JP3263355B2 - Pavement method for road surfaces including manholes - Google Patents

Pavement method for road surfaces including manholes

Info

Publication number
JP3263355B2
JP3263355B2 JP36193097A JP36193097A JP3263355B2 JP 3263355 B2 JP3263355 B2 JP 3263355B2 JP 36193097 A JP36193097 A JP 36193097A JP 36193097 A JP36193097 A JP 36193097A JP 3263355 B2 JP3263355 B2 JP 3263355B2
Authority
JP
Japan
Prior art keywords
temporary lid
pavement
manhole
cut
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP36193097A
Other languages
Japanese (ja)
Other versions
JPH11172610A (en
Inventor
信一 椿森
Original Assignee
株式会社ハネックス・ロード
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ハネックス・ロード filed Critical 株式会社ハネックス・ロード
Priority to JP36193097A priority Critical patent/JP3263355B2/en
Publication of JPH11172610A publication Critical patent/JPH11172610A/en
Application granted granted Critical
Publication of JP3263355B2 publication Critical patent/JP3263355B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、マンホールを含む
道路の舗装方法及びマンホールの設置方法、舗装版の撤
去方法、さらに、方法の実施に使用する拡張アンカーと
仮蓋に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for paving a road including a manhole, a method for installing a manhole, a method for removing a pavement plate, and an expansion anchor and a temporary lid used for carrying out the method.

【0002】[0002]

【従来の技術】既存の舗装表面のひび割れや破損、走行
車両による舗装路面の摩耗による舗装厚の不足はオーバ
ーレイで補修しているが、補修箇所にマンホールが存在
するとそれが邪魔になり、舗装機械の導入を阻み、作業
性を著しく低下させる。さらに、マンホール周辺の転圧
が不十分となり、交通開放後に路面が沈下するという不
都合があった。そこで、本発明者は、特許第26234
90号、2623491号、2623492号に開示さ
れているように、マンホール周辺の転圧を十分に行える
道路舗装方法を提案した。
2. Description of the Related Art Cracking or damage of existing pavement surfaces, and insufficiency of pavement thickness due to abrasion of pavement road surface caused by running vehicles are repaired with overlays. And the workability is significantly reduced. In addition, there was an inconvenience that the compaction around the manhole became insufficient and the road surface sank after the traffic was opened. Therefore, the present inventor has disclosed in Japanese Patent No.
As disclosed in Japanese Patent Nos. 90, 2623491 and 2623492, a road pavement method capable of sufficiently compacting a manhole has been proposed.

【0003】[0003]

【発明が解決しようとする課題】特許第2623491
号においては、仮蓋でマンホールを覆いオーバーレイを
施工し、マンホール周囲のオーバーレイなどの舗装を円
形に切断した後、舗装版にアンカーを打ち込み、このア
ンカーを利用して舗装版を引き揚げて撤去していた。
Problems to be Solved by the Invention Patent No. 2623491
In the issue, the manhole was covered with a temporary lid, an overlay was constructed, the pavement such as the overlay around the manhole was cut into a circle, and an anchor was driven into the pavement plate, and the pavement plate was pulled up and removed using this anchor. Was.

【0004】しかしながら、複数のアンカーに均等に引
き揚げ荷重をかけるのは難しく、1本のアンカーに引き
揚げ荷重が集中する場合があった。アスファルトは、粘
弾性体であり、荷重がかかると徐々に変形するので舗装
版からアンカーが抜け出すことがあり、アンカーの打ち
直しなど撤去に手間取ることがあった。そこで、本発明
は、撤去すべき舗装版を、確実に引き揚げ撤去できる方
法を提供することを課題とする。
[0004] However, it is difficult to apply a lifting load evenly to a plurality of anchors, and in some cases, the lifting load is concentrated on one anchor. Asphalt is a viscoelastic material, and is gradually deformed when a load is applied, so that the anchor may come off from the pavement plate, and it may take time to remove the anchor, such as overhauling the anchor. Therefore, an object of the present invention is to provide a method capable of reliably lifting and removing a pavement plate to be removed.

【0005】[0005]

【課題を解決するための手段】仮蓋に中心孔を設け、中
心孔を閉塞手段で塞いでマンホール位置に設置し、仮蓋
を覆うように舗装を施工し、マンホールを包囲して舗装
路面を円形に切断し、仮蓋の閉塞手段を突き破って中心
孔に拡張アンカーを挿入し、拡張部材を仮蓋の裏面に引
掛けて切断した舗装版を仮蓋と共に撤去することで、切
断した舗装版を確実に撤去できるようにした。
Means for Solving the Problems A temporary hole is provided in the temporary lid, the central hole is closed with a closing means, and the temporary hole is installed at a manhole position. Pavement is constructed so as to cover the temporary lid. Cut into a circular shape, penetrate the closing means of the temporary lid, insert an expansion anchor into the center hole, hook the expansion member on the back surface of the temporary lid, remove the cut pavement plate together with the temporary lid, and cut the paved plate. Can be removed without fail.

【0006】拡張部材をアンカー本体内部に収納した状
態の拡張アンカーを舗装に設けた穴に挿入し、仮蓋の中
心に設けた孔に差し込む。拡張部材は、偏心した状態で
軸に回転可能に支持されているので、仮蓋の下側の空間
に到達すると、重力によって自動的に回転し、アンカー
本体に対して90度回転してアンカー本体から横に突出
し、孔から抜けなくなる。仮蓋の表面に剥離層を設けて
おき、引き揚げ後に舗装版から仮蓋を剥がし易くしてお
く。剥離材は、例えば剥離用の各種薬剤や路盤紙等の各
種シートを使用する。
[0006] An expansion anchor with the expansion member housed inside the anchor body is inserted into a hole provided on the pavement and inserted into a hole provided at the center of the temporary lid. Since the expansion member is rotatably supported on the shaft in an eccentric state, when the expansion member reaches the space below the temporary lid, it automatically rotates by gravity, and rotates by 90 degrees with respect to the anchor body to rotate the anchor body. From the hole and cannot be pulled out of the hole. A release layer is provided on the surface of the temporary lid so that the temporary lid can be easily peeled off from the pavement plate after being lifted. For the release material, for example, various types of release agents or various sheets of roadbed paper or the like are used.

【0007】[0007]

【発明の実施の形態】本発明を切削オーバーレイ工法に
適用した場合について説明する。図1〜図10は本発明
の工程を示す図である。 (1)マンホール1の周囲の既設舗装2を回転型の路面
円形切断機や圧入切断機21で斜壁3上面まで円形に切
断する。(図1) (2)切断した環状舗装版4及びマンホール蓋受枠11
を一体的に撤去する。(図2)
DESCRIPTION OF THE PREFERRED EMBODIMENTS A case where the present invention is applied to a cutting overlay method will be described. 1 to 10 are views showing the steps of the present invention. (1) The existing pavement 2 around the manhole 1 is cut into a circular shape up to the upper surface of the sloping wall 3 by a rotary road surface circular cutter or a press-fitting cutter 21. (FIG. 1) (2) Cut annular paving slab 4 and manhole cover receiving frame 11
Is removed integrally. (Fig. 2)

【0008】(3)図11に示す中心孔51を有する円
形鉄板の仮蓋5を準備し、ガムテープを中心孔51に貼
って塞ぎ、充填する舗装材がマンホール内に落下するの
を防止する。斜壁3上面に設置した仮蓋5が移動する
と、中心孔がずれてしまい、後の舗装版撤去作業に支障
をきたすので、仮蓋5の下面には円筒状の突起53、ま
たは棒状の突起が円形に配置され、これを斜壁3の内壁
に当てて移動を防止する。中心孔51を塞ぐ閉塞手段5
2は、ドリルで簡単に突き破れる程度の強度で、その上
に充填する舗装材の圧力では破壊しない材料で構成す
る。簡易な閉塞手段52は、ガムテープで中心孔51を
塞ぐことである。また、中心孔51に一定以上の機械的
な力で開く扉(図示無し)を設けてもよい。オーバーレ
イ9を施工すると仮蓋5がオーバーレイの下に隠れ、仮
蓋5の中心位置が不明となるため、中心位置を3点オフ
セットで道路側部に印を付けておき、後の作業に備え
る。(図3)
(3) A temporary lid 5 of a circular iron plate having a center hole 51 shown in FIG. 11 is prepared, and a gum tape is stuck to the center hole 51 to close it, thereby preventing the paving material to be filled from falling into the manhole. When the temporary lid 5 installed on the upper surface of the sloping wall 3 moves, the center hole is displaced, which hinders the later pavement slab removing operation. Therefore, the cylindrical projection 53 or the rod-shaped projection is provided on the lower surface of the temporary lid 5. Are arranged in a circular shape, and are applied to the inner wall of the inclined wall 3 to prevent movement. Closing means 5 for closing central hole 51
No. 2 is made of a material which has such strength that it can be easily pierced by a drill and does not break under the pressure of the paving material to be filled thereon. A simple closing means 52 is to close the center hole 51 with a gum tape. Further, a door (not shown) that opens with a certain mechanical force or more may be provided in the center hole 51. When the overlay 9 is constructed, the temporary lid 5 is hidden under the overlay, and the center position of the temporary lid 5 is unknown. Therefore, the center position is marked on the road side with a three-point offset to prepare for later work. (Fig. 3)

【0009】(4)仮蓋5上に舗装材7を既設舗装2の
高さまで充填して転圧し、撤去した環状舗装版4部分と
仮蓋5上側を埋める。仮蓋5の再使用のため、仮蓋5の
表面を剥離材で予め被覆しておく。(図4)
(4) The temporary lid 5 is filled with the pavement material 7 to the height of the existing pavement 2 and rolled to fill the removed annular pavement plate 4 portion and the temporary lid 5 upper side. In order to reuse the temporary lid 5, the surface of the temporary lid 5 is previously covered with a release material. (FIG. 4)

【0010】(5)既設舗装2表面を切削し、路面を平
坦にし、切削面8にタックコートなどのコーティングを
施し、所要厚さのオーバーレイ9を施工し路面舗装を施
工する。マンホールは仮蓋5で保護され、路面に突出す
る部分が無いので、オーバーレイ9を機械施工で能率良
く円滑に行うことができる。(図5)
(5) The surface of the existing pavement 2 is cut, the road surface is flattened, the cut surface 8 is coated with a tack coat or the like, an overlay 9 having a required thickness is applied, and the road pavement is applied. Since the manhole is protected by the temporary lid 5 and there is no protruding portion on the road surface, the overlay 9 can be efficiently and smoothly performed by mechanical construction. (Fig. 5)

【0011】(6)先に印を付けた道路側部の3点のマ
ークからの距離を測量し、仮蓋5の中心位置を求め、路
面に印を付ける。再度、オーバーレイ9上から路面円形
切断機で円形状に斜壁3上面の深さまで舗装を切断す
る。路面円形切断機は水を使用して切断するので求めた
中心位置の印が消えてしまっており、再度仮蓋5の中心
を測量で求め、路面に印を付ける。この印部分をドリル
Dで舗装を穿孔し、仮蓋5の中心孔51を塞いでいた閉
塞手段52のガムテープを突き破って貫通させる。(図
6)
(6) The distance from the three marks on the side of the road previously marked is measured, the center position of the temporary lid 5 is determined, and the road surface is marked. Again, the pavement is cut from the overlay 9 to a depth of the upper surface of the inclined wall 3 in a circular shape by a road surface cutting machine. Since the road surface circular cutting machine cuts using water, the mark of the obtained center position has disappeared, and the center of the temporary lid 5 is obtained again by surveying and the road surface is marked. The marked part is perforated with a drill D on the pavement, and the gum tape of the closing means 52 that has closed the center hole 51 of the temporary lid 5 is pierced and penetrated. (FIG. 6)

【0012】(7)ドリルであけた孔に図12と図13
に示す拡張アンカー6の拡張部材62をアンカー本体6
1に収納した状態で挿入する。拡張アンカー6の先端が
仮蓋5の中心孔51を通過すると、孔壁によって回転を
抑制されていた拡張部材62が回転して側方に拡張し、
図14に示すように仮蓋5の下面に引掛かるので抜け出
なくなる。なお、仮蓋5には補強のため梁を十字状に設
けておく。(図7)
(7) FIG. 12 and FIG.
The expansion member 62 of the expansion anchor 6 shown in FIG.
Insert in the state stored in 1. When the tip of the expansion anchor 6 passes through the center hole 51 of the temporary lid 5, the expansion member 62 whose rotation has been suppressed by the hole wall rotates and expands to the side,
As shown in FIG. 14, the temporary lid 5 is caught on the lower surface and does not come off. The temporary lid 5 is provided with a cross-shaped beam for reinforcement. (FIG. 7)

【0013】(8)拡張アンカー6を引っ張り、図14
に示すように拡張部材62が仮蓋下面に引っかかって抜
けないことを確認し、拡張アンカー6の頭部にワイヤー
をかけ、切断した円盤状舗装版41をクレーンで吊り上
げ撤去する。拡張アンカー6の拡張部材62が仮蓋下面
に引掛かり、円盤状舗装版41は仮蓋5に載せられた形
で撤去されるので、従来の打ち込み型のアンカーのよう
に抜けるようなことなく確実に撤去することができる。
(図8)
(8) The extension anchor 6 is pulled, and FIG.
As shown in (1), it is confirmed that the extension member 62 is caught on the lower surface of the temporary lid and does not come off, a wire is wrapped around the head of the extension anchor 6, and the cut disk-shaped pavement plate 41 is lifted and removed by a crane. Since the expansion member 62 of the expansion anchor 6 is hooked on the lower surface of the temporary lid, and the disc-shaped pavement plate 41 is removed while being placed on the temporary lid 5, it is surely prevented from coming off like a conventional driving type anchor. Can be removed.
(FIG. 8)

【0014】(9)さらに、斜壁3上に高さ調整部材で
マンホール蓋受枠11の据え付け基礎を所要高さに調整
する。据え付け基礎上にマンホール蓋受枠11を設置し
上面がオーバーレイ9表面と一致するように微調整す
る。(図9)
(9) Further, the mounting base of the manhole cover receiving frame 11 is adjusted to a required height on the inclined wall 3 by a height adjusting member. The manhole cover receiving frame 11 is set on the installation base, and fine adjustment is performed so that the upper surface matches the surface of the overlay 9. (FIG. 9)

【0015】(10)最後にマンホール蓋受枠11周囲
に急結型の樹脂セメントコンクリート等の舗装材71を
充填し、転圧してオーバーレイ9の高さと一致させる。
(図10)
(10) Finally, a paving material 71 such as a quick-set resin cement concrete is filled around the manhole cover receiving frame 11 and is rolled to match the height of the overlay 9.
(FIG. 10)

【0016】オーバーレイ9上から切断中心を特定する
ために公知の金属探知機等を使用して内部のマンホール
蓋受枠11の位置を探査するなどの手法を取ってもよ
い。マンホール蓋受枠周囲の切断舗装版は、作業性の向
上や騒音振動の防止等の観点から特公昭61−3393
8号公報、特公昭61−52283号公報、特公昭61
−25844号公報に開示されるようにマンホール蓋受
枠と一体的に撤去する。切断舗装版及びマンホール蓋受
枠を一体的に撤去するには、実開昭59−156942
号公報や実開昭59−193679号公報に開示される
マンホール蓋受枠と斜壁との間にマンホール蓋受枠内部
から伸縮する楔やアームを挿入するようにしたマンホー
ル蓋受枠引き上げ機やマンホール蓋受枠剥離機等を必要
に応じて利用する。
In order to specify the cutting center from the overlay 9, a known metal detector or the like may be used to search the position of the manhole cover receiving frame 11 therein. The cut paving slab around the manhole cover receiving frame is designed to improve workability and prevent noise and vibration.
No. 8, JP-B-61-52283, JP-B-61-52283
As disclosed in Japanese Patent No. 25844, the manhole cover is removed integrally. In order to remove the cut paving slab and the manhole cover receiving frame integrally, see Japanese Utility Model Application Laid-Open No. 59-156942.
Manhole cover lifting machine and manhole cover receiving frame in which a wedge or an arm which expands and contracts from the inside of the manhole cover receiving frame is inserted between the manhole cover receiving frame and the inclined wall disclosed in Japanese Unexamined Patent Application Publication No. 59-193679. A peeling machine or the like is used as needed.

【0017】[0017]

【発明の効果】仮蓋に設けた中心孔に拡張アンカーを挿
入して拡張部材を仮蓋の裏面に引掛けて切断した円盤状
舗装版を仮蓋で支えて撤去するようにしたので、打ち込
み型アンカーのように抜け出ることが無く、切断した円
盤状舗装版を確実に撤去できるようになった。
According to the present invention, the expansion anchor is inserted into the center hole provided in the temporary lid, the expanded member is hooked on the back surface of the temporary lid, and the cut disk-shaped pavement plate is supported by the temporary lid and removed. The disc-shaped pavement slab can be removed reliably without slipping out like a mold anchor.

【図面の簡単な説明】[Brief description of the drawings]

【図1】既設舗装の切断工程の断面図FIG. 1 is a cross-sectional view of a cutting process of an existing pavement.

【図2】切断舗装版撤去工程の断面図FIG. 2 is a cross-sectional view of a cutting pavement plate removing process.

【図3】仮蓋設置工程の断面図FIG. 3 is a cross-sectional view of a temporary lid installation process.

【図4】仮蓋上の舗装材充填工程の断面図FIG. 4 is a sectional view of a paving material filling step on a temporary lid.

【図5】オーバーレイ工程の断面図FIG. 5 is a sectional view of an overlay step.

【図6】ドリル穿孔の工程図FIG. 6 is a process diagram of drilling.

【図7】拡張アンカー設置工程の断面図FIG. 7 is a cross-sectional view of an expansion anchor installation process.

【図8】円盤状舗装版撤去工程の断面図FIG. 8 is a sectional view of a disk-shaped pavement plate removing process.

【図9】マンホール蓋受枠設置工程の断面図FIG. 9 is a sectional view of a manhole cover receiving frame setting step.

【図10】仕上げ工程の断面図FIG. 10 is a sectional view of a finishing step.

【図11】仮蓋の斜視図FIG. 11 is a perspective view of a temporary lid.

【図12】拡張アンカーの正面図FIG. 12 is a front view of an expansion anchor.

【図13】拡張アンカーの部分断面図FIG. 13 is a partial cross-sectional view of an expansion anchor.

【図14】拡張アンカーの拡張状態の説明図FIG. 14 is an explanatory diagram of an expanded state of an expansion anchor.

【符号の説明】[Explanation of symbols]

1 マンホール 11 マンホール蓋受枠 2 既設舗装 3 斜壁 4 環状舗装版 41 円盤状舗装版 5 仮蓋 6 拡張アンカー 7 舗装材 8 切削面 9 オーバーレイ DESCRIPTION OF SYMBOLS 1 Manhole 11 Manhole cover receiving frame 2 Existing pavement 3 Sloping wall 4 Annular pavement plate 41 Disc-shaped pavement plate 5 Temporary lid 6 Expansion anchor 7 Pavement material 8 Cutting surface 9 Overlay

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平5−116881(JP,A) 特開 平6−57774(JP,A) 特開 平7−180365(JP,A) 実開 平2−93307(JP,U) 実開 平2−33802(JP,U) 実開 昭54−153676(JP,U) 特許2623491(JP,B2) (58)調査した分野(Int.Cl.7,DB名) E01C 9/00 E01C 9/08 E01C 23/12 E02D 29/12 - 29/14 E04G 21/16 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-5-116881 (JP, A) JP-A-6-57774 (JP, A) JP-A-7-180365 (JP, A) 93307 (JP, U) JP-A-2-33802 (JP, U) JP-A 54-153676 (JP, U) Patent 2634991 (JP, B2) (58) Fields investigated (Int. Cl. 7 , DB name) ) E01C 9/00 E01C 9/08 E01C 23/12 E02D 29/12-29/14 E04G 21/16

Claims (4)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】マンホールを含む道路舗装方法において、
中心孔を閉塞手段で塞いだ仮蓋をマンホール位置に設置
し、仮蓋を覆うように舗装を施工し、マンホールを包囲
して舗装面を円形に切断し、仮蓋の閉塞手段を突き破っ
て中心孔に拡張アンカーを挿入し、拡張部材を仮蓋の裏
面に引掛けて切断した舗装版を仮蓋と共に引き揚げて撤
去し、マンホール蓋受枠を設置した後、環状部分に舗装
材を充填転圧する舗装方法。
1. A method of paving a road including a manhole,
Place the temporary lid with the central hole closed by the closing means at the manhole position, construct a pavement to cover the temporary lid, cut the pavement surface around the manhole into a circular shape, break through the temporary lid closing means and center Insert the expansion anchor into the hole, hook up the expansion member on the back of the temporary lid, pull up the pavement plate with the temporary lid, remove it, install the manhole cover receiving frame, fill the annular part with the pavement, and roll it. Method.
【請求項2】中心孔を閉塞手段で塞いだ仮蓋をマンホー
ル位置に設置し、仮蓋を覆うように舗装を施工し、マン
ホールを包囲して舗装路面を円形に切断し、仮蓋の閉塞
手段を突き破って中心孔に拡張アンカーを挿入し、拡張
部材を仮蓋の裏面に引掛けて切断した舗装版を仮蓋と共
に引き揚げて撤去し、マンホール蓋受枠の高さを路面に
合わせて設置するマンホール施工方法。
2. A temporary lid having a center hole closed by a closing means is installed at a manhole position, a pavement is constructed so as to cover the temporary lid, the manhole is cut, and a pavement road surface is cut into a circular shape. Break through the means, insert the expansion anchor into the center hole, hook the expansion member on the back of the temporary lid, pull up the cut paving plate together with the temporary lid, remove it, and set the height of the manhole cover receiving frame to match the road surface Manhole construction method.
【請求項3】中心孔を閉塞手段で塞いだ仮蓋をマンホー
ル位置に設置し、仮蓋を覆うように舗装を施工し、マン
ホールを包囲して舗装路面を円形に切断し、仮蓋の閉塞
手段を突き破って中心孔に拡張アンカーを挿入し、拡張
部材を仮蓋の裏面に引掛けて切断した舗装版を仮蓋と共
に引き揚げて撤去する舗装版撤去方法。
3. A temporary lid having a central hole closed by a closing means is installed at a manhole position, a pavement is constructed so as to cover the temporary lid, the manhole is surrounded, and a pavement road surface is cut into a circular shape. A pavement slab removing method in which an expansion anchor is inserted into a center hole by piercing the means, and the expanded member is hooked on the back surface of the temporary lid, and the cut paving slab is pulled up and removed together with the temporary lid.
【請求項4】中心に孔を有する板体と、中心孔を覆う突
き破ることが可能な閉塞手段からなるマンホールを含む
舗装に用いる仮蓋。
4. A temporary lid used for pavement including a plate having a hole at the center and a manhole comprising a pierceable closing means covering the center hole.
JP36193097A 1997-12-10 1997-12-10 Pavement method for road surfaces including manholes Expired - Fee Related JP3263355B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP36193097A JP3263355B2 (en) 1997-12-10 1997-12-10 Pavement method for road surfaces including manholes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP36193097A JP3263355B2 (en) 1997-12-10 1997-12-10 Pavement method for road surfaces including manholes

Publications (2)

Publication Number Publication Date
JPH11172610A JPH11172610A (en) 1999-06-29
JP3263355B2 true JP3263355B2 (en) 2002-03-04

Family

ID=18475335

Family Applications (1)

Application Number Title Priority Date Filing Date
JP36193097A Expired - Fee Related JP3263355B2 (en) 1997-12-10 1997-12-10 Pavement method for road surfaces including manholes

Country Status (1)

Country Link
JP (1) JP3263355B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4587524B2 (en) * 2000-05-10 2010-11-24 日之出水道機器株式会社 Pavement method around the ground surface composition
GB0104106D0 (en) * 2001-02-20 2001-04-04 Hicks Roger Manhole cover plate
WO2003050359A1 (en) * 2001-12-10 2003-06-19 Hanex Co., Ltd. Method of repairing and manhole and paving therearound, and device used for the method
JP2007016479A (en) * 2005-07-07 2007-01-25 Nakaken:Kk Pavement replacing construction method of manhole arranging road surface
JP5266038B2 (en) * 2008-12-24 2013-08-21 セーブマシン株式会社 Method for removing temporary road surface of manhole cover in paved road construction and expansion locking tool for removal
JP6100733B2 (en) * 2014-06-17 2017-03-22 株式会社ハネックス・ロード Method and apparatus for removing temporary lid in paving work including manhole
CN106320131A (en) * 2015-07-10 2017-01-11 济南城建集团有限公司 Asphalt pavement gutter inlet covering construction method
CN106436875A (en) * 2016-08-31 2017-02-22 济南城建集团有限公司 Novel limiting frame for mounting precipitating-preventing rainwater strainer and construction method of novel limiting frame
JP2022102377A (en) * 2020-12-25 2022-07-07 住友金属鉱山シポレックス株式会社 Drilling device for concrete panel
CN113293678A (en) * 2021-05-19 2021-08-24 中交第二航务工程局有限公司 Wellhead cutting and forming device and construction method thereof

Also Published As

Publication number Publication date
JPH11172610A (en) 1999-06-29

Similar Documents

Publication Publication Date Title
JP3263355B2 (en) Pavement method for road surfaces including manholes
EP1891274B1 (en) Torque down pile substructure support system
JP2004346586A (en) Excavating apparatus with expansion blade
EP0110853A1 (en) Apparatus for mounting of a post or a post support
JP2623491B2 (en) Cutting overlay method
JP3453664B2 (en) Shaft construction method
JP3669247B2 (en) Anchor anchor method for soft sandy ground
EP0937825A2 (en) Method and apparatus for forming enlarged pile heads
JP3376293B2 (en) Underground construction method
JP3645313B2 (en) Manhole cover cutting apparatus and information display method on manhole cover using the same
JP3931298B2 (en) Hollow pipe pile core misalignment prevention device and hollow pipe pile core misalignment prevention construction method
JP2004084164A (en) Removal method for existing pile and its device
JP3753857B2 (en) Pile embedding method
JP2709382B2 (en) An auger drill for drilling a spiral groove and a method of constructing a spiral groove on the peripheral wall of an underground hole with this auger drill.
JP4346002B2 (en) Pile embedding method and apparatus
JP2707235B2 (en) Road construction method on the slope
JP2001303570A (en) Method for drawing out pile
JP2004332522A (en) Overlay construction method, cutting overlay construction method, and paving construction method
JP4076146B2 (en) Steel pipe pile press-fitting method and equipment
JP2623490B2 (en) Overlay method
JP3813843B2 (en) Overlay method, cutting overlay method and pavement method
JP2623492B2 (en) Paving method
JP3449246B2 (en) Construction method of embedded pile using expanded steel pipe pile and expanded steel pipe pile
DK200100319U3 (en) A traffic control element
JPS5853136B2 (en) Basic structure of stationary crane

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071221

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081221

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091221

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091221

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101221

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101221

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111221

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121221

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131221

Year of fee payment: 12

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees