JP3566360B2 - Construction method of trench for pipe laying - Google Patents
Construction method of trench for pipe laying Download PDFInfo
- Publication number
- JP3566360B2 JP3566360B2 JP30232094A JP30232094A JP3566360B2 JP 3566360 B2 JP3566360 B2 JP 3566360B2 JP 30232094 A JP30232094 A JP 30232094A JP 30232094 A JP30232094 A JP 30232094A JP 3566360 B2 JP3566360 B2 JP 3566360B2
- Authority
- JP
- Japan
- Prior art keywords
- trench
- pipe
- laying
- pipe laying
- laid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sewage (AREA)
Description
【0001】
【産業上の利用分野】
本発明は、地下内へ埋設される配管布設用トレンチの施工方法に関する。
【0002】
【従来の技術】
通常、配管布設用のトレンチは、図5から図8に示すような手順で構築される。
【0003】
先ず、図5に示すように、地山を掘削して床付けを行い、ベース40及び側壁42の型枠44を組み、コンクリートCを打設する。
【0004】
次に、養生しベース40及び側壁42のコンクリートCが硬化すると型枠44を取り外し、図6に示すように、底板48を支持する支保工をパイプサポート54で構築し、スラブ50の型枠52を組みコンクリートCを打設する。
【0005】
次に、養生しコンクリートCが硬化すると、パイプサポート54、底板48、及び型枠52を撤去し、図7に示すようなボックス型のトレンチ56を完成させる。ここで、図8に示すように、トレンチ56の内部に配管支持材58でラックを構成し、この配管支持材58に配管60を布設していく。
【0006】
しかし、パイプサポート54で支保工を構築し、また撤去する作業は手間を要し、工期の短縮化を図ることが容易でない。また、配管60を支持するためのラックを配管支持材58で組み立る作業も手間がかかる。
【0007】
【発明が解決しようとする課題】
本発明は係る事実を考慮し、トレンチの構築と配管布設作業の効率化及び省力化を図り、配管工事の工期の短縮を実現することを目的とする。
【0008】
【課題を解決するための手段】
【0009】
請求項1に記載の配管布設用トレンチの施工方法は、上方が開口した下部トレンチの側壁に備えられた配管布設用ユニットに配管を布設する工程と、配管が布設された前記下部トレンチを吊下して基盤上に設置する工程と、前記下部トレンチの開口を覆うように接合され配管布設空間を構成する上部トレンチの天井壁に配設された懸架部材に配管を布設する工程と、前記上部トレンチを吊下して前記下部トレンチに接合する工程と、を有することを特徴としている。
【0010】
【作用】
【0013】
請求項1に記載の配管布設用トレンチの施工方法では、先ず、下部トレンチの側壁に備えられた配管布設用ユニットに配管が布設される。この配管が布設された下部トレンチを吊下して基盤上に設置することによって、トレンチ内での配管布設作業が省ける。
【0014】
次に、上部トレンチの天井壁に配設された懸架部材に配管を布設し、吊下して下部トレンチと接合させる。これによって、配管布設用トレンチが完成し、完成後、配管を布設する必要がなく、各ブロック毎に設置された配管を接続するだけで布設工事が完了する。
【0015】
【実施例】
図1に示すように、本実施例に係るトレンチ10を構成するU字形の下部トレンチ12は、床付けされた基盤14の上に設置される。この下部トレンチ12の上方の開口には接合手段して継手ほぞ16が形成されている。
【0016】
また、下部トレンチ12の側壁には、梯子形のラック18が一体に取付けられており、配管20が予め多層状に布設されるようになっている。この下部トレンチ12は図示しないクレン等で吊下され、基盤14の上に設置される。
【0017】
また、図3に示すように、下部トレンチ12の開口を覆う上部トレンチ22は、下方が開口したU字形で、その開口には継手ほぞ16と係合する継手ほぞ24が形成されている。
【0018】
この下部トレンチ12の天井壁からは、懸架部材26が垂れ下がっており、その先端に形成されたホルダー部26Aで配管20を保持できるようになっている。
【0019】
次に、本実施例に係るトレンチ10を利用して配管を布設する施工方法を説明する。
【0020】
図1及び図2に示すように、先ず、地上で下部トレンチ12のラック18に必要な配管20を布設する。次に、この下部トレンチ12を吊下して、基盤上に設置する。
【0021】
ここで、図3及び図4に示すように、上部トレンチ22の懸架部材26に配管20を布設し、下部トレンチ12の開口を覆うようにして、継手ほぞ16、24同士を接合し、配管布設空間を構成する。
【0022】
このため、トレンチ10内に配管支持部材を組立てて、配管20を布設する必要がなくなる。また、各ブロック毎に設置された配管20を接続するだけで布設工事が完了する。
【0023】
なお、本実施例では、1ブロックのトレンチ10の施工方法について説明したが、上述したような工程を順次繰り返してスパンを伸ばしていくか、あるいは、下部トレンチ12を先に数ブロック設置して、上部トレンチ22を載せるようにしてもよい。
【0024】
なお、トレンチ10の各ブロック同士の連結は、トレンチ10に貫通されたシース孔へPC鋼材を挿通させておき、数ブロック単位でPC鋼材の両端をナットとアンカープレートで緊結することで、各ブロックが互いに圧着し合いってジョイント部分が連結される。
【0025】
【発明の効果】
本発明は上記構成としたので、トレンチの構築と配管布設作業の効率化及び省力化を図ることができ、配管工事の工期を短縮することができる。
【図面の簡単な説明】
【図1】本実施例に係る配管布設用トレンチの施工手順を示した断面図である。
【図2】本実施例に係る配管布設用トレンチの施工手順を示した断面図である。
【図3】本実施例に係る配管布設用トレンチの施工手順を示した断面図である。
【図4】本実施例に係る配管布設用トレンチの施工手順を示した断面図である。
【図5】従来の配管布設用トレンチの施工手順を示した断面図である。
【図6】従来の配管布設用トレンチの施工手順を示した断面図である。
【図7】従来の配管布設用トレンチの施工手順を示した断面図である。
【図8】従来の配管布設用トレンチの施工手順を示した断面図である。
【符号の説明】
12 下部トレンチ
18 ラック(配管布設用ユニット)
22 上部トレンチ
26 懸架部材[0001]
[Industrial applications]
The present invention relates to facilities coating method of the pipe laying for the train Chi to be embedded into the underground.
[0002]
[Prior art]
Usually, a trench for laying a pipe is constructed according to a procedure as shown in FIGS.
[0003]
First, as shown in FIG. 5, the ground is excavated and the floor is laid, the
[0004]
Next, when the concrete C of the
[0005]
Next, when the concrete C is cured and cured, the pipe support 54, the
[0006]
However, the work of constructing and removing the shoring with the
[0007]
[Problems to be solved by the invention]
SUMMARY OF THE INVENTION The present invention has been made in consideration of the above-described circumstances, and has as its object to improve the efficiency and labor-saving of trench construction and pipe laying work, and to shorten the construction period of piping work.
[0008]
[Means for Solving the Problems]
[0009]
The method of constructing a pipe laying trench according to claim 1 , wherein a pipe is laid in a pipe laying unit provided on a side wall of the lower trench whose upper side is open, and the lower trench in which the pipe is laid is suspended. Installing the pipe on a suspension member disposed on a ceiling wall of an upper trench which is joined to cover an opening of the lower trench and forms a piping installation space; and And joining the lower trench with the lower trench.
[0010]
[Action]
[0013]
The construction method of a pipe laying trench according to claim 1, firstly, the pipe to the pipe laying for units provided in the side wall of the lower trench is laid. By suspending the lower trench in which the pipe is laid and installing it on the base, the work of laying the pipe in the trench can be omitted.
[0014]
Next, a pipe is laid on the suspension member provided on the ceiling wall of the upper trench, and the pipe is suspended and joined to the lower trench. Thus, the piping installation trench is completed, and after completion, there is no need to install piping, and the installation work is completed only by connecting the piping installed for each block.
[0015]
【Example】
As shown in FIG. 1, a U-shaped
[0016]
Further, a ladder-
[0017]
As shown in FIG. 3, the
[0018]
A
[0019]
Next, a construction method for laying a pipe using the
[0020]
As shown in FIGS. 1 and 2, first,
[0021]
Here, as shown in FIGS. 3 and 4, the
[0022]
For this reason, there is no need to assemble the pipe support member in the
[0023]
In this embodiment, the method of forming one block of the
[0024]
Each block of the
[0025]
【The invention's effect】
Since the present invention is configured as described above, the efficiency of construction of the trench and the work of laying the piping and labor saving can be achieved, and the construction period of the piping work can be shortened.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing a procedure for forming a pipe laying trench according to the present embodiment.
FIG. 2 is a cross-sectional view showing a procedure for forming a pipe laying trench according to the present embodiment.
FIG. 3 is a cross-sectional view showing a procedure for forming a pipe laying trench according to the present embodiment.
FIG. 4 is a cross-sectional view showing a procedure for forming a pipe laying trench according to the present embodiment.
FIG. 5 is a cross-sectional view showing a procedure for forming a conventional pipe laying trench.
FIG. 6 is a cross-sectional view showing a procedure for forming a conventional pipe laying trench.
FIG. 7 is a cross-sectional view showing a procedure for forming a conventional pipe laying trench.
FIG. 8 is a cross-sectional view showing a procedure for forming a conventional pipe laying trench.
[Explanation of symbols]
12
22
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP30232094A JP3566360B2 (en) | 1994-12-06 | 1994-12-06 | Construction method of trench for pipe laying |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP30232094A JP3566360B2 (en) | 1994-12-06 | 1994-12-06 | Construction method of trench for pipe laying |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH08159337A JPH08159337A (en) | 1996-06-21 |
JP3566360B2 true JP3566360B2 (en) | 2004-09-15 |
Family
ID=17907533
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP30232094A Expired - Fee Related JP3566360B2 (en) | 1994-12-06 | 1994-12-06 | Construction method of trench for pipe laying |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3566360B2 (en) |
-
1994
- 1994-12-06 JP JP30232094A patent/JP3566360B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH08159337A (en) | 1996-06-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH01214636A (en) | Execution method for water closet of japanese style | |
JP3566360B2 (en) | Construction method of trench for pipe laying | |
JP3487934B2 (en) | Trench for laying piping and method of construction | |
JP3140229B2 (en) | Dwelling unit variable housing system | |
JP2741387B2 (en) | Construction manhole construction method | |
JP3019742U (en) | BOX type tension vertical joint groove | |
JPH0396551A (en) | Floor construction in building | |
JP2004003168A (en) | Fixing metal fitting of concrete form | |
JPH0416583Y2 (en) | ||
JP2009046842A (en) | Finisher track laying method and track laying base block | |
JP3498951B2 (en) | Intermediate slab for manhole | |
RU2368742C1 (en) | Method for manufacturing of wall-ceiling structure in reinforced concrete version | |
KR100389535B1 (en) | subway open cut structure water proofing method and panel thereby | |
JPH11241349A (en) | Mat foundation for dwelling house, and construction method thereof | |
GB2463070A (en) | Device for reinforcing a joist | |
JP2000257078A (en) | Construction method of mat foundation to use pc foundation beam member and pc support frame for pc foundation beam member | |
JPS63181831A (en) | Underground construction | |
JPH051748Y2 (en) | ||
KR950009611B1 (en) | Assembling high apartments joining structure | |
JP2002129589A (en) | Method for reinforcing existing manhole, and reinforcing steel segment | |
KR20000072287A (en) | Crux construction compositive wire panel | |
JP2915655B2 (en) | Bathroom unit construction method | |
JP2023156702A (en) | Concrete structure using precast formwork and construction method thereof | |
KR200196833Y1 (en) | Apparatus for supporting pipe laying under concrete work | |
JP3009298B2 (en) | Method of manufacturing PCa slab |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20040608 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040610 |
|
R150 | Certificate of patent (=grant) or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (prs date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080618 Year of fee payment: 4 |
|
LAPS | Cancellation because of no payment of annual fees |