JP3714439B2 - Concrete sheet pile construction jig - Google Patents

Concrete sheet pile construction jig Download PDF

Info

Publication number
JP3714439B2
JP3714439B2 JP05775997A JP5775997A JP3714439B2 JP 3714439 B2 JP3714439 B2 JP 3714439B2 JP 05775997 A JP05775997 A JP 05775997A JP 5775997 A JP5775997 A JP 5775997A JP 3714439 B2 JP3714439 B2 JP 3714439B2
Authority
JP
Japan
Prior art keywords
sheet pile
concrete
concrete sheet
head
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP05775997A
Other languages
Japanese (ja)
Other versions
JPH10252066A (en
Inventor
武 小高
光雄 西本
時彦 米田
北村  精男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GIKEN LTD.
Original Assignee
GIKEN LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GIKEN LTD. filed Critical GIKEN LTD.
Priority to JP05775997A priority Critical patent/JP3714439B2/en
Publication of JPH10252066A publication Critical patent/JPH10252066A/en
Application granted granted Critical
Publication of JP3714439B2 publication Critical patent/JP3714439B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は従来はできなかった、地表或いは地表より下までコンクリート矢板を打ち込むことを可能にする、コンクリート矢板の施工治具に関する。
【0002】
【従来の技術及び発明が解決しようとする課題】
従来、コンクリート矢板の施工は、矢板の上部(頭部)をチャックで掴み土中に打ち込むため、矢板の頭部は、地表面より上にでる結果となっていた。
【0003】
図4(a)は従来の方法でコンクリート矢板の頭部をチャックで掴みワイヤに接続したバイブロハンマで打ち込む施行法の正面図であり、(b)は側面図である。この例でわかるようにチャックの掴み代は必ず地表に残る。
【0004】
図5は従来の方法で油圧作動のコンクリートパイラでコンクリート矢板を打ち込んでいる図である。コンクリート矢板の側面をチャックで掴み、油圧で一定深さ打ち込み、しゃくとり虫式に、チャックで掴む位置を上方に変え再び打ち込むことを繰り返す。この例からも明らかなように、地表にコンクリート矢板の頭部が残る。
【0005】
このように従来の方法では矢板の天端を地表面まで或いは地表面より下まで打ち込むことができなかった。従って矢板の天端を地表面と同じ高さ、または地表面より低く(深く)しなければならない場合は、矢板の頭部を斫り揃えるか、矢板を打ち込む部分の地面を予め掘り下げておき、施工後に掘り下げた部分だけ埋め戻しをする必要があった。
【0006】
図6(a)は、予め所定の深さまで掘り下げてコンクリート矢板を打ち込んでいる図であり、(b)はその側面図である。
【0007】
この発明は、従来できなかった矢板の頭部を地表面まで、或いは地表面より低く打ち込むことができる治具を提供するものである。
【0008】
【課題を解決するための手段】
コンクリート矢板の施工治具であり、コンクリート矢板の頭部に、雌ねじを切削したインサートを埋設し、前記コンクリート矢板に掴み部材を重ね、該掴み部材に設けたボルト孔にボルトを挿通し、前記コンクリート矢板に埋設されたインサートに、螺合、固定してなることを特徴とするコンクリート矢板の施工治具を主旨とする。
【0009】
次にその作用について述べる。
【0010】
コンクリート矢板の頭部にボルトで重ねて取り付けた掴み部材部分を、施工機械のチャックで掴み、矢板を打ち込んだ後、前記掴み部材を取り外すことにより、矢板の天端を地表と同じ高さ、または地表より低くすることができる。なお圧入工法のように、既設の矢板を反力として使用する場合は、反力として使用する数枚の矢板に掴み部材を取り付けたまま残しておくことによって、圧入工法にも対処できる。
【0011】
またコンクリート矢板の板厚が変わっても、コンクリート矢板に埋設するインサートの位置を合わせておくことで、掴み部材の兼用ができる。さらに板厚が大きい場合、従来の油圧作動のコンクリートパイラでは、矢板を掴むチャックのストロークは、矢板のコンクリート厚以上必要であったため、コンクリートパイラが大型になる傾向があった。しかしこの発明の治具を用いれば、コンクリート矢板の厚さより薄い掴み部材を掴むに止まるので、コンクリートパイラは小型化できる。
【0012】
なお施工機械のチャックで掴む部分は、直接コンクリート矢板の部分ではなく掴み部材を掴むことになるため、コンクリート矢板の頭部を欠損する虞がない。
【0013】
また掴み部材同志の連結を、従来はコンクリート矢板の頭部に埋設したプレートを溶接して行っていたが、別のプレート等を利用してボルト締結して連結できるので治具の傷みが少なくまた着脱が容易である。
【0014】
【発明の実施の形態】
以下図面に基づいてこの発明のコンクリート矢板の施工治具を説明する。
【0015】
図1(a)は、この発明のコンクリート矢板1の頭部に掴み部材2を重ねた全体図である。3は掴み部材2に穿設したボルト孔である。掴み部材は必ずしもコンクリート矢板と同じ断面である必要はない。(b)はコンクリート矢板に掴み部材2を取り付けた詳細図である。(c)は(b)の上面図である。
【0016】
5はコンクリート矢板の頭部に埋設された、雌ねじを切削したインサートを示し、4は該インサート5に螺合し掴み部材2を、コンクリート矢板に取り付けるボルトである。図2(a)は掴み部材2をチャック7で掴み、バイブロハンマ6でコンクリート矢板を打ち込んでいる正面図である。左側のコンクリート矢板1の掴み部材2は既に取り外してある。(b)はその側面図である。
【0017】
図3は掴み部材2の側面を、油圧作動のコンクリートパイラ8で掴み、一定のストローク分だけ打ち込み、しゃくとり虫的に掴み部材2を掴む位置を上げて、再び打ち込む様子を示した図である。コンクリートパイラ8は油圧シリンダを応用しており、打ち込み時の反力は相隣るコンクリート矢板1に残した掴み部材2を掴むことによって得られる。反力を得ることに預からない、掴み部材2は取り外され他に転用される。
【0018】
【発明の効果】
この発明は以上のような構成からなり次のような効果を奏する。
【0019】
従来は、矢板の天端を地表面と同じ高さ、または地表面より低くする場合は、
▲1▼矢板を施工後に所定の高さに斫るか、
▲2▼矢板を施工する場所を事前に掘り下げておき、施工後埋め戻す。
【0020】
ことが必要であった。▲1▼の場合は、矢板の長さが所定の長さ以上に必要となるばかりか、矢板の斫落としの費用及び工期を要する。また▲2▼の場合は、施工する以前に施工場所を掘り下げ、施工後に埋め戻しを要し、これも▲1▼と同様、費用と工期を余分に要する。
【0021】
この発明のコンクリート矢板の施工治具を用いれば、施工後、掴み部材を取り外すだけで地表と同じ高さか、地表より低い位置に矢板を埋め込むことができる。また取り外した掴み部材、ボルトは、次の矢板の打ち込みに転用することができて、簡便で経済的な矢板施行法が実現できる。
【0022】
またコンクリート矢板の板厚が変わっても、コンクリート矢板に埋設するインサートの位置を合わせておくことで、掴み部材の兼用ができる。さらに板厚が大きい場合、従来の油圧作動のコンクリートパイラでは、矢板を掴むチャックのストロークは、矢板のコンクリート厚以上必要であったため、コンクリートパイラが大型になる傾向があった。しかしこの発明の治具を用いれば、コンクリート矢板の厚さより薄い掴み部材を掴むに止まるので、コンクリートパイラは小型化できる。
【0023】
なお施工機械のチャックで掴む部分は、直接コンクリート矢板の部分ではなく掴み部材を掴むことになるため、コンクリート矢板の頭部を欠損する虞がない。
【0024】
また掴み部材同志の連結を、従来はコンクリート矢板の頭部に埋設したプレートを溶接して行っていたが、別のプレート等を利用してボルト締結して連結できるので治具の傷みが少なくまた着脱が容易である。
【図面の簡単な説明】
【図1】(a)は、この発明のコンクリート矢板1の頭部に掴み部材2を重ねた全体図である。(b)はコンクリート矢板に掴み部材2を取り付けた詳細図である。(c)は(b)の上面図である。
【図2】(a)は掴み部材2をチャック7で掴み、バイブロハンマ6でコンクリート矢板を打ち込んでいる正面図である。(b)はその側面図である。
【図3】掴み部材2の側面を、コンクリートパイラ8で掴み、一定のストローク分だけ打ち込み、しゃくとり虫的に掴み部材2を掴む位置を上げて、再び打ち込む様子を示した図である。
【図4】(a)は従来の方法でコンクリート矢板の頭部をチャックで掴みワイヤに接続したバイブロハンマで打ち込む施行法の正面図であり、(b)側面図である。
【図5】従来の方法でコンクリートパイラでコンクリート矢板を打ち込んでいる図である。
【図6】(a)は、予め所定の深さまで掘り下げてコンクリート矢板を埋め込んでいる図であり、(b)はその側面図である。
【符号の説明】
1……コンクリート矢板
2……掴み部材
3……ボルト孔
4……ボルト
5……インサート
6……バイブロハンマ
7……チャック
8……コンクリートパイラ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a concrete sheet pile construction jig that can be driven to the ground surface or below the ground surface, which could not be done conventionally.
[0002]
[Prior art and problems to be solved by the invention]
Conventionally, in the construction of a concrete sheet pile, since the upper part (head) of the sheet pile is grasped by a chuck and driven into the soil, the head of the sheet pile has come out above the ground surface.
[0003]
FIG. 4A is a front view of an enforcement method in which the head of a concrete sheet pile is gripped by a chuck and driven by a vibro hammer connected to a wire by a conventional method, and FIG. 4B is a side view. As you can see in this example, the gripping cost of the chuck always remains on the ground.
[0004]
FIG. 5 shows a concrete sheet pile driven by a hydraulically operated concrete piler according to a conventional method. Grab the side of the concrete sheet pile with a chuck, drive it to a certain depth with hydraulic pressure, and repeat the driving by changing the gripping position upward with a chuck insect type. As is clear from this example, the head of the concrete sheet pile remains on the ground surface.
[0005]
Thus, in the conventional method, the top of the sheet pile cannot be driven to the ground surface or below the ground surface. Therefore, if the top of the sheet pile must be the same height as the ground surface or lower (deeper) than the ground surface, the heads of the sheet piles should be beaten or the ground of the part where the sheet piles will be driven in advance, It was necessary to backfill only the part dug down after construction.
[0006]
FIG. 6A is a view in which a concrete sheet pile is dug down in advance to a predetermined depth, and FIG. 6B is a side view thereof.
[0007]
The present invention provides a jig capable of driving the head of a sheet pile, which has not been possible before, to the ground surface or lower than the ground surface.
[0008]
[Means for Solving the Problems]
It is a concrete sheet pile construction jig, an insert in which a female thread is cut is embedded in the head of the concrete sheet pile, a grip member is stacked on the concrete sheet pile, a bolt is inserted into a bolt hole provided in the grip member, and the concrete A concrete sheet pile construction jig characterized by being screwed and fixed to an insert embedded in a sheet pile.
[0009]
Next, the operation will be described.
[0010]
Grab the gripping member part attached to the head of the concrete sheet pile with a bolt, grip it with the chuck of the construction machine, drive the sheet pile, then remove the gripping member, so that the top of the sheet pile is the same height as the ground surface, or It can be lower than the ground surface. When the existing sheet pile is used as a reaction force as in the press-fit method, the press-fit method can be dealt with by leaving the gripping members attached to several sheet piles used as the reaction force.
[0011]
Moreover, even if the thickness of the concrete sheet pile changes, the grip member can also be used by matching the position of the insert embedded in the concrete sheet pile. Further, when the plate thickness is large, in the conventional hydraulically operated concrete piler, the stroke of the chuck for gripping the sheet pile needs to be greater than the concrete thickness of the sheet pile, and therefore the concrete pile tends to be large. However, if the jig of the present invention is used, the gripping member that is thinner than the thickness of the concrete sheet pile is stopped, so that the concrete piler can be miniaturized.
[0012]
In addition, since the part gripped with the chuck | zipper of a construction machine will hold | grip a grip member instead of the part of a concrete sheet pile directly, there is no possibility of losing the head part of a concrete sheet pile.
[0013]
Conventionally, the grip members are connected by welding a plate embedded in the head of a concrete sheet pile, but it can be connected by bolting using another plate, etc., so there is little damage to the jig. Easy to put on and take off.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
A concrete sheet pile construction jig according to the present invention will be described below with reference to the drawings.
[0015]
Fig.1 (a) is the whole figure which piled up the holding member 2 on the head of the concrete sheet pile 1 of this invention. Reference numeral 3 denotes a bolt hole formed in the gripping member 2. The gripping member does not necessarily have the same cross section as the concrete sheet pile. (B) is the detail which attached the grip member 2 to the concrete sheet pile. (C) is a top view of (b).
[0016]
Reference numeral 5 denotes an insert embedded in the head of the concrete sheet pile, in which a female screw is cut. Reference numeral 4 denotes a bolt that is screwed into the insert 5 and attaches the gripping member 2 to the concrete sheet pile. FIG. 2A is a front view in which the gripping member 2 is gripped by the chuck 7 and a concrete sheet pile is driven by the vibro hammer 6. The gripping member 2 of the left concrete sheet pile 1 has already been removed. (B) is the side view.
[0017]
FIG. 3 is a view showing a state in which the side surface of the gripping member 2 is gripped by a hydraulically operated concrete pillar 8 and driven for a certain stroke, and the position for gripping the gripping member 2 is raised and driven again. . The concrete pillar 8 uses a hydraulic cylinder, and the reaction force at the time of driving is obtained by gripping the gripping members 2 left on the adjacent concrete sheet piles 1. The gripping member 2 that does not keep the reaction force is removed and diverted to others.
[0018]
【The invention's effect】
The present invention is configured as described above and has the following effects.
[0019]
Conventionally, when the top of the sheet pile is the same height as the ground surface or lower than the ground surface,
(1) Whether the sheet pile is rolled up to a predetermined height after construction,
(2) Dig the place where the sheet pile will be constructed in advance, and backfill after construction.
[0020]
It was necessary. In the case of {circle around (1)}, not only the length of the sheet pile is required to be longer than a predetermined length, but also the cost and construction period for dropping the sheet pile are required. In the case of (2), the construction site is dug down before construction, and backfilling is required after construction. This also requires an extra cost and construction period, as in (1).
[0021]
If the construction jig of the concrete sheet pile of this invention is used, a sheet pile can be embedded in the same height as a ground surface or a position lower than the ground surface only by removing a holding member after construction. The removed gripping member and bolt can be used for driving the next sheet pile, and a simple and economical sheet pile enforcement method can be realized.
[0022]
Moreover, even if the thickness of the concrete sheet pile changes, the grip member can also be used by matching the position of the insert embedded in the concrete sheet pile. Further, when the plate thickness is large, in the conventional hydraulically operated concrete piler, the stroke of the chuck for gripping the sheet pile needs to be greater than the concrete thickness of the sheet pile, and therefore the concrete pile tends to be large. However, if the jig of the present invention is used, the gripping member that is thinner than the thickness of the concrete sheet pile is stopped, so that the concrete piler can be miniaturized.
[0023]
In addition, since the part gripped with the chuck | zipper of a construction machine will hold | grip a grip member instead of the part of a concrete sheet pile directly, there is no possibility of losing the head part of a concrete sheet pile.
[0024]
Conventionally, the grip members are connected by welding a plate embedded in the head of a concrete sheet pile, but it can be connected by bolting using another plate, etc., so there is little damage to the jig. Easy to put on and take off.
[Brief description of the drawings]
FIG. 1 (a) is an overall view in which a gripping member 2 is superimposed on the head of a concrete sheet pile 1 of the present invention. (B) is the detail which attached the grip member 2 to the concrete sheet pile. (C) is a top view of (b).
FIG. 2 (a) is a front view in which a gripping member 2 is gripped by a chuck 7 and a concrete sheet pile is driven by a vibro hammer 6. FIG. (B) is the side view.
FIG. 3 is a view showing a state in which the side surface of the gripping member 2 is gripped by the concrete pillar 8 and driven by a certain stroke, and the position where the gripping member 2 is gripped is raised and driven again.
4A is a front view of an enforcement method in which the head of a concrete sheet pile is gripped by a chuck and driven by a vibro hammer connected to a wire by a conventional method, and FIG. 4B is a side view.
FIG. 5 is a diagram showing a concrete sheet pile driven by a concrete piler according to a conventional method.
FIG. 6A is a view in which a concrete sheet pile is dug down in advance to a predetermined depth, and FIG. 6B is a side view thereof.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Concrete sheet pile 2 ... Grasp member 3 ... Bolt hole 4 ... Bolt 5 ... Insert 6 ... Vibro hammer 7 ... Chuck 8 ... Concrete pile

Claims (1)

コンクリート矢板の施工治具であり、コンクリート矢板の頭部に、雌ねじを切削したインサートを埋設し、前記コンクリート矢板に掴み部材を重ね、該掴み部材に設けたボルト孔にボルトを挿通し、前記コンクリート矢板に埋設されたインサートに、螺合、固定してなることを特徴とするコンクリート矢板の施工治具。It is a concrete sheet pile construction jig, an insert in which an internal thread is cut is embedded in the head of the concrete sheet pile, a grip member is stacked on the concrete sheet pile, a bolt is inserted into a bolt hole provided in the grip member, and the concrete A concrete sheet pile construction jig characterized by being screwed and fixed to an insert embedded in a sheet pile.
JP05775997A 1997-03-12 1997-03-12 Concrete sheet pile construction jig Expired - Fee Related JP3714439B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP05775997A JP3714439B2 (en) 1997-03-12 1997-03-12 Concrete sheet pile construction jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP05775997A JP3714439B2 (en) 1997-03-12 1997-03-12 Concrete sheet pile construction jig

Publications (2)

Publication Number Publication Date
JPH10252066A JPH10252066A (en) 1998-09-22
JP3714439B2 true JP3714439B2 (en) 2005-11-09

Family

ID=13064816

Family Applications (1)

Application Number Title Priority Date Filing Date
JP05775997A Expired - Fee Related JP3714439B2 (en) 1997-03-12 1997-03-12 Concrete sheet pile construction jig

Country Status (1)

Country Link
JP (1) JP3714439B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020122379A (en) * 2019-01-31 2020-08-13 株式会社技研製作所 Attachment for driving down pile and pile press-in method
CN114808837A (en) * 2022-04-14 2022-07-29 中国港湾工程有限责任公司 Lengthened sheet pile structure and sheet pile lengthening method for pipe plate combined pile wharf construction

Also Published As

Publication number Publication date
JPH10252066A (en) 1998-09-22

Similar Documents

Publication Publication Date Title
US20100209186A1 (en) Clamp systems and methods for pile drivers and extractors
JP3714439B2 (en) Concrete sheet pile construction jig
JPH062330A (en) Pile cement extracting tool
EP0937825A3 (en) Method and apparatus for forming enlarged pile heads
JPH03107017A (en) Pile head treatment method for cast-in-place concrete pile
CA2421024A1 (en) Scaling bar
CN215329876U (en) Clamp structure of static pile press
JP4431028B2 (en) Occlusion member attachment and occlusion member press-fitting method
CN209903122U (en) Nail puller for wooden sofa
JP5171978B2 (en) Vibro hammer device
JP2002129566A (en) Press-in and pull-out device for pile
CA1085634A (en) Gripper jaw
CN220202663U (en) Electric pile driver
JPH0813487A (en) Pile driving method
JP2581551B2 (en) Pile press-in assist device
JP2577679Y2 (en) Hydraulic pile puller
JP3547312B2 (en) Pile standing method and vehicle with pile standing mechanism used for the method
JP3078321U (en) Pile driver
JP4084046B2 (en) Self-propelled press-fitting machine
JP2566778Y2 (en) Nail cutter
US6394691B1 (en) Gripping apparatus
JP2733494B2 (en) Attachment structure of claw members to hold the pile
JP2669498B2 (en) Method of driving structure and structure for driving
JPH0645936B2 (en) Underwater sheet pile driving method
JP2515414Y2 (en) Pile press-in / pull-out machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050810

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050817

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050817

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080902

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110902

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110902

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140902

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees