JP3177735B2 - An erect scaffold used to reinforce the perimeter of existing buildings - Google Patents

An erect scaffold used to reinforce the perimeter of existing buildings

Info

Publication number
JP3177735B2
JP3177735B2 JP13195497A JP13195497A JP3177735B2 JP 3177735 B2 JP3177735 B2 JP 3177735B2 JP 13195497 A JP13195497 A JP 13195497A JP 13195497 A JP13195497 A JP 13195497A JP 3177735 B2 JP3177735 B2 JP 3177735B2
Authority
JP
Japan
Prior art keywords
existing building
stage
scaffold
vertical movement
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP13195497A
Other languages
Japanese (ja)
Other versions
JPH10317661A (en
Inventor
袈以多 中島
利夫 田村
光雄 坂本
友彦 有田
一雄 栗原
俊夫 細谷
圭一 大門
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP13195497A priority Critical patent/JP3177735B2/en
Publication of JPH10317661A publication Critical patent/JPH10317661A/en
Application granted granted Critical
Publication of JP3177735B2 publication Critical patent/JP3177735B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、既存建物の外周部
補強に使用する架設足場に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an erecting scaffold used for reinforcing an outer peripheral portion of an existing building.

【0002】[0002]

【従来の技術】既存建物の外周部補強方法による耐震補
強や制震補強では、補強構面を構築する以前に、外壁塗
装の除去、外壁カーテンウォールの取外し、調整、外周
面の柱・梁・床部材とのアンカー打設準備のような前作
業があるため、補強構面部前面にわたって架設足場が必
要である。
2. Description of the Related Art In seismic retrofitting and seismic control retrofitting of existing buildings by the method of reinforcing the perimeter, prior to constructing the reinforcement structure, the outer wall painting must be removed, the outer wall curtain wall must be removed and adjusted, and the outer columns and beams must be removed. Since there is a preparatory work such as preparation for placing an anchor with a floor member, an erecting scaffold is required over the front surface of the reinforcing structure.

【0003】その後、補強構面の鉄骨建方のためには、
足場架設を全て撤去しなければならない。その理由は、
建物と架設足場の間隔が小さいこと、建物と架設足場の
アンカー接続個所数が多いことである。
[0003] Then, for the steel frame construction of the reinforcement structure,
All scaffolding must be removed. The reason is,
The distance between the building and the erection scaffold is small, and the number of anchor connections between the building and the erection scaffold is large.

【0004】また、建方クレーンで建物の新規鉄骨補強
架構の鉄骨建方を行ったのちに、この補強架構の外側に
新たな架設足場を設置して鉄骨建方後に躯体、仕上工事
に対応する。
[0004] Further, after a steel crane for a new steel frame reinforcement frame of a building is constructed with a construction crane, a new construction scaffold is installed outside the reinforcement frame to cope with the frame and finishing work after the steel frame construction. .

【0005】[0005]

【発明が解決しようとする課題】このように従来、既存
建物の外周部補強に使用する架設足場は、架け・払しの
繰返しが多く、枠組み足場では組み立ておよび撤去に多
くの時間と労力がかかり、工費も膨大なものとなる。
As described above, the conventional scaffolds used to reinforce the outer peripheral portion of an existing building often require repeated repetitions of installation and removal, and the frame scaffold requires a lot of time and labor for assembly and removal. In addition, the construction cost will be huge.

【0006】なお、建物と架設足場との間に予め新規鉄
骨補強構面を設置するだけの空間を開けて架設足場を組
むことも考えられるが、それでは安全上の面や施工能率
の面で困難或いは不可能なものとなり用をなさない。
In addition, it is conceivable to form a space for installing a new steel frame reinforcing structure in advance between the building and the construction scaffold, and to construct the construction scaffold, but this is difficult in terms of safety and construction efficiency. Or it becomes impossible and does nothing.

【0007】本発明の目的は前記従来例の不都合を解消
し、既存建物外壁の事前工事の足場として、また、鉄骨
建方時の作業足場として、さらに、鉄骨建方後の躯体、
仕上工事の足場として共通の使用が可能であり、しか
も、足場の架け・払しの2工程が不要な工程、工費の面
で大幅な節約が可能な既存建物の外周部補強に使用する
架設足場を提供することにある。
[0007] An object of the present invention is to solve the above-mentioned disadvantages of the prior art, and as a scaffold for pre-construction of an external wall of an existing building, as a work scaffold when constructing a steel frame, and furthermore, as a scaffold after constructing a steel frame.
Construction scaffolding that can be used in common as a scaffold for finishing work, and that does not require two steps of scaffolding and paying off, and that can greatly reduce the cost of construction. Is to provide.

【0008】[0008]

【課題を解決するための手段】本発明は前記目的を達成
するため、第1に、既存建物の外部に耐震補強構面また
は制震補強構面などの新規補強構面を設ける場合に、
設柱を壁つなぎにより新規補強構面を設けるのに必要な
間隔を存するように離間させて既存建物の外部に沿って
取付け、この架設柱に昇降機構を備えた上下移動ステー
ジを昇降自在に設け、上下移動ステージには、上下移動
ステージの長手方向の手摺りに沿ってクランプを介して
角パイプによる横桟を取付け、この横桟に角パイプによ
る根太を掛け渡し、横桟と根太には適宜にボルト孔を設
けておき、相互にボルトで締結してその前端部を上下移
動ステージの前方に突出させ、これら適宜間隔で並列す
る根太の前端部に足場板を設置して形成する補助ステー
ジを前記上下移動ステージと既存建物との間隔を埋める
ように既存建物側に向けて設けたことを要旨とするもの
である。
Since the present invention SUMMARY OF], to attain the aforementioned object, the first, when the outside of the existing buildings provided novel reinforcing Plane such Retrofit Plane or Seismic reinforcement Plane, rack
It is necessary to establish a new reinforcement structure by connecting the pillars to the wall.
Attached along the outside of the existing building with a space between them, a vertical moving stage equipped with an elevating mechanism is provided on this erection column so as to be able to move up and down, and the vertical moving stage has a handrail in the longitudinal direction of the vertical moving stage. Attach a horizontal pipe with a square pipe through a clamp along the, and cross the joist with the square pipe over this horizontal rail, provide bolt holes in the horizontal rail and the joist as appropriate, fasten each other with bolts, The front end protrudes forward of the vertical movement stage, and an auxiliary stage formed by installing a scaffold at the front end of the joists arranged in parallel at appropriate intervals fills the gap between the vertical movement stage and the existing building.
The main point is that it is provided for the existing building.

【0009】第2に、架設柱は台車上に立設することを
要旨とするものである。
[0009] Second, the gist of the invention is that the erection column is erected on a trolley.

【0010】請求項1記載の本発明によれば、架設柱に
沿って上下移動ステージが昇降するものであり、重量物
の補強架構の鉄骨建方時には別途用意するクレーンによ
るが、その他の作業はこの移動ステージによれば制約が
なく、安全性や施工能率が向上する。
According to the first aspect of the present invention, the vertically moving stage is moved up and down along the erection column, and a crane prepared separately is used when constructing a steel frame for a heavy-weight reinforcing frame. According to this moving stage, there is no restriction, and safety and construction efficiency are improved.

【0011】特に、鉄骨建方前は補助ステージを設ける
ことで、既存建物と移動ステージとの空間をこの補助ス
テージが埋め、外壁塗装の除去、外壁カーテンウォール
の取外し、調整、外周面の柱・梁・床部材とのアンカー
打設準備のような前作業の作業足場として補助ステージ
を使用することができる。
In particular, an auxiliary stage is provided before the steel frame is built, so that the space between the existing building and the moving stage is filled with the auxiliary stage, the outer wall painting is removed, the outer wall curtain wall is removed and adjusted, and the outer surface of the pillar is removed. The auxiliary stage can be used as a work scaffold for preparatory work such as preparation for anchoring with beams and floor members.

【0012】そして、鉄骨建方、仮ボルト時には移動ス
テージが所定のレベルに移動でき、作業ステージとして
機能する。また、鉄骨建方以後の作業は、仮設足場とし
て機能し、足場の架け・払しの2工程が不要で工程・費
用の面で有利となる。
The moving stage can be moved to a predetermined level during steel frame construction and temporary bolting, and functions as a work stage. In addition, the work after the steel frame construction functions as a temporary scaffold, which eliminates the need for two steps of hanging and paying the scaffold, which is advantageous in terms of steps and costs.

【0013】さらに工事期間中、全面足場とならないの
で建物内部の執務空間などが暗くならず、圧迫感を与え
ない。
[0013] Further, during the construction period, since the entire building does not serve as a scaffold, the working space inside the building does not become dark and does not give a feeling of oppression.

【0014】また、補助ステージはこれを簡単に組み立
ておよび撤去することができる。
Also, the auxiliary stage can be easily assembled and removed.

【0015】さらに、補助ステージの組み立ての容易性
を確保したものであり、ボルトの締結で簡単に組立・解
体ができる。
Further, the ease of assembling the auxiliary stage is ensured, and the assembly and disassembly can be easily performed by fastening bolts.

【0016】請求項2記載の本発明によれば、台車によ
り新しい場所への移動が簡単にでき、作業のロスタイム
も短縮できる。
According to the second aspect of the present invention, it is possible to easily move to a new place by using the bogie, and to reduce work loss time.

【0017】[0017]

【発明の実施の形態】以下、図面について本発明の実施
の形態を詳細に説明する。図1は本発明の既存建物の外
周部補強に使用する架設足場の1実施形態を示す平面
図、図2は同上正面図、図3は同上側面図である。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a plan view showing an embodiment of an erecting scaffold used for reinforcing an outer peripheral portion of an existing building of the present invention, FIG. 2 is a front view of the same, and FIG. 3 is a side view of the same.

【0018】図中1は架設柱であり、これはマストとし
て高さ1.25m程度のトラス構造のユニットを上下に積み
重ねていき、後述の壁つなぎを設けることにより最高 1
00mの高さをえることができる。また、この架設柱1は
角部の一角にラック2を設けている。
In the figure, reference numeral 1 denotes an erecting pillar, which is constructed by stacking up and down truss-structure units having a height of about 1.25 m as a mast, and providing a wall connection as described below.
A height of 00m can be obtained. The erection column 1 is provided with a rack 2 at one corner of a corner.

【0019】そして前記架設柱1は車輪4a,4bを有
する台車3の上に立設するもので、安定設置のためにセ
ンタージャッキ5とアウトリガージャッキ6を設ける。
図中7はハンドル、8はレベル計である。前記車輪4a
は走行用モーターを備えた駆動輪、車輪4bは操舵輪で
ある。
The erection column 1 is erected on a trolley 3 having wheels 4a and 4b. A center jack 5 and an outrigger jack 6 are provided for stable installation.
In the figure, 7 is a handle, and 8 is a level meter. The wheel 4a
Is a drive wheel provided with a traveling motor, and wheels 4b are steered wheels.

【0020】この架設柱1に作業床9の周囲に横コ字形
の手摺り10を着脱自在に並べて設けた1層分の上下移動
ステージ13を昇降自在に設けるが、該上下移動ステージ
13は前記架設柱1のラック2に噛合するピニオン11を出
力軸に設けた昇降モーター12を備えている。
A vertically movable stage 13 of one layer, which is provided with a horizontal U-shaped handrail 10 removably arranged around the work floor 9 on the erected pillar 1, is provided to be able to move up and down freely.
Reference numeral 13 denotes a lifting motor 12 having an output shaft provided with a pinion 11 that meshes with the rack 2 of the erection column 1.

【0021】本発明の架設足場は先にも述べたが、図
6、図7に示すように既存建物14の外部に耐震補強構面
または制震補強構面などの新規補強構面15を設ける場合
に使用するものであり、前記架設柱1は図5に示すよう
な壁つなぎ16により新規補強構面15を設けるのに必要な
間隔αを存するように離間させて既存建物14の外部に沿
って取付ける。
Although the erection scaffold of the present invention has been described above, as shown in FIGS. 6 and 7, a new reinforcing surface 15 such as a seismic reinforced surface or a seismic reinforced surface is provided outside the existing building 14. The erection column 1 is separated from the existing building 14 along the outside of the existing building 14 by a wall connection 16 as shown in FIG. And attach it.

【0022】従って、架設柱1に取付ける上下移動ステ
ージ13も既存建物14とは前記間隔αだけ離れて位置する
ことになるが、その間隔αを埋めるため上下移動ステー
ジ13に補助ステージ17を着脱自在に設けるものとした。
Therefore, the vertical moving stage 13 attached to the erection column 1 is also separated from the existing building 14 by the space α, but the auxiliary stage 17 is detachably attached to the vertical moving stage 13 to fill the space α. To be provided.

【0023】該補助ステージ17は、上下移動ステージ13
の長手方向の手摺り10に沿って丸・角自在クランプ(図
示せず)を介してこのクランプの丸の部分を手摺り10の
支柱に嵌め、角の部分を角パイプに嵌めて角パイプによ
る横桟18を取付け、この横桟18に同様な角パイプによる
根太19を掛け渡してその前端部を上下移動ステージの前
方に突出させ、これら適宜間隔で並列する根太19の前端
部に足場板22を設置して形成した。
The auxiliary stage 17 includes a vertically moving stage 13
Along the handrail 10 in the longitudinal direction, a round part of the clamp is fitted to a support of the handrail 10 through a round / square free clamp (not shown), and a corner part is fitted to a square pipe by a square pipe. A horizontal beam 18 is attached, and a joist 19 made of a similar square pipe is laid over the horizontal beam 18 so that its front end protrudes forward of the vertical movement stage, and a scaffold plate 22 is attached to the front end of these parallel joists 19 at appropriate intervals. Was formed.

【0024】図8にも示すようにこれら横桟18と根太19
には、予め適宜間隔にボルト孔20を設けておき、相互に
ボルト21で締結するようにすれば、補助ステージ17を簡
単に組み立てることができる。
As shown in FIG. 8, these cross rails 18 and joists 19
The auxiliary stage 17 can be easily assembled by providing bolt holes 20 at appropriate intervals in advance and fastening the bolts 21 to each other.

【0025】また、補助ステージ17を設けるに際しては
これへの出入り口用に手摺り10を1個取外しておくこと
もでき、さらに図示は省略するが補助ステージ17の周囲
に手摺り等を設けることも可能である。
When the auxiliary stage 17 is provided, one handrail 10 may be removed for the entrance to the auxiliary stage 17, and a handrail or the like may be provided around the auxiliary stage 17 although not shown. It is possible.

【0026】このようにして前記既存建物14の外部に耐
震補強構面または制震補強構面などの新規補強構面15を
設ける前の既存建物14の事前工事(外壁塗装の除去、外
壁カーテンウォールの取外し、調整、外周面の柱・梁・
床部材とのアンカー打設準備等)は、補助ステージ17を
利用して行う。上下移動ステージ13はこの補助ステージ
17を張出したまま、作業に必要に応じて上下方向に移動
・待機できる。
In this way, prior to providing a new reinforcing surface 15 such as a seismic strengthening structure or a seismic control reinforcing surface outside the existing building 14, the pre-construction work of the existing building 14 (removal of outer wall painting, outer wall curtain wall, etc.) Removal, adjustment, outer peripheral columns, beams,
Preparation of anchoring with a floor member, etc.) is performed using the auxiliary stage 17. The vertical movement stage 13 is this auxiliary stage
You can move and stand up and down as needed for work while keeping the 17 extended.

【0027】前記事前工事終了後は、前記補助ステージ
17を上下移動ステージ13から撤去し、図4に示すように
上下移動ステージ13を新規補強構面15の鉄骨建方時の作
業足場として使用し、さらに新規補強構面15が完成後は
躯体、仕上工事の作業足場として使用する。
After the completion of the preliminary work, the auxiliary stage
17 is removed from the vertical moving stage 13, and the vertical moving stage 13 is used as a work scaffold for the steel frame construction of the new reinforcing surface 15 as shown in FIG. Used as a work scaffold for finishing work.

【0028】[0028]

【発明の効果】以上述べたように本発明の既存建物の外
周部補強に使用する架設足場は、既存建物外壁の事前工
事の足場として、また、鉄骨建方時の作業足場として、
さらに、鉄骨建方後の躯体、仕上工事の足場として共通
の使用が可能であり、効率的なもので、しかも、足場の
架け・払しの2工程が不要で工程、工費の面で大幅な節
約が可能なものである。
As described above, the erection scaffold used to reinforce the outer peripheral portion of an existing building according to the present invention is used as a scaffold for pre-construction of an outer wall of an existing building and as a work scaffold for steel frame construction.
Furthermore, it can be used in common as a scaffold for steel frame construction and finishing work, and it is efficient. Moreover, there is no need for the two steps of scaffolding and paying, and the cost and work costs are significant. Savings are possible.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の既存建物の外周部補強に使用する架設
足場の1実施形態を示す平面図である。
FIG. 1 is a plan view showing an embodiment of an erecting scaffold used for reinforcing an outer peripheral portion of an existing building of the present invention.

【図2】本発明の既存建物の外周部補強に使用する架設
足場の1実施形態を示す正面図である。
FIG. 2 is a front view showing an embodiment of an erecting scaffold used for reinforcing an outer peripheral portion of an existing building according to the present invention.

【図3】本発明の既存建物の外周部補強に使用する架設
足場の1実施形態を示す側面図である。
FIG. 3 is a side view showing an embodiment of a erection scaffold used for reinforcing an outer peripheral portion of an existing building of the present invention.

【図4】補助ステージを撤去した状態の平面図である。FIG. 4 is a plan view showing a state where an auxiliary stage is removed.

【図5】壁つなぎの平面図である。FIG. 5 is a plan view of wall connection.

【図6】既存建物の外周部補強工事の正面図である。FIG. 6 is a front view of an outer peripheral part reinforcement work of an existing building.

【図7】既存建物の外周部補強工事の側面図である。FIG. 7 is a side view of an outer peripheral part reinforcement work of an existing building.

【図8】補助ステージの部品構成を示す説明図である。FIG. 8 is an explanatory diagram showing a component configuration of an auxiliary stage.

【符号の説明】[Explanation of symbols]

1…架設柱 2…ラック 3…台車 4a,4b…車輪 5…センタージャッキ 6…アウトリガー
ジャッキ 7…ハンドル 8…レベル計 9…作業床 10…手摺り 11…ピニオン 12…昇降モーター 13…上下移動ステージ 14…既存建物 15…新規補強構面 16…壁つなぎ 17…補助ステージ 18…横桟 19…根太 20…ボルト孔 21…ボルト 22…足場板
DESCRIPTION OF SYMBOLS 1 ... Installation pillar 2 ... Rack 3 ... Truck 4a, 4b ... Wheel 5 ... Center jack 6 ... Outrigger jack 7 ... Handle 8 ... Level gauge 9 ... Work floor 10 ... Handrail 11 ... Pinion 12 ... Elevating motor 13 ... Vertical movement stage 14 ... Existing building 15 ... New reinforcement structure 16 ... Wall connection 17 ... Auxiliary stage 18 ... Side rail 19 ... Joint 20 ... Bolt hole 21 ... Bolt 22 ... Scaffold plate

───────────────────────────────────────────────────── フロントページの続き (72)発明者 田村 利夫 東京都港区元赤坂一丁目3番8号 鹿島 建設株式会社 東京支店内 (72)発明者 坂本 光雄 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (72)発明者 有田 友彦 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (72)発明者 栗原 一雄 東京都港区元赤坂一丁目1番5号 富士 陰ビル カジマメカトロエンジアリング 株式会社内 (72)発明者 細谷 俊夫 東京都港区元赤坂一丁目1番5号 富士 陰ビル カジマメカトロエンジアリング 株式会社内 (72)発明者 大門 圭一 東京都港区元赤坂一丁目1番5号 富士 陰ビル カジマメカトロエンジアリング 株式会社内 (56)参考文献 特開 平6−336823(JP,A) 実開 平5−83183(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04G 1/20 E04G 5/06 ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Toshio Tamura 1-3-8 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. Tokyo Branch (72) Inventor Mitsuo Sakamoto 1-2-chome Moto-Akasaka, Minato-ku, Tokyo 7 Kashima Construction Co., Ltd. (72) Inventor Tomohiko Arita 1-2-7 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. (72) Kazuo Kurihara 1-1-5 Moto-Akasaka, Minato-ku, Tokyo Fuji Ink Building Kajima Mechatro Engineering Co., Ltd. (72) Inventor Toshio Hosoya 1-5-1, Moto-Akasaka, Minato-ku, Tokyo Fuji Ink Building Kajima Mechatro Engineering Co., Ltd. (72) Inventor Keiichi Daimon Minato-ku, Tokyo Former Akasaka 1-chome No. 1-5 Fuji Yin Building Kajima Mechatro Engineering Co., Ltd. (56) References JP-A-6-3368 23 (JP, A) Japanese Utility Model Hei 5-83183 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) E04G 1/20 E04G 5/06

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 既存建物の外部に耐震補強構面または制
震補強構面などの新規補強構面を設ける場合に、架設柱
を壁つなぎにより新規補強構面を設けるのに必要な間隔
を存するように離間させて既存建物の外部に沿って取付
け、この架設柱に昇降機構を備えた上下移動ステージを
昇降自在に設け、上下移動ステージには、上下移動ステ
ージの長手方向の手摺りに沿ってクランプを介して角パ
イプによる横桟を取付け、この横桟に角パイプによる根
太を掛け渡し、横桟と根太には適宜にボルト孔を設けて
おき、相互にボルトで締結してその前端部を上下移動ス
テージの前方に突出させ、これら適宜間隔で並列する根
太の前端部に足場板を設置して形成する補助ステージを
前記上下移動ステージと既存建物との間隔を埋めるよう
既存建物側に向けて設けたことを特徴とする既存建物
の外周部補強に使用する架設足場。
If the method according to claim 1] to the outside of the existing building providing a new reinforcement Plane, such as seismic reinforcement Plane or vibration control reinforcement Plane, erection post
Required to provide a new reinforcing surface by connecting
The in spaced apart so as lie mounted along the exterior of the existing building, provided with vertical movement stage having a lifting mechanism in the erection column vertically movably, the vertical movement stage, in the longitudinal direction of the handrail vertically moving stage Attach a horizontal crosspiece with a square pipe through a clamp along the crossbar, hang a joist with a square pipe over this horizontal crosspiece, provide appropriate bolt holes in the horizontal crosspiece and the joist, fasten each other with bolts, and Part is projected forward of the vertical movement stage, and an auxiliary stage is formed by installing a scaffold plate at the front end of these joists that are juxtaposed at appropriate intervals.
Fill the gap between the vertical movement stage and the existing building
Erection scaffolding used for the outer peripheral portion reinforcing existing buildings, characterized in that provided toward the existing building side.
【請求項2】 架設柱は台車上に立設する請求項1記載
の既存建物の外周部補強に使用する架設足場。
2. The construction scaffold according to claim 1, wherein the construction pillar is erected on a trolley.
JP13195497A 1997-05-22 1997-05-22 An erect scaffold used to reinforce the perimeter of existing buildings Expired - Fee Related JP3177735B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13195497A JP3177735B2 (en) 1997-05-22 1997-05-22 An erect scaffold used to reinforce the perimeter of existing buildings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13195497A JP3177735B2 (en) 1997-05-22 1997-05-22 An erect scaffold used to reinforce the perimeter of existing buildings

Publications (2)

Publication Number Publication Date
JPH10317661A JPH10317661A (en) 1998-12-02
JP3177735B2 true JP3177735B2 (en) 2001-06-18

Family

ID=15070101

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13195497A Expired - Fee Related JP3177735B2 (en) 1997-05-22 1997-05-22 An erect scaffold used to reinforce the perimeter of existing buildings

Country Status (1)

Country Link
JP (1) JP3177735B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011140859A (en) * 2009-12-11 2011-07-21 Kawase Komuten:Kk Scaffolding apparatus for work, skeleton working method, and method for providing skeleton temporary working platform
WO2014192564A1 (en) * 2013-05-28 2014-12-04 株式会社トータル環境 High-rise building and maintenance method therefor
JP5559409B1 (en) * 2013-05-28 2014-07-23 株式会社トータル環境 High-rise building and its maintenance method
JP7220995B2 (en) * 2018-05-21 2023-02-13 株式会社竹中工務店 Mobile scaffolding device and method of use
JP6713144B1 (en) * 2020-01-17 2020-06-24 日建リース工業株式会社 Connecting fittings for hoisting work scaffolds and installation method

Also Published As

Publication number Publication date
JPH10317661A (en) 1998-12-02

Similar Documents

Publication Publication Date Title
CN103635643B (en) The construction method of nigh-level synthesis steel bar concrete cylindrical shell
JP3569861B2 (en) Construction method of stairs and staircase, staircase support device, and staircase structure
JP3106335B2 (en) System formwork
JP3177735B2 (en) An erect scaffold used to reinforce the perimeter of existing buildings
CN114508231B (en) Quick combination construction method for I-steel component
JPS61290164A (en) Method and apparatus for supporting beam and slab
JP3241896B2 (en) Steel frame stair hang down method
CN220319075U (en) Guy rope hanging basket assembling platform
KR100278767B1 (en) Formwork for beam forming and building construction method using the same
JP3368483B2 (en) Bridge pier construction method
CN217782786U (en) Portable operation platform of encorbelmenting convenient to equipment
CN113089897B (en) Construction method for integrally hoisting disassembly-free cement formwork
JPS638260B2 (en)
JP3234442B2 (en) Building and scrap type building method
CN109577632B (en) Suspended scaffold and construction method thereof
JP3281421B2 (en) Construction method of horizontal beam erected on tower
JP3439545B2 (en) Construction method of multi-story parking lot
JP3192543B2 (en) Building demolition method
JP2917235B2 (en) Steel construction method
JP2939752B2 (en) Lift-up method in which an outer wall plate is attached to the floor plate
JP2934567B2 (en) Work gondola for multi-story parking lot construction
JPH0445628B2 (en)
JP3240270B2 (en) Scaffold assembling method and scaffolding device
JP2761526B2 (en) How to build structures
JP2761527B2 (en) How to build structures