JP3336788B2 - Lifting apparatus and lifting method for large structures - Google Patents

Lifting apparatus and lifting method for large structures

Info

Publication number
JP3336788B2
JP3336788B2 JP01000995A JP1000995A JP3336788B2 JP 3336788 B2 JP3336788 B2 JP 3336788B2 JP 01000995 A JP01000995 A JP 01000995A JP 1000995 A JP1000995 A JP 1000995A JP 3336788 B2 JP3336788 B2 JP 3336788B2
Authority
JP
Japan
Prior art keywords
balance
lifting
hook
wire
suspended
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP01000995A
Other languages
Japanese (ja)
Other versions
JPH08198575A (en
Inventor
良郎 溝口
Original Assignee
石川島播磨重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石川島播磨重工業株式会社 filed Critical 石川島播磨重工業株式会社
Priority to JP01000995A priority Critical patent/JP3336788B2/en
Publication of JPH08198575A publication Critical patent/JPH08198575A/en
Application granted granted Critical
Publication of JP3336788B2 publication Critical patent/JP3336788B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、大型構造物の据付作業
を行うに際して使用する吊上げ装置及び吊上げ方法に係
り、特に剛性が低く、変形し易い大型構造物の吊上げに
適した吊上げ装置及び吊上げ方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a lifting apparatus and a lifting method used for performing a work for installing a large structure, and more particularly to a lifting apparatus and a lifting method suitable for lifting a large structure which is low in rigidity and easily deformable. It is about the method.

【0002】[0002]

【従来の技術】図3は、従来の大型構造物の吊上げ装置
の一例を示す概略図である。図示するように、吊上げ装
置21は、吊り荷22となる大型構造物の全長と略等し
い長さの鋼材によって形成された天秤23と、この天秤
23の両端上部に取り付けられた吊上げワイヤ24と、
上記天秤23の両端下部に取り付けられた一対の吊り荷
ワイヤ25と、各吊り荷ワイヤ25の下端部に取り付け
たシャックル等の取付け金具(図示せず)とから成って
いる。
2. Description of the Related Art FIG. 3 is a schematic view showing an example of a conventional large-structure lifting apparatus. As shown in the drawing, the lifting device 21 includes a balance 23 formed of a steel material having a length substantially equal to the entire length of the large structure serving as the suspended load 22, a lifting wire 24 attached to upper ends of both ends of the balance 23,
It consists of a pair of suspended load wires 25 attached to the lower ends of both ends of the balance 23, and a mounting bracket (not shown) such as a shackle attached to the lower end of each suspended load wire 25.

【0003】従来、上記吊上げ装置21を使用した大型
構造物の据付作業は、次のような吊上げ方法により行わ
れていた。まず、吊り荷ワイヤ25の下端部の取付け金
具を吊り荷22に固定した門形状の取付け治具26に係
合すると共に、吊上げワイヤ24をクレーン等の重機か
ら吊下されるフック27に引っ掛ける。
Conventionally, the work of installing a large structure using the above-described lifting device 21 has been performed by the following lifting method. First, the mounting bracket at the lower end of the suspended load wire 25 is engaged with a gate-shaped mounting jig 26 fixed to the suspended load 22, and the lifting wire 24 is hooked on a hook 27 suspended from a heavy machine such as a crane.

【0004】次に、重機の巻取ワイヤ28を巻き上げて
吊上げ装置21を介して吊り荷22を吊り上げ、ブーム
を旋回又は伸縮させて吊り荷22を据付位置に上方に移
動させる。そして、巻取ワイヤ28を巻き戻して吊り荷
22を据付位置に着座させ、仮置き又は仮付け等してい
た。
[0004] Next, the take-up wire 28 of the heavy equipment is wound up, the suspended load 22 is lifted through the lifting device 21, and the boom is swung or extended to move the suspended load 22 upward to the installation position. Then, the take-up wire 28 is unwound and the suspended load 22 is seated at the installation position, and is temporarily placed or temporarily attached.

【0005】[0005]

【発明が解決しようとする課題】ところで、従来の大型
構造物の吊上げ装置及び吊上げ方法は、剛性が高く、変
形し難い吊り荷22の据付作業には適するが、剛性が低
く、変形し易い吊り荷22の据付作業には適さないとい
う問題があった。
The conventional apparatus and method for lifting large structures have high rigidity and are suitable for the installation work of the suspended load 22 which is difficult to deform, but has low rigidity and is easily deformable. There was a problem that it was not suitable for installation work of the load 22.

【0006】即ち、タンクの屋根板のように板厚が5m
m〜8mm程度の薄板を吊り上げる場合には、屋根板が
撓んで変形し易く、予め付与した曲率が損なわれる。
[0006] That is, the thickness is 5 m like a roof plate of a tank.
When a thin plate of about m to 8 mm is lifted, the roof plate is easily bent and deformed, and the curvature given in advance is impaired.

【0007】特に、図4に示すように、地下タンク29
の底部29a上で架台30やルーフラフタを組み立て、
これに沿って吊り荷22である屋根板を仮付けする場合
には、架台30の曲率に合せて屋根板24を傾斜させる
必要があるが、上記吊上げ装置21及び吊上げ方法では
屋根板24を傾斜させて吊り上げることは実質的にでき
なかった。
In particular, as shown in FIG.
Assemble the gantry 30 and the roof raft on the bottom 29a of the
When the roof plate as the suspended load 22 is temporarily attached along this, it is necessary to incline the roof plate 24 in accordance with the curvature of the gantry 30, but in the above-described lifting device 21 and the lifting method, the roof plate 24 is tilted. It was virtually impossible to lift it.

【0008】かかる場合に、吊り荷ワイヤ25の長さや
吊り点を変化させれば屋根板24を傾斜させることがで
きるが、傾斜角度が可変ではないため、現場における据
付作業には適さない。
In such a case, the roof plate 24 can be inclined by changing the length or the hanging point of the suspended load wire 25. However, since the inclination angle is not variable, it is not suitable for installation work on site.

【0009】本発明の目的は、上記課題に鑑み、剛性が
低く、変形し易い大型構造物の据付作業に際して、大型
構造物を変形させることなく、傾斜させて吊り上げるこ
とができる大型構造物の吊上げ装置及び吊上げ方法を提
供することにある。
SUMMARY OF THE INVENTION In view of the above problems, an object of the present invention is to lift a large structure that can be slanted and lifted without deforming the large structure during installation work of a large structure that is low in rigidity and easily deformable. An object is to provide an apparatus and a lifting method.

【0010】[0010]

【課題を解決するための手段】上記目的を達成すべく、
本発明に係る大型構造物の吊上げ装置は、重機から繰り
出されるフックと、大型構造物である吊り荷との間に介
設して吊り荷を吊り上げ、これを据付位置に着座させる
大型構造物の吊上げ装置において、上記大型構造物を支
持するに足りる剛性を有する材料で形成された天秤と、
この天秤から吊下され吊り荷に接続される複数の同一長
さの吊り荷ワイヤと、上記天秤の一端部と中央部とに掛
け渡たされた吊上げワイヤと、この吊上げワイヤの中間
部を支承する滑車と、この滑車を吊り上げる第1のフッ
クと上記天秤の他端部間に緩く連結され控えワイヤと、
上記重機から第1のフックとは別に繰り出され、上記他
端部を吊り下げて天秤を傾動するための第2のフックと
を備えているものである。
In order to achieve the above object,
The lifting device for a large structure according to the present invention is a lifting device for a large structure in which a suspended load is lifted by being interposed between a hook fed from a heavy machine and a suspended load which is a large structure, and the lifting load is seated at an installation position. In the lifting device, a balance formed of a material having sufficient rigidity to support the large structure,
A plurality of suspended load wires of the same length that are suspended from the balance and connected to the suspended load, a lifting wire that extends over one end and the center of the balance, and an intermediate portion of the lifting wire are supported. A pulley, a first hook for lifting the pulley, and a staying wire loosely connected between the other end of the balance and a first hook;
A second hook is extended from the heavy equipment separately from the first hook, and is used to suspend the other end and tilt the balance.

【0011】上記吊上げ装置の構成において、上記吊り
荷ワイヤが、大型構造物の撓みを防止するに足りる本数
だけ天秤に吊下されているものである。
In the construction of the lifting device, the suspended load wires are suspended on the balance by a sufficient number to prevent bending of a large-sized structure.

【0012】また、本発明に係る大型構造物の吊上げ方
法は、重機から繰り出されるフックに吊上げ装置を吊下
し、この吊上げ装置を介して大型構造物である吊り荷を
吊り上げ、これを据付位置に着座させる大型構造物の吊
上げ方法において、上記吊上げ装置を構成する天秤の一
端部と中央部とに掛け渡たされた吊上げワイヤの中間部
を支承する滑車を第1のフックで吊り上げると共に、こ
の第1のフックと上記天秤の他端部とを延出され控えワ
イヤで緩く連結し、その他端部を第2のフックで吊り上
げて天秤を傾斜させるものである。
Further, in the method of lifting a large structure according to the present invention, a lifting device is hung on a hook fed out from a heavy machine, a lifting load as a large structure is lifted via the lifting device, and the lifting position is set. In the method of lifting a large structure to be seated on a pulley, a pulley that supports an intermediate portion of a lifting wire that is bridged between one end and a central portion of the balance constituting the lifting device is lifted by a first hook, and The first hook and the other end of the balance are extended and loosely connected by a stay wire, and the other end is lifted by the second hook to tilt the balance.

【0013】上記吊上げ方法の構成において、上記大型
構造物を、その撓みを防止するに足りる本数で且つそれ
ぞれ同一長さの吊り荷ワイヤで天秤から吊下するもので
ある。
In the above construction of the lifting method, the large-sized structure is suspended from the balance by a suspended load wire having a sufficient number of wires for preventing bending and having the same length.

【0014】[0014]

【作用】上記吊上げ装置の構成によれば、大型構造物で
ある吊り荷は、天秤から複数の吊り荷ワイヤによって吊
下されている。この天秤の一端部と中央部とに掛け渡た
された吊上げワイヤの中央部を支承する滑車は、クレー
ン等の重機から繰り出される第1のフックによって吊り
上げられる。一方、この第1のフックから上記天秤の他
端部を介して延出される控えワイヤは、ゆるく接続され
る。また第2のフックは天秤の他端部を吊りワイヤを介
し吊り上げられる。このように第1のフック及び第2の
フックで吊上げワイヤ、吊りワイヤと控えワイヤとを吊
り上げることにより、天秤に支持された吊り荷が合吊り
される。
According to the construction of the lifting device, a suspended load, which is a large structure, is suspended from the balance by a plurality of suspended wires. A pulley that supports a central portion of a lifting wire that is bridged between one end and a central portion of the balance is lifted by a first hook pulled out from a heavy machine such as a crane. On the other hand, a stay wire extending from the first hook through the other end of the balance is loosely connected. The second hook is lifted at the other end of the balance via a hanging wire. As described above, the lifting wire, the lifting wire, and the holding wire are lifted by the first hook and the second hook, so that the suspended load supported by the balance is suspended.

【0015】この状態で、第1のフックを上昇させる
と、第1のフックの上昇移動が控えワイヤによって規制
されるので、上記天秤の他端部を支点として天秤が傾斜
し、この天秤に吊下した吊り荷も傾斜することになる。
In this state, when the first hook is raised, the rising movement of the first hook is restricted by the restraining wire, so that the balance is inclined with the other end of the balance as a fulcrum, and the balance is suspended from the balance. The suspended load will also be inclined.

【0016】また、上記天秤に、大型構造物の撓みを防
止するに足りる同一長さで複数の吊り荷ワイヤを吊下す
れば、剛性が低く変形し易い大型構造物を、変形させる
ことなく、所望の傾斜角度に合せて傾斜させて吊り上げ
ることができるものである。
Further, if a plurality of hanging load wires are suspended on the balance with the same length enough to prevent the bending of the large-sized structure, the large-sized structure having low rigidity and being easily deformed can be deformed without being deformed. It can be lifted by being inclined in accordance with a desired inclination angle.

【0017】一方、上記吊上げ方法の構成によれば、ま
ず、クレーン等の重機から繰り出される第1のフックに
よって、吊上げ装置を構成する天秤の一端部と中央部と
に掛け渡たされた吊上げワイヤの中央部を支承する滑車
を吊り上げる。これと共に、天秤の他端部を介して延出
された控えワイヤを吊り上げる。また、天秤の他端部を
吊りワイヤを介し第2のフックで吊り上げる。また、天
秤の他端部を吊りワイヤを介し第2のフックで吊り上げ
る。このようにして第1のフック及び第2のフックによ
り吊上げワイヤと控えワイヤとを吊り上げ、天秤に支持
された吊り荷を合吊りする。次に、第1のフックを上昇
させると、第1のフックの上昇移動が控えワイヤによっ
て規制され、上記天秤の他端部を支点として天秤が傾斜
することになり、これに吊下した吊り荷も傾斜するもの
である。次に、重機のブームを旋回又は伸縮して、第1
のフック及び第2のフックを移動し、吊り荷を据付位置
の上方に位置させる。
On the other hand, according to the construction of the above-mentioned lifting method, first, the first hook pulled out from a heavy machine such as a crane or the like, the lifting wire extended over one end and the center of the balance constituting the lifting device. Hoist the pulley that supports the center of the car. At the same time, the stay wire extending through the other end of the balance is lifted. Further, the other end of the balance is lifted by the second hook via the hanging wire. Further, the other end of the balance is lifted by the second hook via the hanging wire. In this way, the lifting wire and the holding wire are lifted by the first hook and the second hook, and the suspended load supported by the balance is suspended. Next, when the first hook is raised, the upward movement of the first hook is restricted by the restraining wire, and the balance is tilted with the other end of the balance as a fulcrum, and the suspended load suspended on the balance is inclined. Is also inclined. Next, the boom of the heavy equipment is swung or expanded and contracted to
And the second hook are moved to position the suspended load above the installation position.

【0018】また、上記大型構造物を吊り上げる際に、
大型構造物を、その撓みを防止するに足りる同一長さの
本数の吊り荷ワイヤで天秤から吊下すれば、剛性が低く
変形し易い大型構造物を、変形させることなく、所望の
傾斜角度に合せて傾斜させて吊り上げることができるも
のである。
Further, when lifting the large-sized structure,
If a large structure is suspended from the balance with the same number of hanging load wires of sufficient length to prevent its deflection, a large structure with low rigidity and easy deformation can be formed at a desired inclination angle without deformation. It can be lifted by being inclined together.

【0019】[0019]

【実施例】以下、本発明に係る大型構造物の吊上げ装置
及び吊上げ方法の好適実施例を添付図面に基づいて詳述
する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of a lifting apparatus and a lifting method for a large structure according to the present invention will be described below in detail with reference to the accompanying drawings.

【0020】図1は、本発明に係る大型構造物の吊上げ
装置の一実施例を示す概略図である。図示するように、
本実施例の吊上げ装置1は、クレーン等の重機から繰り
出される巻取ワイヤ15に取り付けられたフック2及び
巻取ワイヤ17に取り付けられたフック3と、大型構造
物4との間に介設して大型構造物4を吊り上げるもので
ある。
FIG. 1 is a schematic view showing one embodiment of a large structure lifting apparatus according to the present invention. As shown
The lifting device 1 of the present embodiment is interposed between a large structure 4 and a hook 2 attached to a winding wire 15 and a hook 3 attached to a winding wire 17 that are fed out from a heavy machine such as a crane. To lift the large structure 4.

【0021】この吊上げ装置1の本体である天秤5は、
大型構造物4を支持するに足りる剛性を有する材料、例
えばH鋼材やチャンネル鋼材等によって形成されてい
る。この天秤5は、大型構造物4の全長と略等しい長さ
を有しており、本実施例にあっては大型構造物4として
タンクの屋根板を採用するので、屋根板の曲率に合せて
その下面が湾曲凹状に形成されている。
The balance 5 which is the main body of the lifting device 1
It is formed of a material having sufficient rigidity to support the large structure 4, for example, an H steel material or a channel steel material. The balance 5 has a length substantially equal to the entire length of the large structure 4. In this embodiment, since the roof plate of the tank is adopted as the large structure 4, the scale 5 is adjusted to the curvature of the roof plate. The lower surface is formed in a curved concave shape.

【0022】また、この天秤5の下面には、複数の吊り
荷ワイヤ6が吊下されている。本実施例にあっては、天
秤5の下面の両端部及び中央部にそれぞれ1対、合計6
本の吊り荷ワイヤ6が吊下されており、これら吊り荷ワ
イヤ6には同一長さのものが使用される。各吊り荷ワイ
ヤ6の下端部にはシャックル等の取付け金具(図示せ
ず)が取り付けられており、この取付け金具は屋根板と
しての大型構造物4に仮付けされた門形状の取付け治具
7に係合される。
A plurality of suspended load wires 6 are suspended from the lower surface of the balance 5. In this embodiment, one pair is provided at both ends and the center of the lower surface of the balance 5 for a total of 6
The hanging load wires 6 are suspended, and the hanging wires 6 having the same length are used. A mounting bracket (not shown) such as a shackle is attached to the lower end of each hanging load wire 6. The mounting bracket is a gate-shaped mounting jig 7 temporarily attached to the large structure 4 as a roof panel. Is engaged.

【0023】尚、本実施例にあっては、上記天秤5に6
本の吊り荷ワイヤ6を吊下したが、この本数に限るもの
ではなく、タンクの屋根板等の大型構造物4の撓みを防
止するに足りる本数及び吊り点を電子計算機により適宜
算出して設定される。また、本実施例にあっては、各吊
り荷ワイヤ6の下端部に取り付けた取付け金具を大型構
造物4に仮付けした取付け治具7に係合させるように構
成したが、これに限るものではなく、上記取付け治具7
に各吊り荷ワイヤ6を直接係合させても良い。
In the present embodiment, the balance 5
Although the suspended load wires 6 were suspended, the number is not limited to the number, and the number and suspension points sufficient to prevent bending of the large structure 4 such as a roof plate of a tank are appropriately calculated and set by an electronic computer. Is done. Further, in the present embodiment, the mounting bracket attached to the lower end of each hanging load wire 6 is configured to be engaged with the mounting jig 7 temporarily attached to the large-sized structure 4, but is not limited thereto. Not the mounting jig 7
Each hanging load wire 6 may be directly engaged.

【0024】上記天秤5の上面の一端部と中央部とに
は、これらの間隔よりも十分に長い吊上げワイヤ8が掛
け渡たされている。即ち、この吊上げワイヤ8の一端部
は天秤5の上面一端部の取付け金具9に取り付けられ、
その他端部は天秤5の上面中央部の取付け金具10に取
り付けられている。そして、この吊上げワイヤ8の中央
部乃至中間部は滑車11によって支承されるようになっ
ており、この滑車11はクレーン等の重機から繰り出さ
れる第1のフック2によって吊り上げられる。本実施例
には2台の重機が使用され、この第1のフック2は一方
の重機から繰り出される。
A lifting wire 8 that is sufficiently longer than the space between these ends is wrapped around one end and the center of the upper surface of the balance 5. That is, one end of the lifting wire 8 is attached to the mounting bracket 9 at one end of the upper surface of the balance 5,
The other end is attached to a mounting bracket 10 at the center of the upper surface of the balance 5. The center to intermediate portion of the lifting wire 8 is supported by a pulley 11, and the pulley 11 is lifted by a first hook 2 fed from a heavy machine such as a crane. In this embodiment, two heavy machines are used, and the first hook 2 is extended from one of the heavy machines.

【0025】また、上記天秤5の他端側には、上記第1
のフック2から天秤5の上面他端部に設けた金具13間
に図示の実線で示すよう天秤5の最大傾斜を規制する控
えワイヤ12が連結される。この金具13は吊りワイヤ
18を介して他の重機の第2のフック3によって吊り上
げられる。控えワイヤ12の基端部は第1のフック2に
引っ掛けられており、その他端が天秤5の上面他端部の
取付け金具13に緩んだ状態で連結されることで、天秤
5が滑車11を中心に傾動できると共にその最大傾斜を
控えワイヤ12が規制するようになっている。
The other end of the balance 5 is provided with the first
As shown by a solid line in the drawing, a stay wire 12 for regulating the maximum inclination of the balance 5 is connected between the hook 2 and the metal fitting 13 provided at the other end of the upper surface of the balance 5. This metal fitting 13 is lifted by the second hook 3 of another heavy equipment via the hanging wire 18. The base end of the stay wire 12 is hooked on the first hook 2, and the other end is loosely connected to the mounting bracket 13 at the other end of the upper surface of the balance 5, so that the balance 5 connects the pulley 11. The wire 12 can be tilted to the center and the wire 12 restricts the maximum tilt.

【0026】尚、本実施例にあっては、2台の重機を使
用し、第1のフック2と第2のフック3とを別個の重機
から繰り出すように構成したが、これに限るものではな
く、1台の重機から親フックと子フックとを繰り出し
て、第1のフック2及び第2のフック3として使用して
も良い。
In this embodiment, two heavy machines are used, and the first hook 2 and the second hook 3 are extended from separate heavy machines. However, the present invention is not limited to this. Instead, the parent hook and the child hook may be extended from one heavy machine and used as the first hook 2 and the second hook 3.

【0027】次に、上記実施例の吊上げ装置1における
作用を、本発明に係る大型構造物の吊上げ方法とともに
説明する。本実施例の吊上げ方法は、上述した吊上げ装
置1を使用して行うものであり、まず、一方の重機から
繰り出される第1のフック2によって、上記天秤5の一
端部と中央部とに掛け渡した吊上げワイヤ8の中央部乃
至中間部を支承する滑車11を吊り上げる。
Next, the operation of the lifting apparatus 1 of the above embodiment will be described together with the method of lifting a large structure according to the present invention. The lifting method according to the present embodiment is performed using the above-described lifting device 1. First, the lifting method is extended between one end and the center of the balance 5 by the first hook 2 fed from one heavy machine. The pulley 11 that supports the central part to the intermediate part of the lifted wire 8 is lifted.

【0028】この状態で大型構造物4を傾けるには他方
の重機から繰り出される第2のフック3によって吊りワ
イヤ18を引き下げるか、第1のフック2を持ち上げて
控えワイヤ12がピンと張るようにすることで任意の角
度に傾斜できる。
In order to tilt the large structure 4 in this state, the suspension wire 18 is pulled down by the second hook 3 fed from the other heavy machine, or the first hook 2 is lifted so that the holding wire 12 is taut. By doing so, it can be tilted to any angle.

【0029】次に、重機のブームを旋回又は伸縮して、
第1のフック2を移動し、傾斜させた大型構造物4を据
付位置の上方に位置させる。例えば、地下タンクの屋根
板の組立作業を行う場合には、図2に示すように、地下
タンク14の底部14aで大型構造物4を仮組すること
が多いので、第1のフック2によって、大型構造物4を
地下タンク14の底部14a直上に位置させる。
Next, the boom of the heavy equipment is swiveled or expanded and contracted.
The first hook 2 is moved to position the inclined large structure 4 above the installation position. For example, when assembling a roof plate of an underground tank, as shown in FIG. 2, the large structure 4 is often temporarily assembled at the bottom 14 a of the underground tank 14. The large structure 4 is located directly above the bottom 14 a of the underground tank 14.

【0030】第2のフック3を上下させると上記天秤5
が滑車11を支点として回動し傾斜することになる。各
吊り荷ワイヤ6は常に重力方向へ垂下されるので、天秤
5、大型構造物4及び吊り荷ワイヤ6は全体として平行
四辺形状を呈し、天秤5に吊下した大型構造物4もその
傾斜角度に沿って傾斜することになる。
When the second hook 3 is moved up and down, the balance 5
Turns around the pulley 11 and tilts. Since each suspended load wire 6 always hangs in the direction of gravity, the balance 5, the large structure 4 and the suspended load wire 6 have a parallelogram shape as a whole, and the large structure 4 suspended on the balance 5 also has an inclination angle. Will be inclined along.

【0031】また、本実施例にあっては、大型構造物の
撓みを防止するに足りる本数の吊り荷ワイヤ6で大型構
造物4を吊下しており、かつ各吊り荷ワイヤ6の長さが
均一化されているので、大型構造物4のように剛性が低
く変形し易い大型構造物を、変形させることなく、所望
の傾斜角度に合せて傾斜させて吊り上げることができ
る。
Further, in this embodiment, the large structure 4 is suspended by the number of hanging wires 6 sufficient to prevent the bending of the large structure, and the length of each hanging wire 6 Is uniform, a large-sized structure having a low rigidity and easily deformable like the large-sized structure 4 can be lifted without being deformed and inclined in accordance with a desired inclination angle.

【0032】即ち、地下タンク14の底部14aに仮組
した架台16やルーフラフタの傾斜角度に合せて大型構
造物4を傾斜させることができ、大型構造物4を変形さ
せることなく、その組立作業を効率良く行うことができ
るものである。
That is, the large structure 4 can be inclined according to the inclination angle of the gantry 16 and the roof raft temporarily assembled on the bottom 14a of the underground tank 14, and the assembling work can be performed without deforming the large structure 4. It can be performed efficiently.

【0033】さらに、本実施例の吊上げ装置1及び吊上
げ方法によれば、剛性が低く変形し易い大型構造物を、
変形させることなく、水平移動することができ、かつ所
望の傾斜角度に合せて傾斜させて吊り上げることができ
るので、傾斜させた架台16上に仮置する必要がない。
Further, according to the lifting device 1 and the lifting method of the present embodiment, a large structure having low rigidity and easily deformable
Since it can be moved horizontally without being deformed, and can be lifted while being tilted to a desired tilt angle, it is not necessary to temporarily place it on the tilted base 16.

【0034】[0034]

【発明の効果】以上述べたように、本発明に係る大型構
造物の吊上げ装置及び吊上げ方法によれば、剛性が低
く、変形し易い大型構造物の据付作業に際して、大型構
造物を変形させることなく、傾斜させて吊り上げること
ができるという優れた効果を発揮する。
As described above, according to the apparatus and method for lifting a large structure according to the present invention, the large structure is deformed during the installation work of the large structure which is low in rigidity and easily deformable. In addition, it has an excellent effect that it can be lifted while being inclined.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る大型構造物の吊上げ装置の一実施
例を示す概略図である。
FIG. 1 is a schematic view showing an embodiment of a large structure lifting apparatus according to the present invention.

【図2】本実施例の大型構造物の吊上げ装置及び吊上げ
方法を使用した地下タンクの屋根板の組立作業を示す概
略図である。
FIG. 2 is a schematic view showing an assembling operation of a roof plate of an underground tank using the lifting device and the lifting method for a large structure according to the present embodiment.

【図3】従来の大型構造物の吊上げ装置の一例を示す概
略図である。
FIG. 3 is a schematic diagram showing an example of a conventional large-structure lifting apparatus.

【図4】従来の大型構造物の吊上げ装置及び吊上げ方法
を使用した地下タンクの屋根板の組立作業を示す概略図
である。
FIG. 4 is a schematic view showing an assembling operation of a roof plate of an underground tank using a conventional large-structure lifting apparatus and method.

【符号の説明】[Explanation of symbols]

1 吊上げ装置 2 第1のフック 3 第2のフック 4 吊り荷 5 天秤 6 吊り荷ワイヤ 7 取付け治具 8 吊上げワイヤ 9 取付け金具 10 取付け金具 11 滑車 12 控えワイヤ 13 取付け金具 14 地下タンク 14a 底部 15 巻取ワイヤ 16 架台 17 巻取ワイヤ 18 吊りワイヤ DESCRIPTION OF SYMBOLS 1 Lifting device 2 1st hook 3 2nd hook 4 Hanging load 5 Balance 6 Hanging wire 7 Mounting jig 8 Lifting wire 9 Mounting bracket 10 Mounting bracket 11 Pulley 12 Standing wire 13 Mounting bracket 14 Underground tank 14a Bottom part 15 winding Take-off wire 16 Mount 17 Take-up wire 18 Hanging wire

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B66C 1/10 B66C 13/08 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) B66C 1/10 B66C 13/08

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 重機から繰り出されるフックと、大型構
造物である吊り荷との間に介設して吊り荷を吊り上げ、
これを据付位置に着座させる大型構造物の吊上げ装置に
おいて、上記大型構造物を支持するに足りる剛性を有す
る材料で形成された天秤と、該天秤から吊下され吊り荷
に接続される複数の吊り荷ワイヤと、上記天秤の一端部
と中央部とに掛け渡たされた吊上げワイヤと、該吊上げ
ワイヤの中間部を支承する滑車と、該滑車を吊り上げる
第1のフックと上記天秤の他端部間に緩く連結される控
えワイヤと、上記重機から第1のフックとは別に繰り出
され、上記他端部を吊り下げて天秤を傾動するための第
2のフックとを備えていることを特徴とする大型構造物
の吊上げ装置。
1. A suspended load, which is interposed between a hook fed out from a heavy machine and a suspended load which is a large-sized structure,
In a lifting device for a large structure, which is seated at an installation position, a balance formed of a material having sufficient rigidity to support the large structure, and a plurality of suspensions suspended from the balance and connected to a suspended load. A load wire, a lifting wire spanned between one end and the center of the balance, a pulley for supporting an intermediate portion of the lifting wire, a first hook for lifting the pulley, and the other end of the balance. A stay wire loosely connected therebetween, and a second hook which is fed out of the heavy equipment separately from the first hook, and suspends the other end to tilt the balance. Equipment for lifting large structures.
【請求項2】 上記天秤の下面が構造物と同一形状に形
成され上記吊り荷ワイヤが、大型構造物の撓みを防止す
るに足りる本数で、且つそれぞれ同一の長さで天秤に吊
下されている請求項1に記載の大型構造物の吊上げ装
置。
2. A lower surface of the balance is formed in the same shape as a structure, and the number of the suspended load wires is sufficient to prevent bending of a large-sized structure, and each of the suspended wires is suspended by the balance with the same length. The lifting device for a large structure according to claim 1.
【請求項3】 重機から繰り出されるフックに吊上げ装
置を吊下し、この吊上げ装置を介して大型構造物である
吊り荷を吊り上げ、これを据付位置に着座させる大型構
造物の吊上げ方法において、上記吊上げ装置を構成する
天秤の一端部と中央部とに掛け渡たされた吊上げワイヤ
の中間部を支承する滑車を第1のフックで吊り上げると
共に、該第1のフックと上記天秤の他端部とを延出され
控えワイヤで緩く連結し、その他端部を第2のフックで
吊り上げて、天秤を傾動させることを特徴とする大型構
造物の吊上げ方法。
3. A method for lifting a large structure, comprising: suspending a lifting device on a hook fed from a heavy machine, lifting a suspended load as a large structure via the lifting device, and seating the suspended load at an installation position. A pulley that supports an intermediate portion of a lifting wire bridged between one end and a central portion of a balance constituting a lifting device is lifted by a first hook, and the first hook and the other end of the balance are lifted. And lifting the other end with a second hook, and tilting the balance to lift the balance.
【請求項4】 上記大型構造物を、その撓みを防止する
に足りる本数の吊り荷ワイヤで天秤から吊下する請求項
3に記載の大型構造物の吊上げ方法。
4. The method of lifting a large structure according to claim 3, wherein the large structure is suspended from a balance with a sufficient number of hanging load wires to prevent the bending of the large structure.
JP01000995A 1995-01-25 1995-01-25 Lifting apparatus and lifting method for large structures Expired - Fee Related JP3336788B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP01000995A JP3336788B2 (en) 1995-01-25 1995-01-25 Lifting apparatus and lifting method for large structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP01000995A JP3336788B2 (en) 1995-01-25 1995-01-25 Lifting apparatus and lifting method for large structures

Publications (2)

Publication Number Publication Date
JPH08198575A JPH08198575A (en) 1996-08-06
JP3336788B2 true JP3336788B2 (en) 2002-10-21

Family

ID=11738410

Family Applications (1)

Application Number Title Priority Date Filing Date
JP01000995A Expired - Fee Related JP3336788B2 (en) 1995-01-25 1995-01-25 Lifting apparatus and lifting method for large structures

Country Status (1)

Country Link
JP (1) JP3336788B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103241649B (en) * 2013-05-16 2015-03-11 中国十七冶集团有限公司 Method for hoisting drawing head of drawing machine
CN109607382B (en) * 2018-12-28 2020-02-11 湖北航天技术研究院总体设计所 Overturning suspension device for projectile body vertical modal test and using method
CN112707355B (en) * 2020-12-09 2022-08-12 河南平高电气股份有限公司 Turnover tool for transferring spring operating mechanism

Also Published As

Publication number Publication date
JPH08198575A (en) 1996-08-06

Similar Documents

Publication Publication Date Title
JP5818533B2 (en) Jig for lifting a structure with a crane
JP3336788B2 (en) Lifting apparatus and lifting method for large structures
JP3255733B2 (en) PC board lifting device
JPH10273279A (en) Cross stretching device for steel pipe suspension rope
JPH08218641A (en) Method of standing up pillar member in the air and device therefor
JPH09227069A (en) Hung-moving method and device therefor
JP2987374B2 (en) Column material erecting method and device
JPH047292A (en) Elevator equipment
JP3107363B2 (en) Hanging type lifting device
JP2914629B2 (en) Heavy lifting equipment
JP7113577B1 (en) Bottom leveling device
JP2002053290A (en) Jib crane
JP3779510B2 (en) Heavy lifting
JPH10236767A (en) Automatic aligning hoisting accessory and hoisting method using this hoisting accessory
JPH078543Y2 (en) Jib crane
JP3185533B2 (en) Positioning device for rack construction
JP3811419B2 (en) Building material lifting device and building material lifting method
JP3268195B2 (en) Suspension structure for long members and crane boom suspension structure
JPH10273289A (en) Cane suspension type power hoisting device
JPH08144530A (en) Suspending jig of outer wall member
JPH0558588A (en) Device for installing mast holder of tower crane
JP4708067B2 (en) Crane equipment
JP2004331348A (en) Installing method for elevator
JP2543552Y2 (en) Jib crane
JP3234125B2 (en) Hanging jig for heavy object moving device

Legal Events

Date Code Title Description
S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070809

Year of fee payment: 5

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080809

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080809

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090809

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100809

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100809

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110809

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110809

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120809

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120809

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130809

Year of fee payment: 11

LAPS Cancellation because of no payment of annual fees