JP2810853B2 - How to install diagonal cable - Google Patents

How to install diagonal cable

Info

Publication number
JP2810853B2
JP2810853B2 JP22138094A JP22138094A JP2810853B2 JP 2810853 B2 JP2810853 B2 JP 2810853B2 JP 22138094 A JP22138094 A JP 22138094A JP 22138094 A JP22138094 A JP 22138094A JP 2810853 B2 JP2810853 B2 JP 2810853B2
Authority
JP
Japan
Prior art keywords
strand
strands
fixing
tension
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP22138094A
Other languages
Japanese (ja)
Other versions
JPH0885916A (en
Inventor
昭好 鈴木
渡 大橋
洋 木部
雅光 武井
茂雄 庄司
公雄 峰
利邦 坂吉
茂樹 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
SE Corp
Original Assignee
JFE Steel Corp
SE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp, SE Corp filed Critical JFE Steel Corp
Priority to JP22138094A priority Critical patent/JP2810853B2/en
Publication of JPH0885916A publication Critical patent/JPH0885916A/en
Application granted granted Critical
Publication of JP2810853B2 publication Critical patent/JP2810853B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、斜張橋や吊り橋等の構
造物に使用される斜材ケーブルの架設方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for laying a diagonal cable used for a structure such as a cable-stayed bridge or a suspension bridge.

【0002】[0002]

【従来の技術】従来、例えば、図2に示すような斜張橋
の斜材ケーブル1を、主塔2と主桁3の両定着部の間に
所要の緊張力で緊張・架設させるには、図3に示すよう
に、例えば、主塔側の定着部におけるアンカーヘッド2
aの貫通孔からストランド1aを送出し装置等でドラム
から供給して主桁側へと送り出す。
2. Description of the Related Art Conventionally, for example, it is necessary to tension and bridge a cable 1 of a cable-stayed bridge as shown in FIG. 2 between a fixing portion of a main tower 2 and a main girder 3 with a required tension. As shown in FIG. 3, for example, the anchor head 2 in the anchoring section on the main tower side
The strand 1a is sent out from the through hole a and supplied from the drum by an apparatus or the like and sent out to the main girder side.

【0003】そして、主桁側の定着部においては、スト
ランド1aのPE被覆を剥がして露出させたストランド
を、アンカーヘッド3aの貫通孔へガイド棒等で接続し
てガイドさせながら挿通させ、二つ割りのクサビ4a,
4bを前記貫通孔に差し込んで定着させる。
In the fixing section on the main girder side, the strand exposed by peeling off the PE coating of the strand 1a is connected to a through hole of the anchor head 3a by a guide rod or the like and inserted while being guided, and is divided into two parts. Wedge 4a,
4b is inserted into the through hole and fixed.

【0004】一方、主塔側では、前記ストランド1aを
適宜な箇所において切断し、PE被覆を該切断面から所
要長さ分を剥がしてストランドを露出させ、クサビ4
a,4bをアンカーヘッド2aの貫通孔に差し込み、前
記ストランドを把持させてストランド1aを定着させ
る。
On the other hand, on the main tower side, the strand 1a is cut at an appropriate place, the PE coating is peeled off from the cut surface by a required length to expose the strand, and the wedge 4a is removed.
a, 4b are inserted into the through holes of the anchor head 2a, and the strand is gripped to fix the strand 1a.

【0005】その後、センターホール型のジャッキ5を
定着部にセットし、各ストランド1aをそれぞれ緊張さ
せる。その緊張量は、ジャッキ5の伸長量によって決め
られて各ストランド1aの緊張量が揃えられる。その
後、アンカーヘッド2aを大型ジャッキで引っ張りその
移動した分だけ定着ナットを締め込むことで全ストラン
ド1aを纏めて所定量引っ張り、最終的な緊張・定着を
行う。
[0005] Thereafter, a center hole type jack 5 is set in the fixing section, and each strand 1a is tensioned. The amount of tension is determined by the amount of extension of the jack 5, and the amount of tension of each strand 1a is made uniform. Thereafter, the anchor head 2a is pulled by a large jack, and the fixing nut is tightened by an amount corresponding to the movement, so that all the strands 1a are collectively pulled by a predetermined amount, and final tension and fixing are performed.

【0006】そして、全ストランド1aをクランプ等で
一本に束ねて、これに合成樹脂製等による防錆用外套保
護管を全長に亘って被覆し、主塔と主桁の定着部間に斜
材ケーブル1を架設するものである。
[0006] Then, all the strands 1a are bundled together by a clamp or the like, and this is covered with a rust-preventive mantle protection tube made of synthetic resin or the like over the entire length, and an oblique portion is provided between the main tower and the fixing portion of the main girder. The material cable 1 is erected.

【0007】[0007]

【発明が解決しようとする課題】しかしながら、前記各
ストランド1aの緊張量は、主塔と主桁の両定着部間に
架設した時の張設状態が実際には各々異なっているの
で、例えば、19本のストランド1aを各々ジャッキで
引っ張りその後全体を引っ張っても、各ストランド1a
の緊張量が同じになることはなく、理想的な架設状態と
言えないものであった。また、ストランドの端部にマー
クなどを付けて、このマークを基準に定着させようとし
ても、実際に多数のストランドのマークを揃えて定着具
を定着するのは困難な作業で手間が掛かるものであっ
た。
However, the tension amount of each of the strands 1a is different from each other because the tension state when the strands are erected between the fixing portions of the main tower and the main girder is actually different. Even if each of the 19 strands 1a is jacked and then the entire strand is pulled, each strand 1a
The amount of tension was not the same, and it could not be said that it was an ideal erection state. Also, even if a mark or the like is attached to the end of the strand and fixing is performed based on this mark, it is difficult and time-consuming to actually align the marks of many strands and fix the fixing device. there were.

【0008】本発明は、上記の課題に鑑みてなされたも
ので、複数本のストランドの緊張量を同じにして、か
つ、緊張作業が容易な斜材ケーブルの架設方法を提供す
ることを目的とする。
SUMMARY OF THE INVENTION The present invention has been made in view of the above problems, and has as its object to provide a method for laying a diagonal cable in which a plurality of strands have the same amount of tension and which can be easily tensioned. I do.

【0009】[0009]

【課題を解決するための手段】本発明の上記課題を解決
し上記目的を達成するための要旨は、PC鋼線若しくは
PC鋼より線からなる複数のストランドの両端部を主桁
側と主塔側の両定着部間に架設して、各ストランドを引
張り手段で所要の緊張力で緊張させて定着する斜材ケー
ブルの架設方法において、前記各ストランドを所定の長
さに切り揃えて前記両定着部間に架設し、当該各ストラ
ンドの両端部における前記両定着部からの突出量の和が
等しくなるように前記各ストランドを引張り手段で緊張
・定着させることである。
The gist of the present invention to solve the above-mentioned problems and to achieve the above-mentioned object is to form both ends of a plurality of strands made of PC steel wire or PC steel wire into a main girder side and a main tower. In the method of laying a diagonal cable, which is installed between the two fixing sections on the side, and is fixed by tensioning each strand with a required tension by a pulling means, the respective strands are trimmed to a predetermined length and the two fixing sections are fixed. In this case, each strand is tensioned and fixed by tension means so that the sum of the amounts of protrusion from both fixing portions at both ends of each strand is equal.

【0010】[0010]

【作用】本発明に係る斜材ケーブルの架設方法によれ
ば、主塔と主桁の両定着部から突出した各ストランドの
長さの和が等しいことで、一カ所の斜材ケーブルにおけ
る複数(例えば、19本)のストランドに付与された緊
張力が等しくなる。
According to the method for laying a diagonal cable according to the present invention, the sum of the lengths of the strands protruding from both anchoring portions of the main tower and the main girder is equal, so that a plurality of ( For example, the tension applied to (19) strands becomes equal.

【0011】よって、一斜材ケーブルの各ストランドを
ジャッキで緊張させるときに、例えば、主桁側の定着部
からのストランドの突出量が各々のストランドで異なっ
ていても、主塔側の定着部でストランドの出量が総和で
等しくなるように各々調整することで、均一な緊張力を
付与することが出来るものである。このように、ストラ
ンドにマーク等を付けて緊張力を均一化するような手間
が掛からなく容易な緊張作業となるものである。
Therefore, when each of the strands of the single-cable cable is tensioned by the jack, for example, even if the projecting amount of the strand from the fixing portion on the main girder side is different for each strand, the fixing portion on the main tower side. By adjusting each so that the output of the strands becomes equal in total, a uniform tension can be applied. In this way, it is possible to easily perform the tensioning work without taking the trouble of making the marks or the like on the strands to equalize the tension.

【0012】[0012]

【実施例】次に、本発明に係る一実施例について図面を
参照して詳細に説明する。なお、従来例に対応する部分
には同一符号を付けて説明する。
Next, an embodiment of the present invention will be described in detail with reference to the drawings. Parts corresponding to those of the conventional example will be described with the same reference numerals.

【0013】本発明に係る斜材ケーブルの架設方法にお
いては、図1に示すように、まず、一斜材ケーブルを構
成する19本のストランド1a,1b,…を用意し、こ
れらの長さを主塔側と主桁側の両定着部2a,3a間に
必要な所定の長さに切り揃える。
In the method for laying a diagonal cable according to the present invention, first, as shown in FIG. 1, 19 strands 1a, 1b,... The required length between the fixing sections 2a, 3a on the main tower side and the main girder side is trimmed to a required length.

【0014】そして、切り揃えた各ストランド1a,1
b,…の合計19本をそれぞれドラムに巻装する。
Then, each of the trimmed strands 1a, 1
Each of a total of 19 b,... is wound around a drum.

【0015】前記ドラムを現場の主桁上に運び込み、こ
のドラムと送り出し装置から主塔の足場を介して主塔側
の定着部へとストランドを送り出す。
The drum is carried on a main girder at the site, and the strand is sent out from the drum and a delivery device to a fixing section on the main tower side via a scaffold of the main tower.

【0016】次に、主塔側の定着部のアンカーヘッド2
aから、ストランド1aを貫通孔に挿通させて主桁側の
定着部へと送り出す。主桁側では、送り出されてきたス
トランド1aにPE製被覆部があれば、この被覆部を所
要範囲において剥がす作業を行う。
Next, the anchor head 2 in the fixing section on the main tower side
a, the strand 1a is passed through the through hole and sent out to the fixing section on the main girder side. On the main girder side, if there is a PE coating portion on the fed strand 1a, the work of peeling this coating portion within a required range is performed.

【0017】そして、主桁側の定着部におけるアンカー
ヘッド3aの貫通孔にガイド防等を使用して挿通させ
て、クサビ4a,4bによってストランド1aの先端部
をアンカーヘッド3aに定着させる。この場合、定着部
からのストランド先端部の突出量L1は、一定の長さに
設定する必要がない。目視にておよその長さになってい
れば良く、ラフに設定することが出来るものである。
Then, the tip of the strand 1a is fixed to the anchor head 3a by the wedges 4a and 4b by being inserted into the through hole of the anchor head 3a in the fixing portion on the main girder side using a guide block or the like. In this case, the projecting amount L1 of the tip of the strand from the fixing unit does not need to be set to a fixed length. What is necessary is just to be approximately the length visually, and it can be set roughly.

【0018】一方、主塔側の定着部においても、PE製
被覆部があればこの被覆部を所要範囲において剥がし、
クサビ4a,4bでアンカーヘッド2aにストランド1
aを定着させる。
On the other hand, also in the fixing section on the side of the main tower, if there is a coating section made of PE, this coating section is peeled off in a required range,
Strand 1 on anchor head 2a with wedges 4a and 4b
a is fixed.

【0019】そして、残りの各ストランド1b,1c,
…を、上記と同様にして主塔側と主桁側の両定着部間に
合計19本架設する。
The remaining strands 1b, 1c,
Are installed between the fixing sections on the main tower side and the main girder side in the same manner as above.

【0020】次に、主塔側の定着部において、ジャッキ
により前記ストランドを順に緊張させるのであるが、主
桁側の定着部におけるストランド先端部の突出量L1は
各ストランドごとに異なっているので、主塔側の定着部
における突出量L2と前記突出量L1との合計値k=L1
+L2が一定になるような突出量L2にして、各ストラン
ドをジャッキで緊張させる。
Next, in the fixing section on the main tower side, the strands are sequentially tightened by jacks. The amount of protrusion L1 of the tip of the strand in the fixing section on the main girder side differs for each strand. The total value k = L1 of the protrusion amount L2 and the protrusion amount L1 in the fixing section on the main tower side.
Each of the strands is jacked with the amount of protrusion L2 so that + L2 becomes constant.

【0021】前記19本の各ストランド1a,1b,1
c,…について、上記のように突出量の合計値kを一定
にすることで、ストランドの全体長さがLにて全部同じ
になっていることから、主塔側と主桁側の両定着部間の
各ストランドの長さL3が、L3=L−kであって結果的
に全部のストランドで等しい長さとなる。
Each of the 19 strands 1a, 1b, 1
With respect to c,..., the total length k of the protrusions is kept constant as described above, so that the entire length of the strand is the same at L, so that both the main tower side and the main girder side are fixed. The length L3 of each strand between the parts is L3 = Lk, and consequently all the strands have the same length.

【0022】よって、前記19本の各ストランドの前記
両定着部間の緊張力は等しくなり、その後、アンカーヘ
ッド2aを大型ジャッキで所定量引っ張って、定着ナッ
トで全ストランドを緊張・定着させる。
Therefore, the tension between the two fixing portions of the nineteen strands becomes equal. Thereafter, the anchor head 2a is pulled by a predetermined amount by a large jack, and all the strands are tensioned and fixed by the fixing nut.

【0023】そして、前記19本のストランドを束ねて
外套保護管を全長に亘り被覆させ、該外套保護管内に防
錆材等をグラウトする。このようにして、一斜材ケーブ
ルの架設が完了するものである。
Then, the 19 strands are bundled to cover the outer jacket protection tube over the entire length, and a rust preventive or the like is grouted in the outer jacket protection tube. In this way, the installation of the one-cable cable is completed.

【0024】[0024]

【発明の効果】以上説明したように、本発明に係る斜材
ケーブルの架設方法は、PC鋼線若しくはPC鋼より線
からなる複数のストランドの両端部を主桁側と主塔側の
両定着部間に架設して、各ストランドを引張り手段で所
要の緊張力で緊張させて定着する斜材ケーブルの架設方
法において、前記各ストランドを所定の長さに切り揃え
て前記両定着部間に架設し、当該各ストランドの両端部
における前記両定着部からの突出量の和が等しくなるよ
うに前記各ストランドを引張り手段で緊張・定着させる
こととしたので、片方の定着部で各ストランドの突出量
を一定値に設定することなくラフに設定でき作業が容易
となり、工期の短縮になるとともに、各ストランドの緊
張力を均一に設定する際の確実性が確保されると言う優
れた効果を奏する。
As described above, according to the method for laying a diagonal cable according to the present invention, both ends of a plurality of strands composed of PC steel wires or PC steel strands are fixed to both the main girder side and the main tower side. In the method of laying a diagonal cable, which is laid between the fixing portions, and each strand is tensioned with a required tension by a tensioning means and fixed, the respective strands are trimmed to a predetermined length and laid between the fixing portions. Then, the respective strands are tensioned and fixed by the pulling means so that the sum of the protruding amounts from both fixing portions at both ends of the respective strands is equal, so that the protruding amount of each strand at one fixing portion is Can be set roughly without having to set a constant value, which facilitates the work, shortens the construction period, and has an excellent effect of ensuring the certainty in setting the tension of each strand uniformly.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る架設方法の説明図である。FIG. 1 is an explanatory view of a erection method according to the present invention.

【図2】従来例に係る斜張橋の斜材ケーブルの架設方法
の説明図である。
FIG. 2 is an explanatory diagram of a method of erection of a diagonal cable of a cable stayed bridge according to a conventional example.

【図3】同従来例に係る斜材ケーブルの架設方法の説明
図である。
FIG. 3 is an explanatory diagram of a method of erection of a diagonal cable according to the conventional example.

【符号の説明】[Explanation of symbols]

1 斜材ケーブル、 1a,1b,1c ストランド、 2 主塔、 2a 主塔側のアンカーヘッド、 3 主桁、 3a 主桁側のアンカーヘッド、 4a,4b クサビ、 L1,L2 定着部からのストランドの突出量、 L ストランドの全長。 1 diagonal cable, 1a, 1b, 1c strand, 2 main tower, 2a anchor head on main tower side, 3 main girder, 3a anchor head on main girder side, 4a, 4b wedge, L1, L2 Strand from anchoring section Projection length, L Total length of strand.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 大橋 渡 東京都千代田区二番町12番地 株式会社 エスイー内 (72)発明者 木部 洋 東京都千代田区二番町12番地 株式会社 エスイー内 (72)発明者 武井 雅光 千葉県千葉市中央区新浜町1番地 川鉄 テクノワイヤ株式会社内 (72)発明者 庄司 茂雄 千葉県千葉市中央区新浜町1番地 川鉄 テクノワイヤ株式会社内 (72)発明者 峰 公雄 東京都千代田区内幸町2丁目2番3号 川崎製鉄株式会社東京本社内 (72)発明者 坂吉 利邦 東京都千代田区内幸町2丁目2番3号 川崎製鉄株式会社東京本社内 (72)発明者 中村 茂樹 東京都千代田区内幸町2丁目2番3号 川崎製鉄株式会社東京本社内 (58)調査した分野(Int.Cl.6,DB名) E01D 11/04 E01D 21/00──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Wataru Ohashi 12th, Nibancho, Chiyoda-ku, Tokyo SAI Co., Ltd. (72) Inventor Hiroshi Kibe 12th, Nibancho, Chiyoda-ku, Tokyo Sui Co., Ltd. (72 ) Inventor Masamitsu Takei 1-Shinhama-cho, Chuo-ku, Chiba-city, Chiba Pref. In the Kawatetsu Technowire Co., Ltd. Kimio Kimio, 2-3-2 Uchisaiwaicho, Chiyoda-ku, Tokyo Kawasaki Steel Corporation, Tokyo Head Office (72) Inventor Toshikuni Sakayoshi 2-3-2, Uchisaiwaicho, Chiyoda-ku, Tokyo Kawasaki Steel Corporation, Tokyo Main Office (72) Inventor Shigeki Nakamura 2-3-2 Uchisaiwai-cho, Chiyoda-ku, Tokyo Kawasaki Steel Corporation Tokyo Head Office (58) Fields surveyed (Int. Cl. 6 , (DB name) E01D 11/04 E01D 21/00

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 PC鋼線若しくはPC鋼より線からなる
複数のストランドの両端部を主桁側と主塔側の両定着部
間に架設して、各ストランドを引張り手段で所要の緊張
力で緊張させて定着する斜材ケーブルの架設方法におい
て、前記各ストランドを所定の長さに切り揃えて前記両
定着部間に架設し、当該各ストランドの両端部における
前記両定着部からの突出量の和が等しくなるように前記
各ストランドを引張り手段で緊張・定着させることを特
徴とする斜材ケーブルの架設方法。
1. Both ends of a plurality of strands made of a PC steel wire or a PC steel strand are bridged between both fixing portions on a main girder side and a main tower side, and each strand is tensioned by a tension means at a required tension. In the method of laying a diagonal cable that is fixed by being tensioned, the respective strands are trimmed to a predetermined length and laid between the two fixing portions, and the projecting amount of both ends of each strand from the both fixing portions is determined. A method for laying a diagonal cable, wherein each of the strands is tensioned and fixed by a tension means so that the sum becomes equal.
JP22138094A 1994-09-16 1994-09-16 How to install diagonal cable Expired - Lifetime JP2810853B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22138094A JP2810853B2 (en) 1994-09-16 1994-09-16 How to install diagonal cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22138094A JP2810853B2 (en) 1994-09-16 1994-09-16 How to install diagonal cable

Publications (2)

Publication Number Publication Date
JPH0885916A JPH0885916A (en) 1996-04-02
JP2810853B2 true JP2810853B2 (en) 1998-10-15

Family

ID=16765881

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22138094A Expired - Lifetime JP2810853B2 (en) 1994-09-16 1994-09-16 How to install diagonal cable

Country Status (1)

Country Link
JP (1) JP2810853B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108625289B (en) * 2018-04-24 2020-10-16 中铁大桥勘测设计院集团有限公司 Erection device and method suitable for suspension bridge stiffening beam

Also Published As

Publication number Publication date
JPH0885916A (en) 1996-04-02

Similar Documents

Publication Publication Date Title
FI78760B (en) MELLANFOERANKRINGSANORDNING FOER FOERSPAENNING AV I FLERE BYGGNADSSKEDEN FRAMSTAELLDA BYGGNADSDELAR OCH ETT FOERFARANDE FOER FRAMSTAELLNING AV EN SAODAN MELLANFOERANKRINGSANORDNING.
US6055691A (en) Method of mounting and tensioning a freely tensioned tension member and device for carrying out the method
US4821474A (en) Post-tensioning anchor
JP2007315035A (en) Installation method of stay cable
JP2721480B2 (en) Precast slab for bridge and its partial replacement method
JP2002519593A (en) Method and apparatus for attaching load transmitting member to cable and suspension bridge provided with the apparatus
JP2810853B2 (en) How to install diagonal cable
US4121325A (en) Cable anchoring and coupling equipment
US3843288A (en) Tendon anchorage with threaded support element
JP2709279B2 (en) Saddle structure for cable-stayed cable on main tower side of cable-stayed bridge
KR20020045792A (en) Method to reinforce pier using steel and thereof apparatus
JP2807845B2 (en) Construction method of diagonal material for Stypanel Bridge
JP2714531B2 (en) How to install diagonal cable
JP3055081B2 (en) How to fix tension material
JPH01219203A (en) Manufacture of oblique cable for diagonal cable bridge
JP2958241B2 (en) Tensioning material erection method and erection drawing device
JP2003286759A (en) Pc anchorage device and method
JP2935957B2 (en) Cable tension fixing method
JPH06317020A (en) Intermediate fixing device for tension member
JPH076169B2 (en) How to install and tension cable-stayed cables
JP2562006B2 (en) Method for sending PC steel strands in cable-stayed bridge and connecting metal fittings for PC steel strands
JPH0881914A (en) Cable covering structure
JP2894223B2 (en) Adhesion transfer method ground anchor
JPS60261811A (en) Tension-anchoring method of diagnoal member cable of diagonal tension bridge
JP2002332636A (en) Anchor cable

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20070731

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080731

Year of fee payment: 10

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080731

Year of fee payment: 10

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080731

Year of fee payment: 10

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090731

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100731

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110731

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110731

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120731

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120731

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130731

Year of fee payment: 15

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term