EP0675985B1 - Apparatus for removing the ballast of a railway without demounting the track - Google Patents

Apparatus for removing the ballast of a railway without demounting the track Download PDF

Info

Publication number
EP0675985B1
EP0675985B1 EP92923297A EP92923297A EP0675985B1 EP 0675985 B1 EP0675985 B1 EP 0675985B1 EP 92923297 A EP92923297 A EP 92923297A EP 92923297 A EP92923297 A EP 92923297A EP 0675985 B1 EP0675985 B1 EP 0675985B1
Authority
EP
European Patent Office
Prior art keywords
track
ballast
aggregate
remover
excavator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP92923297A
Other languages
German (de)
French (fr)
Other versions
EP0675985A1 (en
Inventor
Matti Greus
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SODERBERG Folke
Original Assignee
SODERBERG Folke
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SODERBERG Folke filed Critical SODERBERG Folke
Publication of EP0675985A1 publication Critical patent/EP0675985A1/en
Application granted granted Critical
Publication of EP0675985B1 publication Critical patent/EP0675985B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/04Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast

Definitions

  • the invention relates to an apparatus for removing the ballast of a railway without demounting the track according to the first part of claim 1.
  • the structural parts of a railway are the track comprising rails and sleepers, the ballast layer, the intermediate layer, the insulating layer and the embankment fill.
  • the purpose of the ballast layer is to hold the track in a specified, geometrically right position and the purpose of ballasting is to obtain a track which is accurately positioned in vertical and lateral directions.
  • the ballast layer is commonly made of railway ballast.
  • the mineral aggregate used for the ballast must be hard, weather resistant, wear and impact resistant.
  • Railway ballast should not contain any humus, plant remains or any other impurities which might enhance frost lifting.
  • ballast Although there are strict quality specifications for the ballast, it is obvious that in the course of years there will be deformations due to weathering and soiling which change the geometry of the railway. Freezing contaminations in the ballast cause frostheaves in the railway. For instance, railway level crossings are particularly apt to be damaged by frost and it is the humus and other frost-susceptible material that spoils the ballast. In this case, the ballast must be removed and the ballasting must be done anew to get the track in the right position.
  • ballast To enable reballasting the old ballast layer must be removed and cleaned by sieving for reutilization. If the ballast is of poor quality it is preferably utilized as filling material for the embankment or it is carried away. If used ballast is to be used as filling material for the embankment it would be beneficial that the removed ballast could be conveyed to both sides of the track to facilitate reutilization.
  • Ballast replacement is conventionally performed so that first the track is demounted and put aside after which the old ballast and possibly other structural layers of the railway can be replaced.
  • An apparatus which removes the ballast without demounting the track.
  • this apparatus there is a scraper chain which goes under the track and which scrapes the mineral aggregate of the ballast and transfers it onto a sieve. By means of the sieve, the waste material of the mineral aggregate is separated from the ballast.
  • the ballast is returned under the track and the waste material is carried by a belt-conveyor to one side of the track.
  • the buckets of the scraper chain typically consist of finger-like members which are made of hard metal and which loosen stones from the ballast.
  • the sieve of the apparatus is typically a vibrating sieve.
  • the apparatus is mounted to a chassis which moves on the track and it is generally provided with a mechanism for supporting the track.
  • Said apparatus is originally designed as a ballast washing-machine.
  • the object of the invention is to eliminate above drawbacks and present an apparatus for removing the ballast of a railway without demounting the track which apparatus has a simple structure and versatile operation. This object is obtained by means of an apparatus which is presented in the claim 1.
  • the apparatus comprises an aggregate remover which is operated by such an excavator which is provided with track wheels in addition to conventional wheels or caterpillar tracks. This is advantageous in that the apparatus can be moved both on roads and on railway tracks and, when there is a passing train, the apparatus need not be moved a long way since one can use e.g. the nearest level crossing to move the excavator aside for the time of the passing train.
  • the aggregate remover which is mounted to the boom of the excavator, is pushed by means of said boom into the ballast below the track from one side of the track.
  • the aggregate remover can be pushed under the track without any trenches and it enables removal of the ballast evenly to both sides of the track.
  • One aggregate remover is provided with blade-like transporting members which are wider within their lower portion and which carefully move the ballast aside through sliding so that the sleepers are not damaged.
  • the apparatus according to the invention brings along a considerable saving of time. For instance, it takes only 2-3 hours to change the ballast under a one-track level crossing.
  • the working speed on track is approximately 100 track-m/h and the work requires only a few persons. If necessary, a sieve dipper can be provided in connection with the excavator which then enables one to perform all those stages of operation which are needed in reballasting.
  • the apparatus comprises an excavator 12, having a boom 13 and own wheels, and a mechanism 15 for removing mineral aggregate which hereon will be called the aggregate remover 15.
  • an excavator or the like apparatus which has conventional operational capabilities and which is provided with normal wheels or track chains, serves as the drive mechanism for the aggregate remover 15.
  • the excavator 12 is also provided with track wheels 14, which are made of steel, to move the excavator 12 specifically on the same track whose ballast is being removed. Therefore, the excavator 12 that is used is a normal excavator except that it is provided with track wheels 14 for travel along the track.
  • the aggregate remover 15 is attached to a fast coupling member on the boom 13 of the excavator.
  • a fast coupling member e.g. a sieve dipper can be connected after the ballast removal work by which dipper the ballast removed from beneath the track is cleaned and sieved for reuse.
  • the trajectories of the aggregate remover 15 there are available the same trajectories of motion as there are in a normal operation of the excavator 12. Therefore, it can be moved up, down, forward, backward, left and right, and it can be inclined and rotated at the end of the boom.
  • the aggregate remover 15 gets its power from the hydraulic system of the excavator.
  • the hoses of the hydraulic motor, which serves as the drive unit 7, are connected to the corresponding hydraulic connectors of the excavator 12 i.e. to the hydraulic inlet and outlet connectors whereby operation of the hydraulic motor can be controlled by a valve in the cab of the excavator 12. If it is desired to change the direction of rotation of the hydraulic motor, the flow direction of the hydraulic liquid is changed so that the inlet hose becomes the outlet hose and the outlet hose becomes the inlet hose, respectively.
  • the aggregate remover 15 comprises primarily a body 1 and, in connection with the body 1, an endless circumferential member 2 having transporting members 3 attached thereto.
  • the body 1 is essentially a planar blade or the like, which is designed to be positioned essentially horizontally under the track.
  • the endless circumferential member 2 is disposed on the outer circumference of the body 1.
  • the aggregate remover 15 is pushed into the ballast layer under the track from the side of the track essentially in a horizontal plane and the endless circumferential member 2 is rotated in a plane below the track.
  • Transporting members 3 attached to the endless circumferential member 2 dig into the mineral aggregate of the ballast and transport it from beneath the track to the side thereof.
  • the aggregate remover 15 transports mineral aggregate of the ballast layer from the middle of the track to the side of the track.
  • the aggregate remover 15 can be turned to operate in a similar way on the other side of the track.
  • the endless circumferential member 2 is in the exemplary case a track chain or the like and the transporting member 3 is a blade which projects perpedicularly from the circumferential member 2 and extends vertically. Attached to the circumferential member 2 between the transporting members 3, there are also provided finger-like members 4 made of hard metal which are designed to disintegrate possible ice or very tightly compacted mineral aggregate in the ballast.
  • the lower part 3' of the transporting member 3 is essentially wider than the upper part 3''. This enables the transporting member 3 to dig into the mineral aggregate so that, during rotation of the endless circumferential member 2, the mineral aggregate of the ballast above the lower portion of the transporting member 3' first falls down and then it is transported, pushed by the transporting member 3, to the side of the track. Transporting members 3 transport mineral aggregate from the ballast layer so that the ballast layer slides down in slices along a slide plane specific to used mineral aggregate to be then transported by the transporting members 3. Therefore, the rotating track chain cannot damage the track structure.
  • the circumferential member 2 is arranged to rotate under guidance of a pulley 5 which is mounted in bearings to the body 1 so that the pulley 5 is connected to the drive unit 7 preferably by means of a power transmission assembly 8.
  • a hydraulic motor serves as the drive unit 7 in the exemplary case.
  • the power transmission assembly 8 comprises a planetary gear which is arranged to control the rotational speed of the endless circumferential member 2.
  • the transmission ratio of the planetary gear is so chosen that the speed of the circumferential member 2 i.e. the track chain can be changed within suitable limits.
  • the trajectory of the circumferential member 2 is elongated. This has been achieved so that the circumferential member 2 is arranged to rotate under guidance of a second pulley 6 which is mounted in bearings to the body 1.
  • the second pulley 6 is mounted in bearings to a spring-loaded traveller 10 which traveller 10, in case of overload, is constrained to move along guides 11, which are mounted to the body 1 and which are parallel with the longitudinal direction of the aggregate remover, towards the pulley 5 which is connected to the drive unit 7.
  • This is beneficial in that if it happens that a stone gets between the track chain and the pulley 6 or the pulley 5 the aggregate remover will not be damaged.
  • the body 1 of the aggregate remover 15 is also provided with suspension means 9 which are advantageously placed closer to the pulley 5, which is connected to the drive unit 7, apart from said drive unit 7.
  • the aggregate remover functions in the following way.
  • the hydraulic motor drives the planetary gear which transmits power to the driven pulley and further to the track chain which performs removal of ballast from beneath the track by means of transporting members.
  • the track chain turns around the sheave pulley and back to the driven pulley.
  • the sheave pulley is spring-loaded and it can move in the traveller 10 towards the driven pulley 5.
  • the pulley assembly of the aggregate remover is protected by protective plates which are part of the body and which are placed on both sides of the track chain.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Manufacturing Of Magnetic Record Carriers (AREA)
  • Medicines That Contain Protein Lipid Enzymes And Other Medicines (AREA)
  • Electric Cable Installation (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to an apparatus for removing the ballast of a railway without demounting the track. The apparatus comprises an excavator (12) or the like, which is provided with a boom (13) and own wheels or the like, and an aggregate remover (15). The aggregate remover (15) comprises a body (1) and, in connection with the body (1), an endless circumferential member (2) having at least one transporting member (3) attached thereto, the body (1) being essentially a planar blade or the like and the body (1) being designed to be inserted under the track for rotating the endless circumferential member (2) by means of a drive unit (7) in a plane below the track for removing mineral aggregate out of the ballast layer by means of said at least one transporting member (3) from beneath the track to the side thereof. The aggregate remover (15) is arranged to be operated by means of said excavator (12) or the like, the aggregate remover (15) being arranged to be moved and pushed by means of said boom (13) into the ballast under the track from said side of the track.

Description

The invention relates to an apparatus for removing the ballast of a railway without demounting the track according to the first part of claim 1.
The structural parts of a railway are the track comprising rails and sleepers, the ballast layer, the intermediate layer, the insulating layer and the embankment fill. The purpose of the ballast layer is to hold the track in a specified, geometrically right position and the purpose of ballasting is to obtain a track which is accurately positioned in vertical and lateral directions.
The ballast layer is commonly made of railway ballast. The mineral aggregate used for the ballast must be hard, weather resistant, wear and impact resistant. Railway ballast should not contain any humus, plant remains or any other impurities which might enhance frost lifting.
Although there are strict quality specifications for the ballast, it is obvious that in the course of years there will be deformations due to weathering and soiling which change the geometry of the railway. Freezing contaminations in the ballast cause frostheaves in the railway. For instance, railway level crossings are particularly apt to be damaged by frost and it is the humus and other frost-susceptible material that spoils the ballast. In this case, the ballast must be removed and the ballasting must be done anew to get the track in the right position.
To enable reballasting the old ballast layer must be removed and cleaned by sieving for reutilization. If the ballast is of poor quality it is preferably utilized as filling material for the embankment or it is carried away. If used ballast is to be used as filling material for the embankment it would be beneficial that the removed ballast could be conveyed to both sides of the track to facilitate reutilization.
Ballast replacement is conventionally performed so that first the track is demounted and put aside after which the old ballast and possibly other structural layers of the railway can be replaced. An apparatus is known which removes the ballast without demounting the track. In this apparatus there is a scraper chain which goes under the track and which scrapes the mineral aggregate of the ballast and transfers it onto a sieve. By means of the sieve, the waste material of the mineral aggregate is separated from the ballast. The ballast is returned under the track and the waste material is carried by a belt-conveyor to one side of the track. The buckets of the scraper chain typically consist of finger-like members which are made of hard metal and which loosen stones from the ballast. The sieve of the apparatus is typically a vibrating sieve.
It is essential of the apparatus of the prior art that the scraper chain and the guide members belonging thereto form a closed unit which goes round the track. The apparatus is mounted to a chassis which moves on the track and it is generally provided with a mechanism for supporting the track. Said apparatus is originally designed as a ballast washing-machine.
There are several drawbacks in the operation of the conventional apparatus. In order to mount the scraper chain, a trench must be excavated across the track whereto the first end of the chain is placed to be attached to the other end of the chain to form an endless member which goes round the track. Normally, the trench must be digged manually. If it is desired to use the removed material as filling material for the embankment, the apparatus of prior art moves all material to one side of the track. Therefrom, the material must then be separately distributed evenly to both sides of the track. When there is a passing train, the apparatus must be moved to a side track which may require that the apparatus must be moved a long way and which naturally causes a delay in the work. The purchase price of the apparatus is very high which means that capital costs have a dominant role compared to the relatively modest work of ballast removing. It should be possible to change the ballast using a much less heavy and a considerably less costly equipment.
From US-A-3,436,848 there is known an apparatus for removing ballast from beneath railway tracks. It includes a driving machinery supported on wheels running on the rails and a digging unit supported by an arm from the machinery. The digging unit includes a chain with scrapers running around an elongated structure. As there is no resiliency in the chain, the risks for broken chain and other damages to the digging unit are great, in case the chain hits a stone or other big object. Further, as the apparatus is supported directly on the track it cannot be easely removed but has to be driven to a railway siding or similar in order to let trains pass the place of work.
From US-A-2,886,904 there is known an apparatus of the same type as the one above and it shows the same drawbacks. However, it is even more complicated in that it is provided with four "diggers".
From FR-A-2 551 781 there is known an apparatus for removing ballast which is extremely complicated as it also includes a device for raising the track during the removal operation. However, the chains of the two digging units are not resiliently supported, which means that the risks for chain breaks and other problems are great as in connection with the two apparatuses above. Further, it cannot easely be brought aside in order to let trains pass.
The object of the invention is to eliminate above drawbacks and present an apparatus for removing the ballast of a railway without demounting the track which apparatus has a simple structure and versatile operation. This object is obtained by means of an apparatus which is presented in the claim 1.
The problem to keep the digging chain unbroken although it often hits big stones and other obstacles, is solved by the structure that one of the pulleys guiding and supporting the digging chain is resiliently arranged so that the chain is biased.
The apparatus comprises an aggregate remover which is operated by such an excavator which is provided with track wheels in addition to conventional wheels or caterpillar tracks. This is advantageous in that the apparatus can be moved both on roads and on railway tracks and, when there is a passing train, the apparatus need not be moved a long way since one can use e.g. the nearest level crossing to move the excavator aside for the time of the passing train. The aggregate remover, which is mounted to the boom of the excavator, is pushed by means of said boom into the ballast below the track from one side of the track. The aggregate remover can be pushed under the track without any trenches and it enables removal of the ballast evenly to both sides of the track. One aggregate remover is provided with blade-like transporting members which are wider within their lower portion and which carefully move the ballast aside through sliding so that the sleepers are not damaged.
The apparatus according to the invention brings along a considerable saving of time. For instance, it takes only 2-3 hours to change the ballast under a one-track level crossing. The working speed on track is approximately 100 track-m/h and the work requires only a few persons. If necessary, a sieve dipper can be provided in connection with the excavator which then enables one to perform all those stages of operation which are needed in reballasting.
The invention will now be described in the following referring to the enclosed drawings in which
figure 1
shows an aggregate remover installed to an excavator seen obliquely from above when the remover is being pushed under the track,
figure 2
shows the aggregate remover installed to an excavator seen from above,
figure 3
shows an aggregate remover seen from above and partly cross-sectioned,
figure 4
shows a part of the aggregate remover according to figure 3 seen from the side,
figure 5
shows a cross-sectioned view of the aggregate remover according to figure 3 with the endless circumferential member removed and seen from the side and
figure 6
an apparatus according to the invention with the aggregate remover pushed under the track.
In the exemplary case, the apparatus according to the invention comprises an excavator 12, having a boom 13 and own wheels, and a mechanism 15 for removing mineral aggregate which hereon will be called the aggregate remover 15. Thus an excavator or the like apparatus, which has conventional operational capabilities and which is provided with normal wheels or track chains, serves as the drive mechanism for the aggregate remover 15. To make use of the aggregate remover 15 possible in a reballasting work that proceeds along the longitudinal direction of the track, the excavator 12 is also provided with track wheels 14, which are made of steel, to move the excavator 12 specifically on the same track whose ballast is being removed. Therefore, the excavator 12 that is used is a normal excavator except that it is provided with track wheels 14 for travel along the track.
The aggregate remover 15 is attached to a fast coupling member on the boom 13 of the excavator. To this fast coupling member, e.g. a sieve dipper can be connected after the ballast removal work by which dipper the ballast removed from beneath the track is cleaned and sieved for reuse.
As to the trajectories of the aggregate remover 15, there are available the same trajectories of motion as there are in a normal operation of the excavator 12. Therefore, it can be moved up, down, forward, backward, left and right, and it can be inclined and rotated at the end of the boom.
The aggregate remover 15 gets its power from the hydraulic system of the excavator. The hoses of the hydraulic motor, which serves as the drive unit 7, are connected to the corresponding hydraulic connectors of the excavator 12 i.e. to the hydraulic inlet and outlet connectors whereby operation of the hydraulic motor can be controlled by a valve in the cab of the excavator 12. If it is desired to change the direction of rotation of the hydraulic motor, the flow direction of the hydraulic liquid is changed so that the inlet hose becomes the outlet hose and the outlet hose becomes the inlet hose, respectively.
The aggregate remover 15 comprises primarily a body 1 and, in connection with the body 1, an endless circumferential member 2 having transporting members 3 attached thereto. The body 1 is essentially a planar blade or the like, which is designed to be positioned essentially horizontally under the track. The endless circumferential member 2 is disposed on the outer circumference of the body 1.
The aggregate remover 15 is pushed into the ballast layer under the track from the side of the track essentially in a horizontal plane and the endless circumferential member 2 is rotated in a plane below the track. Transporting members 3 attached to the endless circumferential member 2 dig into the mineral aggregate of the ballast and transport it from beneath the track to the side thereof. The aggregate remover 15 transports mineral aggregate of the ballast layer from the middle of the track to the side of the track. The aggregate remover 15 can be turned to operate in a similar way on the other side of the track.
The endless circumferential member 2 is in the exemplary case a track chain or the like and the transporting member 3 is a blade which projects perpedicularly from the circumferential member 2 and extends vertically. Attached to the circumferential member 2 between the transporting members 3, there are also provided finger-like members 4 made of hard metal which are designed to disintegrate possible ice or very tightly compacted mineral aggregate in the ballast.
The lower part 3' of the transporting member 3 is essentially wider than the upper part 3''. This enables the transporting member 3 to dig into the mineral aggregate so that, during rotation of the endless circumferential member 2, the mineral aggregate of the ballast above the lower portion of the transporting member 3' first falls down and then it is transported, pushed by the transporting member 3, to the side of the track. Transporting members 3 transport mineral aggregate from the ballast layer so that the ballast layer slides down in slices along a slide plane specific to used mineral aggregate to be then transported by the transporting members 3. Therefore, the rotating track chain cannot damage the track structure.
The circumferential member 2 is arranged to rotate under guidance of a pulley 5 which is mounted in bearings to the body 1 so that the pulley 5 is connected to the drive unit 7 preferably by means of a power transmission assembly 8. As already mentioned earlier, a hydraulic motor serves as the drive unit 7 in the exemplary case. The power transmission assembly 8 comprises a planetary gear which is arranged to control the rotational speed of the endless circumferential member 2. The transmission ratio of the planetary gear is so chosen that the speed of the circumferential member 2 i.e. the track chain can be changed within suitable limits.
The trajectory of the circumferential member 2 is elongated. This has been achieved so that the circumferential member 2 is arranged to rotate under guidance of a second pulley 6 which is mounted in bearings to the body 1. The second pulley 6 is mounted in bearings to a spring-loaded traveller 10 which traveller 10, in case of overload, is constrained to move along guides 11, which are mounted to the body 1 and which are parallel with the longitudinal direction of the aggregate remover, towards the pulley 5 which is connected to the drive unit 7. This is beneficial in that if it happens that a stone gets between the track chain and the pulley 6 or the pulley 5 the aggregate remover will not be damaged.
The body 1 of the aggregate remover 15 is also provided with suspension means 9 which are advantageously placed closer to the pulley 5, which is connected to the drive unit 7, apart from said drive unit 7.
The aggregate remover functions in the following way. The hydraulic motor drives the planetary gear which transmits power to the driven pulley and further to the track chain which performs removal of ballast from beneath the track by means of transporting members. The track chain turns around the sheave pulley and back to the driven pulley. The sheave pulley is spring-loaded and it can move in the traveller 10 towards the driven pulley 5. The pulley assembly of the aggregate remover is protected by protective plates which are part of the body and which are placed on both sides of the track chain. When the operation is transferred to the other side of the track, the rotational direction of the chain is changed so that mineral aggregate moves outwards from beneath the track. That portion of the track whose ballast layer is removed is supported e.g. on jacks or the like. Supporting the track on a right height level can also be performed only when cleaned ballast is being layed under the track.
The invention is not limited to the embodiment described above but can be varied within the limits of the enclosed claims.

Claims (6)

  1. Apparatus for removing the ballast of a railway without demounting the track, the apparatus comprising an excavator (12) or the like supported on wheels and provided with a boom (13) and an aggregate remover (15) mounted to the free end of the boom (13), the aggregate remover (15) being arranged to be operated by means of said excavator (12) or the like and which comprises a body (1) essentially in the shape of a planar blade or the like and, in connection with the body (1), an endless member (2) having at least one transporting member (3) attached thereto and extended around the periphery of the body (1) and arranged to be moved therearound, guided by at least two pulleys (5,6), a driving pulley (5) and an idle pulley (6), mounted to the body (1), the driving pulley (5) being connected to a drive unit (7) via a power transmission assembly (8) for moving the endless member (2) around the periphery of the body (1), characterized in that the idle pulley (6) is mounted to the body (1) by means of a spring assembly (10,11;fig. 5) for biasing the endless member (2).
  2. Apparatus according to claim 1, characterized in that the spring assembly includes a traveller (10) to which the idle pulley is mounted by bearings, and guides (11) mounted to the body (1) and movably supporting the traveller (10), and that the idle pulley (6) in case of overload, is constrained to move towards the driving pulley (5).
  3. Apparatus according to claim 1 or 2, characterized in that the spring assembly includes a coil spring.
  4. Apparatus according to any of claims 1 - 3, characterized in that the power transmission assembly (8) is a planetary gear.
  5. Apparatus according to any of preceding claims, in which the endless member (2) of the aggregate remover (15) is a track chain disposed on the outer peripery of the body and in which said at least one transporting member (3) is essentially a vertical blade projecting from the endless member (2), characterized in that the lower part (3') of the transporting member(s) (3) is essentially wider than the upper part (3").
  6. Apparatus according to any of preceding claims, characterized in that finger-like members (4) made of hard metal for braking ice or the like in the ballast are attached to and projecting from the endless member (2).
EP92923297A 1991-11-08 1992-11-06 Apparatus for removing the ballast of a railway without demounting the track Expired - Lifetime EP0675985B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
FI915274 1991-11-08
FI915274A FI92621C (en) 1991-11-08 1991-11-08 Device for removing support layers in a railway track without tearing the rail
PCT/FI1992/000300 WO1993009292A1 (en) 1991-11-08 1992-11-06 Apparatus for removing the ballast of a railway without demounting the track

Publications (2)

Publication Number Publication Date
EP0675985A1 EP0675985A1 (en) 1995-10-11
EP0675985B1 true EP0675985B1 (en) 1999-03-24

Family

ID=8533457

Family Applications (1)

Application Number Title Priority Date Filing Date
EP92923297A Expired - Lifetime EP0675985B1 (en) 1991-11-08 1992-11-06 Apparatus for removing the ballast of a railway without demounting the track

Country Status (7)

Country Link
EP (1) EP0675985B1 (en)
AT (1) ATE178109T1 (en)
CA (1) CA2122587A1 (en)
DE (1) DE69228766D1 (en)
FI (1) FI92621C (en)
PL (1) PL171948B1 (en)
WO (1) WO1993009292A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894301A (en) * 2015-12-17 2017-06-27 路行(北京)科技发展有限责任公司 A kind of ballast bed line construction and attending device and railcar

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2717510B1 (en) * 1994-03-18 1996-04-19 Robert Pouget Ballast stripper located under the rail tracks.
US7481168B2 (en) 2005-04-07 2009-01-27 Lawrence Glenn Pike Off-track railroad track undercutter apparatus
CN103741564B (en) * 2013-12-05 2015-12-02 冯政 The manufacture method of chain saw type rail crawler loader
CN105803873B (en) * 2016-05-12 2017-06-30 昆明奥通达铁路机械有限公司 Self-propelled railway roadbed ballast excavates robot
IT201800006889A1 (en) * 2018-07-03 2020-01-03 EQUIPMENT AND METHOD FOR THE RESTORATION OF THE BASE OF A RAILWAY LINE
CN112211048A (en) * 2020-10-13 2021-01-12 罗凡 Digging chain structure of railway ballast screen scarifier
CN113981754A (en) * 2021-12-23 2022-01-28 一路行(北京)科技有限公司 Side-cutting excavating device and using method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2886904A (en) * 1956-07-26 1959-05-19 Kershaw Mfg Company Inc Apparatus for removing ballast from beneath railroad tracks
US3436848A (en) * 1966-05-09 1969-04-08 Mannix Intern Inc Apparatus for removing ballast from beneath a railroad track
AT369805B (en) * 1979-11-23 1983-02-10 Plasser Bahnbaumasch Franz MOBILE BOTTLE BED CLEANING MACHINE WITH PLANNING AND COMPRESSION DEVICES
FR2551781B1 (en) * 1983-09-12 1986-04-11 Sotramef METHOD AND APPARATUS FOR CONTINUOUSLY RESHAPING A RAILWAY BALLAST

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106894301A (en) * 2015-12-17 2017-06-27 路行(北京)科技发展有限责任公司 A kind of ballast bed line construction and attending device and railcar

Also Published As

Publication number Publication date
FI915274A (en) 1993-05-09
DE69228766D1 (en) 1999-04-29
FI915274A0 (en) 1991-11-08
ATE178109T1 (en) 1999-04-15
CA2122587A1 (en) 1993-05-13
WO1993009292A1 (en) 1993-05-13
PL171948B1 (en) 1997-07-31
FI92621B (en) 1994-08-31
EP0675985A1 (en) 1995-10-11
FI92621C (en) 1994-12-12

Similar Documents

Publication Publication Date Title
US4563826A (en) Apparatus for removing ballast from beneath a railroad track
US4108076A (en) Method for removing ballast from railroad tracks
US5074063A (en) Undercut trenching machine
US3967396A (en) Undercutter with rotary trencher
US4167826A (en) Self-loading dualistic earth excavator with connecting telescopic conveying and dualistic distribution means
CA1197864A (en) Ditcher method and apparatus
EP0675985B1 (en) Apparatus for removing the ballast of a railway without demounting the track
CN1098398C (en) Pipeline construction machinery for digging road sub-grade material
US5540003A (en) Padding machine with shaker for separator
US3072391A (en) Disintegrating machine having cutting and impact action
RU2119001C1 (en) Track-laying machine for removing ballast material
US1778690A (en) Railway-track ballast-cleaning machine
CN108532382B (en) Small-size railway ballast cleaning machine
US1595420A (en) Railroad tamping
CA2673597A1 (en) Compact padding attachments
AU779499B2 (en) Surface miner
EP0662176A1 (en) Improvements relating to road working apparatus
US6209462B1 (en) Machine with ballast scarifying device
US5109775A (en) Ballast reconditioning apparatus with multiple excavating wheels and independent cleaning stations for increased operating speed
US4882860A (en) Apparatus for removing ballast from beneath railroad tracks
CN109837861A (en) Bucket wheeled rail removes sand vehicle
US2209732A (en) Railway ballast grader
US5029649A (en) Ballast reconditioning apparatus
EP1348057B1 (en) Ballast removal method and apparatus
CN208717668U (en) A kind of clear tiny fragments of stone, coal, etc. machine of small-sized railway

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19940427

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB IT LI LU NL SE

17Q First examination report despatched

Effective date: 19970403

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FR GB IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990324

Ref country code: LI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990324

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 19990324

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990324

Ref country code: ES

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19990324

Ref country code: CH

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990324

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990324

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990324

REF Corresponds to:

Ref document number: 178109

Country of ref document: AT

Date of ref document: 19990415

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 69228766

Country of ref document: DE

Date of ref document: 19990429

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990624

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 19990625

EN Fr: translation not filed
NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19991015

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19991106

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20001106

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20001106

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20101125

Year of fee payment: 19

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20111107