JP7253918B2 - Crane disassembly structure and method - Google Patents

Crane disassembly structure and method Download PDF

Info

Publication number
JP7253918B2
JP7253918B2 JP2018246657A JP2018246657A JP7253918B2 JP 7253918 B2 JP7253918 B2 JP 7253918B2 JP 2018246657 A JP2018246657 A JP 2018246657A JP 2018246657 A JP2018246657 A JP 2018246657A JP 7253918 B2 JP7253918 B2 JP 7253918B2
Authority
JP
Japan
Prior art keywords
boom
wire
crane
main body
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2018246657A
Other languages
Japanese (ja)
Other versions
JP2020104998A (en
Inventor
将一 町田
賢治 石山
岳雄 小山
Original Assignee
株式会社加藤製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社加藤製作所 filed Critical 株式会社加藤製作所
Priority to JP2018246657A priority Critical patent/JP7253918B2/en
Publication of JP2020104998A publication Critical patent/JP2020104998A/en
Application granted granted Critical
Publication of JP7253918B2 publication Critical patent/JP7253918B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Description

本発明は、輸送等の目的でクレーンを分解するための構造、および分解する際の方法に関する。 The present invention relates to a structure and method for dismantling a crane for purposes such as transportation.

図6は建設現場等で使用される移動式のクレーンを示している。クレーン1は、本体2から上方に伸びるブーム3と、本体2の下方に取り付けられた走行装置としてのクローラ4とを備えており、ブーム3の先端から吊り下げられるフック5により、図示しない吊荷の運搬を行うようになっている。 FIG. 6 shows a mobile crane used at construction sites and the like. The crane 1 includes a boom 3 extending upward from a main body 2 and a crawler 4 as a traveling device attached to the lower side of the main body 2. A hook 5 suspended from the tip of the boom 3 suspends a load (not shown). are to be transported.

本体2は、回転台座6を介してクローラ4に対し回転可能に支持されている。ブーム3は、テレスコピック構造を備えて伸縮可能に構成されており、基部は起伏ピン3aを介して本体2に対し起伏可能に取り付けられている。 The main body 2 is rotatably supported by the crawler 4 via the rotating pedestal 6 . The boom 3 has a telescopic structure and is configured to be extendable, and the base is attached to the main body 2 via a hoisting pin 3a so that it can be hoisted.

本体2におけるブーム3の基部より前方の位置には、油圧式の伸縮機構を備えた起伏シリンダ12が設置されている。起伏シリンダ12は、基部を本体2側に起伏可能に設置される一方、先端は接続ピン12aを介してブーム3に対し回転可能に接続されており、ブーム3を下側から支えつつ、自在に伸縮することでブーム3の起伏を行うようになっている。 A hoisting cylinder 12 having a hydraulic telescopic mechanism is installed at a position in front of the base of the boom 3 in the main body 2 . The hoisting cylinder 12 has a base installed on the main body 2 side so that it can be hoisted, while the tip is rotatably connected to the boom 3 via a connecting pin 12a. The boom 3 is raised and lowered by expanding and contracting.

また、本体2には、吊具であるフック5を吊り下げるためのウインチドラム(吊下ドラム)8が設けられており、該ウインチドラム8からワイヤ(吊下ワイヤ)10が繰り出されるようになっている。 Further, the main body 2 is provided with a winch drum (suspension drum) 8 for suspending a hook 5 which is a suspension tool, and a wire (suspension wire) 10 is let out from the winch drum 8. ing.

吊下ドラム8から繰り出される吊下ワイヤ10は、本体2の後部上方に設けられたガイドシーブ7に巻き掛けられた後、前方に伸び、ブーム3の先端に備えられたシーブ3bに巻き掛けられる。さらに、吊下ワイヤ10はシーブ3bから下方へ伸び、フック5に巻き掛けられて該フック5を吊り下げている。そして、吊下ドラム8から吊下ワイヤ10を繰り出しまたは巻き取る動作により、フック5を上下に操作できるようになっている。尚、本明細書では吊下ワイヤ10における吊荷を吊り下げる部分を、必要に応じて吊下部と称することとする。ここに示した例では、フック5を吊り下げている部分が吊下部に相当する。 A suspension wire 10 drawn out from a suspension drum 8 is wound around a guide sheave 7 provided at the upper rear portion of the main body 2, extends forward, and is wound around a sheave 3b provided at the tip of the boom 3. . Furthermore, the suspension wire 10 extends downward from the sheave 3b and is wound around the hook 5 to suspend the hook 5. As shown in FIG. The hook 5 can be moved up and down by the action of drawing out or winding up the suspension wire 10 from the suspension drum 8 . In this specification, the portion of the suspension wire 10 for suspending the load is referred to as the suspension portion as necessary. In the example shown here, the portion from which the hook 5 is suspended corresponds to the suspension portion.

ところで、こうしたクレーン1は、輸送等のために分解可能に構成される場合がある。現場までの道路の耐荷重量や運搬車両の積載重量の制限をクリアし、また交通の便宜を図るために、一台のクレーン1を分解し、複数の運搬車両に積載して運搬するのである。 By the way, such a crane 1 may be configured to be disassembled for transportation or the like. In order to clear the restrictions on the load capacity of the road to the site and the load weight of the transportation vehicle, and to improve the convenience of transportation, one crane 1 is disassembled and loaded on a plurality of transportation vehicles for transportation.

図6に示したクレーン1を分解する手順の一例を図7に示す。まず、吊下ドラム8により吊下ワイヤ10を巻き取りつつブーム3を収縮させ、また、起伏シリンダ12を収縮させて、ブーム3を水平あるいはそれに近い向きに倒伏させる(ステップS1)。ワイヤ10からフック5を取り外し(ステップS2)、さらにブーム3やガイドシーブ7からワイヤ10を取り外す(ステップS3)。吊下ドラム8を作動させて吊下ワイヤ10を巻き取ってから(ステップS4)、ブーム3を本体2から取り外す(ステップS5)。ブーム3の取り外しは、図示しない補助クレーンあるいは台座等でブーム3や起伏シリンダ12を支持しつつ、本体2にブーム3を接続している起伏ピン3aや、ブーム3と起伏シリンダ12を接続している接続ピン12aを抜き取ることで行う。取り外しが完了したら、ブーム3と、本体2とをそれぞれ別の運搬車両(図示せず)にて運搬する。 An example of the procedure for disassembling the crane 1 shown in FIG. 6 is shown in FIG. First, the boom 3 is contracted while the suspension wire 10 is wound by the suspension drum 8, and the hoisting cylinder 12 is contracted to lower the boom 3 horizontally or in a nearly horizontal direction (step S1). The hook 5 is removed from the wire 10 (step S2), and the wire 10 is removed from the boom 3 and the guide sheave 7 (step S3). After operating the suspension drum 8 to wind the suspension wire 10 (step S4), the boom 3 is removed from the main body 2 (step S5). The boom 3 can be removed by supporting the boom 3 and the hoisting cylinder 12 with an auxiliary crane (not shown) or a pedestal or the like, and by connecting the hoisting pin 3a that connects the boom 3 to the main body 2 and the boom 3 and the hoisting cylinder 12. This is done by extracting the connecting pin 12a. After the removal is completed, the boom 3 and the main body 2 are transported by separate transport vehicles (not shown).

尚、この種のクレーンの分解方法や分解構造に関連する先行技術文献としては、例えば、下記の特許文献1等がある。 Prior art documents related to the disassembly method and structure of this type of crane include, for example, Patent Document 1 below.

特開2015-221703号公報JP 2015-221703 A

ところで、上述の如きクレーン1の分解方法においては、ブーム3を本体2から取り外すに先立ち、ブーム3の本体2からの離間を妨げる吊下ワイヤ10をブーム3から取り外し、吊下ドラム8に巻き取る必要がある。しかしながら、ブーム3に取り付けられ、またガイドシーブ7に掛け回された吊下ワイヤ10を取り外すのは非常に手間のかかる作業であり、また、取り付けの際にも同様の手間がかかる。この手間はクレーン1を輸送しようとする度に発生し、これがクレーン1の輸送に必要な作業時間を長引かせる要因となっていた。 By the way, in the method of disassembling the crane 1 as described above, prior to removing the boom 3 from the main body 2, the suspension wire 10 that prevents the separation of the boom 3 from the main body 2 is removed from the boom 3 and wound around the suspension drum 8. There is a need. However, removing the suspension wire 10 attached to the boom 3 and wound around the guide sheave 7 is a very time-consuming work, and the same time and effort is required during installation. This trouble occurs every time the crane 1 is to be transported, and this has been a factor in prolonging the work time required for transporting the crane 1 .

本発明は、斯かる実情に鑑み、クレーンを簡便な手順により分解し得るクレーンの分解構造および方法を提供しようとするものである。 SUMMARY OF THE INVENTION In view of such circumstances, it is an object of the present invention to provide a crane disassembly structure and method capable of disassembling a crane by a simple procedure.

本発明は、本体に対して起伏可能に設置されたブームと、前記ブームに沿って配置されたワイヤと、前記ワイヤの繰り出しおよび巻き取りを行うウインチドラムとを備え、前記ウインチドラムを前記ブームと一体的に前記本体から取り外しできるよう構成され、且つ、前記ブームを前記本体から取り外す際に、吊荷を吊り下げる前記ワイヤの吊下部を前記ブームに係留可能に構成されていることを特徴とするクレーンの分解構造にかかるものである。 The present invention comprises a boom installed so as to be able to rise and fall with respect to a main body, a wire arranged along the boom, and a winch drum for feeding and winding the wire, wherein the winch drum is connected to the boom. It is characterized by being configured to be detachable from the main body integrally, and configured to be able to moor the suspended portion of the wire for suspending a load when the boom is detached from the main body. This is related to the disassembled structure of the crane.

本発明のクレーンの分解構造は、前記ウインチドラムから繰り出された前記ワイヤを巻き掛けるガイドシーブを前記ブーム側に備えていてもよい。 The disassembled structure of the crane of the present invention may include a guide sheave around which the wire drawn out from the winch drum is wound on the boom side.

本発明のクレーンの分解構造において、前記ウインチドラムは、前記ブームに取り付けられ、且つ前記本体側に対して着脱可能に支持された支持ブラケットにより支持されていてもよい。 In the disassembled structure of the crane of the present invention, the winch drum may be attached to the boom and supported by a support bracket detachably supported on the main body side.

また、本発明は、本体に対して起伏可能に設置されたブームと、前記ブームに沿って配置されたワイヤと、前記ワイヤの繰り出しおよび巻き取りを行うウインチドラムとを備えたクレーンを分解するにあたり、吊荷を吊り下げる前記ワイヤの吊下部を前記ブームに係留した状態で、前記ブームを前記ウインチドラムと一体的に前記本体から取り外すことを特徴とするクレーンの分解方法にかかるものである。 Further, the present invention provides a method for disassembling a crane that includes a boom that can be raised and lowered with respect to a main body, a wire that is arranged along the boom, and a winch drum that pays out and winds up the wire. and a method for disassembling a crane, wherein the boom is removed integrally with the winch drum from the main body in a state in which the suspended portion of the wire for suspending a load is moored to the boom .

本発明のクレーンの分解方法において、前記クレーンは、前記ウインチドラムから繰り出された前記ワイヤを巻き掛けるガイドシーブを前記ブーム側に備え、前記ブームは、前記ワイヤを前記ガイドシーブに巻き掛けたまま取り外すことができる。 In the crane disassembly method of the present invention, the crane includes a guide sheave on the boom side around which the wire drawn out from the winch drum is wound, and the boom is removed while the wire is wound around the guide sheave. be able to.

本発明のクレーンの分解構造および方法によれば、クレーンを簡便な手順により分解し得るという優れた効果を奏し得る。 According to the crane disassembly structure and method of the present invention, an excellent effect can be obtained in that the crane can be disassembled by a simple procedure.

本発明を適用したクレーンの形態の一例を示す側面図である。It is a side view which shows an example of the form of the crane to which this invention is applied. 本体からウインチドラムごと取り外されたブームの形態を示す側面図である。FIG. 4 is a side view showing the form of the boom removed from the main body together with the winch drum. 本体からウインチドラムごと取り外されたブームの形態を示す平面図である。FIG. 4 is a plan view showing the form of the boom removed from the main body together with the winch drum. 本実施例における支持ブラケットと本体側のフレームの形態を示す側面図である。FIG. 4 is a side view showing the form of a support bracket and a frame on the main body side in this embodiment. 本発明の実施によりクレーンを分解する手順の一例を説明するフローチャートである。4 is a flow chart illustrating an example of a procedure for disassembling a crane according to the implementation of the present invention; クレーンの形態の一例を示す側面図である。It is a side view which shows an example of the form of a crane. クレーンを分解する手順の一例を説明するフローチャートである。4 is a flow chart illustrating an example of a procedure for disassembling a crane;

以下、本発明の実施の形態を添付図面を参照して説明する。 BEST MODE FOR CARRYING OUT THE INVENTION Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

図1は本発明の実施によるクレーンの形態の一例を示しており、図中、図6と同一の符号を付した部分は同一物を表している。 FIG. 1 shows an example of the form of a crane according to the implementation of the present invention, and in the figure, the same reference numerals as in FIG. 6 represent the same parts.

本実施例のクレーン50は、基本的な構成は図6に示した従来例のクレーン1と同様であり、本体2に対して起伏可能に設置されたブーム3と、本体2の下方に取り付けられた走行装置としてのクローラ4とを備えており、ブーム3の先端から吊具としてのフック5を吊り下げるようになっている。 A crane 50 of this embodiment has a basic configuration similar to that of the conventional crane 1 shown in FIG. A crawler 4 as a traveling device is provided, and a hook 5 as a hanging tool is suspended from the tip of the boom 3. - 特許庁

本体2は、回転台座6を介してクローラ4に対し回転可能に支持されている。ブーム3は、テレスコピック構造を備えて伸縮可能に構成され、基部に備えた起伏ピン3aを介して本体2に起伏可能に取り付けられている。 The main body 2 is rotatably supported by the crawler 4 via the rotating pedestal 6 . The boom 3 has a telescopic structure and is configured to be extendable, and is attached to the main body 2 so as to be able to be raised and lowered via a raising and lowering pin 3a provided at the base.

本体2には、ウインチドラムとして吊下ドラム8が設けられている。吊下ドラム8から繰り出される吊下ワイヤ10は、本体2の後部上方に設けられたガイドシーブ7に巻き掛けられた後、前方に伸び、ブーム3の先端に備えられたシーブ3bに巻き掛けられて下方へ伸び、フック5を吊り下げている。 The main body 2 is provided with a suspension drum 8 as a winch drum. A suspension wire 10 drawn out from a suspension drum 8 is wound around a guide sheave 7 provided at the upper rear portion of the main body 2, extends forward, and is wound around a sheave 3b provided at the tip of the boom 3. and extends downward to suspend the hook 5.

本体2におけるブーム3の基部より前方の位置には油圧式の伸縮機構を備えた起伏シリンダ12が設置され、ブーム3を下側から支えつつ、自在に伸縮することでブーム3の起伏を行うようになっている。 A hoisting cylinder 12 equipped with a hydraulic telescopic mechanism is installed at a position in front of the base of the boom 3 in the main body 2 so as to hoist the boom 3 by freely expanding and contracting while supporting the boom 3 from below. It has become.

以上に説明した構成は図6に示した従来例と概ね同様であるが、本実施例のクレーン50の場合、図2、図3に示す如く、ブーム3の基部に吊下ドラム8を支持する支持ブラケット13を備え、クレーン50を分解するにあたり、ウインチドラム8をブーム3と一体的に本体2側から取り外すことができるよう構成した点を特徴としている。また、ウインチドラム8から繰り出されたワイヤ10が巻き掛けられるガイドシーブ7に関してもブーム3側に取り付けており、吊下ドラム8と合わせてガイドシーブ7をもブーム3と一体的に本体2側から取り外せるようになっている(尚、説明の都合により、図3ではワイヤ10やブーム3の先端側など、一部構成の図示を省略している)。 The construction described above is generally the same as that of the conventional example shown in FIG. The crane 50 is provided with a support bracket 13 and is characterized in that the winch drum 8 can be removed integrally with the boom 3 from the main body 2 side when the crane 50 is disassembled. Further, the guide sheave 7 around which the wire 10 drawn out from the winch drum 8 is wound is also attached to the boom 3 side. It is detachable (for the convenience of explanation, part of the configuration such as the wire 10 and the tip side of the boom 3 is omitted in FIG. 3).

支持ブラケット13は、図4に示す如く、吊下ドラム8を支持する第一部材13aと、ガイドシーブ7を支持する第二部材13bとを備えて構成されている。 The support bracket 13 includes a first member 13a that supports the suspension drum 8 and a second member 13b that supports the guide sheave 7, as shown in FIG.

本実施例のクレーン50では、起伏ピン3aの下方に2基の吊下ドラム8が左右に並列に配置されており、各吊下ドラム8からそれぞれ吊下ワイヤ10が繰り出されるようになっている(図2、図3参照)。支持ブラケット13の第一部材13aは、ブーム3の基部の左右に沿って取り付けられた一対の板状の部材である。各第一部材13aの前後方向中間部における上部には起伏ピン取付部としての貫通穴13cが設けられており(図4参照)、この貫通穴13cを起伏ピン3aがブーム3ごと貫通することで、ブーム3が第一部材13aに対し起伏可能に支持されるようになっている。また、各第一部材13aの前方と、後方下部には取付部としての取付穴13dが設けられており、この取付穴13dにより、後述するように第一部材13aが本体2側に対して着脱可能に取り付けられるようになっている。 In the crane 50 of this embodiment, two suspension drums 8 are arranged in parallel on the left and right below the hoisting pins 3a, and the suspension wire 10 is let out from each suspension drum 8. (See FIGS. 2 and 3). The first members 13 a of the support bracket 13 are a pair of plate-like members attached along the left and right sides of the base of the boom 3 . Each first member 13a has a through hole 13c as a mounting portion for the hoisting pin (see FIG. 4) in the upper portion of the middle portion in the front-rear direction (see FIG. 4). , the boom 3 is supported so as to be able to rise and fall with respect to the first member 13a. Mounting holes 13d as mounting portions are provided in the front and rear lower portions of each first member 13a. so that it can be attached

左右一組で配置された吊下ドラム8(図2、図3参照)の左右端には、前方および後方にそれぞれ固定部8aが突出するように設けられている(図4参照)。一方、支持ブラケット13の第一部材13aには、前部および後部に下方へ張り出すようにドラム取付部13eが設けられている。各ドラム取付部13eは、吊下ドラム8の各固定部8aと対向するように配置されており、各固定部8aを各ドラム取付部13eに対し図示しない締結具等により接続することで、吊下ドラム8を支持ブラケット13に対して固定できるようになっている。 The suspension drums 8 (see FIGS. 2 and 3) arranged as a set on the left and right are provided at the left and right ends with fixing portions 8a projecting forward and rearward (see FIG. 4). On the other hand, the first member 13a of the support bracket 13 is provided with drum mounting portions 13e projecting downward at the front and rear portions thereof. Each drum mounting portion 13e is arranged so as to face each fixing portion 8a of the suspension drum 8, and each fixing portion 8a is connected to each drum mounting portion 13e by a fastener or the like (not shown), whereby the suspension can be suspended. The lower drum 8 can be fixed to the support bracket 13 .

本体2には、ブーム3やその他の構造を支持するフレーム14が設けられており(図4参照)、第一部材13aは、このフレーム14に着脱可能に支持されている。フレーム14には、支持ブラケット13の左右に沿うように支持ブラケット13を支持するための構造が設けられており、該支持構造の上部および後部には、支持ブラケット13の第一部材13aに設けられた各取付穴13dの位置に対応するように、取付部としての取付穴14aが設けられている。そして、フレーム14の取付穴14aと、第一部材13aの取付穴13dに取付具としての取付ピン14bを貫通させることで、第一部材13aをフレーム14に対し着脱可能に支持するようになっている。 The main body 2 is provided with a frame 14 that supports the boom 3 and other structures (see FIG. 4), and the first member 13a is detachably supported by the frame 14. The frame 14 is provided with a structure for supporting the support bracket 13 along the left and right sides of the support bracket 13, and the first member 13a of the support bracket 13 is provided at the top and rear of the support structure. Attachment holes 14a as attachment portions are provided so as to correspond to the positions of the attachment holes 13d. The first member 13a is detachably supported with respect to the frame 14 by passing mounting pins 14b as mounting tools through the mounting hole 14a of the frame 14 and the mounting hole 13d of the first member 13a. there is

また、クレーン50には2個のガイドシーブ7を設けており、各吊下ドラム8から繰り出される吊下ワイヤ10を、各ガイドシーブ7に巻き掛けるようになっている。支持ブラケット13の第二部材13bは、同軸に一対設けられたガイドシーブ7の軸の左右端を支持する一対の板状の部材であり、第一部材13aに対し、起伏ピン3aの位置から後方へ伸びるように固定されている(図4参照)。各ガイドシーブ7は、この第二部材13bにより、起伏ピン3aの後方に支持されている。 Also, the crane 50 is provided with two guide sheaves 7 , and the suspension wire 10 drawn out from each suspension drum 8 is wound around each guide sheave 7 . The second members 13b of the support bracket 13 are a pair of plate-like members that support the left and right ends of the shaft of the guide sheave 7 provided on the same axis. It is fixed so as to extend to (see FIG. 4). Each guide sheave 7 is supported behind the luffing pin 3a by the second member 13b.

こうして、ブーム3に取り付けられた支持ブラケット13は、本体2側のフレーム14に対して着脱可能に支持されつつ、ブーム3を起伏可能に支持し、また、吊下ドラム8およびガイドシーブ7を支持するようになっている。 Thus, the support bracket 13 attached to the boom 3 is detachably supported by the frame 14 on the main body 2 side, supports the boom 3 so that it can be raised and lowered, and also supports the suspension drum 8 and the guide sheave 7. It is designed to

ブーム3の下面における中間部から基部寄りの箇所には、分解時にフック5を係留するための係留部3cが設けられている。係留部3cは、例えばブーム3の下面の左右両側に突出し且つ穴を備えたフランジであり、後述するように、ロープ等の係留具16をフック5と係留部3cの間に張り渡すことで、フック5をブーム3に対して係留できるようになっている。 A mooring portion 3c for mooring the hook 5 during disassembly is provided on the lower surface of the boom 3 at a portion closer to the base portion than the intermediate portion. The mooring portion 3c is, for example, a flange that protrudes to the left and right sides of the lower surface of the boom 3 and is provided with holes. The hook 5 can be moored to the boom 3.

上述の如きクレーン50の分解の手順を、図5のフローチャートを参照しながら説明する。 A procedure for disassembling the crane 50 as described above will be described with reference to the flow chart of FIG.

まず、吊下ドラム8により吊下ワイヤ10を巻き取りつつブーム3を収縮させ、係留具16を用いてフック5をブーム3に係留する(ステップS11)。この際、吊下ドラム8を作動させて吊下ワイヤ10をゆっくりと巻き取って吊下ワイヤ10の繰出し量を操作し、係留具16および吊下ワイヤ10の張力によってフック5がブーム3に沿った位置に支持されるように調整する。また、起伏シリンダ12を収縮させ、ブーム3を水平あるいはそれに近い向きに倒伏させる(ステップS12)。 First, the boom 3 is contracted while the suspension wire 10 is wound by the suspension drum 8, and the hook 5 is moored to the boom 3 using the mooring tool 16 (step S11). At this time, the suspension drum 8 is actuated to slowly wind up the suspension wire 10 to control the payout amount of the suspension wire 10 , and the tension of the mooring device 16 and the suspension wire 10 causes the hook 5 to move along the boom 3 . and adjust it so that it is supported in the same position. Also, the hoisting cylinder 12 is contracted to lower the boom 3 horizontally or in a direction close thereto (step S12).

ブーム3を倒伏させ、吊下ワイヤ10を適当な長さまで吊下ドラム8に巻き取ったら、ブーム3を本体2から取り外す(ステップS13)。このとき、図示しない補助クレーンあるいは台座等でブーム3や起伏シリンダ12を支持しながら各部を接続しているピンを取り外すことになるが、起伏ピン3aの抜き取りはせず、代わりに支持ブラケット13をフレーム14に固定している取付ピン14bを取り外す(図4参照)。ブーム3と起伏シリンダ12を接続している接続ピン12aについては、上記従来例(図6、図7参照)と同様に取り外しを行う。 After the boom 3 is laid down and the suspension wire 10 is wound around the suspension drum 8 to an appropriate length, the boom 3 is removed from the main body 2 (step S13). At this time, the pins connecting each part are removed while supporting the boom 3 and the hoisting cylinder 12 with an auxiliary crane or a pedestal (not shown). Remove the mounting pin 14b fixed to the frame 14 (see FIG. 4). The connecting pin 12a connecting the boom 3 and the hoisting cylinder 12 is removed in the same manner as in the conventional example (see FIGS. 6 and 7).

つまり、本実施例の場合、ブーム3を本体2から取り外すにあたり、吊下ドラム8やガイドシーブ7を支持する支持ブラケット13をブーム3側に固定しつつ、支持ブラケット13と本体2の間の接続を解除することになる。図6、図7に示した従来例の場合、吊下ドラム8やガイドシーブ7を本体2側に残してブーム3を取り外すが、本実施例では、吊下ドラム8やガイドシーブ7ごとブーム3を本体2から取り外すのである。 That is, in the case of this embodiment, when removing the boom 3 from the main body 2, the support bracket 13 for supporting the suspension drum 8 and the guide sheave 7 is fixed to the boom 3 side, and the connection between the support bracket 13 and the main body 2 is performed. will be released. In the case of the conventional example shown in FIGS. 6 and 7, the boom 3 is removed while leaving the suspension drum 8 and the guide sheave 7 on the main body 2 side. is removed from the main body 2.

このようにすると、ブーム3に沿って配置される吊下ワイヤ10の取り外しを行うことなく、ブーム3を取り外すことが可能である。吊下ワイヤ10を繰り出す吊下ドラム8や、吊下ワイヤ10を巻き掛けるガイドシーブ7がブーム3側に取り付けられており、ブーム3と共に本体2から取り外されるので、吊下ワイヤ10がブーム3の取り外しの妨げにならないからである。すなわち、本実施例のクレーン50の分解においては、上記従来例において多大な手間を要していたステップS3(吊下ワイヤ10をブーム3やガイドシーブ7から取り外す作業)を必要としない。吊下ワイヤ10がブーム3に沿って配置され、またガイドシーブ7に巻き掛けられたままの状態でブーム3を取り外すので、クレーン50の分解にあたって手間と時間を大幅に削減することができる。 In this way, the boom 3 can be removed without removing the suspension wires 10 arranged along the boom 3 . A suspension drum 8 for feeding the suspension wire 10 and a guide sheave 7 around which the suspension wire 10 is wound are attached to the boom 3 side, and are removed from the main body 2 together with the boom 3. This is because it does not interfere with removal. That is, the disassembly of the crane 50 of this embodiment does not require step S3 (the operation of removing the suspension wire 10 from the boom 3 and the guide sheave 7), which required a great deal of time and effort in the conventional example. Since the boom 3 is removed while the suspension wire 10 is arranged along the boom 3 and wound around the guide sheave 7, labor and time for disassembling the crane 50 can be greatly reduced.

また、本実施例では、ブーム3の基部に取り付けた支持ブラケット13に吊下ドラム8やガイドシーブ7を支持し、且つ支持ブラケット13を本体2側のフレーム14に着脱可能に支持するようにしている。このようにすると、支持ブラケット13をフレーム14から取り外す作業(取付ピン14bの取外し)によって吊下ドラム8ごとブーム3を本体2側から取り外すことができる。吊下ドラム8を個別に本体2側から取り外す必要がないので、取り外しの作業がいっそう簡便である。 In this embodiment, the suspension drum 8 and the guide sheave 7 are supported by the support bracket 13 attached to the base of the boom 3, and the support bracket 13 is detachably supported by the frame 14 on the main body 2 side. there is In this way, the boom 3 can be removed from the main body 2 side together with the suspension drum 8 by removing the support bracket 13 from the frame 14 (removing the mounting pin 14b). Since it is not necessary to individually remove the suspension drum 8 from the main body 2 side, the removal work is much simpler.

また、本実施例では、吊下ワイヤ10の吊下部に取り付けられたフック5をブーム3に係留した状態でブーム3を取り外すことができるので、吊下ワイヤ10からフック5を取り外す作業(図7、ステップS2参照)も不要である。代わりにフック5をブーム3に係留する作業(ステップS11)が必要となるが、吊下ワイヤ10からフック5を取り外す作業と比較すれば手間が少ない。また、ブーム3の取り外しの際には、係留具16および吊下ワイヤ10によりフック5がブーム3側の適当な位置に支持された状態でブーム3を取り外すことができるので、クレーン50の分解に際してのフック5の取扱いが簡便である。また、吊下ワイヤ10についてもブーム3の適当な位置に束縛された状態となるので、吊下ワイヤ10ごとブーム3を取り扱うにあたっても簡便である。 In addition, in this embodiment, the boom 3 can be removed while the hook 5 attached to the suspension portion of the suspension wire 10 is moored to the boom 3, so the operation of removing the hook 5 from the suspension wire 10 (Fig. 7) , step S2) is also unnecessary. Instead, the work of mooring the hook 5 to the boom 3 (step S11) is required, but compared to the work of removing the hook 5 from the suspension wire 10, the work is less. Further, when the boom 3 is removed, the hook 5 is supported at an appropriate position on the boom 3 side by the mooring device 16 and the suspension wire 10, so that the boom 3 can be removed. The handling of the hook 5 is simple. In addition, since the suspension wire 10 is also bound at an appropriate position on the boom 3, handling of the boom 3 together with the suspension wire 10 is easy.

ブーム3の取り外しが完了したら、吊下ドラム8およびガイドシーブ7と一体に取り外されたブーム3と、該ブーム3を取り外した本体2とをそれぞれ別の運搬車両(図示せず)にて運搬する。 When the removal of the boom 3 is completed, the boom 3 removed integrally with the suspension drum 8 and the guide sheave 7 and the main body 2 from which the boom 3 is removed are transported by separate transportation vehicles (not shown). .

尚、ここでは説明の便宜から、ステップS11からS13までを順番に説明したが、各ステップは順序を適宜入れ替えたり、同時並行で実行しても良い。 For convenience of explanation, steps S11 to S13 have been described in order here, but the order of the steps may be changed as appropriate, or the steps may be executed concurrently.

クレーン50の分解は、上にも説明したように運搬車両一台あたりの積載重量を減らし、またクレーン50を稼働させる建設現場等までの道路の耐荷重量の制限をクリアするといった目的で行われるが、通常、ブーム3側の重量と比較して本体2側の重量が大きくなりがちである。そこで、本実施例の如く吊下ドラム8を本体2側から取り外し、ブーム3側に支持する形でクレーン50を分解すれば、本体2側の重量が小さくなるので、より効率的に重量を分配し、運搬車両の積載重量や道路の耐荷重量といった制限を容易にクリアすることができる。このように、本実施例の如きクレーン50の分解構造および分解方法を採用すれば、分解の手間を軽減する効果に加え、分解された各部への重量の配分を最適化するという効果をも得ることができる。 As described above, the disassembly of the crane 50 is performed for the purpose of reducing the load weight per transport vehicle and clearing the limit of the load capacity of the road to the construction site etc. where the crane 50 is operated. Generally, the weight of the main body 2 tends to be larger than the weight of the boom 3. Therefore, if the hanging drum 8 is removed from the main body 2 side and the crane 50 is disassembled by supporting it on the boom 3 side as in the present embodiment, the weight of the main body 2 side will be reduced, and the weight will be distributed more efficiently. However, it is possible to easily clear the restrictions such as the load weight of the transportation vehicle and the load capacity of the road. Thus, by adopting the disassembly structure and disassembly method of the crane 50 as in the present embodiment, in addition to the effect of reducing the labor for disassembly, the effect of optimizing the weight distribution to each disassembled part can be obtained. be able to.

尚、本発明の分解構造は、ここに説明したようなクレーン50に限らず、分解の必要のある種々のクレーンに対し適用することができる。例えば、起伏シリンダ12に代えてブーム3の起伏を行うためのウインチドラム(起伏ドラム)を備えると共に、該ウインチドラムから繰り出されるワイヤ(起伏ワイヤ)をブーム3に取り付け、前記起伏ワイヤの繰出しまたは巻取りによりブーム3を起伏させるようにしても良い。この場合、前記起伏ドラムについてもブーム3と共に本体2から取り外せるようにし、前記起伏ワイヤをブーム3に取り付けた状態でブーム3の取り外しを行うようにすると良い。 The disassembly structure of the present invention is not limited to the crane 50 described here, but can be applied to various cranes that require disassembly. For example, instead of the hoisting cylinder 12, a winch drum (hoisting drum) for hoisting the boom 3 is provided, and a wire (hoisting wire) paid out from the winch drum (hoisting wire) is attached to the boom 3, and the hoisting wire is paid or wound. The boom 3 may be raised and lowered by picking. In this case, it is preferable that the hoisting drum is detachable from the main body 2 together with the boom 3, and the boom 3 is removed while the hoisting wire is attached to the boom 3.

また、ここではウインチドラム(吊下ドラム)8から繰り出されるワイヤ(吊下ワイヤ)10をガイドシーブ7に巻きかけてからブーム3へ伸ばす構成を例示したが、ウインチドラム8の位置によってはガイドシーブ7は不要な場合もある。例えば、図1~図4におけるガイドシーブ7の位置にウインチドラム8を設ける場合、ガイドシーブは不要である。 Further, here, the wire (suspension wire) 10 drawn out from the winch drum (suspension drum) 8 is wound around the guide sheave 7 and then extended to the boom 3, but depending on the position of the winch drum 8, the guide sheave 7 may not be necessary. For example, if the winch drum 8 is provided at the position of the guide sheave 7 in FIGS. 1 to 4, no guide sheave is required.

また、吊具5としては、ここに例示したフック以外に例えばバケット等の各種の吊具を使用しても良い。あるいは、吊荷の種類によっては、吊具を用いず、吊下ワイヤ10のロープエンドに吊り荷を直接吊り下げることもできる。この場合、ロープエンドが吊下部に相当する。 Moreover, as the hoisting tool 5, various hoisting tools such as a bucket may be used other than the hooks illustrated here. Alternatively, depending on the type of load, the load can be directly suspended from the rope end of the suspension wire 10 without using a lifting tool. In this case, the rope end corresponds to the suspended portion.

以上のように、上記本実施例のクレーンの分解構造は、本体2に対して起伏可能に設置されたブーム3と、ブーム3に沿って配置されたワイヤ10と、ワイヤ10の繰り出しおよび巻き取りを行うウインチドラム8とを備え、ウインチドラム8をブーム3と一体的に本体2から取り外しできるよう構成されている。 As described above, the disassembled structure of the crane of the present embodiment includes the boom 3 installed to be able to rise and fall with respect to the main body 2, the wire 10 arranged along the boom 3, and the payout and winding of the wire 10. and the winch drum 8 can be detached from the main body 2 together with the boom 3.

また、上記本実施例のクレーンの分解方法においては、本体2に対して起伏可能に設置されたブーム3と、ブーム3に沿って配置されたワイヤ10と、ワイヤ10の繰り出しおよび巻き取りを行うウインチドラム8とを備えたクレーン50を分解するにあたり、ブーム3をウインチドラム8と一体的に本体2から取り外すようにしている。 Further, in the disassembling method of the crane of the present embodiment, the boom 3 installed so as to be able to rise and fall with respect to the main body 2, the wire 10 arranged along the boom 3, and the wire 10 are paid out and wound up. When disassembling the crane 50 having the winch drum 8, the boom 3 is removed from the main body 2 together with the winch drum 8. - 特許庁

こうすることにより、ワイヤ10の取り外しを行うことなくブーム3を取り外すことができ、クレーン50の分解にあたって手間と時間を大幅に削減することができる。 By doing so, the boom 3 can be removed without removing the wire 10, and the labor and time required for disassembling the crane 50 can be greatly reduced.

また、上記本実施例のクレーンの分解構造は、ウインチドラム8から繰り出されたワイヤ10を巻き掛けるガイドシーブ7をブーム3側に備えている。 Further, the disassembled structure of the crane of the present embodiment has a guide sheave 7 around which the wire 10 drawn out from the winch drum 8 is wound on the boom 3 side.

また、上記本実施例のクレーンの分解方法において、クレーン50は、ウインチドラム8から繰り出されたワイヤ10を巻き掛けるガイドシーブ7をブーム3側に備えており、ブーム3は、ワイヤ8をガイドシーブ7に巻き掛けたまま取り外すようにしている。 In the method for disassembling the crane of the present embodiment, the crane 50 is provided with the guide sheave 7 around which the wire 10 drawn out from the winch drum 8 is wound on the boom 3 side. I am trying to remove it while it is wrapped around 7.

このようにすると、ワイヤ10を巻き掛けるガイドシーブ7を備えたクレーン50を分解するにあたり、ガイドシーブ7からワイヤ10を取り外す作業を必要とすることなく、ブーム3を本体2から取り外すことができる。 Thus, when disassembling the crane 50 having the guide sheave 7 around which the wire 10 is wound, the boom 3 can be removed from the main body 2 without removing the wire 10 from the guide sheave 7. - 特許庁

また、上記本実施例のクレーンの分解構造は、吊荷を吊り下げるワイヤ10の吊下部をブーム3に係留可能に構成されている。 Further, the disassembled structure of the crane of the present embodiment is configured such that the suspended portion of the wire 10 for suspending the load can be moored to the boom 3 .

また、上記本実施例のクレーンの分解方法においては、吊荷を吊り下げるワイヤ10の吊下部をブーム3に係留した状態で、ブーム3を本体2から取り外すようにしている。 Further, in the method of disassembling the crane of the present embodiment, the boom 3 is removed from the main body 2 while the suspended portion of the wire 10 for suspending the load is moored to the boom 3 .

このようにすると、吊下ワイヤ10がブーム3の適当な位置に束縛された状態でクレーン50の分解作業を行うことができ、吊下ワイヤ10ごとブーム3を取り扱うにあたって簡便である。また、前記吊下部に吊具5が取り付けられる場合は、吊具5をワイヤ10から取り外す作業を必要とすることなく、吊具5をブーム3側に支持した状態でブーム3を本体2から簡便に取り外すことができる。 In this way, the crane 50 can be disassembled while the suspension wire 10 is bound at an appropriate position on the boom 3, and the handling of the boom 3 together with the suspension wire 10 is convenient. In addition, when the hoisting tool 5 is attached to the suspended part, the boom 3 can be easily removed from the main body 2 while the hoisting tool 5 is supported on the boom 3 side without requiring the work of removing the hoisting tool 5 from the wire 10. can be removed.

また、上記本実施例のクレーンの分解構造において、ウインチドラム8は、ブーム3に取り付けられ、且つ本体2側に対して着脱可能に支持された支持ブラケット13により支持されている。このようにすれば、支持ブラケット13を本体2側から取り外す作業により、ブーム3をウインチドラム8ごと簡便に本体2側から取り外すことができる。 In the disassembled structure of the crane of the present embodiment, the winch drum 8 is attached to the boom 3 and supported by the support bracket 13 detachably supported on the main body 2 side. In this way, the boom 3 together with the winch drum 8 can be easily removed from the main body 2 side by removing the support bracket 13 from the main body 2 side.

したがって、上記本実施例によれば、クレーンを簡便な手順により分解し得る。 Therefore, according to this embodiment, the crane can be disassembled by a simple procedure.

尚、本発明のクレーンの分解構造および方法は、上述の実施例にのみ限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々変更を加え得ることは勿論である。 It should be noted that the disassembly structure and method of the crane of the present invention are not limited to the above-described embodiments, and of course various modifications can be made without departing from the gist of the present invention.

2 本体
3 ブーム
5 吊具(フック)
7 ガイドシーブ
8 ウインチドラム(吊下ドラム)
10 ワイヤ(吊下ワイヤ)
13 支持ブラケット
50 クレーン
2 main body 3 boom 5 hoist (hook)
7 guide sheave 8 winch drum (hanging drum)
10 wire (suspension wire)
13 support bracket 50 crane

Claims (5)

本体に対して起伏可能に設置されたブームと、
前記ブームに沿って配置されたワイヤと、
前記ワイヤの繰り出しおよび巻き取りを行うウインチドラムとを備え、
前記ウインチドラムを前記ブームと一体的に前記本体から取り外しできるよう構成され
且つ、前記ブームを前記本体から取り外す際に、吊荷を吊り下げる前記ワイヤの吊下部を前記ブームに係留可能に構成されていること
を特徴とするクレーンの分解構造。
a boom installed so as to be able to rise and fall with respect to the main body;
a wire positioned along the boom;
A winch drum for feeding and winding the wire,
The winch drum is configured to be detachable from the main body integrally with the boom ,
Further, the disassembled structure of the crane is characterized in that, when the boom is detached from the main body, the suspended portion of the wire for suspending a load can be moored to the boom.
前記ウインチドラムから繰り出された前記ワイヤを巻き掛けるガイドシーブを前記ブーム側に備えていること
を特徴とする請求項1に記載のクレーンの分解構造。
2. The disassembled structure of the crane according to claim 1, wherein a guide sheave around which the wire drawn out from the winch drum is wound is provided on the boom side.
前記ウインチドラムは、前記ブームに取り付けられ、且つ前記本体側に対して着脱可能に支持された支持ブラケットにより支持されていること
を特徴とする請求項1または2に記載のクレーンの分解構造。
3. The disassembled structure of the crane according to claim 1 , wherein the winch drum is attached to the boom and supported by a support bracket that is detachably supported with respect to the main body.
本体に対して起伏可能に設置されたブームと、
前記ブームに沿って配置されたワイヤと、
前記ワイヤの繰り出しおよび巻き取りを行うウインチドラムと
を備えたクレーンを分解するにあたり、
吊荷を吊り下げる前記ワイヤの吊下部を前記ブームに係留した状態で、前記ブームを前記ウインチドラムと一体的に前記本体から取り外すこと
を特徴とするクレーンの分解方法。
a boom installed so as to be able to rise and fall with respect to the main body;
a wire positioned along the boom;
In disassembling a crane equipped with a winch drum that pays out and winds up the wire,
A method for disassembling a crane, wherein the boom is removed integrally with the winch drum from the main body while the suspended portion of the wire for suspending a load is moored to the boom .
前記クレーンは、前記ウインチドラムから繰り出された前記ワイヤを巻き掛けるガイドシーブを前記ブーム側に備え、
前記ブームは、前記ワイヤを前記ガイドシーブに巻き掛けたまま取り外されること
を特徴とする請求項に記載のクレーンの分解方法。
The crane includes a guide sheave on the boom side around which the wire drawn out from the winch drum is wound,
5. The method of disassembling a crane according to claim 4 , wherein the boom is removed while the wire is wound around the guide sheave.
JP2018246657A 2018-12-28 2018-12-28 Crane disassembly structure and method Active JP7253918B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018246657A JP7253918B2 (en) 2018-12-28 2018-12-28 Crane disassembly structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018246657A JP7253918B2 (en) 2018-12-28 2018-12-28 Crane disassembly structure and method

Publications (2)

Publication Number Publication Date
JP2020104998A JP2020104998A (en) 2020-07-09
JP7253918B2 true JP7253918B2 (en) 2023-04-07

Family

ID=71448060

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018246657A Active JP7253918B2 (en) 2018-12-28 2018-12-28 Crane disassembly structure and method

Country Status (1)

Country Link
JP (1) JP7253918B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7392546B2 (en) * 2020-03-27 2023-12-06 コベルコ建機株式会社 Work machine and winch attachment/detachment method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004026315A (en) 2002-05-10 2004-01-29 Kokuho:Kk Cargo handling device
US20060043041A1 (en) 2004-08-31 2006-03-02 Edmund Lopes Portable crane
JP2008127150A (en) 2006-11-20 2008-06-05 Kobelco Cranes Co Ltd Crane
JP2010042876A (en) 2008-08-09 2010-02-25 Kobelco Cranes Co Ltd Crawler crane, and winch posture changing method of the same
US20100200822A1 (en) 2009-02-06 2010-08-12 Kitchens Sr James Larry Vehicle-mountable hoist
JP2010247954A (en) 2009-04-15 2010-11-04 Kobelco Cranes Co Ltd Winch installing structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0664891A (en) * 1992-08-14 1994-03-08 Sato Kensetsu Kogyo Kk Manually-operated minicrane for work on steel tower

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004026315A (en) 2002-05-10 2004-01-29 Kokuho:Kk Cargo handling device
US20060043041A1 (en) 2004-08-31 2006-03-02 Edmund Lopes Portable crane
JP2008127150A (en) 2006-11-20 2008-06-05 Kobelco Cranes Co Ltd Crane
JP2010042876A (en) 2008-08-09 2010-02-25 Kobelco Cranes Co Ltd Crawler crane, and winch posture changing method of the same
US20100200822A1 (en) 2009-02-06 2010-08-12 Kitchens Sr James Larry Vehicle-mountable hoist
JP2010247954A (en) 2009-04-15 2010-11-04 Kobelco Cranes Co Ltd Winch installing structure

Also Published As

Publication number Publication date
JP2020104998A (en) 2020-07-09

Similar Documents

Publication Publication Date Title
EP2165964B1 (en) Mobile crane and method for erecting a crane boom
JP5693031B2 (en) Assembly method of mobile lift crane
EP1854759A2 (en) Boom hoisting device of a crane
JP7253918B2 (en) Crane disassembly structure and method
JP6396256B2 (en) Jib crane
JP6638434B2 (en) Crane boom mounting method
JP6825774B2 (en) How to replace the unloader and its grab bucket
JP4822395B2 (en) Self-propelled crane load lifting device
JP4600374B2 (en) Crane boom head
JP2003054876A (en) Device and method for attaching and detaching side frame
JP6969281B2 (en) Crane and crane disassembly method
JP4430861B2 (en) Telescopic boom type work machine
JP2018090372A (en) Workpiece conveyance method using crane
JP4956286B2 (en) Winding drum wire winding method at crane installation
JP5408867B2 (en) Auxiliary jib for mobile crane
WO2021193384A1 (en) Work machine and winch detachment method and winch transportation method
JP7521424B2 (en) Method for raising a lifting member and crane
JP7447613B2 (en) working machine
JP7306137B2 (en) Link holding structure
JP7019469B2 (en) Pile driver and lifting method of pile driver
JP6579172B2 (en) Crane and crane strut raising method
JP6776740B2 (en) How to attach / detach the winch to the work machine and the main body of the work machine
JP6236605B2 (en) How to change auxiliary rope
JP2019038667A (en) Work machine
JP2017178513A (en) crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211223

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221011

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221101

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221129

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230314

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230328

R150 Certificate of patent or registration of utility model

Ref document number: 7253918

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150