JPH10252066A - Execution jig for concrete sheet pile - Google Patents

Execution jig for concrete sheet pile

Info

Publication number
JPH10252066A
JPH10252066A JP5775997A JP5775997A JPH10252066A JP H10252066 A JPH10252066 A JP H10252066A JP 5775997 A JP5775997 A JP 5775997A JP 5775997 A JP5775997 A JP 5775997A JP H10252066 A JPH10252066 A JP H10252066A
Authority
JP
Japan
Prior art keywords
sheet pile
concrete
concrete sheet
ground surface
gripping member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP5775997A
Other languages
Japanese (ja)
Other versions
JP3714439B2 (en
Inventor
Takeshi Odaka
武 小高
Mitsuo Nishimoto
光雄 西本
Tokihiko Yoneda
時彦 米田
Morio Kitamura
北村  精男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geostr Corp
Giken Seisakusho Co Ltd
Original Assignee
Geostr Corp
Giken Seisakusho Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geostr Corp, Giken Seisakusho Co Ltd filed Critical Geostr Corp
Priority to JP05775997A priority Critical patent/JP3714439B2/en
Publication of JPH10252066A publication Critical patent/JPH10252066A/en
Application granted granted Critical
Publication of JP3714439B2 publication Critical patent/JP3714439B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a jig capable of driving the head section of a sheet pile to the ground surface or below the ground surface by burying inserts into the head section of the concrete sheet pile, and screwing and fixing a grip member to the inserts. SOLUTION: A grip member 2 bored with bolt holes is overlapped on the head section of a concrete sheet pile 1, bolts 4 are inserted into the bolt holes and screwed to the inserts buried at the top end of the concrete sheet pile 1, and the grip member 2 is fixed to the concrete sheet pile 1. The portion of the grip member 2 is gripped by the chuck of an execution machine, the concrete sheet pile 1 is driven by a vibratory hammer, then the grip member is removed. When existing sheet piles are used as reaction force like in the press-in construction method, the grip members 2 are left fitted to multiple sheet piles used as the reaction force, and the press-in construction method can be coped with. When the grip members 2 are merely removed after execution, the sheet piles can be buried at the same height as that of the ground surface or at the position lower than the ground surface.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は従来はできなかっ
た、地表或いは地表より下までコンクリート矢板を打ち
込むことを可能にする、コンクリート矢板の施工治具に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete sheet pile working jig which can be driven into the ground or below the surface, which has not been conventionally possible.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】従来、
コンクリート矢板の施工は、矢板の上部(頭部)をチャ
ックで掴み土中に打ち込むため、矢板の頭部は、地表面
より上にでる結果となっていた。
2. Description of the Related Art
In the construction of concrete sheet piles, the upper part (head) of the sheet pile was gripped with a chuck and driven into the soil, so that the head of the sheet pile came out above the ground surface.

【0003】図4(a)は従来の方法でコンクリート矢
板の頭部をチャックで掴みワイヤに接続したバイブロハ
ンマで打ち込む施行法の正面図であり、(b)は側面図
である。この例でわかるようにチャックの掴み代は必ず
地表に残る。
FIG. 4 (a) is a front view of a conventional method in which the head of a concrete sheet pile is gripped by a chuck and driven by a vibrohammer connected to a wire, and FIG. 4 (b) is a side view. As can be seen in this example, the chucking allowance always remains on the ground.

【0004】図5は従来の方法で油圧作動のコンクリー
トパイラでコンクリート矢板を打ち込んでいる図であ
る。コンクリート矢板の側面をチャックで掴み、油圧で
一定深さ打ち込み、しゃくとり虫式に、チャックで掴む
位置を上方に変え再び打ち込むことを繰り返す。この例
からも明らかなように、地表にコンクリート矢板の頭部
が残る。
FIG. 5 is a view of driving a concrete sheet pile with a hydraulically operated concrete piler according to a conventional method. The side of the concrete sheet pile is gripped with a chuck, and is driven to a certain depth by hydraulic pressure. As is clear from this example, the head of the concrete sheet pile remains on the ground surface.

【0005】このように従来の方法では矢板の天端を地
表面まで或いは地表面より下まで打ち込むことができな
かった。従って矢板の天端を地表面と同じ高さ、または
地表面より低く(深く)しなければならない場合は、矢
板の頭部を斫り揃えるか、矢板を打ち込む部分の地面を
予め掘り下げておき、施工後に掘り下げた部分だけ埋め
戻しをする必要があった。
[0005] As described above, in the conventional method, the top end of the sheet pile cannot be driven to the ground surface or below the ground surface. Therefore, if the top of the sheet pile must be at the same height as the ground surface or lower (deeper) than the ground surface, the head of the sheet pile is cut down or the ground where the sheet pile is driven is dug in advance, It was necessary to backfill only the part dug down after construction.

【0006】図6(a)は、予め所定の深さまで掘り下
げてコンクリート矢板を打ち込んでいる図であり、
(b)はその側面図である。
FIG. 6 (a) is a view in which a concrete sheet pile has been dug down to a predetermined depth in advance.
(B) is a side view thereof.

【0007】この発明は、従来できなかった矢板の頭部
を地表面まで、或いは地表面より低く打ち込むことがで
きる治具を提供するものである。
The present invention provides a jig capable of driving the head of a sheet pile, which could not be done conventionally, to the ground surface or below the ground surface.

【0008】[0008]

【課題を解決するための手段】コンクリート矢板の施工
治具であり、コンクリート矢板の頭部に、雌ねじを切削
したインサートを埋設し、前記コンクリート矢板に掴み
部材を重ね、該掴み部材に設けたボルト孔にボルトを挿
通し、前記コンクリート矢板に埋設されたインサート
に、螺合、固定してなることを特徴とするコンクリート
矢板の施工治具を主旨とする。
A jig for concrete sheet pile embedding, wherein an insert obtained by cutting a female screw is buried in the head of the concrete sheet pile, a gripping member is superimposed on the concrete sheet pile, and a bolt provided on the gripping member is provided. A construction jig for a concrete sheet pile characterized in that a bolt is inserted into a hole and screwed and fixed to an insert buried in the concrete sheet pile.

【0009】次にその作用について述べる。Next, the operation will be described.

【0010】コンクリート矢板の頭部にボルトで重ねて
取り付けた掴み部材部分を、施工機械のチャックで掴
み、矢板を打ち込んだ後、前記掴み部材を取り外すこと
により、矢板の天端を地表と同じ高さ、または地表より
低くすることができる。なお圧入工法のように、既設の
矢板を反力として使用する場合は、反力として使用する
数枚の矢板に掴み部材を取り付けたまま残しておくこと
によって、圧入工法にも対処できる。
[0010] A gripping member portion, which is mounted on the head of a concrete sheet pile by bolts, is gripped by a chuck of a construction machine, and after driving the sheet pile, the gripping member is removed, so that the top end of the sheet pile is at the same height as the ground surface. Or lower than the surface. When an existing sheet pile is used as a reaction force as in the press-fitting method, the press-fitting method can be dealt with by leaving the gripping members attached to several sheet piles used as the reaction force.

【0011】またコンクリート矢板の板厚が変わって
も、コンクリート矢板に埋設するインサートの位置を合
わせておくことで、掴み部材の兼用ができる。さらに板
厚が大きい場合、従来の油圧作動のコンクリートパイラ
では、矢板を掴むチャックのストロークは、矢板のコン
クリート厚以上必要であったため、コンクリートパイラ
が大型になる傾向があった。しかしこの発明の治具を用
いれば、コンクリート矢板の厚さより薄い掴み部材を掴
むに止まるので、コンクリートパイラは小型化できる。
Even if the thickness of the concrete sheet pile changes, the gripping member can be used by adjusting the position of the insert buried in the concrete sheet pile. Further, when the sheet thickness is large, in the conventional hydraulically operated concrete piler, the stroke of the chuck for gripping the sheet pile needs to be larger than the concrete thickness of the sheet pile, so that the concrete piler tends to be large. However, if the jig of the present invention is used, the concrete piler can be reduced in size because the gripping member is thinner than the thickness of the concrete sheet pile.

【0012】なお施工機械のチャックで掴む部分は、直
接コンクリート矢板の部分ではなく掴み部材を掴むこと
になるため、コンクリート矢板の頭部を欠損する虞がな
い。
[0012] Since the portion to be gripped by the chuck of the construction machine is not the portion of the concrete sheet pile but the gripping member, there is no possibility that the head of the concrete sheet pile will be lost.

【0013】また掴み部材同志の連結を、従来はコンク
リート矢板の頭部に埋設したプレートを溶接して行って
いたが、別のプレート等を利用してボルト締結して連結
できるので治具の傷みが少なくまた着脱が容易である。
Conventionally, the gripping members are connected by welding a plate buried in the head of the concrete sheet pile. However, since a separate plate or the like can be used to connect by bolting, the jig is damaged. It is easy to remove and attach.

【0014】[0014]

【発明の実施の形態】以下図面に基づいてこの発明のコ
ンクリート矢板の施工治具を説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A concrete sheet pile construction jig according to the present invention will be described below with reference to the drawings.

【0015】図1(a)は、この発明のコンクリート矢
板1の頭部に掴み部材2を重ねた全体図である。3は掴
み部材2に穿設したボルト孔である。掴み部材は必ずし
もコンクリート矢板と同じ断面である必要はない。
(b)はコンクリート矢板に掴み部材2を取り付けた詳
細図である。(c)は(b)の上面図である。
FIG. 1A is an overall view of a concrete sheet pile 1 of the present invention with a gripping member 2 superimposed on the head thereof. Reference numeral 3 denotes a bolt hole formed in the gripping member 2. The gripping members need not necessarily have the same cross section as the concrete sheet pile.
(B) is a detailed view in which the gripping member 2 is attached to a concrete sheet pile. (C) is a top view of (b).

【0016】5はコンクリート矢板の頭部に埋設され
た、雌ねじを切削したインサートを示し、4は該インサ
ート5に螺合し掴み部材2を、コンクリート矢板に取り
付けるボルトである。図2(a)は掴み部材2をチャッ
ク7で掴み、バイブロハンマ6でコンクリート矢板を打
ち込んでいる正面図である。左側のコンクリート矢板1
の掴み部材2は既に取り外してある。(b)はその側面
図である。
Reference numeral 5 denotes an insert which is embedded in the head of the concrete sheet pile and is formed by cutting a female screw. Reference numeral 4 denotes a bolt which is screwed to the insert 5 and attaches the gripping member 2 to the concrete sheet pile. FIG. 2A is a front view in which the gripping member 2 is gripped by the chuck 7 and the concrete sheet pile is driven by the vibro hammer 6. Concrete sheet pile 1 on the left
Has already been removed. (B) is a side view thereof.

【0017】図3は掴み部材2の側面を、油圧作動のコ
ンクリートパイラ8で掴み、一定のストローク分だけ打
ち込み、しゃくとり虫的に掴み部材2を掴む位置を上げ
て、再び打ち込む様子を示した図である。コンクリート
パイラ8は油圧シリンダを応用しており、打ち込み時の
反力は相隣るコンクリート矢板1に残した掴み部材2を
掴むことによって得られる。反力を得ることに預からな
い、掴み部材2は取り外され他に転用される。
FIG. 3 shows a state in which the side surface of the gripping member 2 is gripped with a hydraulically operated concrete piler 8 and driven by a predetermined stroke, the position where the gripping member 2 is gripped like a snake is raised, and the driving is performed again. FIG. The concrete piler 8 uses a hydraulic cylinder, and the reaction force at the time of driving is obtained by gripping the gripping member 2 left on the adjacent concrete sheet pile 1. The gripping member 2, which is not entrusted to obtain a reaction force, is removed and diverted to another.

【0018】[0018]

【発明の効果】この発明は以上のような構成からなり次
のような効果を奏する。
The present invention has the above-described structure and has the following effects.

【0019】従来は、矢板の天端を地表面と同じ高さ、
または地表面より低くする場合は、 矢板を施工後に所定の高さに斫るか、 矢板を施工する場所を事前に掘り下げておき、施工後
埋め戻す。
Conventionally, the top end of a sheet pile has the same height as the ground surface,
Or, if it is lower than the ground surface, cut the sheet pile to the specified height after construction, or dug in advance the place where the sheet pile will be constructed, and refill it after construction.

【0020】ことが必要であった。の場合は、矢板の
長さが所定の長さ以上に必要となるばかりか、矢板の斫
落としの費用及び工期を要する。またの場合は、施工
する以前に施工場所を掘り下げ、施工後に埋め戻しを要
し、これもと同様、費用と工期を余分に要する。
It was necessary. In the case of (1), not only the length of the sheet pile is required to be longer than a predetermined length, but also the cost and construction period for cutting the sheet pile are required. In other cases, the construction site is dug down before construction, and backfilling is required after construction, which also requires extra cost and construction time.

【0021】この発明のコンクリート矢板の施工治具を
用いれば、施工後、掴み部材を取り外すだけで地表と同
じ高さか、地表より低い位置に矢板を埋め込むことがで
きる。また取り外した掴み部材、ボルトは、次の矢板の
打ち込みに転用することができて、簡便で経済的な矢板
施行法が実現できる。
By using the concrete sheet pile construction jig of the present invention, after construction, the sheet pile can be embedded at the same height as the ground surface or at a position lower than the ground surface simply by removing the gripping member. The removed gripping member and bolt can be used for driving the next sheet pile, and a simple and economical sheet pile execution method can be realized.

【0022】またコンクリート矢板の板厚が変わって
も、コンクリート矢板に埋設するインサートの位置を合
わせておくことで、掴み部材の兼用ができる。さらに板
厚が大きい場合、従来の油圧作動のコンクリートパイラ
では、矢板を掴むチャックのストロークは、矢板のコン
クリート厚以上必要であったため、コンクリートパイラ
が大型になる傾向があった。しかしこの発明の治具を用
いれば、コンクリート矢板の厚さより薄い掴み部材を掴
むに止まるので、コンクリートパイラは小型化できる。
Even if the thickness of the concrete sheet pile changes, the gripping member can also be used by adjusting the position of the insert buried in the concrete sheet pile. Further, when the sheet thickness is large, in the conventional hydraulically operated concrete piler, the stroke of the chuck for gripping the sheet pile needs to be larger than the concrete thickness of the sheet pile, so that the concrete piler tends to be large. However, if the jig of the present invention is used, the concrete piler can be reduced in size because the gripping member is thinner than the thickness of the concrete sheet pile.

【0023】なお施工機械のチャックで掴む部分は、直
接コンクリート矢板の部分ではなく掴み部材を掴むこと
になるため、コンクリート矢板の頭部を欠損する虞がな
い。
The portion to be gripped by the chuck of the construction machine is not a part of the concrete sheet pile but a gripping member, so that there is no possibility that the head of the concrete sheet pile is damaged.

【0024】また掴み部材同志の連結を、従来はコンク
リート矢板の頭部に埋設したプレートを溶接して行って
いたが、別のプレート等を利用してボルト締結して連結
できるので治具の傷みが少なくまた着脱が容易である。
Conventionally, the grip members are connected by welding a plate buried in the head of the concrete sheet pile. However, since another plate or the like can be used to connect the bolts by bolting, the jig is damaged. It is easy to remove and attach.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(a)は、この発明のコンクリート矢板1の頭
部に掴み部材2を重ねた全体図である。(b)はコンク
リート矢板に掴み部材2を取り付けた詳細図である。
(c)は(b)の上面図である。
FIG. 1 (a) is an overall view of a concrete sheet pile 1 of the present invention with a gripping member 2 superimposed on the head thereof. (B) is a detailed view in which the gripping member 2 is attached to a concrete sheet pile.
(C) is a top view of (b).

【図2】(a)は掴み部材2をチャック7で掴み、バイ
ブロハンマ6でコンクリート矢板を打ち込んでいる正面
図である。(b)はその側面図である。
FIG. 2A is a front view in which a gripping member 2 is gripped by a chuck 7 and a concrete sheet pile is driven by a vibratory hammer 6; (B) is a side view thereof.

【図3】掴み部材2の側面を、コンクリートパイラ8で
掴み、一定のストローク分だけ打ち込み、しゃくとり虫
的に掴み部材2を掴む位置を上げて、再び打ち込む様子
を示した図である。
FIG. 3 is a diagram showing a state in which the side surface of the gripping member 2 is gripped by a concrete piler 8, driven for a predetermined stroke, the gripping position of the gripping member 2 is raised like a snake, and the driving is performed again.

【図4】(a)は従来の方法でコンクリート矢板の頭部
をチャックで掴みワイヤに接続したバイブロハンマで打
ち込む施行法の正面図であり、(b)側面図である。
FIG. 4 (a) is a front view of a conventional method in which the head of a concrete sheet pile is gripped with a chuck and driven with a vibro hammer connected to a wire, and FIG. 4 (b) is a side view.

【図5】従来の方法でコンクリートパイラでコンクリー
ト矢板を打ち込んでいる図である。
FIG. 5 is a view of driving a concrete sheet pile with a concrete piler according to a conventional method.

【図6】(a)は、予め所定の深さまで掘り下げてコン
クリート矢板を埋め込んでいる図であり、(b)はその
側面図である。
FIG. 6 (a) is a diagram in which a concrete sheet pile has been dug down to a predetermined depth in advance, and FIG. 6 (b) is a side view thereof.

【符号の説明】[Explanation of symbols]

1……コンクリート矢板 2……掴み部材 3……ボルト孔 4……ボルト 5……インサート 6……バイブロハンマ 7……チャック 8……コンクリートパイラ DESCRIPTION OF SYMBOLS 1 ... Concrete sheet pile 2 ... Grip member 3 ... Bolt hole 4 ... Bolt 5 ... Insert 6 ... Vibro hammer 7 ... Chuck 8 ... Concrete piler

───────────────────────────────────────────────────── フロントページの続き (72)発明者 米田 時彦 東京都港区芝4丁目2番3号 ジオスター 株式会社内 (72)発明者 北村 精男 高知県高知市布師田3948番地1 株式会社 技研製作所内 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Tokihiko Yoneda 4-3-3 Shiba, Minato-ku, Tokyo Inside Geostar Co., Ltd. (72) Inventor Seio Kitamura 3948-1, Fushida, Kochi City, Kochi Prefecture Inside Giken Seisakusho Co., Ltd.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート矢板の施工治具であり、コ
ンクリート矢板の頭部に、雌ねじを切削したインサート
を埋設し、前記コンクリート矢板に掴み部材を重ね、該
掴み部材に設けたボルト孔にボルトを挿通し、前記コン
クリート矢板に埋設されたインサートに、螺合、固定し
てなることを特徴とするコンクリート矢板の施工治具。
1. A concrete sheet pile construction jig, wherein an insert obtained by cutting a female screw is buried in the head of the concrete sheet pile, a gripping member is superimposed on the concrete sheet pile, and bolts are inserted into bolt holes provided in the gripping member. A concrete sheet pile construction jig, which is inserted and screwed and fixed to an insert embedded in the concrete sheet pile.
JP05775997A 1997-03-12 1997-03-12 Concrete sheet pile construction jig Expired - Fee Related JP3714439B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP05775997A JP3714439B2 (en) 1997-03-12 1997-03-12 Concrete sheet pile construction jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP05775997A JP3714439B2 (en) 1997-03-12 1997-03-12 Concrete sheet pile construction jig

Publications (2)

Publication Number Publication Date
JPH10252066A true JPH10252066A (en) 1998-09-22
JP3714439B2 JP3714439B2 (en) 2005-11-09

Family

ID=13064816

Family Applications (1)

Application Number Title Priority Date Filing Date
JP05775997A Expired - Fee Related JP3714439B2 (en) 1997-03-12 1997-03-12 Concrete sheet pile construction jig

Country Status (1)

Country Link
JP (1) JP3714439B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020122379A (en) * 2019-01-31 2020-08-13 株式会社技研製作所 Attachment for driving down pile and pile press-in method
CN114808837A (en) * 2022-04-14 2022-07-29 中国港湾工程有限责任公司 Lengthened sheet pile structure and sheet pile lengthening method for pipe plate combined pile wharf construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020122379A (en) * 2019-01-31 2020-08-13 株式会社技研製作所 Attachment for driving down pile and pile press-in method
CN114808837A (en) * 2022-04-14 2022-07-29 中国港湾工程有限责任公司 Lengthened sheet pile structure and sheet pile lengthening method for pipe plate combined pile wharf construction

Also Published As

Publication number Publication date
JP3714439B2 (en) 2005-11-09

Similar Documents

Publication Publication Date Title
KR101766166B1 (en) PHC pile construction method using removeable auxiliary pile
JPH10252066A (en) Execution jig for concrete sheet pile
US20030133765A1 (en) One step countersink
KR200398428Y1 (en) Support pile for a pipe pile
CN214783958U (en) Foundation ditch stagnant water curtain structure
JPH11350473A (en) Execution method for steel pipe pile
JP2709445B2 (en) Steel pipe pile and method of burying steel pipe pile
JPH03107017A (en) Pile head treatment method for cast-in-place concrete pile
KR20110111637A (en) Down hole and steel pressing apparatus for rock base and method using the same
JPH07113229A (en) Cast-in-place concrete pile method
KR20070008124A (en) Support pile for a pipe pile
CN218373808U (en) High-strength concrete pipe pile
CN213510673U (en) Drilling grouting nail mounting device capable of simultaneously drilling and planting ribs
JPH0371524B2 (en)
JP3123333B2 (en) Drilling tools
CN212509831U (en) Oil pipe stabilizing device for hydraulic hammer
JPH0813487A (en) Pile driving method
CN220202663U (en) Electric pile driver
JP2006322226A (en) Steel sheet pile with bolt, its construction method, steel sheet pile body for use in the method, and perforated steel plate with steel
JP7112189B2 (en) Auger device and pile press-in machine
US4174093A (en) Gripper jaw
JPS6319396Y2 (en)
JPH09313054A (en) Treatment of subsidence space under root ball
CN2315287Y (en) Drilling rig of well drilling machine on gravel layer
JP3078321U (en) Pile driver

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040116

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050810

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050817

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050817

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080902

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110902

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110902

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140902

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees