KR100652187B1 - Grouting and Installation Method of Culvert Installation Site in Sanbokdo Road - Google Patents

Grouting and Installation Method of Culvert Installation Site in Sanbokdo Road Download PDF

Info

Publication number
KR100652187B1
KR100652187B1 KR1020040007610A KR20040007610A KR100652187B1 KR 100652187 B1 KR100652187 B1 KR 100652187B1 KR 1020040007610 A KR1020040007610 A KR 1020040007610A KR 20040007610 A KR20040007610 A KR 20040007610A KR 100652187 B1 KR100652187 B1 KR 100652187B1
Authority
KR
South Korea
Prior art keywords
culvert
grouting
mountain road
construction
curtain
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
KR1020040007610A
Other languages
Korean (ko)
Other versions
KR20050079372A (en
Inventor
김영환
Original Assignee
(주)신성엔지니어링
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주)신성엔지니어링 filed Critical (주)신성엔지니어링
Priority to KR1020040007610A priority Critical patent/KR100652187B1/en
Publication of KR20050079372A publication Critical patent/KR20050079372A/en
Application granted granted Critical
Publication of KR100652187B1 publication Critical patent/KR100652187B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B13/00Spanners; Wrenches
    • B25B13/02Spanners; Wrenches with rigid jaws
    • B25B13/08Spanners; Wrenches with rigid jaws of open jaw type
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25GHANDLES FOR HAND IMPLEMENTS
    • B25G1/00Handle constructions
    • B25G1/10Handle constructions characterised by material or shape
    • B25G1/105Handle constructions characterised by material or shape for screwdrivers, wrenches or spanners

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

본 발명에 따른 산복도로 암거 설치지점의 그라우팅 방법은, 산복도로의 암거 설치지점 주변부가 홍수로 인해 세굴되거나 유실된 흔적이 있는 지점을 보강하기 위한 방법으로 기존 암거의 시공이음부나 누수지점에 대한 보강에 있어서는,기존 암거의 시공이음부나 누수지점에 대해서는 탄성이 높고 접착력이 강한 그라우팅재에 의한 커튼 그라우팅을 실시하고, 암거를 신설할 시에는 유입구쪽 암거밑에 터파기를 할 때, 암거 축조와 관련하여 버림 콘크리트 타설 전에 유수 및 용수의 집수를 위해 불투수층까지 U자형으로 터파기하는 단계; 터파기된 U자형의 터널에 집수용 유공관을 묻고 주입구를 입상시킨 후 되메우기를 하는 단계; 및 암거축조 완료 후, 상기 유공관에 그라우팅하여 지중에 커튼식 차수막을 형성하는 단계를 포함한다.The grouting method of the culvert installation site of the mountain road according to the present invention is a method for reinforcing a point where the surrounding area of the culvert installation site of the mountain road is scoured or lost due to flooding, and reinforces the construction joint or leaking point of the existing culvert. In the case of the construction joints and leak points of existing culverts, curtain grouting is performed with a highly elastic and strong adhesive grouting material, and when a culvert is newly formed, when it is dug under the inlet culvert, it is discarded in connection with the culvert construction. Digging in a U-shape up to the impermeable layer for catchment of running water and water prior to concrete pouring; Burying the collecting hole in the ruptured U-shaped tunnel, granulating the injection hole, and then backfilling it; And after completion of culvert construction, grouting to the perforated tube to form a curtain type curtain film in the ground.

이와 같은 본 발명에 의하면, 기존 암거의 누수 부위나 시공이음부에 대한 커튼 그라우트와 암거의 신설 시 유입구쪽 암거 하부에 불투수층까지 횡방향으로 U자형으로 터파기한 후 유공관을 설치하여 그라우팅 채움을 실시함으로써 산복도로 암거 설치 주변부의 침하와 변위를 방지하고 홍수시 산복도로가 유실되는 것을 미연에 방지할 수 있는 장점이 있다.According to the present invention, when the curtain grout on the leaking part or the construction joint of the existing culvert and the culvert when the new culvert in the lower inlet side culvert in the transverse direction to the impermeable layer in the transverse direction by installing a perforated pipe by grouting filling There is an advantage that can prevent the settlement and displacement of the culvert periphery of the mountain road and the loss of the mountain road in the event of a flood.

Description

산복도로 암거 설치지점의 그라우팅 및 이의 그라우팅 방법{Grouting method to the underdrain-installed point in a hillside road}  Grouting method of culvert installation site in mountain road and its grouting method {Grouting method to the underdrain-installed point in a hillside road}             

도 1은 본 발명에 따른 산복도로 암거 설치지점의 그라우팅 방법에 의한 기존 암거의 시공이음부나 누수지점에 대한 그라우팅 보강 개요를 보여주는 도면.1 is a view showing an overview of the grouting reinforcement for the construction joints or leak points of the existing culvert by the grouting method of the culvert installation point of the mountain road according to the present invention.

도 2는 본 발명에 따른 산복도로 암거 설치지점의 그라우팅 방법에 의한 암거 신설시의 암거 저면의 그라우팅 보강 개요를 보여주는 도면. Figure 2 is a view showing the outline of the grouting reinforcement of the bottom of the culvert by the grouting method of the culvert installation point of the mountain road according to the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for main parts of the drawings>

100...산복도로나 제방 101...기존 암거100 ... Sanbok Roadna embankment 101 ... Existing culvert

102...시공이음부나 누수지점 105...차수 그라우팅(부) 102 Construction joint or leaking point 105 Order grouting

101a,101b...암거의 유입구 110...그라우팅용 파이프101a, 101b ... Inlet of the culvert 110 ... Grouting pipe

201...신설 암거 210...U자형 터널201 ... New Culvert 210 ... U-shaped Tunnel

220...유공관220 ...

본 발명은 산복도로 암거 설치지점의 그라우팅 및 이의 그라우팅 방법에 관한 것으로서, 특히 기존 암거의 누수 부위나 시공이음부에 대한 커튼 그라우트와 암거의 신설 시 유입구쪽 암거 하부에 불투수층까지 횡방향으로 U자형으로 터파기한 후 유공관을 설치하여 그라우팅 채움을 실시함으로써 산복도로 암거 설치 주변부의 침하와 변위를 방지하고 홍수시 산복도로가 유실되는 것을 방지할 수 있는 산복도로 암거 설치지점의 그라우팅 방법에 관한 것이다.The present invention relates to the grouting of the culvert installation site and the grouting method of the culvert installation in the mountain road, in particular, when the curtain grout and the culvert for the leakage site or construction joint of the existing culvert in the culvert in the transverse direction to the impermeable layer on the lower side of the inlet It is related with the grouting method of the culvert installation point of the mountain road which can prevent the sinking and displacement of the periphery of the culvert installation and prevent the loss of the mountain corridor during the flood by installing the perforated pipe after dig and filling grouting.

일반적으로, 홍수시 산복도로의 암거 밑부분과 측면부가 세굴되거나 연약해져 암거의 침하와 변위가 발생하게 된다. 또한, 산계곡으로부터 내려오는 물이 암거 하부나 주변으로 흘러 토사중의 세립자가 유실되어 암거 주변이 세굴되거나 유실되는 사태가 발생한다. In general, the bottom and side sections of culverts on mountain roads are scoured or weakened during flooding, causing settlement and displacement of culverts. In addition, water flowing down from the mountain stream flows to the lower part of the culvert or the surroundings, and the fine particles in the soil are lost and the surrounding area is scoured or lost.

본 발명은 이상과 같은 사항을 감안하여 창출된 것으로서, 산복도로 암거 주변부의 침하와 변위를 방지하고 홍수시 도로가 유실되는 것을 방지할 수 있는 산복도로 암거 설치지점의 그라우팅 방법을 제공함에 그 목적이 있다.
The present invention has been made in view of the above matters, and an object of the present invention is to provide a grouting method of a culvert installation point of a mountain road, which can prevent settlement and displacement of the culvert periphery of a mountain road and prevent roads from being lost during a flood. have.

상기의 목적을 달성하기 위하여 본 발명에 따른 산복도로 암거 설치지점의 그라우팅 방법은, 산복도로의 암거 설치지점 주변부가 홍수로 인해 세굴되거나 유 실된 흔적이 있는 지점을 보강하기 위한 공법으로 기존 암거의 시공이음부나 누수지점에 대한 그라우팅에 있어서,In order to achieve the above object, the grouting method of the culvert installation point of the Sanbokdo road according to the present invention is a construction method of the existing culvert as a method for reinforcing the point where the surrounding area of the culvert installation point of the Sanbokdoro is scoured or lost due to flooding. For grouting at seams or leak points,

기존 암거의 시공이음부나 누수지점에 대해서는 탄성이 높고 접착력이 강한 그라우팅재에 의한 커튼 그라우팅을 실시하고, 암거의 유입구의 하부면에 지반 보강 그라우팅(차수 그라우팅)을 실시하는 점에 그 특징이 있다. The construction joints and leak points of existing culverts are characterized by performing curtain grouting with a highly elastic and strong adhesive grouting material, and performing ground reinforcing grouting (order grouting) on the lower surface of the inlet of the culvert.

또한, 상기의 목적을 달성하기 위하여 본 발명에 따른 산복도로 암거 설치지점의 그라우팅 방법은, 산복도로의 암거 설치지점 주변부가 홍수로 인해 세굴되거나 유실된 흔적이 있는 지점을 보강하기 위한 방법으로 암거 신설시에 있어서, In addition, in order to achieve the above object, the grouting method of the culvert installation point of the mountain road according to the present invention, the culvert newly established as a method for reinforcing the point where the periphery of the culvert installation point of the mountain road is scoured or lost due to flooding In the city,

유입구쪽 암거밑에 터파기를 할 때, 상기 암거 축조와 관련하여 버림 콘크리트 타설 전에 유수 및 용수의 집수를 위해 불투수층까지 U자형으로 터파기하는 단계;When digging under an inlet culvert, rupturing U-shaped to an impermeable layer for catchment of running water and water prior to casting concrete in connection with the culvert construction;

상기 터파기된 U자형의 터널에 집수용 유공관을 묻고 주입구를 입상시킨 후 되메우기를 하는 단계; 및Burying a collecting hole for the collection U-shaped tunnel and granulating an inlet; And

암거축조 완료 후, 상기 유공관에 그라우팅하여 지중에 커튼식 차수막을 형성하는 단계를 포함하는 점에 그 특징이 있다.After completion of culvert construction, it is characterized in that it comprises the step of forming a curtain-type curtain in the ground by grouting on the hole.

이하 첨부된 도면을 참조하면서 본 발명의 실시예를 상세히 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

본 발명에 따른 산복도로 암거 설치지점의 그라우팅 방법(일명 MBG (Mountain Box Grouting) 공법이라 함)은, 산복도로의 암거 설치지점 주변부가 홍수로 인해 세굴되거나 유실된 흔적이 있는 지점을 보강하기 위한 방법으로 기존 암거의 시공이음부나 누수지점에 대하여 기초 보강하거나 암거의 신설시 유입구쪽 암 거밑에 터파기를 하여 기초를 보강한다.The grouting method of the culvert installation site of the mountain road according to the present invention (also called MBG (Mountain Box Grouting) method), a method for reinforcing the point where the periphery of the culvert installation site of the mountain road is scoured or lost due to flooding As a result, reinforce the foundation for the construction joints or leak points of existing culverts, or reinforce the foundation by digging at the inlet side culverts when new culverts are installed.

도 1을 참조하면, 산복도로나 제방(100) 등에 설치되어 있는 기존 암거(101)의 시공이음부나 누수지점(102)에 대한 보강에 있어서는 기존 암거(101)의 시공이음부나 누수지점(102)에 탄성이 높고 접착력이 강한 그라우팅재를 이용하여 그라우팅용 파이프(110)를 통해 커튼 그라우팅(curtain grouting)을 실시하고, 암거(101)의 유입구(101a)(101b) 쪽의 하부면에 지반 보강 그라우팅(차수 그라우팅)(105)을 실시하게 된다. 또한, 상기 차수 그라우팅을 위한 공법으로는 MSG (Micro Silica grouting) 공법, 합성실리카 주입공법, 슬라임 재사용 고압분사공법 등이 사용될 수 있다. Referring to FIG. 1, in the reinforcement of a construction joint or a leak point 102 of an existing culvert 101 installed on a mountain road or a levee 100, a construction joint part or a leak point 102 of an existing culvert 101 is provided. Curtain grouting is performed through a grouting pipe 110 using a grouting material having a high elasticity and strong adhesion to the ground, and ground reinforcement grouting is performed on the lower surface of the inlets 101a and 101b of the culvert 101. (Order grouting) 105 is performed. In addition, the method for order grouting may be used such as MSG (Micro Silica grouting) method, synthetic silica injection method, slime reuse high pressure spraying method.

여기서, 상기 MSG 공법은 지반을 천공하여 마이크로 실리카를 주성분으로 한 주입재를 주입 선단장치를 이용하여 지중에 침투시키는 저압 주입 공법으로서, 침투의 중복도가 커서 조밀한 지반에서도 주입효과가 우수하고 균질한 지반 개량이 가능하며, 침투성이 우수하고 용수나 지하수 유출이 예상되는 구역에 시공성이 우수하며, 모든 토사지반 및 풍화대층에 적용이 가능하다. 합성실리카 주입공법은 지반을 천공한 후 특수선단 장치의 2중관 로드를 설치하고 시멘트를 미분쇄하여 약액과 함께 지반내 공극에 주입하는 2-shot 방식 공법이다. 이 합성실리카 주입공법은 차수 및 지반 보강효과가 양호하고 세사층 지반에서도 주입 효과가 우수하며, 사질토, 점성토, 자갈, 전석층 등에 적용될 수 있다. 슬라임 재사용 고압분사공법은 300∼400kgf/㎠의 압력으로 천공하여 대부분의 토립자를 지표로 배출시킴에 따라 생긴 공간에 고화재를 충전하는 공법으로서 사력이나 큰 토립자와 혼합한 고결체를 형성하게 된다. 이와 같은 슬라임 재사용 고압분사공법은 특수 선단 장치의 사용으로 주입속도가 빠르고, 슬라임을 재사용하므로 자재비가 저렴하다. 또한, 압축강도가 커서 전단강도가 비교적 크며, 풍화암 및 연암을 제외한 모든 지층에 적용할 수 있다. 따라서, 이상과 같은 그라우팅 공법 중에서 공사의 목적이나 비용, 지질 및 지형, 기타 주변 환경 등 여러 요소들을 종합적으로 고찰하여 가장 적합한 공법을 선택하여 사용하면 된다. Here, the MSG method is a low pressure injection method that infiltrates the ground by using the injection tip device by injecting the injection material containing micro silica as a main component by drilling the ground. It is possible to improve the ground, and it has excellent permeability and excellent workability in areas where water or groundwater is expected to flow out, and can be applied to all soils and weathered layers. Synthetic silica injection method is a 2-shot method in which a double pipe rod of a special tip device is installed after grinding the ground, and the cement is pulverized and injected into the pores in the ground together with the chemical solution. This synthetic silica injection method is good in order and ground reinforcement effect, and the injection effect is excellent in fine sand, and can be applied to sandy soil, viscous soil, gravel, and stone layers. Slime reuse high-pressure spraying method is a method of filling solidified material into the space created by puncturing at 300 ~ 400kgf / ㎠ pressure and discharging most of the granules to the surface. The slime reuse high pressure spraying method has a high injection speed by using a special tip device, and the material cost is low because the slime is reused. In addition, the compressive strength is large, the shear strength is relatively large, and can be applied to all layers except weathered rock and soft rock. Therefore, among the grouting methods described above, various factors such as the purpose, cost, geology and terrain, and other surrounding environment of the construction are comprehensively considered, and the most suitable method may be selected and used.

한편, 암거 신설의 경우에는, 유입구쪽 암거밑에 터파기를 할 때, 버림 콘크리트의 타설 전에 유수 및 용수의 집수를 위해 우선 불투수층까지 U자형으로 터파기를 한다. 그런 후, 도 2에 도시된 바와 같이, 그 터파기된 U자형의 터널(210)에 집수용 유공관(220)을 묻고 주입구를 입상시킨 후 되메우기를 한다. 이때, 공사중에는 계속해서 양수를 한다. On the other hand, in the case of new culverts, when the trench is drilled under the inlet culvert, U-shaped trenches are first blown up to the impermeable layer for catchment of running water and water before the casting of the discarded concrete. Then, as shown in FIG. 2, the collecting U-shaped tunnel 210 in the rupture U-shaped tunnel 210, the injection hole is granulated and then backfilled. At this time, pumping continues during construction.

그런 다음 신설 암거(201)의 축조 완료 후, 상기 유공관(220)을 통해 그라우팅을 실시하여 지중에 커튼식 차수막을 형성한다. 그리고, 최종적으로 유공관 (220)에도 그라우팅재로 채움하고 마감처리한다. 이렇게 하여 신설 암거(201)에 대한 기초를 보강하게 되는 것이다. Then, after the construction of the new culvert 201 is completed, grouting is performed through the hole tube 220 to form a curtain-type curtain film in the ground. And, finally, the pores 220 are filled with grouting material and finished. In this way it is to reinforce the foundation for the new culvert 201.

이상과 같은 암거 신설의 경우에도 그라우팅 재료로는 상기 도 1의 기존 암 거시의 지반 보강에 사용된 그라우팅 재료를 그대로 이용할 수 있다. Even in the case of culvert construction as described above, as the grouting material, the grouting material used for the ground reinforcement of the existing culvert of FIG. 1 may be used as it is.

이상의 설명에서와 같이, 본 발명에 따른 산복도로 암거 설치지점의 그라우팅 방법은 기존 암거의 누수 부위나 시공이음부에 대한 커튼 그라우트와 암거의 신설 시 유입구쪽 암거 하부에 불투수층까지 횡방향으로 U자형으로 터파기한 후 유공관을 설치하여 그라우팅 채움을 실시함으로써 산복도로 암거 설치 주변부의 침하와 변위를 방지하고 홍수시 산복도로가 유실되는 것을 미연에 방지할 수 있는 장점이 있다. As described above, the grouting method of the culvert installation point of the mountain road according to the present invention is U-shaped in the transverse direction to the impermeable layer on the lower side of the inlet culvert when the curtain grout and the culvert for the leaking site or construction joint of the existing culvert After the trench is installed, grouting is carried out by installing a perforated pipe to prevent settlement and displacement of the periphery of the culvert installation on the mountain road and prevent the loss of the mountain road in the event of a flood.

Claims (8)

산복도로의 암거 설치지점 주변부가 홍수로 인해 세굴되거나 유실된 흔적이 있는 기존 암거의 시공이음부나 누수지점에 대한 보강에 있어서,In the reinforcement of the construction joints or leaking points of existing culverts where the periphery of the culvert installation site on the mountain road is scoured or lost due to the flood, 상기 기존 암거의 시공이음부나 누수지점에 대해서는 탄성이 높고 접착력이 강한 그라우팅재에 의한 커튼 그라우팅을 실시하고, 암거의 유입구의 하부면에 지반 보강 그라우팅을 실시하는 것을 특징으로 하는 산복도로 암거 설치지점의 그라우팅.For the construction joints or the leak points of the existing culverts, curtain grouting is performed by a grouting material having high elasticity and strong adhesive force, and ground reinforcement grouting is performed on the lower surface of the inlet of the culvert, Grouting. 산복도로의 암거 설치지점 주변부가 홍수로 인해 세굴되거나 유실된 흔적이 있는 지점의 암거 신설시 지반보강을 위한 그라우팅에 있어서, In grouting for ground reinforcement when new culverts are built where the periphery of the culvert installation site of Sanbokdoro is scoured or lost due to flooding, 유입구쪽 암거밑에 버림 콘크리트 타설 전에 유수 및 용수의 집수를 위해 불투수층까지 U자형으로 터파기하고, 상기 터파기된 U자형의 터널에 집수용 유공관을 묻고 주입구를 입상시킨 후 되메우기를 한 후에 상기 유공관에 그라우팅하여 지중에 커튼식 차수막을 형성하는 것을 특징으로 하는 산복도로 암거 설치지점의 그라우팅.Abandoned under the inlet side culverts U-shaped to the impervious layer for catching the flowing water and water before pouring concrete, burying the collecting hole in the rupture U-shaped tunnel, and after filling the inlet after filling the inlet hole into the hole The grouting of the culvert installation site in the mountain road, characterized in that the grouting to form a curtain curtain in the ground. 제 1항 또는 제 2항에 있어서,The method according to claim 1 or 2, 상기 그라우팅에 사용하는 그라우팅재는 무착색 폴리우레탄 실란트인 것에 특징이 있는 산복도로 암거 설치지점의 그라우팅.The grouting material used for the grouting is grouting at the culvert installation point of the mountain road, characterized in that the non-colored polyurethane sealant. 산복도로의 암거 설치지점 주변부가 홍수로 인해 세굴되거나 유실된 흔적이 있는 지점을 보강하기 위한 공법으로 기존 암거의 시공이음부나 누수지점에 대한 보강에 있어서,       In the reinforcement of construction joints or leaking points of existing culverts as a method for reinforcing the spots around the culvert installation points on the mountain roads that have been scoured or lost due to flooding, 상기 기존 암거의 시공이음부나 누수지점에 대해서는 탄성이 높고 접착력이 강한 그라우팅재에 의한 커튼 그라우팅을 실시하고, 암거의 유입구의 하부면에 지반 보강 그라우팅을 실시하는 것을 특징으로 하는 산복도로 암거 설치지점의 그라우팅 방법.For the construction joints or the leak points of the existing culverts, curtain grouting is performed by a grouting material having high elasticity and strong adhesive force, and ground reinforcement grouting is performed on the lower surface of the inlet of the culvert, Grouting method. 제 4항에 있어서,       The method of claim 4, wherein 상기 그라우팅 재로는 무착색 폴리우레탄 실란트인 것에 특징이 있는 산복도로 암거 설치지점의 그라우팅 방법.       The grouting method is a grouting method of the culvert installation point of the mountain road characterized in that the non-colored polyurethane sealant. 산복도로의 암거 설치지점 주변부가 홍수로 인해 세굴되거나 유실된 흔적이 있는 지점을 보강하기 위한 방법으로 암거 신설시에 있어서, In the construction of culverts as a way to reinforce the point around the culvert installation site on the mountain road, there are signs of scour or loss due to the flood. (a) 유입구쪽 암거밑에 터파기를 할 때, 상기 암거 축조와 관련하여 버림 콘크리트 타설 전에 유수 및 용수의 집수를 위해 불투수층까지 U자형으로 터파기하는 단계;(a) when digging under the inlet culvert, rupturing U-shaped to an impervious layer for catchment of runoff and water prior to casting concrete in connection with the culvert construction; (b) 상기 터파기된 U자형의 터널에 집수용 유공관을 묻고 주입구를 입상시킨 후 되메우기를 하는 단계; 및(b) burying a collecting hole for the collection U-shaped tunnel and filling the inlet after filling the inlet; And (c) 암거축조 완료 후, 상기 유공관에 그라우팅하여 지중에 커튼식 차수막을 형성하는 단계를 포함하는 것을 특징으로 하는 산복도로 암거 설치지점의 그라우팅 방법.(c) after completion of culvert construction, grouting the hole hole to form a curtain-type curtain in the ground, the grout of the culvert installation site, characterized in that it comprises a step. 제 6항에 있어서,The method of claim 6, 상기 단계 (b)를 실행함에 있어서 계속해서 양수를 수행하면서 실행하는 것을 특징으로 하는 산복도로 암거 설치지점의 그라우팅 방법. The grouting method of the culvert installation point of the mountain road, characterized in that the step of carrying out the pumping continuously in performing step (b). 제 6항에 있어서,The method of claim 6, 상기 (c)단계에서 수행하는 그라우팅에 사용하는 그라우팅재는 무착색 폴리우레탄 실란트인 것에 특징이 있는 산복도로 암거 설치지점의 그라우팅 방법.The grouting material used for the grouting performed in the step (c) is a grouting method of the culvert installation point of the mountain road, characterized in that the colorless polyurethane sealant.
KR1020040007610A 2004-02-05 2004-02-05 Grouting and Installation Method of Culvert Installation Site in Sanbokdo Road Expired - Fee Related KR100652187B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040007610A KR100652187B1 (en) 2004-02-05 2004-02-05 Grouting and Installation Method of Culvert Installation Site in Sanbokdo Road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040007610A KR100652187B1 (en) 2004-02-05 2004-02-05 Grouting and Installation Method of Culvert Installation Site in Sanbokdo Road

Publications (2)

Publication Number Publication Date
KR20050079372A KR20050079372A (en) 2005-08-10
KR100652187B1 true KR100652187B1 (en) 2006-12-01

Family

ID=37266316

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040007610A Expired - Fee Related KR100652187B1 (en) 2004-02-05 2004-02-05 Grouting and Installation Method of Culvert Installation Site in Sanbokdo Road

Country Status (1)

Country Link
KR (1) KR100652187B1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013264B (en) * 2016-07-08 2018-03-16 中铁西南科学研究院有限公司 A kind of regulation method suitable for tunnel bottom interstitital texture protuberance cracking
CN110756570A (en) * 2019-10-22 2020-02-07 中冶南方都市环保工程技术股份有限公司 Subsurface excavation remediation method for deep polluted soil
CN113605933A (en) * 2021-07-13 2021-11-05 山东大学 Grouting reinforcement method for underground excavation channel of close-distance underpass subway station

Also Published As

Publication number Publication date
KR20050079372A (en) 2005-08-10

Similar Documents

Publication Publication Date Title
KR100760293B1 (en) Tunnel construction method in low toffee section
JP2009179945A (en) Well conduit for road and its construction method
JP2019015100A (en) How to remove the Yamato wall
JP4761780B2 (en) Construction method of impermeable layer
KR101392995B1 (en) Construction method for retaining of earth
KR100652187B1 (en) Grouting and Installation Method of Culvert Installation Site in Sanbokdo Road
CN114411745A (en) Post-grouting device for pile end of steel pipe pile and construction method thereof
KR100907434B1 (en) How to close old water pipes
KR100476839B1 (en) Construction method for installing concrete underground structures
KR100402437B1 (en) The construction method of cassion basis using a coagulant
KR20210043402A (en) The safty construction method of the side ditch using the hardening agent
JP3192661B2 (en) Novel sewage wall, method of forming the sewage wall, and members used therefor
JP2000045260A (en) Aseismatic natural ground reinforcing earth engineering method
KR101523948B1 (en) Construction method of underground structure under the established building
KR100333024B1 (en) Grouting Horizontal directional drilling method
JP3356083B2 (en) How to lay a conduit that penetrates the embankment without excavation
JP2005146756A (en) Earth retaining wall construction method and earth retaining wall formed thereby
KR200332284Y1 (en) Inside hollow of abandoned structure filling structure
JP3301936B2 (en) Non-cutting restoration method of service pipe at renewal of underground sewer
KR20030087288A (en) Executon method of wall for intercepting contamination zone of using steel sheet pile
CN103343539B (en) A kind of method of mountainous district subgrade repairing
JPH11241593A (en) Prevention method of ground collapse in shield method
CN111677025B (en) Underground passage repairing method
CN111549809A (en) Water stopping method for sinking geotextile and lapping to form water stopping curtain by sleeve method
Tueyot et al. Evaluation of jet grouting design and construction methods for TBM launching and arrival

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

St.27 status event code: A-0-1-A10-A12-nap-PA0109

PA0201 Request for examination

St.27 status event code: A-1-2-D10-D11-exm-PA0201

PG1501 Laying open of application

St.27 status event code: A-1-1-Q10-Q12-nap-PG1501

E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

St.27 status event code: A-1-2-D10-D21-exm-PE0902

P11-X000 Amendment of application requested

St.27 status event code: A-2-2-P10-P11-nap-X000

P13-X000 Application amended

St.27 status event code: A-2-2-P10-P13-nap-X000

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

St.27 status event code: A-1-2-D10-D22-exm-PE0701

GRNT Written decision to grant
PR0701 Registration of establishment

St.27 status event code: A-2-4-F10-F11-exm-PR0701

PR1002 Payment of registration fee

St.27 status event code: A-2-2-U10-U11-oth-PR1002

Fee payment year number: 1

PG1601 Publication of registration

St.27 status event code: A-4-4-Q10-Q13-nap-PG1601

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 4

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 5

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 6

FPAY Annual fee payment

Payment date: 20121120

Year of fee payment: 7

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 7

PN2301 Change of applicant

St.27 status event code: A-5-5-R10-R13-asn-PN2301

St.27 status event code: A-5-5-R10-R11-asn-PN2301

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20131104

Year of fee payment: 8

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 8

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20141104

Year of fee payment: 9

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 9

FPAY Annual fee payment

Payment date: 20151104

Year of fee payment: 10

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 10

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

FPAY Annual fee payment

Payment date: 20161104

Year of fee payment: 11

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 11

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

FPAY Annual fee payment

Payment date: 20171103

Year of fee payment: 12

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 12

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P22-X000 Classification modified

St.27 status event code: A-4-4-P10-P22-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

FPAY Annual fee payment

Payment date: 20181105

Year of fee payment: 13

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 13

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

FPAY Annual fee payment

Payment date: 20191104

Year of fee payment: 14

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 14

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 15

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 16

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

R18-X000 Changes to party contact information recorded

St.27 status event code: A-5-5-R10-R18-oth-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PR1001 Payment of annual fee

St.27 status event code: A-4-4-U10-U11-oth-PR1001

Fee payment year number: 17

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PC1903 Unpaid annual fee

St.27 status event code: A-4-4-U10-U13-oth-PC1903

Not in force date: 20231124

Payment event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

P14-X000 Amendment of ip right document requested

St.27 status event code: A-5-5-P10-P14-nap-X000

PC1903 Unpaid annual fee

St.27 status event code: N-4-6-H10-H13-oth-PC1903

Ip right cessation event data comment text: Termination Category : DEFAULT_OF_REGISTRATION_FEE

Not in force date: 20231124