KR20020045792A - Method to reinforce pier using steel and thereof apparatus - Google Patents

Method to reinforce pier using steel and thereof apparatus Download PDF

Info

Publication number
KR20020045792A
KR20020045792A KR1020000075189A KR20000075189A KR20020045792A KR 20020045792 A KR20020045792 A KR 20020045792A KR 1020000075189 A KR1020000075189 A KR 1020000075189A KR 20000075189 A KR20000075189 A KR 20000075189A KR 20020045792 A KR20020045792 A KR 20020045792A
Authority
KR
South Korea
Prior art keywords
fixing
pier
fixed
steel wire
piers
Prior art date
Application number
KR1020000075189A
Other languages
Korean (ko)
Other versions
KR100400980B1 (en
Inventor
박재만
Original Assignee
박재만
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박재만 filed Critical 박재만
Priority to KR10-2000-0075189A priority Critical patent/KR100400980B1/en
Publication of KR20020045792A publication Critical patent/KR20020045792A/en
Application granted granted Critical
Publication of KR100400980B1 publication Critical patent/KR100400980B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Abstract

PURPOSE: A process for reinforcing a pier is provided to reduce anchoring force for securing the anchor to the pier to prevent damage to the anchor, to extend cross-sectional area of a column portion of the pier, and to increase joint tension force, bending force and anti-vibrational force. CONSTITUTION: The process comprises steps of: mounting an anchor(20) to outer circumferential side of a pier(10); attaching a bracket(30) to be fixed in multi-stages at both ends of the circumferential side; arranging reinforcement bars(40) and securing them to the anchor with a bundle of steel wires; winding steel wires over the reinforcement bars then fixing both ends of the wound wires into a fixture hole of the bracket by means of fixture device and ring; tensioning the wound wires by a tensioning jack; after completing the tensioning, removing the tensioning jack; spreading adhesive on the pier; and installing a cast at outer side of the pier and introducing concrete into the cast then curing the concrete.

Description

강선을 이용한 교각 보강공법 및 그 장치{METHOD TO REINFORCE PIER USING STEEL AND THEREOF APPARATUS}Pier reinforcement method using steel wire and its device {METHOD TO REINFORCE PIER USING STEEL AND THEREOF APPARATUS}

본 발명은 강선을 이용한 교각 보강공법 및 그 장치에 관한 것으로, 특히 교각의 외주면에 철근을 종방향으로 세워 일정 간격을 두고 배근하고, 강연선과 같은 외부강선을 철근 외측으로 둘러 감아 교각의 양단부에 고정되는 정착 브래키트에 긴장시켜 고정한 후, 콘크리트를 타설 양생시킴으로써 교각의 컬럼부의 단면을 확대함과 아울러 조임 인장력 및 휨 보강력을 증대시킬 수 있고, 내진력을 증대시킬 수 있도록 한 강선을 이용한 교각 보강공법 및 그 장치에 관한 것이다.The present invention relates to a pier reinforcement method using a steel wire and its apparatus, in particular reinforcing bars at a predetermined interval in the longitudinal direction of the reinforcing bar on the outer peripheral surface of the pier, and wound around the outside of the reinforcing steel wire, such as strand wire to be fixed to both ends of the pier After tensioning and fixing to the anchoring bracket, the concrete is poured and cured to enlarge the cross section of the column of the pier, and to increase the tightening tension and bending reinforcement, and to strengthen the pier using steel wire to increase the seismic force. It relates to a construction method and an apparatus thereof.

일반적으로 교각의 보강공법에는 단면 확대공법이나 탄소섬유나 유리섬유와 같은 섬유를 이용한 섬유접착공법이 있으나, 앵커 설치에 의한 기존 구조물의 파손이나 내구성이 지속되기 어려운 문제점이 있었다. 이와 같이 기존 공법의 경우 구조물에 손상을 주거나 내구성이 떨어지는 문제가 발생하여 보수 보강의 목적외에 추가 비용이 소요될 뿐 아니라, 장기적인 교량 구조물 유지 관리 측면에서 손상으로 인한 하자 발생을 초래할 가능성이 있었다.In general, the bridge reinforcement method has a cross-sectional expansion method or a fiber bonding method using fibers such as carbon fiber or glass fiber, but there is a problem that the damage or durability of the existing structure due to the anchor installation is difficult to maintain. As such, the existing construction method may cause damage to the structure or inferior durability, resulting in additional costs in addition to the purpose of repair and reinforcement, and may cause defects due to damage in terms of long-term bridge structure maintenance.

또한 기존의 교각 보수 보강공법은 일예를 들어 교각의 컬럼부 외주면에 다수개의 앙카를 고정하고, 컬럼부의 외주면에 철근을 종방향으로 세워 일정한 간격을 두고 배열함과 아울러 횡방향으로 교차되게 배열하여 이들 종,횡방향 철근을 묶음철선으로 고정한 후, 이와 같이 배근된 철근의 외측으로 거푸집을 설치하고, 콘크리트를 타설하고 양생하여 교각의 단면을 확대하는 보수 보강공법이 이용되고 있으나, 위에서 설명한 바와 같이, 앵커 설치에 의해 구조물의 손상으로 인하여 내구성이 저하되는 문제점이 있었으며, 이와 같은 공법은 교각의 컬럼부를 조여주는 인장력이 부족하고, 휨 보강력의 증가는 기대할 수 없어 내진을 위한 보수 보강에 적용할 수 없게 되는 문제점이 있었다.In addition, the existing pier repair reinforcement method, for example, fixed a number of anchors on the outer peripheral surface of the column portion of the piers, the reinforcing bars on the outer peripheral surface of the column in the longitudinal direction arranged at regular intervals and arranged to cross in the transverse direction After fixing the longitudinal and transverse reinforcing bars with bundle wires, a reinforcement method is used to expand the cross section of the piers by installing formwork on the outside of the reinforcing bars, placing concrete and curing, and as described above. There is a problem that the durability is degraded due to the damage of the structure by the installation of the anchor, this method lacks the tensile force to tighten the column portion of the piers, increase in flexural reinforcement can not be expected can be applied to repair reinforcement for seismic There was a problem of disappearing.

본 발명은 이와 같은 종래의 문제점 및 결함을 해소하기 위하여 창안한 것으로, 교각의 외주면에 철근을 종방향으로 세워 일정 간격을 두고 배근하고, 강연선과 같은 외부강선을 철근 외측으로 둘러 감아 교각의 양단부에 고정되는 정착 브래키트에 긴장시켜 고정한 후, 콘크리트를 타설 양생시킴으로써 교각의 컬럼부의 단면을 확대함과 아울러 조임 인장력 및 휨 보강력을 증대시킬 수 있고, 내진력을 증대시킬 수 있게 되는 강선을 이용한 교각 보강공법 및 그 장치를 제공하기 위한 것이다.The present invention was devised to solve such a conventional problem and defects, reinforcing bars at a predetermined interval in the longitudinal direction of the reinforcing bars on the outer peripheral surface of the piers, and wrapped around the outer steel wires, such as strands to the outside of the reinforcement to both ends of the piers After tensioning and fixing to the anchoring bracket to be fixed, the concrete is poured and cured to enlarge the cross section of the column of the piers, and to increase the tightening tension and bending reinforcement, and to increase the seismic force. It is to provide a reinforcement method and a device thereof.

도 1 내지 도 7은 본 발명에 관한 도면으로서,1 to 7 are views of the present invention,

도 1 및 도 2는 본 공법에 의해 교각의 컬럼부가 보강된 형태를 보인 사시도 및 측면도.1 and 2 are a perspective view and a side view showing the form of the column portion of the piers reinforced by the present method.

도 3은 도 1의 부분 확대도.3 is a partially enlarged view of FIG. 1;

도 4는 도 1의 종단면도.4 is a longitudinal cross-sectional view of FIG.

도 4는 도 3의 부분 확대도.4 is a partially enlarged view of FIG. 3.

도 5는 정착 브래키트를 발췌하여 보인 사시도.5 is a perspective view showing an extract of the fixing bracket.

도 6은 정착구의 분해사시도.6 is an exploded perspective view of the anchorage.

도 7은 정착 브래키트에 강연선이 정착되는 형태를 보인 분해사시도.Figure 7 is an exploded perspective view showing a form in which the strand is fixed to the fixing bracket.

< 도면의 주요부분에 대한 부호의 설명><Description of the reference numerals for the main parts of the drawings>

10 : 교각11 : 푸팅부10: pier 11: footing part

11a : 고정홈12 : 컬럼부11a: fixing groove 12: column portion

12a : 고정홈20 : 앵커12a: fixing groove 20: anchor

21 : 묶음선30 : 정착 브래키트21: bundle line 30: settlement bracket

30' : 몸체31 : 원호 지지부30 ': body 31: arc support

32 : 측면 지지부33 : 고정판32: side support portion 33: fixed plate

34 : 고정공35 : 지지판34: fixing hole 35: support plate

40 : 철근50 : 강연선40: rebar 50: stranded wire

100 : 고정수단110 : 정착구100: fixing means 110: anchorage

111 : 정착링112 : 쐐기부재111: fixing ring 112: wedge member

이와 같은 목적을 달성하기 위하여 본 발명에 의한 강선을 이용한 교각 보강공법은 교각의 외주면에 앵커를 설치하는 단계와, 상기 교각의 외주면 양단부에 정착 브래키트를 다단으로 부착시키는 단계와, 철근을 배근하여 상기 앵커에 묶음철선으로 고정시키는 단계와, 상기 교각의 철근 외측으로 외부강선을 둘러 감아 상기 외부강선의 양단부를 정착구와 정착링으로 정착 브래키트의 고정공에 고정하는 단계와, 인장잭을 이용하여 외부강선을 인장시키는 단계와, 상기 외부강선의 인장이 완료된 후 인장잭을 제거하는 단계와, 상기 교각에 신구접착제를 살포하는 단계와,상기 교각의 외측으로 거푸집을 설치하고, 콘크리트를 타설하여 양생시키는 단계를 포함하여 구성된다.In order to achieve the above object, the pier reinforcement method using the steel wire according to the present invention comprises the steps of installing an anchor on the outer circumferential surface of the pier, attaching the fixing brackets to both ends of the outer circumferential surface of the pier in multiple stages, Fixing to the anchor with a bundle wire, surrounding the outer steel wire to the outside of the reinforcing bars of the piers, and fixing both ends of the outer steel wire to the fixing holes of the fixing bracket with fixing holes and fixing rings, and using tension jacks. Tensioning the outer steel wire, removing the tension jack after the tensioning of the outer steel wire is completed, spraying a new and old adhesive on the pier, installing formwork to the outside of the pier, and pouring concrete to cure It is configured to include.

그리고, 본 발명에 의한 강선을 이용한 교각 보강장치는 교각의 외주면에 다수개의 앵커가 종,횡방향으로 고정되고, 상기 교각의 양단부에는 정착 브래키트가 적어도 일단 이상 고정되며, 상기 교각의 주위로 다수개의 철근이 종방향으로 세워져 일정한 간격을 두고 배열되어 상기 앵커에 묶음철선으로 고정되고, 각 철근의 하단부는 푸팅부에 형성된 고정홈에 고정되며, 상기 각 단의 양쪽 정착 브래키트에는 강연선과 같은 외부 강선이 교각의 푸팅부를 둘러 감아 조이는 형태로 고정수단에 의해 고정되어 구성된다.In addition, the pier reinforcement apparatus using the steel wire according to the present invention, a plurality of anchors are fixed in the longitudinal, transverse direction on the outer peripheral surface of the pier, the fixing brackets are fixed at least once at both ends of the pier, a plurality of around the pier Four bars are arranged in the longitudinal direction and arranged at regular intervals to be fixed to the anchor by a bundle wire, and the lower end of each bar is fixed to a fixing groove formed in the footing part, and both fixing brackets of each end are provided with an external strand such as a strand wire. The steel wire is configured to be fixed by the fixing means in the form of tightening around the footing portion of the piers.

상기 고정수단은 원호 지지부의 외면 중간부에 복수개의 고정공이 형성된 고정판을 고정하고, 상기 고정판에 고정되는 정착구로 외부강선의 단부를 고정하여 구성된다.The fixing means is configured to fix a fixing plate formed with a plurality of fixing holes in the middle of the outer surface of the arc support portion, and to fix the end of the outer steel wire with a fixing fixture fixed to the fixing plate.

이하, 이와 같은 본 발명의 실시예를 첨부 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, the embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 1 내지 도 7은 본 발명에 관한 도면으로서, 도 1 및 도 2에는 본 공법에 의해 교각의 컬럼부가 보강된 형태를 보인 사시도 및 측면도가 도시되어 있고, 도 3에는 도 1의 부분 확대도가 도시되어 있으며, 도 4에는 도 1의 종단면도, 도 4에는 도 3의 부분 확대도가 각각 도시되어 있다.1 to 7 are views of the present invention, Figures 1 and 2 are a perspective view and a side view showing the form of the column portion of the pier reinforced by the method, and Fig. 3 is a partially enlarged view of FIG. 4, a longitudinal cross-sectional view of FIG. 1 and a partially enlarged view of FIG. 3 are respectively shown.

도면에서 부호 10은 교량의 교각을 보인 것으로, 이 교각(10)은 푸팅부(11)에 컬럼부(12)가 일체로 형성된 형태로 도시되어 있으며, 그 상부의 구성은 도시가생략되어 있다.In the figure, reference numeral 10 denotes a bridge pier, and the bridge 10 is illustrated in a form in which the column part 12 is integrally formed on the footing part 11, and the configuration of the upper part thereof is omitted.

상기한 교각(10)의 외주면에는 다수개의 앵커(20)가 종,횡방향으로 고정되고, 교각(10)의 양단부에는 정착 브래키트(30)가 적어도 일단 이상 고정되어 있다.A plurality of anchors 20 are fixed in the longitudinal and lateral directions on the outer circumferential surface of the pier 10, and at least one fixing bracket 30 is fixed to both ends of the pier 10.

상기 교각(10)의 주변에는 다수개의 철근(40)이 종방향으로 세워져 일정한 간격을 두고 배열되어 상기 앵커(20)에 묶음철선(21)으로 고정되어 있으며, 각 철근(40)의 하단부는 푸팅부(11)에 형성된 고정홈(11a)에 고정되어 있다.A plurality of rebars 40 are erected in the longitudinal direction at the periphery of the piers 10 and are arranged at regular intervals, and are fixed to the anchors 20 by the bundled wires 21, and lower ends of each of the reinforcing bars 40 are loosened. It is fixed to the fixing groove 11a formed in the casting part 11.

상기 각 단의 양쪽 정착 브래키트(30)에는 강연선과 같은 외부 강선(50)이 교각(10)의 푸팅부(11)를 둘러 감아 조이는 형태로 고정수단(100)에 의해 고정되어 있다.External fixing wires 50, such as strands, are fixed to both fixing brackets 30 of the respective stages in the form of being wound around and tightening the footing part 11 of the piers 10.

도 5는 정착 브래키트를 발췌하여 보인 사시도이고, 도 6은 정착구의 분해사시도이며, 도 7은 정착 브래키트에 강연선이 정착되는 형태를 보인 분해사시도로서, 이에 도시한 바와 같이 상기 정착 브래키트(30)는 몸체(30')가 원호 지지부(31)의 양측에 측면 지지부(32)가 일체로 구비된 U형으로 형성되어 있다.5 is an exploded perspective view of the anchoring bracket, Figure 6 is an exploded perspective view of the anchorage, Figure 7 is an exploded perspective view showing the shape of the strand is fixed to the anchoring bracket, as shown in the anchoring bracket ( 30 is formed in a U-shape in which the body 30 'is integrally provided with side support portions 32 on both sides of the arc support portion 31.

상기 고정수단(100)은 원호 지지부(31)의 외면 중간부에 복수개의 고정공(34)이 형성된 고정판(33)을 고정하고, 상기 고정판(33)에 고정되는 정착구(110)로 외부강선(50)의 단부를 고정한 구성으로 되어 있다.The fixing means 100 is fixed to the fixing plate 33 formed with a plurality of fixing holes 34 in the middle of the outer surface of the circular arc support portion 31, the external steel wire as a fixing unit 110 fixed to the fixing plate 33 The end of 50) is fixed.

상기 양쪽 브래키트(30)에 양단부가 고정되는 외부강선(50)에는 예를들어 스트랜드(strand) 한 가닥을 이용하는 것이 바람직하다.For example, it is preferable to use one strand of the strand for the outer steel wire 50 having both ends fixed to the brackets 30.

상기 정착구(110)는 상기 고정판(33)의 고정공(34)에 고정되는 정착링(111)과, 상기 정착링(111)에 삽입되어 그 내측에 삽입되는 외부강선(50)의 단부를 고정하는 복수개의 분할형 쐐기부재(112)로 이루어진다.The fixing unit 110 is fixed to the fixing ring 111 is fixed to the fixing hole 34 of the fixing plate 33, and the end of the outer steel wire 50 is inserted into the fixing ring 111 is inserted into the fixing hole (111) It consists of a plurality of divided wedge member (112).

상기 원호 지지부(31)의 내면 중간부에는 지지판(35)이 고정되어 있으며, 이 지지판(35)은 상기 교각(10)의 컬럼부(12)의 양단 원호부에 형성된 고정홈(12a)에 삽입되어 상기 정착 브래키트(30)가 좌우로 유동됨을 방지하는 역할을 한다.The support plate 35 is fixed to the middle portion of the inner surface of the arc support part 31, and the support plate 35 is inserted into the fixing grooves 12a formed at both ends of the arc part 12 of the column part 12 of the piers 10. And serves to prevent the fixing bracket 30 from flowing from side to side.

상기한 바와 같은 본 발명을 적용하여 교량이 교각을 보수 보강함에 있어서는 먼저 교량 구조물의 현장 조사기 교각(10)의 규격 및 끝단의 반경을 정확히 실측한다. 이후 공장에서 제작한 정착 브래키트(30)와 정착구(110) 및 긴장장치를 작업위치로 이동시킨다.In applying the present invention as described above, when the bridge repairs and reinforces the bridge, first, the size and radius of the end of the field surveyor bridge 10 of the bridge structure is accurately measured. After that, the fixing bracket 30 and the fixing device 110 and the tensioning device manufactured at the factory are moved to the working position.

이어서 교각(10)의 외주면에 앵커(20)를 설치하고, 교각(10)의 외주면 양단부에 정착 브래키트(30)를 다단으로 부착시킨다.Subsequently, the anchor 20 is provided on the outer circumferential surface of the pier 10, and the fixing brackets 30 are attached in multiple stages to both ends of the outer circumferential surface of the pier 10.

이어서, 철근(40)을 배근하여 상기 앵커(20)에 묶음철선(21)으로 고정시킨다.Subsequently, the rebar 40 is reinforced and fixed to the anchor 20 with the bundled wires 21.

이어서, 외부강선(50)을 상기 교각(10)의 철근(40) 외측으로 둘러 감아 외부강선(50)의 양단부를 정착구(110)와 정착링(111)으로 정착 브래키트(30)의 고정공(34)에 고정한다.Subsequently, the outer steel wire 50 is wound around the reinforcing bar 40 of the pier 10, and both ends of the outer steel wire 50 are fixed to the fixing bracket 110 and the fixing ring 111 by the fixing holes 110 and the fixing ring 111. Fix it to (34).

이어서, 인장잭(도시되지 않음)을 이용하여 외부강선(50)을 인장시킨다.Subsequently, the outer steel wire 50 is tensioned using a tension jack (not shown).

이와 같이 하여 외부강선(50)의 인장이 완료되면 인장잭을 제거한다.In this way, when the tension of the outer steel wire 50 is completed, the tension jack is removed.

이후, 교각(10)에 신구접착제를 살포한다.Then, spray the old and new adhesive on the piers (10).

이어서, 교각(10)의 외측으로 거푸집(도시되지 않음)을 설치하고, 콘크리트를 타설하며, 양생시킨 후, 거푸집을 제거한다.Subsequently, formwork (not shown) is provided outside the pier 10, concrete is poured and cured, and then the formwork is removed.

이상에서 설명한 바와 같은 본 발명은 외부 강선을 이용하여 기존 교각에 2축 압축 상태로 보강하므로 앵커 천공에 의한 교량의 파손이 감소되고, 외부 강선에 의해서 나선형 철근을 배근한 것과 같은 효과가 나타나며, 단면을 확대하기 전에 기존 교량을 보강하고 단면 확대를 하는 것이므로 더욱 강한 보강효과가 나타난다. 또, 외부 강선을 이용해 인장을 하고 단면을 확대하기 때문에 인장력이 증대되고, 기존의 단면 확대량 보다 적은 양으로 같은 효과를 볼 수 있으며, 내진력이 증대된다.As described above, the present invention uses the external steel wire to reinforce the existing piers in a biaxial compression state, thereby reducing the breakage of the bridge due to anchor boring, and exhibiting the same effect as reinforcing the spiral reinforcement by the external steel wire. The reinforcement effect is shown because the existing bridge is reinforced and the section is enlarged before the expansion. In addition, the tensile force is increased because the tension is made by using an external steel wire and the cross section is enlarged, and the same effect can be obtained with a smaller amount than the existing cross section enlargement, and the seismic force is increased.

따라서, 위와 같은 본 발명은 교각에 고정되는 앵커량을 절감시켜 교각의 앵커 고정에 따른 손상을 방지하면서 교각의 컬럼부의 단면을 확대함과 아울러 조임 인장력 및 휨 보강력을 증대시킬 수 있고, 내진력을 증대시킬 수 있게 되는 이점이 있는 것으로 각종 교량의 교각 보수 보강을 위한 공법으로 매우 유리하게 적용할 수 있다.Therefore, the present invention as described above can reduce the amount of anchors fixed to the piers to prevent damage due to anchoring of the piers while expanding the cross section of the column of the piers and to increase the tightening tension and bending reinforcement, seismic force It is an advantage that can increase the can be applied very advantageously as a construction method for the reinforcement of bridges of various bridges.

Claims (4)

교각의 외주면에 앵커를 설치하는 단계와; 상기 교각의 외주면 양단부에 정착 브래키트를 다단으로 부착시키는 단계와; 철근을 배근하여 상기 앵커에 묶음철선으로 고정시키는 단계와; 상기 교각의 철근 외측으로 외부강선을 둘러 감아 상기 외부강선의 양단부를 정착구와 정착링으로 정착 브래키트의 고정공에 고정하는 단계와; 인장잭을 이용하여 외부강선을 인장시키는 단계와; 상기 외부강선의 인장이 완료된 후 인장잭을 제거하는 단계와; 상기 교각에 신구접착제를 살포하는 단계와; 상기 교각의 외측으로 거푸집을 설치하고, 콘크리트를 타설하여 양생시키는 단계를 포함하여 구성된 것을 특징으로 하는 강선을 이용한 교각 보강공법.Installing an anchor on an outer circumferential surface of the piers; Attaching the fixing brackets in multiple stages at both ends of the outer circumferential surface of the piers; Reinforcing steel bars and fixing the steel bars to the anchors; Winding the outer steel wire to the outside of the reinforcing bars of the piers and fixing both ends of the outer steel wire to the fixing holes of the fixing bracket with fixing holes and fixing rings; Tensioning the outer steel wire using a tension jack; Removing the tension jack after the tension of the outer steel wire is completed; Spraying the new and old adhesive on the piers; Installing a formwork to the outside of the pier, pier reinforced concrete method using a steel wire, characterized in that it comprises a step of curing by pouring concrete. 교각(10)의 외주면에 다수개의 앵커(20)가 종,횡방향으로 고정되고, 상기 교각(10)의 양단부에는 정착 브래키트(30)가 적어도 일단 이상 고정되며, 상기 교각(10)의 주위로 다수개의 철근(40)이 종방향으로 세워져 일정한 간격을 두고 배열되어 상기 앵커(20)에 묶음철선(21)으로 고정되고, 각 철근(40)의 하단부는 푸팅부(11)에 형성된 고정홈(11a)에 고정되며, 상기 각 단의 양쪽 정착 브래키트(30)에는 강연선과 같은 외부 강선(50)이 교각(10)의 푸팅부(11)를 둘러 감아 조이는 형태로 고정수단(100)에 의해 고정되어 구성된 것을 특징으로 하는 강선을 이용한 교각 보강장치.A plurality of anchors 20 are fixed to the outer circumferential surface of the piers 10 in the longitudinal, transverse direction, the fixing bracket 30 is fixed to at least one end at both ends of the piers 10, the periphery of the piers 10 As a plurality of reinforcing bars 40 are erected in the longitudinal direction and arranged at regular intervals to be fixed to the anchor 20 by the bundled wire 21, the lower end of each of the reinforcing bars 40, the fixing groove formed in the footing portion 11 It is fixed to (11a), the both ends of the fixing brackets 30 of each end to the fixing means 100 in the form of an external steel wire 50, such as a stranded wire wound around the footing portion 11 of the piers (10) Pier reinforcement using a steel wire, characterized in that fixed by configured. 제 2 항에 있어서, 상기 고정수단(100)은 원호 지지부(31)의 외면 중간부에 복수개의 고정공(34)이 형성된 고정판(33)을 고정하고, 상기 고정판(33)에 고정되는 정착구(110)로 외부강선(50)의 단부를 고정하여 구성된 것을 특징으로 하는 강선을 이용한 교각 보강장치.According to claim 2, The fixing means 100 is fixed to the fixing plate 33 is formed with a plurality of fixing holes 34 in the middle of the outer surface of the circular arc support portion 31, the fixing fixture fixed to the fixing plate ( Pier reinforcement using a steel wire, characterized in that the 110 is fixed to the end of the outer steel wire (50). 제 2 항에 있어서, 상기 원호 지지부(31)의 내면 중간부에 고정된 지지판(35)이 상기 교각(10)의 컬럼부(12)의 양단 원호부에 형성된 고정홈(12a)에 삽입되어 상기 정착 브래키트(30)가 좌우로 유동되도록 구성된 것을 특징으로 하는 강선을 이용한 교각 보강장치.According to claim 2, wherein the support plate (35) fixed to the middle of the inner surface of the circular arc support portion 31 is inserted into the fixing grooves 12a formed on both ends of the arc portion of the column portion 12 of the piers 10 is A pier reinforcement device using a steel wire, characterized in that the fixing bracket 30 is configured to flow from side to side.
KR10-2000-0075189A 2000-12-11 2000-12-11 Method to reinforce pier using steel and thereof apparatus KR100400980B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2000-0075189A KR100400980B1 (en) 2000-12-11 2000-12-11 Method to reinforce pier using steel and thereof apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2000-0075189A KR100400980B1 (en) 2000-12-11 2000-12-11 Method to reinforce pier using steel and thereof apparatus

Publications (2)

Publication Number Publication Date
KR20020045792A true KR20020045792A (en) 2002-06-20
KR100400980B1 KR100400980B1 (en) 2003-10-10

Family

ID=27680895

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2000-0075189A KR100400980B1 (en) 2000-12-11 2000-12-11 Method to reinforce pier using steel and thereof apparatus

Country Status (1)

Country Link
KR (1) KR100400980B1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100440092B1 (en) * 2001-08-07 2004-07-14 선암산업개발주식회사 Pannel for Repair and Reinforcement Method of Pier and Utilize Pannel Repair and Reinforcement Method
KR100446360B1 (en) * 2001-08-07 2004-09-01 선암산업개발주식회사 Utilize Stone Repair and Reinforcement Method of Pier
KR100492336B1 (en) * 2002-03-18 2005-05-31 박재만 Reinforcement method to resist earthquakes for lower structure of bridge and there of apparatus
KR100492335B1 (en) * 2002-03-18 2005-05-31 박재만 Reinforcement method to resist earthquakes for lower structure of bridge and there of apparatus
KR20150106097A (en) * 2014-03-11 2015-09-21 고려개발 주식회사 The seismic retrofit method of bridge columns using external tendons
CN110205935A (en) * 2019-05-07 2019-09-06 中交路桥北方工程有限公司 A kind of abutment body unilateral side thickeies the autostabiliazer unit of template and its from steady construction method
CN110468745A (en) * 2019-09-02 2019-11-19 长沙理工大学 A kind of bridge pier fastening device and its construction method

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040008977A (en) * 2002-07-20 2004-01-31 주식회사 후레씨네코리아 Method for Reinforcing Concrete Structure Using Curved Tendon and Saddle Apparatus therefor

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100440092B1 (en) * 2001-08-07 2004-07-14 선암산업개발주식회사 Pannel for Repair and Reinforcement Method of Pier and Utilize Pannel Repair and Reinforcement Method
KR100446360B1 (en) * 2001-08-07 2004-09-01 선암산업개발주식회사 Utilize Stone Repair and Reinforcement Method of Pier
KR100492336B1 (en) * 2002-03-18 2005-05-31 박재만 Reinforcement method to resist earthquakes for lower structure of bridge and there of apparatus
KR100492335B1 (en) * 2002-03-18 2005-05-31 박재만 Reinforcement method to resist earthquakes for lower structure of bridge and there of apparatus
KR20150106097A (en) * 2014-03-11 2015-09-21 고려개발 주식회사 The seismic retrofit method of bridge columns using external tendons
CN110205935A (en) * 2019-05-07 2019-09-06 中交路桥北方工程有限公司 A kind of abutment body unilateral side thickeies the autostabiliazer unit of template and its from steady construction method
CN110468745A (en) * 2019-09-02 2019-11-19 长沙理工大学 A kind of bridge pier fastening device and its construction method
CN110468745B (en) * 2019-09-02 2024-02-09 长沙理工大学 Pier reinforcing device and construction method thereof

Also Published As

Publication number Publication date
KR100400980B1 (en) 2003-10-10

Similar Documents

Publication Publication Date Title
US7827642B2 (en) Hollow prestressed concrete (HPC) girder and spliced hollow prestressed concrete girder (s-HPC) bridge construction method
KR100988074B1 (en) Girder bridge connected to abutment and the construction method thereof
KR100400980B1 (en) Method to reinforce pier using steel and thereof apparatus
KR20090055063A (en) Construction method of pre-stressed concrete beam
KR20020037816A (en) Prestressed concrete slab reinforced by various section girder and construction method of simple and continuous supported slab bridge using the same
KR100662814B1 (en) Prestressed concrete u-girder which the hollow pipe contained, and it&#39;s continuationized method of construction
JP2018193709A (en) Concrete structure applying continuous fiber reinforcing material and concrete member joining method
KR102077385B1 (en) Prestressed Steel-Concrete Composite Girder
KR100547485B1 (en) Continuous multi-span bridge using bridge girder units and construction method thereof
KR101339367B1 (en) Fabrication and reinforcing method for pre-flex girder
KR200184684Y1 (en) Apparatus to prevent the negative moment of a bridge
RU2205914C1 (en) Process widening bridge structure
KR100441209B1 (en) Method and Structure for Reinforcing Structure Using Tendon and Saddle Apparatus therefor
KR20010000430A (en) Open-type steel wire holding device and Metod for construction of continuous bridge using of prestressed concret beam having it
KR100616533B1 (en) Construction method for p.s.c. girder bridges and bridges production it
KR100414261B1 (en) External steel wire reinforcement method for concrete structure and anchoring method therefor
KR100406883B1 (en) Bridge construction method using a prestressed concrete beam installed anchorage apparatus for temporary tendon
KR20020089029A (en) Reinforced Method of Head in a Prestressed Spun High Strength Concrete Pile
KR100424410B1 (en) Method for reinforcing a beam of multiple clear span bridge and an apparatus thereof
KR100493514B1 (en) Maintenance and reinforcing apparatus for section enlargement for reinforcing bearing power of pier in reinforced concrete bridge and construction method of repairing and reinforcing for section enlargement using the apparatus
KR100442969B1 (en) Method and its devices to strengthen a bridge by external prestressing cable
KR200240385Y1 (en) PSC Girder having Anchoring Sleeves
KR200235876Y1 (en) Apparatus for reinforcing a beam of single clear span bridge
KR20110135217A (en) A bridge repair and reinforcement method
KR20010068055A (en) PSC Girder having Anchoring Sleeves and Strengthening Method

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120924

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20130925

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140924

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20150921

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20160923

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20180917

Year of fee payment: 16

FPAY Annual fee payment

Payment date: 20190916

Year of fee payment: 17