CN216809880U - Prefabricated square pile sinking auxiliary device - Google Patents
Prefabricated square pile sinking auxiliary device Download PDFInfo
- Publication number
- CN216809880U CN216809880U CN202123181258.0U CN202123181258U CN216809880U CN 216809880 U CN216809880 U CN 216809880U CN 202123181258 U CN202123181258 U CN 202123181258U CN 216809880 U CN216809880 U CN 216809880U
- Authority
- CN
- China
- Prior art keywords
- pile
- square pile
- hoisting chain
- square
- sinking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 abstract description 14
- 230000006378 damage Effects 0.000 abstract description 7
- 238000004804 winding Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 206010063659 Aversion Diseases 0.000 description 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 1
- 208000007101 Muscle Cramp Diseases 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000010030 laminating Methods 0.000 description 1
- 239000000178 monomer Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to a prefabricated square pile sinking auxiliary device which comprises a hoisting chain, wherein the first end of the hoisting chain is fixed to a pile driver, a circular ring for winding a square pile is formed at the second end of the hoisting chain, the second end of the hoisting chain at least extends to the middle section of the square pile, and a sleeve head fixed with the pile driver is sleeved at the end part of the square pile. The utility model solves the technical problems that the verticality is difficult to control and the pile head is easy to damage during pile driving in the prior art by sleeving the sleeve head on the square pile and binding the hoisting chain to assist in pile driving during pile driving. The utility model improves the precision and efficiency of pile sinking, effectively controls the verticality of the pile sinking, improves the quality of engineering entities, avoids the rework risk, greatly accelerates the construction progress of the engineering and controls the construction cost.
Description
Technical Field
The utility model relates to the field of building construction, in particular to a prefabricated square pile sinking auxiliary device.
Background
The prefabricated square pile, namely the prefabricated reinforced concrete square pile, has the advantages of high single-pile bearing capacity, reliable pile sinking quality, low engineering cost and the like, is rapidly developed in the prefabricated square pile industry in recent years, and is widely applied to the fields of industrial and civil buildings and foundation construction at present. Because square pile monomer weight is great, the length is longer, for construction and transportation, often adopt pile sinking method, in the work progress with the stake machine hoist square pile, the stake downwards sinks, but pile body straightness uncontrollable that hangs down among the pile sinking process, the quality defect often appears, leads to effective bearing capacity not enough, causes reworking, increases construction cost.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects existing in the prior art, the utility model provides the prefabricated square pile sinking auxiliary device, which solves the technical problems that the verticality is difficult to control and the pile head is easy to damage during pile sinking in the prior art.
The utility model discloses a prefabricated square pile sinking auxiliary device which comprises a hoisting chain, wherein the first end of the hoisting chain is fixed on a pile driver, a circular ring for winding a square pile is formed at the second end of the hoisting chain, the second end of the hoisting chain at least extends to the middle section of the square pile, and a sleeve head fixed with the pile driver is sleeved at the end part of the square pile. .
The pile sinking auxiliary device for the prefabricated square pile is further improved in that a fixing buckle is arranged at the second end of the hoisting chain, the hoisting chain surrounds the square pile for a circle to form the circular ring, and the circular ring is arranged on the hoisting chain through the fixing buckle for fixing.
The pile sinking auxiliary device for the prefabricated square pile is further improved in that one end of the sleeve head is sealed with a fixing plate, and a connecting piece for connecting a pile driver is fixed on the back of the fixing plate.
The pile sinking auxiliary device for the prefabricated square pile is further improved in that the connecting piece is a connecting plate with an I-shaped section, and the end face of the connecting plate is fixed with the fixing plate.
The pile sinking auxiliary device for the prefabricated square pile is further improved in that the section of the sleeve head is square, and the section area is larger than that of the top end of the square pile.
The pile sinking auxiliary device for the prefabricated square pile is further improved in that the length of the side of the cross section of the sleeve head is 41 cm.
Compared with the prior art, the utility model has positive and obvious effect. The utility model solves the technical problems that the verticality is difficult to control and the pile head is easy to damage during pile driving in the prior art by sleeving the sleeve head on the square pile and binding the hoisting chain to assist in pile driving during pile driving. The utility model improves the precision and efficiency of pile sinking, effectively controls the verticality of the pile sinking, improves the quality of engineering entities, avoids the risk of rework, greatly accelerates the construction progress of the engineering and controls the construction cost.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
Fig. 1 is a schematic view illustrating a state of use of the precast square pile sinking assisting device of the present invention.
Fig. 2 is a schematic structural view of a sleeve head and a fixing plate of the auxiliary device for sinking a precast square pile of the utility model.
Fig. 3 is a schematic view of a hoisting chain of the auxiliary device for sinking the precast square pile of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 and 2, the utility model provides an auxiliary device for sinking a prefabricated square pile 1, which comprises a hoisting chain 4 with a first end fixed to a pile driver 5, wherein a second end of the hoisting chain 4 is formed with a circular ring for the square pile 1 to wind around, the second end of the hoisting chain 4 at least extends to the middle section of the square pile 1, and the end of the square pile 1 is sleeved with a sleeve head 2 fixed to the pile driver 5. The construction of 1 pile sinking of square pile generally adopts the mode of hammering to sink to design elevation, and in the work progress, square pile 1 often receives the loss of very big degree, and the straightness that hangs down often unsatisfied design standard requirement simultaneously, causes effective bearing capacity not enough, overlaps first 2 covers on 1 top of square pile during the construction, overlaps first 2 parcel and lives 1 upper portions of square pile, overlaps first 2 inner walls and the laminating of square pile 1, the tip of protection square pile 1. The first end of the hoisting chain 4 is fixed on the pile driver, then the second end is used for binding the square pile 1, so that the circular ring of the hoisting chain is tightly bound with the square pile 1 for fixing, and then the manual regulation of the verticality is matched for pile sinking operation. In the embodiment, the sleeve head 2 is made of a steel plate with the thickness of 1-2 cm.
Specifically, the second end of the hoisting chain 4 is provided with a fixing buckle, and the hoisting chain 4 surrounds the square pile 1 for a circle to form the circular ring and is fixed on the hoisting chain 4 through the fixing buckle. This 4 second ends of hoist and mount chain are adjusted at will according to the size of square pile 1 around establishing the ring that forms, and with fixed knot buckle establish on hoist and mount chain 4 after the periphery of square pile 1 with hoist and mount chain 4 cramps, this fixed mode suitability is strong, does benefit to the turnover.
Preferably, the sleeve head 2 is sealed at one end by a fixing plate, and a connecting piece for connecting the pile driver 5 is fixed on the back of the fixing plate. The connecting piece can select different forms according to the formation of the connecting position of the pile driver 5, needs to be favorable for the hammering construction of the pile driver 5, and is connected with the pile driver 5, so that the positioning is more accurate when the pile driver 5 hammers, and the damage to the end part of the square pile 1 is reduced.
Specifically, the connecting piece is a connecting plate 3 with an I-shaped section, and the end face of the connecting plate 3 is fixed with the fixing plate. This connecting plate 3 can adopt the steel sheet preparation, and the chuck 5 of pile driver directly presss from both sides and establishes in the web position department of connecting plate 3 during the construction, carries out hammering pile sinking again, makes chuck 5 be difficult for producing the aversion because of the hammering to the position of square pile 1 plays certain positioning action.
Preferably, the section of the sleeve head 2 is square, and the section area is larger than that of the top end of the square pile 1. This pullover 2 can play the guard action to 1 tip of square pile, and the pile driver is direct to be connected with connecting plate 3 and has played the effect of location, avoids square pile 1 to damage and the reverse work, has improved the efficiency of construction of pile sinking.
Specifically, the length of the side of the sleeve head 2 is determined according to the cross-sectional area of the square pile 1, and is slightly larger than the cross-sectional area of the square pile 1, in this embodiment, the length of the side of the sleeve head 2 is 41cm, and the total length of the sleeve head 2 and the connecting plate 3 is 60 cm. As shown in fig. 3, the length of the hoisting chain 4 depends on the length of the square pile 1, and in this embodiment, the length of the hoisting chain 4 is 2 m. The hoisting chain 4 is made of common thick iron chains, and has the advantages of simple and easily obtained materials and low material cost.
During pile sinking operation, the pile driver lifts by crane square pile 1, carries out pile sinking operation afterwards, and pullover 2 carries out effectual parcel and fixed to square pile 1, protection square pile 1 that can be fine at the hammering in-process, reduces the harm that hammering in-process square pile 1 self caused, can play the effect of rectifying simultaneously at the pile sinking in-process for the straightness accords with the design standard that hangs down after the pile sinking is accomplished. The hoisting chain 4 plays a role in fixing the square pile 1 in the pile sinking process, the hoisting chain 4 is removed to continue operation when the pile sinking is half, and the sleeve head 2 can be detached after the pile sinking operation is completed according to the design specification.
The utility model solves the technical problems that the verticality is difficult to control and the pile head is easy to damage during pile driving in the prior art by sleeving the sleeve head on the square pile and binding the hoisting chain to assist in pile driving during pile driving. The utility model improves the precision and efficiency of pile sinking, effectively controls the verticality of the pile sinking, improves the quality of engineering entities, avoids the risk of rework, greatly accelerates the construction progress of the engineering and controls the construction cost.
The parts not involved in the present invention are the same as or can be implemented by the prior art. Although the present invention has been described with reference to a preferred embodiment, it should be understood that various changes, substitutions and alterations can be made herein without departing from the spirit and scope of the utility model as defined by the appended claims.
Claims (6)
1. The utility model provides a prefabricated square pile sinking auxiliary device which characterized in that: the hoisting chain that is fixed in the pile driver including first end, the second end of hoisting chain is formed with the square pile of confession around the ring of establishing, the second end of hoisting chain extends to at least the middle section of square pile, square pile tip cover be equipped with the fixed pullover of pile driver.
2. The prefabricated square pile sinking assisting device of claim 1, wherein a fixing buckle is arranged at a second end of the hoisting chain, the hoisting chain forms the circular ring around the square pile and is fixed on the hoisting chain through the fixing buckle.
3. The prefabricated square pile sinking assisting device of claim 1, wherein a fixing plate is sealed at one end of the sleeve head, and a connecting piece for connecting a pile driver is fixed on the back surface of the fixing plate.
4. The precast square pile driving assisting device according to claim 3, wherein the connecting member is a connecting plate having an i-shaped cross section, and an end surface of the connecting plate is fixed to the fixing plate.
5. A prefabricated square pile sinking aid according to claim 1, wherein said sleeve is square in cross-section and has a cross-sectional area greater than the cross-sectional area of the top end of said square pile.
6. A precast square pile sinking aid according to claim 1, wherein the length of the side of the cross section of the socket is 41 cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123181258.0U CN216809880U (en) | 2021-12-17 | 2021-12-17 | Prefabricated square pile sinking auxiliary device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123181258.0U CN216809880U (en) | 2021-12-17 | 2021-12-17 | Prefabricated square pile sinking auxiliary device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216809880U true CN216809880U (en) | 2022-06-24 |
Family
ID=82054054
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123181258.0U Expired - Fee Related CN216809880U (en) | 2021-12-17 | 2021-12-17 | Prefabricated square pile sinking auxiliary device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216809880U (en) |
-
2021
- 2021-12-17 CN CN202123181258.0U patent/CN216809880U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113353782B (en) | Low-clearance ground wall-connected reinforcement cage rapid hoisting construction method | |
CN110905232A (en) | Mechanical static force dismantling method for concrete structure | |
CN216809880U (en) | Prefabricated square pile sinking auxiliary device | |
CN102041806A (en) | Construction method for inserting steel column in bored pile | |
CN212670961U (en) | Prefabricated floor convenient to stabilize hoist and mount | |
CN211898496U (en) | Pile splicing structure for precast pile and foundation bearing platform | |
CN210857596U (en) | Prefabricated assembly type non-reinforced concrete shear wall | |
CN106193101B (en) | Tower crane steel platform pile foundation and its construction method | |
CN210288002U (en) | But reuse is construction way temporarily | |
CN109356190B (en) | Lattice column type pier concrete tower crane foundation and construction method thereof | |
CN209260922U (en) | Band girder rib laminated floor slab pre-tensioning system connecting joint structure | |
CN211171956U (en) | Anchor rod pile feeder | |
CN215406024U (en) | Engineering pile reinforcement cage structure | |
CN115367075A (en) | Olecranon hook pile turning method for offshore wind power engineering jacket foundation in deep sea area | |
CN212001934U (en) | Novel prefabricated balcony constructional column goes out muscle overlap joint structure | |
CN109747030B (en) | Modification auxiliary device and modification method for tunnel secondary lining template | |
CN102720353A (en) | Post-construction one-side shear wall formwork for settlement joint of tower and construction method | |
CN210313123U (en) | A hoist device for bent cap steel reinforcement cage | |
CN111910794A (en) | Prefabricated wall structure connected by soft cables | |
CN218508784U (en) | Prefabricated wall of hoist and mount fast | |
CN217759545U (en) | Reinforced structure of precast concrete board | |
CN210685181U (en) | Prefabricated reinforced concrete wall connection structure | |
CN219825229U (en) | Quick pile cap of tearing open of landing stage construction | |
CN216239767U (en) | Concrete wall formwork fixing device | |
CN221919368U (en) | Device for binding reinforcement cage in anti-slide pile hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220624 |
|
CF01 | Termination of patent right due to non-payment of annual fee |