JP3058593B2 - Mobile scaffold - Google Patents
Mobile scaffoldInfo
- Publication number
- JP3058593B2 JP3058593B2 JP8199591A JP19959196A JP3058593B2 JP 3058593 B2 JP3058593 B2 JP 3058593B2 JP 8199591 A JP8199591 A JP 8199591A JP 19959196 A JP19959196 A JP 19959196A JP 3058593 B2 JP3058593 B2 JP 3058593B2
- Authority
- JP
- Japan
- Prior art keywords
- scaffold
- frame
- building
- width
- rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Movable Scaffolding (AREA)
- Handcart (AREA)
Description
【0001】[0001]
【発明の属する技術分野】本発明は、建築中の建物の外
側等に使用される足場に関し、特に、組立が容易なもの
に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a scaffold used on the outside of a building under construction, and more particularly to a scaffold which can be easily assembled.
【0002】[0002]
【従来の技術】工場やビルなどの建物を建築する場合、
まず、基礎の上に柱や梁となる鉄骨を組み立てて建物の
骨格を作り、この骨格の回りに足場を組み付け、この足
場から壁材や床材等の資材を運び込み、建物内外の壁や
床を形成していく。2. Description of the Related Art When building buildings such as factories and buildings,
First, a steel frame to be used as pillars and beams is assembled on the foundation to create a building skeleton.A scaffold is assembled around this skeleton, and materials such as wall materials and flooring materials are carried from the scaffold. Is formed.
【0003】このような目的に使用される足場は、規格
化された種々の長さのパイプ材などを縦、横、斜めに組
み合わせ、端部をジョイントでつなぎ、ボルトとナット
で締め付けて形成した枠体と、この枠体の各層(各段)
に取り付けられた板状の通路とから構成される。枠体
は、建物の高さとほぼ同程度の高さまで組み立てられ、
さらに、上下の通路をつなぐ階段も設けられている。[0003] A scaffold used for such a purpose is formed by combining standardized pipe materials of various lengths vertically, horizontally and diagonally, connecting the ends with joints, and tightening with bolts and nuts. Frame and each layer of this frame (each step)
And a plate-shaped passage attached to the vehicle. The frame is assembled to a height approximately equal to the height of the building,
There are also stairs connecting the upper and lower passages.
【0004】建物の骨格ができあがった後は、総て、こ
のような足場から資材を搬入することによって、外壁、
内壁、床といった建物の駆体部分や、水道やガスなどの
各種配管、電気配線等々の付帯設備の工事が行われる。
したがって、この足場は、建物の全体に必要な資材を供
給できるように、建物全体を囲うように形成されている
必要がある。[0004] After the building skeleton is completed, all the materials are brought in from such a scaffold, and the outer wall,
Construction work is performed on the driving parts of the building, such as the inner walls and floors, and various facilities such as various piping such as water and gas, and electric wiring.
Therefore, this scaffold needs to be formed so as to surround the entire building so that necessary materials can be supplied to the entire building.
【0005】[0005]
【発明が解決しようとする課題】しかし、建物全体を囲
う大きさに足場を組むには、大量の足場用資材と、組立
のための作業時間とが必要となり、その結果、足場の費
用が非常に高額になってしまう。また、この足場は、建
物がほぼ完成するまでは、取り外すことができないの
で、足場の設置された足元部分の外構工事は足場を取り
外すまで着手することができなかった。また、足場が邪
魔して大きな資材を建築中の建物の内部に運搬できない
不便もあり、これを回避する為に、足場に通路用の枠部
分を設ける工夫も施されていた。更に、仕上がりの途中
経過を外部から見て確認することも困難であった。従来
あった移動式のローリングタワーのような移動式足場
は、安定性に欠けるとともに、建物の側壁をカバーする
ような長い幅の作業台として利用するには困難があっ
た。However, assembling the scaffold to the size surrounding the entire building requires a large amount of scaffolding material and assembling work time, and as a result, the cost of the scaffold is extremely high. Would be expensive. In addition, since this scaffold cannot be removed until the building is almost completed, the external construction work at the foot portion where the scaffold is installed cannot be started until the scaffold is removed. In addition, there is an inconvenience that a large material cannot be transported into the building under construction because the scaffold interferes. In order to avoid such inconvenience, a method of providing a frame portion for a passage in the scaffold has been devised. Furthermore, it was also difficult to check the progress of the finish from the outside. Conventional mobile scaffolds, such as rolling towers, lack stability and are difficult to use as long working platforms that cover the side walls of buildings.
【0006】本発明は、上記の事実から考えられたもの
で、安価な費用で組み立てられ、仕上がりの途中経過を
簡単に目で見て確認することができる足場を提供するこ
とを目的としている。The present invention has been conceived in view of the above facts, and has as its object to provide a scaffold that can be assembled at low cost and that allows a user to easily visually check the progress of the finish.
【0007】[0007]
【課題を解決するための手段】上記の目的を達成するた
めに本発明は、ほぼ垂直に組み立てられた枠体と、該枠
体内にほぼ水平に形成された1又は2層(段)以上の通
路と、該枠体の下端に取り付けられた台車と、該台車に
取り付けられた複数の車輪と、該車輪が走行するレール
とからなる移動式足場手であって、上記台車の幅が枠体
の幅より大きく、上記レールが3本以上からなるととも
に、上記台車が上下に重なる上の台車と下の台車とから
なり、これらの重なり部分の長さを調整することで台車
の幅を変更可能とした構成である。SUMMARY OF THE INVENTION In order to achieve the above object, the present invention provides a frame assembled substantially vertically, and one or more layers (steps) formed substantially horizontally in the frame. A passage, a truck attached to the lower end of the frame , and
A plurality of mounted wheels and rails on which the wheels travel
A mobile scaffolding hand comprising:
The width of the rail is larger than three
The upper and lower trolleys where the above trolleys overlap vertically
By adjusting the length of these overlapping parts,
Is configured to be changeable .
【0008】[0008]
【0009】[0009]
【0010】[0010]
【発明の実施の形態】以下に本発明の実施例を図面によ
って説明する。図1は、本発明の移動式足場の全体を示
す図である。同図において、Aは建築中の建物を示す。
枠体1は、現場で組み立てられ、その長さLが従来より
小さく、建物Aの一辺のうちの一部を覆う長さである
が、その他の基本的な構成は従来の足場と同様である。
すなわち、規格化された種々の長さのパイプ材を、縦、
横、斜め等に配置し、接続部を締結金具等で接続し、ボ
ルトやナットで締め付けて形成したもので、その幅wは
上下で同一になっている。Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a diagram showing the entire mobile scaffold of the present invention. In the drawing, A indicates a building under construction.
The frame 1 is assembled on site and has a length L smaller than that of the conventional one, and a length covering a part of one side of the building A, but other basic configurations are the same as those of the conventional scaffold. .
In other words, standardized pipe materials of various lengths are
They are arranged sideways, diagonally, etc., and are formed by connecting the connecting parts with fastening hardware or the like and tightening them with bolts or nuts, and have the same width w at the top and bottom.
【0011】枠体1には、作業用の通路2が形成され
る。作業用の通路の位置は建物Aの階層の床の高さと必
ずしも一致するものではない。各層(各段)の通路2
は、内装作業および外装作業をするための足場であると
同時に作業者が資材を持って通る道または、行き来する
通路として使用される。従って、通路2は、歩き易いよ
うに、板材が使用される。また、図示するように、各層
(各段)の通路2を連結し、各層(各段)の昇降が容易
になるように、適宜の箇所に階段8が設けられている。A work passage 2 is formed in the frame 1. The position of the work passage does not always match the height of the floor of the building A. Passage 2 of each layer (each step)
Are used as scaffolds for interior and exterior work, and at the same time used as a path for workers to carry materials or as a back and forth path. Therefore, a plate material is used for the passage 2 to make it easy to walk. Moreover, as shown in the figure, stairs 8 are provided at appropriate places to connect the passages 2 of each layer (each step) and to easily move up and down each layer (each step).
【0012】枠体1は、下端を複数の台車3で支持され
ている。それぞれの台車3の下面には複数の車輪4が取
り付けられ、各車輪4はレール5に設けられた凹状の溝
の中に嵌入してレール上を走行できるようになってい
る。車輪はウレタン等の硬質プチスチックからなり、レ
ールに設けられた溝の幅と略同一またはやや細く形成さ
れていてレールの溝内を走行する構成である。レール5
の長さは適宜の長さが設定できるが、持ち運び移設可能
な長さであることが望ましい。レールは移設して伸延す
ることが可能であり、移動式足場を移動させて建物Aの
一辺の長さの全体をカバーできるように、建物の一辺の
長さに沿って移動設置される。The lower end of the frame 1 is supported by a plurality of carts 3. A plurality of wheels 4 are attached to the lower surface of each truck 3, and each wheel 4 fits into a concave groove provided on the rail 5 so that it can run on the rail. The wheel is made of a hard petit stick such as urethane, is formed to have a width substantially equal to or slightly smaller than a width of a groove provided in the rail, and is configured to run in the groove of the rail. Rail 5
The length can be set to an appropriate length, but is preferably a length that can be carried and relocated. The rails can be relocated and extended, and are moved and installed along the length of one side of the building so that the mobile scaffold can be moved to cover the entire length of one side of the building A.
【0013】台車3の幅Wは、枠体の幅wより広く、図
示の実施例では、Wはwの約2倍となっている。そし
て、台車3の枠体1から離れた端部と、枠体2の側面と
を、斜材(方杖)6が接続している。以上の構成によっ
て、枠体1の高さが高くなった場合でも、枠体自身の幅
を拡げることなく、安定して足場を形成することが可能
となった。また、枠体1は、その上部を建物Aに係止さ
せる構成とすることが望ましいが、移動する際にスライ
ドして移動できる構成か、または簡単に着脱でき、移動
後に簡易に装着できるような構成であることが望まし
い。The width W of the carriage 3 is wider than the width w of the frame, and in the illustrated embodiment, W is about twice as large as w. A diagonal member (or a staff) 6 connects the end of the carriage 3 that is separated from the frame 1 and the side surface of the frame 2. With the above configuration, even when the height of the frame 1 is increased, it is possible to form a scaffold stably without increasing the width of the frame itself. Further, it is desirable that the frame body 1 has a configuration in which the upper part is locked to the building A. However, the frame body 1 can be slid when moving, or can be easily attached and detached, and can be easily attached after moving. It is desirable to have a configuration.
【0014】本発明の移動式足場は、上記の構成なの
で、レールに沿って移動しつつ建設作業を行うことがで
きる。したがって、建物全体を覆う大きさは不要とな
り、長さLを小さくした枠体で十分なので、従来のもの
より安価にできる。また、建物の外部に限らず、内部の
工事も行える。建築中の建物の内部に資材を運び込む場
合は、足場を入口部分から移動することにより容易に資
材の持ち運びが可能となり、また、従来は足場を外して
から工事をしていた排水マスや配管設備、舗装等の付帯
工事や外構工事も建物の内外装工事と同時並行して進行
することが可能となる。また、建築途中の外観を見たい
場合には、移動式足場を移動すれば、目で見て確認する
ことができる。足場はレール5の上を走行するので、軽
く動かすことができ、8層(段)の高さのある足場でも
2名程度の作業員で移動することが可能となる。勿論後
退させることも自在である。足場を所望の位置に固定す
るには、車輪4に楔などを咬ませればよいが、車輪4に
車止め装置を設けることも可能である。さらに、移動を
簡単にするために、台車に車輪駆動用のモータを設ける
こともできる。また、建物の一方の壁を端から順に仕上
げていくことができるので、終わったところから足場の
直下部分の作業が可能となり、足場の撤去作業も効率的
に行うことができる。Since the movable scaffold of the present invention has the above-described configuration, construction work can be performed while moving along the rails. Therefore, a size for covering the entire building is not required, and a frame having a reduced length L is sufficient. Also, not only outside the building, but also inside construction can be performed. When carrying materials into the building under construction, moving the scaffold from the entrance makes it easy to carry the material.In addition, drainage troughs and plumbing facilities that were conventionally constructed after removing the scaffold Also, ancillary work such as pavement and exterior construction work can be performed simultaneously with interior and exterior work of the building. If you want to see the appearance during construction, you can check it by moving the movable scaffold. Since the scaffold runs on the rail 5, the scaffold can be moved lightly, and even a scaffold having a height of eight layers (steps) can be moved by about two workers. Of course, it is also possible to retreat freely. In order to fix the scaffold at a desired position, a wedge or the like may be bitten on the wheel 4, but a wheel stop device may be provided on the wheel 4. In addition, a motor for driving wheels can be provided on the cart to facilitate movement. In addition, since one wall of the building can be sequentially finished from the end, the work immediately below the scaffold can be performed from the end, and the scaffold can be removed efficiently.
【0015】レール5は、通常は3本のレールを並行に
配置し、複数の枕木材51を一定の間隔で横に差し渡し
て全体をボルトとナットで締結して組み立てたものであ
る。3本のレールを枕木を差し渡して組み立てた一台の
レールは、作業員の手作業によって簡易に移動できる程
度の長さに構成されており、この実施例では、5.5m
の長さとなっている。しかしながら、この長さはこれに
限定されるものではない。レール5の表面の形状は、レ
ールの上を車輪がレール内を脱輪せずに嵌入走行できる
ように、レールの中央が車輪走行用の凹状の溝に構成さ
れている。レールとレールの締結接合は接合部をボルト
等で締結して接合するものである。The rail 5 is generally constructed by arranging three rails in parallel, arranging a plurality of pillows 51 horizontally at fixed intervals, and fastening the whole with bolts and nuts. One rail, which is composed of three rails crossed by a sleeper, is configured to have a length that can be easily moved by a manual operation of an operator. In this embodiment, the length is 5.5 m.
Has become the length. However, this length is not limited to this. The shape of the surface of the rail 5 is such that the center of the rail is formed as a concave groove for running the wheel so that the wheel can fit on the rail without running off the rail. The fastening connection between the rails is performed by connecting the connecting portions with bolts or the like.
【0016】[0016]
【0017】図2は、図1の台車とレールの部分を示
す。台車3は下の台車3aと上の台車3bの2つに分か
れている。下の台車3aは、枠体1とほぼ同じ幅であ
り、上の台車3bは片側にのみ車輪5を設けたもので、
その幅は台車3の幅より大きい。FIG. 2 shows the bogie and rails of FIG . Cart 3 or two second carriage 3b of the upper and carriage 3a of the lower minute
Have been. The lower trolley 3a has substantially the same width as the frame 1, and the upper trolley 3b has wheels 5 provided on only one side.
Its width is larger than the width of the carriage 3.
【0018】また、上の台車3bの奥行き方向の梁に
は、複数個所に結合部8a,8b,8c………が形成さ
れており、下の台車3aの梁には一対の結合部9が設け
られている。下の台車3aに上の台車3bの車輪の無い
方の端部を載せ、両台車を結合するのであるが、結合部
8a,8b,8c………のいずれの結合部と下の台車3
aの結合部9とが結合するかによって、台車の幅Wが図
2(a),(b),(c)に示すように、3本目のレー
ル5cの位置と中央のレール5bとの距離を変化させる
ことができ、台車の幅をWa,Wb,Wcと変化させる
ことができる。Further, connecting portions 8a, 8b, 8c... Are formed at a plurality of positions on the beam in the depth direction of the upper bogie 3b, and a pair of connecting portions 9 are formed on the beam of the lower bogie 3a. Is provided. An end of the upper bogie 3b without wheels is mounted on the lower bogie 3a, and both bogies are connected. Any of the connecting portions 8a, 8b, 8c... And the lower bogie 3
As shown in FIGS. 2A, 2B, and 2C, the width W of the bogie depends on whether the connecting portion 9 of FIG. 2A is connected to the connecting portion 9 as shown in FIGS. 2A, 2B, and 2C. Can be changed, and the width of the carriage can be changed to Wa, Wb, Wc.
【0019】この場合、下の台車3aと上の台車3bと
は規格化されたものを1種類づつ製造しておけばよく、
建物が例えば5〜6層(段)の高さであれば、図2
(a)の幅Wa、7層(段)の高さの場合は(b)の幅
Wb、8層(段)階の高さの場合は(c)の幅Wcとい
うように、上下の台車が重なる長さを調整して台車3の
幅を種々に変化させることが可能となる。In this case, the lower cart 3a and the upper cart 3b may be manufactured by standardizing one type at a time.
If the building has a height of, for example, 5 to 6 layers (steps), FIG.
Upper and lower trolleys such as width Wa of (a), width Wb of (b) for the height of 7 layers (stages), and width Wc of (c) for the height of 8 layers (stages). It is possible to change the width of the carriage 3 in various ways by adjusting the length of the overlap.
【0020】図2(a)〜(c)に示す実施例では、下
の台車3aに上の台車3bの片方の梁を載せる構造であ
るが、図2(d)で示すように下の台車3aの奥行き方
向の梁32を中空の角パイプで構成し、その中空梁の中
に、上の台車3bの梁34を嵌入させて適宜の箇所でに
結合する構成とすることも可能である。結合部として
は、下の台車3aの角パイプ梁32と上の台車の嵌入梁
34とにそれぞれ適宜の箇所に結合用の貫通孔を穿設
し、梁を嵌入させてから結合孔を合わせて連通した箇所
で、ピンまたはボルトとナットを貫通させて締結する構
成である。梁に穿設される結合孔の数とそれぞれの間隔
の設定は実施例のものに限定されるものではない。In the embodiment shown in FIGS. 2A to 2C, one of the beams of the upper bogie 3b is placed on the lower bogie 3a, but as shown in FIG. The beam 32 in the depth direction of 3a may be formed of a hollow square pipe, and the beam 34 of the upper carriage 3b may be fitted into the hollow beam and connected at an appropriate location. As connecting portions, through holes for connecting are formed at appropriate places in the square pipe beam 32 of the lower bogie 3a and the fitting beam 34 of the upper bogie, and the connecting holes are aligned after fitting the beams. It is a configuration in which a pin or a bolt and a nut are penetrated and fastened at a communicating place. The number of coupling holes formed in the beam and the setting of the respective intervals are not limited to those of the embodiment.
【0021】[0021]
【0022】[0022]
【0023】[0023]
【0024】また、各種競技場のスタンドの屋根のよう
に、工事現場の床に段差がある作業現場であっても、段
差のある各段にそれぞれレールを敷設することにより上
部に水平の比較的広い移動式足場を形成することが可能
であり、そのままの状態でレール上を並行移動させるこ
とができる。また、移動式足場の上端の高さについて
は、適宜に高さを変更することが可能であり、部分的に
変化を付けることが可能である。すなわち、一か所だけ
屋根のカーブに沿って足場の形を作れば、移動式台車は
その形状を保ったままで屋根に沿ってレール上を並行移
動するので、同一形状(カーブ)の屋根については効率
的に作業することが可能となる。Even in a work site having a step on the floor of a construction site, such as a roof of a stand of various stadiums, a relatively horizontal upper part can be obtained by laying a rail on each of the steps having a step. A wide movable scaffold can be formed, and can be moved in parallel on the rail as it is. Further, the height of the upper end of the movable scaffold can be changed as appropriate, and can be partially changed. In other words, if you make a scaffolding shape along the curve of the roof in only one place, the mobile trolley will move in parallel on the rail along the roof while keeping its shape, so for roofs of the same shape (curve) It is possible to work efficiently.
【0025】[0025]
【発明の効果】以上に説明したように、本発明の移動式
足場は、ほぼ垂直に組み立てられた枠体と、該枠体内に
ほぼ水平に形成された1又は2層(段)以上の通路と、
該枠体の下端に取り付けられた台車と、該台車に取り付
けられた複数の車輪と、該車輪が走行するレールとから
なり、上記台車の幅が枠体の幅より大きく、上記レール
が3本以上からなるとともに、上記台車が上下に重なる
上の台車と下の台車とからなり、これらの重なり部分の
長さを調整することで台車の幅を変更可能としたので、
比較的高い枠体であっても安定した作業台を提供するこ
とができる。上記のような構成であるので、台車の種類
は限定されているが、多様な幅の台車を得ることができ
る。As described above, the movable scaffold of the present invention comprises a substantially vertically assembled frame, and one or two or more layers (steps) formed substantially horizontally in the frame. When,
A truck mounted on the lower end of the frame , and
A plurality of wheels and a rail on which the wheels travel, wherein the width of the bogie is larger than the width of the frame,
Consists of three or more, and the above-mentioned trolleys overlap vertically
It consists of an upper trolley and a lower trolley.
By adjusting the length, you can change the width of the cart,
Provide a stable workbench even with relatively high frames
Can be. Because of the above-described configuration, types of carts are limited, but carts of various widths can be obtained.
【0026】[0026]
【0027】上記レールが、持ち運び移設可能な長さで
あるので、レールの敷設と撤去が極めて簡便であり、常
時建物の長さ一杯にレールを敷設して置く必要がないの
で、資材の搬入の邪魔になる事を避けることができる。
移動式足場の枠体が建物の一辺に沿って移動することに
より該一辺の全体を移動しつつカバーできる構成である
ので、小型の足場でも建物全体をカバーでき、足場を安
価に作成することができる上に、足場を移動すれば建築
中の建物の内部に資材を運び込むことも可能となる。さ
らに、従来は足場を撤去してから工事をしていた排水マ
スや配管設備、舗装等の付帯工事や外構工事・花壇の設
置等々を、建物本体の内外装工事と同時に施工すること
が可能となるので工期の大幅な短縮が可能となった。ま
た、建築途中の外観を見たい場合にも、移動式足場を移
動すれば、目で見て確認することができる。Since the above-mentioned rail is of a length that can be carried and relocated, it is extremely easy to lay and remove the rail, and it is not necessary to lay the rail all the length of the building at all times. You can avoid getting in the way.
Since the frame of the movable scaffold moves along one side of the building to cover the entire side while moving, the small scaffold can cover the entire building, and the scaffold can be created at low cost. In addition to being able to move the scaffold, it will be possible to carry materials into the building under construction. In addition, drainage troughs, plumbing equipment, ancillary work such as pavement, external construction work, flower bed installation, etc., which had been done after removing the scaffold, can be done simultaneously with the interior and exterior work of the building body Therefore, the construction period can be significantly reduced. In addition, when the user wants to see the external appearance during construction, the user can visually check by moving the movable scaffold.
【図1】 本発明の移動式足場の構成を示す図で、
(a)は正面図、(b)は側面図である。FIG. 1 is a diagram showing a configuration of a mobile scaffold according to the present invention;
(A) is a front view, (b) is a side view.
【図2】 本発明の実施例で、(a)は低い建物用、
(b)は中位の建物用、(c)は高い建物用、(d)は
嵌入形の幅変更自在な台車の例を示す。FIG. 2 shows an embodiment of the present invention, wherein (a) is for a low building;
(B) shows an example of a medium-sized building, (c) shows an example of a tall building, and (d) shows an example of a fitting type trolley whose width can be changed.
───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平6−322970(JP,A) 実開 昭60−129442(JP,U) 実開 昭58−93138(JP,U) 実開 昭62−106865(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04G 1/24 E04G 1/14 B62B 3/00 ──────────────────────────────────────────────────続 き Continuation of the front page (56) References JP-A-6-322970 (JP, A) Japanese Utility Model Showa 60-129442 (JP, U) Japanese Utility Model Showa 58-93138 (JP, U) Japanese Utility Model Showa 62- 106865 (JP, U) (58) Fields investigated (Int. Cl. 7 , DB name) E04G 1/24 E04G 1/14 B62B 3/00
Claims (1)
体内にほぼ水平に形成された1又は2層(段)以上の通
路と、該枠体の下端に取り付けられた台車と、該台車に
取り付けられた複数の車輪と、該車輪が走行するレール
とからなる移動式足場において、上記台車の幅が枠体の
幅より大きく、上記レールが3本以上からなるととも
に、上記台車が上下に重なる上の台車と下の台車とから
なり、これらの重なり部分の長さを調整することで台車
の幅を変更可能としたことを特徴とする移動式足場。1. A substantially vertically assembled frame, and the frame
One or two or more layers (levels) formed almost horizontally in the body
A road, a truck attached to the lower end of the frame,
A plurality of mounted wheels and rails on which the wheels travel
In the mobile scaffold consisting of
It is larger than the width, and the above-mentioned rail consists of three or more
A, it consists of a carriage and the lower carriage on which the carriage overlap vertically, movable scaffolding, characterized in that the changeable width of the carriage by adjusting the length of these overlap portions.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8199591A JP3058593B2 (en) | 1996-07-11 | 1996-07-11 | Mobile scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP8199591A JP3058593B2 (en) | 1996-07-11 | 1996-07-11 | Mobile scaffold |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH1025887A JPH1025887A (en) | 1998-01-27 |
JP3058593B2 true JP3058593B2 (en) | 2000-07-04 |
Family
ID=16410403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP8199591A Expired - Lifetime JP3058593B2 (en) | 1996-07-11 | 1996-07-11 | Mobile scaffold |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3058593B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5100100B2 (en) * | 2006-12-11 | 2012-12-19 | 義徳 深田 | How to set up the workbench |
JP7214513B2 (en) * | 2019-03-12 | 2023-01-30 | 清水建設株式会社 | Rail for mobile scaffolding |
-
1996
- 1996-07-11 JP JP8199591A patent/JP3058593B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH1025887A (en) | 1998-01-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3052449A (en) | Jacking means for building construction | |
US4284173A (en) | Motor vehicle lubricating facility | |
US4110952A (en) | Home building method | |
US4585204A (en) | Concrete forming system | |
KR20000010491A (en) | Establishing method of stairs and stair room and supporting device of stairs | |
JP3058593B2 (en) | Mobile scaffold | |
US7832155B1 (en) | Drop floor construction and method for park model home | |
JP3000090B2 (en) | Assembling method of preassembled steel rebar | |
JP2709091B2 (en) | Manufacturing and stocking method of unit floor | |
JP4803907B2 (en) | Mobile assembly scaffold | |
JPH0751843B2 (en) | Wooden house moving method and moving cart | |
JP3384784B2 (en) | Garage deck | |
JP3177735B2 (en) | An erect scaffold used to reinforce the perimeter of existing buildings | |
JP2874577B2 (en) | Moving scaffold for retaining wall construction | |
JP2668217B2 (en) | Arch-shaped large space roof construction method | |
CN220203913U (en) | Automatic spraying maintenance and detection integrated trolley for tunnel secondary lining | |
CN221320690U (en) | Conveying device for paving steel-plastic-wood trestle of abrupt wall of village | |
JP3625699B2 (en) | Temporary rail device for mobile scaffolding | |
CN213510651U (en) | Integral type two lining platform trucks for tunnel construction | |
JP2526657Y2 (en) | Slope movable scaffold | |
JPH0320435Y2 (en) | ||
JP3234442B2 (en) | Building and scrap type building method | |
JPH0621928Y2 (en) | Cart equipment for bridge inspection and maintenance | |
JP3847029B2 (en) | Box-type building | |
JP3074614B2 (en) | Panel ceiling construction method in the panel construction method when there is an obstacle just above the building |