- JPH0743110Y2 JPH0743110Y2 JP1988162103U JP16210388U JPH0743110Y2 JP H0743110 Y2 JPH0743110 Y2 JP H0743110Y2 JP 1988162103 U JP1988162103 U JP 1988162103U JP 16210388 U JP16210388 U JP 16210388U JP H0743110 Y2 JPH0743110 Y2 JP H0743110Y2
- Authority
- JP
- Japan
- Prior art keywords
- strut
- post
- struts
- tower crane
- jib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Jib Cranes (AREA)
Description
【考案の詳細な説明】 [産業上の利用分野] 本考案はタワークレーンに関するものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial application] The present invention relates to a tower crane.
[従来の技術] 一般的なタワークレーンを第5図を用いて説明する。[Prior Art] A general tower crane will be described with reference to FIG.
車両1の上部に設けた旋回フレーム2にポスト3の下端
を枢着し、該ポスト3の上端に前記旋回フレーム2に取
付けた図示しないウインチからのポスト起伏ケーブル4
先端を接続して、ウインチでポスト起伏ケーブル4の巻
取り・巻戻しを行うことによりポスト3を起倒できるよ
うにする。A lower end of a post 3 is pivotally attached to a revolving frame 2 provided on an upper portion of a vehicle 1, and a post hoisting cable 4 from a winch (not shown) attached to the revolving frame 2 is attached to an upper end of the post 3.
The tip 3 is connected, and the post 3 is hoisted and unwound by a winch so that the post 3 can be hoisted.
ポスト3上端前部にジブ5の後端を俯仰できるように枢
着すると共に、3本の棒状のAストラット6、Bストラ
ット7、Cストラット8を三角形状に組合せた後述する
ようなストラット9を前記ポスト3上端に前記ジブ5と
平行な方向に回動できるように枢着し、前記ストラット
9とジブ5先端を所定の長さのジブ支持ケーブル10で連
結し、ストラット9から吊下げた所定長さのペンダント
ケーブル11下端に動滑車であるイコライザシーブ12を取
付け、該イコライザシーブ12と前記旋回フレーム2に設
けた定滑車であるイコライザシーブ13間に図示しない前
記とは異なるウインチからジブ起伏ケーブル14を掛け回
して、ウインチでジブ起伏ケーブル14の巻取り・巻戻し
を行うことにより動滑車であるイコライザシーブ12の昇
降させてペンダントケーブル11、ストラット9、ジブ支
持ケーブル10を介してジブ5を俯仰できるようにする。The rear end of the jib 5 is pivotally attached to the front end of the upper end of the post 3 so that the jib 5 can be lifted up, and a strut 9 as will be described later is formed by combining three rod-shaped A struts 6, B struts 7, and C struts 8 in a triangular shape. The post 3 is pivotally attached to the upper end of the post 3 so as to be rotatable in a direction parallel to the jib 5, and the strut 9 and the tip of the jib 5 are connected by a jib support cable 10 of a predetermined length and suspended from the strut 9. An equalizer sheave 12, which is a moving pulley, is attached to the lower end of the pendant cable 11 having a length, and a winch (not shown) to a jib undulating cable (not shown) is provided between the equalizer sheave 12 and the equalizer sheave 13, which is a constant pulley provided on the turning frame 2. By winding 14 and winding and unwinding the jib undulating cable 14 with a winch, the equalizer sheave 12, which is a moving pulley, is moved up and down to make a pendant cable. Allow the jib 5 to be elevated via the bull 11, strut 9 and jib support cable 10.
前記旋回フレーム2に設けた図示しない別のウインチか
らのフック昇降ケーブル15をポスト3上端、ジブ5先端
間に掛けた後フック16を吊り下げ支持してその先端をジ
ブ5先端に固定し、ウインチでフック昇降ケーブル15の
巻取り・巻戻しを行うことによりフック16を昇降できる
ようにする。A hook lifting cable 15 from another winch (not shown) provided on the swivel frame 2 is hung between the upper end of the post 3 and the tip of the jib 5, and then the hook 16 is suspended and supported to fix the tip of the hook to the tip of the jib 5. The hook 16 can be moved up and down by winding and rewinding the hook lifting cable 15.
従って、上記タワークレーンはポスト起伏ケーブル4を
巻取ってポスト3を起立状態とした後、旋回フレーム2
によりジブ5を旋回させ、ジブ起伏ケーブル14によりジ
ブ5の上下方向の角度即ちジブ角を変更させ、フック昇
降ケーブル15によりフック16を昇降させて、或いはこれ
らの動作を適宜組合わせて作業を行うようにしたもので
ある。Therefore, in the tower crane described above, the post erection cable 4 is wound to make the post 3 stand up and then the swing frame 2
The jib 5 is swung with the jib undulation cable 14 to change the vertical angle of the jib 5, that is, the jib angle, and the hook elevating cable 15 is used to elevate the hook 16 or a combination of these operations is performed. It was done like this.
又、上記タワークレーンは、分解した状態で現場に持ち
込んだ後、組立てて作業を行い、作業が終了したら、再
び分解して運び去るようにして使用する。In addition, the tower crane is used by disassembling it and then performing assembly work, and when the work is finished, disassembling and carrying it away again.
このため、従来のタワークレーンは、ストラット9を第
6図に実線で示すように、Aストラット6両端のヒンジ
17,18を中心にBストラット7とCストラット8を3つ
に折畳めるように枢着し且つ第6図に仮想線で示すよう
にBストラット7とCストラット8の先端を重ね合わせ
てピン19で連結することにより三角形状に組立てられる
構造となっていた。Therefore, in the conventional tower crane, the strut 9 is hinged at both ends of the A strut 6 as shown by the solid line in FIG.
The B struts 7 and the C struts 8 are pivotally attached so that the B struts 7 and the C struts 8 can be folded in three around 17, 18, and the tips of the B struts 7 and the C struts 8 are overlapped with each other as shown by phantom lines in FIG. The structure was such that it could be assembled in a triangular shape by connecting with.
尚、20はBストラット7に取付けたステップである。20 is a step attached to the B strut 7.
このようなストラット9を用いた場合のタワークレーン
の組立ては以下のようにして行われていた。Assembly of a tower crane using such a strut 9 has been performed as follows.
即ち先ず、第7図に示すように車両1の旋回フレーム2
に対し地上に水平状態に倒したポスト3の下端となる部
分を枢着し、次に、地上部でBストラット7とCストラ
ット8を枢着してストラット9を第6図に仮想線で示す
よう三角形状に組立て、組立てられたストラット9を図
示しない別のクレーンの玉掛けワイヤ21で吊り上げてA
ストラット6とBストラット7の枢着部をポスト3の上
端となる部分に枢着し、作業員がBストラット7のステ
ップ20を昇って前記別のクレーンの玉掛けワイヤ21をス
トラット9から外した後ストラット9にペンダントケー
ブル11を接続する。That is, first, as shown in FIG. 7, the turning frame 2 of the vehicle 1
On the other hand, the lower end of the post 3 which is laid horizontally on the ground is pivotally attached, and then the B struts 7 and the C struts 8 are pivotally attached on the ground, and the struts 9 are shown in phantom in FIG. Assembled in a triangular shape and lifted up the assembled strut 9 with a sling wire 21 of another crane (not shown).
After the pivots of the struts 6 and the B struts 7 are pivotally attached to the upper end portion of the post 3, the worker climbs the step 20 of the B struts 7 and removes the sling wire 21 of the other crane from the struts 9. Connect the pendant cable 11 to the strut 9.
以後は第8図に示すように、旋回フレーム2に設けられ
た図示しないウインチに巻付けられたポスト起伏ケーブ
ル4をポスト3の上端となる部分に接続してポスト3を
起伏できるようにし、ペンダントケーブル11のイコライ
ザシーブ12と旋回フレーム2のイコライザシーブ13間に
ウインチ22に巻付けられたジブ起伏ケーブル14を掛け回
してストラット9を傾動できる状態にした後、ストラッ
ト9を下方に傾動させてAストラット6とBストラット
7の枢着部が接地状態を保ようにしつつポスト3を上方
に傾動させてポスト3の上端となる部分を僅かに持ち上
げ、持ち上げられたポスト3の上端となる部分にジブ5
の後端を枢着し、ストラット9とジブ5先端間にジブ支
持ケーブル10を配設すると共に、旋回フレーム2とジブ
5先端間にポスト3の先端となる部分を経由してフック
昇降ケーブル15を配設しフック16を取付ける。After that, as shown in FIG. 8, the post undulation cable 4 wound around a winch (not shown) provided on the swivel frame 2 is connected to the upper end portion of the post 3 so that the post 3 can be undulated, and the pendant is pendant. The jib undulating cable 14 wound around the winch 22 is hung between the equalizer sheave 12 of the cable 11 and the equalizer sheave 13 of the revolving frame 2 so that the strut 9 can be tilted, and the strut 9 is tilted downward to The posts 3 are tilted upward while the pivotally connecting portions of the struts 6 and the B struts 7 are kept in contact with the ground, and the upper end portion of the post 3 is slightly lifted. 5
The jib support cable 10 is arranged between the strut 9 and the tip of the jib 5 while the rear end of the hook is pivotally attached. And attach the hook 16.
[考案が解決しようとする課題] しかしながら上記従来のタワークレーンでは、第6図に
示すようにBストラット7、Cストラット8をAストラ
ット6両端のヒンジ17,18を中心に3つに折り畳めるよ
うにしていたので、第7図に示すようにストラット9を
水平にしたポスト3の上端となる部分に対して取付ける
ためには、地上部でBストラット7とCストラット8を
枢着することにより三角形状に組立てた後、吊り上げる
ようにしなければならず、このために別にクレーンを必
要としていた。[Problems to be Solved by the Invention] However, in the above-mentioned conventional tower crane, as shown in FIG. 6, the B struts 7 and the C struts 8 can be folded in three around the hinges 17 and 18 at both ends of the A strut 6. Therefore, as shown in FIG. 7, in order to attach the strut 9 to the upper end portion of the horizontal post 3, the B strut 7 and the C strut 8 are pivotally attached at the ground portion to form a triangular shape. It had to be lifted after it had been assembled, which required a separate crane for this.
又、この際、ストラット9は吊り上げられた状態となっ
ているので、水平にしたポスト3の上端となる部分への
枢着作業が困難であり時間が掛っていた。Further, at this time, since the strut 9 is in a suspended state, it is difficult and time-consuming to pivotally attach the horizontal post 3 to the upper end portion.
更に、水平にしたポスト3の上端となる部分に枢着した
ストラット9から前記別のクレーンの玉掛けワイヤ20を
外し且つペンダントケーブル11を連結する作業は作業員
がBストラット7の側面に形成したステップ20を昇って
高い位置で行わねばならず非常に危険であった。Further, the step of removing the sling wire 20 of the other crane and connecting the pendant cable 11 from the strut 9 pivotally attached to the upper end of the horizontal post 3 is performed by the worker on the side surface of the B strut 7. It was very dangerous because we had to climb 20 and get up high.
本考案は上述の実情に鑑み、別のクレーンを用いること
なく地上でストラットのポストに対する取付けを安全且
つ迅速に行うことのできるようにしたタワークレーンを
提供することを目的とするものである。The present invention has been made in view of the above circumstances, and an object thereof is to provide a tower crane capable of safely and quickly attaching a strut to a post on the ground without using another crane.
[課題を解決するための手段] 本考案はストラットの一辺を形成する部材を、2本のロ
ッドと、各ロッドの対応する端部間に介在される小リン
クとに3分割して、一方のロッドと小リンクの一端部と
を、又、小リンクの他端部と他方のロッドとをそれぞれ
回動自在に枢着することによって、屈折伸長できるよう
にしたことを特徴とするタワークレーンにかかるもので
ある。[Means for Solving the Problems] According to the present invention, a member forming one side of a strut is divided into two rods and a small link interposed between corresponding ends of the rods. A tower crane characterized in that the rod and one end of the small link, and the other end of the small link and the other rod are rotatably pivotally attached to each other so that they can be bent and extended. It is a thing.
[作用] ストラットの一辺を形成する部材を屈折させるとストラ
ットが折り畳まれ、ストラットの一辺を形成する部材を
伸長するとストラットが三角形状となる。[Operation] When the member forming one side of the strut is bent, the strut is folded, and when the member forming one side of the strut is extended, the strut becomes triangular.
[実施例] 以下、図面に基づいて本考案の実施例を説明する。[Embodiment] An embodiment of the present invention will be described below with reference to the drawings.
第1図〜第3図は本考案の一実施例である。1 to 3 show an embodiment of the present invention.
棒状のAストラット23の一端と棒状のBストラット24の
一端とをヒンジ25を用いて回動できるように枢着し、A
ストラット23の他端とBストラット24の他端間に中途部
で屈折伸長自在なCストラット26をヒンジ27,28を用い
て回動できるように連結する。One end of a rod-shaped A strut 23 and one end of a rod-shaped B strut 24 are pivotally attached to each other by a hinge 25 so that they can be rotated.
Between the other end of the strut 23 and the other end of the B strut 24, a C strut 26, which is bendable and expandable in the middle, is rotatably connected using hinges 27 and 28.
前記Cストラット26は、2本の短いロッド29,30の端部
どうしを夫々小リンク31の両端部の互いに異なる面にピ
ン32,33を用いて屈折伸長できように枢着し、且つ前記
短いロッド29,30の小リンク31に枢着した側の端部にロ
ッド29,30の軸方向に延びる延長部34,35を形成して、ロ
ッド29,30を一直線上に伸ばした時に延長部34,35が重な
り合う位置に延長部34,35及び小リンク31を貫通するロ
ックピン36挿入用のピン孔37,38,39を形成し、且つ小リ
ンク31両面の前記Aストラット23とBストラット24を枢
着するヒンジ25に関して離れた側にある部分の前記短い
ロッド29,30を一直線上に伸長したときの短いロッド29,
30の延長部34,35に接触する位置にストッパ40,41を固着
する。The C-struts 26 pivotally connect the ends of two short rods 29, 30 to different surfaces of both ends of the small link 31 so that they can be bent and extended using pins 32, 33. Extensions 34 and 35 extending in the axial direction of the rods 29 and 30 are formed at the ends of the rods 29 and 30 that are pivotally attached to the small links 31, and the extensions 34 and 35 are formed when the rods 29 and 30 are extended in a straight line. , 35 form pin holes 37, 38, 39 for inserting the lock pin 36 penetrating the extension portions 34, 35 and the small link 31 at the position where they overlap each other, and the A struts 23 and B struts 24 on both sides of the small link 31 are formed. Short rods 29, 30 when the short rods 29, 30 of the part on the remote side with respect to the hinge 25 to be pivoted are extended in a straight line
The stoppers 40 and 41 are fixed to the positions of the extension 30 and 30 which come into contact with the extension portions 34 and 35.
尚、42は折り畳んだ状態のAストラット23とBストラッ
ト24の他端どうしを連結し且つペンダントケーブルを接
続するリンクであり、且つBストラット24にはステップ
20は必ずしも設ける必要はない。Reference numeral 42 is a link for connecting the other ends of the A strut 23 and the B strut 24 in a folded state and connecting a pendant cable, and the B strut 24 has a step.
20 is not always required.
次に本考案による上記ストラットを用いた場合のタワー
クレーンの組立て手順を第1図〜第4図を用いて説明す
る。又、第4図中第7図と同一部分には同一符号を付し
てある。Next, a procedure for assembling a tower crane using the above-mentioned strut according to the present invention will be described with reference to FIGS. The same parts as those in FIG. 7 in FIG. 4 are designated by the same reference numerals.
先ず、車両1の旋回フレーム2に対し地上に水平状態に
倒したポスト3の下端となる部分を枢着し、次に第1図
及び第4図に実線で示したように折り畳んだ状態のスト
ラットのAストラット23とBストラット24の一端間を枢
着するヒンジ25部分をポスト3の上端となる部分に枢着
し、Aストラット23とBストラット24の他端どうしを連
結しているリンク42のAストラット23側の枢着端の枢着
状態を解除して該枢着端にペンダントケーブル11を連結
し、ペンダントケーブル11のイコライザシーブ12と旋回
フレーム2に固定した図示しないイコライザシーブ間に
図示しない旋回フレーム2のウインチに巻付けられたジ
ブ起伏ケーブルを掛け回す。First, the lower end portion of the post 3 which is laid horizontally on the ground is pivotally attached to the turning frame 2 of the vehicle 1, and then the strut in the folded state as shown by the solid line in FIGS. 1 and 4. A hinge 25 portion pivotally connecting one end of the A strut 23 and the B strut 24 is pivotally attached to the upper end portion of the post 3 and a link 42 connecting the other ends of the A strut 23 and the B strut 24 to each other. The pivoted end of the A-strut 23 side is released, and the pendant cable 11 is connected to the pivoted end. The pendant cable 11 is fixed between the equalizer sheave 12 and the swivel frame 2 (not shown). The jib undulating cable wound around the winch of the revolving frame 2 is wound around.
この状態でウインチを巻取ると、イコライザシーブ12及
びペンダントケーブル11が旋回フレーム2側に引張られ
てBストラット24が上方に傾動し且つ第1図及び第4図
に仮想線で示すようにCストラット26がストッパ40,41
で止められるまで伸長して一直線状となりストラットが
三角形状に組立てられる。When the winch is wound in this state, the equalizer sheave 12 and the pendant cable 11 are pulled toward the revolving frame 2 side, the B strut 24 is tilted upward, and the C strut is shown by phantom lines in FIGS. 1 and 4. 26 is stopper 40, 41
Struts are assembled in a triangular shape by extending until they are stopped by.
ストラットが三角形状となったら短いロッド29,30に形
成した延長部34,35及び小リンク31のピン孔37,38,39に
ロックピン36を挿通してCストラット26を一直線状態に
固定する。When the struts become triangular, the lock pins 36 are inserted through the extension portions 34, 35 formed in the short rods 29, 30 and the pin holes 37, 38, 39 of the small links 31 to fix the C struts 26 in a straight line.
この間のストラット取付作業は別のクレーンを用いずに
地上作業で行うことができる。Strut mounting work during this period can be done on the ground without using a separate crane.
以後は第8図と略同様にしてポスト3の上端となる部分
にジブを取付け、ジブの先端にフックを取付けてタワー
クレーンを組立てる。Thereafter, a tower crane is assembled by attaching a jib to the upper end portion of the post 3 and a hook at the tip of the jib in a manner similar to that shown in FIG.
尚、本考案のタワークレーンは、上述の実施例にのみ限
定されるものではなく、Cストラットを屈折伸長する手
段は任意であること、ストッパやロックピン等の形成位
置は任意であること、その他本考案の要旨を逸脱しない
範囲内において種々変更を加え得ることは勿論である。Incidentally, the tower crane of the present invention is not limited to the above-mentioned embodiment, the means for bending and extending the C struts is arbitrary, the forming positions of the stopper, the lock pin and the like are arbitrary, and the like. Needless to say, various changes can be made without departing from the scope of the present invention.
[考案の効果] 以上説明したように、本考案のタワークレーンによれ
ば、ストラットの一辺を形成する部材を屈折伸長できる
ようにしたので別のクレーンを用いずに且つ地上作業の
みでストラットのポストに対する取付けを行うことがで
き、且つ作業の迅速化と安全化を図ることができ、しか
も、上記部材を、2本のロッドと、各ロッドの対応する
端部間に介在される小リンクとに3分割して、一方のロ
ッドと小リンクの一端部とを、又、小リンクの他端部と
他方のロッドとをそれぞれ回動自在に枢着することによ
って、屈折伸長自在となるよう構成しているので、折り
畳んだ時に、両ロッド間の長さに違いがあっても小リン
クが傾いて長さの違いを吸収することにより、両ロッド
が平行になるところまで折り畳めて、納まりを非常に良
くすることができ、且つ、折り畳み時に小リンクが傾く
ようにしたことにより、両ロッドの長さの設定を自由化
することができるという優れた効果を奏し得る。[Advantages of the Invention] As described above, according to the tower crane of the present invention, since the member forming one side of the strut can be bent and extended, the strut post can be performed without using another crane and only by the ground work. Can be attached to the rod, and the work can be speeded up and the safety can be improved. Further, the above member is used as two rods and a small link interposed between the corresponding ends of the rods. It is divided into three parts, and one rod and one end of the small link are pivotally attached to each other, and the other end of the small link and the other rod are pivotally attached to each other so that they can be bent and extended. Therefore, when folded, even if there is a difference in the length between both rods, the small link tilts and absorbs the difference in length, so it can be folded up to the point where both rods are parallel Improve It is possible to achieve the excellent effect that the small links can be tilted at the time of folding and the lengths of both rods can be freely set.
第1図は本考案の一実施例の側面図、第2図は第1図の
部分拡大図、第3図は第2図の側面図、第4図は第1図
のストラットを用いた場合のタワークレーンの組立て説
明図、第5図は従来のタワークレーンの全体図、第6図
は従来のストラットの側面図、第7図は第6図のストラ
ットを用いた場合のタワークレーンの組立て説明図、第
8図は第7図に続くタワークレーンの組立て説明図であ
る。 図中3はポスト、5はジブ、10はジブ支持ケーブル、23
はAストラット、24はBストラット、26はCストラット
を示す。1 is a side view of an embodiment of the present invention, FIG. 2 is a partially enlarged view of FIG. 1, FIG. 3 is a side view of FIG. 2, and FIG. 4 is a case of using the strut of FIG. 5 is an overall view of a conventional tower crane, FIG. 6 is a side view of a conventional strut, and FIG. 7 is an assembly description of a tower crane using the strut of FIG. FIG. 8 and FIG. 8 are explanatory views of assembly of the tower crane subsequent to FIG. In the figure, 3 is a post, 5 is a jib, 10 is a jib support cable, 23
Indicates A strut, 24 indicates B strut, and 26 indicates C strut.
Claims (1)
動自在に枢着したタワークレーンにおいて、前記ストラ
ットの一辺を形成する部材を、2本のロッドと、各ロッ
ドの対応する端部間に介在される小リンクとに3分割し
て、一方のロッドと小リンクの一端部とを、又、小リン
クの他端部と他方のロッドとをそれぞれ回動自在に枢着
することによって、屈折伸長できるようにしたことを特
徴とするタワークレーン。1. A tower crane in which a triangular strut is rotatably pivotally attached to the upper end of a post, and a member forming one side of the strut is provided between two rods and corresponding end portions of each rod. By dividing the rod into three parts with the intervening small link, and pivotally connecting one rod and one end of the small link, and the other end of the small link and the other rod, respectively, so that the rod is bent. A tower crane characterized by being able to extend.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1988162103U JPH0743110Y2 (en) | 1988-12-14 | 1988-12-14 | Tower crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP1988162103U JPH0743110Y2 (en) | 1988-12-14 | 1988-12-14 | Tower crane |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0283891U JPH0283891U (en) | 1990-06-28 |
JPH0743110Y2 true JPH0743110Y2 (en) | 1995-10-04 |
Family
ID=31445627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP1988162103U Expired - Lifetime JPH0743110Y2 (en) | 1988-12-14 | 1988-12-14 | Tower crane |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0743110Y2 (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2537298Y2 (en) * | 1991-11-29 | 1997-05-28 | 住友建機株式会社 | Folding triangular post in the crane |
US8839966B2 (en) * | 2009-03-31 | 2014-09-23 | Manitowoc Crane Companies, Llc | Folding jib main strut and transportable reeved strut caps |
EP2253575B1 (en) * | 2009-05-20 | 2013-01-16 | Manitowoc Crane Companies, LLC | Crane backstay spreader |
JP6647987B2 (en) * | 2016-08-05 | 2020-02-14 | 住友重機械建機クレーン株式会社 | Crane strut |
JP6428740B2 (en) * | 2016-10-06 | 2018-11-28 | コベルコ建機株式会社 | Gantry assembly apparatus and gantry assembly method |
JP6562049B2 (en) * | 2017-08-18 | 2019-08-21 | コベルコ建機株式会社 | Link storage device and link storage method |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS59127095U (en) * | 1983-02-15 | 1984-08-27 | 日立建機株式会社 | Tower crane swing lever |
JPS6085589U (en) * | 1983-11-15 | 1985-06-12 | 日本車輌製造株式会社 | Tower crane strut device |
-
1988
- 1988-12-14 JP JP1988162103U patent/JPH0743110Y2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH0283891U (en) | 1990-06-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH0743110Y2 (en) | Tower crane | |
JP2004075294A (en) | Jib strut self-assembling method for tower crane | |
JP6638434B2 (en) | Crane boom mounting method | |
JP3122068B2 (en) | Backstay positioning device for crane high mast | |
JP6683086B2 (en) | Mobile crane assembly method | |
JP2547044B2 (en) | Jib loading and unloading method and device in crane | |
JP7306080B2 (en) | Crane and crane assembly method | |
JP2006199484A (en) | Strut of crane | |
JPH0323479B2 (en) | ||
JP2002255478A (en) | Luffing jib crane and method of assembling it | |
JPH078549Y2 (en) | Crane mounting structure such as jib | |
JPS6326391Y2 (en) | ||
JP4848094B2 (en) | Roughing jib equipment for self-propelled crane | |
JPH1160167A (en) | Tower crane | |
JPH085199Y2 (en) | Bridle moving device in crane | |
JPH07187574A (en) | Jib device of crane | |
JPH0355597Y2 (en) | ||
JPH0324556Y2 (en) | ||
JP7234811B2 (en) | A crane strut, a method for folding a crane strut, and a method for assembling a crane strut | |
JP3917236B2 (en) | Roughing jib crane | |
JPS6348628Y2 (en) | ||
JP2570505Y2 (en) | Crane with multi-stage jib | |
JPH0716706Y2 (en) | Post-type floor crane guide support structure | |
JP3213587B2 (en) | Auxiliary crane equipment | |
JPH0333747Y2 (en) |