JP2984700B2 JP2301915A JP30191590A JP2984700B2 JP 2984700 B2 JP2984700 B2 JP 2984700B2 JP 2301915 A JP2301915 A JP 2301915A JP 30191590 A JP30191590 A JP 30191590A JP 2984700 B2 JP2984700 B2 JP 2984700B2
Authority
JP
Japan
Prior art keywords
string
support
lift
length
distance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2301915A
Other languages
Japanese (ja)
Other versions
JPH04176931A (en
Inventor
憲衛 幸村
博史 日下
千博 加藤
幸夫 森
勝夫 金子
芳実 荻野
清治 川辺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP2301915A priority Critical patent/JP2984700B2/en
Publication of JPH04176931A publication Critical patent/JPH04176931A/en
Application granted granted Critical
Publication of JP2984700B2 publication Critical patent/JP2984700B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、張弦梁のリフトアップ工法における取付距
離の管理方法に関するものである。
Description: TECHNICAL FIELD The present invention relates to a method for managing an installation distance in a lift-up method of a beam string.

[従来の技術] 本発明者等は、仮設の構台または支柱等の支保工上で
張弦梁をあらかじめ地組みしてからリフトアップし、そ
の両端部を柱または耐力壁等の支持構造体に取り付け架
設する張弦梁のリフトアップ工法を先に開発した。
[Prior Art] The present inventors set up a string beam in advance on a temporary gantry or a support such as a column, lift it up, attach both ends of the beam to a support structure such as a column or a load-bearing wall, and erection. We first developed a lift-up method for string beams.

ところで、このリフトアップ工法は張弦梁を地組みす
る際には支保工により支持させながら組みたて、リフト
アップする際には張弦梁の両端部をワイヤー等の引張材
により吊り上げるため、張弦梁はその自重により水平方
向にその長さが伸びて変化する。
By the way, in this lift-up method, when assembling the string string, it is assembled while supporting it by the support, and when lifting up, both ends of the string string are lifted by a tensile material such as a wire, so the string string is weighed by its own weight. Its length extends and changes in the horizontal direction.

従って、この変化した張弦梁の長さが、支持構造体に
よる所定の取り付け位置間の距離の許容範囲内にあるこ
とが必須の条件であり、これより長すぎると接続架設が
不可能となる。
Therefore, it is an essential condition that the length of the changed beam string is within an allowable range of a distance between predetermined mounting positions by the support structure, and if it is longer than this, connection and erection is impossible.

[発明が解決しようとする課題] 本発明は、上記地組み後リフトアップ前に自重により
張弦梁の長さ伸ばして、取付距離を安全かつ容易に管理
することのできる張弦梁のリフトアップ工法における取
付距離の管理方法を提供することを目的とするものであ
る。
[Problems to be Solved by the Invention] The present invention relates to a mounting length in a lift-up method of a string string beam, in which the length of the string beam can be lengthened by its own weight before the lift-up after the ground structure and the mounting distance can be managed safely and easily. The purpose of the present invention is to provide a management method.

[課題を解決するための手段] 本発明の張弦梁のリフトアップ工法における取付距離
の管理方法は、仮設の構台または支柱等の支保工上で張
弦梁を地組みしてリフトアップし、その両端部を柱また
は耐力壁等の支持構造体に取り付け架設する張弦梁のリ
フトアップ工法において、上記地組み完了後リフトアッ
プする前に、上記支保工による張弦梁の支持を解除して
支持装置による支持に移行せしめると共に、該支持され
た張弦梁の両端部の少なくとも一方の端部が外方に滑る
ことができるようにして、該張弦梁の端部がその自重に
より滑って張弦梁の長さが伸びるようにし、自重で伸び
た張弦梁の長さが、上記支持構造体による所定の取り付
け位置間の距離の許容範囲内にあることを確認したり長
さ調整を行うことを特徴とする。
[Means for Solving the Problems] In the method of managing the installation distance in the lift-up method of the string beams according to the present invention, the string beams are laid on a support such as a temporary gantry or a column and lifted, and both ends thereof are lifted up. In the lift-up method of the beam string to be installed and erected on a support structure such as a column or a load-bearing wall, before the lift-up after the completion of the laying, release the support of the beam string by the support and shift to the support by the support device. At least one end of both ends of the supported string beam is allowed to slide outward, and the end of the string string is slid by its own weight so that the length of the string string is extended; The length of the beam string is confirmed to be within an allowable range of a distance between predetermined attachment positions by the support structure, and the length is adjusted.

また、上記システムにおいて、張弦梁の張弦材に予め
セット位置をマーキングしておいて、上記張弦梁の地組
み時に、該張弦材の端部を引張しながら張弦材を大梁材
や突張材にセットすることも特徴とするものである。
Further, in the above system, the setting position is marked in advance on the string member of the string string, and when the string string is laid, the string member is set on the large beam member or the project member while pulling the end of the string member. It is assumed that.

[実施例] 以下、本発明の一実施例について図面を参照しながら
説明する。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.

第1図に示すように、予め柱や耐力壁等のような建物
の支持構造体1を構築しておいて、その上に受けトラス
2を取り付けておく。
As shown in FIG. 1, a building support structure 1 such as a pillar or a load-bearing wall is constructed in advance, and a receiving truss 2 is mounted thereon.

該受けトラス2は、主として2本の傾斜材2aと、屋根
を受ける頂梁材2bとから構成されている。上記2本の傾
斜材2aの下端部は、上記支持構造体1の上端部にピン接
合により定着されていると共に、上記頂梁材2bの両端部
も各傾斜材2aの上端部にピン接合により枢着されてい
る。
The receiving truss 2 is mainly composed of two inclined members 2a and a top beam member 2b for receiving a roof. The lower ends of the two inclined members 2a are fixed to the upper end of the support structure 1 by pin joining, and both ends of the top beam 2b are also joined to the upper end of each inclined member 2a by pin joining. Being pivoted.

次に、上記支持構造体1の間の地上において、張弦梁
3を組み立てる。該張弦梁3は、主としてアーチ状の大
梁材3aと、ストランドロープ等の張弦材3bと、棒状の突
張材3cとから構成される。該大梁材3aは、上記受けトラ
ス2の頂梁材2bの内端部に接続固定されて、全体として
アーチ状の屋根を構成するようになっている。また、上
記張弦材3bは、アーチ状の大梁材3aの両端部に接続し
て、該大梁材3aを弓形に張るようになっている。さら
に、上記突張材3cは、上記大梁材3aと張弦材3bとの間に
介在して、該大梁材3aの荷重を張弦材3bに伝え、該張弦
材3bにプレストレスを与えるようになっている。
Next, the string beams 3 are assembled on the ground between the support structures 1. The string beam 3 mainly includes an arch-shaped large beam member 3a, a string member 3b such as a strand rope, and a rod-shaped projecting member 3c. The large beam 3a is connected and fixed to the inner end of the top beam 2b of the receiving truss 2 so as to constitute an arched roof as a whole. The string members 3b are connected to both ends of the arch-shaped large beam 3a so as to stretch the large beam 3a in an arc shape. Further, the projecting member 3c is interposed between the large beam member 3a and the string member 3b to transmit the load of the large beam member 3a to the string member 3b and apply a prestress to the string member 3b.

4は、例えば仮設の構台または支柱等の組立て用の支
保工であって、上記張弦梁3の地組み作業は、この支保
工4上で行われる。
Reference numeral 4 denotes a shoring for assembling a temporary gantry, a column, or the like. The work of laying the string beam 3 is performed on the shoring 4.

第2図からも明らかなように、上記張弦材3bの両端部
は、大梁材3aの両端部下側に設けられた取付スリーブ3
a′に差込まれて締付ナット3b′により締め付け固定さ
れる。また、張弦材3bの途中は、上記突張材3cの下端部
に付設された適宜クランプ(図示せず)に固定される。
As is clear from FIG. 2, both ends of the string member 3b are attached to the mounting sleeves 3 provided below both ends of the girder member 3a.
a 'and inserted and fastened by the fastening nut 3b'. In the middle of the string member 3b, an appropriate clamp (not shown) attached to the lower end of the string member 3c is fixed.

上記張弦材3bには、あらかじめ両端の締付け固定位置
(取付け長さ)がマーキングされていると共に、上記突
張材3cによるクランプ位置もマーキングされていて、上
記地組みの際に、ワイヤー5の先端部を張弦材3bの端部
付近に接続して、該ワイヤー5をトラッククレーン等の
適宜引張り手段(図示せず)により引っ張り、上記所定
のマーキングが取付スリーブ3a′による取付位置や、突
張材3cの下端のクランプ位置に一致するように調整して
固定する。
The stringing material 3b is marked in advance with the fastening and fixing positions (mounting lengths) at both ends, and the clamp position by the projecting material 3c is also marked. Is connected to the vicinity of the end of the string member 3b, and the wire 5 is pulled by an appropriate pulling means (not shown) such as a truck crane. Adjust and fix so that it matches the clamp position at the lower end.

尚、張弦材3の地組みの際、屋根下地材(図示せず)
も取り付けるとよい。また、上記張弦梁3の地組み作業
は、上記支持構造体1や受けトラス2の構築作業と平行
して行ってもよい。
In addition, the roof foundation material (not shown) is used when the string 3 is laid.
It is good to attach also. The work of laying the string beams 3 may be performed in parallel with the work of constructing the support structure 1 and the receiving truss 2.

張弦梁3の地組みが完了すると、上記支保工4の上部
のジャッキ4aをジャッキダウンして、上記大梁材3aとの
縁切りを行う。
When the construction of the beam string 3 is completed, the jack 4a at the upper part of the support 4 is jacked down to cut off the large beam 3a.

支保工4による張弦梁3の支持が解除されると、第2
図に示すように、大梁材3aの一側端部が、仮設の補助端
部材6を介して支持装置7により支持されると共に、大
梁材3aの端部、即ち補助端部材6が外方に滑らないよう
に滑り止め部材7aにより係止されている。
When the support of the beam string 3 by the support 4 is released, the second
As shown in the figure, one end of the girder 3a is supported by the supporting device 7 via the temporary auxiliary end member 6, and the end of the girder 3a, that is, the auxiliary end member 6 is turned outward. It is locked by a non-slip member 7a so as not to slip.

一方、上記大梁材3aの他側端部は、仮設の補助端部材
8を介して支持装置9により支持されると共に、該支持
装置9の上面にはテフロンシート等の滑り材9aが張って
あって、補助端部材8が外方に滑ることが可能になって
いる。
On the other hand, the other end of the beam 3a is supported by a supporting device 9 via a temporary auxiliary end member 8, and a sliding material 9a such as a Teflon sheet is stretched on the upper surface of the supporting device 9. Thus, the auxiliary end member 8 can slide outward.

このように、大梁材3aの両端部が支持装置7,9による
支持に移行すると、弓形の大梁材3aは、その自重によ
り、その滑り側端部の補助端部材8が支持装置9の滑り
材9a上を矢印Aのように滑って仮想線のように伸びる。
As described above, when both ends of the girder 3a shift to the support by the supporting devices 7 and 9, the auxiliary end member 8 at the sliding side end of the arched girder 3a is slid by its own weight. It slides on 9a as shown by arrow A and extends like an imaginary line.

この際、該大梁材3aや屋根下地材等の荷重が上記突張
材3cを介して張弦材3bに加えられて、該張弦3bにプレス
トレスが与えられる。
At this time, a load such as the girder 3a or the roof base material is applied to the string 3b via the strut 3c, and a prestress is given to the string 3b.

次に、このにように自重で伸びた張弦梁3の長さが、
両側の支持構造体1による所定の取り付け位置間の距離
の許容範囲内にあるかどうか、その伸び量を確認する。
Next, the length of the string beam 3 that has been extended by its own weight as described above is
The amount of elongation is checked to see if the distance between the predetermined mounting positions by the support structures 1 on both sides is within an allowable range.

尚、本実施例では、大梁材3aの一側方向のみ伸びるよ
うに支持させたが、本発明はこれに限定するものではな
く、大梁材3aの両端部が伸びるように、両方の補助端部
材6,8が外方に滑るようにしてもよい。
In the present embodiment, the girder 3a is supported so as to extend only in one direction, but the present invention is not limited to this. Both auxiliary end members are supported so that both ends of the girder 3a extend. 6, 8 may be slipped outward.

次に、第3図に示すように、張弦材3の両端部に吊ワ
イヤーやロッド等の引張材10の下端部を取り付けると共
に、上記受けトラス2の内端部に取り付けた吊上用ジャ
ッキ11により張弦梁3をリフトアップして、仮想線で示
すように、上記受けトラス2に取り付け固定する。
Next, as shown in FIG. 3, a lower end of a tension member 10 such as a hanging wire or a rod is attached to both ends of the string member 3 and a lifting jack 11 attached to the inner end of the receiving truss 2. The beam string 3 is lifted up and fixed to the receiving truss 2 as shown by a virtual line.

尚、上記張弦梁3のリフトアップに際して、上記受け
トラス2の外端部と基盤12との間にバッスステー13を張
設して、リフトアップ時の受けトラス2の変位を制御し
てバランスをとるようになっている。
At the time of lifting up the beam 3, a bush stay 13 is stretched between the outer end of the receiving truss 2 and the base 12 so as to control the displacement of the receiving truss 2 at the time of lifting up to achieve balance. It has become.

[発明の効果] (1)上記地組み完了後リフトアップする前に、支保工
による張弦梁の支持を解除して支持装置による支持に移
行せしめると共に、該支持された張弦梁の両端部の少な
くとも一方の端部が外方に滑ることができるようにし
て、該張弦梁の端部がその自重により滑って張弦梁の長
さが伸びるようにし、自重で伸びた張弦梁の長さが、上
記支持構造体による所定の取り付け位置間の距離の許容
範囲内にあることを確認したり長さ調整を行うようにし
たので、張弦梁の取付距離の管理を、張弦梁が支持装置
に支持された非常に安定した状態のもとで行うことがで
き、長さの正確な測定を安全かつ迅速に行うことができ
る。
[Effects of the Invention] (1) Before lifting up after completion of the above-mentioned laying, the support of the beam string by support is released to shift to the support by the support device, and at least one of both ends of the supported beam string is supported. The end of the string string can be slid outward by its own weight so that the length of the string string can be extended by its own weight, and the length of the string string that has been extended by its own weight can be determined by the support structure. The installation distance of the beam string was confirmed to be within the allowable range of the installation position and the length was adjusted, so the management of the installation distance of the beam string was performed in a very stable state where the beam string was supported by the support device. And accurate measurement of the length can be performed safely and quickly.

(2)張弦梁の張弦材に予めセット位置をマーキングし
ておいて、上記張弦梁の地組み時に、該張弦材の端部を
引張しながら張弦材を大梁材や突張材にセットするよう
にしたので、最終形状に近い状態で張弦梁を地組みする
ことができる。
(2) The setting position is marked in advance on the string member of the string string, and the string member is set on the large beam member or the projecting member while pulling the end of the string member at the time of assembling the string member. The beam string can be laid in a state close to the shape.

【図面の簡単な説明】[Brief description of the drawings]

第1図は張弦梁の地組み状態を示す施工説明図、第2図
は張弦梁の両端部の支持状態を示す拡大図、第3図はリ
フトアップ状態の施工説明図である。 1……支持構造体、2……受けトラス、2a……傾斜材、
2b……頂梁材、3……張弦梁、3a……大梁材、3a′……
取付スリーブ、3b……張弦材、3b′……締付ナット、3c
……突張材、4……支保工、4a……ジャッキ、5……ワ
イヤー、6……補助端部材、7……支持装置、7a……滑
り止め部材、8……補助端部材、9……支持装置、9a…
…滑り材、10……引張材、11……吊上用ジャッキ、12…
…基盤、13……バックステー。
FIG. 1 is a construction explanatory view showing a grounded state of a string beam, FIG. 2 is an enlarged view showing a support state of both ends of the string string, and FIG. 3 is a construction explanatory view of a lift-up state. 1 ... support structure, 2 ... receiving truss, 2a ... inclined material,
2b: Top beam, 3 ... Beam string, 3a: Large beam, 3a '...
Mounting sleeve, 3b ... Cable, 3b '... Tightening nut, 3c
... Strut, 4... Shoring, 4a... Jack 5... Wire 6... Auxiliary end member 7... …… Support device, 9a…
... Sliding material, 10 ... Tensioning material, 11 ... Hanging jack, 12 ...
... Base, 13 ... Backstay.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 荻野 芳実 宮城県仙台市泉区高森3―4―267 (72)発明者 川辺 清治 岩手県盛岡市稲荷町7―32 (56)参考文献 特開 平1−219203(JP,A) 特公 昭58−56778(JP,B2) (58)調査した分野(Int.Cl.6,DB名) E04B 1/34 E04B 1/32 101 - 102 E04B 1/342 E04G 21/14 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Yoshimi Ogino 3-4-267 Takamori, Izumi-ku, Sendai, Miyagi (72) Inventor Seiji Kawabe 7-32, Inaricho, Morioka-shi, Iwate (56) References 1-219203 (JP, A) JP-B-58-56778 (JP, B2) (58) Fields investigated (Int. Cl. 6 , DB name) E04B 1/34 E04B 1/32 101-102 E04B 1/342 E04G 21/14

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】仮設の構台または支柱等の支保工上で張弦
梁を地組みしてリフトアップし、その両端部を柱または
耐力壁等の支持構造体に取り付け架設する張弦梁のリフ
トアップ工法において、上記地組み完了後リフトアップ
する前に、上記支保工による張弦梁の支持を解除して支
持装置による支持に移行せしめると共に、該支持された
張弦梁の両端部の少なくとも一方の端部が外方に滑るこ
とができるようにして、該張弦梁の端部がその自重によ
り滑って張弦梁の長さが伸びるようにし、自重で伸びた
張弦梁の長さが、上記支持構造体による所定の取り付け
位置間の距離の許容範囲内にあることを確認したり長さ
調整を行うことを特徴とする張弦梁のリフトアップ工法
における取付距離の管理方法。
In a lift-up method of a beam stringer, a beam is erected on a support such as a temporary gantry or a column and lifted up, and both ends of the beam are attached to a support structure such as a column or a load-bearing wall. Before the lift-up after the completion of the framing, the support of the stringer by the support is released to shift to the support by the support device, and at least one end of both ends of the supported stringer slides outward. So that the end of the string string can be slid by its own weight so that the length of the string string can be extended, and the length of the string string that has been extended by its own weight can be reduced by the distance between predetermined mounting positions by the support structure. A method for managing a mounting distance in a lift-up method of a beam string, comprising confirming that the length is within an allowable range and adjusting the length.
【請求項2】上記張弦梁の張弦材に予めセット位置をマ
ーキングしておいて、上記張弦梁の地組み時に、該張弦
材の端部を引渡しながら張弦材を大張材や突張材にセッ
トすることを特徴とする請求項1に記載の張弦梁のリフ
トアップ工法における取付距離の管理方法。
2. The method according to claim 1, wherein a setting position is marked in advance on the string member of the string string, and when the string string is laid, an end of the string string is set on the large string member or the strut member while handing over the end of the string member. The method for managing a mounting distance in a lift-up method for a beam string according to claim 1.
JP2301915A 1990-11-07 1990-11-07 Control method of installation distance in lift-up method of beam string Expired - Fee Related JP2984700B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2301915A JP2984700B2 (en) 1990-11-07 1990-11-07 Control method of installation distance in lift-up method of beam string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2301915A JP2984700B2 (en) 1990-11-07 1990-11-07 Control method of installation distance in lift-up method of beam string

Publications (2)

Publication Number Publication Date
JPH04176931A JPH04176931A (en) 1992-06-24
JP2984700B2 true JP2984700B2 (en) 1999-11-29

Family

ID=17902646

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2301915A Expired - Fee Related JP2984700B2 (en) 1990-11-07 1990-11-07 Control method of installation distance in lift-up method of beam string

Country Status (1)

Country Link
JP (1) JP2984700B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980158A (en) * 2020-08-27 2020-11-24 中国二十二冶集团有限公司 Net rack assembling construction method under complex conditions

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7005262B2 (en) * 2017-10-11 2022-02-10 大成建設株式会社 How to build a building
CN115977407B (en) * 2022-12-23 2024-01-26 中国建筑第二工程局有限公司 Prestressed large-span truss string slipping construction system and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111980158A (en) * 2020-08-27 2020-11-24 中国二十二冶集团有限公司 Net rack assembling construction method under complex conditions

Also Published As

Publication number Publication date
JPH04176931A (en) 1992-06-24

Similar Documents

Publication Publication Date Title
EP0237667B1 (en) Building truss
US4083156A (en) Apparatus for bracing a tilt-up wall panel
JP2984700B2 (en) Control method of installation distance in lift-up method of beam string
CN113718957A (en) Cable net system of truss cable structure and cable net linkage tensioning construction method thereof
CN110952786B (en) Truss structure and installation method thereof
JPH06200625A (en) Frame method of arch truss construction
JP2002356297A (en) Steel tower constructing crane and steel tower construction method using crane
JP2018135190A (en) Foundation frame of tower crane and tower crane
JP2882541B2 (en) A method of mounting a lifting device and a method of joining frame members in a frame material lift-up method
JPH01299943A (en) Truss structure
JP2756723B2 (en) How to set up the beam string
JPH11269825A (en) Installation method of bridge girder and lifting equipment
JP3049300B2 (en) Construction method of beam truss in building with overhead traveling crane
JP2761792B2 (en) Construction method of large space building
JPH06167102A (en) Portable walking way for construction site
JPH01322064A (en) Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe
JP3265401B2 (en) Slip form equipment
WO1990013715A1 (en) Lift arch building system
CN217557657U (en) String-type same-layer supporting system
JPH06127889A (en) Flexible climbing method of crane
AU2021221510A1 (en) A system and method for moving objects between vertically and/or horizontally spaced-apart locations on a building or like structure
AU640658B2 (en) Lift arch building system
JP2764366B2 (en) Temporary tent with opening and closing mechanism
JPH0693720A (en) Portable passageway for construction work
JPH02200402A (en) Method and apparatus for preparing semi-pc floor panel with small beams

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20081001

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091001

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101001

Year of fee payment: 11