JPH0645936B2 - Underwater sheet pile driving method - Google Patents

Underwater sheet pile driving method

Info

Publication number
JPH0645936B2
JPH0645936B2 JP62061346A JP6134687A JPH0645936B2 JP H0645936 B2 JPH0645936 B2 JP H0645936B2 JP 62061346 A JP62061346 A JP 62061346A JP 6134687 A JP6134687 A JP 6134687A JP H0645936 B2 JPH0645936 B2 JP H0645936B2
Authority
JP
Japan
Prior art keywords
sheet pile
yatco
water
driving
sheet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62061346A
Other languages
Japanese (ja)
Other versions
JPS63233118A (en
Inventor
真佐志 石原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toa Corp
Original Assignee
Toa Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toa Corp filed Critical Toa Corp
Priority to JP62061346A priority Critical patent/JPH0645936B2/en
Publication of JPS63233118A publication Critical patent/JPS63233118A/en
Publication of JPH0645936B2 publication Critical patent/JPH0645936B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】 〔発明の技術分野〕 本発明は、岸壁などにおいて水底面より僅かに上部の水
中の所定深さを打ち止めの天端位置として、鋼製の矢板
を打込む際、特にその水深よりも打込む矢板長さが短い
場合に有効に使用される水中の矢板打込工法に関するも
のである。
Description: TECHNICAL FIELD OF THE INVENTION The present invention is particularly suitable for driving a steel sheet pile with a predetermined depth in water slightly above the bottom surface of the water as a top end position for stopping, particularly when driving a steel sheet pile. The present invention relates to an underwater sheet pile driving method that is effectively used when the sheet pile length to be driven is shorter than the water depth.

〔従来技術〕[Prior art]

従来、水底に鋼製の矢板を打込み、その天端が水底面か
ら一寸出たところで打止めする場合で、しかもその矢板
が水深よりも短い場合には、潜水土が水中に潜水しなが
ら水底に打込まれた既設の矢板のセクションに打込みを
行なう矢板のセクションを合せると共に、これら打込み
を行なう各矢板が一直線上に配設されるように枠材から
なる水中導材を設置する必要があった。
Conventionally, when a steel sheet pile is driven into the bottom of the water and it is stopped when the top of the top of the water is a little out of the bottom of the water, and when the sheet pile is shorter than the water depth, the submersible soil dive into the water while It was necessary to match the section of the existing sheet pile that was driven in with the section of the sheet pile to be driven, and to install the underwater conducting material consisting of a frame material so that each sheet pile to be driven was arranged in a straight line. .

しかしながら、上記の場合、各矢板のセクションを合せ
る建込みを全て水中で行なうことになり、しかも潜水士
施工となり非常に危険を伴うという問題があった。
However, in the above-mentioned case, there is a problem in that the construction for combining the sections of each sheet pile is all performed underwater, and furthermore, the construction is a diver construction, which is extremely dangerous.

また、上記のような水中建込みのため、矢板の法線及び
傾斜の管理が不可能であり、更に、矢板を打込む際に
は、バイブロハンマーを水中に入れることはできないの
で、矢板の頭部にヤットコを介して打込むことになり、
そのヤットコを矢板の頭部に支持するのも潜水士によっ
て行なうことになり、それらの作業が危険であり、かつ
能率が悪いという問題があった。
In addition, because of the above-mentioned underwater construction, it is impossible to control the normal and inclination of the sheet pile. Furthermore, when driving the sheet pile, the vibro hammer cannot be put into the water, so the sheet pile head. I will drive into the department via Yatco,
The diver also supported the Yatco on the head of the sheet pile, and there was a problem that the work was dangerous and inefficient.

〔発明の目的〕[Object of the Invention]

本発明は前記従来の問題点を解消するためになされたも
のであり、水底面より上部の水中の所定深さまで打込む
矢板が上記所定水深よりも短い場合でも、潜水士施工に
よる作業を大幅に削減して、安全でかつ能率の良い作業
を行ないうる水中の矢板打込工法を提供することを目的
としたものである。
The present invention has been made to solve the above-mentioned conventional problems, and even if the sheet pile that is driven to a predetermined depth in the water above the water bottom is shorter than the predetermined water depth, the work by the diver construction is greatly reduced. It is an object of the present invention to provide an underwater sheet pile driving method capable of reducing and performing safe and efficient work.

〔発明の概要〕[Outline of Invention]

上記の目的を達成するため本発明の矢板打込工法は、水
底面より上部の水中の所定深さまで予め打込まれた既設
矢板のセクションに合せたガイド用矢板の天端を、岸壁
上部工などから支持された水上の導材に溶接した後、こ
のガイド用矢板と1本乃至2本の打込用の矢板及び残留
させる矢板の各セクションを合せる建込みを行ない、こ
の打込用の矢板の天端を保持するヤットコと、上記ガイ
ド用矢板及び残留させる矢板の各セクションを合せた状
態で上記ヤットコを介して打込用の矢板のみを所定深さ
までバイブロハンマーなどで打込み、残留させた矢板の
セクションに新たに矢板を合わせ、かつ上記残留させた
矢板の天端を保持する次のヤットコと前のヤットコ及び
新たな矢板の各セクションを合せた建込み状態で、次の
ヤットコを介して新たな矢板を残留させながら次のヤッ
トコで支持された矢板を打込用の矢板としてバイブロハ
ンマーなどで打込む工程を、前のヤットコと次のヤット
コとを交互に使用しながら繰返すことを特徴としてい
る。
In order to achieve the above-mentioned object, the sheet pile driving method of the present invention, the top end of the guide sheet pile that matches the section of the existing sheet pile that has been previously driven to a predetermined depth in the water from the bottom of the water, quay superstructure, etc. After welding to the conducting material on the water supported by the guide sheet pile, the guide sheet pile and one or two driving sheet piles and the sections of the sheet piles to be left are assembled so that the sheet piles for the driving sheet pile are assembled. With the yatco that holds the top end and the sections for the guide sheet pile and the remaining sheet pile to be combined, only the sheet pile for driving is driven to the specified depth via the yatco with a vibro hammer etc. A new sheet pile is fitted to the section, and the next yatco that holds the top of the remaining sheet pile and the previous yatco and the new sheet pile section are assembled together, and the next yatco is inserted. Characterized by repeating the process of driving the sheet pile supported by the next Yatco as a sheet pile for driving with a vibrohammer while leaving the remaining sheet pile while alternately using the previous Yatco and the next Yatco. There is.

以上の工程を繰り返し行なうことにより、連続した矢板
の打込み時に、水面上にある水上の導材によって各矢板
の建込みが能率良く、しかも正確に行なわれる。つま
り、本発明の本質的構成は、打込用の矢板をヤットコを
介して打込み、次の打込用の矢板を、前記ヤットコに沿
って他のヤットコを介して打込み、これを順次繰返す水
中の矢板打込工法にある。
By repeating the above steps, when the sheet piles are continuously driven, the sheet piles on the water surface allow the sheet piles to be efficiently and accurately installed. That is, the essential configuration of the present invention is to drive a sheet pile for driving through a yatco, a sheet pile for next driving is driven through another yatco along the yatco, and this is sequentially repeated in water. It is in the sheet pile driving method.

〔実施例〕〔Example〕

以下図面を参照して本発明の実施例を説明するが、第1
−A図から、第1−J図までは本発明の水中の矢板打込
工法を適用した一実施例における一連の工程を示す説明
用側面図、第2図は第1−B図で示すヤットコの拡大側
面図、第3図は第2図のA−A方向の拡大平断面図、第
4図は第2図のB−B方向の拡大平断面図、第5図は第
1−A図で使用される水上の導材の拡大平面図、第6図
は第5図の側断面図である。
An embodiment of the present invention will be described below with reference to the drawings.
-FIG. 1 to FIG. 1-J are explanatory side views showing a series of steps in one embodiment to which the underwater sheet pile driving method of the present invention is applied, and FIG. 2 is a yatco shown in FIG. 1-B. FIG. 3 is an enlarged plan sectional view taken along line AA of FIG. 2, FIG. 4 is an enlarged plan sectional view taken along line BB of FIG. 2, and FIG. FIG. 6 is an enlarged plan view of the conductive material on the water used in FIG. 6, and FIG. 6 is a side sectional view of FIG.

まず、第1−A図において、水底面1よりも僅かに高い
水中の所定深さHまで予め打込まれた既設矢板2のセク
ションと、ガイド用矢板3の下端のセクションとを合せ
る作業を潜水士により行なう。
First, in FIG. 1-A, the work of combining the section of the existing sheet pile 2 that has been previously driven to a predetermined depth H in the water slightly higher than the water bottom surface 1 and the section at the lower end of the guide sheet pile 3 is dived. Performed by a mentor

ここで、以後に打込みを行なう矢板4は水中の所定深さ
Hよりも短く、ガイド用矢板3は既設矢板2に建込まれ
た状態で、その天端が、後に説明する第5図及び第6図
のように設けられた導材5よりも上部になるような長さ
に溶接Wにより継ぎ足したものを使用している。
Here, the sheet pile 4 to be subsequently driven is shorter than a predetermined depth H in water, the guide sheet pile 3 is installed in the existing sheet pile 2, and its top end is shown in FIGS. As shown in FIG. 6, the welding material is added to the length of the conductive material 5 provided above the conductive material 5 by welding W.

次に、上記のガイド用矢板3の天端を第5図の水上の導
材5の上部に設けた2本のガイド材6の間の端部に溶接
により取り付ける。
Next, the top end of the guide sheet pile 3 is attached by welding to the end portion between the two guide members 6 provided on the water-based conducting member 5 in FIG.

この導材5は第6図のごとく岸壁上部工7に受材8を介
して水面上に突出した受材9と上記のガイド材6とから
なり、第6図のAで示すのが岸壁仮法線で、そしてBで
示すのが矢板法線であり、2本のガイド材6の中心の矢
板法線Bに沿って一直線に、上記ガイド用矢板3及び引
き続き打込みを行なう矢板4などが第5図のごとく位置
することになる。
As shown in FIG. 6, the guide member 5 is composed of a support member 9 projecting above the water surface via a support member 8 on the quay superstructure 7 and the guide member 6 described above. A normal line, and B is a sheet pile normal, and the guide sheet pile 3 and the sheet pile 4 for subsequent driving are aligned in a straight line along the sheet pile normal line B at the center of the two guide members 6. It will be located as shown in Fig. 5.

次に、このガイド用矢板3のセクションに、打込用の2
枚の矢板4及び残留させる矢板4Aの各セクションを合
せた建込み物を合せて、導材5に固定するが、この実施
例では打込用の矢板4は2枚なので、この2枚の矢板4
は溶接するものとする。
Next, in the section of this guide sheet pile 3, 2
The sheet pile 4 and the remaining pile sheet 4A sections are combined together and fixed to the guide member 5. However, in this embodiment, since there are two sheet piles 4 for driving, these two sheet piles are used. Four
Shall be welded.

ここで、3枚目の残留させる矢板4Aはワイヤー10を
介してクレーンで吊り下げておく。
Here, the remaining sheet pile 4A of the third sheet is suspended by a crane via the wire 10.

次に、第1−B図において、2枚の打込用の矢板4の天
端を第2図、第3図及び第4図に示すヤットコ11Aの
油圧チャック12により保持し、打込用の矢板4及びヤ
ットコ11Aとガイド用矢板3及び残留させる矢板4A
の各セクションを合せた状態で、第1−C図及び第1−
D図のごとく、このヤットコ11Aを介してバイブロハ
ンマー13により打込用の矢板4のみをHで示す所定深
さまで打込む。
Next, in FIG. 1-B, the top ends of the two sheet piles 4 for driving are held by the hydraulic chuck 12 of the yatco 11A shown in FIG. 2, FIG. 3, and FIG. The sheet pile 4 and the yatco 11A, the guide sheet pile 3 and the remaining sheet pile 4A.
1-C and 1-C with each section of FIG.
As shown in FIG. D, only the hammering sheet pile 4 is driven to a predetermined depth indicated by H by the vibro hammer 13 through the cots 11A.

次に、上記のヤットコ11Aをそのままにして、残留さ
せた矢板4Aに、第1−E図のごとく新たに矢板4Bを
溶接し、各セクションを合せた建込み状態で導材5に固
定し、最後の1枚の矢板4Cをワイヤー10を介してク
レーンで吊り下げる。
Next, leaving the above yatco 11A as it is, the remaining sheet pile 4A is newly welded to the sheet pile 4B as shown in FIG. 1-E, and the sections are fixed to the conductor 5 in a built-in state, The last sheet pile 4C is hung with a crane via the wire 10.

更に、第1−F図において、2枚の矢板4A,4Bを打
込用矢板とし、この矢板4Bの天端を保持する次のヤッ
トコ11B及び打込用矢板4A,4Bと、前のヤットコ
11A及び新たな矢板4Cの各セクションを合せた後、
第1−G図のごとくこのヤットコ11Bを介してバイブ
ロハンマー13で打込用の矢板4A,4Bを所定深さH
まで打込む。
Further, in FIG. 1-F, the two sheet piles 4A and 4B are used as a driving sheet pile, and the next yatco 11B and the driving sheet piles 4A and 4B that hold the top end of the sheet pile 4B and the previous yatko sheet 11A. And after combining each section of the new sheet pile 4C,
As shown in FIG. 1-G, the vibrating hammer 13 is used to insert the sheet piles 4A and 4B for hammering through the yatco 11B to a predetermined depth H.
Drive up to.

次に、第1−H図のごとく最初のヤットコ11Aを引抜
いて、次のヤットコ11Bをそのままにして、残留させ
た矢板4Cに更に2枚の新たな矢板4D,4Eを建込
み、前のヤットコ11Aが第1−G図の工程で共下りし
ていないかを確認し、良ければ油圧チャック12を開き
あげ、ここでガイド用矢板3を打込みの上溶接W部分で
潜水士により切断する。
Next, as shown in FIG. 1-H, the first yatco 11A is pulled out, the next yatco 11B is left as it is, and two new sheet piles 4D and 4E are installed on the remaining sheet pile 4C, and the previous yatco 11C is installed. It is confirmed whether or not 11A does not go down in the process of FIG. 1-G, and if it is good, the hydraulic chuck 12 is opened and the guide sheet pile 3 is driven in and cut by the diver at the upper welding W portion.

更に、第1−I図及び第1−J図に示すようにヤットコ
11Aで打込用の矢板4C,4Dを保持し、打込用の矢
板4C,4D及びヤットコ11Aと残留させる矢板4E
及びヤットコ11Bとの各セクションを合せた上バイブ
ロハンマー13で打込む。
Further, as shown in FIGS. 1-I and 1-J, the sheet piles 4C and 4D for driving are held by the yatco 11A, and the sheet piles 4C and 4D for driving and the sheet pile 4E left behind.
And the sections with Yatco 11B are combined and driven by the upper vibro hammer 13.

上記第1−E図から第1−J図の工程を前のヤットコ1
1Aと次のヤットコ11Bとを交互に使用して連続的に
繰り返すことにより連続矢板の打込みが行なわれること
になる。
Yatco 1 before the steps of FIGS. 1-E to 1-J
By continuously using 1A and the next yatco 11B alternately, the continuous sheet pile is driven.

なお、ヤットコ11A,11Bは第2図、第3図及び第
4図に示すごとく2枚の矢板材20に補強板15を取り
付け、油圧チャック12は下部に補強材16によって強
固に取り付けたフランジ部材17に取り付けられてい
る。
The yatco 11A, 11B is a flange member in which a reinforcing plate 15 is attached to two sheet pile members 20 as shown in FIGS. 2, 3 and 4 and a hydraulic chuck 12 is firmly attached to the lower portion by a reinforcing member 16. It is attached to 17.

〔発明の効果〕 本発明の矢板打込工法は、水底面より僅かに上部の水中
の所定深さを打ち止めの天端位置として鋼製の矢板を打
込む際、その水深よりも打込む矢板長さが短い場合に、
各矢板のセクション及びヤットコのセクションの建込み
が水上に設けた導材によって行なわれるので、それらの
作業が水上で能率良く、しかも正確に行なわれることに
なり、既設矢板とガイド用矢板との水底面付近でのセク
ション合せ作業と、ガイド用矢板の一枚打ち後の所定深
さでの切断作業とだけが潜水士施工で他は全て水上施工
となるので作業の安全性の向上がはかれるという利点が
ある。
[Effects of the Invention] The sheet pile driving method of the present invention is, when the steel sheet pile is driven with the predetermined depth in the water slightly above the water bottom as the top end position for stopping, the sheet pile length to be driven is greater than the water depth. Is short,
Since the section of each sheet pile and the section of Yatco are built by the conducting material provided on the water, the work will be performed efficiently and accurately on the water, and the water between the existing sheet pile and the guide sheet pile will be used. Only section alignment work near the bottom and cutting work at a predetermined depth after hitting one sheet of guide sheet pile are diver construction and all others are above water construction, so the work safety can be improved. There is.

【図面の簡単な説明】[Brief description of drawings]

第1−A図から第1−J図までは、本発明の水中の矢板
打込工法を適用した一実施例における一連の工程を示す
説明用側面図、第2図は第1−A図で示すヤットコの拡
大側面図、第3図は第2図のA−A方向の拡大平断面
図、第4図は第2図のB−B方向の拡大平断面図、第5
図は第1−A図で使用される水上の導材の拡大平面図、
第6図は第5図の側断面図である。 1…水底面、2…既設矢板、3…ガイド用矢板、4,4
A,4B,4C,4D,4E…矢板、5…導材、11
A,11B…ヤットコ、13…バイブロハンマー、H…
所定深さ。
FIGS. 1-A to 1-J are explanatory side views showing a series of steps in one embodiment to which the underwater sheet pile driving method of the present invention is applied, and FIG. 2 is FIG. 1-A. FIG. 3 is an enlarged side sectional view of the YATCO shown in FIG. 3, FIG. 3 is an enlarged plan sectional view taken along the line AA of FIG. 2, and FIG. 4 is an enlarged plan sectional view taken along the line BB of FIG.
The figure is an enlarged plan view of the conductive material on the water used in FIG. 1-A.
FIG. 6 is a side sectional view of FIG. 1 ... Water bottom surface, 2 ... Existing sheet pile, 3 ... Guide sheet pile, 4, 4
A, 4B, 4C, 4D, 4E ... sheet pile, 5 ... conductive material, 11
A, 11B ... Yatco, 13 ... Vibro hammer, H ...
Predetermined depth.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】水底面より上部の水中の所定深さまで予め
打込まれた既設矢板のセクションに合せたガイド用矢板
の天端を、岸壁上部工などから支持された水上の導材に
取付けた後、このガイド用矢板と1本以上の打込用の矢
板及び残留させる矢板の各セクションを合せる建込みを
行ない、この打込用の矢板の天端を保持するヤットコ
と、上記ガイド用矢板及び残留させる矢板の各セクショ
ンを合せた状態で上記ヤットコを介して打込用の矢板の
みを所定深さまでバイブロハンマーなどで打込み、残留
させた矢板のセクションに新たに矢板を合わせ、かつ上
記残留させた矢板の天端を保持する次のヤットコと前の
ヤットコ及び新たな矢板の各セクションを合せた建込み
状態で、次のヤットコを介して新たな矢板を残留させな
がら次のヤットコで支持された矢板を打込用の矢板とし
てバイブロハンマーなどで打込む工程を、前のヤットコ
と次のヤットコとを交互に使用しながら繰返す水中の矢
板打込工法。
1. The top end of a guide sheet pile fitted to a section of an existing sheet pile preliminarily driven to a predetermined depth above the bottom of the water is attached to a conducting material on the water supported from a quay superstructure or the like. After that, the guide sheet pile, one or more driving sheet piles, and the remaining sheet pile sections are assembled together, and a yatco that holds the top end of the sheet pile for driving, the guide sheet pile, and In the state where each section of the sheet pile to be left is combined, only the sheet pile for driving is driven to a predetermined depth with a vibro hammer etc. through the above-mentioned Yatco, a sheet pile is newly fitted to the section of the sheet pile left, and the above is left. With the next yatco holding the top of the sheet pile, the previous yatco, and each section of the new sheet pile, in the installed state, while leaving the new sheet pile through the next yatco, The lifting been vibro-hammer over implanted in such process the sheet piles as sheet pile for nailing, sheet pile driving tool construction method in water repeated while using the previous forceps and next the forceps alternately.
JP62061346A 1987-03-18 1987-03-18 Underwater sheet pile driving method Expired - Lifetime JPH0645936B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62061346A JPH0645936B2 (en) 1987-03-18 1987-03-18 Underwater sheet pile driving method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62061346A JPH0645936B2 (en) 1987-03-18 1987-03-18 Underwater sheet pile driving method

Publications (2)

Publication Number Publication Date
JPS63233118A JPS63233118A (en) 1988-09-28
JPH0645936B2 true JPH0645936B2 (en) 1994-06-15

Family

ID=13168480

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62061346A Expired - Lifetime JPH0645936B2 (en) 1987-03-18 1987-03-18 Underwater sheet pile driving method

Country Status (1)

Country Link
JP (1) JPH0645936B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0441816A (en) * 1990-06-06 1992-02-12 Chiyouwa Kogyo Kk Plier for pile driving work at water bottom
JPH0733669B2 (en) * 1990-07-04 1995-04-12 調和工業株式会社 Yatco for underwater pile driving
JP4947459B2 (en) * 2006-05-19 2012-06-06 清水建設株式会社 Pile core construction method
JP5634708B2 (en) * 2009-12-24 2014-12-03 西松建設株式会社 Joint fall prevention jig and Yatco

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61180232U (en) * 1985-04-30 1986-11-10

Also Published As

Publication number Publication date
JPS63233118A (en) 1988-09-28

Similar Documents

Publication Publication Date Title
JPH0756136B2 (en) How to get angry in the Yamato construction method
JPH0645936B2 (en) Underwater sheet pile driving method
CN109252521A (en) Steel-pipe pile extracts equipment and its construction method in confined space water under girder steel
JPH0393917A (en) Steel sheet pile underwater build-up method and nipper for steel sheet pile
DE2622991A1 (en) METHOD AND DEVICE FOR DRIVING UNDERWATER POLES
JPH03107017A (en) Pile head treatment method for cast-in-place concrete pile
JP2005002561A (en) Hybrid cell and construction method therefor
JPH0619642Y2 (en) Sea garden building equipment
JPS6153915A (en) Method of driving down sheathing material
JPS5968410A (en) Method and apparatus for constructing pier
CN216809880U (en) Prefabricated square pile sinking auxiliary device
JP2839838B2 (en) Pulling device for foundation pile and method of pulling underwater foundation pile
JP2516118B2 (en) Concrete block for offshore construction
JP3868140B2 (en) Penetration device and penetration method for steel piles
CN213683156U (en) Integrated high-pile construction platform
GB2183524A (en) A device for applying an impact
JP2759428B2 (en) Underwater steel pipe pile driving method and equipment
JP2554898B2 (en) Underwater driving method for steel pipe piles
JP3843167B2 (en) Sand pile driving method and apparatus
JPS60250123A (en) Driving work of steel pipe sheet pile
JPH02300413A (en) Construction of sand pile
JPH07197464A (en) Driving method of submerged steel pipe pile
JPS60119804A (en) Construction of off-shore structure
SU1470962A1 (en) Method of separating natural stone blocks from mass with triple-surface exposure
JPH0315625Y2 (en)