JP3255733B2 - PC board lifting device - Google Patents

PC board lifting device

Info

Publication number
JP3255733B2
JP3255733B2 JP29625192A JP29625192A JP3255733B2 JP 3255733 B2 JP3255733 B2 JP 3255733B2 JP 29625192 A JP29625192 A JP 29625192A JP 29625192 A JP29625192 A JP 29625192A JP 3255733 B2 JP3255733 B2 JP 3255733B2
Authority
JP
Japan
Prior art keywords
board
hook
hanging
rope
streaks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP29625192A
Other languages
Japanese (ja)
Other versions
JPH06144774A (en
Inventor
秀明 近藤
Original Assignee
豊田総建株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 豊田総建株式会社 filed Critical 豊田総建株式会社
Priority to JP29625192A priority Critical patent/JP3255733B2/en
Publication of JPH06144774A publication Critical patent/JPH06144774A/en
Application granted granted Critical
Publication of JP3255733B2 publication Critical patent/JP3255733B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明はプレキャストコンクリー
ト製の壁板や床板等(以下PC板という)の吊り上げ装
置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a device for lifting precast concrete wall plates and floor plates (hereinafter referred to as PC plates).

【0002】[0002]

【従来の技術】従来、ベッド上で成型されたPC板を脱
型、建起し、吊り移動する吊り上げ装置として、図6に
示すように、天秤材1に、同長の複数本の吊りロープ
2,3,4を固着垂設し、夫々の下端に吊りフック2
a,3a,4aを備え、該各吊りフック2a,3a,4
aをPC板5に突設したフック筋6,7,8に引っ掛
け、天秤材1に備えたワイヤ9をホイスト等で巻き上げ
てPC板5を脱型、建起し、吊上げ移動するようにした
ものがある。尚、図中3bはチェーンブロックである。
2. Description of the Related Art Conventionally, as a lifting device for removing, erecting, and moving a PC board formed on a bed, as shown in FIG. 2, 3 and 4 are fixedly attached and suspended.
a, 3a, 4a, and each of the hanging hooks 2a, 3a, 4
a was hooked on hook studs 6, 7, and 8 protruding from the PC board 5, and the wire 9 provided on the balance material 1 was wound up by a hoist or the like, so that the PC board 5 was detached, erected, and lifted. There is something. In the figure, 3b is a chain block.

【0003】[0003]

【発明が解決しようとする課題】ところで、PC板に
は、例えば図6に示すように、PC板5の一部に、壁高
が高い部分5aを有する異形のものがある。
By the way, as shown in FIG. 6, for example, as the PC board, there is an irregularly shaped PC board having a portion 5a having a high wall height in a part of the PC board 5.

【0004】このような異形のPC板5を前記従来の吊
り上げ装置で建起すと次のような問題がある。尚、各吊
りロープ2,3,4のPC板5に対する掛け位置は、図
6に示すように、2本の吊りロープ2,3を低い壁の上
辺にあるフック筋6,7とし、他の1本の吊りロープ4
を高い壁部分5aの上辺のフック筋8に掛けるものとす
る。
[0004] When such a modified PC board 5 is erected by the above-mentioned conventional lifting device, the following problem arises. As shown in FIG. 6, the hanging positions of the hanging ropes 2, 3, and 4 with respect to the PC board 5 are such that the two hanging ropes 2, 3 are hook streaks 6, 7 on the upper side of the low wall, and other One hanging rope 4
On the hook streaks 8 on the upper side of the high wall portion 5a.

【0005】図7において、ベッド上に横たわっている
PC板5Aに各吊りロープ2,3,4を掛けた状態で
は、各フック筋6,7,8から天秤材1Aまでの高さ
(距離)は同一であり、吊りロープ2,3と壁高の高い
部分5aの吊りロープ4が図のように、同一の張り状態
になっている。
In FIG. 7, when the hanging ropes 2, 3, and 4 are hung on the PC board 5A lying on the bed, the height (distance) from the hook streaks 6, 7, 8 to the balance material 1A is set. Are the same, and the hanging ropes 2 and 3 and the hanging rope 4 of the portion 5a having a high wall height are in the same tension state as shown in the figure.

【0006】しかし、この状態で天秤材1をホイスト1
0aで吊上げると共にクレーン10で移動させてPC板
を5Bの傾斜状態に建起すと、フック筋8から天秤材1
Bまでの高さが、フック筋6,7から天秤材1Bまでの
高さよりも短くなり、これらに段差Hを生じる。
However, in this state, the balance material 1 is
When the PC board is lifted at 0a and moved by the crane 10 to erect the PC board in an inclined state of 5B, the balance 1
The height to B becomes shorter than the height from the hook streaks 6 and 7 to the balance material 1B, and a step H occurs in these.

【0007】そのため、吊りロープ2,3は緊張状態に
なるが他の吊りロープ4は図のように遊びたるみ、高い
壁部分5aのフック筋8に荷重負担がなくなり、若令P
C板においては高い壁部分5aが下方へ反り、PC板が
変形してクラックCが発生する問題がある。
As a result, the hanging ropes 2 and 3 become tensioned, but the other hanging ropes 4 play loose as shown in the figure, and the load on the hook streaks 8 of the high wall portion 5a is eliminated, and the young P
In the C plate, there is a problem that the high wall portion 5a is warped downward, and the PC plate is deformed and cracks C are generated.

【0008】更に、PC板が図7の5Cで示すように鉛
直状態に建起されると、吊りロープ4は更にたるみ、こ
の状態でベッドから吊り上げられると、図6に示すよう
に、PC板は2本の吊りロープ2,3のみで支持され
る。そのため、図6においてフック筋7より右側の部分
の壁は、フック筋7で支持された片持構造となり、フッ
ク筋7部に過大な負担荷重が作用して、PC板にクラッ
クCが発生する問題がある。
Further, when the PC board is erected in a vertical state as shown by 5C in FIG. 7, the hanging rope 4 further slackens. When the PC board is lifted from the bed in this state, as shown in FIG. Is supported only by two suspension ropes 2 and 3. Therefore, the wall on the right side of the hook streaks 7 in FIG. 6 has a cantilever structure supported by the hook streaks 7, and an excessive load is applied to the hook streaks 7 to generate cracks C on the PC board. There's a problem.

【0009】また、上記のような異形のPC板ではな
く、図8に示すように、全長に亘って同一壁高の通常の
PC板であっても、その各フック筋の6,7,8の突出
長を完全に一致させることが困難であり、該各フック筋
の突出長に不揃いが生じる。
Further, as shown in FIG. 8, instead of the above-mentioned irregularly shaped PC board, even if it is a normal PC board having the same wall height over its entire length, the 6, 7, 8 It is difficult to completely match the protruding lengths of the hook streaks, and the protruding lengths of the hook streaks are irregular.

【0010】このような不揃いがあると、前記のように
ベッドに接着したPC板を、その接着力に抗して建起す
場合、突出長の長いフック筋、例えば図8のフック筋7
の吊りロープ3に遊びが生じ、図のようなクラックCが
発生する。
If the PC board adhered to the bed as described above is erected against the adhesive force due to such irregularities, a hook streak having a long protruding length, for example, the hook streak 7 shown in FIG.
Play occurs in the suspension rope 3, and a crack C as shown in FIG.

【0011】そのため、従来、図8のように中央の吊り
ロープ3にチェーンブロック3bを備え、上記のように
各フック筋6,7,8の突出長が不揃いの場合に、チェ
ーンブロック3bを操作してその吊りロープ3の全長を
調整し、クラックが発生しないようにしている。
Conventionally, as shown in FIG. 8, a chain block 3b is provided on the central hanging rope 3, and when the projection lengths of the hook streaks 6, 7, 8 are not uniform as described above, the chain block 3b is operated. Then, the entire length of the hanging rope 3 is adjusted to prevent cracks.

【0012】しかし、このチェーンブロック3bによっ
て、各フック筋の微少な突出長の差を調整することは困
難であり、このチェーンブロックを使用してもクラック
の発生を防止することができなかった。
However, it is difficult to adjust a slight difference in the protruding length of each hook streak by using the chain block 3b, and even if this chain block is used, generation of cracks cannot be prevented.

【0013】そこで本発明はこのような問題を生じない
PC板の吊り上げ装置を提案することを目的とするもの
である。
Accordingly, an object of the present invention is to propose a PC board lifting apparatus which does not cause such a problem.

【0014】[0014]

【課題を解決するための手段】本発明は前記の課題を解
決するために、ホイスト等により吊り下げて昇降させる
天秤材(11)の両端に固定ローラ(13),(14)
を設け、天秤材(11)の下辺部に複数の可動ローラ
(15,16,17)を下辺方向に移動自在に設け、ル
ープ状の支持ロープ(18)を、上記各ローラ(13〜
17)に掛け渡すと共に支持ロープ(18)の下辺にお
ける各ローラ(13〜17)間を垂れ下がるようにし、
各ローラ(13〜17)間の垂れ下った支持ロープ(1
8)には吊り滑車(23a〜26a)を転動可能に備
え、該各吊り滑車(23a〜26a)には、下端に吊り
フック(23b〜26b)を備えた吊りロープ(23〜
26)を備えたことを特徴とするものである。
According to the present invention, in order to solve the above-mentioned problems, fixed rollers (13) and (14) are mounted on both ends of a balance material (11) which is suspended by a hoist or the like and raised and lowered.
A plurality of movable rollers (15, 16, 17) are provided on the lower side of the balance material (11) so as to be movable in the lower side direction, and the loop-shaped support rope (18) is attached to each of the rollers (13 to 13).
17) and hang between the rollers (13 to 17) on the lower side of the support rope (18),
The hanging support rope (1) between each roller (13-17)
8) is provided with a hanging pulley (23a-26a) in a rotatable manner, and each of the hanging pulleys (23a-26a) has a hanging rope (23-26) provided with a hanging hook (23b-26b) at the lower end.
26).

【0015】[0015]

【作用】一部に壁高が高い部分(5a)を有する異形の
PC板(5)をベッド上から建起す場合に、各吊りロー
プ(23〜26)のフック(23b〜26b)を、PC
板(5)に設けたフック筋(27〜30)に引っ掛け
て、天秤材(11)をホイスト等により上昇させる。
When the oddly shaped PC board (5) having a part (5a) with a high wall height is partially erected from the bed, the hooks (23b-26b) of the hanging ropes (23-26) are connected to the PC.
The balance material (11) is lifted by a hoist or the like by being hooked on hook streaks (27 to 30) provided on the plate (5).

【0016】図4に示すように、PC板(5)が建起し
途中である傾斜状態になると、壁高が高い部分(5a)
におけるフック筋(30)から天秤材(11)までの高
さと、その他の低い部分のフック筋(27〜29)から
天秤材(11)までの高さに段差(H)が生じ、壁高が
高い部分(5a)の吊りロープ(26)及びその吊りロ
ープ(26)が係合する支持ロープ部(18a)がたる
もうとする。
As shown in FIG. 4, when the PC board (5) is in the middle of being erected and is in an inclined state, a portion (5a) where the wall height is high is provided.
In step (H), the height from the hook streak (30) to the balance material (11) and the height from the hook streaks (27 to 29) to the balance material (11) in the other low portions are different, and the wall height is lower. The hanging rope (26) of the high part (5a) and the supporting rope part (18a) with which the hanging rope (26) engages tend to sag.

【0017】しかし、その支持ロープ部(18a)は他
の支持ロープ部(18b〜18d)に引っ張られて移動
し、各吊り滑車(23a〜26a)部の負担荷重が釣り
合った状態で支持ロープ(18)の移動が停止する。
However, the supporting rope portion (18a) is pulled by the other supporting rope portions (18b to 18d) and moves, and the supporting ropes (18a to 18d) are balanced with the load imposed on the suspension pulleys (23a to 26a). 18) The movement stops.

【0018】そのため、各吊りロープ(23〜26)が
同一張力により緊張し、かつ各吊りフック筋(27〜3
0)の負担荷重が均一になり、壁高の高い部分(5a)
も他の部分と同等の吊り力で建て起される。
Therefore, each of the hanging ropes (23 to 26) is tensioned by the same tension, and each of the hanging hook bars (27 to 3) is tensioned.
Part (5a) where the burden load of (0) becomes uniform and the wall height is high
Is also erected with the same lifting force as the other parts.

【0019】更に、このPC板を建起した後に吊り移動
する場合にも、上記と同様に壁高の高い部分(5a)も
支持される。また、このような異形PC板ではなく、全
長に亘って同一壁高の通常のPC板であって、各フック
筋の突出長に不揃いがある場合には、突出長の長いフッ
ク筋の吊りロープに遊びが生じる。しかし、その遊び分
は、他の吊りロープにより、支持ロープ18を介して持
ち上げられ、各フック筋の負担荷重が同等になり、各フ
ック筋に同等の吊り力が生じてPC板が建起される。
Further, when the PC board is suspended after being erected, the portion (5a) having a high wall height is also supported as described above. In addition, in the case of a regular PC board having the same wall height over the entire length instead of such a deformed PC board, and the projection lengths of the hook streaks are not uniform, the hanging ropes of the hook streaks having a long projection length are used. Play occurs. However, the play is lifted by the other suspension ropes via the support ropes 18, and the load imposed on each hook streak becomes equal, and the same suspension force is generated in each hook streak, and the PC board is erected. You.

【0020】更に、前記のような壁高に差があったり、
吊りフックに長短の不揃いがある場合には、PC板の建
起し時に、各吊りフック部に微妙な応力変化が生じる。
この場合、支持ロープ(18)がループ状に形成されて
いることにより、その応力変化が生じた部分における吊
りロープの左右の支持ロープ部が、各吊りフックに作用
する負担荷重を均一にする。
Further, there is a difference in wall height as described above,
If the hanging hooks are irregular in length, a slight change in stress occurs in each hanging hook when the PC board is erected.
In this case, since the support rope (18) is formed in a loop shape, the support rope portions on the left and right sides of the suspension rope in the portion where the stress change occurs make the load applied to each suspension hook uniform.

【0021】[0021]

【実施例】図1乃至図4に示す本発明の実施例について
説明する。11は所定の長さに形成された天秤材で、ホ
イスト10aの昇降用ワイヤ12により水平状態に支持
され、ホイスト10aによる昇降用ワイヤ12の巻き上
げ、巻き戻しにより、昇降するようになっている。また
ホイスト10aはクレーン10により移動される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention shown in FIGS. 1 to 4 will be described. Numeral 11 denotes a balance material formed in a predetermined length, which is supported in a horizontal state by a lifting wire 12 of a hoist 10a, and is lifted and lowered by hoisting and rewinding the lifting wire 12 by the hoist 10a. The hoist 10a is moved by the crane 10.

【0022】13,14は天秤材11の両端に備えられ
た固定ローラである。15,16,17は可動ローラ
で、天秤材11の下辺に設けたレール11a上に備えら
れており、天秤材11の長手方向に移動自在になってい
る。
Reference numerals 13 and 14 denote fixed rollers provided at both ends of the balance material 11. Movable rollers 15, 16 and 17 are provided on rails 11a provided on the lower side of the balance material 11, and are movable in the longitudinal direction of the balance material 11.

【0023】18はループ状の支持ロープで、前記両固
定ローラ13,14間に掛け渡すと共にその下辺部が前
記可動ローラ15,16,17の上側に掛け渡されてい
る。また、該支持ロープ18の長さは、上記の掛け渡し
状態において、両固定ローラ13,14間の下辺部のロ
ープが図1に示すように若干垂れ下るような長さに設定
されている。
Numeral 18 denotes a loop-shaped support rope which extends between the fixed rollers 13 and 14, and a lower side of which is extended above the movable rollers 15, 16 and 17. Further, the length of the support rope 18 is set such that the rope at the lower side between the fixed rollers 13 and 14 hangs slightly as shown in FIG.

【0024】19,20は支持ロープ18の上側支持ロ
ーラである。21,22はコイルスプリングからなるス
トッパで、夫々傾斜して配置され、その下端が天秤材1
1に固着され、上端が支持ロープ18に固着されてい
る。
Reference numerals 19 and 20 denote upper support rollers of the support rope 18. Reference numerals 21 and 22 denote stoppers formed of coil springs, each of which is disposed at an angle, and the lower end thereof is a balance material 1.
1 and the upper end is fixed to the support rope 18.

【0025】23,24,25,26は4本の吊りロー
プで、夫々同一長に形成され、その上端に吊り滑車23
a,24a,25a,26aが備えられ、該各滑車が前
記支持ロープ18の下辺部に転動可能に掛けられてい
る。また各吊りロープ23,24,25,26の下端に
吊りフック23b,24b,25b,26bが備えられ
ている。
Reference numerals 23, 24, 25, and 26 denote four suspension ropes, each having the same length, and a suspension pulley 23 at the upper end thereof.
a, 24a, 25a, 26a are provided, and each of the pulleys is rotatably hung on the lower side of the support rope 18. Further, hanging hooks 23b, 24b, 25b, 26b are provided at lower ends of the hanging ropes 23, 24, 25, 26, respectively.

【0026】5はPC板で、前記と同様に高い壁部分5
aを有する異形のPC板となっている。5b,5cはP
C板5に形成された窓穴を示す。PC板5における低い
壁の部分の上辺にはフック筋27,28,29が、高い
壁部分5aの上辺にはフック筋30が突設されている。
Reference numeral 5 denotes a PC board, which has a high wall portion 5 as described above.
This is a modified PC board having a. 5b and 5c are P
5 shows a window hole formed in the C plate 5. Hook bars 27, 28 and 29 are provided on the upper side of the lower wall portion of the PC board 5, and hook bars 30 are provided on the upper side of the high wall portion 5a.

【0027】次にPC板の建起し作業について説明す
る。建起すPC板は図1に示すような異形のPC板とす
る。図4に示すように、ベッド上で打設し、養生、硬化
した後の横たわっているPC板5Aの各フック筋27〜
30に、前記のように各吊りロープ23〜26のフック
23b〜26bを引っ掛ける。
Next, the work of erecting a PC board will be described. The PC board to be erected is a modified PC board as shown in FIG. As shown in FIG. 4, each of the hook streaks 27 to of the lying PC board 5 </ b> A after being cast on a bed, cured, and cured.
The hooks 23b to 26b of the suspension ropes 23 to 26 are hooked on the hook 30 as described above.

【0028】この状態では、各フック筋27〜30から
の天秤材11Aまでの高さは同一であるから、この状態
での吊り初期においては、各吊りロープ23〜26に均
一な荷重が作用し、低い位置のフック筋27,28,2
9と高い位置のフック筋30に均等な荷重を負担させて
異形のPC板の建起しが行われる。
In this state, since the height from the hook streaks 27 to 30 to the balance material 11A is the same, a uniform load acts on each of the suspension ropes 23 to 26 in the initial stage of suspension in this state. , Lower hook streaks 27, 28, 2
The odd-shaped PC board is erected by applying an even load to the hook streaks 30 at a position as high as 9.

【0029】図4において、ホイスト10aをクレーン
10によりAからB,C,Dの如く左方へ移動させなが
らワイヤ12を巻き上げると、天秤材11が図4の11
Aから11B,11C,11Dのように移動しつつ上昇
し、PC板は5Aから、5B,5C,5Dのように建起
される。
In FIG. 4, when the wire 12 is wound up while the hoist 10a is moved to the left from A to B, C and D by the crane 10, the balance material 11 becomes 11 in FIG.
The PC board rises while moving from A to 11B, 11C, and 11D, and the PC board is erected from 5A to 5B, 5C, and 5D.

【0030】この5Aから5Dに至る建起し状態におい
ては、高い壁部分5aのフック筋30から天秤材11ま
での高さが、低い壁部分のフック筋27,28,29か
ら天秤材11までの高さよりも短く、その段差Hは建起
し角度が大きい程大きくなる。
In the standing state from 5A to 5D, the height from the hook streaks 30 of the high wall portion 5a to the balance material 11 is from the hook streaks 27, 28, 29 of the low wall portion to the balance material 11. Is smaller than the height H, and the step H increases as the angle increases.

【0031】このとき、支持ロープ18は、各可動ロー
ラ13〜17に対し自由移動可能に備えられており、か
つ、この支持ロープ18にはその全長に亘って均一な引
張応力が作用しようとするため、前記段差Hによりたる
もうとする吊りロープ26の部分の支持ロープ部18a
が吊りロープ23,24,25の部分の支持ロープ部1
8b,18c,18dに引っ張られて、図1に示すよう
な状態になり、各吊り滑車23a〜26a部の負担荷重
が釣り合った状態で支持ロープ18の吊り姿勢が停止す
る。
At this time, the support rope 18 is provided so as to be freely movable with respect to each of the movable rollers 13 to 17, and a uniform tensile stress is applied to the support rope 18 over its entire length. Therefore, the supporting rope portion 18a of the portion of the suspension rope 26 that is likely to sag due to the step H
Is the supporting rope part 1 of the part of the hanging ropes 23, 24, 25
As shown in FIG. 1, the suspension ropes 8 b, 18 c, and 18 d are pulled, and the suspension posture of the support rope 18 is stopped in a state where the load on each of the suspension pulleys 23 a to 26 a is balanced.

【0032】また、可動ローラ15〜17は各フック筋
27〜30間における重心位置に移動して停止する。こ
のようなことにより、低位置のフック筋27,28,2
9及び高位置のフック筋30の負担荷重を均等にして、
異形PC板を脱型、建起し及び吊上げ移動することがで
きる。
Further, the movable rollers 15 to 17 move to the position of the center of gravity between the hook streaks 27 to 30 and stop. As a result, the hook streaks 27, 28, 2
9 and equalize the load on the hook 30 at the high position,
The deformed PC board can be removed, raised and lifted.

【0033】また、PC板の重心が著しく片寄っている
場合、例えば図1において、PC板5の右側の荷重が左
側より過大の場合には、支持ロープ18が図1の状態か
ら時計方向に回動する虞れがある。この場合には、図1
の左側のコイルスプリング状のストッパ21がその回動
を抑制する。また、左側の荷重が過大の場合には、右側
のコイルスプリング状のストッパ22bが支持ロープ1
6の回動を抑制する。
When the center of gravity of the PC board is significantly deviated, for example, in FIG. 1, when the load on the right side of the PC board 5 is larger than the left side, the support rope 18 is turned clockwise from the state of FIG. It may move. In this case, FIG.
The coil spring-shaped stopper 21 on the left side of FIG. If the load on the left side is excessive, the right coil spring-shaped stopper 22b is
6 is suppressed.

【0034】図5は、前記のような高い壁部分5aを有
しない通常の方形PC板を建起す場合を示す。この場合
は、建起し時に前記のような段差Hがないため、各吊り
ロープ23〜26の吊り滑車23a〜26aは同一高さ
に位置する。
FIG. 5 shows a case where a normal rectangular PC board having no such a high wall portion 5a is erected. In this case, since there is no step H at the time of erecting, the suspension pulleys 23a to 26a of the suspension ropes 23 to 26 are located at the same height.

【0035】また、図5のような全長に亘って同一壁高
である場合において、各フック筋27〜30の突出長に
不揃いがある場合には、その突出長の長いフック筋の吊
りロープに遊びが生じる。しかし、その遊び分は、他の
吊りロープにより、ループ状のロープ18を介して持ち
上げられ、各フック筋27〜30の負担荷重が同等にな
り、各フック筋に同等の吊り力が生じてPC板が建起
し、吊り上げられる。
In the case where the wall height is the same over the entire length as shown in FIG. 5, if the projection lengths of the hook streaks 27 to 30 are not uniform, the hooking ropes of the hook streaks having the longer projection length may be used. Play occurs. However, the play is lifted by the other hanging ropes via the loop-shaped rope 18, and the load on each of the hook streaks 27 to 30 is equalized. A board is erected and lifted.

【0036】更に、支持ロープ18をループ状に形成し
て上記のように掛け渡したので、次のような作用、効果
がある。上記のようにフック筋30の取付け位置が他の
フック筋27,28,29の取付け位置と相違している
場合や、フック筋27〜30の突出長が相違している場
合には、PC板の建起し角度が大きくなるにつれて支持
ロープ18の垂れ部の長さが連続的に変化する現象が生
じる。
Further, since the support rope 18 is formed in a loop shape and laid as described above, the following operations and effects are obtained. As described above, when the attachment position of the hook streaks 30 is different from the attachment position of the other hook streaks 27, 28, 29, or when the protrusion lengths of the hook streaks 27 to 30 are different, the PC board A phenomenon occurs in which the length of the hanging portion of the support rope 18 changes continuously as the standing angle of the support rope 18 increases.

【0037】この場合に、支持ロープ18の垂れ部と各
吊りロープ23〜26を同体でかつ同じような張りがあ
る状態に保てないとPC板にそりが起り若令コンクリー
トに亀裂を発生させる。
In this case, if the hanging portion of the support rope 18 and each of the suspension ropes 23 to 26 cannot be kept in the same state and have the same tension, the PC board warps and cracks occur in the young concrete. .

【0038】そのため、建起し作業中に、PC板の各フ
ック筋部附近に発生する純粋な応力に対応するために
は、支持ロープ18が応力の変化に微妙な動きで対応す
る必要がある。
Therefore, in order to cope with a pure stress generated near each hook streak portion of the PC board during the erecting work, the support rope 18 needs to respond to the change in the stress with a delicate movement. .

【0039】そこで、本発明のように、支持ロープ18
をループ状に形成し、かつその両側部を固定ローラ1
3,14により支持して、その支持ロープ18がそのル
ープ方向に回動できるようにすることにより、その支持
ロープ18の垂れ部に作用する吊り荷重の変化で、その
垂れ部が左右に引張られる動きにも柔らかく敏速に反応
できるようにしたものである。
Therefore, as in the present invention, the support rope 18
Are formed in a loop shape and both sides thereof are fixed rollers 1
By supporting the supporting rope 18 in the loop direction by supporting the supporting rope 18, the hanging part is pulled right and left due to a change in the suspension load acting on the hanging part of the supporting rope 18. It is designed to respond softly and quickly to movement.

【0040】尚、フック筋の個数及びこれを支持する吊
りフックの本数は、PC板の横方向の長さにより4本以
上設けてもよく、またその付設位置も、各フック筋の負
担荷重(面積)が均等になるように選定する。
The number of hook streaks and the number of hanging hooks supporting the hook streaks may be four or more depending on the lateral length of the PC board. Area).

【0041】[0041]

【発明の効果】以上のように本発明によれば、一部に壁
の高い部分がある異形PC板や、フック筋の突出長が相
違するPC板を建起したり吊り移動する場合にも、各フ
ック筋を同等の吊り力で支持できるため、前記従来のよ
うなPC板の変形によるクラックが発生することを防止
できる。
As described above, according to the present invention, even when a deformed PC board having a part with a high wall or a PC board having a different projection length of a hook streak is to be built or suspended. Further, since each hook streak can be supported with the same lifting force, it is possible to prevent the occurrence of cracks due to the deformation of the PC board as in the related art.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の実施例を示す正面図。FIG. 1 is a front view showing an embodiment of the present invention.

【図2】 同斜視図。FIG. 2 is a perspective view of the same.

【図3】 図2におけるA−A線断面図。FIG. 3 is a sectional view taken along line AA in FIG. 2;

【図4】 建起し状態を示す説明図。FIG. 4 is an explanatory view showing a standing state.

【図5】 壁高が均一なPC板を吊り支持した状態を示
す正面図。
FIG. 5 is a front view showing a state in which a PC board having a uniform wall height is suspended and supported.

【図6】 従来の吊り装置により異形のPC板を吊り上
げた場合の正面図。
FIG. 6 is a front view of a case where an odd-shaped PC board is lifted by a conventional lifting device.

【図7】 同建起し状態を示す説明図。FIG. 7 is an explanatory view showing the standing state.

【図8】 従来の吊り装置によりフック筋の突出長が異
なるPC板を吊り上げた場合の正面図。
FIG. 8 is a front view showing a case where a PC board having a different projection length of a hook streak is lifted by a conventional lifting device.

【符号の説明】[Explanation of symbols]

11 天秤材 13,14 固定ローラ 15〜17 可動ローラ 18 支持ロープ 23〜26 吊りロープ 23a〜26a 吊り滑車 23b〜26b 吊りフック 11 Balance material 13,14 Fixed roller 15-17 Movable roller 18 Support rope 23-26 Suspended rope 23a-26a Suspended pulley 23b-26b Suspended hook

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B66C 1/10 B66C 1/62 B66C 13/08 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) B66C 1/10 B66C 1/62 B66C 13/08

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 ホイスト等により吊り下げて昇降させる
天秤材(11)の両端に固定ローラ(13),(14)
を設け、天秤材(11)の下辺部に複数の可動ローラ
(15,16,17)を下辺方向に移動自在に設け、ル
ープ状の支持ロープ(18)を、上記各ローラ(13〜
17)に掛け渡すと共に支持ロープ(18)の下辺にお
ける各ローラ(13〜17)間を垂れ下がるようにし、
各ローラ(13〜17)間の垂れ下った支持ロープ(1
8)には吊り滑車(23a〜26a)を転動可能に備
え、該各吊り滑車(23a〜26a)には、下端に吊り
フック(23b〜26b)を備えた吊りロープ(23〜
26)を備えたことを特徴とするPC板の吊上げ装置。
1. Fixed rollers (13) and (14) at both ends of a balance material (11) suspended and raised by a hoist or the like.
A plurality of movable rollers (15, 16, 17) are provided on the lower side of the balance material (11) so as to be movable in the lower side direction, and the loop-shaped support rope (18) is attached to each of the rollers (13 to 13).
17) and hang between the rollers (13 to 17) on the lower side of the support rope (18),
The hanging support rope (1) between each roller (13-17)
8) is provided with a hanging pulley (23a-26a) in a rotatable manner, and each of the hanging pulleys (23a-26a) has a hanging rope (23-26) provided with a hanging hook (23b-26b) at the lower end.
26) A lifting device for a PC board, comprising:
JP29625192A 1992-11-06 1992-11-06 PC board lifting device Expired - Lifetime JP3255733B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP29625192A JP3255733B2 (en) 1992-11-06 1992-11-06 PC board lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP29625192A JP3255733B2 (en) 1992-11-06 1992-11-06 PC board lifting device

Publications (2)

Publication Number Publication Date
JPH06144774A JPH06144774A (en) 1994-05-24
JP3255733B2 true JP3255733B2 (en) 2002-02-12

Family

ID=17831153

Family Applications (1)

Application Number Title Priority Date Filing Date
JP29625192A Expired - Lifetime JP3255733B2 (en) 1992-11-06 1992-11-06 PC board lifting device

Country Status (1)

Country Link
JP (1) JP3255733B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7043644B1 (en) 2021-02-26 2022-03-29 株式会社光電製作所 Communications system

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7677623B2 (en) * 2003-02-24 2010-03-16 Sonsub Inc. Active rigging device
CN100340470C (en) * 2005-06-20 2007-10-03 上海外高桥造船有限公司 Sectional hoisting method
JP4924453B2 (en) * 2008-01-28 2012-04-25 コベルコクレーン株式会社 Crawler belt disassembly suspension
CN101987651B (en) * 2010-11-09 2012-11-21 沪东中华造船(集团)有限公司 Assembling method and assembling bracket of total segments of small ship
JP5548636B2 (en) * 2011-03-02 2014-07-16 住友重機械搬送システム株式会社 Crane suspension
CN102398849A (en) * 2011-07-06 2012-04-04 中国海洋石油总公司 Method for moving whole crawler crane down to dock
KR200486869Y1 (en) * 2013-11-20 2018-07-09 대우조선해양 주식회사 Loading beam with member for fixing horizentally
CN107161857B (en) * 2017-07-24 2018-11-09 中国十九冶集团有限公司 The Lift-on/Lift-off System and method upright suitable for flat thin-wall member

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7043644B1 (en) 2021-02-26 2022-03-29 株式会社光電製作所 Communications system

Also Published As

Publication number Publication date
JPH06144774A (en) 1994-05-24

Similar Documents

Publication Publication Date Title
JP3255733B2 (en) PC board lifting device
JPH092774A (en) Heavy object suspending device
JP2860313B2 (en) Escalator / truss lifting method
JP5673134B2 (en) Lifting device, shaking prevention jig and suspension jig
JP3018061B2 (en) Work stage in boiler furnace and how to move it
JPH1160138A (en) Hoisting tool for crane
JPH07285783A (en) Suspension tool for electrically-operated hoist
JPH078543Y2 (en) Jib crane
JP3336788B2 (en) Lifting apparatus and lifting method for large structures
JP2603152Y2 (en) Supporting device for curing net corner
JP2001316074A (en) Lifting jig for lifted cargo and its use
JPS6019107Y2 (en) Crane lifting balancer device
JPH0540056Y2 (en)
JPH06298487A (en) Hoisting jig for precast concrete mold and method for hoisting precast concrete mold
JPH0640273Y2 (en) Stabilization device for building structure
JPH09235091A (en) Crane device
JP2513309Y2 (en) Suspending device for hoses for fire fighting, etc.
JPH0414710A (en) Bushing suspending tool for electric equipment
JPH10152290A (en) Attitude control device of hoisted cargo
SU872429A2 (en) Device for lifting and mounting building structures
JPS5935830B2 (en) Large crane boom elevation device
JPS6114310B2 (en)
JPS6183998A (en) Erected stand
JPH10120359A (en) Crane device with rope locking tool
JP3811419B2 (en) Building material lifting device and building material lifting method

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101130

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121130

Year of fee payment: 11

EXPY Cancellation because of completion of term