CN213683156U - Integrated high-pile construction platform - Google Patents
Integrated high-pile construction platform Download PDFInfo
- Publication number
- CN213683156U CN213683156U CN202021389395.6U CN202021389395U CN213683156U CN 213683156 U CN213683156 U CN 213683156U CN 202021389395 U CN202021389395 U CN 202021389395U CN 213683156 U CN213683156 U CN 213683156U
- Authority
- CN
- China
- Prior art keywords
- platform
- main part
- pile
- stand
- pile construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model relates to an integration high pile construction platform, including the platform main part, its characterized in that, the rigid coupling all around of platform main part top has a plurality of vertical stands that correspond, and the both sides of every stand even have the support frame about corresponding stand symmetry, and the other end and the platform main part rigid coupling of support frame have the guardrail between the adjacent stand. The utility model discloses simple structure utilizes the pile-clamping wood to press from both sides the pile, as supporting, through setting up the stand of ann's support frame to and the platform main part of ann's guardrail, make the platform whole firm, utilize external pile driving boat or crane hoist and mount the utility model discloses place on the pile-clamping wood, improved work efficiency, practice thrift the time limit for a project, through setting up the fixing base of ann's windproof rope connecting block, reduced the wave, the influence of strong wind weather, strengthened high pile construction platform's stability, effectively reduced constructor's potential safety hazard, realize that constructor carries out construction operation at construction platform, improved the effect of vibrating when follow-up stake core concrete is pour.
Description
Technical Field
The utility model relates to a marine pile sinking operation platform technical field especially relates to an integration high pile construction platform.
Background
In the offshore pile sinking engineering, after pile sinking is finished, pile clamping wood is required to be erected after pile cutting to the designed elevation, square pile head and the like. No matter single straight pile construction or double-inclined pile construction, traditional operation is that constructor is the safety rope, and the foot is stepped on and is pressed from both sides pile wood and chisel out pile head concrete, and constructor construction operation is inconvenient on it, poor stability, and the construction effect is unsatisfactory, and the effect of vibrating when directly influencing follow-up stake core concreting has certain potential safety hazard simultaneously because of influences such as wave, strong wind weather.
Disclosure of Invention
The utility model discloses aim at solving prior art not enough, and provide an integration high stake construction platform.
The utility model discloses a realize above-mentioned purpose, adopt following technical scheme:
the utility model provides an integration high pile construction platform, including the platform main part, a serial communication port, the rigid coupling all around of platform main part top has the stand of a plurality of vertical correspondences, the both sides of every stand even have the support frame about corresponding stand symmetry, the other end and the platform main part rigid coupling of support frame, ann has the guardrail between the adjacent stand, the top rigid coupling of the relative guardrail in front and back has the fixing base of a plurality of correspondences, ann has the rope connecting block of preventing wind on every fixing base, center at the platform main part is equipped with the trompil, the internal diameter of trompil is less than the external diameter of placing the seat on the double-layered stake wood, the platform main.
The platform main body is of a rectangular or square structure welded by channel steel.
The stand column is fixedly connected with the platform main body in a welding mode.
The support frame is arranged in a triangular frame structure.
The opening is circular or oval.
The guardrail comprises a plurality of steel bars which are arranged in parallel from bottom to top, and two ends of each steel bar are fixedly connected with the corresponding upright posts.
And a reinforcing plate is arranged between the wood plate and the platform main body.
The utility model has the advantages that: the utility model discloses simple structure, utilize the pile-clamping wood to press from both sides the pile, as supporting, through setting up the stand that ann has the support frame, and ann has the platform main part of guardrail, make the platform whole firm, utilize external pile driving boat or crane hoist and mount the utility model discloses place on pile-clamping wood, easy and simple to handle, improved work efficiency, practice thrift the time limit for a project, through setting up the fixing base of ann's windproof rope connecting block, reduced the wave, the influence of strong wind weather, the stability of high pile construction platform has been strengthened, constructor's potential safety hazard has effectively been reduced, realize constructor and carry out construction operation at construction platform, avoided constructor system safety rope, the foot is stepped on pile-clamping wood and is chiseled out pile head concrete, the effect of vibrating when having improved follow-up stake core concrete pouring.
Drawings
Fig. 1 is a schematic structural diagram of a state of the present invention;
FIG. 2 is a schematic structural view of another embodiment of the present invention;
in the figure: 1-wood board; 2-opening a hole; 3-upright column; 4-a support frame; 5, protecting the fence; 6-fixing the base; 7-windproof rope connecting blocks; 8-a platform body;
the following detailed description will be made in conjunction with embodiments of the present invention with reference to the accompanying drawings.
Detailed Description
The invention will be further explained with reference to the following figures and examples:
as shown in fig. 1-2, an integration high pile construction platform, including platform main part 8, its characterized in that, the rigid coupling all around of platform main part 8 top has a plurality of vertical stand 3 that correspond, the both sides of every stand 3 even have support frame 4 about corresponding stand 3 symmetry, the other end and the platform main part 8 rigid coupling of support frame 4, ann has guardrail 5 between the adjacent stand 3, the top rigid coupling of front and back relative guardrail 5 has a plurality of fixing bases 6 that correspond, ann has on every fixing base 6 prevent wind rope connecting block 7, be equipped with trompil 2 at the center of platform main part 8, the internal diameter of trompil 2 is less than the external diameter of placing the seat on the external double-layered stake wood, platform main part 8 upper berth that is located the 2 outsides of trompil is.
The platform main body 8 is of a rectangular or square structure welded by channel steel.
The upright column 3 is fixedly connected with the platform main body 8 in a welding mode.
The support frame 4 is arranged in a triangular frame structure.
The opening 2 is circular or oval.
The guardrail 5 comprises a plurality of steel bars arranged in parallel from bottom to top, and two ends of the steel bars are fixedly connected with the corresponding upright posts 3.
And a reinforcing plate is arranged between the wood board 1 and the platform main body 8.
Before the utility model is used, constructors use phi 14mm thick wire harness rods to erect pile clamping wood, the pile clamping wood adopts 10cm square wood, the pile clamping wood is used for clamping piles during working as a support, the integral high pile construction platform is placed on the pile clamping wood by reasonably utilizing an on-site pile driving ship or a crane to hoist the integral high pile construction platform and tying a windproof rope on a windproof rope connecting block 7 according to the operation radius of the pile driving ship and the crane, the constructors construct in an operation platform, the influence of sea waves and strong wind weather is reduced, the stability of the high pile construction platform is enhanced, the potential safety hazard of the constructors is effectively reduced, the operation is simple and convenient, the working efficiency is improved, the construction period is saved, the constructors are prevented from tying safety ropes, the pile clamping wood is chiseled by feet to remove pile clamping wood, the vibrating effect during the subsequent pile core concrete pouring is improved.
The present invention has been described above with reference to the accompanying drawings, and it is obvious that the present invention is not limited by the above embodiments, and various improvements made by the method concept and technical solution of the present invention or directly applied to other occasions without improvement are all within the protection scope of the present invention.
Claims (7)
1. The utility model provides a high stake construction platform of integration, including platform main part (8), a serial communication port, platform main part (8) top rigid coupling all around has stand (3) of a plurality of vertical correspondences, the both sides of every stand (3) link has support frame (4) about corresponding stand (3) symmetry, the other end and platform main part (8) rigid coupling of support frame (4), ann has guardrail (5) between adjacent stand (3), the top rigid coupling of relative guardrail (5) has fixing base (6) of a plurality of correspondences around, ann has windproof rope connecting block (7) on every fixing base (6), center in platform main part (8) is equipped with trompil (2), the internal diameter of trompil (2) is less than the external diameter of placing the seat on the double-layered stake wood, platform main part (8) upper berth that is located the trompil (2) outside is equipped.
2. An integrated high pile construction platform according to claim 1, characterised in that the platform body (8) is of channel-welded rectangular or square construction.
3. An integrated high pile construction platform according to claim 1, characterized in that the upright (3) is fixedly connected with the platform body (8) by welding.
4. An integrated high pile construction platform according to claim 1, characterised in that the support frame (4) is of a triangular frame structure.
5. An integrated high pile construction platform according to claim 1, characterised in that the opening (2) is circular or oval.
6. An integrated high pile construction platform according to claim 1, characterized in that the guardrail (5) comprises a plurality of steel bars arranged in parallel from bottom to top, and both ends of the steel bars are fixedly connected with the corresponding upright posts (3).
7. An integrated high pile construction platform according to claim 1, characterized in that a reinforcing plate is arranged between the wood plate (1) and the platform body (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021389395.6U CN213683156U (en) | 2020-07-15 | 2020-07-15 | Integrated high-pile construction platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202021389395.6U CN213683156U (en) | 2020-07-15 | 2020-07-15 | Integrated high-pile construction platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213683156U true CN213683156U (en) | 2021-07-13 |
Family
ID=76724884
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202021389395.6U Active CN213683156U (en) | 2020-07-15 | 2020-07-15 | Integrated high-pile construction platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213683156U (en) |
-
2020
- 2020-07-15 CN CN202021389395.6U patent/CN213683156U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3177157U (en) | A simple tower instrument in a high-rise bridge. | |
CN109083167A (en) | A kind of construction method of cofferdam of base slab for high peg | |
CN110984004B (en) | Method for dismantling lower supporting structure of bridge | |
CN213683156U (en) | Integrated high-pile construction platform | |
CN209816665U (en) | Bent cap bracket suitable for round end shape pier stud | |
CN214657195U (en) | Tower crane foundation structure | |
CN108425374A (en) | Complicated sea situation lower band binder dumbbell shape cushion cap steel suspended box cofferdam monolithic construction method | |
CN210482242U (en) | Cylindrical tail water surge chamber impedance plate concrete pouring combined supporting system | |
CN210597325U (en) | Anti-falling conversion device for steel enclosing purlin | |
CN210238492U (en) | Crown beam type miniature pile construction formwork capable of being circulated | |
CN108104136B (en) | Foundation pit supporting structure and construction method thereof | |
CN111424676A (en) | Main frame beam support changing structure and construction method | |
CN104532758A (en) | Construction support for pre-stress concrete suspension-poured continuous beam number zero segment | |
CN111424554A (en) | Construction method for suspended formwork of seascape trestle | |
CN212866621U (en) | Prefabricated welded steel bar net | |
CN210134349U (en) | Hanging type platform for welding steel sleeve box side plate | |
CN212452262U (en) | Pier stud steel form and construction structure | |
CN114922186B (en) | Large-diameter arc overhanging type breast wall template system and construction method | |
CN212427142U (en) | Fill side slope supporting construction | |
CN216194717U (en) | Single barge type pile planting system | |
CN218293508U (en) | Geology drilling platform on water | |
CN213804924U (en) | Formwork support of bridge bent cap | |
CN213329085U (en) | Novel combined platform is in pile foundation construction auxiliary assembly on water | |
CN217325468U (en) | Novel retaining wall founds mould structure | |
CN214459681U (en) | Tied beam construction device and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |