JP2622035B2 - Earth retaining method and earth retaining material - Google Patents

Earth retaining method and earth retaining material

Info

Publication number
JP2622035B2
JP2622035B2 JP3062780A JP6278091A JP2622035B2 JP 2622035 B2 JP2622035 B2 JP 2622035B2 JP 3062780 A JP3062780 A JP 3062780A JP 6278091 A JP6278091 A JP 6278091A JP 2622035 B2 JP2622035 B2 JP 2622035B2
Authority
JP
Japan
Prior art keywords
earth retaining
pair
steel sheet
suspension member
members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3062780A
Other languages
Japanese (ja)
Other versions
JPH04297614A (en
Inventor
邦三 武部
日出夫 風間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sato Kogyo Co Ltd
Original Assignee
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sato Kogyo Co Ltd filed Critical Sato Kogyo Co Ltd
Priority to JP3062780A priority Critical patent/JP2622035B2/en
Publication of JPH04297614A publication Critical patent/JPH04297614A/en
Application granted granted Critical
Publication of JP2622035B2 publication Critical patent/JP2622035B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は土留工法及び同工法に使
用される土留支保工材に係るものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an earth retaining method and an earth retaining material used in the method.

【0002】[0002]

【従来の技術】従来のこの種の工法においては地盤内に
施工した掘削溝に軽量鋼矢板を建込んだのち、同鋼矢板
を掘削溝底部に圧入し、次いで腹起し材、切梁を順次取
付けている。
2. Description of the Related Art In a conventional method of this kind, a lightweight steel sheet pile is erected in a digging groove constructed in the ground, and then the steel sheet pile is pressed into the bottom of the digging groove, and then the bellows and the cutting beam are removed. Installed sequentially.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、前記腹
起し材と切梁の取付に際しては、作業員が掘削溝の内部
に入って作業をしなければならず、その組立て最中に掘
削溝壁の崩壊によって作業員が災害に遭う危険があっ
た。本発明は前記従来技術の有する問題点に鑑みて提案
されたもので、その目的とする処は、掘削溝壁が崩壊す
る可能性のある最も危険な時期に、地上部より土留支保
工を組立て、安全な状態となってから、掘削溝内部で作
業することができるあて矢板土留工法及び同工法に使用
される土留支保工材を提供する点にある。
However, when attaching the flared material and the cutting beam, an operator must enter the inside of the digging groove to perform the work, and during the assembly, the digging groove wall is required. There was a danger that workers could be hit by the collapse. The present invention has been proposed in view of the problems of the prior art described above, and the object thereof is to assemble the earth retaining structure from the above-ground portion at the most dangerous time when the excavation groove wall may collapse. Another object of the present invention is to provide a piled sheet pile retaining method capable of working inside an excavation trench after it is in a safe state and a soil retaining material used in the method.

【0004】[0004]

【課題を解決するための手段】前記の目的を達成するた
め、本発明に係る土留工法によれば、吊込部材より懸垂
された複数の懸吊部材に、相対する一双の腹起し材を着
脱自在に支持するとともに、同一双の腹起し材間に切梁
ジヤツキを装架してなる土留支保工材を、掘削溝内に吊
込み、同掘削溝壁と前記各腹起し材との間に鋼矢板を建
込み、同鋼矢板を掘削溝底部に圧入したのち、前記切梁
ジヤツキを伸長して懸吊部材の下端に起伏自在に枢支さ
れた受台上に支持されている前記一双の腹起し材を前記
各鋼矢板に圧接し、次いで前記各腹起し材と前記懸吊部
材との係着を解除して、同懸吊部材及び前記吊込部材を
撤去するものである。
According to the earth retaining method of the present invention, in order to attain the above object, a pair of hanging members opposed to a plurality of suspension members suspended from the suspension members are provided. Aside from being detachably supported, an earth retaining material constructed by mounting a cutting girder between the same two uplifting materials is suspended in the excavation groove, and the excavation groove wall and each of the uplifting materials After the steel sheet pile is erected, the steel sheet pile is press-fitted into the bottom of the excavation groove, and then the cutting beam jack is extended to be supported on a cradle pivotally supported at the lower end of the suspension member so as to be able to move up and down. Pressing the pair of uplifting members against the respective steel sheet piles, then releasing the engagement between the respective uplifting members and the suspension members, and removing the suspension members and the suspension members It is.

【0005】また本発明に係る土留支保工材は、水平吊
込部材、同吊込部材の前後左右より垂下された懸吊部
材、同各懸吊部材の下端に起伏可能に枢支された受台、
同各受台上に支持された一双の腹起し材、及び同各腹起
し材間に装架された切梁ジヤツキより構成されている。
Further, the earth retaining support material according to the present invention comprises a horizontal suspension member, a suspension member suspended from the front, rear, left and right of the suspension member, and a support pivotally supported on the lower end of each suspension member so as to be able to undulate. Table,
It is composed of a pair of protruding members supported on each of the receiving stands, and a cutting beam jack mounted between the respective protruding members.

【0006】[0006]

【作用】本発明によれば前記したように構成された土留
支保工材を掘削溝内に吊込んで、同土留支保工材におけ
る吊込部材より懸吊部材を介して懸吊された相対する一
双の腹起し材と、掘削溝壁との間隙に鋼矢板を建込み、
同各鋼矢板を掘削溝底部に圧入することによって掘削溝
壁に沿って鋼矢板を打設し、更に前記一双の腹起し材間
に予め装架されていた切梁ジヤツキを地上部より作動し
て伸長せしめ、前記鋼矢板壁に腹起し材を介して切梁ジ
ヤツキを圧着することによって、掘削溝壁にかかる土
圧、地下水圧を鋼矢板、腹起し材及び切梁を介して支持
することによって土留支保工材全体が安定した形になっ
ており、土留作業は安全な環境の下で行なわれる。
According to the present invention, the soil retaining material constructed as described above is suspended in the excavation groove, and the suspended material in the soil retaining material is suspended from the suspended member via the suspension member. A steel sheet pile was built in the gap between one pair of uplifting materials and the excavation trench wall,
Each of the steel sheet piles is pressed into the bottom of the excavation groove to drive a steel sheet pile along the wall of the excavation groove, and further, the cutting beam jacks previously mounted between the pair of flared members are operated from the ground part. The earth pressure and the groundwater pressure applied to the excavation groove wall are pressed through the steel sheet pile, the flared material and the cut beam by pressing the cutting beam jack on the steel sheet pile wall through the flared material. With the support, the entire retaining material is in a stable form, and the retaining operation is performed in a safe environment.

【0007】しかるのち前記土留支保工材における懸吊
部材と腹起し材との係着を解除し、同懸吊部材及び吊込
部材を掘削溝外に取出し、安全な状態を作ってから掘削
溝内に入って所要の施工を行なうものである。
[0007] Thereafter, the engagement between the suspension member and the bulging member in the earth retaining material is released, the suspension member and the suspension member are taken out of the excavation groove, and a safe state is established. It is necessary to go inside and perform necessary construction.

【0008】[0008]

【実施例】以下本発明を図示の実施例について説明す
る。Aは土留支保工材で、相対する一双の互いに平行な
水平横部材1間に一双の水平縦部材2が連結され、同各
縦部材2,2間に夫々一双の連結材3,3が間隔を存し
て連結され、前記各部材1,2,3によって枠状の吊込
材が構成されている。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. A is an earth retaining material, in which a pair of horizontal members 2 is connected between a pair of parallel horizontal members 1 facing each other, and a pair of connecting members 3, 3 are provided between the respective vertical members 2, 2. The members 1, 2, 3 constitute a frame-shaped hanging member.

【0009】なお同連結材3は水平縦部材2に列設され
た取付孔群のうち、所要の取付孔に結合され、縦断方向
の所定の位置に取付調整される。図中4は前記水平縦部
材2の上面に取付けられた吊上金具である。相対する一
双の連結材3,3間には、夫々2組の懸吊部材5が同部
材5の上端ストツパー5aを介して懸吊され、同懸吊部
材5の下端には係止金具6が装着され、同係止金具6に
よって相対する一双の腹起し材7が支持されている。な
おストツパー5aは連結材3に設けた長溝孔3aに結合
されることにより、横断方向の所定位置に取付調整され
る。
The connecting member 3 is coupled to a required mounting hole of the group of mounting holes arranged in the horizontal vertical member 2, and is mounted and adjusted at a predetermined position in the longitudinal direction. In the figure, reference numeral 4 denotes a lifting bracket attached to the upper surface of the horizontal vertical member 2. Two pairs of suspending members 5 are suspended between the opposing pair of connecting members 3 and 3 via the upper end stopper 5a of the member 5, and a locking fitting 6 is provided at the lower end of the suspending member 5. A pair of opposed belly members 7 are mounted and supported by the locking fittings 6. The stopper 5a is attached and adjusted to a predetermined position in the transverse direction by being coupled to the long slot 3a provided in the connecting member 3.

【0010】前記係止金具6は懸吊部材5の下端に嵌装
された筒状部片6aと、同部片6aの下端に枢支(8)
された腹起し材7の受台6bとより構成され、前記筒状
部片6aと懸吊部材5とは夫々に列設されたピン孔に亘
ってピンを挿貫することによって固定され、また受台6
bはそのピン孔6b′と筒状部片6aにおける対応部位
に設けられたピン孔6a′にピンを挿貫することによっ
て水平位置に固定され、かくして係止金具6が上下方向
に亘つて取付位置が調整されるとともに、腹起し材7を
支承するものであり、(図5参照)またこのピンを抜く
ことによって受台6bは下方に回動して、腹起し材7に
対する係止が解除される。(図6参照)更に相対する前
記一双の腹起し材7,7間には水平の切梁ジヤツキ9が
取付具10を介して装架されている。
[0010] The latch 6 is a cylindrical piece 6a fitted to the lower end of the suspension member 5, and is pivotally connected to the lower end of the piece 6a.
The cylindrical part 6a and the suspension member 5 are fixed by inserting pins through the pin holes arranged in a row, respectively. In addition, cradle 6
b is fixed in a horizontal position by inserting a pin into the pin hole 6b 'and a pin hole 6a' provided at a corresponding portion of the cylindrical piece 6a, so that the locking metal member 6 is attached vertically. The position is adjusted and, at the same time, the belly material 7 is supported (see FIG. 5). By removing this pin, the receiving base 6b is rotated downward to lock the belly material 7. Is released. (See FIG. 6) Further, a horizontal cut-off jack 9 is mounted between the pair of opposed protruding members 7, 7 via a fixture 10.

【0011】而して地盤BをバツクホウCによって掘削
し、(図7参照)同掘削溝D内に溝幅より少し小さい幅
に組立てられた前記土留支保工材Aを吊込み挿入する。
(図8参照)この際腹起し材7を図示せぬチエーンによ
つて縦部材2より仮吊する。同土留支保工材Aの腹起し
材7と掘削溝Dの内壁との間に鋼矢板Eを建込み、(図
9参照)同鋼矢板Eを圧入したのち、前記切梁ジヤツキ
9を地上部から油圧ポンプFの操作によって伸長して、
腹起し材7を介して鋼矢板Eを圧着し、(図11参照)
而るのち前記受台6bと筒状部片6aとを連結するピン
を抜取り受台6b)を図6に示すように回動して腹起し
材7に対する係止を解除し(図12参照)しかるのち土
留支保工材Aをクレーン車Gによって撤去し、(図13
参照)掘削溝D内に管Hを敷設して掘削溝Dを埋戻す。
(図14参照)なおこの際チエーンを支保工材より外
し、鋼矢板等に係止しておく。
Then, the ground B is excavated by the backhoe C, and the soil retaining support material A assembled to a width slightly smaller than the groove width is suspended and inserted into the excavation groove D (see FIG. 7).
At this time, the belly 7 is temporarily suspended from the vertical member 2 by a chain (not shown). A steel sheet pile E is erected between the protruding material 7 of the earth retaining material A and the inner wall of the excavation groove D, and the steel sheet pile E is pressed into the steel sheet pile E (see FIG. 9). From the section by the operation of the hydraulic pump F,
The steel sheet pile E is crimped through the protruding material 7 (see FIG. 11).
Thereafter, the pin connecting the receiving table 6b and the cylindrical piece 6a is removed, and the receiving table 6b is rotated as shown in FIG. After that, the earth retaining material A was removed by the crane G and then (Fig. 13).
(See Reference) The pipe H is laid in the trench D and the trench D is backfilled.
(See FIG. 14.) At this time, the chain is detached from the support material, and locked to a steel sheet pile or the like.

【0012】[0012]

【発明の効果】本発明によれば、予め地上で腹起し材と
切梁ジヤツキを組込んだ土留支保工材を掘削溝に吊込
み、同掘削溝壁と前記腹起し材との間に鋼矢板を建込ん
でこれを圧入し、切梁ジヤツキを地上より伸長すること
によって前記一双の腹起し材を鋼矢板に圧接して土留を
行ない、掘削溝壁にかかる土圧・地下水圧を鋼矢板、腹
起し材、及び切梁を介して支持することによって、土留
支保工全体を安定した状態とし、土留作業が安全な環境
の下で行なわれるようにし、掘削溝の崩壊する惧れのあ
る危険な状態のときには掘削溝内に入らないで地上より
土留支保工を組立てて安全な状態を作ってから、同掘削
溝内に入って前記土留支保工材における腹起し材と懸吊
部材との係着を解除して、掘削溝内部の作業を行なうこ
とによって、作業の安全性を確保するものである。
According to the present invention, the earth retaining material, in which the uplifting material and the cut-out jack are previously assembled on the ground, is suspended in the excavation groove, and the space between the excavation groove wall and the uplifting material is hung. A steel sheet pile is erected and inserted into the steel sheet pile, and the cutting beam is extended from the ground so that the pair of flared materials is pressed against the steel sheet pile to carry out soil retention. Is supported through steel sheet piles, uplifting members, and girder beams to stabilize the entire earth retaining structure, ensure that the earth retaining operation is performed in a safe environment, and that the excavation trench may collapse. When there is a dangerous situation, do not enter the excavation trench and assemble the earth retaining structure from the ground to create a safe state, then enter the excavation trench and suspend the bulging material in the earth retaining material. Release the engagement with the suspension members and work inside the excavation trench, It is intended to ensure a full sexual.

【0013】また本発明によれば支保工材の腹起し材と
切梁ジヤツキが予め地上で組込まれてから掘削溝内に吊
込まれるので、山留めの高さ方向の位置決めが正確に行
なわれる。請求項2の発明は水平吊込部材、同吊込部材
の前後左右より垂下された懸吊部材、同各懸吊部材の下
端に起状可能に枢支された受台、同各受台上に支持され
た一双の腹起し材、及び同各腹起し材間に装架された切
梁ジヤツキより土留支保工材を構成したことによって、
前記あて矢板土留工法を、安全にしかも効率よく遂行し
うるものである。
Further, according to the present invention, since the bulging material of the support material and the cut-off jack are previously assembled on the ground and then suspended in the excavation groove, the height of the mountain retaining device is accurately positioned. . The invention of claim 2 is directed to a horizontal suspension member, a suspension member suspended from the front, rear, left and right of the suspension member, a pedestal pivotally supported at the lower end of each suspension member, and on each pedestal. By constructing the earth retaining material from a pair of uplifting materials supported by, and a cut beam jack mounted between each of the uplifting materials,
The above-mentioned sheet pile retaining method can be safely and efficiently performed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る土留支保工材の一実施例を示す斜
視図である。
FIG. 1 is a perspective view showing an embodiment of an earth retaining material according to the present invention.

【図2】前記土留支保工材の平面図である。FIG. 2 is a plan view of the earth retaining material.

【図3】前記土留支保工材の側面図である。FIG. 3 is a side view of the earth retaining material.

【図4】図3の矢視イ−イ図である。FIG. 4 is a view taken along the arrow in FIG. 3;

【図5】図3の矢視ロ−ロ図である。FIG. 5 is a roll view of FIG. 3;

【図6】図5において、腹起し材と懸吊部材の係着を解
除した状態を示す。
FIG. 6 shows a state in which the engagement between the belly member and the suspension member is released in FIG. 5;

【図7】本発明に係る土留工法の一実施例の掘削工程を
示す縦断面図である。
FIG. 7 is a longitudinal sectional view showing an excavation step of one embodiment of the earth retaining method according to the present invention.

【図8】土留支保工材の挿入工程を示す縦断面図であ
る。
FIG. 8 is a vertical cross-sectional view showing a step of inserting a soil retaining material.

【図9】鋼矢板の建込み工程を示す縦断面図である。FIG. 9 is a vertical cross-sectional view showing a steel sheet pile setting process.

【図10】鋼矢板の圧入工程を示す縦断面図である。FIG. 10 is a longitudinal sectional view showing a step of press-fitting a steel sheet pile.

【図11】切梁ジヤツキの配設工程を示す横断側面図で
ある。
FIG. 11 is a cross-sectional side view showing a step of disposing a cutting beam jack.

【図12】腹起し材と懸吊部材との係着解除工程を示す
横断側面図である。
FIG. 12 is a cross-sectional side view showing a step of releasing engagement between the belly member and the suspension member.

【図13】土留支保工材の撤去工程を示す横断側面図で
ある。
FIG. 13 is a cross-sectional side view showing a removal process of the earth retaining material.

【図14】管敷設、埋戻し工程を示す横断側面図であ
る。
FIG. 14 is a cross-sectional side view showing a pipe laying and backfilling step.

【符号の説明】[Explanation of symbols]

A 土留支保工材 B 地盤 D 掘削溝 E 鋼矢板 1 水平横部材 2 水平縦部材 3 連結材 4 吊上金具 5 懸吊部材 6 係止金具 7 腹起し材 9 切梁ジヤツキ Reference Signs List A soil retaining material B ground D excavation groove E steel sheet pile 1 horizontal horizontal member 2 horizontal vertical member 3 connecting material 4 lifting metal fitting 5 hanging member 6 locking metal fitting 7 belly material 9 cutting beam jack

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 吊込部材より懸垂された複数の懸吊部材
に、相対する一双の腹起し材を着脱自在に支持するとと
もに、同一双の腹起し材間に切梁ジヤツキを装架してな
る土留支保工材を、掘削溝内に吊込み、同掘削溝壁と前
記各腹起し材との間に鋼矢板を建込み、同鋼矢板を掘削
溝底部に圧入したのち、前記切梁ジヤツキを伸長して懸
吊部材の下端に起伏自在に枢支された受台上に支持され
ている前記一双の腹起し材を前記各鋼矢板に圧接し、次
いで前記各腹起し材と前記懸吊部材との係着を解除し
て、同懸吊部材及び前記吊込部材を撤去することを特徴
とする土留工法。
1. A pair of suspension members suspended from a suspension member, detachably supporting a pair of opposed protruding members, and mounting a cutting beam jack between the same pair of protruding members. The earth retaining support material is suspended in the excavation groove, a steel sheet pile is erected between the excavation groove wall and each of the bulging materials, and the steel sheet pile is pressed into the excavation groove bottom, and then the The pair of flared members supported on a receiving table pivotally supported at the lower end of a suspension member by extending a cutting beam jack are pressed against the respective steel sheet piles, and then the respective flared jacks are pressed. An earth retaining method, wherein the suspension member is disengaged from the suspension member and the suspension member and the suspension member are removed.
【請求項2】 水平吊込部材、同吊込部材の前後左右よ
り垂下された懸吊部材、同各懸吊部材の下端に起伏可能
に枢支された受台、同各受台上に支持された一双の腹起
し材、及び同各腹起し材間に装架された切梁ジヤツキよ
りなることを特徴とする土留支保工材。
2. A horizontal suspending member, a suspending member suspended from the front, rear, left and right of the suspending member, a pedestal pivotally supported at the lower end of each suspending member, and supported on each pedestal. An earth retaining support material, comprising: a pair of raised materials, and a cut-off jack attached between the raised materials.
JP3062780A 1991-03-27 1991-03-27 Earth retaining method and earth retaining material Expired - Lifetime JP2622035B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3062780A JP2622035B2 (en) 1991-03-27 1991-03-27 Earth retaining method and earth retaining material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3062780A JP2622035B2 (en) 1991-03-27 1991-03-27 Earth retaining method and earth retaining material

Publications (2)

Publication Number Publication Date
JPH04297614A JPH04297614A (en) 1992-10-21
JP2622035B2 true JP2622035B2 (en) 1997-06-18

Family

ID=13210222

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3062780A Expired - Lifetime JP2622035B2 (en) 1991-03-27 1991-03-27 Earth retaining method and earth retaining material

Country Status (1)

Country Link
JP (1) JP2622035B2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6176837U (en) * 1984-10-20 1986-05-23
JPH02232418A (en) * 1989-03-06 1990-09-14 Shiyokuei Sangyo Kk Safe application method of wooden sheet pile for sheathing

Also Published As

Publication number Publication date
JPH04297614A (en) 1992-10-21

Similar Documents

Publication Publication Date Title
JP2684155B2 (en) Excavation method used for construction of underground structures
JP2622035B2 (en) Earth retaining method and earth retaining material
JP3018921B2 (en) Earth retaining method and earth retaining device
GB2053314A (en) Trench shoring
JPH01304217A (en) Jack method of pile and jack device thereof
JP2579584B2 (en) Earth retaining method and earth retaining box
JP3673921B2 (en) Preload panel retaining ring
JPH09111763A (en) Device for pulling-out casing
JPH0346612B2 (en)
JP2000257069A (en) Earth retaining and earth retaining construction method
JP4346029B2 (en) Protection device for earth retaining method and earth retaining method
JP3824384B2 (en) Construction method of shaft and apparatus used in the method
JPH0989159A (en) Pipe line laying method, timbering method, and timbering assembling body
JPH08120676A (en) Earth retaining timbering detaching method and device therefor
JP2583830B2 (en) Construction method of concrete deep foundation pile
JPH04194224A (en) Advancing method for open shield machine and device thereof
JPH082178Y2 (en) Earth retaining plate support device for excavation trench
JPH10266209A (en) Locking structure of cut beam for sheathing/timbering
JP3252365B2 (en) Pillar structure of sheet pile type support for excavation trench
JPH0338271Y2 (en)
JPS6015792Y2 (en) Strut beam device in earth retention shoring
JPS597403Y2 (en) Shoring frame
JPH0310198Y2 (en)
JPS6088725A (en) Sheathing work of excavated trench
JPS605089Y2 (en) Raising stand in earth retaining structure

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080404

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090404

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100404

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100404

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110404

Year of fee payment: 14

EXPY Cancellation because of completion of term