KR100389535B1 - subway open cut structure water proofing method and panel thereby - Google Patents

subway open cut structure water proofing method and panel thereby Download PDF

Info

Publication number
KR100389535B1
KR100389535B1 KR10-2001-0001794A KR20010001794A KR100389535B1 KR 100389535 B1 KR100389535 B1 KR 100389535B1 KR 20010001794 A KR20010001794 A KR 20010001794A KR 100389535 B1 KR100389535 B1 KR 100389535B1
Authority
KR
South Korea
Prior art keywords
panel
concrete
reinforcing bars
underground
formwork
Prior art date
Application number
KR10-2001-0001794A
Other languages
Korean (ko)
Other versions
KR20020060805A (en
Inventor
한기만
Original Assignee
금호엔지니어링 (주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 금호엔지니어링 (주) filed Critical 금호엔지니어링 (주)
Priority to KR10-2001-0001794A priority Critical patent/KR100389535B1/en
Publication of KR20020060805A publication Critical patent/KR20020060805A/en
Application granted granted Critical
Publication of KR100389535B1 publication Critical patent/KR100389535B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • E04G9/021Forming boards or similar elements the form surface being of cardboard
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork

Abstract

목적 : 본 발명은 지하구조물의 측벽에 대한 외측 거푸집 및 동바리 설치 공정과 방수 처리 공정을 동시에 진행시키는 지하철 지하구조물 방수 시공 공법 및 그 패널을 제공하는 데 있다.Object: The present invention is to provide a method for waterproofing the underground construction of underground structures and the panel for simultaneously proceeding the installation and waterproofing of the outer formwork and the grouping of the side wall of the underground construction.
구성 : 본 발명은 기초 버림 콘크리트, 방수층, 몰탈 콘크리트를 타설하는 공정; 기초 철근, 측벽 철근, 그리고 슬라브 철근을 조립하고 내측 거푸집을 조립하는 공정; 내측 거푸집을 향하여 순차적으로 방수 쉬트, 제1패널, 종, 횡 서포트 부재, 제2패널의 조립체를 설치하는 공정; 제2패널에 응력 버팀목을 설치하는 공정; 기초 철근, 측벽 철근, 그리고 슬라부 철근에 콘크리트를 타설하고 방수층을 포설하는 공정; 그리고 제1패널, 종, 횡 서포트 부재, 그리고 제2패널을 분리한 후 다시 메우는 공정을 포함한다.Composition: The present invention is the process of pouring foundation cast concrete, waterproof layer, mortar concrete; Assembling the foundation reinforcing bars, the sidewall reinforcing bars, and the slab reinforcing bars, and the inner formwork; Installing an assembly of a waterproof sheet, a first panel, a longitudinal, a lateral support member, and a second panel sequentially toward the inner formwork; Installing a stress strut on the second panel; Placing concrete in the foundation reinforcing bars, sidewall reinforcing bars, and slab reinforcing bars and installing a waterproof layer; And separating and refilling the first panel, the longitudinal, the lateral support members, and the second panel.
효과 : 본 발명은 외측 거푸집과 동바리의 역할을 하는 제1,2패널과 방수 쉬트를 하나의 조립체로 하여 하나의 공정으로 설치하므로 측벽 콘크리트에 대한 별도의 방수 처리 공정을 불필요하게 한다.EFFECT: The present invention eliminates the need for a separate waterproofing process for the sidewall concrete because the first and second panels and the waterproof sheet serving as the outer formwork and the club are installed in one process.

Description

지하철 지하구조물 방수 시공 공법 및 그 패널{subway open cut structure water proofing method and panel thereby}Substructure open cut structure water proofing method and panel
본 발명은 지하철 지하구조물 방수 시공 공법 및 그 패널에 관한 것으로서, 보다 상세하게는 지하구조물의 측벽에 대한 외측 거푸집 및 동바리 설치 공정과 방수 처리 공정을 동시에 진행시키는 지하철 지하구조물 방수 시공 공법 및 그 패널에 관한 것이다.The present invention relates to a subway underground construction waterproofing method and a panel thereof, and more particularly, to a subway underground structural waterproofing method and a panel for simultaneously proceeding the outer formwork and the group installation process and waterproofing process on the side wall of the underground structure. It is about.
일반적으로 관 또는 케이블 등을 지하에 매설하거나 터널을 건설하는 방법에는 땅을 지상으로부터 파내려 가지 않는 비개착식 시공 방법과 지상으로부터 파내려 가는 개착식 시공 방법이 있다.In general, a method of laying a pipe or a cable underground or constructing a tunnel includes a non-adhesive construction method that does not dig the ground from the ground and an open construction method that digs from the ground.
비개착식 시공 방법은 도시지역에서 통신케이블, 전력케이블, 도시가스관, 상하수도관 등의 설치와 같은 작은 직경을 형성하는 경우에는 교통체증이나 소음공해 등을 피하기 위하여 1980년대 이후에 급속히 발전하고 있으며 특히 일본, 독일, 캐나다 등의 선진국에서 세계시장을 거의 장악하고 있다.Non-removable construction methods have been developed rapidly since the 1980s to avoid traffic jams and noise pollution when forming small diameters such as the installation of communication cables, power cables, city gas pipes, water and sewage pipes in urban areas. In developed countries such as Japan, Germany and Canada, they dominate the world market.
그럼에도 불구하고 지하철 공사와 같은 큰 지하 공간을 형성하는 터널 건설의 경우에는 노동 집약적인 개착식 시공 방법이 적용되고 있다.Nevertheless, in the case of tunnel construction that forms a large underground space such as subway construction, a labor-intensive open-type construction method is applied.
이 개착식 시공 방법은 땅을 파내고, 그 자리에 개착 구조물을 형성한 후 땅을 다시 메우는 과정을 거치게 된다. 이때 개착 구조물을 시공하기 위한 거푸집이 사용된다.This installation method involves digging up the ground, forming the attachment structure in place, and then refilling the ground. At this time, formwork for constructing the attachment structure is used.
이와 관련되는 대한민국 특허 제1992-0009741호에는 "지중구조물용 거푸집 및 지중구조물의 제조방법"이 기재되어 있다.Related Korean Patent No. 1992-0009741 describes a formwork for underground structures and a method for manufacturing underground structures.
이 지중구조물용 거푸집은 "속이 빈 통체를 평면적으로 몇 개로 분할시킨 형상의 내측 판체부와, 상기 내측 판체부의 양측 끝에서 직각 방향으로 돌출되는 내측 플랜지부로 되는 합성수지재의 내측 조각판; 상기 내측 조각판보다 소정의 치수만큼 직경이 큰 것 이외에는 상기 내측 판체부와 동일한 형상을 가지는 외측 판체부와 외측 판체부의 양측 끝에서 직각 방향으로 돌출되는 외측 플랜지부로 되는 합성수지재의 외측 조각판; 상기 내, 외측 플랜지부들 사이에 끼워져서 상기 내, 외측 조각판들을 연결하여 하나의 이중 통체를 형성시켜 주는 수단을 구비함"으로 기재되어 있다.The formwork for underground structures includes an inner plate of synthetic resin material comprising an inner plate portion having a shape in which a hollow cylinder is divided into several planes, and an inner flange portion projecting at right angles from both ends of the inner plate portion; An outer engraving plate of a synthetic resin material comprising an outer plate portion having the same shape as the inner plate portion and an outer flange portion projecting in a direction perpendicular to both ends of the outer plate portion except that the diameter is larger by a predetermined dimension than the engraving plate; And means for fitting between the outer flanges to connect the inner and outer pieces to form one double cylinder.
그리고 지중구조물의 제조방법은 "소정의 위치에 구덩이를 파고; 기초 콘크리트를 타설하여 경화시킨 후에; 속이 빈 통체를 형성하는 내측 거푸집, 상기 내측 거푸집보다 슬라브 두께만큼 높으며 직경이 크게 되는 외측 거푸집, 상기 내, 외측 거푸집을 연결시켜 주는 연결편들로 구성되는 이중 통체 형상의 거푸집을 상기 기초 콘크리트 위에 올려놓고; 상기 내측 거푸집 위에는 그 위에 걸쳐져서 지지되는 정도의 크기를 가지는 수평 지지판부와 안쪽에서 상부로 꺾여지는 수직 지지벽으로 되는 상부판을 올려놓고 못으로 고정시킨 후에; 벽체부와 슬라브 부분의 콘크리트를 동시에 타설함"으로 기재되어 있다.And the manufacturing method of the underground structure is "digging a pit at a predetermined position; after the foundation concrete is poured and hardened; the inner formwork to form a hollow cylinder, the outer formwork is higher than the inner formwork by the slab thickness and the diameter is larger, the said A double-cylindrical formwork consisting of connecting pieces connecting the inner and outer formwork is placed on the base concrete, and the inner support form a horizontal support plate having a size that is supported and supported thereon and bent from the inside to the upper portion. After the top plate serving as the vertical support wall is fixed and nailed; placing the concrete of the wall portion and the slab portion at the same time.
그러나 상기와 같은 지중구조물용 거푸집이 적용되는 지중구조물의 제조방법은 타설된 콘크리트가 경화된 후 내, 외측 거푸집 모두를 제거하고, 경화된 콘크리트 통체 내부로 지중의 수분이 유입되지 않도록 동체의 외부에 별도의 방수 처리를 실시하여야 하는 단점이 있다.However, the manufacturing method of the underground structure to which the formwork for the underground structure is applied is to remove both the inner and outer formwork after the cast concrete is cured, and to the outside of the fuselage so that the moisture in the ground does not flow into the hardened concrete cylinder There is a disadvantage that a separate waterproof treatment should be performed.
따라서 본 발명은 상기와 같은 단점을 해소하기 위하여 발명된 것으로서, 본 발명의 목적은 지하구조물의 측벽에 대한 외측 거푸집 및 동바리 설치 공정과 방수 처리 공정을 동시에 진행시키는 지하철 지하구조물 방수 시공 공법 및 그 패널을 제공하는 데 있다.Therefore, the present invention has been invented to solve the above disadvantages, an object of the present invention is to waterproof the underground construction of the underground structure and the panel that proceeds at the same time the outer formwork and the group installation and waterproofing process for the side wall of the underground structure To provide.
도 1은 본 발명에 따른 지하철 지하구조물 방수 시공 공법에 적용되는 지하철 지하구조물의 단면도이다.1 is a cross-sectional view of a subway underground structure applied to the subway underground construction waterproof construction method according to the present invention.
도 2는 도 1의 A-A에 따른 단면도이다.2 is a cross-sectional view taken along the line A-A of FIG.
도 3은 본 발명에 따른 지하철 지하구조물 방수 시공 공법에 적용되는 방수 쉬트, 제1패널, 종, 횡 서포트 부재, 그리고 제2패널 조립체의 분해 사시도이다.3 is an exploded perspective view of the waterproof sheet, the first panel, the longitudinal, the lateral support member, and the second panel assembly applied to the underground construction of the underground structure according to the present invention.
도 4는 본 발명에 따른 지하철 지하구조물 방수 시공 공법에 적용되는 제1패널, 종, 횡 서포트 부재, 제2패널, 그리고 방수 쉬트의 설치 상태의 단면도이다.Figure 4 is a cross-sectional view of the installation state of the first panel, longitudinal, transverse support member, the second panel, and the waterproof sheet applied to the underground construction of the underground structure according to the present invention.
도 5는 본 발명에 따른 지하철 지하구조물 방수 시공 공법에 적용되는 패널이 연속적으로 설치된 측면도이다.5 is a side view in which the panels applied to the subway underground construction waterproofing construction method according to the present invention are continuously installed.
도 6은 도 5의 B-B선에 따른 단면도이다.FIG. 6 is a cross-sectional view taken along line B-B of FIG. 5.
**도면의 주요 부분에 대한 부호의 설명**** Description of the symbols for the main parts of the drawings **
3 : 측벽 13 : 콘크리트3: sidewall 13: concrete
15 : 방수 쉬트 17 : 내측 거푸집15: waterproof sheet 17: inner formwork
19 : 유지 부재 21,23 : 제1,2패널19: holding member 21, 23: first and second panels
25 : 접착 돌기 27 : 고정 핀25: adhesive projection 27: fixing pin
31 : 체결 돌기 33 : 체결 홈31: fastening protrusion 33: fastening groove
35,37 : 종, 횡 서포트 홈 39,41 : 종, 횡 서포트 부재35,37: longitudinal, lateral support groove 39,41: longitudinal, lateral support member
45 : 방수층 47: 응력 버팀목45: waterproof layer 47: stress support
u : 지중 s : 지하 공간u: underground s: underground
이를 실현하기 위하여 본 발명에 따른 지하철 지하구조물 방수 시공 공법은,In order to realize this, the underground construction of the underground construction method according to the present invention,
기초 버림 콘크리트를 타설하고, 측벽의 일정 높이까지 방수층을 포설한 후, 몰탈 콘크리트를 타설하는 공정;Placing foundation discarded concrete, laying a waterproof layer to a predetermined height of the sidewall, and then pouring mortar concrete;
상기 몰탈 콘크리트 위에 기초 철근, 측벽 철근, 그리고 슬라브 철근을 조립하고 내측 거푸집을 조립하는 공정;Assembling basic reinforcing bars, sidewall reinforcing bars, and slab reinforcing bars on the mortar concrete and assembling inner formwork;
상기 측벽 철근을 사이에 두고 상기 내측 거푸집을 향하여 순차적으로 방수 쉬트, 제1패널, 종, 횡 서포트 부재, 제2패널의 조립체를 설치하는 공정;Installing an assembly of a waterproof sheet, a first panel, a longitudinal, a lateral support member, and a second panel sequentially toward the inner formwork with the sidewall reinforcement therebetween;
상기 조립체를 지중 측에서 지지하도록 상기 제2패널에 응력 버팀목을 설치하는 공정;Installing a stress strut on the second panel to support the assembly on the underground side;
상기 기초 철근, 측벽 철근, 그리고 슬라부 철근에 콘크리트를 타설하고 이 콘크리트 위에 방수층을 포설하는 공정;Placing concrete on the foundation reinforcing bars, sidewall reinforcing bars, and slab reinforcing bars and installing a waterproof layer on the concrete;
상기 콘크리트가 경화된 후, 상기 제1패널, 종, 횡 서포트 부재, 그리고 제2패널을 분리한 후 다시 메우는 공정을 포함한다.After the concrete is hardened, the first panel, the longitudinal, the lateral support member, and the second panel is separated and then backfilled.
또, 본 발명에 따른 지하철 지하구조물 방수 시공 공법의 패널은,In addition, the panel of the subway underground structure waterproof construction method according to the present invention,
측벽 철근을 사이에 두고 내측 거푸집을 향하여 설치되는 방수 쉬트가 장착되도록 그 일측에 고정 핀이 구비되고 다른 일측에 체결 돌기가 형성된 제1패널;A first panel provided with a fixing pin at one side thereof and a fastening protrusion formed at the other side thereof so that the waterproof sheet installed toward the inner formwork with the sidewall reinforcing bars interposed therebetween;
상기 제1패널의 체결 돌기가 결합되어 제1패널과 같이 종, 횡 서포트 부재에 지지되도록 체결 돌기의 대향측에 체결 홈이 형성되고 종, 횡 서포트 부재에 설치되는 종, 횡 서포트 홈이 격자로 형성되는 제2패널을 포함한다.The fastening protrusions of the first panel are coupled to each other so that the fastening grooves are formed on opposite sides of the fastening protrusions so as to be supported by the longitudinal and horizontal support members as the first panel, and the longitudinal and horizontal support grooves installed on the longitudinal and horizontal support members are arranged in a grid. A second panel is formed.
이하, 본 발명의 바람직한 실시예를 첨부한 도면에 의하여 보다 상세히 설명한다.Hereinafter, with reference to the accompanying drawings, preferred embodiments of the present invention will be described in more detail.
도 1은 본 발명에 따른 지하철 지하구조물 방수 시공 공법에 따른 지하철 지하구조물의 단면도로서, 이 지하철 지하구조물은 통상적인 경우와 마찬가지로 지하 공간(s)을 형성하는 기초(1), 측벽(3), 그리고 슬라브(5)에 의하여 형성된다.1 is a cross-sectional view of a subway underground structure according to the waterproof construction method of the subway underground structure according to the present invention, the subway underground structure is the base (1), side walls (3), And it is formed by the slab (5).
기초(1)는 타설되는 콘크리트(7)에 의하여 지하철 선로(r)를 설치할 수 있는 면을 형성하여 지중(u)과 지하 공간(s)의 하방을 구획한다. 또 기초(1)에는 지중(u)에서 지하 공간(s)으로 유입되려는 수분을 차단시키는 방수층(9)과 이 방수층(9)의 포설을 가능케 하는 기초 버림 콘크리트(11)가 구비된다.The foundation 1 forms a surface on which the subway line r can be installed by the concrete 7 to be poured to partition the underground u and the lower part of the underground space s. In addition, the foundation 1 is provided with a waterproof layer 9 for blocking water from entering the underground space s from the ground u, and a foundation discarded concrete 11 for enabling the installation of the waterproof layer 9.
측벽(3)은 기초 콘크리트(7) 위에 타설되는 벽 콘크리트(13)에 의하여 상 방향으로 형성되어 지중(u)과 지하 공간(s)의 측방을 구획한다.The side wall 3 is formed in the upward direction by the wall concrete 13 placed on the foundation concrete 7 to partition the side of the underground u and the underground space s.
이 측벽(3)은 도 2에 도시된 바와 같이, 지하 공간(s) 측의 콘크리트(13)와 방수 쉬트(15)를 포함하여 구성된다. 즉, 콘크리트(13)의 지중(u) 측은 방수 쉬트(15) 자체로 형성되고, 지하 공간(s) 측은 내측 거푸집(17)에 의하여 형성된다. 내측 거푸집(17)과 방수 쉬트(15)은 유지 부재(19)에 의하여 일정한 간격으로 유지 연결된다.As shown in FIG. 2, the side wall 3 includes a concrete 13 and a waterproof sheet 15 on the side of the underground space s. That is, the ground u side of the concrete 13 is formed of the waterproof sheet 15 itself, and the underground space s side is formed of the inner formwork 17. The inner formwork 17 and the waterproof sheet 15 are connected to each other at regular intervals by the retaining member 19.
이 방수 쉬트(15)는 도 3,4에 도시된 바와 같이, 지하철 지하구조물 방수 시공 공법에 적용되는 제1,2패널(21,23)의 조립체에 의하여 측벽(3)의 지중(u) 측을 형성하게 된다.As shown in FIGS. 3 and 4, the waterproof sheet 15 is the underground (u) side of the side wall 3 by the assembly of the first and second panels 21 and 23 applied to the underground construction of the underground structure. Will form.
즉, 방수 쉬트(15)는 측벽 철근(미도시)을 사이에 두고 내측 거푸집(17)을 향하도록 제1패널(21)의 일측에 설치된다. 또한 방수 쉬트(15)에는 벽 콘크리트(13)와 강력하게 접착하도록 접착 돌기(25)가 형성된다. 이 방수 쉬트(15)는 측벽(3)의 방수를 위하여 설치되는 것으로 다양한 재질로 형성될 수 있으나 본 실시예에서는 고무로 형성되는 것을 예시한다. 이러한 방수 쉬트(15)는 제1패널(21)의 측면에서 상당한 자중을 가지는 중량체로 작용하므로 벽 콘크리트(13)를 타설할 때까지 변형되지 않은 상태로 지지될 필요가 있다.That is, the waterproof sheet 15 is installed at one side of the first panel 21 to face the inner formwork 17 with the sidewall rebar (not shown) therebetween. In addition, the adhesive sheet 25 is formed on the waterproof sheet 15 so as to strongly adhere to the wall concrete 13. The waterproof sheet 15 is installed for waterproofing the side wall 3, but may be formed of various materials. Since the waterproof sheet 15 acts as a weight having a considerable self weight on the side of the first panel 21, it is necessary to be supported in an undeformed state until the wall concrete 13 is poured.
이를 위하여 제1패널(21)에는 방수 쉬트(15)가 장착되는 고정 핀(27)이 구비된다. 이 고정 핀(27)은 방수 쉬트(15)의 자중을 충분히 지지할 수 있는 정도의 다수로 형성됨이 바람직하다. 이 고정 핀(27)의 뒷면 제1패널(21)에는 제2패널(23)과 체결되는 체결 돌기(31)가 형성된다.To this end, the first panel 21 is provided with a fixing pin 27 on which the waterproof sheet 15 is mounted. It is preferable that the fixing pins 27 are formed in a large number that can sufficiently support the weight of the waterproof sheet 15. A fastening protrusion 31 for fastening with the second panel 23 is formed on the first panel 21 on the rear side of the fixing pin 27.
이 체결 돌기(31)의 대향측 제2패널(23)에는 체결 돌기(31)와 결합되는 체결 홈(33)이 형성된다. 또한 제2패널(23)에는 종, 횡 서포트 홈(35,37)이 격자로 형성된다. 이 종, 횡 서포트 홈(35,37)은 제1,2패널(21,23)이 종, 횡 서포트 부재(39,41)에 설치되게 한다. 한편 종, 횡 서포트 부재(39,41)가 격자로 설치될 수 있도록 횡 서포트 홈(37)은 종 서포트 홈(35)보다 깊게 형성된다. 또 종 서포트 홈(35)이 횡 서포트 홈(37)보다 깊게 형성되어도 무방하다.A fastening groove 33 coupled to the fastening protrusion 31 is formed in the second panel 23 on the opposite side of the fastening protrusion 31. In the second panel 23, longitudinal and horizontal support grooves 35 and 37 are formed in a lattice. The longitudinal and lateral support grooves 35 and 37 allow the first and second panels 21 and 23 to be provided on the longitudinal and lateral support members 39 and 41. On the other hand, the transverse support grooves 37 are formed deeper than the longitudinal support grooves 35 so that the longitudinal and transverse support members 39 and 41 can be installed in a lattice. Moreover, the longitudinal support groove 35 may be formed deeper than the horizontal support groove 37.
한편, 제1,2패널(21,23)은 콘크리트를 타설할 정도의 강도를 가지는 어떠한 재료라도 무방하겠으나 본 실시예에서는 폴리에칠렌 수지로 형성되는 것을 예시한다.On the other hand, the first and second panels 21 and 23 may be any material having a strength enough to pour concrete, but in the present embodiment, the first and second panels 21 and 23 may be formed of polyethylene resin.
상기와 같이 구성되는 지하철 지하구조물 방수 시공 공법의 패널, 즉 제1,2패널(21,23)은 지하철 터널 공사와 같은 긴 공간에서는 도 5,6에 도시된 바와 같이, 연속적으로 조립될 필요가 있다.Panels of the underground construction of the underground construction method, that is, the first and second panels 21 and 23 need to be continuously assembled in a long space such as subway tunnel construction, as shown in FIGS. 5 and 6. have.
그리고 슬라부(5)는 측벽(3)의 상단에서 횡 방향으로 타설되는 콘크리트(43)에 의하여 지중(u)과 지하 공간(s)의 상방을 구획한다. 또 슬라부(5)에는 지중(u)에서 지하 공간(s)으로 유입되려는 수분을 차단시키는 방수층(45)이 구비된다.And the slab 5 is partitioned above the underground (u) and the underground space (s) by the concrete 43 poured in the transverse direction from the top of the side wall (3). In addition, the slab 5 is provided with a waterproof layer 45 to block moisture to be introduced into the underground space (s) from the ground (u).
한편, 상술한 바와 같이 구성되는 지하철 지하구조물에 대한 방수 시공 공법을 설명한다.On the other hand, it will be described a waterproof construction method for the subway underground structure configured as described above.
먼저, 일정한 지면을 파낸 개착부에 기초 버림 콘크리트(7)를 타설한다. 이 기초 버림 콘크리트(7)는 지하구조물의 하중을 버틸 수 있는 강도를 가져야 한다. 그리고 측벽(3)의 일정 높이까지 방수층(9)을 포설한다. 그 후, 몰탈 콘크리트를타설한다.First, the foundation discarded concrete 7 is poured in the attachment part which dug a fixed ground. This foundation concrete 7 should have strength to withstand the load of the underground structure. And the waterproof layer 9 is laid up to the predetermined height of the side wall 3. After that, mortar concrete is poured.
이 몰탈 콘크리트 위에 기초 철근, 측벽 철근, 그리고 슬라브 철근을 조립하고 내측 거푸집(17)을 조립한다. 이 기초 철근, 측벽 철근, 그리고 슬라브 철근은 지하구조물의 골격을 형성하도록 구성된다.The base reinforcing bar, side wall reinforcing bar, and slab reinforcing bar are assembled on the mortar concrete, and the inner formwork 17 is assembled. These foundation bars, sidewall bars, and slab bars are configured to form the skeleton of the underground structure.
이 측벽 철근을 사이에 두고 방수 쉬트(15), 제1패널(21), 종, 횡 서포트 부재(39,41), 제2패널(23)의 조립체를 설치한다. 이 조립체의 방수 쉬트(15)는 내측 거푸집(17)을 향하여 설치된다. 이 조립체의 제1패널(21)에 방수 쉬트(15)를 장착한 상태로 측벽 철근에 설치하는 것은 측벽(3)에 대한 별도의 방수 처리 공정을 불필요하게 한다. 이 조립체를 설치할 때에는 방수 쉬트(15)와 내측 거푸집(17)이 일정한 간격을 유지할 수 있도록 방수 쉬트(15)와 내측 거푸집(17)을 유지 부재(19)로 연결한다.The assembly of the waterproof sheet 15, the 1st panel 21, the longitudinal and horizontal support members 39 and 41, and the 2nd panel 23 is provided through this side wall reinforcement. The waterproof sheet 15 of this assembly is installed toward the inner formwork 17. Installing in the sidewall reinforcement with the waterproof sheet 15 mounted on the first panel 21 of this assembly eliminates the need for a separate waterproofing process for the sidewall 3. When the assembly is installed, the waterproof sheet 15 and the inner formwork 17 are connected to the retaining member 19 so that the waterproof sheet 15 and the inner formwork 17 can be maintained at regular intervals.
이 조립체를 지중(u) 측에서 지지하도록 제2패널(23)에 응력 버팀목(47)을 설치한다. 이 응력 버팀목(47)은 콘크리트(13) 타설시 방수 쉬트(15), 제1,2패널(21,23)이 지중(u)측으로 벌어지는 것을 방지한다.The stress strut 47 is installed in the second panel 23 so as to support the assembly on the ground (u) side. This stress strut 47 prevents the waterproof sheet 15 and the first and second panels 21 and 23 from spreading to the ground side u when the concrete 13 is placed.
상기 기초 철근, 측벽 철근, 그리고 슬라부 철근에 콘크리트(7,13,43)를 타설한다. 그리고 슬라부(5) 콘크리트(43) 위에는 방수층(45)을 포설한다.Concrete (7, 13, 43) is poured into the base reinforcing bar, side wall reinforcing bar, and slab reinforcing bar. And on the slab (5) concrete 43, a waterproof layer 45 is installed.
그리고 콘크리트(7,13,43)가 경화된 후, 제1패널(21), 종, 횡 서포트 부재(39,41), 그리고 제2패널(23)을 분리한 후 지하구조물을 다시 메운다. 이때 방수 쉬트(17)는 측벽(3)의 콘크리트(13)로부터 분리되지 않으므로 이 콘크리트(13)에 대한 방수 작용을 하게 된다.After the concrete (7, 13, 43) is hardened, the first panel 21, longitudinal, transverse support members (39, 41), and the second panel 23 is separated and the underground structure is filled again. At this time, since the waterproof sheet 17 is not separated from the concrete 13 of the side wall 3, the waterproof sheet 17 is waterproof.
상술한 바와 같이 본 발명에 따른 지하철 지하구조물 방수 시공 공법 및 그 패널은 외측 거푸집과 동바리의 역할을 하는 제1,2패널과 방수 쉬트를 하나의 조립체로 하여 하나의 공정으로 설치하므로 측벽 콘크리트에 대한 별도의 방수 처리 공정을 불필요하게 한다.As described above, the subway underground structure waterproof construction method and the panel according to the present invention are installed in one process using the first and second panels and the waterproof sheet serving as outer molds and clubs as one assembly, so that This eliminates the need for a separate waterproofing process.
따라서 본 발명은 지하구조물의 측벽 콘크리트에 대한 방수 처리 공사 기간을 단축시킬 수 있다.Therefore, the present invention can shorten the waterproofing construction period for the sidewall concrete of the underground structure.

Claims (4)

  1. 기초 버림 콘크리트를 타설하고, 측벽의 일정 높이까지 방수층을 포설한 후, 몰탈 콘크리트를 타설하는 공정;Placing foundation discarded concrete, laying a waterproof layer to a predetermined height of the sidewall, and then pouring mortar concrete;
    상기 몰탈 콘크리트 위에 기초 철근, 측벽 철근, 그리고 슬라브 철근을 조립하고 내측 거푸집을 조립하는 공정;Assembling basic reinforcing bars, sidewall reinforcing bars, and slab reinforcing bars on the mortar concrete and assembling inner formwork;
    상기 측벽 철근을 사이에 두고 상기 내측 거푸집을 향하여 순차적으로 방수 쉬트, 제1패널, 종, 횡 서포트 부재, 제2패널의 조립체를 설치하는 공정;Installing an assembly of a waterproof sheet, a first panel, a longitudinal, a lateral support member, and a second panel sequentially toward the inner formwork with the sidewall reinforcement therebetween;
    상기 조립체를 지중 측에서 지지하도록 상기 제2패널에 응력 버팀목을 설치하는 공정;Installing a stress strut on the second panel to support the assembly on the underground side;
    상기 기초 철근, 측벽 철근, 그리고 슬라부 철근에 콘크리트를 타설하고 이 콘크리트 위에 방수층을 포설하는 공정;Placing concrete on the foundation reinforcing bars, sidewall reinforcing bars, and slab reinforcing bars and installing a waterproof layer on the concrete;
    상기 콘크리트가 경화된 후, 상기 제1패널, 종, 횡 서포트 부재, 그리고 제2패널을 분리한 후 다시 메우는 공정을 포함하는 지하철 지하구조물 방수 시공 공법.After the concrete is hardened, the underground underground structure waterproof construction method comprising the step of separating and refilling the first panel, longitudinal, transverse support member, and the second panel.
  2. 청구항 1에 있어서, 상기 조립체를 설치하는 공정은 상기 방수 쉬트와 상기 내측 거푸집이 일정한 간격을 유지할 수 있도록 상기 방수 쉬트와 상기 내측 거푸집을 유지 부재로 연결하는 공정을 포함하는 지하철 지하구조물 방수 시공 공법.The method of claim 1, wherein the installation of the assembly includes a step of connecting the waterproof sheet and the inner formwork with a retaining member so that the waterproof sheet and the inner formwork maintain a constant gap.
  3. 측벽 철근을 사이에 두고 내측 거푸집을 향하여 설치되는 방수 쉬트가 장착되도록 그 일측에 고정 핀이 구비되고 다른 일측에 체결 돌기가 형성된 제1패널;A first panel provided with a fixing pin at one side thereof and a fastening protrusion formed at the other side thereof so that the waterproof sheet installed toward the inner formwork with the sidewall reinforcing bars interposed therebetween;
    상기 제1패널의 체결 돌기가 결합되어 제1패널과 같이 종, 횡 서포트 부재에 지지되도록 체결 돌기의 대향측에 체결 홈이 형성되고 종, 횡 서포트 부재에 설치되는 종, 횡 서포트 홈이 격자로 형성되는 제2패널을 포함하는 지하철 지하구조물 방수 시공 공법의 패널.The fastening protrusions of the first panel are coupled to each other so that the fastening grooves are formed on opposite sides of the fastening protrusions so as to be supported by the longitudinal and horizontal support members as the first panel, and the longitudinal and horizontal support grooves installed on the longitudinal and horizontal support members are arranged in a grid. Panel of the subway underground structure waterproof construction method including a second panel formed.
  4. 청구항 3에 있어서, 상기 횡 서포트 홈과 상기 종 서포트 홈 중, 어느 하나는 다른 하나보다 깊게 형성됨을 특징으로 하는 지하철 지하구조물 방수 시공 공법의 패널.4. The panel of claim 3, wherein one of the lateral support grooves and the longitudinal support grooves is formed deeper than the other one. 5.
KR10-2001-0001794A 2001-01-12 2001-01-12 subway open cut structure water proofing method and panel thereby KR100389535B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0001794A KR100389535B1 (en) 2001-01-12 2001-01-12 subway open cut structure water proofing method and panel thereby

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0001794A KR100389535B1 (en) 2001-01-12 2001-01-12 subway open cut structure water proofing method and panel thereby

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR2020010000822U Division KR200226684Y1 (en) 2001-01-12 2001-01-12 panel of subway open cut structure water proofing method

Publications (2)

Publication Number Publication Date
KR20020060805A KR20020060805A (en) 2002-07-19
KR100389535B1 true KR100389535B1 (en) 2003-06-27

Family

ID=27691507

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0001794A KR100389535B1 (en) 2001-01-12 2001-01-12 subway open cut structure water proofing method and panel thereby

Country Status (1)

Country Link
KR (1) KR100389535B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100910778B1 (en) 2009-04-06 2009-08-04 (주)서흥이엔지 Pe panel unit for lining the inside of water tank and lining method using it

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436777B (en) * 2016-09-12 2018-12-04 中国建筑第五工程局有限公司 A kind of subway station skin-type waterproof construction and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100910778B1 (en) 2009-04-06 2009-08-04 (주)서흥이엔지 Pe panel unit for lining the inside of water tank and lining method using it

Also Published As

Publication number Publication date
KR20020060805A (en) 2002-07-19

Similar Documents

Publication Publication Date Title
US6434900B1 (en) Prefabricated concrete wall system
KR101630235B1 (en) Precast truss wall structure and construction method of underground structure using thereof
US5860262A (en) Permanent panelized mold apparatus and method for casting monolithic concrete structures in situ
US6301851B1 (en) Apparatus and method for forming precast modular units and method for constructing precast modular structure
KR100951097B1 (en) Slab and subgrade external wall structure and method for constructing underground slab and subgrade external wall, bracket
US20120102863A1 (en) Soloarmar construction engineering system
WO2015192179A1 (en) Formwork
KR101278547B1 (en) The precast concrete wall for the water-storage construct
JP2001295298A (en) Foundation for columnar structure and its work execution method
US20210017755A1 (en) Composite wall and methods of constructing a composite wall
KR100389535B1 (en) subway open cut structure water proofing method and panel thereby
KR200391986Y1 (en) Carbon-glass fiber composite concrete mold
KR200226684Y1 (en) panel of subway open cut structure water proofing method
KR100568904B1 (en) Structure, Method and Apparatus for Fiberglass Reinforced Plastics Deck-to-Girder Connections
KR20060127631A (en) Wall structure using precast concrete panel with rib rows
KR100805555B1 (en) Sectional manhole using multi-divided segments
JPH0913486A (en) Concrete structure body
KR102026112B1 (en) Pre-cast concrete segment blocks for vertical structures with various bracket connection means
KR100664965B1 (en) Carbon-glass fiber composite concrete mold, its manufacturing method and construction method
KR102140407B1 (en) Mamanufacturing method of PSC girder using end form steel plate
RU73363U1 (en) REINFORCED CONCRETE PLATE WITH EMPTINGS
KR101219459B1 (en) The water-storage tank of assembly type and method for constructing thereof
CN212001868U (en) Hollow plastic module and assembly applied to building field
KR100696910B1 (en) The method of making the temporary retaining wall block using a temporary retaining wall block type and this
KR20030034379A (en) A Wall Frame and a Method for Constructing Buildings Using the Same

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20110408

Year of fee payment: 9

LAPS Lapse due to unpaid annual fee