JP3122068B2 - Backstay positioning device for crane high mast - Google Patents

Backstay positioning device for crane high mast

Info

Publication number
JP3122068B2
JP3122068B2 JP09285869A JP28586997A JP3122068B2 JP 3122068 B2 JP3122068 B2 JP 3122068B2 JP 09285869 A JP09285869 A JP 09285869A JP 28586997 A JP28586997 A JP 28586997A JP 3122068 B2 JP3122068 B2 JP 3122068B2
Authority
JP
Japan
Prior art keywords
back stay
high mast
base end
upper strut
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP09285869A
Other languages
Japanese (ja)
Other versions
JPH11116187A (en
Inventor
康宏 吉村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo SHI Construction Machinery Co Ltd
Original Assignee
Sumitomo SHI Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo SHI Construction Machinery Co Ltd filed Critical Sumitomo SHI Construction Machinery Co Ltd
Priority to JP09285869A priority Critical patent/JP3122068B2/en
Publication of JPH11116187A publication Critical patent/JPH11116187A/en
Application granted granted Critical
Publication of JP3122068B2 publication Critical patent/JP3122068B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はクレーンのハイマス
トに於けるバックステーの位置決め装置に関するもので
あり、特に、ハイマスト組立時の組立作業性の向上並び
に安全性を確実にしたクレーンのハイマストに於けるバ
ックステーの位置決め装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a positioning device for a backstay in a high mast of a crane, and more particularly to a high mast of a crane in which the assembling workability in assembling the high mast and the safety thereof are ensured. The present invention relates to a backstay positioning device.

【0002】[0002]

【従来の技術】従来のクレーンのハイマストに於けるバ
ックステーの組立手順を図7乃至図9に従って説明す
る。図7に於て1はクレーンのブーム後方に設けられる
門型のハイマストであり、該ハイマスト1は水平材にて
一体に固定されたアッパーストラット2と、該アッパー
ストラット2に連結された左右一対のバックステー3と
から成り、該バックステー3の先端部3aと前記アッパ
ーストラット2の先端部2aとはピン4によって回動自
在に連絡されている。又、前記アッパーストラット2の
基端部2bにはピン孔5が開穿されていると共に、前記
アッパーストラット2の基端部2b近傍に設けられた下
側ラグ6にはピン孔7が開穿されている。
2. Description of the Related Art A procedure for assembling a back stay in a conventional high mast of a crane will be described with reference to FIGS. In FIG. 7, reference numeral 1 denotes a gate-type high mast provided at the rear of the crane boom. The high mast 1 includes an upper strut 2 integrally fixed by a horizontal member, and a pair of right and left right struts connected to the upper strut 2. The front end 3a of the back stay 3 and the front end 2a of the upper strut 2 are rotatably connected by pins 4. A pin hole 5 is formed in the base end 2b of the upper strut 2, and a pin hole 7 is formed in the lower lug 6 provided near the base end 2b of the upper strut 2. Have been.

【0003】一方、前記バックステー3の先端部3a近
傍には、該バックステー3の長さを数段階に変更して固
定できる固定ピン8が設けられていると共に、前記バッ
クステー3の基端部3bにはピン孔9が開穿されてい
る。
On the other hand, near the distal end 3a of the back stay 3, there is provided a fixing pin 8 for changing the length of the back stay 3 in several steps and fixing the same. A pin hole 9 is formed in the portion 3b.

【0004】前記ハイマスト1を組立ててクレーンに取
り付けるに際しては、先ず、前記バックステー3の長さ
を最縮小して前記固定ピン8により固定し、その後、前
記アッパーストラット2の基端部2bに設けられたブラ
イドル収納用リンク10と、前記アッパーストラット2
の先端部2aに設けられたベイル取付リンク11とにワ
イヤー12を係止してクレーン13にて前記ハイマスト
1を吊り揚げる。
When assembling the high mast 1 and attaching it to a crane, first, the length of the back stay 3 is reduced to a minimum and fixed by the fixing pin 8, and then provided on the base end 2 b of the upper strut 2. Bridle storage link 10 and the upper strut 2
The high mast 1 is lifted by a crane 13 by locking the wire 12 to a bail attachment link 11 provided at the tip 2a of the vehicle.

【0005】斯くして、図8に示すように前記アッパー
ストラット2が水平状態となり、且つ、バックステー3
の基端部3bが鉛直方向に垂下し、前記ハイマスト1は
逆L字形の姿勢で吊り揚げられる。そして、前記バック
ステー3の基端部3bに開穿されたピン孔9とクレーン
の上部旋回体14の後部に設けられたラグ15とを対峙
させピン16を挿入して、前記バックステー3を前記上
部旋回体14に枢着する。引き続き前記クレーン13を
少し降下し、図9に示すように前記上部旋回体14のロ
ーマスト部17に設けられたラグ(図示せず)と前記ア
ッパーストラット2の基端部2bに開穿されたピン孔5
とを対峙させてピン止めし、前記アッパーストラット2
を上部旋回体14の後部に枢着する。
Thus, as shown in FIG. 8, the upper strut 2 is in a horizontal state and the back stay 3
, And the high mast 1 is lifted in an inverted L-shaped posture. Then, the pin hole 9 formed in the base end portion 3b of the back stay 3 and the lug 15 provided at the rear of the upper revolving unit 14 of the crane face each other, and the pin 16 is inserted. It is pivotally attached to the upper swing body 14. Subsequently, the crane 13 is lowered slightly, and as shown in FIG. 9, a lug (not shown) provided on the roman strut portion 17 of the upper revolving unit 14 and a pin opened in the base end 2 b of the upper strut 2. Hole 5
And the upper strut 2
At the rear of the upper swing body 14.

【0006】然る後、前記ローマスト14の基端部近傍
に設けられたガントリー昇降シリンダ18の他端部を前
記アッパーストラット2の下側ラグ19に接続し、その
後、玉掛けを外して前記ブライドル収納用リンク10を
格納する。
After that, the other end of the gantry lifting cylinder 18 provided near the base end of the romant 14 is connected to the lower lug 19 of the upper strut 2, and then the sling is removed to store the bridle. Link 10 is stored.

【0007】斯くして、前記ハイマスト1がクレーンの
前記上部旋回体14に取り付けられた後、前記ガントリ
ー昇降シリンダ18を伸張すれば、前記アッパーストラ
ット2の先端部2aが前記バックステー3と共に起立
し、ハイマスト1が作業姿勢となる。
When the gantry lifting cylinder 18 is extended after the high mast 1 is attached to the upper swing body 14 of the crane, the tip 2a of the upper strut 2 stands up with the back stay 3. , The high mast 1 is in the working posture.

【0008】[0008]

【発明が解決しようとする課題】従来のハイマストの組
立はピンにより回動自在に連結されているアッパースト
ラットとバックステーとをチェンブロックやクレーン等
により吊り揚げて、前記バックステーの基端部に開穿さ
れたピン孔を上部旋回体の後部ラグに対峙させ、ピンを
挿入して枢着した後に、前記アッパーストラットの基端
部に開穿されたピン孔をローマスト部のラグに対峙させ
ピンを挿入して枢着する。従って、前記バックステー側
及びアッパーストラット側の2個所でピン孔の位置合せ
作業を行う必要があると共に、同作業時には前記ハイマ
ストが揺れるので作業の安全性及び作業効率の面でも問
題があった。
In a conventional high mast assembly, an upper strut and a back stay rotatably connected by a pin are lifted and lifted by a chain block, a crane, or the like, and are mounted on the base end of the back stay. After the opened pin hole is opposed to the rear lug of the upper revolving structure, and the pin is inserted and pivoted, the pin hole opened at the base end of the upper strut is opposed to the lug of the roman strut. Insert and pivot. Therefore, it is necessary to perform the positioning of the pin holes at the two places on the back stay side and the upper strut side, and at the same time, the high mast is shaken during the work, so that there is a problem in terms of work safety and work efficiency.

【0009】そこで、ハイマストの組立作業を簡略化し
て作業効率を向上させると共に、作業の安全性を向上さ
せるために解決せらるべき技術的課題が生じてくるので
あり、本発明はこの課題を解決することを目的とする。
[0009] In view of the above, technical problems that need to be solved in order to simplify the operation of assembling the high mast to improve the work efficiency and to improve the work safety arise. The present invention solves this problem. The purpose is to do.

【0010】[0010]

【課題を解決するための手段】本発明は上記目的を達成
するために提案されたものであり、クレーンのブームの
後方に設けられた左右のアッパーストラットの先端部
に、該アッパーストラットの後方から左右一対のバック
ステーの先端部を回動自在に接続し、且つ、前記アッパ
ーストラットと前記バックステーの基端部を夫々上部旋
回体のメインフレームに接続して成るクレーンのハイマ
ストに於て、前記アッパーストラットと前記バックステ
ーとが一定の姿勢で接続されるように前記バックステー
の回転角度を規制する手段を設けると共に、前記メイン
フレームに位置決め用のストッパーを設け、前記アッパ
ーストラットの基端部側を前記メインフレームへ位置決
めする際に、前記バックステーの基端部が前記メインフ
レームに自動的に位置決めされるように構成されたクレ
ーンのハイマストに於けるバックステーの位置決め装置
を提供するものである。
SUMMARY OF THE INVENTION The present invention has been proposed in order to achieve the above-mentioned object, and is provided at the distal ends of left and right upper struts provided at the rear of a crane boom, from the rear of the upper struts. In a crane high mast comprising a pair of left and right back stays rotatably connected to a tip end thereof, and a base end of the upper strut and a base end of the back stay connected to a main frame of an upper revolving structure, respectively. A means for restricting the rotation angle of the back stay is provided so that the upper strut and the back stay are connected in a fixed posture, and a positioning stopper is provided on the main frame, and a base end side of the upper strut is provided. When positioning the back stay on the main frame, the base end of the back stay is automatically positioned on the main frame. The Haimasuto the configured crane as determined there is provided a positioning device in the backstay.

【0011】[0011]

【発明の実施の形態】以下、本発明の一実施の形態を図
1乃至図6に従って詳述する。図1はクレーン20を示
し、上部旋回体21の前方部にブーム22を前後回動自
在に装着し、該ブーム22の先端にトップシーブ23及
びガイドシーブ24を枢着して、フックロープ25を巻
回し、フック26を吊り下げてある。そして、前記上部
旋回体21に設けられたウインチユニット(図示せず)
により、前記フックロープ25を巻き下げして前記フッ
ク26を上下動させる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below in detail with reference to FIGS. FIG. 1 shows a crane 20, in which a boom 22 is attached to the front part of an upper swing body 21 so as to be able to rotate back and forth, and a top sheave 23 and a guide sheave 24 are pivotally attached to the tip of the boom 22 to attach a hook rope 25. It is wound and the hook 26 is suspended. A winch unit (not shown) provided on the upper swing body 21
Thereby, the hook rope 25 is lowered and the hook 26 is moved up and down.

【0012】一方、前記上部旋回体21の後部には門型
のハイマスト27が設けられており、該ハイマスト27
はブーム22の後部に前後回動自在に枢着した左右のア
ッパーストラット28と、該アッパーストラット28の
先端部28aを後方から支承する左右一対のバックステ
ー29とから成る。
On the other hand, a gate-shaped high mast 27 is provided at the rear of the upper revolving superstructure 21.
The upper strut 28 includes left and right upper struts 28 pivotally attached to a rear portion of the boom 22 and a pair of left and right back stays 29 for supporting a distal end portion 28a of the upper strut 28 from behind.

【0013】更に、前記ブーム22の先端部にペンダン
トロープ30の一端を係止し、該ペンダントロープ30
の他端部にブライドル31を連結すると共に、前記バッ
クステー29の先端部29aにベイル32を枢着し、前
記ブライドル31とベイル32の各シーブ間にブーム起
伏ロープ33を巻回して前記ウインチユニットへ接続す
る。
Further, one end of a pendant rope 30 is fixed to the end of the boom 22 so that the pendant rope 30
A bridle 31 is connected to the other end of the winch unit, and a bail 32 is pivotally attached to the tip end 29a of the back stay 29. Connect to

【0014】一方、前記アッパーストラット28の基端
部28b近傍にガントリー昇降シリンダ34の先端部を
接続すると共に、該ガントリー昇降シリンダ34の基端
部を図示は省略するが前記アッパーストラット28の基
端部28bに枢着された門型連結部に接続する。
On the other hand, the distal end of a gantry lifting cylinder 34 is connected to the vicinity of the proximal end 28b of the upper strut 28, and the proximal end of the gantry lifting cylinder 34 is omitted from the drawing. Connects to a portal connection pivoted to section 28b.

【0015】図2は前記ハイマスト27を示し、該ハイ
マスト27は前記アッパーストラット28と、該アッパ
ーストラット28の先端部28aを後方から支承する前
記バックステー29とから成り、該バックステー29の
先端部29a近傍には該バックステー29の長さを数段
階に変更して固定できる固定ピン40が設けられている
ので、該バックステー29は伸縮可能となっている。従
って、該バックステー29の長さを伸縮することによ
り、前記アッパーストラット28の傾斜角度を自由に変
更することができる。
FIG. 2 shows the high mast 27. The high mast 27 includes the upper strut 28 and the back stay 29 for supporting a tip 28a of the upper strut 28 from behind. In the vicinity of 29a, there is provided a fixing pin 40 which can fix the back stay 29 by changing the length of the back stay 29 in several steps, so that the back stay 29 can be extended and contracted. Therefore, the inclination angle of the upper strut 28 can be freely changed by expanding and contracting the length of the back stay 29.

【0016】次に、図2に示したアッパーストラット2
8とバックステー29の夫々の先端部分28a.29a
(図中Aの部分)を図3に示す。同図に於て、前記バッ
クステー29の先端部29aには小径の長孔41が開穿
されていると共に、先端部29a近傍にはやゝ大径のピ
ン孔42が開穿されている。又、前記アッパーストラッ
ト28の先端部28aには小径のピン孔43が開穿され
ており、先端部28a近傍にはやゝ大径のピン孔44が
開穿されている。
Next, the upper strut 2 shown in FIG.
8 and the back stay 29, respectively. 29a
(Part A in the figure) is shown in FIG. In the same drawing, a small-diameter long hole 41 is formed in the front end portion 29a of the back stay 29, and a slightly large-diameter pin hole 42 is formed in the vicinity of the front end portion 29a. A pin hole 43 having a small diameter is formed in the tip portion 28a of the upper strut 28, and a pin hole 44 having a slightly larger diameter is formed in the vicinity of the tip portion 28a.

【0017】後述するように、前記アッパーストラット
28の先端部28aと前記バックステー29の先端部2
9aを合接し、双方のピン孔44,42を対峙させたと
きに、前記小径の長孔41の短軸部分と小径のピン孔4
3の直径とが一致するように形成されている。
As will be described later, the tip 28a of the upper strut 28 and the tip 2 of the back stay 29
9a are brought into contact with each other so that the pin holes 44 and 42 are opposed to each other.
3 are formed so as to have the same diameter.

【0018】一方、図2に示すように、前記アッパース
トラット28の基端部28b近傍の上側部にはブライド
ル収納用リンク45が設けられていると共に、基端部2
8bにはピン孔46が開穿されている。更に、門型連結
部47の上部に開穿されたピン孔48と、前記アッパー
ストラット28の基端部28bのピン孔46とを対峙さ
せてピン49を挿入することにより、前記アッパースト
ラット28の基端部28bが前記門型連結部47に連結
されるようになっている。
On the other hand, as shown in FIG. 2, a bridle storage link 45 is provided on an upper portion of the upper strut 28 near the base end portion 28b.
A pin hole 46 is formed in 8b. Further, a pin 49 is inserted into the upper strut 28 so that the pin hole 48 formed in the upper part of the portal type connecting portion 47 and the pin hole 46 of the base end 28b of the upper strut 28 face each other. The base end portion 28b is connected to the portal-shaped connecting portion 47.

【0019】又、前記上部旋回体21のメインフレーム
50に固設されたブラケット51,52には夫々ピン孔
53,54が開穿されていると共に、該ピン孔53,5
4の下方部には後述するハイマスト27の組立時に前記
門型連結部47の脚部47a,47bの基端部が降下し
て、前記ブラケット51,52の上方部へ案内されるよ
うに、前記脚部47a,47bの位置合せ用ストッパー
ボルト55,56,57,58が所定の間隔を有して突
設されている。そして、前記脚部47a,47bには夫
々ピン孔59,60が開穿されていると共に、前記脚部
47bに設けられたガントリー昇降シリンダ34の他端
部は前記アッパーストラット28の下側ラグ61に接続
されている。
The brackets 51, 52 fixed to the main frame 50 of the upper rotating body 21 are provided with pin holes 53, 54, respectively.
In the lower part of the bracket 4, the base ends of the legs 47a, 47b of the gate-shaped connecting part 47 are lowered at the time of assembling the high mast 27, which will be described later. Stopper bolts 55, 56, 57, 58 for positioning the legs 47a, 47b are provided at predetermined intervals. Pin holes 59 and 60 are formed in the legs 47a and 47b, respectively, and the other end of the gantry lifting cylinder 34 provided in the legs 47b is connected to a lower lug 61 of the upper strut 28. It is connected to the.

【0020】一方、前記バックステー29の基端部29
bにはピン孔62が開穿されており、前記ピン孔62に
対峙させて接続できるブラケット63が前記メインフレ
ーム50に固設されている。又、前記ブラケット63の
左側上方部にはピン孔64が開穿されており、該ピン孔
64の下方部にはハイマスト27の組立時に前記バック
ステー29の基端部29bが自重で降下し、前記ブラケ
ット63の左側上方部へ案内されるように位置合せ用ス
トッパーボルト65,66が突設されている。更に、前
記ブラケット63の右側部には上方部に湾曲部を有する
大略三角形状のスライド部67が固設されており、該ス
ライド部67の上方湾曲部には前記バックステー29の
基端部29bがスライドして、前記ブラケット63の左
側上方部に案内されるようにスライド面68が形成され
ている。
On the other hand, the base end 29 of the back stay 29
The b is provided with a pin hole 62, and a bracket 63 that can be connected to the pin hole 62 so as to face the pin hole 62 is fixed to the main frame 50. A pin hole 64 is formed in the upper left portion of the bracket 63, and a base end portion 29b of the back stay 29 descends by its own weight below the pin hole 64 when the high mast 27 is assembled. Positioning stopper bolts 65 and 66 are projected from the bracket 63 so as to be guided to the upper left side. Further, a substantially triangular slide portion 67 having a curved portion on the upper side is fixedly provided on the right side of the bracket 63, and the base portion 29b of the back stay 29 is fixed to the upper curved portion of the slide portion 67. The slide surface 68 is formed so that the slide surface slides and is guided to the upper left part of the bracket 63.

【0021】次に、ハイマスト27の組立方法を図3乃
至図6に従って説明する。図3に於て、前記アッパース
トラット28の先端部28a近傍のスリット部28cに
前記バックステー29の先端部29aを挿入し、双方の
ピン孔42と44とを対峙させてピン69を挿入し、前
記アッパーストラット28と前記バックステー29とを
回動自在に接続する。続いて、前記バックステー29の
先端部29aに開穿された長孔41に前記アッパースト
ラット28に開穿されたピン孔43とを対峙させてピン
70を挿入すれば、前記バックステー29とピン70と
が一体に回動し、且つ、ピン70は前記長孔41の長軸
方向の長さしか移動できないので、前記アッパーストラ
ット28に対する前記バックステー29の回転角度がピ
ン70の移動範囲内に規制される。そこで、前記バック
ステー29と前記アッパーストラット28との姿勢が略
一定に保持されることになる。
Next, a method of assembling the high mast 27 will be described with reference to FIGS. In FIG. 3, the tip portion 29a of the back stay 29 is inserted into the slit portion 28c near the tip portion 28a of the upper strut 28, and the pin 69 is inserted with the two pin holes 42 and 44 facing each other. The upper strut 28 and the back stay 29 are rotatably connected. Subsequently, the pin 70 is inserted into the elongated hole 41 formed in the tip portion 29a of the back stay 29 so as to face the pin hole 43 formed in the upper strut 28. 70 rotates together with the pin 70 and the pin 70 can move only the length of the long hole 41 in the long axis direction, so that the rotation angle of the back stay 29 with respect to the upper strut 28 is within the moving range of the pin 70. Be regulated. Therefore, the posture of the back stay 29 and the upper strut 28 is kept substantially constant.

【0022】尚、前記バックステー29の回転角度規制
手段としてはピンを使用することに限定されるものでは
なく、例えばプレートを使用してもよい。然る後、前記
アッパーストラット28に設けられたブライドル収納用
リンク45と前記ピン69とを用いてクレーン等により
前記ハイマスト27を吊り揚げる。図4(a)に示すよ
うに、前記ブラケット51,52に前記門型連結部47
の脚部47a,47bを対峙させた後、前記クレーンに
て前記ハイマスト27を降下させると、前記脚部47
a,47bが前記ブラケット51,52に降下してゆ
く。斯くして、図4(b)に示すように、前記脚部47
a,47bは夫々前記ブラケット51,52に突設され
た位置合せ用ストッパーボルト55,56,57,58
によって双方のピン孔が対峙するように案内されてスト
ップする。そこで、前記ピン孔59は前記ピン孔53に
正確に一致すると共に、前記ピン孔60は前記ピン孔5
4に正確に一致するので、夫々のピン孔59,53及び
60,54へピン71,72を挿入すると前記脚部47
a,47bの位置が決定され、該脚部47a,47bは
前記メインフレーム50に接続されることになる。
The rotation angle regulating means of the back stay 29 is not limited to the use of a pin, but may be a plate, for example. Thereafter, the high mast 27 is lifted by a crane or the like using the bridle storage link 45 provided on the upper strut 28 and the pin 69. As shown in FIG. 4 (a), the brackets 51 and 52 are
When the high mast 27 is lowered by the crane after the legs 47a and 47b of
a, 47b descend to the brackets 51, 52. Thus, as shown in FIG.
a and 47b are positioning stopper bolts 55, 56, 57 and 58 projecting from the brackets 51 and 52, respectively.
The two pin holes are guided so as to face each other and stop. Therefore, the pin hole 59 exactly matches the pin hole 53, and the pin hole 60 is
4, the pins 47 are inserted into the respective pin holes 59, 53 and 60, 54.
The positions of a and 47b are determined, and the legs 47a and 47b are connected to the main frame 50.

【0023】このとき、前記アッパーストラット28の
先端部28aに接続されている前記バックステー29は
前述するように、ピン70が長孔41の上端に当接して
回転角度が規制されているため図5(a)に示すように
バックステー29の基端部29bが前記スライド面68
におりてくる。そして、前記クレーンにより前記ハイマ
スト27を降下させると、図5(b)に示すように前記
バックステー29の基端部29bは自重により前記スラ
イド面68をスライドしながら前記ブラケット63の左
上方部へ降下し、前記位置合せ用ストッパーボルト6
5,66により双方のピン孔62,64が対峙するよう
に案内されてストップする。
At this time, the back stay 29 connected to the distal end portion 28a of the upper strut 28 has the pin 70 abutting on the upper end of the elongated hole 41 to restrict the rotation angle as described above. As shown in FIG. 5A, the base end 29b of the back stay 29 is
Come to. Then, when the high mast 27 is lowered by the crane, the base end 29b of the back stay 29 slides on the slide surface 68 by its own weight toward the upper left portion of the bracket 63 as shown in FIG. Descending, the stopper bolt 6 for alignment
The pin holes 62, 64 are guided by the pins 5, 66 so as to face each other and stopped.

【0024】斯くして、前記ブラケット63に開穿され
たピン孔64と前記バックステー29の基端部29bに
開穿されたピン孔62とが正確に一致し、双方のピン孔
62,64へピン73を挿入すれば、前記バックステー
29の位置が決定され、該バックステー29は前記メイ
ンフレーム50に回動自在に枢着されることになる。
Thus, the pin hole 64 formed in the bracket 63 and the pin hole 62 formed in the base end portion 29b of the back stay 29 exactly coincide with each other, and both pin holes 62, 64 are formed. When the pin 73 is inserted, the position of the back stay 29 is determined, and the back stay 29 is pivotally connected to the main frame 50 so as to be freely rotatable.

【0025】即ち、前記アッパーストラット28の基端
部28bに接続された前記門型連結部47の脚部47
a,47bの基端部を前記ブラケット51,52へ接近
させ、前記ピン孔59,60を前記ピン孔53,54に
一致させてピン結合すれば、前記アッパーストラット2
8と前記バックステー29との姿勢が略一定に保持され
ているため、該バックステー29の基端部29bに開穿
されたピン孔62が前記ブラケット63に開穿されたピ
ン孔64へ自動的に位置決めされる。
That is, the leg portion 47 of the portal type connecting portion 47 connected to the base end portion 28b of the upper strut 28
a, 47b are brought closer to the brackets 51, 52, and the pin holes 59, 60 are aligned with the pin holes 53, 54 so as to be pin-coupled.
8 and the back stay 29 are held in a substantially constant posture, so that the pin hole 62 formed in the base end portion 29b of the back stay 29 is automatically inserted into the pin hole 64 formed in the bracket 63. Is positioned.

【0026】尚、前記バックステー29の位置合せ用ス
トッパーとしてはストッパーボルトを使用することに限
定されるものではなく、例えばプレートを使用してもよ
い。斯くして、図6に示すように前記ハイマスト27が
前記メインフレーム50に組立てられる。そして、作業
時には前記バックステー29に設けられた固定ピン40
を一旦離脱し、前記ガントリー昇降シリンダ34を作動
して前記アッパーストラット28を起立させる。このと
き、前記バックステー29の先端部29aが引き上げら
れるので、バックステー29の長さが伸長する。斯くし
て、前記ハイマスト27は前記アッパーストラット28
と前記バックステー29との角度を一定に保持しつつ、
前記ピン49及び73を支点として起立し、続いて、前
記固定ピン40を再び挿入してバックステー29の長さ
を固定すれば、前記ハイマスト27が所定の作業姿勢に
固定される。
The stopper for positioning the back stay 29 is not limited to the use of a stopper bolt, but may be a plate, for example. Thus, the high mast 27 is assembled to the main frame 50 as shown in FIG. At the time of work, a fixing pin 40 provided on the back stay 29 is provided.
, And the gantry lifting cylinder 34 is operated to raise the upper strut 28. At this time, the front end 29a of the back stay 29 is pulled up, so that the length of the back stay 29 is extended. Thus, the high mast 27 is connected to the upper strut 28
While keeping the angle between the and the back stay 29 constant,
The high mast 27 is fixed in a predetermined working posture by standing up with the pins 49 and 73 as fulcrums and subsequently inserting the fixing pin 40 again to fix the length of the back stay 29.

【0027】尚、本発明は、本発明の精神を逸脱しない
限り種々の改変を為すことができ、そして、本発明が該
改変されたものに及ぶことは当然である。
The present invention can be variously modified without departing from the spirit of the present invention, and it goes without saying that the present invention extends to the modified ones.

【0028】[0028]

【発明の効果】以上説明したように、クレーンのハイマ
ストをメインフレームに組立てるとき、該ハイマストを
形成するアッパーストラットとバックステーとが略一定
の姿勢で接続されるように前記バックステーの回転角度
を規制する手段を設けると共に、前記アッパーストラッ
ト並びにバックステーの基端部を接続するブラケットに
位置決め用のストッパーを設けてあるので、前記アッパ
ーストラットの基端部側を前記メインフレームのブラケ
ットへ位置決めする際に、前記バックステーの基端部が
前記メインフレームに自動的に位置決めされる。
As described above, when assembling the crane high mast to the main frame, the rotation angle of the back stay is adjusted so that the upper strut forming the high mast and the back stay are connected in a substantially constant posture. In addition to providing a restricting means, a positioning stopper is provided on a bracket connecting the upper strut and the base end of the back stay, so that the base end side of the upper strut is positioned on the bracket of the main frame. Then, the base end of the back stay is automatically positioned on the main frame.

【0029】斯くして、ハイマストの基端部を1回の位
置合せによりメインフレームに接続できるようになり、
組立作業者の作業負担を軽減できると共に、作業の安全
性も向上する。
[0029] Thus, the base end of the high mast can be connected to the main frame by a single alignment.
The work load on the assembly worker can be reduced, and work safety can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態を示し、クレーンの側面
図。
FIG. 1 shows an embodiment of the present invention and is a side view of a crane.

【図2】本発明の一実施の形態を示し、ハイマストの解
説図。
FIG. 2 shows an embodiment of the present invention and is an explanatory diagram of a high mast.

【図3】(a)バックステー並びにアッパーストラット
の先端部を接続した状態を示す平面図。 (b)図3(a)のB−B線断面図。
FIG. 3A is a plan view showing a state in which a back stay and a distal end of an upper strut are connected. FIG. 3B is a sectional view taken along line BB of FIG.

【図4】(a)門型連結部をブラケットに接続する前の
状態を示す解説図。 (b)門型連結部をブラケットに接続した状態を示す解
説図。
FIG. 4A is an explanatory view showing a state before connecting a gate-shaped connecting portion to a bracket. (B) Explanatory drawing which shows the state which connected the portal connection part to the bracket.

【図5】(a)バックステーの基端部をブラケットに接
続する前の状態を示す解説図。 (b)バックステーの基端部をブラケットに接続した状
態を示す解説図。
FIG. 5A is an explanatory view showing a state before a base end of a back stay is connected to a bracket. (B) Explanatory drawing which shows the state which connected the base end part of the back stay to the bracket.

【図6】ハイマストをメインフレームに組立てた状態を
示す解説図。
FIG. 6 is an explanatory view showing a state where the high mast is assembled to the main frame.

【図7】従来のハイマストの解説図。FIG. 7 is an explanatory diagram of a conventional high mast.

【図8】従来のハイマストの組立解説図。FIG. 8 is an explanatory view of assembly of a conventional high mast.

【図9】従来のハイマストの組立解説図。FIG. 9 is an explanatory view of assembly of a conventional high mast.

【符号の説明】[Explanation of symbols]

20 クレーン 21 上部旋回体 22 ブーム 27 ハイマスト 28 アッパーストラット 28a 先端部 28b 基端部 29 バックステー 29a 先端部 29b 基端部 50 メインフレーム 55,56,57,58,65,66 ストッパーボ
ルト
Reference Signs List 20 Crane 21 Upper revolving structure 22 Boom 27 High mast 28 Upper strut 28a Tip 28b Base end 29 Back stay 29a Tip 29b Base end 50 Main frame 55, 56, 57, 58, 65, 66 Stopper bolt

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 クレーンのブームの後方に設けられた左
右のアッパーストラットの先端部に、該アッパーストラ
ットの後方から左右一対のバックステーの先端部を回動
自在に接続し、且つ、前記アッパーストラットと前記バ
ックステーの基端部を夫々上部旋回体のメインフレーム
に接続して成るクレーンのハイマストに於て、前記アッ
パーストラットと前記バックステーとが一定の姿勢で接
続されるように前記バックステーの回転角度を規制する
手段を設けると共に、前記メインフレームに位置決め用
のストッパーを設け、前記アッパーストラットの基端部
側を前記メインフレームへ位置決めする際に、前記バッ
クステーの基端部が前記メインフレームに自動的に位置
決めされるように構成されたことを特徴とするクレーン
のハイマストに於けるバックステーの位置決め装置。
1. A pair of left and right back stays are rotatably connected to the tips of left and right upper struts provided behind a crane boom from the rear of the upper struts. And a high mast of a crane having a base end of the back stay connected to a main frame of an upper revolving structure, wherein the upper strut and the back stay are connected in a fixed posture. A means for regulating the rotation angle is provided, and a positioning stopper is provided on the main frame, and when positioning the base end side of the upper strut to the main frame, the base end of the back stay is connected to the main frame. Crane high mast characterized by being automatically positioned Backstay positioning device.
JP09285869A 1997-10-17 1997-10-17 Backstay positioning device for crane high mast Expired - Fee Related JP3122068B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP09285869A JP3122068B2 (en) 1997-10-17 1997-10-17 Backstay positioning device for crane high mast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP09285869A JP3122068B2 (en) 1997-10-17 1997-10-17 Backstay positioning device for crane high mast

Publications (2)

Publication Number Publication Date
JPH11116187A JPH11116187A (en) 1999-04-27
JP3122068B2 true JP3122068B2 (en) 2001-01-09

Family

ID=17697098

Family Applications (1)

Application Number Title Priority Date Filing Date
JP09285869A Expired - Fee Related JP3122068B2 (en) 1997-10-17 1997-10-17 Backstay positioning device for crane high mast

Country Status (1)

Country Link
JP (1) JP3122068B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106477467B (en) * 2016-01-07 2018-07-17 徐工集团工程机械股份有限公司 Wedge-shaped frame and dynamic compaction machinery
CN109626236B (en) * 2018-11-09 2020-05-22 中船华南船舶机械有限公司 Control method for suspension arm and lifting appliance of folding arm type lifting equipment
JP7313945B2 (en) * 2019-07-19 2023-07-25 日鉄エンジニアリング株式会社 Hanging hardware, suspension structure, and suspension method
JP2022091375A (en) * 2020-12-09 2022-06-21 コベルコ建機株式会社 Pin slip-off preventing mechanism and work machine provided with the same

Also Published As

Publication number Publication date
JPH11116187A (en) 1999-04-27

Similar Documents

Publication Publication Date Title
US4828124A (en) Extension jib for a boom
WO1991005730A1 (en) An automatic lifting angle adjuster for lifting wire rope
JP3122068B2 (en) Backstay positioning device for crane high mast
JP2017137164A (en) Method for mounting jib of crane
JP4422845B2 (en) Counterweight mounting method and frame support means
JP3009375B2 (en) Jib attachment / detachment device for crane beam
JP6683086B2 (en) Mobile crane assembly method
JP2726239B2 (en) Assembling method of rear post supporting cable in jib crane
JPH0743110Y2 (en) Tower crane
JPH0132159B2 (en)
JPH03267297A (en) Mounting device for jib supporting rod in crane
JPH085199Y2 (en) Bridle moving device in crane
JP2001310895A (en) Counter weight detaching/attaching device for crawler crane
JP4191955B2 (en) Jib storage mechanism of crane equipment
JP7416034B2 (en) How to assemble the crane
JP3917236B2 (en) Roughing jib crane
JPH09240989A (en) Auxiliary jib
JP6816647B2 (en) Jib pull-in device and jib pull-in method
JPH0752148Y2 (en) Crane jib
JP2018048015A (en) Method for assembling mobile crane
JPS6032074Y2 (en) boom for crane
JP3737017B2 (en) Pile driver leader triggering device
JPH078549Y2 (en) Crane mounting structure such as jib
JPH0192198A (en) Method and equipment for mounting and dismounting jib to crane
JP2520223Y2 (en) Hanging angle adjustment device for sling wire rope

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees