JP3208729B2 - Blistering prevention method and construction method of underground building - Google Patents

Blistering prevention method and construction method of underground building

Info

Publication number
JP3208729B2
JP3208729B2 JP35110597A JP35110597A JP3208729B2 JP 3208729 B2 JP3208729 B2 JP 3208729B2 JP 35110597 A JP35110597 A JP 35110597A JP 35110597 A JP35110597 A JP 35110597A JP 3208729 B2 JP3208729 B2 JP 3208729B2
Authority
JP
Japan
Prior art keywords
ground
pile
concrete
aquifer
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP35110597A
Other languages
Japanese (ja)
Other versions
JPH11181806A (en
Inventor
一政 山崎
光明 平泉
裕之 田中
博志 近久
薫 小林
洋 松島
幸雄 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tobishima Corp
Original Assignee
Tobishima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tobishima Corp filed Critical Tobishima Corp
Priority to JP35110597A priority Critical patent/JP3208729B2/en
Publication of JPH11181806A publication Critical patent/JPH11181806A/en
Application granted granted Critical
Publication of JP3208729B2 publication Critical patent/JP3208729B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は盤ぶくれ防止工法と
地下建造物の構築法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for preventing swelling and a method for constructing an underground building.

【0002】[0002]

【従来の技術】盤ぶくれは、根切り底面から土留め壁の
先端付近までの間に不透水層地盤が存在し、その下に被
圧された滞水層地盤がある場合に、生じるおそれがあ
り、それは事故につながる危険性もあるとされている
が、従来、その盤ぶくれ防止工法としては、ディープウ
ェルによって減圧する方法、土留め壁を不透水層まで降
ろして締め切る方法、底盤改良により締め切る方法ある
いはまた地下室を分割して施工する方法等が提案されて
いる。
2. Description of the Related Art Bulging can occur when there is an impermeable ground between the bottom of the root cutting and the vicinity of the tip of the retaining wall, and there is a pressurized aquifer underneath. It is said that there is a risk of causing an accident.However, in the past, the methods for preventing swelling were to reduce the pressure with a deep well, to lower the retaining wall to an impermeable layer and close it, and to improve the bottom plate And a method of dividing the basement and constructing it.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、ディー
プウェルにより減圧する方法は、排水にともなう公共下
水道の処理能力が問題になるとか、水位低下による周辺
地盤の圧密沈下のおそれがあるという欠点がある。土留
め壁を不透水層地盤まで降ろして締め切る方法は、不透
水層地盤を正確に想定し、確実に締め切ることが技術的
に難しいとともに工費が嵩むという欠点がある。底盤改
良により締め切る方法は、底盤改良のための薬液注入の
信頼性が必ずしも高くないとともに工費が嵩むという欠
点がある。地下室を分割して施工する方法は、深い掘削
に運用限界があり、また、工期が長くなり、かつまた躯
体の打ち継ぎが増えるという欠点がある。
However, the method of reducing the pressure by the deep well has the drawback that the treatment capacity of the public sewerage system due to drainage becomes a problem, or that the surrounding ground may be compacted and settled due to a decrease in water level. The method of lowering the earth retaining wall to the impermeable layer ground and closing it has the drawback that the impermeable layer ground is accurately assumed, and it is technically difficult to securely close the ground and the construction cost increases. The method of closing off by improving the bottom plate has the disadvantages that the reliability of the injection of the chemical solution for improving the bottom plate is not always high and the cost is high. The method of dividing the basement and constructing it has the drawback that there is a limit to the operation of deep excavation, the construction period is long, and the joint of the skeleton is increased.

【0004】発明者らは、これらの欠点を改善した盤ぶ
くれ防止工法とそれを利用した地下建造物の構築法を開
発すべく鋭意研究し、本発明を完成したもので、盤ぶく
れを比較的簡単に、しかも、効果的にしてかつ経済的に
防止できるようにしたものである。
[0004] The inventors of the present invention have intensively studied to develop a method for preventing swelling which has improved these disadvantages and a method for constructing an underground building using the same, and completed the present invention. It is relatively simple, yet effective and economical to prevent.

【0005】[0005]

【課題を解決するための手段】本発明盤ぶくれ防止工法
の構成は、次のとおりである。 (1)難・不透水層地盤1の上方に透水層地盤2、同難
・不透水層地盤1の下方に被圧滞水層地盤3がある地盤
において、先端が上記難・不透水層地盤1に到達する土
留め壁4,5を構築設立して、上記透水層地盤2に建造
物構築領域bを囲繞する。 (2)その建造物構築領域b内で、オーガースクリュー
を使用して上記透水層地盤2の表面から上記被圧滞水層
地盤3の所要深さに達する削孔を行う。 (3)その削孔の少なくとも上記難・不透水層地盤1お
よび被圧滞水層地盤3の部分にモルタルまたはコンクリ
ートcを圧送充填しつつ、該オーガースクリューを、そ
のヘッドがモルタルまたはコンクリートcから離隔する
ことなく差し込んだ状態を維持しながら引き抜く。 (4)その後ただちに、上部が上記透水層地盤2の表面
付近に位置するとともに下部が上記難・不透水層地盤1
を貫通して被圧滞水層地盤3の所要深さにまで貫入する
長さの鋼製杭材dを、上記削孔に建て込んで、該モルタ
ルまたはコンクリートcが硬化するまで静置する。 (5)これによって、上部が上記透水層地盤2の表面付
近に位置し、下部が上記難・不透水層地盤1を貫通する
とともに被圧滞水層地盤3の所要深さに貫入する盤ぶく
れ防止杭aを築造する。
SUMMARY OF THE INVENTION The present invention provides a method for preventing board bulge.
Is as follows. (1) Permeable layer ground 2 above difficult / impermeable layer ground 1
・ Soil where there is a confined aquifer ground 3 below impermeable layer ground 1
In the soil, the tip reaches the difficult / impermeable layer ground 1
Retained walls 4 and 5 are constructed and established on the permeable ground 2
The object construction area b is surrounded. (2) In the building construction area b, an auger screw
From the surface of the permeable layer ground 2 using
Drilling to the required depth of the ground 3 is performed. (3) At least the hard and impermeable ground 1
And mortar or concrete
The auger screw while pressing and filling the plate c.
Head separates from mortar or concrete c
Pull out while maintaining the inserted state without inserting. (4) Immediately thereafter, the upper part is the surface of the permeable ground 2
It is located in the vicinity and the lower part is the above-mentioned difficult / impermeable layer ground 1
And penetrates to the required depth of the confined aquifer ground 3
A steel pile material d having a length of
The concrete or c is hardened. (5) With this, the upper part is provided with the surface of the permeable ground 2
Located near, the lower part penetrates the above-mentioned hard / impermeable layer ground 1
Along with the required depth of the confined aquifer ground 3
The stake prevention pile a is built.

【006】 上記鋼製杭材dとしては、H型鋼または鋼管
が好適である。 また、盤ぶくれ防止杭aとして、拡底杭
を採用することにより被圧滞水層地盤 3に貫入させる先
端側長さを短くできるメリットがある
[006] As the steel pilings d, H-type steel or steel
Is preferred. In addition, as the swelling prevention pile a, an expanded pile
To penetrate the pressurized aquifer ground 3 by adopting
There is an advantage that the end side length can be shortened .

【007】本発明地下建造物の構築法の構成は、次のと
おりである。 (1′) 上記盤ぶくれ防止工法により、盤ぶくれ防止杭
aの所要本数を所定の配置で打設して所要の盤ぶくれ防
止施工をする。 (2′) 土留め壁4,5が囲繞する建造物構築領域b内
の掘削と支保工6の設置を繰り返し行うとともに、盤ぶ
くれ防止杭aの上記透水層地盤2の表面付近に位置する
上部に覆工板7を施工し、根切り底面に底版コンクリー
ト8を施工する。 (3′) 目的の建造物の躯体9を構築する。 (4′) その後、上記盤ぶくれ防止杭aを根切り底面の
ところで切断して掘削空間b′内に位置していたその盤
ぶくれ防止杭aの部分を取り除くとともに、その掘削空
間b′に対し埋め戻し土施工を行う。
The construction method of the underground building of the present invention is as follows.
It is a cage. (1 ') The required number of piles a for preventing swelling a is driven in a predetermined arrangement by the above-mentioned swelling prevention method to perform required swelling prevention . (2 ') repeatedly performs the installation of the excavation and支保Engineering 6 in building construction region b where Retaining walls 4, 5 are surrounded, board department
It is located near the surface of the permeable layer ground 2 of the stake prevention pile a.
A lining plate 7 is constructed on the upper part, and a bottom slab concrete 8 is constructed on the root bottom . (3 ') Construct the frame 9 of the target building . (4 ') Thereafter, the pile-prevention pile a is cut at the root bottom surface to remove the pile-prevention pile a located in the excavation space b', and the excavation space b 'is removed. Backfill soil will be constructed for

【0008】[0008]

【発明の実施の形態】以下本発明を図示の一実施形態に
ついて説明する。1は粘性土等からなる難透水層地盤も
しくは不透水層地盤、すなわち、難・不透水層地盤、2
は難・不透水層地盤1の上方の透水層地盤、3は難・不
透水層地盤1の下方の砂質土等の被圧滞水層地盤、4,
5は、透水層地盤2中に建造物構築領域bを囲繞形成す
るのに必要な所要の間隔をおいて構築設立した土留め壁
であって、その各先端を難・不透水層地盤1に到達させ
ている。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to an embodiment shown in the drawings. 1 is a poorly permeable or impermeable ground made of cohesive soil or the like, that is, a poorly / impermeable ground.
Is a permeable ground above the difficult / impermeable ground 1, 3 is a pressurized aquifer ground such as sandy soil below the hard / impermeable ground 1, 4,
Reference numeral 5 denotes a retaining wall constructed and established at a required interval necessary for surrounding and forming the building construction area b in the permeable ground 2, each end of which is formed on the hard / impermeable permeable ground 1. Has been reached.

【009】aは、土留め壁4,5が囲繞する上記建造物
構築領域b内に打設した盤ぶくれ防止杭で、その先端側
所要長さを被圧滞水層地盤3に貫入させている。この盤
ぶくれ防止杭aは、次のようにして施工する。所定の位
置に杭打ち機をセットし、オーガースクリューにより、
地表から被圧滞水層地盤3の所要深さ(たとえば最低9
m)に達する削孔を行う。
Reference numeral a denotes a slab prevention pile which is cast in the above-mentioned building construction area b surrounded by the retaining walls 4 and 5, and the required length of the tip side penetrates the pressurized aquifer ground 3. ing. This swelling prevention pile a is constructed as follows. Set the pile driver in place and use the auger screw to
The required depth of the confined aquifer ground 3 from the ground surface (for example, at least 9
drilling up to m).

【0010】削孔が予定深度に達したことを確認した
後、オーガーシャフト中空軸を通じ、予め調合練り合わ
せしたモルタルあるいはコンクリートをグラウトポンプ
で圧送し、オーガーの先端から注入することにより、削
孔の被圧滞水層地盤3および難・不透水層地盤1の部分
に充填する。この場合、オーガーヘッドを、モルタル面
から離隔させることなく常時約1m差し込んだ状態を維
持したまま引き上げ、オーガースクリューを正回転させ
ながら引き抜き、排土する。
After confirming that the drilling has reached the predetermined depth, the mortar or concrete, which has been previously kneaded and mixed, is pumped by a grout pump through an auger shaft hollow shaft, and injected from the tip of the auger, thereby covering the hole. The portion of the confined aquifer ground 3 and the hard / impermeable aquifer ground 1 is filled. In this case, the auger head is pulled up while being kept inserted at about 1 m without being separated from the mortar surface, pulled out while rotating the auger screw forward, and discharged.

【0011】オーガーを引き抜いた後、注入充填されて
いるモルタルまたはコンクリートc中に、所要長さ、す
なわち、上部が上記透水層地盤2の表面付近に位置する
とともに下部が上記難・不透水層地盤1を貫通して被圧
滞水層地盤3の所要深さにまで貫入する長さを有するH
型鋼または鋼管等の鋼製杭材dをただちに建て込み、
ルタルまたはコンクリートcが硬化するまで静置する。
これによって、上部が上記透水層地盤2の表面近くに位
置し、下部が上記難・不透水層地盤1を貫通するととも
に被圧滞水層地盤3の所要深さに貫入する盤ぶくれ防止
杭aが築造される。
After the auger has been pulled out, the required length and space are poured into the mortar or concrete c which is being filled .
That is, the upper part is located near the surface of the permeable ground 2.
At the same time, the lower part penetrates through the difficult / impermeable
H having a length that penetrates to the required depth of the aquifer ground 3
Immediately build a steel pile material d such as a mold steel or a steel pipe and let it stand until the mortar or concrete c hardens.
Thereby, the upper part is located near the surface of the permeable ground 2.
And the lower part penetrates the above-mentioned difficult / impermeable ground 1
Prevention of blistering that penetrates into the required depth of confined aquifer ground 3
The pile a is built.

【0012】上記モルタルまたはコンクリートcの注入
充填は、難・不透水層地盤1および被圧滞水層地盤3に
おける鋼製杭材dと周辺地盤との間を密閉して、被圧地
下水が削孔を通じて難・不透水層地盤1の上方に漏水す
るのを防止することになる。換言すると、削孔のみで鋼
製杭材dを建て込むとか、地盤に直接鋼製杭材dを打ち
込むということでは、地盤と鋼製杭材dとの間に空隙を
生じ、被圧地下水を難・不透水層地盤1の上方に漏水さ
せるとともに周辺地盤との間に所期の摩擦力を得ること
ができないこととなるため適当でない。
Injecting and filling the mortar or concrete c seals the gap between the steel pile material d and the surrounding ground in the hard / impermeable layer ground 1 and the pressurized aquifer layer 3 to reduce the groundwater to be pressed. It is possible to prevent water from leaking above the hard / impermeable layer ground 1 through the hole. In other words, building a steel pile d only by drilling or driving a steel pile d directly into the ground creates an air gap between the ground and the steel pile d, thereby reducing the pressure of groundwater. It is not appropriate because it causes water to leak above the hard / impermeable layer ground 1 and cannot obtain the desired frictional force with the surrounding ground.

【0013】上記のようにして築造した盤ぶくれ防止杭
aは、鋼製杭材dとモルタルまたはコンクリートcとが
強固に付着して一体化し、また、そのモルタルまたはコ
ンクリートcの外周面が被圧滞水層地盤3および難・不
透水層地盤1の孔壁面に対し圧着状態となる。
The swelling prevention pile a constructed as described above has a steel stake d and a mortar or concrete c firmly adhered and integrated, and the outer peripheral surface of the mortar or the concrete c is covered. The compressed water layer 3 and the hard / impermeable layer ground 1 are pressed against the wall surface of the hole.

【0014】この盤ぶくれ防止杭aは、難・不透水層地
盤1を貫通し被圧滞水層地盤3に貫入状態となるから、
被圧滞水層地盤3におけるモルタルまたはコンクリート
cの外周面(杭周面)と周辺地盤との周面摩擦力を反力
とし、また、難・不透水層地盤1におけるモルタルまた
はコンクリートcの外周面(杭周面)と周辺地盤との摩
擦力を、難・不透水層地盤1に作用する揚圧力に対する
抵抗力とすることで、盤ぶくれを防止できるものであ
る。
The pile a for preventing swelling penetrates through the hard / impermeable layer ground 1 and penetrates into the pressurized aquifer layer 3.
The peripheral frictional force between the outer peripheral surface (pile peripheral surface) of the mortar or concrete c in the pressurized aquifer ground 3 and the peripheral ground is set as a reaction force, and the outer periphery of the mortar or concrete c in the hard / impermeable aquifer ground 1 By setting the frictional force between the surface (pile peripheral surface) and the surrounding ground as the resistance to the lifting pressure acting on the difficult / impermeable layer ground 1, the floor bulging can be prevented.

【0015】実験によれば、鋼製杭材dとモルタルまた
はコンクリートcとの付着力は、そのモルタルまたはコ
ンクリートcの周辺地盤との周面摩擦抵抗力より大き
く、したがって、周面摩擦抵抗力が切れる前に上記付着
力が切れることがない。
According to the experiment, the adhesive force between the steel pile material d and the mortar or concrete c is larger than the peripheral friction resistance of the mortar or concrete c with the surrounding ground. The above-mentioned adhesive force does not break before breaking.

【0016】上記盤ぶくれ防止杭aの所要本数を所定の
配置にして打設して、所要の盤ぶくれ防止施工をした後
において、土留め壁4,5が囲繞する上記建造物構築領
域b内の掘削と、切梁,腹起こし等の支保工6の設置を
繰り返し行うとともに、盤ぶくれ防止杭aの上記透水層
地盤2の表面付近に位置する上部に覆工板7を施工し
掘削空間b′の上面開口を仮閉鎖する(図4)。
After the required number of the piles for pile-up prevention a has been set and set, and the construction for the pile-up prevention has been performed, the building construction area surrounded by the retaining walls 4 and 5 is obtained. The excavation in b and the installation of the shoring 6 such as cutting beams and erection are repeated, and the permeable layer of the pile a
A lining plate 7 is constructed on the upper part located near the surface of the ground 2 ,
The upper opening of the excavation space b 'is temporarily closed (FIG. 4).

【0017】このように盤ぶくれ防止杭aは、盤ぶくれ
を防止する他に、透水層地盤2の表面付近に位置する上
部で覆工板7を支持する支持杭として利用できるもの
で、このことは工費の節減に多大な貢献をすることにな
る。
As described above, in addition to preventing the swelling, the swelling prevention pile a is located near the surface of the permeable ground 2.
It can be used as a support pile for supporting the lining plate 7 at the section, and this greatly contributes to a reduction in construction cost.

【0018】その後、根切り底面に底版コンクリート8
を施工敷設し(図5)、さらに、目的の建造物(トンネ
ル、地下鉄駅舎等)の躯体9を構築する(図6)。さら
に、盤ぶくれ防止杭aを根切り底面のところで切断して
掘削空間b′内に位置していた鋼製杭材dを取り除くと
ともに、その掘削空間b′に対し埋め戻し土施工をする
(図7)。
Then, the bottom concrete 8
(FIG. 5), and furthermore, a frame 9 of a target building (tunnel, subway station building, etc.) is constructed (FIG. 6). Further, the swelling prevention pile a is cut at the root bottom surface to remove the steel pile material d located in the excavation space b ', and the excavation space b' is backfilled with soil ( (FIG. 7).

【0019】なお、盤ぶくれ防止杭aは、これを拡底杭
とすることによって、すなわち、先端に拡幅部a′を形
成したものとすることによって、被圧滞水層地盤3に対
する貫入長さ、したがってまた、その全長を短くできる
ものであること明らかである(図8)。
The swelling prevention pile a is formed as an expanded bottom pile, that is, a widened portion a 'is formed at the tip, so that the penetration length of the pile 3 into the pressurized aquifer ground 3 is improved. Thus, it is also clear that the overall length can be shortened (FIG. 8).

【0020】[0020]

【発明の効果】以上述べたところから明らかなように、
本発明盤ぶくれ防止工法によれば次の効果を奏する。盤
ぶくれ防止杭を、難・不透水層地盤を貫通させるととも
にその下方の被圧滞水層地盤に貫入打設させるので、そ
の盤ぶくれ防止杭は、被圧滞水層地盤においてその外周
面(杭周面)と周辺地盤との周面摩擦力を反力とし、ま
た、難・不透水層地盤においてその外周面(杭周面)と
周辺地盤との摩擦力を、難・不透水層地盤に作用する揚
圧力に対する抵抗力とすることで、盤ぶくれをきわめて
効果的に防止できるもので、しかもそれは、従来の盤ぶ
くれ防止工法に比較すると、施工を簡単確実に行うこと
ができるとともに工期を短縮できるメリットがある。
As is apparent from the above description,
The following effects can be obtained by the method of the present invention. The anti-blurring pile penetrates through the impervious / impermeable layer ground and penetrates into the confined aquifer ground below it. The friction force between the peripheral surface (pile peripheral surface) and the surrounding ground is defined as the reaction force between the peripheral surface (pile peripheral surface) and the surrounding ground as the reaction force. By making the resistance to the lifting pressure acting on the layered ground, the swelling can be prevented very effectively.Moreover, compared with the conventional swelling prevention method, the construction can be performed easily and reliably. There is an advantage that the construction period can be shortened.

【0021】また、盤ぶくれ防止杭を、削孔の少なくと
も被圧滞水層地盤および難・不透水層地盤中の部分にモ
ルタルまたはコンクリートを注入充填し、それに鋼製杭
材を建て込むことによって打設すると、モルタルまたは
コンクリートの注入充填が、難・不透水層地盤おび被圧
滞水層地盤における鋼製杭材と周辺地盤との間を密閉し
て、被圧地下水が削孔を通じて難・不透水層地盤の上方
に漏水するのを防止しながら所期の施工ができ、削孔の
みで鋼製杭材を建て込むとか、地盤に直接鋼製杭材を打
ち込むということでは、地盤と鋼製杭材との間に空隙を
生じ、被圧地下水を難・不透水層地盤の上方に漏水させ
るとともに周辺地盤との間に所期の摩擦力を得ることが
できないというおそれがない。
In addition, the swelling prevention pile is prepared by injecting and filling mortar or concrete into at least a portion of the borehole in the pressurized aquifer layer and the hard / impervious layer ground, and embedding a steel pile into it. Mortar or concrete is difficult to inject and fill, making it difficult to seal the gap between the steel pile and the surrounding ground in the impervious and impregnated aquifer ground, and to make the pressurized groundwater through boreholes.・ The expected construction can be performed while preventing water from leaking above the impermeable layer ground.Steel piles can be built only by drilling, or steel piles can be driven directly into the ground. a gap between a steel pilings, that can not <br/> to obtain the desired frictional force between the surrounding ground causes the leakage of artesian water above the flame-impermeable layer ground There is no fear.

【0022】また、上記のようにして築造した盤ぶくれ
防止杭は、鋼製杭材とモルタルまたはコンクリートとが
強固に付着して一体化し、かつ、そのモルタルまたはコ
ンクリートの外周面が被圧滞水層地盤および難・不透水
層地盤の孔壁面に対し圧着状態となり、被圧滞水層地盤
におけるモルタルまたはコンクリートの外周面(杭周
面)と周辺地盤との周面摩擦力を反力とし、また、難・
不透水層地盤におけるモルタルまたはコンクリートcの
外周面(杭周面)と周辺地盤との摩擦力を、難・不透水
層地盤に作用する揚圧力に対する抵抗力とすることで、
盤ぶくれを防止する機能は一層確実となる。
In addition, the pile for preventing swelling constructed in the above-described manner has a steel pile material and mortar or concrete firmly adhered and integrated, and the outer peripheral surface of the mortar or concrete is pressurized and confined. It is pressed against the hole wall surface of the water layer ground and the impervious / impermeable layer ground, and the peripheral friction force between the outer peripheral surface (pile peripheral surface) of mortar or concrete and the surrounding ground in the pressurized aquifer layer is regarded as the reaction force. Also, difficult
By making the frictional force between the outer peripheral surface (pile peripheral surface) of mortar or concrete c and the surrounding ground in the impermeable layer ground, the resistance to the lifting pressure acting on the difficult / impermeable layer ground,
The function of preventing the bulging becomes more certain.

【0023】本発明地下建造物の構築法は、上記本発明
盤ぶくれ防止工法により、盤ぶくれを確実に防止しなが
ら所期の躯体の構築を行うものであり、その場合、盤ぶ
くれ防止杭の透水層地盤の表面付近に位置する上部によ
り覆工板を支持できるから、換言すると、盤ぶくれ防止
杭は、文字どおり盤ぶくれを防止するとともに支持杭と
しても利用できるものであり、その施工上のメリットは
きわめて大きいこと明らかである。
The method for constructing an underground building according to the present invention
The board blisters prevention method, which performs construction of the intended precursor while reliably prevented me board department, in which case, the board department
The upper part of the stake prevention pile located near the surface of the permeable ground
In other words, the swelling prevention pile can literally prevent swelling and can also be used as a supporting pile, and it is clear that the construction advantage is extremely large.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施形態を示すもので透水層地盤中
に建造物構築領域を囲繞形成する土留め壁を構築設立し
た状態の断面図である。
FIG. 1 is a cross-sectional view showing an embodiment of the present invention, in which a retaining wall for surrounding a building construction area is constructed and established in a permeable ground.

【図2】建造物構築領域に盤ぶくれ防止杭を打設した状
態の断面図である。
FIG. 2 is a cross-sectional view showing a state where a slab prevention pile is cast in a building construction area.

【図3】盤ぶくれ防止杭の要部拡大断面図である。FIG. 3 is an enlarged cross-sectional view of a main part of a swelling prevention pile.

【図4】建造物構築領域の掘削と支保工を行った状態の
断面図である。
FIG. 4 is a cross-sectional view of a state where excavation and support of a building construction area are performed.

【図5】同上の掘削空間に底版コンクリートを施工敷設
した状態の断面図である。
FIG. 5 is a cross-sectional view showing a state in which bottom slab concrete is laid and laid in the above excavation space.

【図6】同上の掘削空間に建造物の躯体を構築した状態
の断面図である。
FIG. 6 is a cross-sectional view of a state in which a building body of the building is constructed in the above-described excavation space.

【図7】盤ぶくれ防止杭を切断するとともに埋め戻した
状態の断面図である。
FIG. 7 is a cross-sectional view showing a state in which the swelling prevention pile is cut and backfilled.

【図8】盤ぶくれ防止杭として拡底杭を打設した状態の
断面図である。
FIG. 8 is a cross-sectional view of a state in which an expanded pile is cast as a pile for preventing swelling.

【符号の説明】[Explanation of symbols]

a 盤ぶくれ防止杭 a′ 拡幅部 b 建造物構築領域 b′ 掘削空間 c モルタルまたはコンクリート d 鋼製杭材 1 難・不透水層地盤 2 透水層地盤 3 被圧滞水層地盤 4,5 土留め壁 6 支保工 7 覆工板 8 底版コンクリート 9 躯体 a Piling preventing pile a 'Widening part b Building construction area b' Excavation space c Mortar or concrete d Steel pile material 1 Difficult / impermeable layer 2 Permeable layer 3 Pressurized aquifer layer 4,5 Soil Retaining wall 6 Shoring 7 Lining plate 8 Bottom concrete 9 Frame

───────────────────────────────────────────────────── フロントページの続き (72)発明者 田中 裕之 東京都千代田区永田町二丁目14番2号 日本鉄道建設公団内 (72)発明者 近久 博志 東京都千代田区三番町2番地 飛島建設 株式会社内 (72)発明者 小林 薫 東京都千代田区三番町2番地 飛島建設 株式会社内 (72)発明者 松島 洋 東京都千代田区三番町2番地 飛島建設 株式会社内 (72)発明者 阿部 幸雄 東京都千代田区三番町2番地 飛島建設 株式会社内 (56)参考文献 特開 平4−174134(JP,A) 特開 平4−30019(JP,A) 特開 昭50−91113(JP,A) 特開 平5−9945(JP,A) 特開 平6−158671(JP,A) 特開 平10−121465(JP,A) (58)調査した分野(Int.Cl.7,DB名) E02D 29/045 E02D 27/34 E21D 13/00 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hiroyuki Tanaka 2- 14-2 Nagatacho, Chiyoda-ku, Tokyo Japan Railway Construction Public Corporation (72) Inventor Hiroshi Chikyu 2nd Sanbancho, Chiyoda-ku, Tokyo Tobishima Construction Co., Ltd. In-company (72) Inventor Kaoru Kobayashi No. 2 Sanbancho, Chiyoda-ku, Tokyo Tobishima Construction Co., Ltd. (72) Inventor Hiroshi Matsushima No. 2 Sanbancho, Chiyoda-ku, Tokyo Tobishima Construction Co., Ltd. (72) Inventor Abe Yukio No.2 Sanbancho, Chiyoda-ku, Tokyo Tobishima Construction Co., Ltd. (56) References JP-A-4-174134 (JP, A) JP-A-4-30019 (JP, A) JP-A-50-91113 (JP) JP-A-5-9945 (JP, A) JP-A-6-158671 (JP, A) JP-A-10-121465 (JP, A) (58) Fields investigated (Int. Cl. 7 , DB Name) E02D 29/045 E02D 27/34 E21D 13/00

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】難・不透水層地盤の上方に透水層地盤、同
難・不透水層地盤の下方に被圧滞水層地盤がある地盤に
おいて、先端が上記難・不透水層地盤に到達する土留め
壁を構築設立して、上記透水層地盤に建造物構築領域を
囲繞し、 その建造物構築領域内で、オーガースクリューを使用し
て上記透水層地盤の表面から上記被圧滞水層地盤の所要
深さに達する削孔を行うとともに、 その削孔の少なくとも上記難・不透水層地盤および被圧
滞水層地盤の部分にモルタルまたはコンクリートを圧送
充填しつつ、該オーガースクリューを、そのヘッドがモ
ルタルまたはコンクリートから離隔することなく差し込
んだ状態を維持しながら引き抜き、 その後ただちに、上部が上記透水層地盤の表面付近に位
置するとともに下部が上記難・不透水層地盤を貫通して
被圧滞水層地盤の所要深さにまで貫入する長さの鋼製杭
材を、上記削孔に建て込んで、該モルタルまたはコンク
リートが硬化するまで静置し、 これによって、上部が上記透水層地盤の表面付近に位置
し、下部が上記難・不透水層地盤を貫通するとともに被
圧滞水層地盤の所要深さに貫入する盤ぶくれ防止杭を築
造することを特徴とする盤ぶくれ防止工法。
(1) a permeable layer ground above a difficult / impermeable layer ground;
In the ground where there is a pressurized aquifer under the hard / impermeable layer
And the earth retaining point where the tip reaches the above-mentioned impervious and impermeable ground
Establish a wall and establish a building construction area on the permeable ground
Surround and use auger screws within the building construction area.
From the surface of the permeable ground
While drilling to the depth , at least the above-mentioned impervious and impervious
Pumping mortar or concrete to aquifer ground
While filling, the auger screw is
Insert without separation from rutar or concrete
Pull out while maintaining the proper state, and then immediately place the upper part near the surface of the permeable ground.
And the lower part penetrates the above-mentioned impervious and impervious layer ground
Steel pile with a length that penetrates to the required depth of the pressurized aquifer ground
The mortar or concrete
Leave to rest until the REIT hardens, so that the upper part is located near the surface of the permeable ground.
And the lower part penetrates
Construction of piles for preventing blisters that penetrate the required depth of consolidation aquifer ground
Blending prevention method characterized by building.
【請求項2】鋼製杭材がH型鋼または鋼管であることを
特徴とする請求項1記載の盤ぶくれ防止工法。
2. The steel pile material is an H-section steel or a steel pipe.
2. The method for preventing swelling of a board according to claim 1.
【請求項3】盤ぶくれ防止杭が拡底杭であることを特徴
とする請求項1または2記載の盤ぶくれ防止工法。
3. The method according to claim 1 or 2, wherein the pile for preventing swelling is an expanded pile.
【請求項4】請求項1,2または3記載の盤ぶくれ防止
工法により、盤ぶくれ防止杭の所要本数を所定の配置で
打設して所要の盤ぶくれ防止施工をした後において、 土留め壁が囲繞する建造物構築領域内の掘削と支保工の
設置を繰り返し行うとともに、盤ぶくれ防止杭の上記透
水層地盤の表面付近に位置する上部に覆工板を施工し
根切り底面に底版コンクリートを施工し、目的の建造物
の躯体を構築し、その後、上記盤ぶくれ防止杭を根切り
底面のところで切断して掘削空間内に位置していたその
盤ぶくれ防止杭の部分を取り除くとともに、その掘削空
間に対し埋め戻し土施工を行うことを特徴とする地下建
造物の構築法。
4. The method according to claim 1, 2 or 3, wherein after the required number of piles for pile-prevention is driven in a predetermined arrangement and the required pile-prevention construction is performed, In the building construction area surrounded by the retaining wall, the excavation and the installation of the shoring are repeated, and
Install a lining plate on the upper part located near the surface of the aquifer ground ,
Bottom slab concrete is constructed on the bottom of the root cutting, the skeleton of the target building is constructed, and then the above-mentioned pile-prevention pile is cut at the bottom of the root-cut to prevent the pile from being located in the excavation space. A method of constructing an underground building, comprising removing a pile portion and performing backfill soil construction in the excavated space.
JP35110597A 1997-12-19 1997-12-19 Blistering prevention method and construction method of underground building Expired - Fee Related JP3208729B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP35110597A JP3208729B2 (en) 1997-12-19 1997-12-19 Blistering prevention method and construction method of underground building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP35110597A JP3208729B2 (en) 1997-12-19 1997-12-19 Blistering prevention method and construction method of underground building

Publications (2)

Publication Number Publication Date
JPH11181806A JPH11181806A (en) 1999-07-06
JP3208729B2 true JP3208729B2 (en) 2001-09-17

Family

ID=18415095

Family Applications (1)

Application Number Title Priority Date Filing Date
JP35110597A Expired - Fee Related JP3208729B2 (en) 1997-12-19 1997-12-19 Blistering prevention method and construction method of underground building

Country Status (1)

Country Link
JP (1) JP3208729B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4511080B2 (en) * 2001-06-15 2010-07-28 大成建設株式会社 Construction method of underground structure
JP4910217B2 (en) * 2008-12-05 2012-04-04 飛島建設株式会社 Bump prevention pile
JP5848038B2 (en) * 2011-06-15 2016-01-27 株式会社竹中工務店 Overhead deterrent structure
JP7017980B2 (en) * 2018-05-14 2022-02-09 鹿島建設株式会社 Ground improvement structure and excavation method

Also Published As

Publication number Publication date
JPH11181806A (en) 1999-07-06

Similar Documents

Publication Publication Date Title
JP4451553B2 (en) Buoyancy prevention structure and construction method thereof
JP3752560B2 (en) Basic structure for constructing a new building in an existing basement and its construction method
JP3208729B2 (en) Blistering prevention method and construction method of underground building
JP3534928B2 (en) Construction method of seismic isolation pit for existing building
JP4485006B2 (en) Construction method for underground structures
JP3760343B2 (en) Drilling bottom stabilization method and construction method of underground building
KR101392995B1 (en) Construction method for retaining of earth
KR101021913B1 (en) A method for constructing cut-off temporary structure for sheathing work
JP2000110178A (en) Soil-improvement method by rotational press-in pipe pile, pipe-jacking burying method for rotational press-in pipe pile, and rotational press-in pipe pile
KR20100123576A (en) Method for carrying out improved pile
WO2009139510A1 (en) Construction method for continuous cut-off wall using overlap casing
JP3438942B2 (en) Liquefaction countermeasures for underground linear structures
JP2874906B2 (en) Shaft construction method
JPH1162469A (en) Structure of earth retaining wall in shield pit, and starting and reaching method of shield machine
JP3728659B2 (en) Basement extension method
JP2690361B2 (en) Pile construction method
JP2846925B2 (en) Nakabori construction method with tip enlarged diameter pile
CN217870574U (en) Structure for applying locking steel sheet pile to water-stop curtain between piles
KR102117392B1 (en) Method for constructing earth retaining wall
JPH0489916A (en) Embedding method for already fabricated pipe
JP2873809B2 (en) Construction method of house with basement in soft ground
JPH0949229A (en) Non-earth removing pile and execution method therefor
JP2681511B2 (en) Vertical shaft structure of shield machine starting part, its construction method, and start / arrival method of shield machine using the structure
JP2881501B2 (en) Construction method for high strength cast-in-place concrete piles
JPH08209687A (en) Partial casing pile construction method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080713

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090713

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090713

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100713

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100713

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110713

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120713

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130713

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130713

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140713

Year of fee payment: 13

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees