Prior art keywords
drum
rope
reduction gear
sheave
grab bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP08058817A
Other languages
Japanese (ja)
Other versions
JPH09249380A (en
Inventor
光雄 平田
義明 宮長
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP08058817A priority Critical patent/JP3114608B2/en
Publication of JPH09249380A publication Critical patent/JPH09249380A/en
Application granted granted Critical
Publication of JP3114608B2 publication Critical patent/JP3114608B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Control And Safety Of Cranes (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、クレーン、特に2
種類の吊り具を択一的に利用する多目的クレーン、特
に、主トロリ、補助トロリの2つを備えたクレーンに関
するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a crane,
TECHNICAL FIELD The present invention relates to a multipurpose crane that selectively uses different types of hanging tools, and more particularly to a crane having two main trolleys and auxiliary trolleys.

【0002】[0002]

【従来の技術】ばら物を扱うクレーンにおいては、ガー
ダを走行するトロリとして主トロリ、補助トロリを備
え、ウインチから繰り出したロープを補助トロリ、主ト
ロリを順次経由してグラブバケットに連結している。
2. Description of the Related Art A crane for handling loose objects is provided with a main trolley and an auxiliary trolley as trolleys for traveling the girder, and a rope pulled out from a winch is connected to a grab bucket via the auxiliary trolley and the main trolley in order. .

【0003】多目的クレーンとしてはグラブバケットと
コンテナ用吊り具とを選択的に利用するようにしたもの
が多い。昇降用のロープを共通にして吊り具のみを取替
え、グラブバケットを利用する場合は電動式グラブバケ
ットを使用するようにしている。昇降用ロープによって
吊り下げたシーブブロックに対してコンテナ用吊り具、
グラブバケットを着脱自在に構成している。このような
クレーンは特開平02−276795号公報に示されて
いる。
[0003] Many multipurpose cranes selectively use a grab bucket and a container hanger. The lifting rope is commonly used, and only the hanging tool is replaced. When a grab bucket is used, an electric grab bucket is used. A container hanging device for the sheave block suspended by the lifting rope,
The grab bucket is detachable. Such a crane is disclosed in Japanese Patent Application Laid-Open No. 02-276795.

【0004】また、クレーンには複数のロープがある
が、そのロープの交換には多数の作業者で多大な時間を
かけて行っている。
A crane has a plurality of ropes, and a large number of workers take a long time to replace the ropes.

【0005】[0005]

【発明が解決しようとする課題】上記特開平02−27
6795号公報の多目的クレーンによれば、グラブバケ
ットを使用する場合には電動式とすることが必要にな
る。電動式グラブバケットは大型と成り、荷役容量を大
きくしたグラブバケットには不適当である。
Problems to be Solved by the Invention
According to the multipurpose crane disclosed in Japanese Patent No. 6795, when a grab bucket is used, it is necessary to be electrically driven. The electric grab bucket is large and is not suitable for a grab bucket having a large cargo handling capacity.

【0006】本発明の目的は2種類の吊り具の操作のす
べてをロープで行うことができるようにした多目的クレ
ーンを提供することにある。つまり、吊り具の交換作業
を容易に行えるようにすることを目的とする。
[0006] It is an object of the present invention to provide a multi-purpose crane in which all operations of the two types of suspenders can be performed by ropes. That is, an object of the present invention is to make it possible to easily perform an operation of replacing a hanging tool.

【0007】[0007]

【課題を解決するための手段】本発明の目的は、長尺物
を吊る第1の吊り具の一端を着脱自在に連結した第1の
ロープを巻いたものであって、トロリの幅方向に軸心を
向けて設置した第1のドラムと、 前記第1の吊り具の他
端に着脱自在に連結した第2のロープを巻いたものであ
って、前記幅方向に向けて前記第1のドラムの軸心の方
向に設置した第2のドラムと、 前記第1の吊り具よりも
吊り点の間隔が小さいグラブバケットを吊るために着脱
自在に連結した第3のロープを巻いたものであって、前
記第1のドラムと前記第2のドラムとの間において、前
記幅方向に軸心を向けて設置した第3のドラムと、 前記
グラブバケットを吊るために着脱自在に連結した第4の
ロープを巻いたものであって、前記第1のドラムと前記
第2のドラムとの間において、前記第3のドラムの軸心
に平行に軸心を向けて設置した第4のドラムと、 前記第
1のドラムと前記第3のドラムとの間に設けた第1の減
速機と、 前記第2のドラムと前記第4のドラムとの間に
設けた第2の減速機と、 前記第1の減速機よりも前記幅
方向の一端側に設置した第1の電動機と、 前記第2の減
速機よりも前記幅方向の他端側に設置した第2の電動機
と、 前記第1の減速機と前記第2の減速機とを接続する
第1のクラッチと、 前記第1の減速機と前記第1のドラ
ムとの間に設置した第2のクラッチと、 前記第1の減速
機と前記第3のドラムとの間に設置した第3のクラッチ
と、 前記第2の減速機と前記第2のドラムとの間に設置
した第4のクラッチと、 前記第2の減速機と前記第4の
ドラムとの間に設置した第5のクラッチと、 前記第1の
電動機、前記第1のクラッチ、前記第2の電動機のそれ
ぞれの軸心が実質的に同一であり、 前記第1の減速機の
出力軸、前記第1のドラム、前記第3のドラムの軸心は
実質的に同一であり、 前記第2の減速機の出力軸、前記
第2のドラム、前記第4のドラムの軸心は実 質的に同一
であること、によって達成できる。
SUMMARY OF THE INVENTION An object of the present invention is to provide a long object.
One end of a first hanging tool for detachably connecting
A rope is wound around the trolley in the width direction.
The first drum installed facing the other , the first hanging
A second rope removably connected to the end
The direction of the axis of the first drum in the width direction.
A second drum installed in direction, than the first crane
Detachable for hanging grab buckets with small hanging point intervals
A third rope that is freely connected,
Between the first drum and the second drum,
A third drum installed toward the axis in the serial width direction, wherein
Fourth detachably connected to suspend the grab bucket
A rope, wherein the first drum and the
Between the second drum and the axis of the third drum
A fourth drum installed with its axis parallel to the
A first damper provided between the first drum and the third drum;
Between the speed changer and the second and fourth drums
A second reduction gear provided, and the width of the second reduction gear is larger than that of the first reduction gear.
A first electric motor which is installed on one end side in the direction, the second reduction of
Second electric motor installed on the other end side in the width direction of the electric motor
When, connecting the second reduction gear and said first reduction gear
A first clutch, the first reducer, and the first drive;
A second clutch disposed between the first clutch and the first deceleration.
Third clutch installed between the machine and the third drum
If, installed between the second drum and the second reduction gear
The fourth clutch, the second speed reducer and the fourth
A fifth clutch installed between the first clutch and the first drum ;
An electric motor, the first clutch, and the second electric motor
The respective axis centers are substantially the same, and the first reduction gear
The axis of the output shaft, the first drum, and the third drum are
The output shaft of the second reducer being substantially identical,
Second drum, the axis of the fourth drum substantive identical
It is, by can be achieved.

【0008】吊り具を変更する場合は、使用中の吊り具
からシーブブロックを外して上昇させ、休止中の吊り具
を下降して吊り具に付けることによって行う。この時、
長尺物用吊り具の2つのシーブブロックは長手方向に分
割されているので、第2の吊り具と干渉しないので、2
つの吊り具をトロリの中心部から吊り下げることができ
るものである。
[0008] When changing the suspension, the sheave block is removed from the suspension in use and raised, and the suspension in suspension is lowered and attached to the suspension. At this time,
Since the two sheave blocks of the hanging object for a long object are divided in the longitudinal direction, they do not interfere with the second hanging member.
One hanging tool can be hung from the center of the trolley.

【0009】[0009]

【発明の実施の形態】本発明をコンテナ用吊り具とグラ
ブバケットを選択的に使用する多目的クレーンに適用し
た場合の一実施例を図1から図8により説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment in which the present invention is applied to a multipurpose crane which selectively uses a container hanger and a grab bucket will be described with reference to FIGS.

【0010】図1の状態はグラブバケット100を使用
する場合の状態であり、グラブバケット100の操作に
用いるロープ61,62を実線で示している。休止中の
コンテナ用吊り具150の巻き上げに用いる4本のロー
プ65,66を想像線で示している。
FIG. 1 shows a state in which the grab bucket 100 is used, and the ropes 61 and 62 used for operating the grab bucket 100 are shown by solid lines. Four ropes 65 and 66 used for hoisting the container hanger 150 at rest are shown by imaginary lines.

【0011】主トロリ80、補助トロリ85の走行する
ガーダ30は4本の脚31,32で支えられている。海
側の脚31と陸側の脚32との間33がコンテナの陸側
の荷役位置である。陸側の脚32よりもさらに陸側にグ
ラブバケット100からのばら物を受けるホッパ38を
設置している。コンテナを荷役するときには、主トロリ
80は位置33と船との間を走行する。ばら物を荷役す
るときには、主トロリ80は船とホッパ38との間を走
行する。ガーダ30の陸側の上には各種のドラムを設置
した機械室45を設置している。
The girder 30 on which the main trolley 80 and the auxiliary trolley 85 run are supported by four legs 31 and 32. A space 33 between the sea-side leg 31 and the land-side leg 32 is the land-side cargo handling position of the container. A hopper 38 for receiving bulk materials from the grab bucket 100 is provided further on the land side than the land side legs 32. When loading a container, the main trolley 80 travels between the location 33 and the ship. When loading bulk materials, the main trolley 80 travels between the ship and the hopper 38. A machine room 45 in which various drums are installed is provided on the land side of the girder 30.

【0012】機械室45の支持用ドラム51に巻いた支
持用ロープ61は、マスト40に設置したシーブ41、
補助トロリ85のシーブ86、補助トロリ85よりも海
側の主トロリ80のシーブ81、グラブバケット100
のシーブブロック101のシーブ105を順次経由し
て、主トロリ80に固定している。固定点はシーブ81
よりも海側にある。
A supporting rope 61 wound around a supporting drum 51 of a machine room 45 is provided with a sheave 41 installed on a mast 40,
Sheave 86 of auxiliary trolley 85, sheave 81 of main trolley 80 on the sea side of auxiliary trolley 85, grab bucket 100
Is fixed to the main trolley 80 sequentially through the sheave 105 of the sheave block 101. Fixed point is sheave 81
More on the sea side.

【0013】機械室45の開閉用ドラム52に巻いた開
閉用ロープ62は、シーブ41、補助トロリ85のシー
ブ86、海側の主トロリ80のシーブ82、グラブバケ
ット100のシーブブロック102のシーブ106、そ
の上方のシーブブロック101のシーブ105、シーブ
106、シーブ105、シーブ106を順次経由して、
主トロリ80に固定している。固定点はシーブ82より
も海側にある。
The opening / closing rope 62 wound around the opening / closing drum 52 of the machine room 45 includes a sheave 41, a sheave 86 of an auxiliary trolley 85, a sheave 82 of a main trolley 80 on the sea side, and a sheave 106 of a sheave block 102 of a grab bucket 100. , Via the sheave 105, the sheave 106, the sheave 105, and the sheave 106 of the sheave block 101 thereabove in order,
It is fixed to the main trolley 80. The fixed point is on the sea side of the sheave 82.

【0014】機械室45の巻き上げ用ドラム55,56
に巻いたそれぞれ2本の巻き上げ用ロープ65,66は
シーブ41、補助トロリ85のシーブ86、主トロリ8
0のシーブ83、コンテナ用吊り具150のシーブブロ
ック151のシーブ152を順次経由して、主トロリ8
0に固定している。シーブ83はトロリ80の4点に設
置している。つまり、4つのシーブ83は主トロリ80
の走行方向およびその直角方向(幅方向)に離れて設置
している。それぞれのシーブ83の近くにロープ65,
66の端部を固定している。シーブブロック151,1
51は幅方向において2分割されており、両者の間にグ
ラブバケット100が入ることができる。シーブブロッ
ク151,151はそれぞれ2つのシーブ155を有す
る。
The hoisting drums 55 and 56 of the machine room 45
The two winding ropes 65 and 66 wound around the sheave 41, the sheave 86 of the auxiliary trolley 85, and the main trolley 8
0, and the sheave 152 of the sheave block 151 of the container hanging device 150 sequentially passes through the main trolley 8.
It is fixed to 0. Sheaves 83 are installed at four points of the trolley 80. That is, the four sheaves 83 are the main trolley 80
In the direction of travel and in the direction perpendicular to the direction (width direction). Rope 65 near each sheave 83,
66 are fixed at the end. Sheave block 151,1
51 is divided into two in the width direction, and the grab bucket 100 can enter between them. Each of the sheave blocks 151 and 151 has two sheaves 155.

【0015】機械室45の横行ドラム70に巻いた2本
のロープ75は海側のガーダ30の端部のシーブ32を
経由して主トロリ80のイコライズビーム84に固定し
ている。横行ドラム70に逆方向に巻いた2本のロープ
76はガーダ30の陸側の端部のシーブ33、補助トロ
リ85のシーブ86を順次経由してシーブ33の近くの
イコライズビーム34に固定している。
The two ropes 75 wound around the traverse drum 70 of the machine room 45 are fixed to the equalizing beam 84 of the main trolley 80 via the sheave 32 at the end of the sea-side girder 30. The two ropes 76 wound in the opposite direction on the traverse drum 70 are fixed to the equalizing beam 34 near the sheave 33 via the sheave 33 at the land side end of the girder 30 and the sheave 86 of the auxiliary trolley 85 in order. I have.

【0016】シーブ33,34,41,83,86,1
05,106,155はそれぞれ複数である。
Sheaves 33, 34, 41, 83, 86, 1
05, 106 and 155 are respectively plural.

【0017】支持用ドラム51、開閉用ドラム52、巻
き上げ用ドラム55,56の構成について、図3、図4
によって説明する。
FIGS. 3 and 4 show the structure of the supporting drum 51, the opening / closing drum 52, and the winding drums 55 and 56.
It will be explained by.

【0018】コンテナ用ロープ65,66はそれぞれ2
本づつからなるので、ドラム55,56はそれぞれ2つ
づつからなる。支持用ドラム51および開閉用ドラム5
2の外側に巻き上げ用ドラム65,66がある。2つの
ドラム55,56の間にドラム51,52、減速機27
1,272を設置できる。
Each of the container ropes 65 and 66 is 2
Since each of the drums 55 and 56 is composed of two books, the drums 55 and 56 are each composed of two drums. Supporting drum 51 and opening / closing drum 5
There are winding drums 65 and 66 on the outside of 2. Drums 51 and 52 and the speed reducer 27 between the two drums 55 and 56
1,272 can be installed.

【0019】開閉用ドラム52の軸心は支持用ドラム5
1の軸心に並列である。両者は水平方向に並んでいる。
開閉用ドラム52は支持用ドラム51よりも海側にあ
る。
The axis of the opening / closing drum 52 is the supporting drum 5
It is parallel to one axis. Both are lined up horizontally.
The opening / closing drum 52 is closer to the sea than the supporting drum 51.

【0020】支持用ドラム51と巻き上げ用ドラム56
とは減速機53を介して同一軸線上に連結している。2
つのドラム51,56の間に減速機53がある。開閉用
ドラム52と巻き上げ用ドラム55とは減速機54を介
して同一軸線上に連結している。2つのドラム52,5
5の間に減速機54がある。2つの減速機53,54は
軸57とクラッチ58で連結している。軸57とクラッ
チ58はドラム51とドラム52との間にある。減速機
53,54とドラム51,56,52,55とはそれぞ
れクラッチ59,60,63,64で連結している。
Supporting drum 51 and hoisting drum 56
Are connected on the same axis via a speed reducer 53. 2
There is a speed reducer 53 between the two drums 51,56. The opening / closing drum 52 and the hoisting drum 55 are connected on the same axis via a speed reducer 54. Two drums 52,5
There is a speed reducer 54 between 5. The two reduction gears 53 and 54 are connected by a shaft 57 and a clutch 58. The shaft 57 and the clutch 58 are between the drum 51 and the drum 52. The speed reducers 53, 54 and the drums 51, 56, 52, 55 are connected by clutches 59, 60, 63, 64, respectively.

【0021】67,68は電動機であり、軸57と同一
軸線上にある。電動機67,68の軸心はドラム56,
55の軸心に並列である。電動機67(68)とドラム
56(55)とは水平方向に並んでいる。電動機67,
68はブレーキ67a,68aを有する。電動機67,
68はそれぞれ単独で運転できる。ドラム51,52,
56,55はそれぞれブレーキ(図示せず)を有する。
Reference numerals 67 and 68 denote electric motors, which are on the same axis as the shaft 57. The shaft center of the electric motors 67 and 68 is
It is parallel to 55 axes. The electric motor 67 (68) and the drum 56 (55) are arranged in a horizontal direction. Electric motor 67,
68 has brakes 67a and 68a. Electric motor 67,
68 can be operated independently. Drums 51, 52,
Each of 56 and 55 has a brake (not shown).

【0022】ドラム51,52,56,55は同一高さ
にある。電動機67,68は同一高さにある。減速機5
3,54は同一高さにある。ドラム52,55のロープ
66,62は電動機68、クラッチ59等の下部を通過
している。電動機68およびブレーキ68aの架台はロ
ープ66の邪魔にならないように配置している。横行ド
ラム70のロープ75はドラム51,52,55,56
等の架台の下方を通過している。ドラム51,52,5
6,55,70、減速機53,54、および電動機6
7,68等は機械室45にある。
The drums 51, 52, 56, 55 are at the same height. The motors 67, 68 are at the same height. Reduction gear 5
3, 54 are at the same height. The ropes 66, 62 of the drums 52, 55 pass under the electric motor 68, the clutch 59 and the like. The mount of the electric motor 68 and the brake 68a is arranged so as not to interfere with the rope 66. The ropes 75 of the traversing drum 70 are drums 51, 52, 55, 56
Etc. are passing under the frame. Drums 51, 52, 5
6, 55, 70, reduction gears 53, 54, and electric motor 6
7, 68, etc. are in the machine room 45.

【0023】クラッチ58,59,60,63,64は
それぞれ単独で動作する。図3、図4において、クラッ
チ58,59,60,63,64に付している○印は接
続(ON)状態を示し、×印は分離(OFF)状態を示
している。
Each of the clutches 58, 59, 60, 63, 64 operates independently. In FIGS. 3 and 4, marks ○ on the clutches 58, 59, 60, 63, 64 indicate a connected (ON) state, and marks X indicate a disengaged (OFF) state.

【0024】図3はグラブバケットによる荷役時のクラ
ッチの接続状態を示すものである。2つの減速機53,
54を接続するクラッチ58は分離状態にある。巻き上
げ用ドラム56,55のクラッチ60,64は分離状態
にある。グラブバケットの支持用ドラム51、開閉ドラ
ム52のクラッチ59,63は接続状態にある。これに
よれば、グラブバケットのみを支持させ、開閉させるこ
とができる。グラブバケットの開閉は公知のごとく行
う。
FIG. 3 shows the connection state of the clutch at the time of loading by the grab bucket. Two reduction gears 53,
The clutch 58 connecting the clutch 54 is in a disengaged state. The clutches 60, 64 of the hoisting drums 56, 55 are in a separated state. The support drum 51 of the grab bucket and the clutches 59 and 63 of the opening / closing drum 52 are in a connected state. According to this, only the grab bucket can be supported and can be opened and closed. Opening and closing of the grab bucket is performed as known.

【0025】図4はコンテナ用吊り具による荷役時のク
ラッチの接続状態を示すものである。グラブバケットの
支持用ドラム51、開閉用ドラム52のクラッチ59,
63は分離状態にある。2つの減速機53,54を接続
するクラッチ58は接続状態にある。巻き上げ用ドラム
56,55のクラッチ60,64は接続状態にある。こ
れによれば、コンテナ用吊り具のみを巻き上げることが
できる。
FIG. 4 shows the connection state of the clutch at the time of cargo handling by the container hanging device. A drum 51 for supporting the grab bucket, a clutch 59 for the drum 52 for opening and closing,
63 is in a separated state. The clutch 58 connecting the two reduction gears 53 and 54 is in a connected state. The clutches 60 and 64 of the winding drums 56 and 55 are in a connected state. According to this, it is possible to wind up only the container hanger.

【0026】図5において、上昇したシーブブロック1
01,151は下端が拡がった筒84の穴に入る。そし
て、筒84およびシーブブロック101(151)にピ
ン84aを挿入する。筒84は主トロリ80の下面に設
置している。筒84はシーブブロック101,151,
151のそれぞれに対応してある。これによれば、シー
ブブロックをピン84aで支えるので、ドラムのブレー
キを小さくできるか不要にできる。トロリ80の走行に
よるシーブブロックの移動はピン84aによって防止さ
れる。ピン84aの着脱はトロリ80の下部に設置した
足場から作業員が行う。
In FIG. 5, the sheave block 1 which has been raised
01 and 151 enter the holes of the cylinder 84 whose lower end is expanded. Then, the pin 84a is inserted into the cylinder 84 and the sheave block 101 (151). The cylinder 84 is installed on the lower surface of the main trolley 80. The tube 84 is a sheave block 101, 151,
151. According to this, since the sheave block is supported by the pins 84a, the brake of the drum can be made small or unnecessary. The movement of the sheave block due to the traveling of the trolley 80 is prevented by the pins 84a. The operator attaches and detaches the pins 84a from a scaffold installed under the trolley 80.

【0027】次に、使用吊り具をグラブバケット100
からコンテナ用吊り具150にする場合の手順を説明す
る。
Next, the hanger used was changed to a grab bucket 100.
Will be described in the case of using the container hanging device 150 from the above.

【0028】S1:ドラム51,52を運転させて、グ
ラブバケット100を地上に降ろす。図6および図8に
示すように、下降させる前に開閉用ドラム52を運転さ
せてグラブバケット100を開き、地上に置いた際のグ
ラブバケット100の転倒を防止する。 S2:グラブバケット100の下部のシーブブロック1
02とグラブバケット100の本体103とを連結する
複数の連結金具113を抜く。 S3:開閉用ドラム52を運転させてシーブブロック1
02を上昇させ、シーブブロック101と102を合体
させる。 S5:シーブブロック101と102とを複数の連結板
115と複数の連結金具116とによって連結する。こ
れによって2つのブロック101,102の間隔を一定
に保つことができる。図6は連結板115をシーブブロ
ック101に固定した状態を示しているが、通常は連結
板115はシーブブロック101に設置していない。 S7:上部のシーブブロック101とグラブバケット1
00の本体103とを連結する複数の連結金具112を
抜く。 S9:ドラム51,52を運転させて2つのブロック1
01,102を上昇させる。これによってシーブブロッ
ク101,102は本体103から離脱する。 S11:グラブバケット100用の筒84にシーブブロ
ック101が入ると、ピン84aを挿入する。 S13:多目的クレーンを走行させ、または横行ドラム
70を運転させて、地上に置かれたコンテナ用吊り具1
50の本体153の上方に主トロリ80を位置させる。 S15:クラッチの接続状態を図4の吊り具150によ
る荷役状態にする。 S17:吊り具150用のピン84aを抜く。 S19:ドラム55,55を運転させてシーブブロック
151,151を下降させ、シーブブロック151,1
51と吊り具本体153とを連結金具161で接続す
る。これを図8に示す。 S21:ケーブルバスケット154の電源ケーブルを主
トロリ80に接続する。以上により、吊り具150によ
る荷役を行うことができる。
S1: The drums 51 and 52 are operated to lower the grab bucket 100 on the ground. As shown in FIGS. 6 and 8, before the descent, the opening / closing drum 52 is operated to open the grab bucket 100, thereby preventing the grab bucket 100 from falling over when placed on the ground. S2: Sheave block 1 at the bottom of grab bucket 100
A plurality of connecting fittings 113 for connecting the 02 and the main body 103 of the grab bucket 100 are removed. S3: The sheave block 1 is operated by driving the opening / closing drum 52.
02 is raised, and the sheave blocks 101 and 102 are united. S5: The sheave blocks 101 and 102 are connected by a plurality of connecting plates 115 and a plurality of connecting fittings 116. Thus, the interval between the two blocks 101 and 102 can be kept constant. FIG. 6 shows a state where the connecting plate 115 is fixed to the sheave block 101, but the connecting plate 115 is not normally installed on the sheave block 101. S7: Upper sheave block 101 and grab bucket 1
Then, a plurality of connection fittings 112 for connecting the main body 103 to the main body 103 are removed. S9: Operate the drums 51 and 52 to drive the two blocks 1
01 and 102 are raised. Thus, the sheave blocks 101 and 102 are detached from the main body 103. S11: When the sheave block 101 enters the cylinder 84 for the grab bucket 100, the pin 84a is inserted. S13: Run the multipurpose crane or drive the traversing drum 70 to hang the container hanging device 1 placed on the ground.
The main trolley 80 is located above the main body 153 of the 50. S15: The connection state of the clutch is set to the cargo handling state by the hanging device 150 in FIG. S17: Pull out the pin 84a for the hanging tool 150. S19: The sheave blocks 151 and 151 are lowered by operating the drums 55 and 55, and the sheave blocks 151 and 151 are moved down.
51 and the hanger main body 153 are connected by a connection fitting 161. This is shown in FIG. S21: Connect the power cable of the cable basket 154 to the main trolley 80. As described above, it is possible to carry out the cargo handling by the hanger 150.

【0029】次に、使用吊り具をコンテナ用吊り具15
0からグラブバケット100にする場合の手順を説明す
る。 S31:まず、電源ーケーブルを主トロリ80から外
し、電源ケーブルをケーブルバスケット154に収納す
る。次に、ドラム55,56を運転させて、コンテナ用
吊り具150を地上に降ろす。 S33:吊り具150のシーブブロック151,151
と本体153とを連結する複数の連結金具161を外
す。 S35:ドラム55,56を運転させてシーブブロック
151,151を上昇させる。これによってシーブブロ
ック151,151は本体103から離脱する。 S37:吊り具150用の筒84にシーブブロック15
1が入ると、ピン84aを挿入する。
Next, the hanger to be used is changed to the hanger 15 for container.
A procedure for changing the grab bucket 100 from 0 will be described. S31: First, the power cable is disconnected from the main trolley 80, and the power cable is stored in the cable basket 154. Next, the drums 55 and 56 are operated, and the container hanger 150 is lowered to the ground. S33: Sheave blocks 151 and 151 of the hanging device 150
The plurality of connecting fittings 161 for connecting the main body 153 to the main body 153 are removed. S35: The drums 55 and 56 are operated to raise the sheave blocks 151 and 151. As a result, the sheave blocks 151 and 151 are detached from the main body 103. S37: The sheave block 15 is attached to the cylinder 84 for the hanging device 150.
When 1 is inserted, the pin 84a is inserted.

【0030】S39:多目的クレーンを走行させ、また
は横行ドラム70を運転させて、地上に置かれたグラブ
バケット100の本体103の上方に主トロリ80を位
置させる。 S41:クラッチの接続状態を図3のグラブバケット1
00による荷役状態にする。 S43:グラブバケット100用のピン84aを抜く。 S45:ドラム51,52を運転させてグラブバケット
100のシーブブロック101,102を下降させ、本
体103に挿入する。シーブブロック101を本体10
3に連結金具112で固定する。次に、2つのシーブブ
ロック101,102を結合していた連結板115、連
結金具116を取り外す。次に、ドラム52を運転させ
てシーブブロック102を下降させ、シーブブロック1
02を本体103に連結金具113で固定する。グラブ
バケット100は開いている。以上により、グラブバケ
ット100による荷役を行うことができる。
S39: The main trolley 80 is positioned above the main body 103 of the grab bucket 100 placed on the ground by running the multipurpose crane or driving the traversing drum 70. S41: The connection state of the clutch is changed to the grab bucket 1 in FIG.
The cargo handling state is set to 00. S43: Pull out the pin 84a for the grab bucket 100. S45: The sheave blocks 101 and 102 of the grab bucket 100 are lowered by operating the drums 51 and 52, and inserted into the main body 103. Sheave block 101 for main body 10
3 is fixed with a connection fitting 112. Next, the connection plate 115 and the connection fitting 116 that have connected the two sheave blocks 101 and 102 are removed. Next, the drum 52 is operated to lower the sheave block 102, and the sheave block 1
02 is fixed to the main body 103 with the connection fitting 113. Grab bucket 100 is open. As described above, cargo handling by the grab bucket 100 can be performed.

【0031】これによれば、ドラムをコンテナ吊り具
用、グラブバケット用に専用にできるので、ロープの交
換作業を不要にでき、吊り具の交換作業のみとなるの
で、荷役作業の切り替えを容易に行うことができるもの
である。
According to this, the drum can be used exclusively for container hanging equipment and grab buckets, so that it is not necessary to replace the rope, and only the replacement of the hanging equipment is required. Is what you can do.

【0032】また、シーブブロック151,151はコ
ンテナ用吊り具100の一端と他端とに分割されている
ので、両者の間にグラブバケット100のシーブブロッ
ク101,102が有っても、シーブブロック151,
151をコンテナ用吊り具150の所定位置にまで下降
させることができる。また、グラブバケット100や吊
り具150を主トロリ80の中央部に吊り下げることが
でき、主トロリ80の長さ(トロリの走行方向の長さ)
を小さくできる。
Further, since the sheave blocks 151 and 151 are divided into one end and the other end of the container hanging device 100, even if the sheave blocks 101 and 102 of the grab bucket 100 are provided between the two, the sheave blocks 151 and 151 are separated. 151,
151 can be lowered to a predetermined position of the container hanger 150. In addition, the grab bucket 100 and the hanging tool 150 can be hung at the center of the main trolley 80, and the length of the main trolley 80 (the length of the trolley in the traveling direction).
Can be reduced.

【0033】また、ドラムの径を荷役仕様(荷重、巻き
上げ速度)に適した大きさにできると共に、2つの荷役
において電動機67,68の容量を同一にできるもので
ある。このため、効率を向上できるものである。一般
に、グラブバケットによる荷役時の最大巻き上げ速度、
最大吊り上げ荷重はコンテナの荷役時の最大巻き上げ速
度、最大吊り上げ荷重のそれぞれ約半分である。このた
め、この実施例では、グラブバケット用のドラム51,
52の径をコンテナ用のドラム55,56の径よりも大
きくし、ロープの本数を変えている。
Further, the diameter of the drum can be set to a size suitable for the cargo handling specification (load, hoisting speed), and the capacity of the electric motors 67 and 68 can be the same in the two cargo handling. Therefore, efficiency can be improved. Generally, the maximum hoisting speed when loading by grab bucket,
The maximum hoisting load is about half of the maximum hoisting speed and the maximum hoisting load, respectively, when the container is unloaded. For this reason, in this embodiment, the drum 51 for the grab bucket,
The diameter of 52 is made larger than the diameter of the container drums 55 and 56, and the number of ropes is changed.

【0034】上記実施例はグラブバケットの支持用ロー
プ、開閉用ロープがそれぞれ1本、コンテナの吊り具用
のロープが4本であったが、支持用ロープ、開閉用ロー
プがそれぞれ2本、吊り具用のロープが2本の場合にも
適用できる。この場合の吊り具はパイプ等の長尺材を吊
る場合に適している。
In the above embodiment, the supporting rope and the opening / closing rope of the grab bucket are each one, and the rope for the hanging device of the container is four. However, the supporting rope and the opening / closing rope are each two, and the hanging rope is used. The present invention can be applied to a case where two ropes are used. The hanging tool in this case is suitable for hanging a long material such as a pipe.

【0035】グラブバケットは材木等を掴むグラブであ
っても良い。コンテナ用吊り具の代わりに、パイプ等の
長尺物を吊る吊り具であってもよい。コンテナも長尺物
の1つである。長尺物用吊り具の場合はロープは2本に
することができる。
The grab bucket may be a grab for gripping timber or the like. Instead of the container hanging tool, a hanging tool for hanging a long object such as a pipe may be used. The container is also one of the long objects. In the case of a hanging object for a long object, two ropes can be used.

【0036】次に、開閉用ロープ62の交換作業につい
て説明する。 S101:主トロリ80を機械室45の下方に停止させ
る。主トロリ80の停止位置は、ロープ62と主トロリ
80との固定点の上方に、機械室45から新規なロープ
を下降させる位置が望ましい。 S103:グラブバケット100を開いて地上に置く。 S105:主トロリ80に固定したチェンブロックをロ
ープ62の端部に固定する。 S107:ロープ62の端部と主トロリ80との連結を
解除する。 S109:機械室45に搬入した新規なロープを巻いた
ドラムから新規なロープを地上側に降ろす。新規なロー
プの端部をチェンブロックで固定したロープ62の端部
に連結する。この連結は溶接で行なう。 S111:新規なドラムを回転させて新規なロープを所
定量繰り出す。 S113:ドラム52を巻き取り方向に回転させ、たる
んだロープ62を巻き取る。新規なドラムを回転させた
後、ドラム52を回転させているので、両者の同期を取
る必要がない。 S115:ステップS111,S113を繰り返し、新
規なロープの先端をドラム52の近くに位置させる。ド
ラム52にはロープを巻き取る溝がなければ、ドラム5
2に重ね巻きさせる。 S117:機械室45に固定したチェンブロックに新規
なロープの先端の近くを固定する。 S119:前記固定点とドラム52との間を切断する。
新規なロープはチェンブロックとの接続点から先端側に
ドラム52に巻くための長さを有する。 S121:ドラム52を繰り出し方向に回転させ、旧ロ
ープを地上側に排出する。次に、ドラム52と旧ロープ
との固定を解除する。 S123:新規なロープをドラム52に3回程度巻く。
新規なロープの端部をドラム52に固定する。 S125:ステップS111,113によって、新規な
ロープをドラム52に巻き取る。所定量の新規なロープ
がドラム52巻かれるまで行なう。所定量とはグラブバ
ケット100を地上に置いた際のドラム52への巻きつ
け量である。 S125:主トロリ80側のロープの端部を主トロリ8
0に固定する。次に、ロープの切断、チェンブロックの
取外しを行なう。
Next, the replacement operation of the opening / closing rope 62 will be described. S101: The main trolley 80 is stopped below the machine room 45. The stop position of the main trolley 80 is preferably a position at which a new rope is lowered from the machine room 45 above a fixing point of the rope 62 and the main trolley 80. S103: The grab bucket 100 is opened and placed on the ground. S105: The chain block fixed to the main trolley 80 is fixed to the end of the rope 62. S107: The connection between the end of the rope 62 and the main trolley 80 is released. S109: The new rope is lowered to the ground side from the drum around which the new rope carried into the machine room 45 is wound. The end of the new rope is connected to the end of the rope 62 fixed by the chain block. This connection is performed by welding. S111: The new drum is rotated to feed out a new rope by a predetermined amount. S113: The drum 52 is rotated in the winding direction, and the slack rope 62 is wound. Since the drum 52 is rotated after the new drum is rotated, there is no need to synchronize the two. S115: Steps S111 and S113 are repeated to position the tip of the new rope near the drum 52. If the drum 52 has no groove for winding the rope, the drum 5
Roll over 2 S117: The vicinity of the tip of the new rope is fixed to the chain block fixed to the machine room 45. S119: Cut between the fixed point and the drum 52.
The new rope has a length for winding around the drum 52 from the connection point with the chain block to the distal end side. S121: The drum 52 is rotated in the feeding direction, and the old rope is discharged to the ground side. Next, the fixing between the drum 52 and the old rope is released. S123: Wind a new rope around the drum 52 about three times.
Secure the end of the new rope to drum 52. S125: A new rope is wound around the drum 52 in steps S111 and S113. The operation is performed until a predetermined amount of a new rope is wound around the drum 52. The predetermined amount is a winding amount around the drum 52 when the grab bucket 100 is placed on the ground. S125: Connect the end of the rope on the side of the main trolley 80 to the main trolley 8
Fix to 0. Next, the rope is cut and the chain block is removed.

【0037】これによれば、機械室45から新規なロー
プを垂らせばよいので、新旧のロープの接続を容易に行
なうことができるものである。
According to this, since a new rope may be hung from the machine room 45, connection of the old and new ropes can be easily performed.

【0038】シーブブロック101を筒84にピン84
aによって固定した状態で、ロープの交換を行なうこと
ができる。
The sheave block 101 is attached to the cylinder 84 with the pin 84
The rope can be replaced while being fixed by a.

【0039】ロープ62,65,66においても同様で
ある。
The same applies to the ropes 62, 65, 66.

【0040】[0040]

【発明の効果】本発明によれば、2種類の吊り具の操作
のすべてをロープで行うことができるようにした多目的
クレーンを提供でき、吊り具の交換作業を容易に行える
ものである。
According to the present invention, it is possible to provide a multipurpose crane in which all the operations of the two types of hanging tools can be performed by using a rope, and the work of replacing the hanging tools can be easily performed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例の多目的クレーンのロープの
配置図である。
FIG. 1 is a layout view of ropes of a multipurpose crane according to one embodiment of the present invention.

【図2】図1の多目的クレーンの側面図である。FIG. 2 is a side view of the multipurpose crane of FIG.

【図3】使用吊り具をグラブバケットとした場合の各ド
ラムの接続状態を示す機械室の平面図である。
FIG. 3 is a plan view of a machine room showing a connection state of each drum when a hanging tool used is a grab bucket.

【図4】使用吊り具をコンテナ用吊り具とした場合の各
ドラムの接続状態を示す機械室の平面図である。
FIG. 4 is a plan view of a machine room showing a connection state of each drum when a used hanging tool is a container hanging tool.

【図5】図1の多目的クレーンにおいて、休止中の吊り
具のシーブブロックの固定部の側面図である。
FIG. 5 is a side view of a fixing portion of the sheave block of the suspending device at rest in the multipurpose crane of FIG. 1;

【図6】本発明の一実施例のグラブバケットの正面図で
ある。
FIG. 6 is a front view of the grab bucket according to the embodiment of the present invention.

【図7】図6の側面図である。FIG. 7 is a side view of FIG. 6;

【図8】図8は本発明の一実施例のコンテナ用吊り具等
の正面図である。
FIG. 8 is a front view of a container hanger and the like according to one embodiment of the present invention.

【符号の説明】[Explanation of symbols]

51…支持用ドラム、52…開閉用ドラム、53,54
…減速機、55,56…巻き上げ用ドラム、61…支持
用ロープ、62…開閉用ロープ、65,66…巻き上げ
用ロープ、58,59,60,63,64…クラッチ、
67,68…電動機、70…横行ドラム、80…主トロ
リ、85…補助トロリ、100…グラブバケット、10
1,102,151…シーブブロック、150…コンテ
ナ用吊り具150。
51: drum for support, 52: drum for opening and closing, 53, 54
... reduction gears, 55, 56 ... winding drums, 61 ... supporting ropes, 62 ... opening and closing ropes, 65, 66 ... winding ropes, 58, 59, 60, 63, 64 ... clutches,
67, 68: electric motor, 70: traversing drum, 80: main trolley, 85: auxiliary trolley, 100: grab bucket, 10
1, 102, 151 ... sheave block, 150 ... hanging device 150 for containers.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B66C 13/32 ──────────────────────────────────────────────────続 き Continued on front page (58) Field surveyed (Int. Cl. 7 , DB name) B66C 13/32

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 長尺物を吊る第1の吊り具の一端を着脱自
在に連結した第1のロープを巻いたものであって、トロ
リの幅方向に軸心を向けて設置した第1のドラムと、 前記第1の吊り具の他端に着脱自在に連結した第2のロ
ープを巻いたものであって、前記幅方向に向けて前記第
1のドラムの軸心の方向に設置した第2のドラムと、 前記第1の吊り具よりも吊り点の間隔が小さいグラブバ
ケットを吊るために着脱自在に連結した第3のロープを
巻いたものであって、前記第1のドラムと前記第2のド
ラムとの間において、前記幅方向に軸心を向けて設置し
た第3のドラムと、 前記グラブバケットを吊るために着脱自在に連結した第
4のロープを巻いたものであって、前記第1のドラムと
前記第2のドラムとの間において、前記第3のドラムの
軸心に平行に軸心を向けて設置した第4のドラムと、 前記第1のドラムと前記第3のドラムとの間に設けた第
1の減速機と、 前記第2のドラムと前記第4のドラムとの間に設けた第
2の減速機と、 前記第1の減速機よりも前記幅方向の一端側に設置した
第1の電動機と、 前記第2の減速機よりも前記幅方向の他端側に設置した
第2の電動機と、 前記第1の減速機と前記第2の減速機とを接続する第1
のクラッチと、 前記第1の減速機と前記第1のドラムとの間に設置した
第2のクラッチと、 前記第1の減速機と前記第3のドラムとの間に設置した
第3のクラッチと、 前記第2の減速機と前記第2のドラムとの間に設置した
第4のクラッチと、 前記第2の減速機と前記第4のドラムとの間に設置した
第5のクラッチと、 前記第1の電動機、前記第1のクラッチ、前記第2の電
動機のそれぞれの軸心が実質的に同一であり、 前記第1の減速機の出力軸、前記第1のドラム、前記第
3のドラムの軸心は実質的に同一であり、 前記第2の減速機の出力軸、前記第2のドラム、前記第
4のドラムの軸心は実質的に同一であること、 を特徴とする多目的クレーン。
A first rope in which one end of a first hanging member for hanging a long object is removably connected to a first rope, and the first rope is installed with its axis oriented in the width direction of the trolley. A second rope, which is detachably connected to the other end of the first hanging member, and is disposed in a direction of an axis of the first drum toward the width direction. And a third rope removably connected to suspend a grab bucket having a smaller hanging point interval than the first suspending device, wherein the first drum and the first drum are connected to each other. A third drum installed with its axis oriented in the width direction, and a fourth rope detachably connected to suspend the grab bucket, between the second drum and the second drum, Between the first drum and the second drum, the third drum A fourth drum installed with its axis oriented parallel to the core, a first reducer provided between the first drum and the third drum, a second drum and the fourth drum A second reduction gear provided between the first reduction gear and the first reduction gear, a first electric motor installed on one end side in the width direction with respect to the first reduction gear, and a second reduction gear in the width direction with respect to the second reduction gear. A second electric motor installed on the other end side, and a first electric motor connecting the first reduction gear and the second reduction gear.
A second clutch provided between the first reduction gear and the first drum; and a third clutch provided between the first reduction gear and the third drum. A fourth clutch installed between the second reduction gear and the second drum; a fifth clutch installed between the second reduction gear and the fourth drum; The first electric motor, the first clutch, and the second electric motor have substantially the same axis. The output shaft of the first reduction gear, the first drum, and the third The multi-purpose, wherein the axis of the drum is substantially the same, and the output shaft of the second reduction gear, the axis of the second drum, and the axis of the fourth drum are substantially the same. crane.
JP08058817A 1996-03-15 1996-03-15 Multipurpose crane Expired - Fee Related JP3114608B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP08058817A JP3114608B2 (en) 1996-03-15 1996-03-15 Multipurpose crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP08058817A JP3114608B2 (en) 1996-03-15 1996-03-15 Multipurpose crane

Publications (2)

Publication Number Publication Date
JPH09249380A JPH09249380A (en) 1997-09-22
JP3114608B2 true JP3114608B2 (en) 2000-12-04

Family

ID=13095178

Family Applications (1)

Application Number Title Priority Date Filing Date
JP08058817A Expired - Fee Related JP3114608B2 (en) 1996-03-15 1996-03-15 Multipurpose crane

Country Status (1)

Country Link
JP (1) JP3114608B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102642770A (en) * 2012-04-19 2012-08-22 大连华锐重工集团股份有限公司 Grab bucket driving mechanism of eight-ropes grab ship unloader
JP2016120995A (en) * 2014-12-25 2016-07-07 Ihi運搬機械株式会社 Swing angle detection method and device of crane

Also Published As

Publication number Publication date
JPH09249380A (en) 1997-09-22

Similar Documents

Publication Publication Date Title
JP3057085B2 (en) Deep sea descent device
US3540603A (en) Mill liner handling machine
US3153486A (en) Tower crane
JP3114608B2 (en) Multipurpose crane
US4082193A (en) Pipe handling apparatus
JP6825774B2 (en) How to replace the unloader and its grab bucket
JP3031288B2 (en) Multipurpose crane
JP3013772B2 (en) Multipurpose crane
JP2531539Y2 (en) Long lifting equipment
WO1997011021A1 (en) Crane and rope changing method
CA1064897A (en) Method and device for use with hoisting gear
JP4027628B2 (en) Kibble replacement method in shaft excavation
WO1997034824A1 (en) Crane and method for replacing ropes
CN219408917U (en) Concrete pipeline installation device
KR20010086287A (en) Lift
CN211815224U (en) Multifunctional rail part carrier
JP2003146583A (en) Material collecting conveying machine
JP4077281B2 (en) Shaft excavator
JPH0717343B2 (en) Hoisting device
JPH0668165B2 (en) Concrete transport method and device
JP2023154303A (en) Derricking rope cradle, and method of using derricking rope cradle
JPH01317995A (en) Container delivery method and apparatus in container crane
JPH04256690A (en) Transport device of gathered material for overhead installation
JP4427209B2 (en) Kibble changer for shaft excavation equipment
JP2737822B2 (en) Vessel with tipping device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees