JP2949623B1 - How to build a tunnel - Google Patents
How to build a tunnelInfo
- Publication number
- JP2949623B1 JP2949623B1 JP10136869A JP13686998A JP2949623B1 JP 2949623 B1 JP2949623 B1 JP 2949623B1 JP 10136869 A JP10136869 A JP 10136869A JP 13686998 A JP13686998 A JP 13686998A JP 2949623 B1 JP2949623 B1 JP 2949623B1
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- ceiling block
- cut
- construction
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
【要約】
【課題】地表面への影響を最小限にとどめ、安全で安価
にトンネルを構築できる方法を提供することを目的とす
る。
【解決手段】トンネルの構築範囲の上部の土砂を、トン
ネルの上部断面の一部を含んだ状態で開削する。開削部
の底面部に、トンネルの上部形状を残してコンクリート
を打設して天井ブロックを形成する。天井ブロックの下
部にトンネルの残りの部分を構築する。An object of the present invention is to provide a method capable of constructing a tunnel safely and inexpensively while minimizing the influence on the ground surface. SOLUTION: The earth and sand on the upper part of the construction range of a tunnel is cut in a state including a part of the upper section of the tunnel. Concrete is cast on the bottom of the excavated section, leaving the top shape of the tunnel, to form a ceiling block. Build the rest of the tunnel at the bottom of the ceiling block.
Description
【0001】[0001]
【発明の属する技術分野】本発明は、トンネルの構築方
法に関するものである。The present invention relates to a tunnel construction method.
【0002】[0002]
【従来の技術】地表面から浅い位置にトンネルを構築す
る場合に、従来は一般に開削工法が採用されており、開
削が困難な場合には薬液注入やパイプルーフ工法が採用
されている。2. Description of the Related Art Conventionally, when a tunnel is constructed at a position shallow from the ground surface, an open-cutting method is generally used, and when cutting is difficult, a chemical injection or a pipe roof method is used.
【0003】[0003]
【本発明が解決しようとする課題】前記したような従来
のトンネルの構築方法にあっては、次のような問題点が
ある。 <イ>開削工法は開削部の周辺施設の不等沈下や傾斜な
どを防止するために広い範囲にわたって防護工事を施す
必要がある。また長期間にわたって地表施設の使用を制
限しなければ開削を行うことができない。 <ロ>パイプルーフ工法や薬液注入工法は、地表面に影
響を与えやすく環境汚染を生じる可能性がある。The conventional tunnel construction method as described above has the following problems. <B> In the excavation method, it is necessary to perform protection work over a wide range in order to prevent unequal settlement or inclination of facilities surrounding the excavation part. Excavation cannot be performed unless the use of surface facilities is restricted for a long period of time. <B> The pipe roof method and the chemical liquid injection method tend to affect the ground surface and may cause environmental pollution.
【0004】本発明は上記したような従来の問題を解決
するためになされたもので、地表面への影響を最小限に
とどめ、安全で安価にトンネルを構築できる方法を提供
することを目的とする。[0004] The present invention has been made to solve the above-mentioned conventional problems, and has as its object to provide a method for constructing a tunnel at a low cost with a minimum effect on the ground surface. I do.
【0005】[0005]
【課題を解決するための手段】上記のような目的を達成
するために、本発明のトンネルの構築方法は、トンネル
の構築範囲の上部の土砂を、トンネルの上部断面の一部
を含んだ状態で開削し、開削部の底面部に、トンネルの
上部形状を残してコンクリートを打設して天井ブロック
を形成し、天井ブロックの下部にトンネルの残りの部分
を構築して行う、トンネルの構築方法を特徴としたもの
である。In order to achieve the above object, a method for constructing a tunnel according to the present invention is directed to a method for constructing a tunnel including a part of an upper cross section of a tunnel in which an upper portion of a tunnel is constructed. A method of constructing a tunnel, in which a ceiling block is formed by casting concrete on the bottom of the excavated part while leaving the top shape of the tunnel, and then constructing the remaining part of the tunnel under the ceiling block It is characterized by.
【0006】[0006]
【本発明の実施の態様】以下図面を参照しながら本発明
のトンネルの構築方法の実施例について説明する。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of a tunnel construction method according to the present invention will be described below with reference to the drawings.
【0007】<イ>トンネル上部の開削。 トンネルを構築する予定の範囲の上部の土砂を開削して
開削部1を構成する。この場合に開削部1は、構築を予
定しているトンネルの上部の断面の一部を含んだ状態で
開削する。(図1)<A> Opening of the upper part of the tunnel. The excavated part 1 is formed by excavating the earth and sand in the upper part of the area where the tunnel is to be constructed. In this case, the excavation unit 1 performs excavation while including a part of the upper cross section of the tunnel to be constructed. (Fig. 1)
【0008】<ロ>天井ブロックの形成。 開削部1の底面両側には、例えば道路縁石状、あるいは
擁壁の基礎状にコンクリートを打設して支保工受け2を
形成する。(図2) こうして形成した両側の支保工受け2に掛け渡す状態
で、円弧状の支保工3を設置する。(図3) 支保工3の間隔は、型枠4の寸法に合わせて配置し、隣
接する支保工3の間に型枠4を設置する。(図4)<B> Formation of a ceiling block. On both sides of the bottom surface of the excavated portion 1, for example, concrete is poured into the shape of a road curb or the shape of a foundation of a retaining wall to form a support support 2. (FIG. 2) An arc-shaped support 3 is installed in a state of being bridged over the support supports 2 on both sides thus formed. (FIG. 3) The spacing between the supports 3 is arranged in accordance with the dimensions of the formwork 4, and the formwork 4 is installed between the adjacent supports 3. (FIG. 4)
【0009】<ハ>コンクリートの打設。 この型枠4の上にコンクリートを打設する。すると開削
部1の底面部に、トンネルの上部形状を残した状態で、
コンクリート製の天井ブロック5を形成することができ
る。(図5)<C> Casting concrete. Concrete is cast on the formwork 4. Then, with the upper part of the tunnel left on the bottom of the excavation part 1,
A ceiling block 5 made of concrete can be formed. (Fig. 5)
【0010】<ニ>支持杭の打設。 天井ブロック5の形成した後、この天井ブロック5の上
面にボーリング機械6を設置する。そしてトンネルの構
築範囲の外周に向けて削孔し、多数本の支持杭7を平行
に打設する。(図6) 支持杭7の打設が完了したら、天井ブロック5の上面を
埋め戻して、開削前の状態に復元する。(図7)<4> Driving a support pile. After the formation of the ceiling block 5, a boring machine 6 is installed on the upper surface of the ceiling block 5. Then, holes are drilled toward the outer periphery of the construction area of the tunnel, and a number of support piles 7 are driven in parallel. (FIG. 6) When the placing of the support pile 7 is completed, the upper surface of the ceiling block 5 is buried back to restore the state before the excavation. (FIG. 7)
【0011】<ホ>トンネルの構築。 上部を天井ブロック5で、側面を支持杭で保護された状
態の範囲内にトンネル8を構築する。(図8) その場合にトンネル8の上部のアーチ部はすでに天井ブ
ロック5として構築されているから、徐々に地盤を下
げ、側壁を打設してその後に、底面を構築してトンネル
8を完成する。<E> Construction of tunnel. The tunnel 8 is constructed within a range where the upper part is protected by the ceiling block 5 and the side surface is protected by the support pile. (Fig. 8) In this case, the upper arch of the tunnel 8 is already constructed as a ceiling block 5, so the ground is gradually lowered, the side walls are cast, and then the bottom is constructed to complete the tunnel 8. I do.
【0012】[0012]
【本発明の効果】本発明のトンネルの構築方法は以上説
明したようになるから次のような効果を得ることができ
る。 <イ>トンネルの天井部の構築を、簡単な機器によって
地上からの掘削によって完了することができる。そのた
めにトンネル掘削費を低減することができる。 <ロ>トンネルの構築に際しては、事前にトンネルの天
井部の構築が完了しているために、土砂の崩壊の危険性
がない。 <ハ>既設のトンネルの拡幅に利用する場合には、既設
トンネルの一般車両防護シェルター上に大型掘削機が乗
ることがないために安全である。 <ニ>トンネルの天井部がすでに完成しているために、
その後の掘削は下半部の盤下げ掘削の価格程度の低価格
で構築することができる。 <ホ>トンネルの天井部の構築と埋め戻しが完成すれ
ば、地上部分は通常の交通など、一般者に開放した状態
でその後のトンネル下半部の施工を行うことができる。As described above, the tunnel construction method of the present invention has the following advantages. <B> Construction of the tunnel ceiling can be completed by excavation from the ground with simple equipment. Therefore, tunnel excavation costs can be reduced. <B> When constructing the tunnel, there is no danger of earth and sand collapse since the construction of the ceiling of the tunnel has been completed in advance. <C> When used for widening an existing tunnel, it is safe because a large excavator does not ride on a general vehicle protection shelter in the existing tunnel. <D> Because the ceiling of the tunnel has already been completed,
Subsequent excavations can be constructed at a price as low as the lower half of the excavation. <E> When the construction and backfilling of the ceiling of the tunnel is completed, the lower half of the tunnel can be constructed with the ground part open to the general public, such as ordinary traffic.
【図1】本発明のトンネルの構築順序の実施例の説明図FIG. 1 is an explanatory diagram of an embodiment of a tunnel construction order according to the present invention.
【図2】構築順序の説明図FIG. 2 is an explanatory diagram of a construction order.
【図3】構築順序の説明図FIG. 3 is an explanatory diagram of a construction order.
【図4】構築順序の説明図FIG. 4 is an explanatory diagram of a construction order.
【図5】構築順序の説明図FIG. 5 is an explanatory diagram of a construction order.
【図6】構築順序の説明図FIG. 6 is an explanatory diagram of a construction order.
【図7】構築順序の説明図FIG. 7 is an explanatory diagram of a construction order.
【図8】構築順序の説明図FIG. 8 is an explanatory diagram of a construction order.
Claims (3)
リートを打設して天井ブロックを形成し、 天井ブロックの下部にトンネルの残りの部分を構築して
行う、 トンネルの構築方法1. The earth and sand in the upper part of the construction area of the tunnel is cut and cut in a state including a part of the upper cross section of the tunnel, and concrete is cast on the bottom part of the cut part while leaving the top shape of the tunnel. A method of constructing a tunnel by forming a ceiling block and building the rest of the tunnel below the ceiling block
う、 請求項1記載の、トンネルの構築方法2. The tunnel construction method according to claim 1, wherein after the ceiling block is formed, a support pile is driven toward the outer periphery of the tunnel construction area.
し、 この支保工受けに支保工、型枠を設置し、 この型枠の上にコンクリートを打設して構築する、 請求項1記載の、トンネルの構築方法3. A support work is formed on both sides of the bottom surface of the cut-out portion, a support and a formwork are installed on the support work, and concrete is cast on the formwork. Item 1. A tunnel construction method according to item 1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10136869A JP2949623B1 (en) | 1998-05-19 | 1998-05-19 | How to build a tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP10136869A JP2949623B1 (en) | 1998-05-19 | 1998-05-19 | How to build a tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2949623B1 true JP2949623B1 (en) | 1999-09-20 |
JPH11323974A JPH11323974A (en) | 1999-11-26 |
Family
ID=15185434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP10136869A Expired - Fee Related JP2949623B1 (en) | 1998-05-19 | 1998-05-19 | How to build a tunnel |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2949623B1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015021322A (en) * | 2013-07-22 | 2015-02-02 | 鉄建建設株式会社 | Tunnel construction method and tunnel structure |
-
1998
- 1998-05-19 JP JP10136869A patent/JP2949623B1/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH11323974A (en) | 1999-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3586864B2 (en) | Underground structure construction method and elevated traffic path | |
JP2002146811A (en) | Construction method for underwater structure foundation | |
KR100376589B1 (en) | Underground construction method using permanent reinforced concrete girders as temporary struts | |
JPH1136338A (en) | Construction method of underground structure | |
JP2003193495A (en) | Underground structure constructing method | |
JP4485006B2 (en) | Construction method for underground structures | |
JP2949623B1 (en) | How to build a tunnel | |
JP2001317217A (en) | Base isolation building construction under foundation of exiting building | |
JP2813807B2 (en) | How to build an underground tunnel | |
JPH07243269A (en) | Method of building underground parking lot | |
JPH0415878B2 (en) | ||
JP3030622B2 (en) | How to build a tunnel | |
JP2656892B2 (en) | Underground structure construction method and continuous underground wall construction method | |
JP2508852B2 (en) | How to build an underground structure | |
JP2000309931A (en) | Construction method of tunnel | |
JP2874906B2 (en) | Shaft construction method | |
JP3728659B2 (en) | Basement extension method | |
JP3105706B2 (en) | Construction method of piled raft foundation using existing foundation | |
JP3101762B2 (en) | Simple mountain retaining method | |
CN217710838U (en) | A cover and dig top-down construction equipment for existing pipeline | |
JP4031284B2 (en) | Construction method for underground structures | |
JP2963802B2 (en) | How to build an underground parking | |
JP2745083B2 (en) | Tunnel construction method | |
JP3171716B2 (en) | Foundation construction method on inclined surface | |
JPH10121465A (en) | Continuos underground wall engineering method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090709 Year of fee payment: 10 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100709 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110709 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110709 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120709 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130709 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130709 Year of fee payment: 14 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140709 Year of fee payment: 15 |
|
LAPS | Cancellation because of no payment of annual fees |