JP2003286759A JP2002091232A JP2002091232A JP2003286759A JP 2003286759 A JP2003286759 A JP 2003286759A JP 2002091232 A JP2002091232 A JP 2002091232A JP 2002091232 A JP2002091232 A JP 2002091232A JP 2003286759 A JP2003286759 A JP 2003286759A
Authority
JP
Japan
Prior art keywords
steel wire
fixing
cable
block
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002091232A
Other languages
Japanese (ja)
Inventor
Tsutomu Sumiya
務 角谷
Souji Kanai
壮次 金井
Yoshiteru Suzuki
義晃 鈴木
Hiroshi Sakai
博士 酒井
Junichi Todo
純一 藤堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PS Mitsubishi Construction Co Ltd
Kobelco Wire Co Ltd
Original Assignee
Shinko Wire Co Ltd
PS Mitsubishi Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shinko Wire Co Ltd, PS Mitsubishi Construction Co Ltd filed Critical Shinko Wire Co Ltd
Priority to JP2002091232A priority Critical patent/JP2003286759A/en
Publication of JP2003286759A publication Critical patent/JP2003286759A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an anchorage body which does not cause an excessive load on a wedge anchorage section of PC steel wires or PC stranded wires and which is excellent in fatigue characteristic when a repeated stress acts on a PC cable and an increasing tension is applied. <P>SOLUTION: A PC anchorage device is provided with a casting block 3 buried in concrete, a bonding block 31 supported by the casting block 3, and an anchor head 6 in which PC steel wires or PC stranded wires 5 are anchored. The bonding block 31 internally forms an integrated conical body 33 formed of a filler excellent in adherence and integrated conical bodies 33 of PC steel wires or PC stranded wires to bear an excessive tension. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、PC定着装置及び
PC定着方法に関する。さらに詳しくは、ポストテンシ
ョン方式、アウトケーブル方式などのPC鋼材や斜材な
どのPCケーブル材を対象とする疲労特性の優れたPC
定着装置及び方法に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a PC fixing device and a PC fixing method. More specifically, a PC with excellent fatigue properties for PC cable materials such as post tension type, out cable type PC steel materials and diagonal materials.
The present invention relates to a fixing device and method.

【0002】[0002]

【従来の技術】PC鋼線又はPC鋼より線から成るPC
ケーブルを定着する最も一般的なPC定着システムは、
コンクリート内に埋め込まれたキャスティングブロック
とアンカーヘッドとから構成されている。PC鋼線又は
PC鋼より線は、緊張後、それぞれくさびによりアンカ
ーヘッドに固定され、キャスティングブロックに設けら
れたグラウト孔より、キャスティングブロックおよびシ
ース内にグラウトを充填して定着を完了する。グラウチ
ングは、PC鋼線又はPC鋼より線から成るPCケーブ
ルを腐食から保護する目的で施されるものである。構造
物の使用状態において、PCケーブル全体に作用する増
加張力は、直接アンカーヘッドのくさび部に作用する。
くさび定着はその定着メカニズムから、定着時にPC鋼
線又はPC鋼より線表面に何らかの傷を付けることにな
り、このような部位に繰り返し張力が作用すると、PC
鋼線又はPC鋼より線の疲労強度が問題となる場合があ
る。特にPC鋼線又はPC鋼より線をアウトケーブルや
吊り構造のPCケーブルとして用いる場合には、増加張
力が直接くさび定着部に作用することとなる。このた
め、定着部の疲労強度を向上させることを目的として、
アンカーヘッドやくさびに種々の工夫を凝らしたり、品
質を向上させるなどの対策が講じられている。このよう
な疲労特性を向上させる技術は、その程度に応じて、ア
ウトケーブル仕様定着体とか斜張橋仕様定着体として市
販されている。しかし、これらはいずれも高価なもので
あり、経済性に難点があるのが現状である。
2. Description of the Related Art PC made of PC steel wire or PC steel wire
The most common PC fixing system for fixing cables is
It consists of a casting block embedded in concrete and an anchor head. After tensioning, the PC steel wire or the PC steel wire is fixed to the anchor head by a wedge, respectively, and the casting block and the sheath are filled with grout through the grout holes provided in the casting block to complete the fixing. Grouting is performed for the purpose of protecting a PC steel wire or a PC cable made of a PC steel wire from corrosion. When the structure is in use, the increased tension acting on the entire PC cable directly acts on the wedge portion of the anchor head.
Due to its fixing mechanism, wedge fixing causes some damage to the surface of PC steel wire or PC steel wire during fixing, and if tension is repeatedly applied to such a part, PC
Fatigue strength of steel wire or PC stranded wire may be a problem. In particular, when a PC steel wire or a PC stranded wire is used as an out cable or a PC cable having a hanging structure, the increased tension directly acts on the wedge fixing portion. Therefore, for the purpose of improving the fatigue strength of the fixing portion,
Various measures have been taken such as making various improvements to the anchor head and wedges and improving the quality. A technique for improving such fatigue characteristics is commercially available as an out-cable specification fixing member or a cable-stayed bridge specification fixing member, depending on its degree. However, all of them are expensive and have a drawback in economic efficiency.

【0003】特に斜張橋のPCケーブルでは、車両や列
車などが通過するときの活荷重による繰り返し変動張力
が大きいため、優れた疲労特性が要求される。くさび定
着によるPCケーブルの損傷を避けるために、PCケー
ブルを構成する多本数の単線1本ごとにボタンヘッド加
工を施してソケットに定着し、さらにその内部に特殊樹
脂や鋼球を充填するなどの特殊な工夫の凝らしたものが
市販されている。
In particular, PC cables for cable-stayed bridges are required to have excellent fatigue characteristics because the repeated variable tension due to the live load is large when a vehicle or train passes. In order to avoid damage to the PC cable due to wedge fixing, a button head process is applied to each of the multiple single wires that make up the PC cable to fix it in the socket, and then a special resin or steel ball is filled inside it. There are many specially crafted products on the market.

【0004】このようなPC定着システムは、専用の工
場で製作されたプレハブケーブルを現地へ搬入し、一旦
仮置きした後、架設,緊張そして定着される。プレハブ
ケーブルでは単線ごとの長さの誤差を吸収できないこと
から、PCケーブル製作では、各単線ごとに張力のばら
つきが生じないように、一定の張力を与えたまま温度補
正を行ったうえで切断、ボタンヘッド加工そして検測な
どきわめて厳格に品質管理を行わなければならず、非常
に高価なものとなっている。また架設地点では、構造体
の自重や施工機械および外気温度など工事の進捗によっ
て刻一刻と変化する橋桁のたわみを、プレハブケーブル
架設の数が月前からあらかじめ予測計算し、各種誤差要
因も十分検討したうえでPCケーブル製作長を決定しな
ければならず、このような予測に多大な労力を要す。ま
た、架設機械重量や作業荷重の変更など計画と実際の施
工が大幅に異なった場合には、プレハブケーブルの定着
長の調整には限界があるため、架設が不可能となる場合
が予想されリスクが非常に大きくなる。さらに、規模の
大きなPCケーブルでは自重が数十トンにも達し、現地
での揚重,PCケーブル展開,架設など一連の作業に大
がかりな機械が何台も必要となり、これらの設備やPC
ケーブル作業が橋梁工事の工程,工費などに大きく占
め、合理的なPCケーブルシステムの開発が望まれてい
る。
In such a PC fixing system, a prefabricated cable manufactured in a dedicated factory is carried into the site, temporarily placed, and then installed, tensioned and fixed. Since the prefabricated cable cannot absorb the length error for each single wire, in the PC cable manufacturing, the temperature is corrected while applying a constant tension so that the tension does not vary among the single wires, and then cut. It is extremely expensive because it requires extremely strict quality control such as button head processing and inspection. At the erection point, the deflection of the bridge girder, which changes moment by moment due to the progress of construction such as the weight of the structure, construction machinery and the outside air temperature, is calculated in advance from the number of months of prefabricated cable erection, and various error factors are thoroughly examined. After that, the production length of the PC cable has to be determined, and such a prediction requires a great deal of labor. In addition, if there is a large difference between the planned and actual construction, such as changes in the weight of the erection machine or the work load, there is a limit to the adjustment of the fixing length of the prefabricated cable. Will be very large. In addition, large-scale PC cables can weigh dozens of tons, and many large machines are required for a series of operations such as hoisting, PC cable deployment, and erection at the site.
Cable work occupies a large part of bridge construction process, construction cost, etc., and it is desired to develop a rational PC cable system.

【0005】本発明者らはこのような課題を解決する技
術として、先に、図3、4に示すPC定着装置を提案し
た。この装置は、緊張したPC鋼線又はPC鋼より線を
アンカーヘッドにくさび定着した後、キャスティングブ
ロック内に特殊グラウト材を充填して、高強度の錐体を
形成したものである。
The present inventors have previously proposed the PC fixing device shown in FIGS. 3 and 4 as a technique for solving such a problem. In this apparatus, a tensioned PC steel wire or PC steel stranded wire is wedge-fixed to an anchor head, and then a special grout material is filled in a casting block to form a high-strength cone.

【0006】図3はPC定着装置1で定着したアウトケ
ーブルを示す縦断面図である。コンクリート2内にキャ
スティングブロック3を埋設し、シース4内に挿通され
たPC鋼線又はPC鋼より線5をアンカーヘッド6にく
さび7を用いて定着する。PC鋼線又はPC鋼より線5
の外周には保護被覆22が施されている。アンカーヘッ
ド6は、キャスティングブロック3の端面に圧着されて
いる。キャスティングブロック3とシース4との接合部
には、バックアップ材9が施され、キャスティングブロ
ック3内に耐圧性錐体12が形成されている。この錐体
12はアンカーヘッド7をカバー8で覆い、注入材11
を注入孔から圧入して形成されたもので、PC鋼線又は
PC鋼より線5と一体化してPCケーブルを纏めて定着
するくさびを形成している。この装置では、PCケーブ
ルがPC鋼線又はPC鋼より線の緊張力以上の張力を受
けたとき、この錐体とPC鋼線又はPC鋼より線との付
着効果および充填材からなる錐体のくさび効果により、
アンカーヘッド部のくさびに直接増加張力が作用するの
を緩和する。その結果、優れた疲労特性を示す。
FIG. 3 is a longitudinal sectional view showing the out cable fixed by the PC fixing device 1. The casting block 3 is embedded in the concrete 2, and the PC steel wire or the PC steel wire 5 inserted in the sheath 4 is fixed to the anchor head 6 by using the wedge 7. PC steel wire or PC steel stranded wire 5
A protective coating 22 is applied to the outer periphery of the. The anchor head 6 is pressure-bonded to the end surface of the casting block 3. A backup material 9 is applied to the joint portion between the casting block 3 and the sheath 4, and a pressure-resistant cone 12 is formed in the casting block 3. This cone 12 covers the anchor head 7 with a cover 8 and
Is formed by press-fitting from the injection hole, and is integrated with the PC steel wire or the PC stranded wire 5 to form a wedge for collectively fixing the PC cables. In this device, when the PC cable receives a tension equal to or higher than the tension of the PC steel wire or the PC steel wire, the adhesion effect between the cone and the PC steel wire or the PC steel wire and the cone formed of the filler are Due to the wedge effect,
Reduces the effect of increased tension directly on the wedge of the anchor head. As a result, it exhibits excellent fatigue properties.

【0007】図4は、図3の定着装置1を再緊張定着し
た定着装置の縦断面図である。アンカーヘッド6及び錐
体12を牽引し、アンカーヘッド6とキャスティングブ
ロック3の端面との間にシムプレート13を挿入し、次
いで、キャスティングブロック3の内面と錐体12との
間に生成した隙間15及び錐体12の背面に硬化性耐圧
充填材14を圧入して再緊張定着したものである。この
ようなPC定着装置はアウトケーブルの定着に適してお
り、再緊張も可能であるが、図4に示す僅かな隙間15
に耐圧充填材を充填することは必ずしも容易ではなかっ
た。
FIG. 4 is a longitudinal sectional view of the fixing device in which the fixing device 1 of FIG. 3 is re-tensioned and fixed. The anchor head 6 and the cone 12 are pulled, the shim plate 13 is inserted between the anchor head 6 and the end surface of the casting block 3, and then the gap 15 generated between the inner surface of the casting block 3 and the cone 12 is formed. Further, the curable pressure-resistant filling material 14 is press-fitted on the back surface of the cone 12 to be re-tensioned and fixed. Such a PC fixing device is suitable for fixing an out cable and can be re-tensioned, but a slight gap 15 shown in FIG.
It has not always been easy to fill the above with a pressure resistant filling material.

【0008】[0008]

【発明が解決しようとする課題】本発明は上記技術にさ
らに改善を加えたもので、本発明が解決しようとする課
題は、ポストテンション方式、アウトケーブル方式など
のPC鋼材や斜材などのPCケーブル材を対象として、
疲労特性の優れた定着体を安価に供給することにある。
本発明は、PCケーブルに繰り返し応力が作用し、増加
張力が生ずるような場合に特に優れた性能を有し、PC
鋼線又はPC鋼より線のくさび定着部に過重な負担を掛
けることがない、簡易な構造の高性能PC定着装置を提
供することを目的とするものである。
SUMMARY OF THE INVENTION The present invention is a further improvement of the above-mentioned technique. The problem to be solved by the present invention is that of PC steel materials such as post tension type and out cable type and PC such as diagonal members. For cable materials,
It is to supply a fixing member having excellent fatigue characteristics at low cost.
INDUSTRIAL APPLICABILITY The present invention has particularly excellent performance when repeated stress is applied to a PC cable to cause an increased tension.
It is an object of the present invention to provide a high-performance PC fixing device having a simple structure that does not apply an excessive load to the wedge fixing portion of a steel wire or a PC stranded wire.

【0009】[0009]

【課題を解決するための手段】本発明は上記課題を解決
するためになされたもので、その技術手段は、PC鋼線
又はPC鋼より線の定着装置において、コンクリート内
に埋め込まれたキャスティングブロックと、キャスティ
ングブロックに支承されPC鋼線又はPC鋼より線束を
定着する内部コーンを有するボンディングブロックと、
PC鋼線又はPC鋼より線を定着するアンカーヘッドと
を備えたことを特徴とするPC定着装置である。
The present invention has been made to solve the above problems, and its technical means is a casting block embedded in concrete in a PC steel wire or PC steel stranded wire fixing device. And a bonding block having an inner cone that is supported by the casting block and that fixes the PC steel wire or the PC steel wire bundle.
A PC fixing device, comprising: an anchor head for fixing a PC steel wire or a PC steel wire.

【0010】上記PC定着装置において、前記ボンディ
ングブロックを、キャスティングブロックに対してPC
鋼線又はPC鋼より線の長手方向に移動可能に形成する
と、緊張力弛緩を生じたPCケーブルを再緊張して再定
着することができ、弛緩の回復が容易で、このような条
件の下で用いる定着装置として好適である。
In the above PC fixing device, the bonding block is connected to the casting block by a PC.
If it is formed so as to be movable in the longitudinal direction of the steel wire or the PC steel stranded wire, the PC cable that has experienced tension relaxation can be re-tensioned and re-established, and the relaxation can be easily recovered under such conditions. It is suitable as a fixing device used in.

【0011】本発明の別の発明として、前記キャスティ
ングブロックに代え、コンクリート内に埋め込まれたケ
ーシングパイプおよびその口元に設置した座金を備えた
ことを特徴とするPC定着装置を提供する。この発明で
は、PC鋼線又はPC鋼より線の定着部に過酷な荷重を
付与することなく、PCケーブルに増加張力を付与する
ことができ、また、PCケーブルの緊張力を完全に除荷
することもできる。
As another invention of the present invention, there is provided a PC fixing device comprising a casing pipe embedded in concrete and a washer installed at its mouth instead of the casting block. According to the present invention, increased tension can be applied to the PC cable without applying a severe load to the fixing portion of the PC steel wire or the PC stranded wire, and the tension of the PC cable can be completely removed. You can also

【0012】本発明方法は、上記のPC定着装置を用
い、PC鋼線又はPC鋼より線を初期緊張してアンカー
ヘッドに定着した後、ボンディングブロック内に充填材
を注入し、変動張力に抵抗する充填材とPC鋼材との一
体錐体を定着部とボンディングブロック内に形成するこ
とを特徴とするPC定着方法である。この場合、充填材
としては、自硬性を有し、付着性のよいセメント系、樹
脂系等の充填材であって流動性のよい材料を用いるとよ
い。このような充填材はPC鋼線又はPC鋼より線間の
狭い隙間に充填され、ボンディングブロック内でPC鋼
線又はPC鋼より線の束と一体の錐体を形成するような
材料を用いると好適である。
In the method of the present invention, using the above PC fixing device, the PC steel wire or the PC steel wire is initially tensioned and fixed to the anchor head, and then the filler is injected into the bonding block to resist the variable tension. In the fixing method for a PC, an integral cone of the filling material and the PC steel material is formed in the fixing portion and the bonding block. In this case, as the filler, it is preferable to use a cement-based or resin-based filler having self-hardening property and good adhesiveness and having good fluidity. Such a filler is used to fill a narrow gap between the PC steel wires or the PC steel wires and to form a cone that is integral with the PC steel wires or the bundle of PC steel wires in the bonding block. It is suitable.

【0013】[0013]

【発明の実施の形態】本発明は、キャスティングブロッ
クと、ボンディングブロックと、アンカーヘッドとから
なるシステムである。ボンディングブロックは内部にP
C鋼線又はPC鋼より線全体に充填材を充填して形成し
た一体の錐体を備えている。
BEST MODE FOR CARRYING OUT THE INVENTION The present invention is a system comprising a casting block, a bonding block and an anchor head. Bonding block has P inside
It has an integral cone formed by filling the entire C steel wire or PC steel wire with a filler.

【0014】以下図面を参照して本発明の実施の態様を
説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0015】PC鋼より線の付着力は、緊張力が作用し
ていない状態でPC鋼より線53をコンクリート52に
付着させ、図5に示すように、PC鋼より線53に引張
力Pを加えて付着試験を行った場合、異形鉄筋に比べて
著しく小さな値となることが知られている。これはPC
鋼より線53のよりの戻りや、図6に示すように、PC
鋼より線53の断面プロフィール54が断面積減少によ
り、断面プロフィール55となることに起因するもので
ある。
As for the adhesive force of the PC steel strand, the PC steel strand 53 is attached to the concrete 52 in the state where no tension force is applied, and as shown in FIG. 5, a tensile force P is applied to the PC steel strand 53. In addition, when an adhesion test is performed, it is known that the value becomes significantly smaller than that of the deformed bar. This is a PC
The twisting back of the steel stranded wire 53 and the PC as shown in FIG.
This is because the cross-sectional profile 54 of the steel stranded wire 53 becomes the cross-sectional profile 55 due to the reduction of the cross-sectional area.

【0016】本発明では、破断荷重の40〜60%程度
の緊張力を付与した状態でボンディングブロック内に充
填材を圧入し、ボンディングブロック内のPC鋼線又は
PC鋼より線間に充填し、一体錐体を形成させる。その
後作用する変動荷重は大きくともPC鋼線又はPC鋼よ
り線破断荷重の10%程度である。従って、上述したよ
りの戻りや断面積減少がほとんどなく、またボンディン
グブロック内のくさび効果によりPC鋼線又はPC鋼よ
り線と充填材との付着力がさらに高まるため、きわめて
高い疲労特性を期待することができる。
In the present invention, the filler is press-fitted into the bonding block with a tension of about 40 to 60% of the breaking load being applied to fill the space between the PC steel wire or the PC steel wire in the bonding block. Form an integral cone. The fluctuating load applied thereafter is at most about 10% of the PC steel wire or the wire breaking load of PC steel. Therefore, there is almost no return or reduction in cross-sectional area as described above, and the adhesive effect between the PC steel wire or the PC steel wire and the filler is further increased due to the wedge effect in the bonding block, so that extremely high fatigue properties are expected. be able to.

【0017】図1は、本発明の第1の発明のPC定着装
置1の縦断面図である。コンクリート2中にキャスティ
ングブロック3が埋設されており、キャスティングブロ
ック3の口元内に尾端部が嵌合するボンディングブロッ
ク31が設けられ、このボンディングブロック31にア
ンカーヘッド6が定着されている。実施例ではアンカー
ヘッド6はくさび7でPC鋼線又はPC鋼より線を定着
する形式のものを示しているがこれに限るものではな
く、他の定着手段、例えば、ねじ定着でもよい。
FIG. 1 is a longitudinal sectional view of a PC fixing device 1 according to the first invention of the present invention. The casting block 3 is embedded in the concrete 2, and a bonding block 31 having a tail end portion fitted therein is provided in the mouth of the casting block 3, and the anchor head 6 is fixed to the bonding block 31. In the embodiment, the anchor head 6 is of the type in which the PC steel wire or the PC steel wire is fixed by the wedge 7, but the present invention is not limited to this, and other fixing means such as screw fixing may be used.

【0018】PC鋼線又はPC鋼より線5はキャスティ
ングブロック3、ボンディングブロック31を通ってア
ンカーヘッド6にくさび定着されている。ボンディング
ブロック31内でPC鋼線又はPC鋼より線5は束とな
ってその隙間に充填材32が充填され硬化して一体とな
り、緊張力を負担することができるように一体の錐体3
3を形成している。
The PC steel wire or the PC steel wire 5 passes through the casting block 3 and the bonding block 31 and is wedge-fixed to the anchor head 6. In the bonding block 31, the PC steel wire or the PC steel stranded wire 5 forms a bundle and the gap is filled with the filling material 32 and hardens to be integrated, so that the integrated cone 3 can bear the tension force.
3 is formed.

【0019】さらに、例えば、アウトケーブルを用いた
構造物に供用後、PC鋼線又はPC鋼より線に腐食が生
じたりその後何らかの原因でシステムの安全性が低下
し、PC鋼線又はPC鋼より線を交換する場合において
も、損傷したPC鋼線又はPC鋼より線を切断の上、本
定着体のボンディングブロック31およびアンカーヘッ
ド6を容易に除去することが可能であり、コンクリート
内に埋め込まれたキャスティングブロック3は再使用可
能である。
Further, for example, after being applied to a structure using an out cable, corrosion of the PC steel wire or the PC steel wire occurs, and then the safety of the system deteriorates for some reason, and the PC steel wire or the PC steel wire Even when the wire is replaced, it is possible to cut the damaged PC steel wire or PC steel stranded wire, and then easily remove the bonding block 31 and the anchor head 6 of the main fixing body, which is embedded in concrete. The casting block 3 can be reused.

【0020】このPC定着装置1の施工方法は次の通り
である。PC鋼線又はPC鋼より線5の初期緊張及び定
常定着をアンカーヘッドのくさび7で行う。このくさび
定着後、PC鋼線又はPC鋼より線5の余長を切断し、
ボンディングブロック31内に充填材32として、例え
ば、セラミック添加エポキシ樹脂を圧入し、充填材32
とPC鋼線又はPC鋼より線5とが一体化した錐体33
をボンディングブロック31内に形成する。このPC定
着装置1は、将来の荷重変動に対して、ボンディングブ
ロック31と錐体33が定着力を分担する効果を期待す
ることができ、高耐力、高疲労強度を有するものであ
る。
The construction method of the PC fixing device 1 is as follows. Initial tension and steady fixing of the PC steel wire or the PC stranded wire 5 are performed by the wedge 7 of the anchor head. After fixing this wedge, cut the excess length of PC steel wire or PC steel wire 5,
A ceramic-added epoxy resin, for example, is press-fitted into the bonding block 31 as the filler 32 to form the filler 32.
Cone 33 in which the PC wire and the PC steel wire 5 are integrated
Are formed in the bonding block 31. The PC fixing device 1 is expected to have an effect that the fixing force is shared by the bonding block 31 and the cone 33 against future load fluctuation, and has high yield strength and high fatigue strength.

【0021】また、PC構造物建設時に多く用いられる
再緊張(構造物の施工段階にあわせて緊張力を段階的に
増加させる手法)においても、本発明ではボンディング
ブロック31を設け、図1に示すようにその尾端をキャ
ステイングブロック3内に収納し、支持端面34をキャ
ステイングブロックの口元に当接するように形成し、ボ
ンディングブロック31をキャスティングブロック3と
軸方向に移動可能にし、支持端面34にシムを挟み込む
ことができるようにしたので、再緊張が容易である。
Also in the re-tensioning (a method of gradually increasing the tension force in accordance with the construction stage of the structure) which is often used in the construction of the PC structure, the present invention is provided with the bonding block 31 and is shown in FIG. Thus, the tail end is housed in the casting block 3, the support end face 34 is formed so as to abut the mouth of the casting block, the bonding block 31 is axially movable with the casting block 3, and the support end face 34 is shimmed. Since it is possible to pinch, it is easy to re-tension.

【0022】図2は本発明の第2の発明に係る実施例を
示すもので、図1のキャスティングブロック3の代わり
に、コンクリート2内に埋め込まれたケーシングパイプ
41およびその口元に設置した座金42が装着されてい
る。座金42は、ケーシングパイプ41とボンディング
ブロック31との間に介在し、ボンディングブロック3
1を支持している。この構造でも図1に示す構造と同様
の作用、効果を生ずる。
FIG. 2 shows an embodiment according to the second invention of the present invention. Instead of the casting block 3 of FIG. 1, a casing pipe 41 embedded in concrete 2 and a washer 42 installed at its mouth are provided. Is installed. The washer 42 is interposed between the casing pipe 41 and the bonding block 31, and is connected to the bonding block 3
Supports 1. This structure also produces the same operation and effect as the structure shown in FIG.

【0023】本発明では、何らかの原因で緊張力が低下
したときは、ボンディングブロック31及びアンカーヘ
ッド6を牽引し、図1の装置ではボンディングブロック
とキャスティングブロックとの間にシムを挿入し、図2
の装置では、座金42の厚さを変更することによって、
所望の緊張力に回復させることができ、緊張材は設置当
初と同等の性能を得ることが可能である。また、座金4
2をとりはずすとケーブル定着具はケーシングパイプ4
1内を移動し、PCケーブルの緊張力を完全に除荷する
こともでき、ケーブル交換も可能となる。
In the present invention, when the tension is lowered for some reason, the bonding block 31 and the anchor head 6 are pulled, and in the apparatus of FIG. 1, a shim is inserted between the bonding block and the casting block,
In the device of, by changing the thickness of the washer 42,
The desired tension can be restored, and the tension material can obtain the same performance as that at the time of installation. Also, washers 4
When 2 is removed, the cable fixing device is the casing pipe 4
It is possible to move inside 1 to completely unload the tension of the PC cable, and it is also possible to replace the cable.

【0024】前述したように,疲労特性に優れた既存の
PCケーブルは定着部にソケットを用いたプレハブケー
ブルであるが,多くの問題やリスクを有する。本発明で
は、従来の技術で解決できなかった以下のような特長を
有する。現場製作PCケーブルとすることが可能プレ
ハブケーブルにする必要がなく、単線又は数本束ねたP
C鋼材を現場へ搬入して多数本のPC鋼線又はPC鋼よ
り線で形成するPCケーブルを組み立てる。現場製作と
することにより取り扱う重量を調節することができ、P
Cケーブルの運搬費、製作費、架設費およびその設備費
などのコストを大幅に縮減することが可能となる。半
プレハブケーブルも可能定着システム,PCケーブルお
よびその保護材などのPCケーブルシステムをある程度
プレハブ化し、架設地点の揚重設備や工程などの条件に
応じて必要な材料や装置を自由な組み合わせてプレハブ
化することが可能で、自由度が高い。PCケーブルの
長さの管理が容易初期緊張力はくさびで定着されるた
め、プレハブケーブルのような厳格な長さ管理が不要で
あり、複雑に変化する構造系にも容易に対応できる。
As described above, the existing PC cable having excellent fatigue characteristics is a prefabricated cable using a socket in the fixing portion, but it has many problems and risks. The present invention has the following features that cannot be solved by the conventional techniques. Can be made in-situ PC cable No need for prefabricated cable, single wire or bundled P
Carry the C steel material to the site and assemble a PC cable formed of a large number of PC steel wires or PC steel strands. The weight to be handled can be adjusted by making it on-site.
Costs such as C cable transportation costs, manufacturing costs, installation costs, and equipment costs thereof can be significantly reduced. Semi-prefabricated cables are also possible. PC cable systems such as fixing system, PC cable and its protective material are prefabricated to some extent, and prefabricated by freely combining the necessary materials and equipment according to the conditions such as lifting equipment and process at the installation point. It is possible and has a high degree of freedom. Easy management of PC cable length Since the initial tension is fixed by the wedge, there is no need for strict length management as with prefabricated cables, and it is possible to easily deal with structural systems that change intricately.

【0025】以上のように、本発明は、施工性にきわめ
て優れ、低コストなPC定着方法である。
As described above, the present invention is a PC fixing method which is excellent in workability and low in cost.

【0026】[0026]

【発明の効果】本発明によれば、PCケーブルに繰り返
し応力が作用し、増加張力が生ずるような場合にも、P
C鋼線又はPC鋼より線のくさび定着部に過重な負担を
掛けることがなく、疲労特性の優れた高性能なPC定着
装置を安価に供給することが可能となった。また、再緊
張応力を導入して緊張定着することが容易である。
According to the present invention, even when a repeated stress is applied to the PC cable to cause an increased tension, the P
It has become possible to inexpensively supply a high-performance PC fixing device having excellent fatigue characteristics without placing an excessive load on the wedge fixing portion of the C steel wire or the PC steel wire. Further, it is easy to introduce re-tensioning stress to fix the tension.

【0027】また、現場製作ケーブルとすることが可能
で、ケーブル運搬費、製作費、架設費およびその設備費
などで大幅にコストを縮減することが可能となる。さら
に、架設地点の揚重設備や工程などの条件に応じて必要
な材料や装置を自由な組み合わせてプレハブ化すること
が可能で、自由度が高い。また、プレハブケーブルのよ
うな厳格な長さ管理が不要である。
Further, since it is possible to use a cable manufactured in the field, it is possible to significantly reduce the cost of cable transportation, manufacturing cost, installation cost and equipment cost thereof. Furthermore, it is possible to freely combine the necessary materials and equipment according to the conditions such as the lifting equipment and the process at the erection point to form a prefab, and the degree of freedom is high. Also, strict length control such as prefabricated cables is not required.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施例のPC定着装置の縦断面図である。FIG. 1 is a vertical cross-sectional view of a PC fixing device according to an embodiment.

【図2】他の実施例のPC定着装置の縦断面図である。FIG. 2 is a vertical sectional view of a PC fixing device according to another embodiment.

【図3】従来例のPC定着装置の縦断面図である。FIG. 3 is a vertical cross-sectional view of a conventional PC fixing device.

【図4】従来例のPC定着装置の縦断面図である。FIG. 4 is a vertical sectional view of a conventional PC fixing device.

【図5】付着試験の説明図である。FIG. 5 is an explanatory diagram of an adhesion test.

【図6】断面積減少の説明図である。FIG. 6 is an explanatory diagram of reduction in cross-sectional area.

【符号の説明】[Explanation of symbols]

1 PC定着装置 2 コンクリート 3 キャスティングブロック 4 シース 5 PC鋼線又はPC鋼より線 6 アンカーヘッド 7 くさび 8 カバー 9 バックアップ材 11 注入材 12 錐体 13 シムプレート 14 充填材 15 隙間 22 保護被覆 31 ボンディングブロック 32 充填材 33 錐体 34 支持端面 41 ケーシングパイプ 42 座金 51 PC鋼線 52 コンクリート 53 PC鋼より線 54 断面プロフィール 55 断面プロフィール 1 PC fixing device 2 concrete 3 casting blocks 4 sheath 5 PC steel wire or PC steel stranded wire 6 anchor head 7 wedge 8 covers 9 backup materials 11 Injection material 12 cones 13 Shim Plate 14 Filling material 15 Gap 22 Protective coating 31 bonding block 32 Filling material 33 cones 34 Support end face 41 casing pipe 42 washer 51 PC steel wire 52 concrete 53 PC steel stranded wire 54 cross-section profile 55 cross-section profile

───────────────────────────────────────────────────── フロントページの続き (72)発明者 金井 壮次 東京都千代田区丸の内3丁目4番1号 株 式会社ピー・エス内 (72)発明者 鈴木 義晃 東京都千代田区丸の内3丁目4番1号 株 式会社ピー・エス内 (72)発明者 酒井 博士 東京都千代田区丸の内3丁目4番1号 株 式会社ピー・エス内 (72)発明者 藤堂 純一 尼崎市中浜町10番地1 神鋼鋼線工業株式 会社内 Fターム(参考) 2D059 AA41 BB06 BB08 CC25 DD27 DD28 GG02 2E164 DA01 DA24    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Souji Kanai             Marunouchi 3-4-1 shares, Chiyoda-ku, Tokyo             Ceremony Company PS (72) Inventor Yoshiaki Suzuki             Marunouchi 3-4-1 shares, Chiyoda-ku, Tokyo             Ceremony Company PS (72) Inventor Dr. Sakai             Marunouchi 3-4-1 shares, Chiyoda-ku, Tokyo             Ceremony Company PS (72) Inventor Junichi Todo             10-1 Nakahama-cho, Amagasaki-shi Shinko Steel Wire Industrial Co., Ltd.             In the company F term (reference) 2D059 AA41 BB06 BB08 CC25 DD27                       DD28 GG02                 2E164 DA01 DA24

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 PC鋼線又はPC鋼より線の定着装置に
おいて、コンクリート内に埋め込まれたキャスティング
ブロックと、キャスティングブロックに支承されPC鋼
線又はPC鋼より線束を定着する内部コーンを有するボ
ンディングブロックと、PC鋼線又はPC鋼より線を定
着するアンカーヘッドとを備えたことを特徴とするPC
定着装置。
1. A fixing device for a PC steel wire or a PC steel strand, comprising a casting block embedded in concrete and an inner cone supported by the casting block for fixing a PC steel wire or a PC steel wire bundle. And a PC steel wire or an anchor head for fixing the PC steel wire.
Fixing device.
【請求項2】 前記ボンディングブロックを、キャステ
ィングブロックに対してPC鋼線又はPC鋼より線の長
手方向に移動可能に形成したことを特徴とする請求項1
記載のPC定着装置。
2. The bonding block is formed so as to be movable in a longitudinal direction of a PC steel wire or a PC steel wire with respect to a casting block.
The described PC fixing device.
【請求項3】 前記キャスティングブロックに代え、コ
ンクリート内に埋め込まれたケーシングパイプおよびそ
の口元に設置した座金を備えたことを特徴とする請求項
1記載のPC定着装置。
3. The PC fixing device according to claim 1, further comprising a casing pipe embedded in concrete and a washer installed at a mouth of the casing pipe, instead of the casting block.
【請求項4】 請求項1〜3のいずれかに記載のPC定
着装置を用い、PC鋼線又はPC鋼より線を初期緊張し
てアンカーヘッドに定着した後、ボンディングブロック
内に充填材を注入し、変動張力に抵抗する充填材とPC
鋼材との一体錐体を定着部とボンディングブロック内に
形成することを特徴とするPC定着方法。
4. The PC fixing device according to claim 1, wherein a PC steel wire or a PC steel wire is initially tensioned and fixed to the anchor head, and then a filler is injected into the bonding block. And PC that resists variable tension
A PC fixing method characterized in that an integral cone with a steel material is formed in a fixing portion and a bonding block.
JP2002091232A 2002-03-28 2002-03-28 Pc anchorage device and method Pending JP2003286759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002091232A JP2003286759A (en) 2002-03-28 2002-03-28 Pc anchorage device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002091232A JP2003286759A (en) 2002-03-28 2002-03-28 Pc anchorage device and method

Publications (1)

Publication Number Publication Date
JP2003286759A true JP2003286759A (en) 2003-10-10

Family

ID=29236370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002091232A Pending JP2003286759A (en) 2002-03-28 2002-03-28 Pc anchorage device and method

Country Status (1)

Country Link
JP (1) JP2003286759A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010126207A1 (en) * 2009-04-28 2010-11-04 (주)삼우기초기술 Wire tensioner
CN102002911A (en) * 2010-11-10 2011-04-06 中交公路规划设计院有限公司 Carbon fiber cable strand inner sleeve conical bonded anchorage device
JP2012159400A (en) * 2011-02-01 2012-08-23 Nippon Telegraph & Telephone East Corp Diagnostic device and diagnostic method
CN104818804A (en) * 2015-04-20 2015-08-05 北京交通大学 Torsion and disengaging prevention clamping piece type anchorage device assembly part system
KR20180077327A (en) * 2011-04-15 2018-07-06 소레탄체 프레씨네트 Method of protecting the end of a multi-tendon cable

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010126207A1 (en) * 2009-04-28 2010-11-04 (주)삼우기초기술 Wire tensioner
CN102439230A (en) * 2009-04-28 2012-05-02 株式会社三友基础技术 Wire tensioner
JP2012525518A (en) * 2009-04-28 2012-10-22 サムウ ジオテック カンパニー リミテッド Wire pulling machine
AU2009345276B2 (en) * 2009-04-28 2014-02-06 Samwoo Geotech Co., Ltd. Wire tensioner
US8794596B2 (en) 2009-04-28 2014-08-05 Samwoo Geotech Co., Ltd. Wire tensioner
CN102439230B (en) * 2009-04-28 2014-11-12 株式会社三友基础技术 Wire tensioner
CN102002911A (en) * 2010-11-10 2011-04-06 中交公路规划设计院有限公司 Carbon fiber cable strand inner sleeve conical bonded anchorage device
CN102002911B (en) * 2010-11-10 2012-07-11 中交公路规划设计院有限公司 Carbon fiber cable strand inner sleeve conical bonded anchorage device
JP2012159400A (en) * 2011-02-01 2012-08-23 Nippon Telegraph & Telephone East Corp Diagnostic device and diagnostic method
KR20180077327A (en) * 2011-04-15 2018-07-06 소레탄체 프레씨네트 Method of protecting the end of a multi-tendon cable
KR102012838B1 (en) * 2011-04-15 2019-08-21 소레탄체 프레씨네트 Method of protecting the end of a multi-tendon cable
CN104818804A (en) * 2015-04-20 2015-08-05 北京交通大学 Torsion and disengaging prevention clamping piece type anchorage device assembly part system

Similar Documents

Publication Publication Date Title
JP6083702B2 (en) PC steel connection method and bridge widening method
KR20110111907A (en) Saddle assembly
EP3808899B1 (en) System and method for destressing stay cables by incorporation of, or substitution by, improved filler material
KR102098014B1 (en) Ahchoring device using shape memory alloy and constructiion method therefor
US4484425A (en) Anchorage of cables
KR100949440B1 (en) Slab reinforced structure and the form of construction work of concrete structure
JP2007231683A (en) Tension anchoring connection method of connected member by wire
JP2003286759A (en) Pc anchorage device and method
KR100414448B1 (en) Reinforcing armature for repair of concrete structure and repair method using thereof
JP6811678B2 (en) Method of joining concrete structures and concrete members to which continuous fiber reinforced concrete is applied
KR100469579B1 (en) A Pannel Style Reinforcement for Concrete Structure and Repair Method using thereof
CN110331868B (en) External prestress reinforcing method for support pillar removing
KR20130005928A (en) A composite steel box girder using prestressed concrete for a positive moment area of a bridge
KR100400980B1 (en) Method to reinforce pier using steel and thereof apparatus
KR101339367B1 (en) Fabrication and reinforcing method for pre-flex girder
US9315998B1 (en) Cable lock-off block for repairing a plurality of post-tensioned tendons
JP6232300B2 (en) Re-fixing method for existing PC steel
JP2744955B2 (en) Reinforcement structure and reinforcement method of hinge part of gel bar bridge
JP7222824B2 (en) Wall balustrade reinforcement method and reinforcement structure
CN107165059A (en) A kind of construction method of the anti-bend reinforced device of bridge prestress high-strength steel cord
CN114190094A (en) Bridging device and system and method for implementing the same
KR100516769B1 (en) A reinforcement method by anchoring &amp; tensioning steel strand.
JP4944679B2 (en) Truss construction method
KR20080080078A (en) A continuity method of the composite bridges using reusable anchorage devices
JP3906912B2 (en) Adjacent back construction side pre-grout cable bearing plate embedded in front construction side PC girder of split construction multi-span continuous PC girder and structure of fixing part of split construction multi-span continuous PC girder using the same bearing plate

Legal Events

Date Code Title Description
A977 Report on retrieval

Effective date: 20050221

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Effective date: 20050502

Free format text: JAPANESE INTERMEDIATE CODE: A131

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050906