinforcing bars from being changed by the concrete placement height reference device fixedly fastened by the vertically arranged second reinforcing bars for forming the wall.

도 1은 본 발명에 따른 콘크리트 타설 높이 기준기가 수직 배열된 철근에 설치된 상태를 도시한 사시도.
도 2는 본 발명에 따른 콘크리트 타설 높이 기준기를 이용하여 콘크리트를 타설한 상태를 도시한 단면도.
도 3은 본 발명에 따른 콘크리트 타설 높이 기준기 및 그 설치 지그의 분해 사시도.
도 4는 본 발명에 따른 설치 지그를 이용하여 콘크리트 타설 높이 기준기를 고정되게 설치하는 것을 도시한 사시도.
1 is a perspective view showing a state in which a concrete pile height reference device according to the present invention is installed on a vertically arranged reinforcing bar.
FIG. 2 is a cross-sectional view showing a state in which concrete is laid using a concrete pile height reference device according to the present invention; FIG.
3 is an exploded perspective view of a concrete pile height reference device and its installation jig according to the present invention.
4 is a perspective view showing a concrete installation height reference device fixedly installed using an installation jig according to the present invention;

이하, 첨부한 도면을 참조하여 본 발명을 상세하게 설명한다.DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will now be described in detail with reference to the accompanying drawings.

도 1은 본 발명에 따른 콘크리트 타설 높이 기준기가 수직 배열된 철근에 설치된 상태를 도시한 사시도이다.1 is a perspective view illustrating a state in which a concrete pouring height reference device according to the present invention is installed on a vertically arranged reinforcing bar.

본 발명에 따른 콘크리트 타설 높이 기준기(11)는 1쌍의 볼트공(15)을 갖는 고정 브라켓(13), 클램프(17) 및 레벨봉(18)을 포함하며 콘크리트를 타설하여 슬라브를 형성하기 위한 수평 거푸집(21)에 대응되게 매트릭스 형상으로 수평으로 배근된 제 1 철근(23)이 아닌 벽체를 형성하기 위해 수직 거푸집(25) 내에 수직으로 배근된 제 2 철근(27)에 고정되게 체결된다.The concrete pouring height reference 11 according to the present invention includes a fixing bracket 13 having a pair of bolt holes 15, a clamp 17 and a level bar 18, And fixed to a second reinforcing bar 27 vertically laid in the vertical formwork 25 to form a wall that is not a first reinforcing bar 23 horizontally laid out in a matrix corresponding to the horizontal formwork 21 .

고정 브라켓(13)은 서로 인접되게 배근된 1쌍의 제 2 철근(27)과 접촉되게 가로 방향이 길게 형성되어 1쌍의 볼트공(15)은 가로 방향으로 길게 형성된다. 상기에서 1쌍의 볼트공(15)은 고정 브라켓(13)에 접촉되는 서로 인접되게 배근된 1쌍의 제 2 철근(27)이 중간에 위치되도록 형성되는데, 서로 인접되게 배근된 1쌍의 제 2 철근(27)의 사이의 간격이 넓거나 좁아도 모두 수용할 수 있도록 볼트공(15)이 가로 방향으로 길게 형성된다. 또한, 고정 브라켓(13)은 아래 방향을 향하는 하부 단부는 레벨봉(18)을 감싸 고정시키도록 구부려지게 형성된다.The fixing bracket 13 is formed so as to be long in a lateral direction so as to be in contact with a pair of second reinforcing bars 27 disposed adjacent to each other, so that the pair of bolt holes 15 are elongated in the transverse direction. The pair of bolt holes 15 are formed such that a pair of second reinforcing bars 27 contacting the fixing bracket 13 and positioned adjacent to each other are positioned in the middle. The bolt hole 15 is formed to be long in the transverse direction so that the bolt hole 15 can be accommodated even if the gap between the two reinforcing bars 27 is wide or narrow. Further, the lower end of the fixing bracket 13, which faces downward, is formed to be bent so as to surround and fix the level bar 18.

클램프(17)는 1쌍이 각각 서로 인접되게 배근된 1쌍의 제 2 철근(27)에 고정 브라켓(13)을 체결하여 고정시킨다. 상기에서 클램프(17)는 중간 부분에 제 2 철근(27)을 각각 삽입 수용하는 부분을 가지며 양측 부분은 고정 브라켓(13)에 접촉되게 형성되어 1쌍의 볼트공(15)을 관통하는 체결 볼트(19) 및 너트(도 2의 참조 번호 20)에 의해 고정 브라켓(13)을 서로 인접되게 배근된 1쌍의 제 2 철근(27)에 체결하여 고정시킨다. The clamp 17 fastens and fixes the fixing bracket 13 to a pair of second reinforcing bars 27, one pair of which is adjacent to each other. The clamp 17 has a portion for inserting and receiving the second reinforcing bars 27 at an intermediate portion thereof and both side portions thereof are formed to be in contact with the fixing bracket 13 so that the fastening bolts 15, The fixing bracket 13 is fastened to and fixed to a pair of second reinforcing bars 27 which are adjacent to each other by a nut 19 and a nut (reference numeral 20 in Fig. 2).

상기에서 클램프(17)에 의해 제 2 철근(27)에 체결되어 고정된 고정 브라켓(13)은 서로 인접되게 배근된 1쌍의 제 2 철근(27)이 변형되어 간격이 변하는 것을 방지한다. 또한, 클램프(17)에 의해 수직 배근된 제 2 철근(27)에 고정 브라켓(13)을 고정되게 체결되므로 작업자 등에 의해 제 1 철근(23)의 높이가 변형되어도 콘크리트 타설 높이 기준기(11)의 높이는 변화되는 것이 방지된다.The fixing bracket 13 fastened to the second reinforcing bar 27 by the clamp 17 prevents a pair of second reinforcing bars 27 adjacent to each other from being deformed and changing the gap. Since the fixing bracket 13 is fixedly fastened to the second reinforcing bars 27 vertically laid by the clamp 17, even if the height of the first reinforcing bars 23 is deformed by the operator or the like, Is prevented from being changed.

레벨봉(18)은 고정 브라켓(13)의 아래 방향을 향하는 일측 끝단의 구부러진 부분에 끼워져 고정된다. 상기에서 레벨봉(18)은 콘크리트의 타설 높이를 육안으로 식별할 수 있도록 고정 브라켓(13)의 길이 방향 양측으로 연장되게 형성된다. 레벨봉(18)은 고정 브라켓의 하부 단부의 구부려진 부분에 끼워지는 부분과 나머지 노출된 부분을 포함하는 모든 부분이 동일한 직경을 갖도록 형성될 수도 있으나 고정 브라켓(13)의 일측 끝단의 구부러진 부분에 끼워지는 부분이 나머지 부분 보다 작은 직경을 갖도록 형성되어 타설 작업시 움직이거나 빠지는 것을 방지할 수도 있다.The level rod (18) is fitted and fixed in a bent portion at one end of the fixing bracket (13) facing downward. The level rod 18 is formed to extend on both sides of the fixing bracket 13 in the longitudinal direction so that the height of the concrete can be visually recognized. The level rod 18 may be formed such that all portions including the bent portion of the lower end of the fixing bracket and the remaining exposed portion have the same diameter but the bent portion of one end of the fixing bracket 13 The fitting portion is formed to have a smaller diameter than the remaining portion so as to prevent the fitting portion from moving or coming off during the pouring work.

도 2는 본 발명에 따른 콘크리트 타설 높이 기준기(11)를 이용하여 콘크리트를 타설한 상태를 도시한 단면도이다.FIG. 2 is a cross-sectional view showing a state where concrete is laid by using the concrete placement height reference unit 11 according to the present invention.

상기에서 수직 거푸집(25) 내에 수직으로 제 2 철근(27)이 배근되고 수평 거푸집(21)이 설치된 상태에서 제 2 철근(27)에 콘크리트 타설 높이 기준기(11)가 고정되게 설치된다. 그리고, 콘크리트 타설 높이 기준기(11)의 레벨봉(18)을 기준으로 하여 콘크리트를 타설한다. 이에, 콘크리트는 수직 거푸집(25) 내에 타설되어 벽체(31)를 형성하고, 수평 거푸집(21) 상에 레벨봉(18)이 타설된 콘크리트에 상부가 노출되도록 묻히도록 하여 슬라브(29)를 형성한다. 상기에서 콘크리트 타설 높이 기준기(11)의 콘크리트에 묻히지 않고 노출되는 고정 브라켓(13)은 다음 층의 벽체(도시되지 않음)에 묻힌다.The concrete pouring height reference 11 is fixed to the second reinforcing bar 27 in a state where the second reinforcing bars 27 are vertically disposed in the vertical pouring mold 25 and the horizontal pouring mold 21 is installed. The concrete is laid on the basis of the level rods 18 of the concrete placement height reference device 11. Accordingly, the concrete is placed in the vertical formwork 25 to form the wall body 31, and the slab 29 is formed by allowing the upper portion to be exposed to the concrete in which the level rods 18 are laid on the horizontal formwork 21 do. In this case, the fixing bracket 13 exposed without being buried in the concrete of the concrete placement height reference 11 is buried in a wall (not shown) of the next layer.

도 3은 본 발명에 따른 콘크리트 타설 높이 기준기 및 그 설치 지그의 분해 사시도이며, 도 4는 본 발명에 따른 설치 지그를 이용하여 콘크리트 타설 높이 기준기를 고정되게 설치하는 것을 도시한 사시도이다.FIG. 3 is an exploded perspective view of the concrete pouring height reference device and its installation jig according to the present invention, and FIG. 4 is a perspective view illustrating a concrete pouring height reference device fixedly installed using the installation jig according to the present invention.

본 발명에 따른 콘크리트 타설 높이 기준기(11)를 설치하기 위한 설치 지그(33)는 고정 블럭(35), 기준 블럭(37), 고정 볼트(43), 높이 조절 볼트(45), 제 1 및 제 2 자석(47)(48)과 수준기(49)를 포함한다.The installation jig 33 for installing the concrete placement height reference 11 according to the present invention includes a fixing block 35, a reference block 37, a fixing bolt 43, a height adjusting bolt 45, And includes a second magnet (47) (48) and a leveling device (49).

상기에서 고정 블럭(35)은 사각봉으로 일측면의 서로 인접되게 배근된 제 2 철근(27)과 대응하는 부분에 "┗┛"자 형상을 갖는 홈을 가지며 자석에 붙는 금속, 즉, 철 또는 페라이트계 스테인레스 등으로 형성된다. 그리고, 고정 블럭(35)은 양측 끝 부분에 상부 면에서 하부 면까지 관통하는 제 1 관통홀(39)과, 이 제 1 관통홀(39) 사이에 제 2 관통홀(41)이 형성된다.The fixed block 35 has a groove having a "┛" -shaped shape at a portion corresponding to the second reinforcing bar 27 disposed adjacent to one side of the square bar, and a metal attached to the magnet, that is, Ferritic stainless steel or the like. The fixed block 35 is provided with a first through hole 39 passing through from the upper surface to the lower surface at both end portions and a second through hole 41 formed between the first through hole 39.

기준 블럭(37)은 사각봉으로 일측면의 서로 인접되게 배근된 제 2 철근(27)과 대응하는 부분에 "┗┛"자 형상을 갖는 홈을 가지며 자석에 붙는 금속, 즉, 철 또는 페라이트계 스테인레스 등으로 형성된다. 상기에서 기준 블럭(37)은 고정 블럭(35)과 수평하도록 이격되게 설치된다. 기준 블럭(37)은 상부 표면에 콘크리트 타설 높이 기준기(11)를 고정 브라켓(13)의 하부가 접촉되게 실장한 상태에서 클램프(17)로 제 2 철근(27)을 감싼 후 체결 볼트(19) 및 너트(20)에 의해 고정되게 체결한다.The reference block 37 has grooves having a " ┛ "-shaped shape at a portion corresponding to the second reinforcing bars 27 disposed adjacent to each other on one side of the square bar, and a metal attached to the magnet, that is, iron or ferrite Stainless steel or the like. The reference block 37 is spaced apart from the fixed block 35 in a horizontal direction. The reference block 37 is formed by wrapping the second reinforcing bar 27 with the clamp 17 in the state that the concrete pouring height reference 11 is mounted on the upper surface with the lower portion of the fixing bracket 13 being in contact with the fastening bolt 19 ) And the nut (20).

고정 볼트(43)는 제 1 관통홀(39)의 하부에서 상부로 끼워져 하부로 일정 길이가 노출되도록 한다. 상기에서 고정 볼트(43)의 제 1 관통홀(39)의 하부의 노출된 끝단은 노출된 끝단이 도 2에 도시된 수평 거푸집(21)의 표면에 접촉되어 고정 블럭(35)이 수평을 유지하면서 높이를 조절한다.The fixing bolt 43 is inserted into the upper portion of the first through hole 39 from the lower portion to expose a predetermined length thereof. The exposed end of the lower portion of the first through hole 39 of the fixing bolt 43 is exposed to the surface of the horizontal mold 21 shown in FIG. 2 so that the fixing block 35 is horizontal While adjusting the height.

높이 조절 볼트(45)는 제 2 관통홀(41)의 상부에서 하부로 끼워져 상부로 일정 길이가 노출되도록 한다. 상기에서 높이 조절 볼트(45)는 상부에 노출된 끝단의 헤드 부분은 제 2 철근(27)에 콘크리트 타설 높이 기준기(11)를 체결하여 고정시키는 작업을 할 때 기준 블럭(37)이 실장되어 체결 높이를 일정하고 빠르게 한정할 수 있다. 상기에서 높이 조절 볼트(45)의 상부에 노출된 헤드 부분이 돔 형상으로 형성되는 것이 바람직하다.The height adjusting bolt 45 is fitted to the lower portion of the second through hole 41 so as to be exposed to a predetermined length. The reference block 37 is mounted on the height adjustment bolt 45 when the head portion of the end exposed at the top is fastened and fixed to the concrete pile height reference 11 by the second reinforcing bar 27 It is possible to constrain the fastening height constantly and quickly. The head portion exposed above the height adjusting bolt 45 may be formed in a dome shape.

제 1 및 제 2 자석(47)(48)은 고정 블럭(35) 및 기준 블럭(37)의 각각에 형성된 "┗┛"자 형상을 갖는 홈에 부착되게 설치된다. 상기에서 제 1 및 제 2 자석(47)(48)은 제 2 철근(27)에 자력에 의해 부착되어 고정 블럭(35) 및 기준 블럭(37)을 작업자가 손으로 잡지 않아도 고정시킨다. 즉, 제 2 철근(27)에 콘크리트 타설 높이 기준기(11)를 체결하여 고정시키는 작업을 할 때 고정 블럭(35)을 고정 볼트(43)가 수평 거푸집(21)의 표면에 접촉되게 위치시키고 기준 블럭(37)을 높이 조절 볼트(45)의 헤드에 실장하면 제 2 자석(48)의 자력에 의해 제 2 철근(27)에 부착되므로 작업이 용이하다.The first and second magnets 47 and 48 are installed so as to adhere to grooves having a "?" Shape formed in each of the fixed block 35 and the reference block 37. The first and second magnets 47 and 48 are attached to the second reinforcing bars 27 by magnetic force to fix the fixed block 35 and the reference block 37 even if the operator does not hold them by hand. That is, when the concrete pile height reference 11 is fastened and fixed to the second reinforcing bar 27, the fixing block 35 is placed in contact with the surface of the horizontal mold 21 When the reference block 37 is mounted on the head of the height adjusting bolt 45, it is attached to the second reinforcing bar 27 by the magnetic force of the second magnet 48, so that the operation is easy.

수준기(49)는 기준 블럭(37)의 상부 표면에 형성되며 기포관(도시되지 않음)을 갖추어 기포가 중앙에 위치할 때 이 기준 블럭(37)이 수평이라는 것을 확인할 수 있다. 상기에서 기준 블럭(37)이 수평하지 않으면 제 2 철근(27)에 콘크리트 타설 높이 기준기(11)가 수평하지 않게 고정 체결되어 레벨봉(18) 양끝의 높이가 서로 다르게 되므로 콘크리트는 타설 높이가 변하거나 평탄하지 않게 된다. The leveler 49 is formed on the upper surface of the reference block 37 and has a bubble tube (not shown) to confirm that the reference block 37 is level when the bubble is centered. If the reference block 37 is not horizontal, the concrete placement height reference 11 is fixed to the second reinforcing bars 27 in a non-horizontal manner so that the height of the level rods 18 is different from each other. It becomes unstable or uneven.

그러므로, 수준기(49)의 기포 위치가 중앙에 위치하는 가를 판단하여 기준 블럭(37)의 수평을 확인한 후 제 2 철근(27)에 콘크리트 타설 높이 기준기(11)를 수평하게 고정 체결한다. 이에, 레벨봉(18) 양끝이 동일한 높이에 위치되므로 콘크리트가 동일한 높이로 평탄하게 타설될 수 있다.Therefore, it is determined whether the bubble position of the leveling device 49 is located at the center, and the horizontal position of the reference block 37 is confirmed. Then, the concrete placement height reference device 11 is horizontally fixed to the second reinforcing bar 27. Thus, since both ends of the level bar 18 are located at the same height, the concrete can be laid flat at the same height.

상술한 구성의 본 발명에 따른 설치 지그(33)를 이용하여 콘크리트 타설 높이 기준기(11)를 고정되게 체결하는 것을 설명한다.Fixing of the concrete placement height reference 11 using the installation jig 33 according to the present invention having the above-described structure will be described.

먼저, 설치 지그(33)를 수직으로 배근된 제 2 철근(27)에 제 2 철근(27)에 부착시킨다. 상기에서 설치 지그(33)는 고정 블럭(35)에 형성된 제 1 및 제 2 관통홀(39)(41) 각각에 고정 볼트(43)와 높이 조절 볼트(45)를 끼운다. 그리고, 고정 볼트(43)의 하부를 수평 거푸집(21)의 표면에 접촉되어 고정 블럭(35)을 제 2 철근(27)에 접촉시킨다. 이에 의해, 고정 블럭(35)은 제 1 자석(47)의 자력에 의해 제 2 철근(27)에 부착되어 작업자가 손으로 고정하지 않아도 유동하지 않는다.First, the installation jig 33 is attached to the second reinforcing bar 27 with the vertically disposed second reinforcing bars 27. The fixing jig 33 is provided with a fixing bolt 43 and a height adjusting bolt 45 in the first and second through holes 39 and 41 formed in the fixing block 35. The lower part of the fixing bolt 43 is brought into contact with the surface of the horizontal mold 21 so that the fixing block 35 is brought into contact with the second reinforcing bars 27. Thereby, the fixed block 35 is attached to the second reinforcing bar 27 by the magnetic force of the first magnet 47 and does not flow even if the operator does not fix it by hand.

그리고, 기준 블럭(37)을 높이 조절 볼트(45)의 헤드에 실장하고 수준기(49)의 기포가 기포관(도시되지 않음)의 중앙에 위치되도록 고정 블럭(35)의 높이를 조절하여 기준 블럭(37)이 수평이루도록 한다. 이때, 기준 블럭(37)도 제 2 자석(48)의 자력에 의해 제 2 철근(27)에 부착되어 작업자가 손으로 잡지 않아도 유동하지 않는다. 상기에서 고정 블럭 및 기준 블럭(37)이 작업자가 손으로 고정하지 않아도 제 1 및 제 2 자석(47)(48)에 의해 제 2 철근(27)으로부터 유동하지 않으므로 작업이 용이하다.The reference block 37 is mounted on the head of the height adjusting bolt 45 and the height of the fixing block 35 is adjusted so that the bubble of the leveling instrument 49 is positioned at the center of the bubble tube (37) is horizontal. At this time, the reference block 37 is attached to the second reinforcing bar 27 by the magnetic force of the second magnet 48, and does not flow even if the operator does not hold it by hand. Since the fixed block and the reference block 37 do not flow from the second reinforcing bars 27 by the first and second magnets 47 and 48 even if the operator does not fix them by hand, the operation is easy.

그 다음, 아래 방향을 향하는 일측 끝단의 구부러진 부분에 레벨봉(18)이 끼워져 고정된 고정 브라켓(13)을 서로 인접되게 배근된 1쌍의 제 2 철근(27)이 가로 방향으로 길게 형성된 2개의 볼트공(15)의 중간에 위치하도록 한다. 그리고, 각각 서로 인접되게 배근된 1쌍의 제 2 철근(27)을 1쌍의 클램프(17)의 각각 삽입 수용하는 부분에 수용하면서 양측 부분이 고정 브라켓(13)에 접촉시킨다. 그 후 볼트공(15)을 관통하는 체결 볼트(19) 및 너트(20)에 의해 고정 브라켓(13)을 서로 인접되게 배근된 1쌍의 제 2 철근(27)에 체결하여 고정시킨다. 상기에서 고정 브라켓(13)은 서로 인접되게 배근된 1쌍의 제 2 철근(27)의 간격이 변하는 것을 방지하여 일정하게 하는 스페이서의 기능도 한다.Then, a pair of second reinforcing bars 27, which are adjacent to each other, are fixed to the fixing bracket 13, which is fixed by fixing the level bar 18 to the bent portion at one end facing downward, So that it is positioned in the middle of the bolt hole 15. A pair of second reinforcing bars 27, which are adjacent to each other, are accommodated in the respective insertion and receiving portions of the pair of clamps 17, and both side portions are brought into contact with the fixing bracket 13. The fixing bracket 13 is fastened and fixed to a pair of second reinforcing bars 27 adjacent to each other by means of a fastening bolt 19 and a nut 20 penetrating the bolt hole 15. The fixing bracket 13 also functions as a spacer for preventing the spacing of the pair of second reinforcing bars 27 adjacent to each other from being changed to be constant.

이러한 방법에 의해 설치 지그(33)를 이용하여 콘크리트 타설 높이 기준기(11)를 연속해서 고정되게 체결할 수 있는데, 이 후에는 높이가 조절된 고정 블럭(35)과 기준 블럭(37)을 이동하여 설치하는 것에 의해 콘크리트 타설 높이 기준기(11)를 일정한높이에 용이하게 체결할 수 있다. 또한, 수준기(49)의 기포 위치를 확인하여 기준 블럭(37)의 수평을 용이하게 확인할 수 있으며, 이 기준 블럭(37)이 수평을 이루지 않은 경우에는 높이 조절 볼트(45)를 미세 조정하여 수평을 이룰 수 있도록 한다. In this way, the concrete pouring height reference 11 can be fixed in a continuous manner by using the installation jig 33. After that, the fixed block 35 and the reference block 37, which are adjusted in height, So that the concrete placement height reference device 11 can be easily fastened to a predetermined height. When the reference block 37 is not horizontally aligned, the height adjustment bolt 45 is finely adjusted to adjust the horizontal position of the reference block 37, .

그러므로, 콘크리트 타설 높이 기준기(11)를 일정한 높이에 용이하게 고정되게 체결할 수 있어 작업시간이 감소할 수 있으며, 특히, 인건비가 낮은 초심자라도 용이하게 고정되게 체결할 수 있으므로 시공비를 절감할 수 있다. 또한, 콘크리트 타설 높이 기준기(11)를 수직 배열되는 제 2 철근(27)에 설치되므로 작업자가 수평 방향으로 배열되는 제 1 철근(23) 상에서 작업을 하여도 일정한 높이에 설치할 수 있다.Therefore, it is possible to fasten the concrete placement height reference unit 11 to a fixed height so that the work time can be reduced. In particular, even a novice having a low labor cost can be fastened easily and fixedly, have. In addition, since the concrete placement height reference device 11 is installed on the vertically arranged second reinforcing bars 27, the operator can work on the first reinforcing bars 23 arranged in the horizontal direction and can be installed at a constant height.

상기에서 설명한 바와 같이 본 발명은 하나의 실시 예에 불과한 것으로, 본 발명은 상술한 실시 예에 한정되지 않고, 본 발명의 기술적 사상 내에서 당 분야의 통상의 지식을 가진 자에 의하여 여러 가지 변형이 가능하다.
As described above, the present invention is only one embodiment, and the present invention is not limited to the above-described embodiments, and various modifications may be made by those skilled in the art within the technical scope of the present invention. It is possible.

11 : 콘크리트 타설 높이 기준기 13 : 고정 브라켓
17 : 클램프 18 : 레벨봉
23 : 제 1 철근 27 : 제 2 철근
33 : 설치 지그 35 : 고정 블럭
37 : 기준 블럭 43 : 고정 볼트
45 : 높이 조절 볼트 47, 48 : 제 1 및 제 2 자석
49 : 수준기
11: Reference height of concrete pile 13: Fixing bracket
17: Clamp 18: Leveling rod
23: first reinforcing bar 27: second reinforcing bar
33: installation jig 35: fixed block
37: reference block 43: fixing bolt
45: height adjusting bolts 47, 48: first and second magnets
49: Levels

Claims (7)

삭제delete 삭제delete 삭제delete 건축물 시공시 슬라브를 형성하기 위한 수평 거푸집 상에 매트릭스 형상으로 수평으로 배근된 제 1 철근과 수직되어 벽체를 형성하기 위해 수직으로 배근되는 1쌍의 제 2 철근과 대응하는 부분에 "┗┛"자 형상을 갖는 홈이 형성되며 양측 끝 부분에 상부 면에서 하부 면까지 관통하는 제 1 관통홀과 이 제 1 관통홀 사이에 제 2 관통홀을 갖는 사각봉으로 형성된 고정 블럭과,
상기 제 1 관통홀에 끼워져 하부로 일정 길이가 노출된 끝단이 상기 수평 거푸집의 표면에 접촉되어 고정 블럭의 높이를 조절하는 고정 볼트와,
상기 제 2 관통홀에 끼워져 상부로 일정 길이가 노출된 높이 조절 볼트와,
상기 1쌍의 제 2 철근과 대응하는 부분에 "┗┛"자 형상을 갖는 홈이 형성되며 상기 높이 조절 볼트의 노출된 끝단에 콘크리트 타설 높이 기준기를 상기 1쌍의 제 2 철근의 동일한 높이에 설치할 수 있도록 상부 표면이 수평되게 실장되는 기준 블럭과,
상기 고정 블럭 및 기준 블럭의 상기 "┗┛"자 형상을 갖는 홈의 각각에 형성된 제 1 및 제 2 자석을 포함하는 콘크리트 타설 높이 기준기의 설치 블럭.
A first reinforcing bar horizontally disposed in a matrix form on a horizontal mold for forming a slab at the time of building construction, and a portion "┗┛" at a portion corresponding to a pair of second reinforcing bars vertically arranged to form a wall, A stationary block having a first through hole passing through the upper surface to the lower surface at both end portions thereof and a square bar having a second through hole between the first through hole,
A fixing bolt which is inserted into the first through hole and has an end exposed by a predetermined length to be in contact with the surface of the horizontal mold to adjust the height of the fixing block;
A height adjusting bolt inserted into the second through hole and exposed to a predetermined length,
A groove having a "┛" shape is formed at a portion corresponding to the pair of second reinforcing bars and a concrete pouring height reference unit is disposed at the same height of the pair of second reinforcing bars at the exposed end of the height adjusting bolt A reference block on which the upper surface is horizontally mounted,
And a first and second magnets formed on each of the grooves having the "┛" -shaped shape of the fixed block and the reference block.
청구항 4에 있어서 상기 기준 블럭의 상부 표면에 형성된 수준기를 더 포함하는 콘크리트 타설 높이 기준기의 설치 블럭.
The installation block of claim 4, further comprising a leveler formed on an upper surface of the reference block.
청구항 4에 있어서 상기 고정 블럭 및 기준 블럭이 자석에 붙는 철 또는 페라이트계 스테인레스로 형성된 콘크리트 타설 높이 기준기의 설치 블럭.
The installation block of claim 4, wherein the fixed block and the reference block are made of iron or ferritic stainless steel attached to a magnet.
청구항 4에 있어서 상기 높이 조절 볼트의 노출된 헤드 부분이 돔 형상으로 형성되는 콘크리트 타설 높이 기준기의 설치 블럭.The installation block of claim 4, wherein the exposed head portion of the height adjustment bolt is formed in a dome shape.
KR1020130158444A 2013-12-18 2013-12-18 Concrete placing leveler and installing jig thereof KR101627159B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020130158444A KR101627159B1 (en) 2013-12-18 2013-12-18 Concrete placing leveler and installing jig thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020130158444A KR101627159B1 (en) 2013-12-18 2013-12-18 Concrete placing leveler and installing jig thereof

Publications (2)

Publication Number Publication Date
KR20150071417A KR20150071417A (en) 2015-06-26
KR101627159B1 true KR101627159B1 (en) 2016-06-03

Family

ID=53517707

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020130158444A KR101627159B1 (en) 2013-12-18 2013-12-18 Concrete placing leveler and installing jig thereof

Country Status (1)

Country Link
KR (1) KR101627159B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089271A (en) * 2015-09-09 2015-11-25 成都蒲江珂贤科技有限公司 Mechanical embedded bolt positioning and installing assembly
KR102395438B1 (en) * 2020-07-13 2022-05-10 노희아 Level indicator for construction

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100680250B1 (en) 2004-12-31 2007-02-07 김진선 Horizontal Recognition Member for Concrete
JP2009266409A (en) 2008-04-22 2009-11-12 Hokumei Denki Kogyo Kk Light guide plate supporting structure of light guide plate surface emission type display device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0996053A (en) * 1995-09-29 1997-04-08 Akoo:Kk Holder for reinforcement

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100680250B1 (en) 2004-12-31 2007-02-07 김진선 Horizontal Recognition Member for Concrete
JP2009266409A (en) 2008-04-22 2009-11-12 Hokumei Denki Kogyo Kk Light guide plate supporting structure of light guide plate surface emission type display device

Also Published As

Publication number Publication date
KR20150071417A (en) 2015-06-26

Similar Documents

Publication Publication Date Title
KR100758356B1 (en) Boundary stone establishing structure and method
JP4738886B2 (en) Equipment foundation
RU2011135194A (en) METHOD FOR CREATING A CONCRETE PLATFORM, CONCRETE PLATFORM AND CONNECTING DETAIL
KR101627159B1 (en) Concrete placing leveler and installing jig thereof
CN107386455B (en) Shock insulation support and installation and construction method thereof
KR100837230B1 (en) A fixing apparatus for a shape steel beam
JP4523869B2 (en) Column fixing member installation method and column fixing member installation device for steel pipe foundation pile
JP2008081980A (en) Positioning tool for anchor bolt
EP2414604B1 (en) Building construction method
KR20100117288A (en) Concrete slab leveler
JP3673108B2 (en) Hollow slab void member installation method
EP2337910B1 (en) Device for determining the concrete cover of reinforcements during casting
JP4723920B2 (en) Anchor bolt positioning device
KR200468906Y1 (en) Foundation bolt mount with height adjustment
KR100416216B1 (en) Spacer
JP5706182B2 (en) Seismic isolation base plate mounting jig and mounting method
JP3118630U (en) Gripping guide for floor concrete level
KR200418000Y1 (en) A location fixing device for aluminum form
KR200418001Y1 (en) A location fixing device for aluminum form
CN215671162U (en) Can dismantle thick controlling means of concrete slab
KR200478204Y1 (en) Rise preventing device of hollow materials for hollow core slab
KR20160017348A (en) The strengthen support for a concrete form
JPH0138947B2 (en)
KR101426650B1 (en) Forming Structure of Building Frame
JP2012067441A (en) Installation method for anchor bolt

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
FPAY Annual fee payment

Payment date: 20190423

Year of fee payment: 4