JP3500469B2 - Excavation method of ballast and soil for ballast removal of track bed of railway track, digging of soil, land leveling and stepping of slope for residential land development. - Google Patents

Excavation method of ballast and soil for ballast removal of track bed of railway track, digging of soil, land leveling and stepping of slope for residential land development.

Info

Publication number
JP3500469B2
JP3500469B2 JP18852992A JP18852992A JP3500469B2 JP 3500469 B2 JP3500469 B2 JP 3500469B2 JP 18852992 A JP18852992 A JP 18852992A JP 18852992 A JP18852992 A JP 18852992A JP 3500469 B2 JP3500469 B2 JP 3500469B2
Authority
JP
Japan
Prior art keywords
ballast
soil
digging
endless chain
chain band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP18852992A
Other languages
Japanese (ja)
Other versions
JPH0734402A (en
Inventor
智行 尾島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MIZUTANI-GUMI CO., LTD.
Original Assignee
MIZUTANI-GUMI CO., LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MIZUTANI-GUMI CO., LTD. filed Critical MIZUTANI-GUMI CO., LTD.
Priority to JP18852992A priority Critical patent/JP3500469B2/en
Publication of JPH0734402A publication Critical patent/JPH0734402A/en
Application granted granted Critical
Publication of JP3500469B2 publication Critical patent/JP3500469B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は鉄道軌道の道床のバラス
ト除去用・、土壌の溝掘り用、土地整地用及び宅地造成
のための法面の段切り用等のためのバラスト・土壌の掘
り出し方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to ballast / soil excavation for ballast removal of railroad track beds, soil trench digging, land leveling, and slope cutting for residential land development. Regarding the method.

【0002】従来は、鉄道軌道の道床のバラスト除去用
土木機装置と、宅地造成のための抜根等を含む土地整地
用土木機装置と、宅地造成のための法面(ノリメン)の
段切り用土木機装置とは、夫々別個の機械装置であり、
これらを兼用する装置は存在しなかったのであるが、本
発明者は、これらを兼用する多目的土木機装置を発明し
た、特許第1761635号[特公平4−14215号
(鉄道軌道の道床のバラスト除去用、土壌の溝掘り用、
整地のための抜根等を含む土地整地用及び宅地造成のた
めの法面の段切り用等の多目的土木機装置)]がそれで
ある。
[0002] Conventionally, a civil engineering machine device for removing ballast on the track of a railroad track, a civil engineering machine device for land preparation including rooting for building a residential land, and a step cutting of a slope (Norimen) for building a residential land. Civil engineering equipment is a separate mechanical equipment,
Although there is no device that also serves as these, the inventor of the present invention invented a multipurpose civil engineering machine device that also serves as these. Patent No. 1761635 [Japanese Patent Publication No. 4-14215 (ballast removal of the railroad track bed) For soil digging,
Multipurpose civil engineering equipment for land leveling, including root removal for leveling, and step cutting of slopes for residential land development)].

【0003】[0003]

【発明が解決しようとする課題】然し乍ら、本発明者
は、この多目的土木機装置を鉄道軌道などのスペースの
狭小な現場で所定の作業を行うに当り、不充分な点があ
ることを見い出した。本発明はこの問題点を解決せんと
することを目的とする。
However, the inventor of the present invention has found that the multipurpose civil engineering machine device has insufficient points for performing a predetermined work at a site having a small space such as a railway track. . The present invention aims to solve this problem.

【0004】[0004]

【課題を解決するための手段】前記目的のために、本発
明はエンドレスチェーン帯10を使用するバラスト・土
壌の掘り出し方法に於て、前記エンドレスチェーン帯1
0を支承し案内する案内盤体12を支承し且つ上下と左
右方向に移動せしめるための油圧手段(48,49,5
0)を有する作業台8が、これを案内盤体12のバラス
ト・土壌に接触する部分を、前記エンドレスチェーン帯
10の移動方向と直交する水平方向に移動せしめ得る油
圧シリンダ体9にて支承せしめられて、バラスト・土壌
の掘り出しの進み具合に従って作業台8を漸次前記水平
方向に移動せしめるものである方法を提供したのであ
る。
To achieve the above object, the present invention provides a ballast / soil digging method using an endless chain band 10, wherein the endless chain band 1 is used.
Hydraulic means (48, 49, 5) for supporting and guiding the guide board body 12 for supporting and guiding 0.
The workbench 8 having 0) is supported by a hydraulic cylinder body 9 capable of moving a portion of the guide board body 12 in contact with the ballast / soil in a horizontal direction orthogonal to the moving direction of the endless chain band 10. The worktable 8 is gradually moved in the horizontal direction according to the progress of ballast / soil digging.

【0005】而して、図7と図6に示されるように、前
記エンドレスチェーン帯10が長円状鎖環24を組合せ
てなるものとなし、該長円状鎖環24のうちの所要数の
長円状鎖環24は、バラスト・土壌掻き出し用突起体2
5付きの広幅板体26を固着したるものとなし、而かも
該掻き出し用突起体25は、斜め上向きの錐状突起体2
5a、斜め下向き錐状突起体25cが順次に固着されて
いるものであるに於て、該斜め上向きの錐状突起体25
aと下向きの錐状突起体25cとの中間位置に、水平向
きの錐状突起体25bが設けられているものであること
が好ましい。
Thus, as shown in FIGS. 7 and 6, the endless chain band 10 is formed by combining elliptical chain rings 24, and the required number of the elliptical chain rings 24. The oval chain ring 24 of the ballast / soil scraping protrusion 2
It is assumed that the wide plate member 26 with 5 is fixed, and that the scraping protrusion 25 is a cone-shaped protrusion 2 that is diagonally upward.
5a and the oblique downward pyramidal projection 25c are sequentially fixed, the oblique upward pyramidal projection 25
It is preferable that a horizontal conical protrusion 25b is provided at an intermediate position between a and the downward conical protrusion 25c.

【0006】前記エンドレスチェーン帯10の移動速度
は約3乃至5米/秒の範囲とすることが好ましい。
The moving speed of the endless chain band 10 is preferably in the range of about 3 to 5 US / sec.

【0007】[0007]

【作用】本発明方法は、例えば、図1(多目的土木機装
置全体の側面図)と図2(同上の正面図)と図3(同上
の平面図)に示される多目的土木機装置1に於て、バラ
スト・土壌の掘り出し手段を備えたエンドレスチェーン
帯10を支承し案内するチェーン帯案内溝11のある
(図示例では)逆へ字状の案内盤帯12の先端部15
を、掘り出しすべき個所、例えば鉄道の枕木13の下方
のバラスト層14の少許側方の所に接触させ油圧シリン
ダ体9の操作により掘り出すべき個所の方に案内盤体1
2を漸次移動させると同時にエンドレスチェーン帯10
を約2米/秒以上の高速で運転しバラスト・土壌を掻き
出すのである。
The method of the present invention is applied to the multipurpose civil engineering machine apparatus 1 shown in, for example, FIG. 1 (side view of the whole multipurpose civil engineering machine apparatus), FIG. 2 (front view of the same) and FIG. 3 (plan view of the same). And a tip end portion 15 of an inverted V-shaped guide plate band 12 (in the illustrated example) having a chain band guide groove 11 for supporting and guiding the endless chain band 10 provided with ballast / soil digging means
Is brought into contact with a place to be dug out, for example, a place on the side of the ballast layer 14 below the sleepers 13 of the railway, and the guide board body 1 is brought to the place to be dug out by operating the hydraulic cylinder body 9.
2 is moved gradually and at the same time endless chain belt 10
Is operated at a high speed of about 2 US / sec or more to scrape out ballast and soil.

【0008】この際案内盤体12はバラスト層14内に
突入する部分は案内盤体12の水平部分16であると共
に、掻き出されたバラストは、機体2の側方で地面より
相当離れた処に位置する掻き出し物放出部17に於て案
内盤体12より放出され、ベルトコンベヤ3,4,5で
所望の個所に移され、例えばトラックの荷台などに集め
られる。この目的のために、案内盤体12の上端部52
付近をカバーするように放出物を集めるためのカバー体
18を装着する。(図5と図1と図3参照)。
At this time, the portion of the guide board 12 that projects into the ballast layer 14 is the horizontal portion 16 of the guide board 12, and the ballast scraped out is located at a side of the machine body 2 which is far away from the ground. It is discharged from the guide board body 12 at the scraped-out material discharging portion 17 located at, is moved to a desired place by the belt conveyors 3, 4, and, and is collected on, for example, a truck bed. For this purpose, the upper end 52 of the guide board 12 is
A cover body 18 is attached to collect the emission so as to cover the vicinity. (See FIGS. 5, 1 and 3).

【0009】本発明方法に於て、バラスト・土壌の掘り
出しと掻き出しに当りエンドレスチェーン帯10の移動
速度を約2米/秒以上の高速となしたのは、これ以下の
低速では充分な掘り出しと掻き出しが困難であること
を、本発明者が見い出したからである。更に、この移動
速度を約3乃至5米/秒の範囲とすることは最も好まし
いものである。これ以上の高速になるとエンドレスチェ
ーン帯10の掻き出しのための部材の磨耗を早めること
になり好ましくないのである。
In the method of the present invention, the moving speed of the endless chain belt 10 for digging and scraping ballast / soil is set to a high speed of about 2 US / sec or more, because it is sufficient for the digging at a low speed. This is because the present inventor has found that scraping is difficult. Further, it is most preferable to set the moving speed in the range of about 3 to 5 US / sec. If the speed is higher than this, the wear of the member for scraping out the endless chain band 10 is accelerated, which is not preferable.

【0010】而して前記エンドレス前記エンドレスチェ
ーン帯10の移動速度は、作業中は、約2米/秒以上と
する。
The moving speed of the endless chain band 10 is about 2 US / sec or more during the work.

【0011】本発明方法を実施する多目的土木機装置に
於ては、前記の作業を円滑に遂行するために、逆へ字状
の案内盤体12を支承し且つ上下と左右方向に移動せし
めるための油圧手段(48,49,50)を有する作業
台8が、これを案内盤体12のバラスト・土壌に接触す
る部分を、前記エンドレスチェーン帯10の移動方向と
直交する水平方向に移動せしめ得る油圧シリンダ体9に
て支承せしめられて、バラスト・土壌の掘り出しの進み
具合に従って作業台8を漸次前記水平方向に移動せしめ
るものである。
In the multipurpose earthmoving apparatus for carrying out the method of the present invention, in order to smoothly carry out the above-mentioned work, the guide board 12 having an inverted V-shape is supported and can be moved vertically and horizontally. The workbench 8 having the hydraulic means (48, 49, 50) can move the portion of the guide board 12 that comes into contact with the ballast / soil in the horizontal direction orthogonal to the moving direction of the endless chain band 10. It is supported by a hydraulic cylinder body 9 and gradually moves the workbench 8 in the horizontal direction in accordance with the progress of ballast and soil excavation.

【0012】本発明方法を実施する多目的土木機装置に
於ては、図6と図7に示されるように、エンドレスチェ
ーン帯10が長円状鎖環24,24,24を組合せてな
るものとなし、該長円状鎖環のうちの所要数の長円状鎖
環24は、バラスト・土壌掻き出し用突起体25付きの
広幅板体26を固着したるものとなし、而かも該掻き出
し用突起体26は、斜め上向きの錐状突起体25a、水
平向きの錐状突起体25b、斜め下向き錐状突起体25
cが順次に固着されているものであるようにする構成で
あることに依って、効率の良い掘り出しができるのであ
る。
As shown in FIGS. 6 and 7, in the multipurpose earthmoving apparatus for carrying out the method of the present invention, the endless chain band 10 is formed by combining elliptic chain rings 24, 24, 24. None, the required number of elliptical chain rings 24 among the elliptical chain rings are those to which the wide plate 26 with the ballast / soil scraping projection 25 is fixed. The body 26 includes an obliquely upward conical projection 25a, a horizontal conical projection 25b, and an oblique downward conical projection 25.
Due to the structure in which c is sequentially fixed, the digging can be performed efficiently.

【0013】[0013]

【実施例】図1乃至図3に、本発明方法を実施するため
の多目的土木機装置1にて枕木13の下方のバラスト層
14に対する掘り出しを行う実施例が図示される。その
機体2がレール6上に、レール用車輪の前輪29、後輪
31により、走行可能の形で乗っている状態が、図1に
図示される。この際には、機体2を一般道路上で移動さ
せるためのクローラ走行機30はレール6より所要距離
だけ上方位置にあるように吊支されている。
1 to 3 show an embodiment in which a ballast layer 14 under a sleeper 13 is dug by a multipurpose earthmoving machine 1 for carrying out the method of the present invention. FIG. 1 shows a state in which the vehicle body 2 is riding on the rail 6 in a form capable of traveling by front wheels 29 and rear wheels 31 of the rail wheels. At this time, the crawler traveling machine 30 for moving the machine body 2 on the general road is suspended and supported so as to be located above the rail 6 by a required distance.

【0014】該クローラ走行機30は、機体2の中央下
面に油圧回動軸32を介して、前記前輪29と後輪31
との略々中間に装着される。機体2が一般道路上を走行
するときには、前記の前輪29と後輪31とが図1の二
点鎖線で示された上昇位置33,34にあるようにして
クローラ走行機30上に機体2が乗っている状態となす
ものである。道路上からレール6上に移るときには前記
油圧回動軸32を回動させることで機体2をレール6上
に移すことになる。レール6上から道路上に移るとき
は、この逆の動作をする。
The crawler traveling machine 30 includes a front wheel 29 and a rear wheel 31 on the lower surface of the center of the machine body 2 via a hydraulic rotation shaft 32.
It is installed almost in the middle of. When the vehicle body 2 travels on a general road, the vehicle body 2 is placed on the crawler traveling machine 30 so that the front wheels 29 and the rear wheels 31 are in the raised positions 33 and 34 shown by the two-dot chain line in FIG. It is a state of riding. When moving from the road to the rail 6, the body 2 is moved to the rail 6 by rotating the hydraulic rotation shaft 32. When moving from the rail 6 to the road, the reverse operation is performed.

【0015】図3に於て、35は油圧シリンダ体であ
る。図3中でベルトコンベヤ5がレール6に平行な場合
と斜め方向にある場合との二種類の位置が假想線で図示
されているのは、この二種類のどちらかの都合の良い方
を採用すると云う趣旨である。図1乃至図3に於て、7
は操作室であって、その前方と側方にガラス窓36,3
7を設ける。
In FIG. 3, reference numeral 35 is a hydraulic cylinder body. In FIG. 3, two types of positions, that is, the case where the belt conveyor 5 is parallel to the rail 6 and the case where the belt conveyor 5 is in the diagonal direction, are shown by a imaginary line. That is the purpose. In FIGS. 1 to 3, 7
Is an operation room, and glass windows 36, 3 are provided in front and side of the operation room.
7 is provided.

【0016】図4に逆へ字状案内盤体12及びこれを支
承する作業台8並びに該作業台8の位置と向きとの操作
をする油圧シリンダ手段(48,49,50)などが図
示される。同図に於て、38はエンドレスチェーン帯1
0を駆動する油圧モータであって、前記操作室7内の作
業員がその回転速度を制御する。
FIG. 4 shows an inverted V-shaped guide plate 12, a workbench 8 supporting it, and hydraulic cylinder means (48, 49, 50) for operating the position and orientation of the workbench 8. It In the figure, 38 is an endless chain belt 1
It is a hydraulic motor that drives 0, and the worker in the operation room 7 controls the rotation speed.

【0017】図5は前記案内盤体12とカバー体18と
ベルトコンベヤ3などの関連関係を図示したものであ
る。図6はエンドレスチェーン帯10の一部拡大図であ
って、図示のようにエンドレスチェーン帯10は長円状
鎖環24,24,24を組合せてなり、該長円状鎖環の
うち2個に1個の割合のものである案内盤体12のチェ
ーン案内溝11内に摺動自在に嵌入されている。該長円
状鎖環24,24,24のうち2個に1個の割合で長円
状鎖環24にバラスト・土壌掻き出し用突起体25付き
の広幅板体26を固着する。該掻き出し用突起体25
は、斜め上向きの錐状突起体25a、水平向きの錐状突
起体25b、斜め下向き錐状突起体25cが順次に固着
されているようにする。図中、54は前記広幅板体26
の長円状鎖環24への固着のための取付ボルトである。
FIG. 5 shows the relationship among the guide board body 12, the cover body 18, the belt conveyor 3 and the like. FIG. 6 is a partially enlarged view of the endless chain band 10. As shown, the endless chain band 10 is formed by combining elliptical chain rings 24, 24, 24, and two of the elliptical chain rings are included. One of them is slidably fitted in the chain guide groove 11 of the guide board body 12. A wide plate 26 having a ballast / soil scraping projection 25 is fixed to the elliptic chain ring 24 at a ratio of one to two of the elliptical chain rings 24, 24, 24. The protrusion 25 for scraping
The obliquely upward conical protrusions 25a, the horizontally oriented conical protrusions 25b, and the obliquely downward conical protrusions 25c are sequentially fixed. In the figure, 54 is the wide plate member 26.
Is a mounting bolt for fixing to the elliptical chain ring 24.

【0018】本発明に於ては、エンドレスチェーン帯1
0は常に適切な張度の状態であるようにするのであっ
て、このために、図8と図9に図示のように、エンドレ
スチェーン帯10の張度調節手段として、該チェーン帯
10の駆動のためのスプロケット19の軸受21を支承
するブラケット22を前記案内盤体12のカッターフレ
ーム部20に、長手方向に摺動自在に遊嵌せしめ、且つ
ブラケット22を長手方向に押圧するように弾性体23
を介して調整自在な押圧手段53をカッターフレーム部
20に装着するのである。この構成の張度調節手段は、
作業現場の苛酷な状況であっても充分にその作用を達成
し而かも耐用年数が永いのである。
In the present invention, the endless chain belt 1
0 is always in an appropriate tension state. For this reason, as shown in FIGS. 8 and 9, as a tension adjusting means for the endless chain belt 10, the chain belt 10 is driven. The bracket 22 for supporting the bearing 21 of the sprocket 19 for the sprocket is loosely fitted in the cutter frame portion 20 of the guide board 12 in the longitudinal direction so as to be slidable, and the bracket 22 is pressed in the longitudinal direction by an elastic body. 23
The adjustable pressing means 53 is attached to the cutter frame portion 20 via the. The tonicity adjusting means of this configuration is
Even in the harsh conditions of the work site, it fully achieves its function and has a long service life.

【0019】図8と図9に図示のように、エンドレスチ
ェーン帯10の張度調節手段として、該チェーン帯10
の駆動のためのスプロケット19の軸受21を支承する
ブラケット22を、前記案内盤体のカッターフレーム部
20に、長手方向に摺動自在に遊嵌せしめ、且つブラケ
ット22を長手方向に押圧するように弾性体23を介し
て調整自在な押圧手段53をカッターフレーム部20に
装着するのであって、図8の実施例は、押圧手段53と
して、ボルト42の頭部43で前記弾性体23を押圧す
る方式を採用したものであって、図中、44は固定用ナ
ット、45はカッターフレーム部20の固定壁板51に
穿設された螺孔であって、該螺孔45にボルト42が螺
入され、ボルト頭部43が適切な押圧力で弾性体23を
押圧した状態でボルト42を固定するように固定用ナッ
ト44を設けるのである。図9の実施例は、押圧手段5
3として、押圧用油圧シリンダ体46を採用したもので
あって、ピストン頭部47で弾性体23を押圧するので
ある。
As shown in FIGS. 8 and 9, as a tension adjusting means of the endless chain band 10, the chain band 10 is adjusted.
A bracket 22 for supporting a bearing 21 of a sprocket 19 for driving the above is slidably fitted in the cutter frame portion 20 of the guide plate in the longitudinal direction, and the bracket 22 is pressed in the longitudinal direction. Adjustable pressing means 53 is attached to the cutter frame portion 20 via the elastic body 23. In the embodiment of FIG. 8, the elastic body 23 is pressed by the head 43 of the bolt 42 as the pressing means 53. In the drawing, 44 is a fixing nut, 45 is a screw hole formed in the fixed wall plate 51 of the cutter frame portion 20, and the bolt 42 is screwed into the screw hole 45. The fixing nut 44 is provided so as to fix the bolt 42 in a state where the bolt head 43 presses the elastic body 23 with an appropriate pressing force. In the embodiment shown in FIG. 9, the pressing means 5 is used.
3, the pressing hydraulic cylinder body 46 is adopted, and the piston head 47 presses the elastic body 23.

【0020】[0020]

【発明の効果】以上説明したように、本発明は鉄道軌道
の道床のバラスト除去用、土壌の溝掘り用、整地のため
の抜根等を含む土地整地用、及び宅地造成のための法面
の段切り用等のためのバラスト・土壌の掘り出しにまこ
とに優れた方法であり、特に、鉄道軌道などのスペース
が狭小な現場での作業に適し、パンドロール締結枕木の
下方のバラスト層及びポイント部のバラスト層の掘り出
しを高効率で遂行し得る。
INDUSTRIAL APPLICABILITY As described above, the present invention provides a slope for removing ballast on a railroad track bed, for digging soil, for ground leveling including rooting for leveling, and for building a land. It is a very excellent method for digging out ballast and soil for step cutting, etc., and is particularly suitable for work at sites where the space such as railroad tracks is small, and it is suitable for the ballast layer and point part under the pandroll fastening sleepers. The digging of the ballast layer can be performed with high efficiency.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例に係る多目的土木機装置の側面
図。
FIG. 1 is a side view of a multipurpose civil engineering machine device according to an embodiment of the present invention.

【図2】同上の正面図。FIG. 2 is a front view of the above.

【図3】同上の平面図。FIG. 3 is a plan view of the above.

【図4】同上に於ける案内盤体及び作業台とこれの位置
と向きとの操作をする油圧シリンダ体などの正面図。
FIG. 4 is a front view of the guide board body and the workbench in the above, and a hydraulic cylinder body and the like for operating the position and direction of the workbench.

【図5】同上の案内盤体とカバー体とベルトコンベヤな
どの関連関係を示した一部切欠の斜面図。
FIG. 5 is a partially cutaway perspective view showing a relational relationship among the guide board body, the cover body, the belt conveyor and the like.

【図6】エンドレスチェーン帯の一部拡大平面図。FIG. 6 is a partially enlarged plan view of an endless chain band.

【図7】エンドレスチェーン帯に装着される広幅板体の
斜面図。
FIG. 7 is a perspective view of a wide plate body attached to the endless chain belt.

【図8】エンドレスチェーン帯の張度調整手段の第一実
施例の正面断面図。
FIG. 8 is a front sectional view of the first embodiment of the tension adjusting means for the endless chain band.

【図9】エンドレスチェーン帯の張度調整手段の第二実
施例の正面断面図。
FIG. 9 is a front sectional view of a second embodiment of the tension adjusting means for an endless chain band.

【符号の説明】[Explanation of symbols]

1 多目的土木機装置 2 機体 3 ベルトコンベヤ(第1) 4 ベルトコンベヤ(第2) 5 ベルトコンベヤ(第3) 6 軌条(レール) 7 操作室 8 作業台 9 油圧シリンダ体 10 エンドレスチェーン帯 11 チェーン帯案内溝 12 案内盤体 13 枕木 14 バラスト層 15 案内盤体先端部 16 案内盤体水平部分 17 掻き出し物放出部 18 カバー体 19 スプロケット 20 カッターフレーム部 21 軸受 22 ブラケット 23 弾性体 24 長円状鎖環 25 突起体 25a 斜め上向きの錐状突起体 25b 水平向きの錐状突起体 25c 斜め下向きの錐状突起体 26 広幅板体 27 油圧シリンダ体 28 油圧シリンダ体 29 レール用車輪(前輪) 30 クローラ走行機 31 レール用車輪(後輪) 32 油圧回動軸 33 前輪の不使用時の上昇位置 34 後輪の不使用時の上昇位置 35 油圧シリンダ体 36 ガラス窓 37 ガラス窓 38 油圧モータ 39 板体支承部 40 予備エンジン 41 ボルト取付孔 42 ボルト 43 ボルト頭部 44 ナット 45 螺孔 46 押圧用油圧シリンダ体 47 ピストン頭部 48 油圧シリンダ体 49 油圧シリンダ体 50 油圧シリンダ体 51 固定壁板 52 案内盤体上端部 53 調整自在な押圧手段 54 取付ボルト 1 Multipurpose civil engineering equipment 2 aircraft 3 Belt conveyor (first) 4 Belt conveyor (second) 5 Belt conveyor (3rd) 6 rails 7 Control room 8 workbench 9 Hydraulic cylinder body 10 Endless chain belt 11 Chain band guide groove 12 Information board 13 sleepers 14 Ballast layer 15 Guide board tip 16 Guide panel horizontal part 17 Scrap discharge part 18 cover body 19 sprocket 20 Cutter frame part 21 bearings 22 bracket 23 Elastic body 24 oval chain ring 25 protrusions 25a Diagonal upward conical protrusion 25b Horizontal conical protrusion 25c Diagonal downward facing conical protrusion 26 Wide plate 27 Hydraulic cylinder body 28 Hydraulic cylinder body 29 Rail wheels (front wheels) 30 crawler traveling machine 31 Rail wheels (rear wheels) 32 hydraulic rotation axis 33 Lifted position when the front wheel is not in use 34 Rear wheel raised position when not in use 35 hydraulic cylinder body 36 glass windows 37 glass window 38 Hydraulic motor 39 Plate support 40 spare engine 41 Bolt mounting hole 42 volt 43 bolt head 44 nuts 45 screw holes 46 Pressing hydraulic cylinder body 47 Piston head 48 hydraulic cylinder body 49 Hydraulic cylinder body 50 hydraulic cylinder body 51 fixed wall board 52 Guide board upper end 53 Adjustable pressing means 54 Mounting bolt

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 エンドレスチェーン帯を使用するバラス
ト・土壌の掘り出し方法に於て、前記エンドレスチエェ
ーン帯を支承し案内する案内盤体を支承し且つ上下と左
右方向に移動せしめるための油圧手段を有する作業台
が、これを案内盤体のバラスト・土壌に接触する部分
を、前記エンドレスチェーン帯の移動方向と直交する水
平方向に移動せしめ得る油圧シリンダ体にて支承せしめ
られて、バラスト・土壌の掘り出しの進み具合に従って
作業台を漸次前記水平方向に移動せしめるものであるこ
とを特徴とするバラスト・土壌の掘り出し方法。
1. In a ballast / soil digging method using an endless chain band, a hydraulic means for supporting a guide panel body for supporting and guiding the endless chain band and for moving it vertically and horizontally. The workbench that has this is supported by a hydraulic cylinder body that can move the portion of the workbench that comes into contact with the ballast / soil of the guide plate in the horizontal direction orthogonal to the moving direction of the endless chain belt, and A ballast / soil digging method, characterized in that the work table is gradually moved in the horizontal direction according to the progress of the digging.
【請求項2】 請求項1記載のバラスト・土壌の掘り出
し方法に於て、前記エンドレスチェーン帯が長円状鎖環
を組合せてなるものとなし、該長円状鎖環のうちの所要
数の長円状鎖環は、バラスト・土壌掻き出し用突起体付
きの広幅板体を固着したるものとなし、而かも該掻き出
し用突起体は、斜め上向きの錐状突起体25a、斜め下
向き錐状突起体25cが順次に固着されているものであ
るに於て、該斜め上向きの錐状突起体25aと下向きの
錐状突起体25cとの中間位置に、水平向きの錐状突起
体25bが設けられているものであることを特徴とする
バラスト・土壌の掘り出し方法。
2. The ballast / soil digging method according to claim 1, wherein the endless chain band is a combination of elliptic chain rings, and the required number of the oval chain rings is The oval chain ring is assumed to have a wide plate body with ballast / soil scraping projections fixed thereto, and the scraping projections may also be obliquely upward conical projections 25a and obliquely downward conical projections. In the case where the body 25c is sequentially fixed, a horizontally oriented conical protrusion 25b is provided at an intermediate position between the obliquely upward conical protrusion 25a and the downward conical protrusion 25c. A method for digging out ballast and soil, which is characterized by being
【請求項3】 請求項1記載のバラスト・土壌の掘り出
し方法に於て、エンドレスチェーン帯の移動速度を約3
乃至5米/秒の範囲としたことを特徴とするバラスト・
土壌の掘り出し方法。
3. The ballast / soil digging method according to claim 1, wherein the moving speed of the endless chain belt is about 3
Ballasts characterized by a range of up to 5 US / sec.
How to dig up the soil.
JP18852992A 1992-06-08 1992-06-08 Excavation method of ballast and soil for ballast removal of track bed of railway track, digging of soil, land leveling and stepping of slope for residential land development. Expired - Lifetime JP3500469B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP18852992A JP3500469B2 (en) 1992-06-08 1992-06-08 Excavation method of ballast and soil for ballast removal of track bed of railway track, digging of soil, land leveling and stepping of slope for residential land development.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP18852992A JP3500469B2 (en) 1992-06-08 1992-06-08 Excavation method of ballast and soil for ballast removal of track bed of railway track, digging of soil, land leveling and stepping of slope for residential land development.

Publications (2)

Publication Number Publication Date
JPH0734402A JPH0734402A (en) 1995-02-03
JP3500469B2 true JP3500469B2 (en) 2004-02-23

Family

ID=16225306

Family Applications (1)

Application Number Title Priority Date Filing Date
JP18852992A Expired - Lifetime JP3500469B2 (en) 1992-06-08 1992-06-08 Excavation method of ballast and soil for ballast removal of track bed of railway track, digging of soil, land leveling and stepping of slope for residential land development.

Country Status (1)

Country Link
JP (1) JP3500469B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3956173B2 (en) * 1998-08-25 2007-08-08 株式会社小松製作所 Roadbed ballast removal machine
CN107012750A (en) * 2017-05-22 2017-08-04 中铁四局集团有限公司 Railway has tiny fragments of stone, coal, etc. track to lay integral type long rail tractor
JP7186439B2 (en) * 2019-03-15 2022-12-09 保線機器整備株式会社 track excavator

Also Published As

Publication number Publication date
JPH0734402A (en) 1995-02-03

Similar Documents

Publication Publication Date Title
CN1471602A (en) Trenching method and apparatus
CA2352939C (en) A machine for renewing a track
JP3500469B2 (en) Excavation method of ballast and soil for ballast removal of track bed of railway track, digging of soil, land leveling and stepping of slope for residential land development.
CN1098398C (en) Pipeline construction machinery for digging road sub-grade material
US3948185A (en) Method and apparatus for removing railroad ties
JP2004114562A (en) Wire saw type cutting device and cutting method using the device
SU1487821A3 (en) Mobile unit for continuous replacement of track rails and sleepers
EP0283286A2 (en) Apparatus for removing a surface layer from the ground
JP2003269074A (en) Extension method of existing tunnel
JPH11323802A (en) Mechanical device for eliminating ballast of sleeper crib
EP0675985B1 (en) Apparatus for removing the ballast of a railway without demounting the track
JP2539151B2 (en) Excavation method for bottom floor in tunnel
JPH0414215B2 (en)
WO1998050641A3 (en) Machine for digging into the lower layers of the ground
JP2943086B2 (en) Roadbed continuous excavator
US4848426A (en) Adzer cribber
CN117468284B (en) Railway screening backfill equipment and method
JPH0670325B2 (en) Slope construction equipment
RU2092645C1 (en) Device for extracting ballast from railway track
RU93058435A (en) METHOD FOR REPLACING RAILBED SLEEPERS AND EQUIPMENT FOR IMPLEMENTING THIS METHOD
US20020166266A1 (en) Earth leveling excavator
JP3647933B2 (en) Demolition removal method of reinforced concrete structure
RU63767U1 (en) TRACK CAR TROLLEY
JP3484597B2 (en) Slope rock drill
SU1170060A1 (en) Cable scraper unit

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081212

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091212

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101212

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111212

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111212

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121212

Year of fee payment: 9

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121212

Year of fee payment: 9