JP3473379B2 - Underground hydraulic method - Google Patents
Underground hydraulic methodInfo
- Publication number
- JP3473379B2 JP3473379B2 JP05964498A JP5964498A JP3473379B2 JP 3473379 B2 JP3473379 B2 JP 3473379B2 JP 05964498 A JP05964498 A JP 05964498A JP 5964498 A JP5964498 A JP 5964498A JP 3473379 B2 JP3473379 B2 JP 3473379B2
- Authority
- JP
- Japan
- Prior art keywords
- water
- underground
- excavation
- wall
- permeable material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
- Biological Depolymerization Polymers (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、地下通水工法に関
し、特に、止水性の地中壁を構築した後に、地下水の流
通を可能にする地下通水工法に関するものである。 TECHNICAL FIELD The present invention relates to an underground water supply method.
The flow of groundwater, especially after constructing a waterproof underground wall.
It relates to the underground water flow method that enables water to pass.
【0002】[0002]
【従来の技術】周知のように、地下構造物、例えば、地
下鉄や車両専用道路用などの地下トンネルを開削工法で
構築する際には、地山の崩壊を防止して、内部の掘削を
可能にするために止水性を備えた地中壁が構築される。2. Description of the Related Art As is well known, when constructing an underground structure, for example, an underground tunnel for a subway or a dedicated road for vehicles by an excavation method, it is possible to prevent the ground from collapsing and excavate the interior. In order to achieve this, an underground wall with a water stop is constructed.
【0003】この種の地中壁を構築する工法は、地中連
続壁工法を始めとして、各種各様の方法が提供されてい
るが、地中連続壁工法や柱列壁工法などで構築される地
中壁は、地下構造物の本体部を構築した後にも地中に残
置される場合がある。Various methods are provided for constructing this type of underground wall, including the underground continuous wall method, but the underground continuous wall method and the column wall method are used. The underground wall may be left in the ground even after the main body of the underground structure is constructed.
【0004】ところで、止水性を備えた地中壁を地中に
残置しておくと、地下水流を遮断することになり、地中
壁の下流側の水脈が途絶えるため、井戸が枯れたり、あ
るいは、地盤が沈下するといった不都合が発生する。By the way, if the underground wall provided with waterproofing is left in the ground, the groundwater flow is blocked, and the water vein on the downstream side of the underground wall is cut off. However, inconvenience such as the subsidence of the ground occurs.
【0005】そこで、例えば、特開平6−49839号
公報には、地下構造物の本体部を施工する際には、止水
性が確保されるとともに、本体部の完成時に通水性が確
保できる地中壁の構築工法が開示されている。Therefore, for example, in Japanese Unexamined Patent Publication No. 6-49839, it is possible to secure water-stopping when constructing the main body of an underground structure and ensure water permeability when the main body is completed. A wall construction method is disclosed.
【0006】この公報に開示されている工法では、地中
連続壁工法で地中壁が構築されるが、この地中壁を構築
する際に、掘削溝内に、中空円形ないしは角形などの有
孔管や、地山側開口部に鋼製メッシュを配置した特殊通
水枠を鉛直方向に設置しておき、この通水枠内に不透水
性で伸縮性のある筒状体を挿入して、筒状体内の水圧を
周囲の水圧よりも高くした状態で、コンクリートを打設
し、コンクリートが硬化した後に、前記筒状体を特殊通
水枠内から撤去して、有孔管や地山側開口部に配置され
た鋼製メッシュにより地中壁に通水性を与える。In the construction method disclosed in this publication, the underground wall is constructed by the underground continuous wall construction method. When the underground wall is constructed, a hollow circle or a square shape is present in the excavation trench. A hole tube or a special water-permeable frame in which a steel mesh is placed in the ground side opening is installed in the vertical direction, and an impermeable and stretchable tubular body is inserted into this water-permeable frame. Concrete is poured in a state where the water pressure inside the tubular body is higher than the surrounding water pressure, and after the concrete has hardened, the tubular body is removed from the special water passage frame, and a perforated pipe or natural side opening Water permeability is given to the underground wall by the steel mesh placed in the section.
【0007】特殊通水枠は、地中壁の厚み方向を貫通さ
せる大きさ、ないしは、地中壁の厚み方向の一部を置換
する大きさになっていて、内部には、砕石が充填され
る。しかしながら、このような従来の地下通水工法に
は、以下に説明する技術的な課題があった。The special water-passing frame is sized to penetrate the underground wall in the thickness direction or to partially replace the underground wall in the thickness direction, and the inside thereof is filled with crushed stone. It However, such conventional underground water flow method
Have had technical problems to be described below.
【0008】[0008]
【発明が解決しようとする課題】すなわち、上記公報の
地下通水工法では、地中壁に通水性を付与するために、
地中壁の厚み方向の全部または一部が、深度方向の全長
に亙って特殊枠体で置換されているため、この部分が構
造上の弱点となる恐れがある。That is, in the underground water supply method of the above publication, in order to impart water permeability to the underground wall,
Since the whole or part of the underground wall in the thickness direction is replaced with the special frame over the entire length in the depth direction, this part may become a structural weak point.
【0009】また、この公報に示されている方法では、
泥水が充満された掘削溝内に有孔管などを建て込むた
め、有孔管の貫通孔内に泥水膜が付着して、目詰まりを
起こす恐れがあるとともに、コンクリートを打設する際
には、その内部に筒状体を挿入して、コンクリートの回
り込みを防いでいるが、この筒状体が有孔管などの通水
枠体の内部側に挿入されるので、有孔管の貫通孔内に
は、セメントなどが侵入して、目詰まりを起こす恐れも
あって、地中壁の通水性が低下するという問題があっ
た。In the method disclosed in this publication,
Since a perforated pipe etc. is built in the excavation trench filled with muddy water, a muddy water film may adhere to the through hole of the perforated pipe and cause clogging, and when placing concrete. , A cylindrical body is inserted inside it to prevent the concrete from wrapping around, but since this cylindrical body is inserted inside the water passage frame body such as a perforated pipe, the through hole of the perforated pipe is There is a problem that cement or the like may enter the inside to cause clogging, and the water permeability of the underground wall is lowered.
【0010】本発明は、このような従来の問題点に鑑み
てなされたものであって、その目的とするところは、構
造上の弱点になることがなく、地中壁の通水性を十分に
確保することができる地中通水工法を提供することにあ
る。The present invention has been made in view of such conventional problems, and the object thereof is not to become a structural weak point and to sufficiently pass water through the underground wall. It is to provide the underground water supply method that can be secured.
【0011】[0011]
【課題を解決するための手段】上記目的を達成するため
に、本発明は、掘削溝内にコンクリートを打設して構築
される止水性地中壁が、地中の地下水路を遮断するよう
に形成され、前記地中壁の形成後に、内部を掘削して、
前記地下水路間を連通させる通水路を形成する地下通水
工法において、前記通水路は、地山側が生分解性樹脂の
分解により透水性を復元する透水材で閉塞されるととも
に、掘削側が内端板で閉塞され、前記地中壁の厚み方向
を横断するように設置された伸縮自在な鋼製通水管から
構成され、前記止水性地中壁を構築する際には、前記掘
削溝内にコンクリートを打設する前に、押圧手段により
前記透水材を、前記掘削溝の前記地山側の掘削壁面に押
圧するようにした。このように構成された地下通水工法
によれば、鋼製通水管の地山側を、生分解性樹脂の分解
により透水性を復元する透水材で閉塞し掘削溝内にコン
クリートを打設する前に、押圧手段により、透水材を地
山側の掘削壁面に押圧しているので、透水部材側へのコ
ンクリートの回り込みが防止され、地中に存在している
微生物,バクテリア,黴などにより生分解性樹脂が分解
除去されると、透水性が復元される。透水材の透水性が
復元すると、止水性地中壁間を貫通する通水路が形成さ
れ、地下水路の遮断が解放される。透水材で地山側が閉
塞された鋼製通水管は、止水性地中壁の横断面方向に埋
設されるので、この部分が構造上の弱点となることがな
い。前記通水路を構成する通水管,透水材,内端板は、
前記止水性地中壁を構築する際に、掘削溝内に建て込ま
れる鉄筋籠に取付け、この鉄筋籠を前記掘削溝内に設置
した後に、前記透水材を前記地山側の掘削壁面に押圧す
ることができる。この構成によれば、止水性地中壁の構
築手順に従うことで、通水路を簡単に設置することがで
きる。また、前記鋼製通水管内には、砕石,砂利などの
塊状フィルター材を充填することができる。この構成に
よれば、鋼製通水管にかかる土水圧に対抗させることが
でき、簡単な構成で大深度に通水路を形成することが可
能になる。 In order to achieve the above object, the present invention is constructed by placing concrete in an excavation trench.
The water-blocking underground wall is formed so as to block an underground waterway in the ground, and after the underground wall is formed, the inside is excavated,
In the underground water supply method of forming a water passage for communicating between the ground water passages, in the water passage, the ground side is closed by a water permeable material that restores water permeability by decomposition of the biodegradable resin, and the excavation side is an inner end. is closed by a plate, is composed of the installed telescopic steel water passage tube so as to cross the thickness direction of the diaphragm wall, in constructing the water cut-off diaphragm wall, the drilling
Before the concrete is poured into the digging groove, the water permeable material is pressed by the pressing means against the excavation wall surface of the excavation groove on the natural ground side. According to the underground water supply method constructed in this way, the ground side of the steel water pipe is closed with a water permeable material that restores water permeability by decomposition of the biodegradable resin, and the ground water side is confined inside the excavation trench.
Before the cleat is placed, the permeable material is pressed against the excavated wall surface on the ground side by the pressing means, so that concrete is prevented from wrapping around the permeable member side, and microorganisms, bacteria existing in the ground, The water permeability is restored when the biodegradable resin is decomposed and removed by mold and the like. When the water permeability of the water permeable material is restored, a water passage that penetrates between the water-blocking underground walls is formed, and the cutoff of the ground water passage is released. Since the steel water pipe whose ground side is blocked by the water permeable material is buried in the cross-sectional direction of the waterproof underground wall, this portion does not become a structural weak point. The water pipe, the water permeable material, and the inner end plate that constitute the water passage are
When constructing the waterproofing underground wall, it is attached to a rebar cage built in the excavation groove, and after the rebar cage is installed in the excavation groove, the water-permeable material is pressed against the excavation wall surface on the natural ground side. be able to. According to this configuration, the water passage can be easily installed by following the procedure for constructing the water impermeable underground wall. In addition, a block filter material such as crushed stone or gravel can be filled in the steel water pipe. With this configuration, it is possible to resist the earth pressure applied to the steel water pipe, and it is possible to form a water passage in a large depth with a simple structure.
Become Noh.
【0012】[0012]
【発明の実施の形態】以下、本発明の好適な実施の形態
について、添付図面を参照にして詳細に説明する。図1
および図2は、本発明にかかる地下通水工法の一実施例
を示している。Preferred embodiments of the present invention will now be described in detail with reference to the accompanying drawings. Figure 1
2 and FIG. 2 show an embodiment of the underground water supply method according to the present invention.
Is shown .
【0013】同図に示した工法は、通水性のある砂質土
層10を挟んで、その上下に通水性のない粘性土層12
が存在している地盤中に止水性地中壁14を構築する場
合の適用例であり、止水性地中壁14の構築により地中
の地下水路(図1の砂質土層10間)が遮断される。In the construction method shown in the figure, a sandy soil layer 10 having water permeability is sandwiched and a viscous soil layer 12 having no water permeability is provided above and below the sandy soil layer 10.
It is an application example in the case of constructing the water-stopping underground wall 14 in the ground where the existing water is present, and the construction of the water-stopping underground wall 14 causes the underground waterway (between the sandy soil layers 10 in FIG. 1) to be formed. Be cut off.
【0014】そこで、地中壁14の構築後に、地下水路
間を連通させる通水路16を形成するようにした。地中
壁14は、本実施例の場合には、地中連続壁工法により
構築され、地中に掘削溝18を掘削形成し、鉄筋籠20
を建て込んだ後に、コンクリート21を打設して形成さ
れる。Therefore, after the underground wall 14 is constructed, the water passage 16 for connecting the underground water passages is formed. In the case of the present embodiment, the underground wall 14 is constructed by the underground continuous wall construction method, excavates and forms the excavation groove 18 in the ground, and the rebar cage 20 is formed.
It is formed by pouring concrete 21 after the building is built.
【0015】通水路16を形成する通水装置は、図2に
その詳細を示すように、伸縮自在な鋼管製の通水管22
と、深度方向に沿って多段状に配置された油圧ジャッキ
24(押圧手段)を主要構成部材としている。The water passage forming the water passage 16 is , as shown in detail in FIG. 2, a water pipe 22 made of a stretchable steel pipe.
The hydraulic jacks 24 (pressing means) arranged in multiple stages along the depth direction are the main constituent members.
【0016】これらの通水管22および油圧ジャッキ2
4は、鉄筋籠20にほぼ水平方向を指向するように並列
に、かつ、深度方向の同軸上に配置されている。通水管
22は、鋼製の内管22aと外管22bとからなる二重
管であって、両端が開口している。These water pipe 22 and hydraulic jack 2
4 are arranged in parallel to the rebar cage 20 so as to orient in a substantially horizontal direction and coaxially in the depth direction. The water flow pipe 22 is a double pipe made of a steel inner pipe 22a and an outer pipe 22b, and is open at both ends.
【0017】内管22aの開口端は、地山側Aにあっ
て、透水材26により閉塞されている。この透水材26
は、透水マット26aと、透水マット26aの地山側A
に位置するように付設された生分解性プラスチックシー
ト26bとから構成されている。The open end of the inner pipe 22a is on the natural ground side A and is closed by the water permeable material 26. This water permeable material 26
Is the water permeable mat 26a and the natural side A of the water permeable mat 26a
And a biodegradable plastic sheet 26b attached so as to be located at.
【0018】透水マット26aは、比較的径の太いコイ
ル状合成樹脂繊維をランダムに絡ませたものであって、
例えば、コスモジオマット(東洋紡績株式会社製、商品
名)を用いることができる。The water-permeable mat 26a is formed by randomly entwining coil-shaped synthetic resin fibers having a relatively large diameter,
For example, Cosmo Geomat (manufactured by Toyobo Co., Ltd., trade name) can be used.
【0019】生分解性プラスチックシート26bは、地
中に存在している微生物,バクテリア,黴などにより分
解されるものであって、例えば、スーパーペーパー(信
越ポリマー株式会社製、商品名)を用いることができ
る。The biodegradable plastic sheet 26b is decomposed by microorganisms, bacteria, molds and the like existing in the ground, and for example, super paper (trade name, manufactured by Shin-Etsu Polymer Co., Ltd.) is used. You can
【0020】外管22bの開口端は、掘削側Bにあっ
て、内端板28により開閉可能に閉塞されている。この
内端板28は、外管22bの開口端に固設された接続用
フランジ板28aと、このフランジ板28aの外側にあ
って、外管22bの開口端に対応する位置に、ボルト止
めされた着脱可能な仮止めプレート28bとから構成さ
れている。The open end of the outer pipe 22b is on the excavation side B and is closed by an inner end plate 28 so as to be openable and closable. The inner end plate 28 is bolted to a connecting flange plate 28a fixed to the open end of the outer pipe 22b and to a position outside the flange plate 28a and corresponding to the open end of the outer pipe 22b. And a detachable temporary fixing plate 28b.
【0021】また、内管22aの地山側Aの開口端周縁
には、外端板32が固設されている。この外端板32
は、中央部分に透水材26を収容する凹部32aが深度
方向に沿って設け、その全長に亙って設けられ、透水材
26は、この凹部32aとほぼ同じ長さと幅を有してい
る。An outer end plate 32 is fixedly provided around the open end of the inner pipe 22a on the natural side A. This outer end plate 32
Has a recess 32a for accommodating the water-permeable material 26 in the central portion along the depth direction, and is provided over the entire length thereof, and the water-permeable material 26 has substantially the same length and width as the recess 32a.
【0022】凹部32aの両側には、平坦部32bが延
設されている。平坦部32bの外周には、ゴムシートな
どの可撓性部材32cが嵌着固定されている。Flat portions 32b are provided on both sides of the recess 32a. A flexible member 32c such as a rubber sheet is fitted and fixed to the outer periphery of the flat portion 32b.
【0023】油圧ジャッキ24には、図示省略の油圧ホ
ースがそれぞれ接続され、各油圧ホースは、地上側まで
延設されている。各油圧ジャッキ24は、本体24a
と、本体24aの両側に設けられた一対の伸縮プランジ
ャ24b,24cとを備えている。A hydraulic hose (not shown) is connected to each of the hydraulic jacks 24, and each hydraulic hose extends to the ground side. Each hydraulic jack 24 has a main body 24a.
And a pair of telescopic plungers 24b and 24c provided on both sides of the main body 24a.
【0024】各油圧ジャッキ24の地山側Aに向けて伸
縮するプランジャ24bの先端は、外端板32の凹部3
2aの背面側に固設されている。各油圧ジャッキ24の
掘削側Bに向けて伸縮するプランジャ24cの先端に
は、反力プレート34がそれぞれ固設されている。The tip of the plunger 24b, which expands and contracts toward the natural ground side A of each hydraulic jack 24, has a concave portion 3 of the outer end plate 32.
It is fixed to the back side of 2a. A reaction force plate 34 is fixed to the tip of each plunger 24c that expands and contracts toward the excavation side B of each hydraulic jack 24.
【0025】次に、以上の構成を備えた地下通水装置を
用いて通水路16を形成する方法について説明する。通
水路16は、止水性地中壁14の構築後に形成するの
で、まず、止水性地中壁14の構築が行われる。Next, a method of forming the water passage 16 by using the underground water passage having the above-mentioned structure will be described. Since the water passage 16 is formed after the water blocking underground wall 14 is constructed, the water blocking underground wall 14 is first constructed.
【0026】地中壁14の構築は、掘削溝18を砂質土
層10を貫通して、下側の粘性土層12の下方まで掘削
した後に、掘削溝18内に鉄筋籠20を建て込んで、掘
削溝18内にコンクリート21を打設することで行われ
る。The underground wall 14 is constructed by piercing the excavation groove 18 through the sandy soil layer 10 to the lower side of the lower cohesive soil layer 12 and then installing the rebar cage 20 in the excavation groove 18. Then, it is performed by placing concrete 21 in the excavation groove 18.
【0027】このとき、鉄筋籠20には、予め、通水管
22,油圧ジャッキ24が所定の個所(砂質土層10中
に位置する個所)に係止される。通水管22には、内,
外端板28,32を固着し、掘削側Bの開口端を開閉可
能に内端板28で閉塞するとともに、外端板32の凹部
32a内に透水材26を収納して、通水管22の地山側
Aの開口端を閉塞する。At this time, the water pipe 22 and the hydraulic jack 24 are previously locked to the rebar cage 20 at predetermined positions (positions in the sandy soil layer 10). Inside the water pipe 22,
The outer end plates 28 and 32 are fixed to each other, the opening end of the excavation side B is closed by the inner end plate 28 so as to be openable and closable, and the water permeable material 26 is housed in the recess 32a of the outer end plate 32. The open end on the natural ground side A is closed.
【0028】この場合の透水材26の収納状態は、透水
マット26aに付設されている生分解性プラスチックシ
ート26bの外表面が、外端板32の平坦部32bの表
面と一致するか、あるいは、若干外方に突出させる。In this case, when the water permeable material 26 is accommodated, the outer surface of the biodegradable plastic sheet 26b attached to the water permeable mat 26a coincides with the surface of the flat portion 32b of the outer end plate 32, or Make it protrude slightly outward.
【0029】また、通水管22内に、砕石,砂利などの
塊状フィルター材を充填しておくと、通水管22にかか
る土水圧に対抗させることができ、簡単な構成で大深度
に通水路16を形成することが可能になる。Further, by filling the water pipe 22 with a block filter material such as crushed stone or gravel, it is possible to counteract the earth pressure applied to the water pipe 22, and the water passage 16 can be provided at a large depth with a simple structure. Can be formed.
【0030】各ジャッキ24には、地山側Aのプランジ
ャ24bを外端板32の背面側に固設し、掘削側Bのプ
ランジャ24cには、それぞれ反力プレート34を固設
する。A plunger 24b on the natural side A is fixed to each jack 24 on the back side of the outer end plate 32, and a reaction plate 34 is fixed to the plunger 24c on the excavation side B, respectively.
【0031】通水管22,油圧ジャッキ24が係止され
た鉄筋籠20が所定の位置に建て込まれると、コンクリ
ート21を打設する前に、油圧ジャッキ24が地上側か
らの操作により駆動される。When the rebar cage 20 in which the water pipe 22 and the hydraulic jack 24 are locked is installed at a predetermined position, the hydraulic jack 24 is driven by an operation from the ground side before the concrete 21 is placed. .
【0032】各油圧ジャッキ24を駆動すると、伸縮プ
ランジャ24b,24cがそれぞれ地山側A,掘削側B
に延び、このプランジャ24b,24cの伸長により、
外端板32の平坦部32bが地山側Aの掘削壁面に押圧
されるとともに、反力プレート34が掘削側Bの掘削壁
面に押圧される。When each of the hydraulic jacks 24 is driven, the telescopic plungers 24b and 24c are respectively on the natural side A and the excavating side B.
And the extension of the plungers 24b and 24c
The flat portion 32b of the outer end plate 32 is pressed against the excavation wall surface on the natural side A, and the reaction plate 34 is pressed against the excavation wall surface on the excavation side B.
【0033】このような押圧動作時に、通水管22が二
重管構造となっていて伸縮するので、この動作の障害と
ならない。また、外端板32の平坦部32bの外周部に
は、可撓性部材32cが嵌着固定されているので、可撓
性部材32cが掘削壁面の凹凸に応じて変形し、平坦部
32bを掘削壁面に密着させる。During such a pressing operation, the water pipe 22 has a double pipe structure and expands and contracts, so that this operation is not hindered. Further, since the flexible member 32c is fitted and fixed to the outer peripheral portion of the flat portion 32b of the outer end plate 32, the flexible member 32c is deformed according to the unevenness of the excavation wall surface, and the flat portion 32b is formed. Adhere closely to the excavated wall.
【0034】このような押圧動作が終了すると、掘削溝
18内にコンクリート21を打設して、打設したコンク
リート21が硬化することにより地中壁14が構築され
る。コンクリート21を打設すると、コンクリート21
が平坦部32bの外周部分から、その内方に回り込もう
とするが、平坦部32bは、可撓性部材32cを介在さ
せて、掘削壁面に密着しているので、コンクリート21
の回り込みは、確実に防止される。When such a pressing operation is completed, concrete 21 is placed in the excavation groove 18 and the placed concrete 21 is hardened to construct the underground wall 14. When placing concrete 21, concrete 21
Tries to go inward from the outer peripheral portion of the flat portion 32b, but since the flat portion 32b is in close contact with the excavation wall surface with the flexible member 32c interposed, the concrete 21
The wraparound is surely prevented.
【0035】地中壁14の構築が完了すると、掘削側B
の地盤を掘削し、地中壁14の内部に構造物が構築され
る。このとき、本実施例では、根切り掘削面Cまで掘削
が行われた後に、その以深まで掘削し、通水管22の一
端を閉塞している内端板28を露出させる。When the construction of the underground wall 14 is completed, the excavation side B
The ground is excavated and a structure is built inside the underground wall 14. At this time, in the present embodiment, after excavating to the root excavation surface C, excavation is performed to a deeper depth to expose the inner end plate 28 that closes one end of the water pipe 22.
【0036】内端板28が露出すると、仮止めプレート
28bのボルトを外して、これを除去し、通水管22の
開口端に導出管36を連通接続して、埋め戻す。なお、
この導出管36は、例えば、止水性地中壁14が対向し
て設けられている場合には、地中壁14に設けられた通
水管22間を連通接続させるために設けることもできる
が、この導出管36は、必ずしも必要とせず、通水管2
2の開口端を砂質土層10に開口させるだけでもよい。When the inner end plate 28 is exposed, the bolts of the temporary fixing plate 28b are removed and removed, and the outlet pipe 36 is communicatively connected to the open end of the water pipe 22 to backfill it. In addition,
For example, when the water blocking underground wall 14 is provided so as to face each other, the lead-out pipe 36 can be provided to connect the water passages 22 provided on the underground wall 14 to each other, The outlet pipe 36 is not always necessary, and the water pipe 2
The open end of 2 may be opened in the sandy soil layer 10.
【0037】このようにして地中壁14を構築した後
に、所定期間が経過すると、地山側Aの掘削壁面に接触
している生分解性プラスチックシート26bが、地中に
存在している微生物,バクテリア,黴などにより分解さ
れると、通水管22の地山側Aの開口が解放され、地中
壁14を挟む砂質土層10間を連通する通水路16が形
成される。After a predetermined period of time elapses after the underground wall 14 is constructed in this way, the biodegradable plastic sheet 26b in contact with the excavated wall surface on the ground side A is the microorganisms existing in the ground. When it is decomposed by bacteria, mold, etc., the opening of the water conduit 22 on the ground side A is released, and the water conduit 16 that connects the sandy soil layers 10 sandwiching the underground wall 14 is formed.
【0038】さて、以上にように構成された地下通水工
法によれば、生分解性プラスチックシート26bが分解
除去され透水材26の透水性が復元すると、止水性地中
壁14間を貫通する通水路16が形成され、地下水路の
遮断が解放される。According to the underground water flow method constructed as described above, when the biodegradable plastic sheet 26b is decomposed and removed and the water permeability of the water permeable material 26 is restored, the water permeable underground wall 14 is penetrated. The water passage 16 is formed, and the blockage of the underground water passage is released.
【0039】透水材で地山側が閉塞された鋼製通水管
は、止水性地中壁の横断面方向に埋設されるので、この
部分が構造上の弱点となることがない。Since the steel water pipe, which is closed on the ground side by the water permeable material, is buried in the cross-sectional direction of the water blocking underground wall, this portion does not become a structural weak point.
【0040】また、本実施例の場合には、通水路16を
構成する通水管22,透水材26,内端板28は、止水
性地中壁14を構築する際に、掘削溝18内に建て込ま
れる鉄筋籠20に取付けているので、止水性地中壁14
の構築手順に従うことで、通水路16を簡単に設置する
ことができる。Further, in the case of the present embodiment, the water pipe 22, the water permeable material 26, and the inner end plate 28 which form the water passage 16 are provided in the excavation groove 18 when the waterproof underground wall 14 is constructed. Since it is attached to the rebar cage 20 that is built in,
By following the construction procedure of, the water passage 16 can be easily installed.
【0041】[0041]
【発明の効果】以上、実施例で詳細に説明したように、
本発明にかかる地下通水工法によれば、構造上の弱点に
なることがなく、コンクリートの回り込みを防ぎつつ、
地中壁の通水性を十分に確保することができる。As described above in detail in the embodiments,
According to the underground water flowing method according to the present invention, without becoming a structural weak point, while preventing the wraparound of concrete,
It is possible to secure sufficient water permeability of the underground wall.
【図1】本発明にかかる地下通水工法の一実施例を示す
要部縦断面図である。FIG. 1 is a longitudinal sectional view of an essential part showing an embodiment of an underground water supply method according to the present invention.
【図2】図1の要部拡大斜視図である。FIG. 2 is an enlarged perspective view of a main part of FIG.
10 砂質土層 12 粘性土層 14 地中壁 16 通水路 18 掘削溝 20 鉄筋籠 21 コンクリート 22 通水管 22a 内管 22b 外管 24 油圧ジャッキ(押圧手段) 26 透水材 26a 透水マット 26b 生分解性プラスチックシート 28 内端板 28a 接続用フランジ板 28b 仮止めプレート 32 外端板 32a 凹部 32b 平坦部 32c 可撓性部材 A 地山側 B 掘削側 10 Sandy soil layer 12 Cohesive soil layer 14 underground wall 16 waterways 18 excavation ditch 20 Rebar cage 21 concrete 22 Water pipe 22a inner tube 22b outer tube 24 Hydraulic jack (pressing means) 26 Water-permeable material 26a Water-permeable mat 26b Biodegradable plastic sheet 28 Inner end plate 28a Connection flange plate 28b Temporary fixing plate 32 outer end plate 32a recess 32b flat part 32c flexible member A ground side B Excavation side
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平9−324417(JP,A) 特開 平9−228360(JP,A) 特開 平7−268863(JP,A) 特開 平5−311643(JP,A) (58)調査した分野(Int.Cl.7,DB名) E02D 5/20 102 E02D 5/18 102 ─────────────────────────────────────────────────── --- Continuation of the front page (56) References JP-A-9-324417 (JP, A) JP-A-9-228360 (JP, A) JP-A-7-268863 (JP, A) JP-A-5- 311643 (JP, A) (58) Fields investigated (Int.Cl. 7 , DB name) E02D 5/20 102 E02D 5/18 102
Claims (3)
される止水性地中壁が、地中の地下水路を遮断するよう
に形成され、前記地中壁の形成後に、内部を掘削して、
前記地下水路間を連通させる通水路を形成する地下通水
工法において、 前記通水路は、地山側が生分解性樹脂の分解により透水
性を復元する透水材で閉塞されるとともに、掘削側が内
端板で閉塞され、前記地中壁の厚み方向を横断するよう
に設置された伸縮自在な鋼製通水管から構成され、 前記止水性地中壁を構築する際には、前記掘削溝内にコ
ンクリートを打設する前に、押圧手段により前記透水材
を、前記掘削溝の前記地山側の掘削壁面に押圧すること
を特徴とする地下通水工法。1. Construction by placing concrete in the excavation trench
The water-blocking underground wall is formed so as to block an underground waterway in the ground, and after the underground wall is formed, the inside is excavated,
In the underground waterway construction method for forming a waterway for communicating between the groundwaterways, the waterway is closed on the ground side with a water-permeable material that restores water permeability by decomposition of the biodegradable resin, and the excavation side is an inner end. is closed by a plate, is composed of the installed telescopic steel water passage tube so as to cross the thickness direction of the diaphragm wall, in constructing the water cut-off diaphragm wall is co into the excavation groove
An underground water passage method, characterized in that the water permeable material is pressed against the excavation wall surface of the excavation groove on the side of the natural ground before the concrete is placed by pressing.
内端板は、前記止水性地中壁を構築する際に、掘削溝内
に建て込まれる鉄筋籠に取付け、この鉄筋籠を前記掘削
溝内に設置した後に、前記透水材を前記地山側の掘削壁
面に押圧することを特徴とする請求項1記載の地下通水
工法。2. A water pipe, a water permeable material, which constitutes the water passage,
The inner end plate is attached to a rebar cage built in the excavation groove when constructing the water-proof underground wall, and after the rebar cage is installed in the excavation groove, the water-permeable material is attached to the rock side. The underground water supply method according to claim 1, wherein the underground water supply method is pressed against the excavated wall surface.
などの塊状フィルター材を充填することを特徴とする請
求項1または2記載の地下通水工法。3. The underground water supply method according to claim 1, wherein the steel water pipe is filled with a lumped filter material such as crushed stone or gravel in advance.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP05964498A JP3473379B2 (en) | 1998-03-11 | 1998-03-11 | Underground hydraulic method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP05964498A JP3473379B2 (en) | 1998-03-11 | 1998-03-11 | Underground hydraulic method |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003162076A Division JP3726823B2 (en) | 2003-06-06 | 2003-06-06 | Underground water passage |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH11256568A JPH11256568A (en) | 1999-09-21 |
JP3473379B2 true JP3473379B2 (en) | 2003-12-02 |
Family
ID=13119145
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP05964498A Expired - Fee Related JP3473379B2 (en) | 1998-03-11 | 1998-03-11 | Underground hydraulic method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3473379B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5797394B2 (en) * | 2010-11-22 | 2015-10-21 | 清水建設株式会社 | Well equipment for underground wall installation |
-
1998
- 1998-03-11 JP JP05964498A patent/JP3473379B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH11256568A (en) | 1999-09-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4741644A (en) | Environmental cut-off and drain | |
JP3473379B2 (en) | Underground hydraulic method | |
JP3245537B2 (en) | Method of forming permeable section in continuous underground wall | |
CN214363565U (en) | A drainage structures and pipeline network fall fast in foundation ditch bottom for suspension type curtain | |
JP3451564B2 (en) | Underground water supply method and underground water supply equipment | |
JP3726823B2 (en) | Underground water passage | |
JP3192661B2 (en) | Novel sewage wall, method of forming the sewage wall, and members used therefor | |
JP3253868B2 (en) | Forming method of water passage section in continuous underground wall | |
CN112609672A (en) | Prevention and treatment remediation method for directional drilling pipeline to penetrate through soft dike foundation | |
JP3355282B2 (en) | Construction method of perforated sheet pile and continuous underground wall having permeation section using this sheet pile | |
JP3208729B2 (en) | Blistering prevention method and construction method of underground building | |
CN217870574U (en) | Structure for applying locking steel sheet pile to water-stop curtain between piles | |
JP2981165B2 (en) | Underground impermeable wall and method of forming the same | |
JP2876265B2 (en) | Sheet pile for underground continuous wall and underground continuous wall method | |
JP2611104B2 (en) | Water passing method for continuous underground wall | |
JP3128456B2 (en) | How to attach impermeable walls to gutter pipes | |
JP2900842B2 (en) | Earth retaining wall structure with water permeability | |
JPH0329383Y2 (en) | ||
CN217976303U (en) | Fretwork drain pipe is used in civil engineering | |
KR100652187B1 (en) | Grouting method to the underdrain-installed point in a hillside road | |
JP2002348858A (en) | Underground water-conveyance device and underground water-conveyance method | |
JP3264437B2 (en) | Water shielding device and method of measuring water permeability | |
JP2985736B2 (en) | Soil retaining wall with water permeability and construction method | |
JP3311961B2 (en) | Continuous wall permeation method using water permeation pipe | |
CN112681352A (en) | Method and structure for quickly lowering and draining water at bottom of foundation pit for suspended curtain and pipeline network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080919 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090919 Year of fee payment: 6 |
|
LAPS | Cancellation because of no payment of annual fees |