JP2023154303A - Derricking rope cradle, and method of using derricking rope cradle - Google Patents

Derricking rope cradle, and method of using derricking rope cradle Download PDF

Info

Publication number
JP2023154303A
JP2023154303A JP2022063551A JP2022063551A JP2023154303A JP 2023154303 A JP2023154303 A JP 2023154303A JP 2022063551 A JP2022063551 A JP 2022063551A JP 2022063551 A JP2022063551 A JP 2022063551A JP 2023154303 A JP2023154303 A JP 2023154303A
Authority
JP
Japan
Prior art keywords
rope
gantry
hoisting
undulating
derricking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022063551A
Other languages
Japanese (ja)
Inventor
啓志 武藤
Keiji Muto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Sharyo Ltd
Original Assignee
Nippon Sharyo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Sharyo Ltd filed Critical Nippon Sharyo Ltd
Priority to JP2022063551A priority Critical patent/JP2023154303A/en
Publication of JP2023154303A publication Critical patent/JP2023154303A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Jib Cranes (AREA)
  • Component Parts Of Construction Machinery (AREA)

Abstract

To provide a derricking rope cradle which can safely and easily bring a derricking rope into a transport state, and a method of using the derricking rope cradle.SOLUTION: A derricking rope cradle 39 is used as a transport jig for a construction machine comprising a gantry 22 derrickably and detachably provided on a revolving body and a derricking winch winding a derricking rope 24, and stores and transports a portion of the derricking rope 24 fed out from the derricking winch in a state where the derricking rope 24 is arranged in the gantry 22. The derricking rope cradle 39 comprises: a bottomed frame-like storage portion 41 storing the portion of the derricking rope 24 as a bundle 40 obtained by winding multiple times and bundling; a hanging portion 42 for lifting; and attaching portions 43, 44 capable of being attached to and detached from the gantry 22.SELECTED DRAWING: Figure 2

Description

本発明は、起伏ロープ架台及び起伏ロープ架台の使用方法に関し、詳しくは、建設機械の分解・輸送の際に用いられる起伏ロープ架台及び起伏ロープ架台の使用方法に関する。 The present invention relates to an undulating rope mount and a method of using the undulating rope mount, and more particularly, to a method of using an undulating rope mount and an undulating rope mount used when disassembling and transporting construction machinery.

大型の建設機械、例えば3点式杭打機では、輸送時における質量制限のため、上部旋回体からガントリと付属のミドルシーブブロックとを一体で取り外して輸送し、現場でこれらを組み立てて使用している(例えば、特許文献1参照。)。 Due to mass limitations during transportation of large construction machines, such as 3-point pile drivers, the gantry and attached middle sheave block must be removed from the upper revolving body and transported together, and then assembled and used on site. (For example, see Patent Document 1.)

特開2019-131364号公報Japanese Patent Application Publication No. 2019-131364

ガントリの着脱を行うための準備として、起伏ロープを輸送に適した形にまとめる処理が施される。起伏ロープは、長さが100mを超えるワイヤロープであって、上部旋回体に搭載した起伏ウインチから繰り出された後、ガントリシーブブロックを経由してミドルシーブブロックの複数のシーブに巻き掛けられ、ロープ末端がガントリシーブブロックに接続されている。 In preparation for attaching and detaching the gantry, the undulating ropes are assembled into a shape suitable for transportation. The hoisting rope is a wire rope with a length of over 100m, and after being paid out from the hoisting winch mounted on the upper revolving structure, the hoisting rope is passed through the gantry sheave block, wrapped around multiple sheaves of the middle sheave block, and the rope is The end is connected to the gantry sheave block.

起伏ロープのまとめ処理は、通常、ガントリに配備した状態で行われ、起伏ウインチのドラムから抜き取った部分をガントリに縛り付けて固定する方法が用いられている。しかしながら、こうした作業は、ガントリに上って行う高所作業となり、番線(比較的柔らかい鉄線)などを用いて固定する手間も生じることから、作業者にとって負担が大きいものであった。 Normally, the hoisting ropes are assembled together while they are placed on a gantry, and a method is used in which a portion extracted from the drum of a hoisting winch is tied and fixed to the gantry. However, such work is a heavy burden on the worker because it involves climbing up on a gantry and requiring the labor of fixing it using wire (relatively soft iron wire).

そこで本発明は、安全かつ簡単に起伏ロープを輸送状態にすることができる起伏ロープ架台及び起伏ロープ架台の使用方法を提供することを目的としている。 SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to provide a hoisting rope mount and a method for using the levitation rope mount, which can safely and easily transport a hoisting rope.

上記目的を達成するため、本発明の起伏ロープ架台は、旋回体に起伏可能かつ着脱可能に設けられたガントリと、起伏ロープを巻回する起伏ウインチとを備えた建設機械の輸送治具として用いられ、前記ガントリに前記起伏ロープを配備した状態で、前記起伏ウインチから繰り出された前記起伏ロープの部分を収納して搬送する起伏ロープ架台において、前記起伏ロープの部分を複数回周回して束ねた集束体として収納する有底枠状の収納部と、吊り上げ用の吊り部と、前記ガントリに着脱可能な取付部とを備えていることを特徴としている。 In order to achieve the above object, the hoisting rope mount of the present invention is used as a transportation jig for construction machinery, which is equipped with a gantry that can be hoisted and detachably installed on a revolving structure, and a hoisting winch that winds a hoisting rope. In a state where the hoisting rope is placed on the gantry, the hoisting rope portion is wound around a plurality of times and bundled in a hoisting rope mount that stores and transports the hoisting rope portion paid out from the hoisting winch. It is characterized by comprising a bottomed frame-shaped storage section for storing as a bundle, a hanging section for lifting, and a mounting section that can be attached to and detached from the gantry.

また、本発明の起伏ロープ架台の使用方法は、前記起伏ロープ架台の使用方法であって、前記ガントリを倒伏させた状態で、前記起伏ロープ架台を前記起伏ウインチの起伏ロープを繰り出す方向に整合させて地面に載置する段階と、前記起伏ロープを繰り出しながら、前記集束体を平面視で8の字状をなして前記収納部に収納する段階と、前記起伏ウインチのドラムから前記起伏ロープの末端を取り外す段階と、前記吊り部及び前記取付部を使用して前記起伏ロープ架台を前記ガントリに取り付ける段階とを順に行うことを特徴としている。 Further, a method of using the hoisting rope mount according to the present invention is a method of using the hoisting rope mount, which comprises aligning the hoisting rope mount in the direction in which the hoisting rope of the hoisting winch pays out the hoisting rope in a state where the gantry is laid down. placing the hoisting rope on the ground, while feeding out the hoisting rope, storing the bundle in the storage part in the shape of a figure 8 in plan view; and removing the end of the hopping rope from the drum of the hopping winch. and the step of attaching the undulating rope pedestal to the gantry using the hanging part and the attaching part are performed in sequence.

本発明によれば、起伏ロープ架台が、起伏ロープの部分を集束体として収納する有底枠状の収納部と、吊り上げ用の吊り部と、ガントリに着脱可能な取付部とを備えているので、従来では高所作業を強いられていた起伏ロープのまとめ処理を地上で行うことが可能となり、その後のクレーン搬送やガントリへの取付け、ガントリの分離・積載といった一連の作業を効率良く進めることができる。すなわち、安全かつ簡単に起伏ロープを輸送状態にすることができる。しかも、起伏ロープの集束体を平面視で8の字状をなして収納する手順を実施するので、ロープ末端が両方固定された状態、すなわち、一方のロープ末端がガントリに、他方のロープ末端が起伏ウインチにそれぞれ固定された状態であっても起伏ロープに無理な力が加わることがなく、安定した収納状態を得ることができる。 According to the present invention, the hoisting rope mount includes a bottomed frame-shaped storage section that stores the hoisting rope portion as a bundle, a hanging section for lifting, and a mounting section that is detachable from the gantry. Now, it is now possible to collectively process the undulating ropes on the ground, which previously required work at heights, and the subsequent work such as crane transportation, attachment to the gantry, and separation and loading of the gantry can be carried out more efficiently. can. That is, the undulating rope can be brought into a transport state safely and easily. Moreover, since the bundle of undulating ropes is stored in a figure-eight shape when viewed from above, both rope ends are fixed, that is, one rope end is attached to the gantry and the other rope end is fixed. Even when the ropes are fixed to the hoisting winch, no unreasonable force is applied to the hoisting ropes, and a stable storage state can be obtained.

本発明の一形態例を示す起伏ロープ架台を搭載したガントリの側面図である。FIG. 1 is a side view of a gantry equipped with an undulating rope pedestal according to an embodiment of the present invention. 図1のII-II矢視図である。2 is a view taken along arrow II-II in FIG. 1. FIG. 図1のIII-III断面図である。2 is a sectional view taken along line III-III in FIG. 1. FIG. 図1のIV-IV断面図である。2 is a sectional view taken along line IV-IV in FIG. 1. FIG. 同じく起伏ロープを起伏ロープ架台に収納する作業工程を示す図である。It is a figure which shows the work process of similarly storing a undulating rope in an undulating rope mount. 同じく起伏ロープ架台をガントリと一体で上部旋回体から分離する作業工程を示す図である。It is a figure showing the working process of separating the undulating rope mount from the upper revolving body together with the gantry. 図6のVII-VII断面図である。7 is a sectional view taken along line VII-VII of FIG. 6. FIG. 図6のVIII-VIII断面図である。7 is a sectional view taken along line VIII-VIII in FIG. 6. FIG. 図6のIX-IX断面図である。7 is a sectional view taken along line IX-IX in FIG. 6. FIG. 同じく起伏ロープ架台が適用される杭打機の側面図である。It is a side view of the pile driver to which the undulating rope mount is similarly applied.

図1乃至図10は、本発明の一形態例における起伏ロープ架台を建設機械の一例である杭打機に適用した図である。杭打機11は、図10に示すように、下部走行体12及び該下部走行体12の上部に旋回可能に設けられた上部旋回体13からなるベースマシン14と、上部旋回体13の前部に着脱可能に設けられたリーダブラケット15と、該リーダブラケット15の前端部に起伏可能に設けられたリーダ16と、リーダブラケット15の両側面に設けられた左右一対のフロントジャッキ17と、上部旋回体13の後部に設けられた左右一対のアウトリガジャッキ18と、リーダ16を上部旋回体13の後部から支持する左右一対のバックステー19とを備えている。 1 to 10 are diagrams in which the undulating rope mount according to one embodiment of the present invention is applied to a pile driver, which is an example of a construction machine. As shown in FIG. 10, the pile driver 11 includes a base machine 14 consisting of a lower traveling body 12 and an upper rotating body 13 that is rotatably provided on the upper part of the lower traveling body 12, and a front part of the upper rotating body 13. A leader bracket 15 is removably attached to the front end of the leader bracket 15, a leader 16 is provided at the front end of the leader bracket 15 so that it can be raised and lowered, a pair of left and right front jacks 17 are provided on both sides of the leader bracket 15, and an upper swivel It includes a pair of left and right outrigger jacks 18 provided at the rear of the body 13 and a pair of left and right backstays 19 that support the leader 16 from the rear of the upper revolving body 13.

また、上部旋回体13の後端下部には、アウトリガジャッキ18が取り付けられるアウトリガボックス20と、該アウトリガボックス20上に載置されるカウンタウエイト21とが設けられている。さらに、上部旋回体13の後部上方には、ガントリ22が起伏可能かつ着脱可能に設けられている。 Furthermore, an outrigger box 20 to which an outrigger jack 18 is attached, and a counterweight 21 placed on the outrigger box 20 are provided at the lower rear end of the upper revolving body 13. Furthermore, a gantry 22 is provided above the rear part of the upper revolving body 13 so that it can be raised and lowered and is detachably attached.

ガントリ22は、図5にも示すように、上部旋回体13の中央後部に設けられた起伏ウインチ23から繰り出される起伏ロープ24をガイドするためのガントリシーブ25を備えている。また、起伏ロープ24は、ガントリ22を起立させた状態(図10)で、起伏ウインチ23から上方に立ち上がってガントリシーブ25の滑車25aを経て前方のミドルシーブブロック26の複数の滑車26aとガントリシーブ25の複数の滑車25aとに掛け回されてロープ末端24aがガントリシーブ25の支軸25bに固定されている(図2)。さらに、ミドルシーブブロック26には、一端がリーダ16に接続されたペンダントロープ27の他端が接続されている。こうして、ガントリ22に起伏ロープ24を配備した状態では、起伏ウインチ23で起伏ロープ24を巻き取ったり、繰り出したりすることによりリーダ16を起伏させることができる。 As shown in FIG. 5, the gantry 22 includes a gantry sheave 25 for guiding a hoisting rope 24 that is let out from a hoisting winch 23 provided at the rear center of the upper revolving body 13. In addition, when the gantry 22 is erected (FIG. 10), the hoisting rope 24 rises upward from the hoisting winch 23, passes through the pulley 25a of the gantry sheave 25, and connects to the plurality of pulleys 26a of the front middle sheave block 26 and the gantry sheave. The end 24a of the rope is fixed to the support shaft 25b of the gantry sheave 25 (FIG. 2). Furthermore, one end of a pendant rope 27 is connected to the leader 16, and the other end of the pendant rope 27 is connected to the middle sheave block 26. In this manner, with the undulating rope 24 disposed on the gantry 22, the leader 16 can be undulated by winding or letting out the undulating rope 24 with the undulating winch 23.

また、ガントリ22は、図8及び図9にも示すように、下端が上部旋回体13のメインフレーム前部に設けられた左右一対の前側ブラケット28,28に油圧式のピン連結装置29で前後方向に回動可能かつ着脱可能に装着された左右一対の前脚30,30と、上端が前脚30,30の上端部にガントリシーブ25の支軸25bを介して回動可能に装着されるとともに、下端が上部旋回体13のメインフレーム後部に設けられた左右一対の後側ブラケット31,31に油圧式のピン連結装置32で回動可能かつ着脱可能に装着された左右一対の後脚33,33とを備え、例えば、クレーンの吊り動作によって、上部旋回体13の後部に起伏可能に設けられている。さらに、前脚30と後脚33との間には、前脚30と後脚33とがなす相対角度を設定角度に保持する周知の後脚吊下げリンク34が設けられている(図1,特許文献1参照)。 Further, as shown in FIGS. 8 and 9, the gantry 22 has a lower end connected to a pair of left and right front brackets 28, 28 provided at the front of the main frame of the upper revolving body 13, with a hydraulic pin connecting device 29. A pair of left and right front legs 30, 30 are attached detachably and rotatably in the direction, and the upper ends are rotatably attached to the upper ends of the front legs 30, 30 via the support shaft 25b of the gantry sheave 25, A pair of left and right rear legs 33, 33 whose lower ends are rotatably and removably attached to a pair of left and right rear brackets 31, 31 provided at the rear of the main frame of the upper revolving body 13 by means of a hydraulic pin connection device 32. It is provided in the rear part of the revolving upper structure 13 so that it can be raised and lowered by, for example, a lifting operation of a crane. Furthermore, a well-known rear leg suspension link 34 is provided between the front leg 30 and the rear leg 33 to maintain the relative angle formed by the front leg 30 and the rear leg 33 at a set angle (see FIG. 1, Patent Document (see 1).

図2に示されるように、左右一対の前脚30,30の上面には、左右一対のガントリ昇降梯子35,35や複数の吊り部(吊り耳)36、ミドルシーブブロック26の取付部37がそれぞれ設けられている。ガントリ昇降梯子35は、図3及び図4にも示すように、前脚30の上面側長手方向に沿って互いに平行に設けられた一対の縦桟35a,35aと、該一対の縦桟35a,35a同士を繋ぐ複数の横桟35bと、内側の縦桟35aの複数個所に設けられた内側取付腕35cと、外側の縦桟35aにおける内側取付腕35cに対応した位置に設けられた外側取付腕35dとを有し、両取付腕35c,35dを介して前脚30の周壁に設けられたブラケットまたはネジ座にボルト止めされている。 As shown in FIG. 2, on the upper surfaces of the pair of left and right front legs 30, 30, a pair of left and right gantry lifting ladders 35, 35, a plurality of hanging parts (hanging ears) 36, and a mounting part 37 of the middle sheave block 26 are installed, respectively. It is provided. As shown in FIGS. 3 and 4, the gantry elevating ladder 35 includes a pair of vertical bars 35a, 35a provided parallel to each other along the longitudinal direction of the upper surface of the front leg 30, and a pair of vertical bars 35a, 35a. A plurality of horizontal bars 35b connecting the horizontal bars 35b, inner mounting arms 35c provided at multiple locations on the inner vertical bar 35a, and outer mounting arms 35d provided at positions corresponding to the inner mounting arms 35c on the outer vertical bar 35a. It is bolted to a bracket or screw seat provided on the peripheral wall of the front leg 30 via both mounting arms 35c and 35d.

このような杭打機11を輸送する際には、質量や大きさに応じて複数に分解されてトレーラなどの輸送車にそれぞれ積載される。まず、上部旋回体13からは、リーダ16、バックステー19、カウンタウエイト21などの大型部品が取り外される。そして、ガントリ22を後方に倒伏して前脚30,30を略水平にした状態で、取付部37に対してミドルシーブブロック26を固定ピン38で固定する。これにより、ミドルシーブブロック26は、左右前脚30,30間の下端部(倒伏状態において前端部)に止着した状態となり(図2)、このとき、ペンダントロープ27は、適宜巻き取られてガントリ22に弛みの少ない状態で保持される。 When transporting such a pile driver 11, it is disassembled into a plurality of parts according to their mass and size, and each is loaded onto a transport vehicle such as a trailer. First, large components such as the leader 16, backstay 19, and counterweight 21 are removed from the upper revolving body 13. Then, the middle sheave block 26 is fixed to the mounting portion 37 with the fixing pin 38 with the gantry 22 laid down rearward and the front legs 30, 30 made substantially horizontal. As a result, the middle sheave block 26 is fixed to the lower end (the front end in the collapsed state) between the left and right front legs 30, 30 (FIG. 2), and at this time, the pendant rope 27 is appropriately wound up and attached to the gantry. 22 with little slack.

ここで、ガントリ22の着脱を行うための準備として、起伏ロープ24を輸送に適した形にまとめる処理が施される。起伏ロープ24のまとめ処理は、ガントリ22に配備された状態で行われることから、組立性を考慮すると、起伏ウインチ23のドラムから抜き取ってしまうのが効率的である。しかしながら、ドラムから抜き取った起伏ロープ24をまとめるには、ガントリ22に上る必要があるだけでなく、番線などで固定する手間も生じてしまう。そこで、こうした起伏ロープ24のまとめ処理には、安全かつ簡単に起伏ロープ24を輸送状態にすることが可能な起伏ロープ架台39が使用される。 Here, in preparation for attaching and detaching the gantry 22, the undulating rope 24 is assembled into a shape suitable for transportation. Since the hoisting ropes 24 are assembled while they are placed in the gantry 22, it is efficient to take them out from the drum of the hoisting winch 23 in terms of ease of assembly. However, in order to collect the undulating ropes 24 that have been extracted from the drum, it is not only necessary to climb onto the gantry 22, but also requires the effort of fixing them with wires or the like. Therefore, for such processing of the levitation ropes 24, a levitation rope mount 39 is used which can safely and easily transport the levitation ropes 24.

起伏ロープ架台39は、図1乃至図4に示すように、起伏ウインチ23から繰り出された起伏ロープ24の部分(ミドルシーブブロック26の複数の滑車26aとガントリシーブ25の複数の滑車25aとに掛け回されていない部分)を収納して搬送し、ガントリ22と一体的に取り扱える輸送治具であって、起伏ロープ24の部分を複数回周回して束ねた集束体(平面視で略8の字状にまとめた束)40として収納する収納部41と、吊り上げ用の吊り部42と、ガントリ22に着脱可能な前部側取付部43及び後部側取付部44と、架台足場用の手摺45とを備えている。 As shown in FIGS. 1 to 4, the hoisting rope pedestal 39 hangs a portion of the hoisting rope 24 let out from the hoisting winch 23 (a plurality of pulleys 26a of the middle sheave block 26 and a plurality of pulleys 25a of the gantry sheave 25). It is a transportation jig that can store and transport the parts that are not rotated and can be handled integrally with the gantry 22, and is a bundled body (approximately a figure 8 in plan view A storage section 41 for storing a bundle (bundle) 40, a hanging section 42 for lifting, a front side attachment section 43 and a rear side attachment section 44 that are detachable from the gantry 22, and a handrail 45 for the gantry scaffolding. It is equipped with

収納部41は、集束体40が程よく収まる大きさの有底枠状に形成され、ガントリ22の長手方向に対応した略矩形の底板41aと前後左右一対の側板41bとを有している。底板41aの下面側には4箇所の支持脚41cが設けられるとともに、底板41aの上面側には起伏ロープ24の集束体40を側板41bの内側面に保持するための複数(例えば6つ)のガイド板が設けられ、これらの板片に前後左右4箇所の吊り孔42aを備えることで吊り部(吊り耳)42が形成されている。 The storage section 41 is formed in the shape of a bottomed frame large enough to accommodate the bundle 40, and has a substantially rectangular bottom plate 41a corresponding to the longitudinal direction of the gantry 22 and a pair of front, rear, left and right side plates 41b. Four support legs 41c are provided on the lower surface of the bottom plate 41a, and a plurality of (for example, six) support legs 41c are provided on the upper surface of the bottom plate 41a to hold the bundle 40 of the undulating ropes 24 on the inner surface of the side plate 41b. Guide plates are provided, and hanging portions (hanging ears) 42 are formed by providing hanging holes 42a at four locations on the front, back, left, and right sides of these plate pieces.

前部側及び後部側の各取付部43,44は、左右一対のガントリ昇降梯子35,35に係合可能な左右で対をなす対称形状を有し、収納部41の側板41bの外側面にそれぞれ固着されている。前部側取付部43は、側面視で略逆Jの字状をなす板体であって、先端突部43aがガントリ昇降梯子35の内側の縦桟35aに設けられたブラケットの上部に凹設された係合溝部35eに対して係合可能に形成されている。一方、後部側取付部44は、側面視で略逆Uの字状をなす二股状のブラケットであって、ガントリ昇降梯子35の横桟35bを挟み込む前後2枚の板体の先端下部44a,44aにおいて、固定ピン46が挿通されるピン孔44b,44bが設けられている。 Each of the mounting parts 43 and 44 on the front side and the rear side has a symmetrical shape that forms a pair on the left and right that can be engaged with the pair of left and right gantry lifting ladders 35 and 35, and is attached to the outer surface of the side plate 41b of the storage part 41. Each is fixed. The front side attachment part 43 is a plate having a substantially inverted J shape when viewed from the side, and a tip protrusion 43a is recessed in the upper part of a bracket provided on the vertical bar 35a inside the gantry elevating ladder 35. The groove 35e is formed so as to be engageable with the engagement groove 35e. On the other hand, the rear side mounting portion 44 is a bifurcated bracket having a substantially inverted U shape when viewed from the side, and includes lower end portions 44a, 44a of two front and rear plates that sandwich the horizontal bar 35b of the gantry lifting ladder 35. , pin holes 44b, 44b into which the fixing pin 46 is inserted are provided.

以下では、起伏ロープ架台39を使用して起伏ロープ24を輸送状態にする方法を、図5乃至図9を参照しながら説明する。まず、図5に示すように、上部旋回体13において、ガントリ22を後方に倒伏して前脚30,30を略水平にした状態とする。このとき、ミドルシーブブロック26は、あらかじめガントリ22の前端部に止着しておき、これに従って起伏ロープ24は、その余長分が所定量巻き取られた状態でガントリ22に配備される。 In the following, a method of bringing the hoisting rope 24 into a transport state using the hoisting rope mount 39 will be described with reference to FIGS. 5 to 9. First, as shown in FIG. 5, in the upper revolving body 13, the gantry 22 is laid down rearward, and the front legs 30, 30 are brought into a substantially horizontal state. At this time, the middle sheave block 26 is fixed in advance to the front end of the gantry 22, and accordingly, the undulating rope 24 is arranged on the gantry 22 with its surplus length wound up by a predetermined amount.

次いで、用意した起伏ロープ架台39を起伏ウインチ23の起伏ロープ24を繰り出す方向に整合させて地面に載置する。具体的には、ガントリシーブ25の真下位置に対して収納部41の前端位置が揃うように前後間隔をあけて地面に載置する。この状態で、起伏ロープ24を後方へ繰り出しながら、起伏ロープ24の部分を手扱いによって起伏ロープ架台39に載せていく。このとき、収納部41の底板41a上において、起伏ロープ24の束状部分が複数のガイド板(吊り部42)と側板41bとの間に挟まり、略8の字形状を保ちながら集束体40として収納部41に収納される。 Next, the prepared hoisting rope pedestal 39 is placed on the ground in alignment with the direction in which the hoisting rope 24 of the hoisting winch 23 is paid out. Specifically, the housing section 41 is placed on the ground with an interval in front and back such that the front end position of the storage section 41 is aligned with the position directly below the gantry sheave 25. In this state, while letting out the hoisting rope 24 rearward, a portion of the hopping rope 24 is placed on the hoisting rope mount 39 by hand. At this time, on the bottom plate 41a of the storage section 41, the bundled portion of the undulating rope 24 is sandwiched between a plurality of guide plates (hanging portions 42) and the side plate 41b, and forms a bundle 40 while maintaining an approximately figure-eight shape. It is stored in the storage section 41.

起伏ウインチ23に巻回されていた起伏ロープ24がなくなると、図示は省略するが、起伏ウインチ23のドラムから起伏ロープ24の末端を取り外し、起伏ロープ24の部分を起伏ロープ架台39に収納した状態とする。そして、吊り部42を使用したクレーンの吊り動作で、ガントリ22上に起伏ロープ架台39を運び込み、前部側取付部43及び後部側取付部44を使用して、ガントリ22の前脚30,30間の定位置に取り付ける。これにより、ガントリ22上において、ミドルシーブブロック26と起伏ロープ架台39とが前後に並んで安定状態で保持される(図2)。 When the hoisting rope 24 that has been wound around the hoisting winch 23 is gone, the end of the hoisting rope 24 is removed from the drum of the hopping winch 23 and the portion of the hopping rope 24 is stored in the hopping rope mount 39 (not shown). shall be. Then, by the lifting operation of the crane using the hanging part 42, the undulating rope mount 39 is carried onto the gantry 22, and using the front side attachment part 43 and the rear side attachment part 44, it is placed between the front legs 30 and 30 of the gantry 22. Attach it in place. Thereby, the middle sheave block 26 and the undulating rope pedestal 39 are held in a stable state side by side on the gantry 22 (FIG. 2).

ここで、上部旋回体13に対してガントリ22を分離させるには、図7などに示すように、吊り位置を起伏ロープ架台39の吊り部42からガントリ22の吊り部36に変更し、図8及び図9に示すように、前脚30,30及び後脚33,33の各ピン連結装置29,32に対して、油圧供給のためのホース47,48を接続した状態で、圧油を得てそれぞれピン抜取り方向に作動させる。これにより、各脚30,32と上部旋回体13との間で連結状態が解除される。また、連結解除時には、前脚30と後脚33との間において後脚吊下げリンク34が取り付けられ、前脚30に対して後脚33が設定角度に保持される。 Here, in order to separate the gantry 22 from the upper revolving body 13, as shown in FIG. As shown in FIG. 9, pressure oil is obtained by connecting hoses 47 and 48 for hydraulic pressure supply to the pin coupling devices 29 and 32 of the front legs 30, 30 and rear legs 33, 33, respectively. Each operates in the pin removal direction. Thereby, the connection state between each leg 30, 32 and the upper revolving body 13 is released. Further, when the connection is released, the rear leg suspension link 34 is attached between the front leg 30 and the rear leg 33, and the rear leg 33 is held at a set angle with respect to the front leg 30.

こうして、ガントリ22と一体で搬送することが可能になった起伏ロープ架台39は、図6に示すように、クレーンの吊り動作によって、例えば、ベースマシン14の近傍地面に搬送され、ガントリ22の後脚33に輸送台座49を取り付けた後、その状態のまま輸送車の荷台に積載される。そして、輸送先の現場に搬入されると、杭打機11を組み立てる過程において、上述と逆の手順が行われる。つまり、起伏ロープ24は、再び起伏ウインチ23に取り込まれ、一方で、空状態の起伏ロープ架台39は、現場に設けられた置き場所に移動される。 The undulating rope pedestal 39, which can now be transported together with the gantry 22, is transported, for example, to the ground near the base machine 14 by the lifting operation of the crane, as shown in FIG. After the transport base 49 is attached to the legs 33, the transport base 49 is loaded in that state onto the platform of a transport vehicle. When the pile driver 11 is transported to the destination site, the reverse procedure to that described above is performed in the process of assembling the pile driver 11. That is, the hoisting rope 24 is taken into the hoisting winch 23 again, while the empty hoisting rope pedestal 39 is moved to a storage location provided at the site.

このように、本発明によれば、起伏ロープ架台39が、起伏ロープ24の部分を集束体40として収納する有底枠状の収納部41と、吊り上げ用の吊り部42と、ガントリ22に着脱可能な取付部43,44とを備えているので、従来では高所作業を強いられていた起伏ロープ24のまとめ処理を地上で行うことが可能となり、その後のクレーン搬送やガントリ22への取付け、ガントリ22の分離・積載といった一連の作業を効率良く進めることができる。すなわち、安全かつ簡単に起伏ロープ24を輸送状態にすることができる。しかも、起伏ロープ24の集束体40を平面視で8の字状をなして収納する手順を実施するので、ロープ末端が両方固定された状態、すなわち、一方のロープ末端がガントリ22に、他方のロープ末端が起伏ウインチ23にそれぞれ固定された状態であっても起伏ロープ24に無理な力が加わることがなく、安定した収納状態を得ることができる。 As described above, according to the present invention, the hoisting rope pedestal 39 can be attached to and detached from the gantry 22 , the bottomed frame-shaped storage section 41 that stores the portion of the hoisting rope 24 as a bundle 40 , the hanging section 42 for lifting, and the gantry 22 . Since it is equipped with possible attachment parts 43 and 44, it is now possible to collectively process the undulating ropes 24 on the ground, which conventionally required work at heights, and the subsequent crane transportation and attachment to the gantry 22, A series of operations such as separating and loading the gantry 22 can be carried out efficiently. That is, the undulating rope 24 can be brought into a transport state safely and easily. Moreover, since the bundle 40 of the undulating rope 24 is stored in a figure-eight shape in plan view, both ends of the rope are fixed, that is, one rope end is attached to the gantry 22 and the other rope is fixed. Even when the ends of the ropes are fixed to the hoisting winches 23, no unreasonable force is applied to the hoisting ropes 24, and a stable storage state can be obtained.

なお、本発明は、前記形態例に限定されるものではなく、起伏ロープ架台の各部の構成は、搬送性を考慮して種々の構成が考えられ、ガントリの仕様や起伏ロープの長さに応じて適宜変更を加えることができる。また、実施例では杭打機を例に挙げて説明したが、これに限定されるものではなく、ガントリを備えた他の大型建設機械にも適用することができる。 It should be noted that the present invention is not limited to the above-mentioned embodiments, and various configurations of each part of the hoisting rope mount can be considered in consideration of transportability, and may be varied depending on the specifications of the gantry and the length of the hoisting rope. Changes may be made as appropriate. Furthermore, although the embodiments have been described using a pile driver as an example, the invention is not limited to this, and can be applied to other large construction machines equipped with a gantry.

11…杭打機、12…下部走行体、13…上部旋回体、14…ベースマシン、15…リーダブラケット、16…リーダ、17…フロントジャッキ、18…アウトリガジャッキ、19…バックステー、20…アウトリガボックス、21…カウンタウエイト、22…ガントリ、23…起伏ウインチ、24…起伏ロープ、24a…ロープ末端、25…ガントリシーブ、25a…滑車、25b…支軸、26…ミドルシーブブロック、26a…滑車、27…ペンダントロープ、28…前側ブラケット、29…ピン連結装置、30…前脚、31…後側ブラケット、32…ピン連結装置、33…後脚、34…後脚吊下げリンク、35…ガントリ昇降梯子、35a…縦桟、35b…横桟、35c…内側取付腕、35d…外側取付腕、35e…係合溝部、36…吊り部、37…取付部、38…固定ピン、39…起伏ロープ架台、40…集束体、41…収納部、41a…底板、41b…側板、41c…支持脚、42…吊り部、42a…吊り孔、43…前部側取付部、43a…先端突部、44…後部側取付部、44a…先端下部、44b…ピン孔、45…手摺、46…固定ピン、47,48…ホース、49…輸送台座 11...Pile driver, 12...Lower traveling body, 13...Upper rotating body, 14...Base machine, 15...Leader bracket, 16...Leader, 17...Front jack, 18...Outrigger jack, 19...Backstay, 20...Outrigger Box, 21...Counterweight, 22...Gantry, 23...Luffing winch, 24...Luffing rope, 24a...Rope end, 25...Gantry sheave, 25a...Pulley, 25b...Spindle, 26...Middle sheave block, 26a...Pulley, 27... Pendant rope, 28... Front bracket, 29... Pin connecting device, 30... Front leg, 31... Rear side bracket, 32... Pin connecting device, 33... Rear leg, 34... Rear leg hanging link, 35... Gantry elevation ladder , 35a...Vertical bar, 35b...Horizontal bar, 35c...Inner mounting arm, 35d...Outer mounting arm, 35e...Engagement groove, 36...Hanging part, 37...Mounting part, 38...Fixing pin, 39...Luffing rope mount, 40... Bundle, 41... Storage part, 41a... Bottom plate, 41b... Side plate, 41c... Support leg, 42... Hanging part, 42a... Hanging hole, 43... Front side attachment part, 43a... Tip protrusion, 44... Rear part Side mounting part, 44a... Lower tip, 44b... Pin hole, 45... Handrail, 46... Fixing pin, 47, 48... Hose, 49... Transport pedestal

Claims (2)

旋回体に起伏可能かつ着脱可能に設けられたガントリと、起伏ロープを巻回する起伏ウインチとを備えた建設機械の輸送治具として用いられ、前記ガントリに前記起伏ロープを配備した状態で、前記起伏ウインチから繰り出された前記起伏ロープの部分を収納して搬送する起伏ロープ架台において、
前記起伏ロープの部分を複数回周回して束ねた集束体として収納する有底枠状の収納部と、
吊り上げ用の吊り部と、
前記ガントリに着脱可能な取付部と、
を備えていることを特徴とする起伏ロープ架台。
It is used as a transportation jig for a construction machine, which is equipped with a gantry that is removably and removably installed on a revolving structure, and a hoisting winch that winds a hoisting rope. A hoisting rope mount that stores and transports a portion of the hoisting rope paid out from a hoisting winch,
a bottomed frame-shaped storage section that stores the undulating rope portion as a bundle made by going around the undulation rope multiple times;
A hanging part for lifting,
a mounting part that is detachable from the gantry;
An undulating rope trestle characterized by comprising:
請求項1記載の起伏ロープ架台の使用方法であって、
前記ガントリを倒伏させた状態で、
前記起伏ロープ架台を前記起伏ウインチの起伏ロープを繰り出す方向に整合させて地面に載置する段階と、
前記起伏ロープを繰り出しながら、前記集束体を平面視で8の字状をなして前記収納部に収納する段階と、
前記起伏ウインチのドラムから前記起伏ロープの末端を取り外す段階と、
前記吊り部及び前記取付部を使用して前記起伏ロープ架台を前記ガントリに取り付ける段階と、
を順に行うことを特徴とする起伏ロープ架台の使用方法。
A method of using the undulating rope frame according to claim 1, comprising:
With the gantry laid down,
placing the hoisting rope pedestal on the ground in alignment with the direction in which the hoisting rope of the hoisting winch is paid out;
While letting out the undulating rope, storing the bundle in the storage part in a figure-eight shape in plan view;
removing the end of the hoisting rope from the drum of the hoisting winch;
attaching the undulating rope trestle to the gantry using the hanging part and the attachment part;
A method of using an undulating rope trestle, which is characterized by performing the following steps in order.
JP2022063551A 2022-04-06 2022-04-06 Derricking rope cradle, and method of using derricking rope cradle Pending JP2023154303A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022063551A JP2023154303A (en) 2022-04-06 2022-04-06 Derricking rope cradle, and method of using derricking rope cradle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022063551A JP2023154303A (en) 2022-04-06 2022-04-06 Derricking rope cradle, and method of using derricking rope cradle

Publications (1)

Publication Number Publication Date
JP2023154303A true JP2023154303A (en) 2023-10-19

Family

ID=88372697

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022063551A Pending JP2023154303A (en) 2022-04-06 2022-04-06 Derricking rope cradle, and method of using derricking rope cradle

Country Status (1)

Country Link
JP (1) JP2023154303A (en)

Similar Documents

Publication Publication Date Title
JP5999902B2 (en) Method for connecting components of a crane suspension assembly and frame mounting assembly used for the method
US20100252522A1 (en) Auxiliary Device For Installing The Lower And Upper Jib Support Of An Adjustable Auxiliary Boom On A Mobile Crane
JP2010076939A (en) Boom hoist transport system and crane using the same
US10717633B2 (en) Adjustable length tensioning member
CN101708809A (en) Reel frame system used for crane
KR100493248B1 (en) Tie rod installation method and device of tower jib crane
JP2023154303A (en) Derricking rope cradle, and method of using derricking rope cradle
JP2003201089A (en) Mobile crane and self-operated attachment/detachment method
JP6825774B2 (en) How to replace the unloader and its grab bucket
US20230202808A1 (en) Assembly method for crane
JP7287055B2 (en) ROPE WIRING METHOD AND GUIDE SHEAVE DEVICE FOR WORKING MACHINE
JP2011252318A (en) Load receiving platform and its transferring method
JP7253918B2 (en) Crane disassembly structure and method
JP2018090372A (en) Workpiece conveyance method using crane
JP2003128367A (en) Rope extension method at climbing of lifting device and its auxiliary device
JP6683087B2 (en) Mobile crane assembly method
JP2017154838A (en) crane
JP6787223B2 (en) Wiring method and crane
JP7230895B2 (en) crane hitch beam
EP4339148A1 (en) Backstop
JP7416035B2 (en) Guyline storage device
JP7136161B2 (en) Connection mechanism and connection method
JP7293921B2 (en) Pin anti-rotation structure
JP6579172B2 (en) Crane and crane strut raising method
JP2023023086A (en) pile driver