JP2854389B2 - Steel construction method - Google Patents
Steel construction methodInfo
- Publication number
- JP2854389B2 JP2854389B2 JP16941090A JP16941090A JP2854389B2 JP 2854389 B2 JP2854389 B2 JP 2854389B2 JP 16941090 A JP16941090 A JP 16941090A JP 16941090 A JP16941090 A JP 16941090A JP 2854389 B2 JP2854389 B2 JP 2854389B2
- Authority
- JP
- Japan
- Prior art keywords
- crane
- steel frame
- tower crane
- block
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【発明の詳細な説明】 「産業上の利用分野」 本発明は、小型クレーンのみで可能な高層若しくは長
辺建物に適した鉄骨建方方法に関する。Description: TECHNICAL FIELD The present invention relates to a steel frame construction method suitable for a high-rise or long-sided building that can be realized only with a small crane.
「従来の技術」 従来、高層若しくは長辺建物における鉄骨建方は、タ
ワークレーンをクライミングさせながら逐次増加する高
さに対応させながら建方をしていくか、一方、長辺建物
に対応し得る移動式クレーン方式では、高層になるにつ
れブームを継足しするか、あるいは大型クレーンに機種
変更をして施工している。"Conventional technology" Conventionally, steel frame construction in a high-rise or long-sided building can be done while climbing a tower crane while corresponding to a height that gradually increases, or on the other hand, it can correspond to a long-sided building In the mobile crane method, the boom is added as the height of the building increases, or the model is changed to a large crane for construction.
「発明が解決しようとする課題」 従来の技術では、クライミングクレーンを用いる場合
も移動式クレーンを用いる場合も、いずれの場合にもク
レーンは建物の外側に設置しなければならず、建物敷地
のほかにクレーン据付のためのかなり広い余分なスペー
スとクレーン設備のための基礎工事または地盤の養生を
要するのであるが、ほとんどの現場は、周囲に建物が密
集していることが多いことなどにより、スペースの確保
が不可能なケースもあり得、大型クレーンの場合にいた
っては、なをさら設置が困難化しているのが実情であ
る。"Problems to be solved by the invention" With the conventional technology, in both cases of using a climbing crane and a mobile crane, the crane must be installed outside the building, Requires extra space for crane installation and foundation work for the crane equipment or ground curing.However, most of the sites are often congested due to densely populated buildings. In some cases, it is not possible to secure a large crane, and in the case of a large crane, the fact is that the installation becomes even more difficult.
又、例え、場所的な要件が充たされたとしても、建方
の進行に伴ない、クライミング、ブームの継ぎ足しでク
レーンは長大化するため、これを考慮してクレーンの規
模を設定しておかねばならないから、結局は当初から完
成建物規模に適用可能な大きな規模のクレーン基台を設
置しておかなければならないこととなる。Even if locational requirements are satisfied, the crane length will increase due to climbing and boom extension as the construction progresses. As a result, a large crane base that can be applied to the size of the completed building must be installed from the beginning.
一方、大型クレーンの場合は、当初には不必要な機能
を具備したまま稼動することとなる。On the other hand, in the case of a large crane, the crane is initially operated with unnecessary functions.
叙上の如く、高層若しくは長辺建物の鉄骨建方におけ
るクレーンの操業に関しては、不便,不合理がある。As described above, there is inconvenience and irrational operation of the crane in the steel frame construction of a high-rise or long-sided building.
本発明は、建物敷地のほかにクレーン設置用のスペー
スを別途要することがなく、また、必要とするクレーン
も建方中の小区画ブロックに対応し得る小型クレーンで
なし得る鉄骨建方方法を提供することを目的としてい
る。The present invention provides a steel frame construction method that does not require a separate space for crane installation in addition to the building site, and that the required crane can be a small crane that can correspond to the small block under construction. It is intended to be.
「課題を解決するための手段」 上記目的を達成するために、本発明の鉄骨建方方法に
おいては、低階層ブロックの鉄骨を小型の移動式クレー
ンにて建方後、当該低階層ブロック上に走行レールを布
設したうえ、この上に小型のタワークレーンを内部設置
し、当該タワークレーンを走行させて上層ブロックの鉄
骨建方を、タワークレーンのタワーの移動線に位置する
最上端以外の本設梁はクレーン移動後に後付けする要領
にてとり行ない、次いで、当該上層ブロック上端に仮設
の仮受梁を介してタワークレーンをクライミングさせる
と共に走行レールの盛替えをしてタワークレーンを上層
ブロックの階に盛替え、以下この手順を繰返して所望
階,所望長辺の建物の鉄骨建方をなすとしたものであ
る。"Means for Solving the Problems" In order to achieve the above object, in the steel frame construction method of the present invention, after the steel frame of the low-level block is erected with a small mobile crane, After laying travel rails, a small tower crane is installed inside the rails, and the tower crane is driven to move the steel frame of the upper block to the main building except for the top end located on the tower crane's movement line. After the crane is moved, the beam is removed in a manner that will be retrofitted, and then the tower crane is climbed via a temporary temporary support beam at the upper end of the upper block, and the traveling rails are repositioned to move the tower crane to the upper block floor This procedure is repeated, and the procedure is repeated to form a steel frame of a building having a desired floor and a desired long side.
「作用」 上記のように構成された方法で鉄骨建方をとり行なう
と、先ず基礎となる低階層ブロックは小型の移動式クレ
ーンで建方され、次いで、上層ブロックは順次小型で移
動式のタワークレーンがクライミングして上階に盛替え
されながら建方し得ることとなる。[Operation] When a steel frame is erected by the method configured as described above, first, the base low-level blocks are erected by a small mobile crane, and then the upper blocks are sequentially small and mobile towers. The crane will be able to climb and build while being relocated to the upper floor.
しかして、既設架構を上層ブロック建方用のクレーン
の設置基盤,走行路として利用するので、建物敷地外に
クレーン設置,走行スペースを別段確保する要はない。Since the existing frame is used as an installation base and a traveling path for the crane for the upper block construction, there is no need to separately install a crane and secure a traveling space outside the building site.
又、当該タワークレーンは、移動し、且つクライミン
グするものであるから極く狭い作業範囲に有効であれば
よいこととなり合理的である。In addition, since the tower crane moves and climbs, it is reasonable that the tower crane is effective only in an extremely narrow working range.
「実施例」 実施例について図面を参照して説明すると、第1図,
第2図は上端が階段状となる場合の高層若しくは長辺建
物についての実施態様を示す。"Example" An example will be described with reference to the drawings.
FIG. 2 shows an embodiment of a high-rise or long-sided building in which the upper end is stepped.
高層若しくは長辺建物の鉄骨架構1における低階層ブ
ロック2は、先ず小型の移動式クレーンにて建方される
(図示省略)。The low-rise block 2 in the steel frame 1 of a high-rise or long-side building is first constructed by a small mobile crane (not shown).
次いで、第2図aに示す如く、当該低階層ブロック2
上に走行レール3を布設して、この上に小型のタワーク
レーン4を搭載、つまり内部設置する。尚、図では布設
レール3は一部に敷設のもののみを画いてある。このタ
ワークレーン4は移動可であるから、前記の低階層ブロ
ック2と同様にして上層ブロック5の鉄骨を建方するこ
とが出来る。この際、第2図bに示される如く、タワー
クレーン4のタワー4aが、移動時建方中のブロックの本
設梁6,6′に遮えぎられることのないように、このもの
はクレーン4が移動した後に後付けする要領のもとにな
されねばならない。但し、最上端の本設梁6′は、後述
する上階に盛替えされたクレーン4の走行を遮えぎるこ
ととなるので、後付けはしてはならない。Next, as shown in FIG.
The traveling rail 3 is laid on the upper part, and the small tower crane 4 is mounted thereon, that is, installed inside. In the drawing, only the laying rail 3 is partially laid. Since the tower crane 4 is movable, it is possible to build the steel frame of the upper block 5 in the same manner as the above-described low-layer block 2. At this time, as shown in FIG. 2b, the tower crane 4 is mounted on a crane so that the tower 4a of the tower crane 4 is not blocked by the main beams 6, 6 'of the block being moved. It must be done in a manner that will be added after 4 has moved. However, since the uppermost permanent beam 6 'blocks the traveling of the crane 4 which has been relocated to the upper floor, which will be described later, it must not be retrofitted.
上層ブロック5の鉄骨建方が完了したならば、第2図
aに明示される如くブロック5の上端に仮受梁7を仮設
し、これにタワー4aに組付いている回転台4bを掛止させ
て反力を取りつつタワー4aをクライミング上昇させると
共にブロック5に敷設のレール3を上階に盛替えて、ク
レーン4を上階に盛替える。この際、ブロック5の最上
端の梁6′は上述の如く未設で架構が不安定であるの
で、少なくともクライミング部については、仮設の梁
(図示省略)を付設して補強するを良しとする。ブロッ
ク5内に盛替えされたクレーン4は、同じ要領でもって
上方ブロック8の鉄骨建方を行なう。When the steel construction of the upper block 5 is completed, a temporary receiving beam 7 is temporarily installed on the upper end of the block 5 as shown in FIG. 2a, and the turntable 4b attached to the tower 4a is hooked on this. Then, the tower 4a is climbed upward while taking a reaction force, and the rail 3 laid on the block 5 is changed to the upper floor, and the crane 4 is changed to the upper floor. At this time, since the beam 6 'at the uppermost end of the block 5 is not provided as described above and the frame is unstable, it is preferable to provide a temporary beam (not shown) and to reinforce at least the climbing portion. . The crane 4 replaced in the block 5 constructs the upper block 8 in the same manner.
以下、この工程を上方に繰返す。 Hereinafter, this step is repeated upward.
第1図は、このクレーン4の盛替え過程を示してい
る。最上階の建方を完了したところで、クレーン4は解
体用クレーン(図示省略)で解体する。尚、上方に順次
盛替えされるクレーン4に対する資材の供給は既設架構
内に設置の揚重装置(図示省略)を介してとり行なえば
良い。FIG. 1 shows the process of changing the crane 4. When the construction of the top floor is completed, the crane 4 is dismantled by a dismantling crane (not shown). It should be noted that the supply of materials to the cranes 4 which are sequentially rearranged upward may be performed via a lifting device (not shown) installed in the existing frame.
「発明の効果」 本発明は、以上説明したように構成されているので、
以下に記載されるような効果を奏する。[Effect of the Invention] Since the present invention is configured as described above,
The following effects are obtained.
(1)高層若しくは長辺建物の鉄骨建方を建物敷地外に
クレーン設置用スペースを確保する必要無くしてなし得
る。(1) The steel frame construction of a high-rise or long-sided building can be achieved without having to secure a crane installation space outside the building site.
(2)高層若しくは長辺建物の鉄骨建方が、規模の大き
なクレーンを一切必要とせずに、小型のクレーンのみで
可能となる。(2) The steel frame construction of a high-rise or long-sided building can be achieved with only a small crane without any need for a large-scale crane.
第1図は、上端が階段状となる場合の高層若しくは長辺
建物における本発明方法のクレーンの盛替え過程を示す
説明図、第2図a,bは、本発明方法におけるクレーン盛
替え手段を示す正,側面図である。 1……鉄骨架構、2……低階層ブロック、3……走行レ
ール、4……タワークレーン、4a……タワークレーン、
4b……回転台、5……上層ブロック、6,6′……本設
梁、7……仮受梁、8……上方ブロック。FIG. 1 is an explanatory view showing a crane reordering process of the method of the present invention in a high-rise or long-sided building when the upper end is stepped. FIGS. 2a and 2b show crane reordering means in the method of the present invention. FIG. 1 ... steel frame, 2 ... low-level block, 3 ... travel rail, 4 ... tower crane, 4a ... tower crane,
4b: turntable, 5: upper block, 6, 6 ': permanent beam, 7: temporary beam, 8: upper block.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 甲野 裕之 広島県広島市中区橋本町10番10号 株式 会社竹中工務店広島支店内 (56)参考文献 特開 昭48−78727(JP,A) 特開 昭48−54727(JP,A) (58)調査した分野(Int.Cl.6,DB名) E04G 21/14 - 21/18──────────────────────────────────────────────────続 き Continuation of the front page (72) Inventor Hiroyuki Kono 10-10 Hashimotocho, Naka-ku, Hiroshima-shi, Hiroshima Takenaka Corporation Hiroshima Branch (56) References JP-A-48-78727 (JP, A) JP-A-48-54727 (JP, A) (58) Fields investigated (Int. Cl. 6 , DB name) E04G 21/14-21/18
Claims (1)
ーンにて建方後、当該低階層ブロック上に走行レールを
布設したうえ、この上に小型のタワークレーンを内部設
置し、当該タワークレーンを走行させて上層ブロックの
鉄骨建方を、タワークレーンのタワーの移動線に位置す
る最上端以外の本設梁はクレーン移動後に後付けする要
領にてとり行ない、次いで、当該上層ブロック上端に仮
設の仮受梁を介してタワークレーンをクライミングさせ
ると共に走行レールの盛替えをしてタワークレーンを上
層ブロックの階に盛替え、以下この手順を繰返して所望
階,所望長辺の建物の鉄骨建方をなすとしたことを特徴
とする鉄骨建方方法。After a steel frame of a low-level block is built with a small mobile crane, a traveling rail is laid on the low-level block, and a small tower crane is installed on the rail. The main building beam other than the uppermost one located on the movement line of the tower crane is installed in a manner that will be retrofitted after the crane has been moved. The tower crane is climbed via the temporary support beam and the traveling rails are rearranged, and the tower crane is rearranged to the floor of the upper block. This procedure is then repeated to determine the steel frame construction of the desired floor and the desired long side building. A steel frame construction method characterized by the fact that it has been done.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16941090A JP2854389B2 (en) | 1990-06-27 | 1990-06-27 | Steel construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP16941090A JP2854389B2 (en) | 1990-06-27 | 1990-06-27 | Steel construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0460062A JPH0460062A (en) | 1992-02-26 |
JP2854389B2 true JP2854389B2 (en) | 1999-02-03 |
Family
ID=15886085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP16941090A Expired - Fee Related JP2854389B2 (en) | 1990-06-27 | 1990-06-27 | Steel construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2854389B2 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007004380A1 (en) | 2005-07-01 | 2007-01-11 | Konica Minolta Holdings, Inc. | Organic electroluminescent element material, organic electroluminescent element, display device, and lighting equipment |
CN104047433B (en) * | 2014-06-20 | 2016-03-02 | 中建五局第三建设有限公司 | Installation method of section steel beam in steel structure engineering |
-
1990
- 1990-06-27 JP JP16941090A patent/JP2854389B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH0460062A (en) | 1992-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760529A (en) | Roof system steel truss slipping and assembling operation platform and installation method | |
JP2000282691A (en) | Construction method for mounting member on inner wall of high-rise, tower structure, and scaffold device | |
CN206319610U (en) | Roof system steel truss slipping and assembling construction platform structure | |
JP2854389B2 (en) | Steel construction method | |
JP3049300B2 (en) | Construction method of beam truss in building with overhead traveling crane | |
JP2745004B2 (en) | Steel construction method | |
JP2845060B2 (en) | Construction method of underground construction by fully automatic building construction system | |
JP2871468B2 (en) | How to build a building | |
JP3073371B2 (en) | Tower-like structure erection method and equipment | |
KR200182858Y1 (en) | Moving work deck for constructing a core section of building | |
JP2779258B2 (en) | Roof lift-up method | |
JPH01121460A (en) | Method of installing safety handrail in frame base landing bridge | |
JP2832278B2 (en) | Building method | |
JP3532161B2 (en) | Tower construction machine and tower construction method | |
JP3239154B2 (en) | Lift-up device for all-weather temporary roof | |
JP2876991B2 (en) | Steel frame method for high-rise buildings | |
JP3225455B2 (en) | How to build a building | |
JP3174678B2 (en) | Tower-like structure erection equipment | |
JP2621748B2 (en) | All-weather temporary shed | |
KR100472639B1 (en) | The installation method of lift car for multistoried building's construction, using core preceding construction method | |
JP3079326B2 (en) | All-weather construction method | |
JP3066218B2 (en) | Rotation erection method and its rotation device | |
JP2590671B2 (en) | Construction method of steel frame using overhead crane frame | |
KR960002379B1 (en) | A form-less style working method and a structure apparatus for underground constructions | |
JPH04166562A (en) | Construction of pc building by portal crane |