JP2946074B2 - Large roof erection method - Google Patents

Large roof erection method

Info

Publication number
JP2946074B2
JP2946074B2 JP22293693A JP22293693A JP2946074B2 JP 2946074 B2 JP2946074 B2 JP 2946074B2 JP 22293693 A JP22293693 A JP 22293693A JP 22293693 A JP22293693 A JP 22293693A JP 2946074 B2 JP2946074 B2 JP 2946074B2
Authority
JP
Japan
Prior art keywords
roof
stadium
temporary
stand
truss
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP22293693A
Other languages
Japanese (ja)
Other versions
JPH0776933A (en
Inventor
久米彦 河野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP22293693A priority Critical patent/JP2946074B2/en
Publication of JPH0776933A publication Critical patent/JPH0776933A/en
Application granted granted Critical
Publication of JP2946074B2 publication Critical patent/JP2946074B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、例えば既存の競技場ス
タンドに大屋根を架設する為に用いられる大屋根架設方
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for installing a large roof on an existing stadium stand, for example.

【0002】[0002]

【発明の背景】近年、屋根を持たない開放された競技場
における雨天対策が重要性を増してきており、既存の競
技場スタンドに屋根を架設し、これに対処するといった
方法が提案されている。ところで、陸上競技場等の大規
模な構築物において、競技場スタンドに大屋根を架設す
る場合には、競技場スタンド上に大掛かりな仮設ステー
ジ等を設けての工事となる為、競技場の使用が大幅に制
限されることになる。又、これは高所での作業が殆どを
占めるようになるから、それだけ危険性が高く、仮設材
の設置や撤去作業に多大な労力を必要とし、コストも高
く付いていた。その上、競技場スタンドが大屋根の重量
を支持できるだけの十分な強度を備えていないこともあ
り、このような競技場スタンドに大きな荷重を負担させ
た場合の安全性についても問題が有った。
BACKGROUND OF THE INVENTION In recent years, measures against rain in an open stadium without a roof have become increasingly important, and a method has been proposed in which a roof is erected on an existing stadium stand to cope with this. . By the way, in the case of a large structure such as an athletic stadium, where a large roof is erected on the stadium stand, it is necessary to install a large temporary stage etc. on the stadium stand. It will be severely restricted. In addition, since the work at a high place is occupied mostly, the danger is high, and the work of installing and removing the temporary materials requires a great deal of labor, and the cost is high. In addition, the stadium stands were not strong enough to support the weight of the large roof, and there was a problem with the safety of such stadium stands under heavy loads. .

【0003】そこで、競技グランド上にも柱を立設して
競技場の内外を結ぶような仮設ステージを設け、これに
頼って大屋根架設工事を実施することも考えられたが、
この方法では、本設工事に比して仮設工事の割合が大き
くなり、工事期間が著しく長くなり、施工コストも一層
高く付くといった問題が有った。
[0003] Therefore, it was considered that a temporary stage was provided on the competition ground so as to connect the inside and the outside of the stadium, and a large roof erection work was carried out by relying on this.
This method has a problem that the ratio of the temporary construction is larger than that of the main construction, the construction period is significantly increased, and the construction cost is further increased.

【0004】[0004]

【発明の開示】本発明の目的は、既存の競技場スタンド
に大屋根を架設するに際して、工事中であっても競技場
が利用可能であり、しかも仮設材の使用量が少なく、そ
の設置や撤去に掛かる手間が省け、工期の短縮や施工コ
ストの低減が図れ、更には既存の競技場スタンドに大屋
根の全重量を負担させなくても良いようになり、大屋根
を簡単に架設することができる安全性の高い大屋根架設
方法を提供することである。
DISCLOSURE OF THE INVENTION An object of the present invention is to construct a large roof on an existing stadium stand so that the stadium can be used even during construction and the amount of temporary materials used is small. Eliminating the time required for removal, shortening the construction period and reducing construction costs, and also eliminating the need to bear the entire weight of the large roof on the existing stadium stand, making it easy to install the large roof It is an object of the present invention to provide a large-roof erection method with high safety.

【0005】この本発明の目的は、競技場スタンドに大
屋根を架設する方法であって、前記競技場スタンドの周
囲に所定間隔で本設柱を立設する工程と、前記競技場ス
タンド上で屋根梁を地組みし、この地組みされた屋根梁
を前記本設柱の上端に連接する工程と、前記本設柱の上
端を基点とし、前記屋根梁の所定区間を一辺とした立体
トラスを組立てる工程と、仮設ガイサポートを取付ける
工程と、前記立体トラスに前記仮設ガイサポートを介し
て仮設ガイラインを取付ける工程と、前記屋根梁に屋根
を葺く工程と、前記仮設ガイラインを緊張させて屋根を
最終状態となるように引き起こす工程とを具備すること
を特徴とする大屋根架設方法によって達成される。
[0005] An object of the present invention is a method of erection of a large roof on a stadium stand, comprising the steps of: erecting a main pillar at predetermined intervals around the stadium stand; A step of connecting the roof beam to the upper end of the main pillar, and a three-dimensional truss having a predetermined section of the roof beam as one side with the upper end of the main pillar as a base point. An assembling step, a step of attaching a temporary guy support, a step of attaching a temporary guy line to the three-dimensional truss via the temporary guy support, a step of roofing the roof beam, and tensioning the temporary guy line to cover the roof. And a step of causing it to be in a final state.

【0006】尚、仮設ガイサポートは、競技場スタンド
の外部に突出するよう立体トラス、又は本設柱に取付け
られるものである。そして、屋根を葺く工程は、仮設ガ
イラインを仮緊張させ地組みされた屋根梁をスタンドか
ら地切りした状態で行われることが好ましい。又、上記
本発明の目的は、競技場スタンドに大屋根を架設する方
法であって、前記競技場スタンドの周囲に所定間隔で本
設柱を立設する工程と、前記競技場スタンド上で屋根梁
を地組みし、この地組みされた屋根梁を前記本設柱の上
端に連接する工程と、前記本設柱の上端にトラス柱を取
付ける工程と、前記トラス柱と屋根梁との間にワイヤを
取付ける工程と、前記屋根梁に屋根を葺く工程と、前記
ワイヤを緊張させて屋根を最終状態となるように引き起
こす工程とを具備することを特徴とする大屋根架設方法
によって達成される。
[0006] The temporary guy support is attached to a space truss or a main pillar so as to protrude outside the stadium stand. The roofing step is preferably performed in a state where the temporary guy line is temporarily tensioned and the erected roof beam is separated from the stand. Further, an object of the present invention is a method of erection of a large roof on a stadium stand, the step of erecting a main pillar at predetermined intervals around the stadium stand, Laying beams, connecting the laid roof beams to the upper ends of the main columns, attaching truss columns to the upper ends of the main columns, and This is achieved by a method for erection of a large roof, comprising the steps of attaching a wire, laying a roof on the roof beam, and tensioning the wire to cause the roof to be in a final state. .

【0007】尚、この大屋根架設方法においては、仮設
ガイサポートを取付ける工程と、トラス柱に仮設ガイサ
ポートを介して仮設ガイラインを張設する工程とを更に
具備することが好ましい。又、屋根を葺く工程は、ワイ
ヤを仮緊張させ地組みされた屋根梁をスタンドから地切
りした状態で行われることが好ましい。
It is preferable that the large roof erection method further includes a step of attaching a temporary guy support and a step of extending a temporary guy line to the truss column via the temporary guy support. Further, the step of roofing is preferably performed in a state where the wire is temporarily tensioned and the erected roof beam is separated from the stand.

【0008】そして、上記の大屋根架設方法が実施さ
れ、各ブロック毎に屋根を引き起こした後、引き起こさ
れた屋根を略環状に接続することによって、屋根が自立
するようになる。即ち、本発明の大屋根架設方法は、競
技場スタンドの周囲に所定間隔で立設された本設柱の、
例えば上端を支点として、競技場スタンド上で地組みさ
れた屋根を引き起こすことにより、競技場スタンドに大
屋根を架設する方法であるから、競技場スタンドの内外
に大規模な仮設ステージを設ける必要が無く、又、競技
場スタンドも地組み工事の際に一時的に利用されるだけ
であるから、長期間にわたって競技場の利用を制限され
ることが無い。
[0008] Then, the above-described large roof erection method is performed, and after the roof is raised for each block, the raised roof is connected in a substantially annular shape, whereby the roof becomes self-supporting. That is, the large roof erection method of the present invention is based on the main pillars erected at predetermined intervals around the stadium stand,
For example, a large roof is erected on the stadium stand by raising the erected roof on the stadium stand using the upper end as a fulcrum.Therefore, it is necessary to provide a large temporary stage inside and outside the stadium stand. There is no stadium, and the stadium stand is used only temporarily during the construction work. Therefore, the use of the stadium is not restricted for a long period of time.

【0009】そして、仮設材の使用量は格段に少ないの
で、設置や撤去に掛かる面倒な手間を省け、工期の短縮
や施工コストの低減が図れるようになる。更には、競技
場スタンドに大屋根の全重量を負担させず、殆どを本設
柱やトラス柱等に負担させているから、競技場スタンド
の強度に関係無く大屋根の架設工事を実施することがで
き、工事の安全性が高い。
[0009] Since the amount of temporary materials used is extremely small, the troublesome work of installation and removal can be omitted, the construction period can be shortened, and the construction cost can be reduced. Furthermore, since the stadium stands do not bear the entire weight of the large roof, most of them are borne by main pillars and truss pillars, construction of the large roof should be carried out regardless of the strength of the stadium stand. And the safety of construction is high.

【0010】[0010]

【実施例】図1〜図10は本発明に係る大屋根架設方法
の第1実施例を示すものであり、図1は競技場スタンド
を大ブロックに分割した状態を示す平面図、図2は準備
工程を示す断面図、図3は大柱(本設柱)の立設工程を
示す側面からの概略図、図4は大柱の立設状態を示す正
面からの概略図、図5は屋根の地組工程を示す側面から
の概略図、図6は立体トラスの取付工程を示す側面から
の概略図、図7は仮設ガイラインの張設工程を示す側面
からの概略図、図8は屋根葺き工程を示す側面からの概
略図、図9は立体トラスの取付状態を示す斜視図、図1
0は最終緊張工程を示す側面からの概略図である。
1 to 10 show a first embodiment of a large roof erection method according to the present invention. FIG. 1 is a plan view showing a state in which a stadium stand is divided into large blocks, and FIG. FIG. 3 is a cross-sectional view showing a preparation process, FIG. 3 is a schematic view from the side showing an erecting process of a large pillar (main pillar), FIG. FIG. 6 is a schematic view from the side showing the process of mounting the space truss, FIG. 7 is a schematic view from the side showing the process of extending the temporary guy line, and FIG. FIG. 9 is a schematic view from the side showing a process, FIG. 9 is a perspective view showing an attached state of a space truss, FIG.
0 is a schematic side view showing the final tensioning step.

【0011】図1〜図10中、Sはスリ鉢状に構成され
た競技場スタンド、1は仮設ステージ、2は仮設サポー
ト柱、3は競技場の外部に立設させられた大柱であり、
この大柱3は、図4に示す如く、逆V字状に構成された
ものであり、その上端にはヒンジ4が設けられている。
5は、大柱3を競技場スタンドSの外壁に固定する為の
接合部材である。
In FIG. 1 to FIG. 10, S is a stadium stand configured like a pickpocket, 1 is a temporary stage, 2 is a temporary support pillar, and 3 is a large pillar erected outside the stadium. ,
As shown in FIG. 4, the large pillar 3 is formed in an inverted V shape, and a hinge 4 is provided at an upper end thereof.
5 is a joining member for fixing the large pillar 3 to the outer wall of the stadium stand S.

【0012】6は屋根大梁、7は横梁であり、屋根大梁
6はヒンジ4を介して大柱3に回動自在に連結されてい
る。8は屋根大梁6の地組みに際して用いられる仮設サ
ポートブロック、9は最終状態において屋根を吊る役割
を果たす斜張材、10は立体トラスにおける外周リング
の一部をなすトラス柱、11は隣合うトラス柱10の先
端同士を連結するリング梁であり、即ちこれら斜張材
9、トラス柱10及びリング梁11は、競技場を取巻く
環状の立体トラスの一部となり、最終的にはこの環状の
立体トラスにより屋根の自立状態が得られるようにな
る。
Reference numeral 6 denotes a roof girder, 7 denotes a horizontal beam, and the roof girder 6 is rotatably connected to the large column 3 via a hinge 4. Reference numeral 8 denotes a temporary support block used for laying the roof girders 6, reference numeral 9 denotes a cable staying member that plays a role of suspending the roof in the final state, reference numeral 10 denotes a truss pillar that forms a part of an outer peripheral ring in a space truss, and reference numeral 11 denotes an adjacent truss. A ring beam connecting the tips of the pillars 10, that is, the stay members 9, the truss pillars 10, and the ring beams 11 become a part of an annular three-dimensional truss surrounding the stadium, and ultimately, the annular three-dimensional truss. The truss allows the roof to be self-supporting.

【0013】12はトラス柱10に対して直角に設けら
れた仮設ガイサポート、13はトラス柱10の上端から
仮設ガイサポート12の先端を経て張設された仮設ガイ
ラインである。即ち、図7等から判る如く、仮設ガイラ
イン13を引張することによって地組みされた屋根が大
柱3の上端を支点として引き起こされるよう構成されて
いる。
Reference numeral 12 denotes a temporary guy support provided at a right angle to the truss pillar 10, and reference numeral 13 denotes a temporary guy line extended from the upper end of the truss pillar 10 through the tip of the temporary guy support 12. That is, as can be seen from FIG. 7 and the like, the roof erected by pulling the temporary guide line 13 is raised using the upper end of the large pillar 3 as a fulcrum.

【0014】14は屋根、15は競技場スタンドSと屋
根との間に張られる煽り防止用ワイヤである。本発明の
大屋根架設方法に係る概略の手順について図1を用いて
説明すると、先ず競技場スタンドはA,B,C及びDの
4ブロックに分割され、Aブロックの屋根工事が開始さ
れた後、向かい合うBブロックの工事が開始され、続い
てCブロック、Dブロックへと順次移行する。
Reference numeral 14 denotes a roof, and reference numeral 15 denotes a wire for preventing fluttering stretched between the stadium stand S and the roof. The schematic procedure according to the large roof erection method of the present invention will be described with reference to FIG. 1. First, the stadium stand is divided into four blocks A, B, C, and D, and after the roof construction of the A block is started. Then, the construction of the facing B block is started, and the operation sequentially shifts to the C block and the D block.

【0015】そして、例えばAブロックは、(a)〜
(e)の5ユニットに分割されており、(a)ユニット
から順に準備工事、柱・鉄骨建方工事、屋根地組工事、
屋根葺き工事、最終緊張工事といった各工事が実施され
る。本工事に先立っては、先ず基礎(杭・地業・土留・
土・基礎躯体)工事が行われるが、これらの工事は全て
競技場の外で行われるものであるから、競技場の使用に
支障を来すことは無い。
Then, for example, the A block is composed of (a) to
It is divided into 5 units of (e), and preparation work, pillar / steel frame construction work, roof framing work,
Various works such as roofing work and final tensioning work will be implemented. Prior to this construction, first, the foundation (pile,
(Soil and foundation frame) Construction will be performed, but since all these constructions are performed outside the stadium, there is no hindrance to the use of the stadium.

【0016】基礎工事が終了した後、準備工事として競
技場スタンドの上端部には、図2に示す如く、仮設ステ
ージ1及び仮設サポート柱2が設置される。続いて、図
3に示す如く、上端にヒンジ4が取付けられた大柱3が
競技場の外部に立設させられる。尚、大柱3の立設状態
を正面から見たものが図4であり、この図4から判るよ
うに、最初の段階では屋根1ユニットに対応して逆V字
状の大柱3が2本必要となるが、その後の段階では屋根
1ユニットに対して大柱3を1本立設するだけで良い。
After the completion of the foundation work, a temporary stage 1 and a temporary support column 2 are installed at the upper end of the stadium stand as a preparatory work, as shown in FIG. Subsequently, as shown in FIG. 3, the large pillar 3 with the hinge 4 attached to the upper end is erected outside the stadium. FIG. 4 shows the standing state of the large columns 3 as viewed from the front. As can be seen from FIG. 4, at the initial stage, two inverted V-shaped large columns 3 correspond to one roof unit. This is necessary, but in the subsequent stage, only one large pillar 3 needs to be erected for one roof unit.

【0017】接合部材5によって大柱3を競技場の外壁
に固定した後、競技場スタンドS上に設置された仮設サ
ポートブロック8を用いて屋根大梁6や横梁7を組立
て、屋根大梁6を図5に示す如く大柱3上端のヒンジ4
に取付ける。尚、屋根大梁6や横梁7からなる屋根は完
全な平面状のものではなく、最終的な形状を考慮して湾
曲状に組立てられる。
After fixing the large pillar 3 to the outer wall of the stadium by the joining member 5, the roof girders 6 and the horizontal beams 7 are assembled using the temporary support blocks 8 installed on the stadium stand S, and the roof girders 6 are drawn. 5. Hinge 4 at upper end of large pillar 3 as shown in 5
Attach to The roof composed of the roof girders 6 and the cross beams 7 is not completely flat, but is assembled in a curved shape in consideration of the final shape.

【0018】続いて、仮設サポート柱2を利用して斜張
材9、トラス柱10及びリング梁11を組立て、図9に
示す如くの立体トラスが形成される。そして、仮設ガイ
サポート12及び仮設ガイライン13を図7に示す如く
取付け、不用となった仮設ステージ1や仮設サポート柱
2を撤去する。この後、仮設ガイライン13を引張する
ことによって、屋根を地切りし、図8に示す如く、仮設
サポートブロック8を撤去して屋根14を葺く。
Subsequently, the cable stay 9, the truss pillar 10 and the ring beam 11 are assembled using the temporary support pillar 2, and a three-dimensional truss as shown in FIG. 9 is formed. Then, the temporary guy support 12 and the temporary guy line 13 are attached as shown in FIG. 7, and the unnecessary temporary stage 1 and the temporary support pillar 2 are removed. After that, the temporary guy line 13 is pulled to cut off the roof, and as shown in FIG. 8, the temporary support block 8 is removed and the roof 14 is laid.

【0019】この状態は図9の斜視図に示される通りで
あり、この図からも判るように屋根の重量は競技場スタ
ンドSには殆ど掛かっておらず、屋根の重量の大部分は
大柱3や立体トラスによって支持されている。そして、
仮設ガイライン13を更に引張して屋根を図10に示す
如く引き起こし、屋根が風で煽られないようにする為
に、競技場スタンドSとの間に煽り防止用ワイヤ15を
取付ける。
This state is as shown in the perspective view of FIG. 9, and as can be seen from this figure, the weight of the roof hardly hangs on the stadium stand S, and most of the weight of the roof is large columns. 3 and are supported by a space truss. And
In order to further pull the temporary guy line 13 to raise the roof as shown in FIG. 10 and prevent the roof from being blown by the wind, a wire 15 for preventing fluttering is mounted between the stadium stand S and the stadium.

【0020】上述した工程が(a)〜(e)ユニットま
で順次行われてAブロックの工事が完了する。そして、
B,C,Dブロックについても同様の工事が逐次行わ
れ、A〜Dブロックが全て完了した時点で、立体トラス
は競技場スタンドSを取巻く環状体となり、これらを互
いに接続させた後においては、大屋根は仮設ガイライン
13の張力に頼らずとも所定の位置に自立するようにな
る。
The above steps are sequentially performed for the units (a) to (e), and the construction of the block A is completed. And
Similar work is sequentially performed for the blocks B, C, and D. When the blocks A to D are all completed, the space truss becomes a ring surrounding the stadium stand S, and after these are connected to each other, The large roof can stand at a predetermined position independently of the tension of the temporary guy line 13.

【0021】この後、仮設ガイサポート12や仮設ガイ
ライン13を撤去し、工事が完了する。上述した如くの
本発明の大屋根架設方法によれば、競技場スタンドの使
用は一時的なものであるから、競技場の運営に大きな支
障が無く、競技グランドを作業エリヤとして使用する必
要も無いので、競技グランドも使用制限を受けない。
After that, the temporary guy support 12 and the temporary guy line 13 are removed, and the construction is completed. According to the large roof erection method of the present invention as described above, since the use of the stadium stand is temporary, there is no major obstacle to the operation of the stadium and there is no need to use the competition ground as a work area. Therefore, the competition ground is not subject to any restrictions.

【0022】そして、仮設材の使用量も格段に少ないの
で、その設置や撤去に掛かる面倒な手間を省くことがで
き、工期の短縮や施工コストの低減が図れるようにな
る。更には、既存の競技場スタンドに大屋根の重量を殆
ど負担させる必要が無いので、安全性に優れ、競技場の
強度に関係無く大屋根を架設することができる。図11
〜図17は、本発明に係る大屋根架設方法の第2実施例
を示すものであり、図11は準備工程を示す断面図、図
12は大柱の立設工程を示す側面からの概略図、図13
は屋根の地組工程を示す側面からの概略図、図14はト
ラス柱取付工程を示す側面からの概略図、図15は仮設
ガイラインの張設工程を示す側面からの概略図、図16
はワイヤの張設状態を示す斜視図、図17は最終緊張工
程を示す側面からの概略図である。
Further, since the amount of the temporary material used is extremely small, the troublesome work of installation and removal thereof can be omitted, and the construction period can be shortened and the construction cost can be reduced. Furthermore, since the existing stadium stand hardly needs to bear the weight of the large roof, it is excellent in safety and the large roof can be erected regardless of the strength of the stadium. FIG.
17 to 17 show a second embodiment of the large roof erection method according to the present invention. FIG. 11 is a cross-sectional view showing a preparation step, and FIG. 12 is a schematic side view showing an erecting step of a large pillar. FIG.
Is a schematic view from the side showing a roof terrain process, FIG. 14 is a schematic view from the side showing a truss pillar mounting process, FIG. 15 is a schematic view from a side showing a temporary guy line extension process, FIG.
FIG. 17 is a perspective view showing a tensioned state of the wire, and FIG. 17 is a schematic view from the side showing a final tensioning step.

【0023】この第2実施例においても、基本的な技術
思想は第1実施例と同様であるから、第1実施例のもの
と同じ部材については第1実施例で用いた符号を付与
し、その説明は省略する。図11〜図17中、16はト
ラス柱であり、このトラス柱16は先の第1実施例のも
のとは異なり、大柱3の上端に直接取付られている。
Also in this second embodiment, the basic technical concept is the same as that of the first embodiment. Therefore, the same members as those of the first embodiment are assigned the same reference numerals as those used in the first embodiment. The description is omitted. In FIGS. 11 to 17, reference numeral 16 denotes a truss column. Unlike the first embodiment, the truss column 16 is directly attached to the upper end of the large column 3.

【0024】17は屋根大梁6とトラス柱16との間に
張設されるワイヤ、18はワイヤ17を引張する為の油
圧ジャッキである。この第2実施例の大屋根架設方法に
おいても、先ず第1実施例と同様の基礎工事がなされ、
この後準備工事として競技場スタンドSの上端部に仮設
ステージ1が図11に示す如く設置される。
Reference numeral 17 denotes a wire stretched between the roof girder 6 and the truss post 16, and reference numeral 18 denotes a hydraulic jack for pulling the wire 17. In the large roof erection method of the second embodiment, first, the same foundation work as that of the first embodiment is performed.
Thereafter, as a preparatory work, the temporary stage 1 is installed at the upper end of the stadium stand S as shown in FIG.

【0025】続いて、上端にヒンジ4が取付けられた大
柱3が図12に示す如く、競技場の外部に立設させられ
る。尚、大柱3は第1実施例のものと同様に逆V字状に
構成されている。大柱3の立設が完了した後、仮設サポ
ートブロック8を用いて競技場スタンドS上において屋
根の地組が行われ、図13に示す如く、屋根大梁6は大
柱3に連結される。
Subsequently, the large pillar 3 having the hinge 4 attached to the upper end is erected outside the stadium as shown in FIG. The large pillar 3 is formed in an inverted V-shape as in the first embodiment. After the erecting of the pillar 3 is completed, the roof is laid on the stadium stand S using the temporary support block 8, and the roof beam 6 is connected to the pillar 3 as shown in FIG.

【0026】屋根の骨組みが概略完成した後、図14に
示す如く、大柱3の上端にトラス柱16を立設し、この
トラス柱16に対して仮設ガイサポート12及び仮設ガ
イライン13を取付け、トラス柱16の倒壊を防止す
る。更に、ワイヤ17を屋根大梁6とトラス柱16との
間に張設し、油圧ジャッキ18によってワイヤ17を仮
緊張させて、屋根を競技場スタンドSから地切りする。
After the framework of the roof is substantially completed, as shown in FIG. 14, a truss column 16 is erected on the upper end of the large column 3, and a temporary guy support 12 and a temporary guy line 13 are attached to the truss column 16. The truss column 16 is prevented from collapsing. Further, a wire 17 is stretched between the roof girder 6 and the truss pillar 16, and the wire 17 is temporarily tensioned by the hydraulic jack 18, and the roof is separated from the stadium stand S.

【0027】そして、図15に示す如く、仮設サポート
ブロック8を撤去して屋根14を葺く。尚、ワイヤ17
を張設した状態は、図16に示す通りのものであり、こ
の図からも判るように屋根の重量を競技場スタンドSに
は殆ど負担させておらず、屋根の重量の大部分は大柱3
やワイヤ17によって支持されている。上記の如く組立
てられた屋根を油圧ジャッキ18を作動させて本緊張さ
せて、図17に示す如く、所定の角度まで引き起こし、
屋根が風で煽られないようにする為に煽り防止用ワイヤ
15を取付ける。
Then, as shown in FIG. 15, the temporary support block 8 is removed and the roof 14 is laid. The wire 17
16 is as shown in FIG. 16. As can be seen from FIG. 16, the weight of the roof is hardly applied to the stadium stand S, and most of the weight of the roof is 3
And supported by wires 17. The roof assembled as described above is fully tensioned by operating the hydraulic jack 18 to raise it to a predetermined angle as shown in FIG.
In order to prevent the roof from being lifted by the wind, a wire 15 for preventing the lift is attached.

【0028】そして、最後にワイヤ15の代わりに棒状
の斜張材等を組付けて、ワイヤ17を外し、更に仮設ガ
イサポート12及び仮設ガイライン13を撤去する。こ
れらの工程が(a)〜(e)ユニットまで順次行われて
Aブロックの工事が完了し、B,C,Dブロックについ
ても同様の工事が行われ大屋根が完成する。即ち、この
第2実施例においても、第1実施例と同様に工事中でも
競技場の使用が可能であり、省力化やコストの低減が図
れ、更には既存のスタンドに屋根の重量を殆ど負担させ
ないので、強度的に安全性が高いといった特長が得られ
るものであり、特にワイヤを介して屋根を引き上げるか
ら、屋根の角度調節が自在であるといった特長を有す
る。
Finally, a bar-shaped cable staying member or the like is assembled in place of the wire 15, the wire 17 is removed, and the temporary guy support 12 and the temporary guy line 13 are removed. These steps are sequentially performed for the units (a) to (e) to complete the construction of the block A, and the same construction is performed for the blocks B, C, and D to complete the large roof. That is, in the second embodiment as well, the stadium can be used during construction, as in the first embodiment, saving labor and reducing costs, and furthermore, the existing stand hardly bears the weight of the roof. Therefore, a feature such as high safety in strength is obtained, and in particular, since the roof is pulled up via a wire, the angle of the roof can be freely adjusted.

【0029】[0029]

【効果】本発明によれば、既存の競技場スタンドに大屋
根を架設するに際して、工事中であっても競技場が利用
でき、しかも仮設材の使用量は少ないので設置や撤去作
業に掛かる手間を省け、工期の短縮や施工コストの低減
が図れ、更には既存の競技場スタンドに大屋根の全重量
を負担させる必要が無く、競技場スタンドの強度等に関
係無く大屋根を架設することができる。
According to the present invention, when a large roof is erected on an existing stadium stand, the stadium can be used even during construction, and the amount of temporary materials used is small, so that installation and removal work is troublesome. And the construction period can be shortened and the construction cost can be reduced.In addition, there is no need to bear the entire weight of the large roof on the existing stadium stand, and the large roof can be erected regardless of the strength of the stadium stand. it can.

【図面の簡単な説明】[Brief description of the drawings]

【図1】競技場スタンドを大ブロックに分割した状態を
示す平面図である。
FIG. 1 is a plan view showing a state where a stadium stand is divided into large blocks.

【図2】第1実施例における準備工程を示す断面図であ
る。
FIG. 2 is a cross-sectional view showing a preparation step in the first embodiment.

【図3】第1実施例における大柱の立設工程を示す側面
からの概略図である。
FIG. 3 is a schematic side view showing a step of erecting a large pillar in the first embodiment.

【図4】第1実施例における大柱の立設状態を示す正面
からの概略図である。
FIG. 4 is a schematic view from the front showing a standing state of a large pillar in the first embodiment.

【図5】第1実施例における屋根の地組工程を示す側面
からの概略図である。
FIG. 5 is a schematic side view showing a roof laying process in the first embodiment.

【図6】第1実施例における立体トラスの取付工程を示
す側面からの概略図である。
FIG. 6 is a schematic side view showing a mounting step of the space truss in the first embodiment.

【図7】第1実施例における仮設ガイラインの張設工程
を示す側面からの概略図である。
FIG. 7 is a schematic side view showing a step of extending a temporary guide line in the first embodiment.

【図8】第1実施例における屋根葺き工程を示す側面か
らの概略図である。
FIG. 8 is a schematic side view showing a roofing step in the first embodiment.

【図9】第1実施例における立体トラスの取付状態を示
す斜視図である。
FIG. 9 is a perspective view showing an attached state of the space truss in the first embodiment.

【図10】第1実施例における最終緊張工程を示す側面
からの概略図である。
FIG. 10 is a schematic side view showing a final tensioning step in the first embodiment.

【図11】第2実施例における準備工程を示す断面図で
ある。
FIG. 11 is a sectional view showing a preparation step in the second embodiment.

【図12】第2実施例における大柱の立設工程を示す側
面からの概略図である。
FIG. 12 is a schematic side view showing a step of erecting a large pillar in a second embodiment.

【図13】第2実施例における屋根の地組工程を示す側
面からの概略図である。
FIG. 13 is a schematic side view showing a roof laying process in the second embodiment.

【図14】第2実施例における仮設ガイラインの張設工
程を示す側面からの概略図である。
FIG. 14 is a schematic side view showing a step of extending a temporary guy line in the second embodiment.

【図15】第2実施例における屋根葺き工程を示す側面
からの概略図である。
FIG. 15 is a schematic side view showing a roofing step in the second embodiment.

【図16】第2実施例におけるワイヤの張設状態を示す
斜視図である。
FIG. 16 is a perspective view showing a state where wires are stretched in the second embodiment.

【図17】第2実施例における最終緊張工程を示す側面
からの概略図である。
FIG. 17 is a schematic side view showing a final tensioning step in the second embodiment.

【符号の説明】[Explanation of symbols]

S 競技場スタンド 1 仮設ステージ 2 仮設サポート柱 3 大柱 4 ヒンジ 5 結合部材 6 屋根大梁 7 横梁 8 仮設サポートブロック 9 斜張材 10,16 トラス柱 11 リング梁 12 仮設ガイサポート 13 仮設ガイライン 14 屋根 15 煽り防止用ワイヤ 17 ワイヤ 18 油圧ジャッキ S Stadium stand 1 Temporary stage 2 Temporary support pillar 3 Large pillar 4 Hinge 5 Connecting member 6 Roof girder 7 Cross beam 8 Temporary support block 9 Cable stay 10, 16 Truss pillar 11 Ring beam 12 Temporary guy support 13 Temporary guy line 14 Roof 15 Wire 17 for preventing fluttering 17 Wire 18 hydraulic jack

Claims (9)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 競技場スタンドに大屋根を架設する方法
であって、前記競技場スタンドの周囲に所定間隔で本設
柱を立設する工程と、前記競技場スタンド上で屋根梁を
地組みし、この地組みされた屋根梁を前記本設柱の上端
に連接する工程と、前記本設柱の上端を基点とし、前記
屋根梁の所定区間を一辺とした立体トラスを組立てる工
程と、仮設ガイサポートを取付ける工程と、前記立体ト
ラスに前記仮設ガイサポートを介して仮設ガイラインを
取付ける工程と、前記屋根梁に屋根を葺く工程と、前記
仮設ガイラインを緊張させて屋根を最終状態となるよう
に引き起こす工程とを具備することを特徴とする大屋根
架設方法。
1. A method of erection of a large roof on a stadium stand, comprising: erecting main pillars at predetermined intervals around the stadium stand; Connecting the erected roof beam to the upper end of the main pillar; assembling a three-dimensional truss having the upper end of the main pillar as a base and a predetermined section of the roof beam as one side; A step of attaching a guy support, a step of attaching a temporary guy line to the space truss via the temporary guy support, a step of roofing the roof beam, and tensioning the temporary guy line so that the roof is in a final state. A method for erection of a large roof.
【請求項2】 各ブロック毎に引き起こされた屋根を略
環状に接続する工程を更に具備することを特徴とする請
求項1の大屋根架設方法。
2. The method according to claim 1, further comprising the step of connecting the roof raised for each block in a substantially annular shape.
【請求項3】 仮設ガイサポートが競技場スタンドの外
部に突出するよう立体トラスに取付けられることを特徴
とする請求項1の大屋根架設方法。
3. The method according to claim 1, wherein the temporary guy support is attached to the space truss so as to protrude outside the stadium stand.
【請求項4】 仮設ガイサポートが競技場スタンドの外
部に突出するよう本設柱に取付けられることを特徴とす
る請求項1の大屋根架設方法。
4. The method according to claim 1, wherein the temporary guy support is attached to the main pillar so as to protrude outside the stadium stand.
【請求項5】 屋根を葺く工程は、仮設ガイラインを仮
緊張させ地組みされた屋根梁をスタンドから地切りした
状態で行われることを特徴とする請求項1の大屋根架設
方法。
5. The large roof erection method according to claim 1, wherein the step of roofing is performed in a state where the temporary guy line is temporarily tensioned and the erected roof beam is separated from the stand.
【請求項6】 競技場スタンドに大屋根を架設する方法
であって、前記競技場スタンドの周囲に所定間隔で本設
柱を立設する工程と、前記競技場スタンド上で屋根梁を
地組みし、この地組みされた屋根梁を前記本設柱の上端
に連接する工程と、前記本設柱の上端にトラス柱を取付
ける工程と、前記トラス柱と屋根梁との間にワイヤを取
付ける工程と、前記屋根梁に屋根を葺く工程と、前記ワ
イヤを緊張させて屋根を最終状態となるように引き起こ
す工程とを具備することを特徴とする大屋根架設方法。
6. A method of erection of a large roof on a stadium stand, comprising: erecting a main pillar at predetermined intervals around the stadium stand; Connecting the erected roof beam to the upper end of the main column, attaching a truss column to the upper end of the main column, and attaching a wire between the truss column and the roof beam. And a step of laying a roof on the roof beam, and a step of tensioning the wire to cause the roof to be in a final state.
【請求項7】 各ブロック毎に引き起こされた屋根を略
環状に接続する工程を更に具備することを特徴とする請
求項6の大屋根架設方法。
7. The method according to claim 6, further comprising the step of connecting the roof raised for each block in a substantially annular shape.
【請求項8】 仮設ガイサポートを取付ける工程と、ト
ラス柱に前記仮設ガイサポートを介して仮設ガイライン
を張設する工程とを更に具備することを特徴とする請求
項6の大屋根架設方法。
8. The method according to claim 6, further comprising a step of attaching a temporary guy support and a step of extending a temporary guy line on the truss column via the temporary guy support.
【請求項9】 屋根を葺く工程は、ワイヤを仮緊張させ
地組みされた屋根梁をスタンドから地切りした状態で行
われることを特徴とする請求項6の大屋根架設方法。
9. The large roof erection method according to claim 6, wherein the step of roofing is performed in a state where the wire is temporarily tensioned and the erected roof beam is separated from the stand.
JP22293693A 1993-09-08 1993-09-08 Large roof erection method Expired - Lifetime JP2946074B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22293693A JP2946074B2 (en) 1993-09-08 1993-09-08 Large roof erection method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22293693A JP2946074B2 (en) 1993-09-08 1993-09-08 Large roof erection method

Publications (2)

Publication Number Publication Date
JPH0776933A JPH0776933A (en) 1995-03-20
JP2946074B2 true JP2946074B2 (en) 1999-09-06

Family

ID=16790195

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22293693A Expired - Lifetime JP2946074B2 (en) 1993-09-08 1993-09-08 Large roof erection method

Country Status (1)

Country Link
JP (1) JP2946074B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1001314C2 (en) * 1995-09-29 1997-04-03 Ballast Nedam Groep Nv Method for erecting a building and building erected in this way.
CN105569358B (en) * 2015-12-15 2017-09-29 中国建筑第八工程局有限公司 The construction method on the special-shaped curved roof of large span multi-curvature
CN106812236A (en) * 2017-03-07 2017-06-09 新乡学院 A kind of construction technology of large-span shell steel structural roof
JP7152282B2 (en) * 2018-12-03 2022-10-12 株式会社竹中工務店 Building
CN111779173A (en) * 2020-06-18 2020-10-16 中国十七冶集团有限公司 Rapid installation method of high-rise steel structure truss roof

Also Published As

Publication number Publication date
JPH0776933A (en) 1995-03-20

Similar Documents

Publication Publication Date Title
US5309693A (en) Frame structure
JP4691431B2 (en) Roof structure and construction method thereof
JP2946074B2 (en) Large roof erection method
JPH06200625A (en) Frame method of arch truss construction
JP3426339B2 (en) Construction method of large building with dome roof
US4651496A (en) Method of erecting a cable stay roof over an existing structure
JP3061560B2 (en) Tent warehouse and its construction method
JP2882541B2 (en) A method of mounting a lifting device and a method of joining frame members in a frame material lift-up method
JP2942761B1 (en) Construction method of large roof
JP2985161B2 (en) How to adjust the tip height of a cantilever roof
JP2994205B2 (en) Structural assembly method
JP3506022B2 (en) How to build a dome roof
JP2663102B2 (en) Long span canopy equipment and its construction method
JP2858891B2 (en) Construction method of large span dome roof
JPH09317185A (en) Construction method of housing
JPH04247175A (en) Level raising method of steel tower for power transmission
JPH09242191A (en) Construction of large span structure
JP2761792B2 (en) Construction method of large space building
JP3128178B2 (en) How to build a tent frame
JP3111446B2 (en) Gas station canopy manufacturing method
JPH1037314A (en) Building and construction method therefor
JPH10219629A (en) Windproof and snowproof fence with spike and its folding and erecting method
JP2871468B2 (en) How to build a building
JPH0489939A (en) Large span truss erecting method
JP2634271B2 (en) Jack-up method and device