JPH01304217A - Jack method of pile and jack device thereof - Google Patents
Jack method of pile and jack device thereofInfo
- Publication number
- JPH01304217A JPH01304217A JP13042388A JP13042388A JPH01304217A JP H01304217 A JPH01304217 A JP H01304217A JP 13042388 A JP13042388 A JP 13042388A JP 13042388 A JP13042388 A JP 13042388A JP H01304217 A JPH01304217 A JP H01304217A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- guide frame
- foundation
- press
- jack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 10
- 238000005452 bending Methods 0.000 abstract description 4
- 229910000831 Steel Inorganic materials 0.000 description 12
- 239000010959 steel Substances 0.000 description 12
- 238000010276 construction Methods 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000003466 welding Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000010419 fine particle Substances 0.000 description 1
- 230000009931 harmful effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 239000008188 pellet Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Landscapes
- Foundations (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は鉄筋コンクリ−1−造等の比較的重量の大なる
建造物において建築後の年数の経過に件って生ずる構造
1勿の沈下又は最近多く起こっている地盤沈下による諸
構漬物の不等沈下に対処して該構造物を補強するととも
に不等沈下の修正ため又は沈下そのものを停止させ或い
は沈下の発生を未然に防止するため基礎の真下に圧入す
る杭の圧入方法及び圧入装置に関するものである。Detailed Description of the Invention (Industrial Field of Application) The present invention is intended to solve the problem of structural subsidence that occurs over the years after construction in relatively heavy buildings such as reinforced concrete structures. Or, in order to cope with the uneven settlement of various structures due to ground subsidence, which has been occurring frequently recently, to reinforce the structure, and to correct the uneven settlement, to stop the subsidence itself, or to prevent the occurrence of subsidence, the foundation is installed. The present invention relates to a method and a press-in device for press-fitting a pile directly under a pile.
(従来の技術)
鉄筋コンクリート造等の比較的重量の大なる建造物にお
いては、建築後成る年数を経過すると軟弱地盤やヒル建
設等により該建造物が不等沈下する、いわゆる沈下現象
を生ずるのはしはしは見られるところであるか、かかる
沈下現象は建造物の一階床面を道路等の地表面よりも低
下させる等の不都合を生しさせるほか、不等沈下を生し
た場合等には建造物自体に歪みを生じさせて建具等の立
付けを悪くする等の結果をもたらす。(Prior art) In relatively heavy buildings such as those made of reinforced concrete, the so-called subsidence phenomenon occurs in which the building sinks unevenly due to soft ground, hill construction, etc. after several years have passed since construction. This phenomenon of subsidence can cause inconveniences such as lowering the first floor of a building below the ground level of roads, etc., and in cases of uneven subsidence, etc. This results in distortion of the building itself, making it difficult to erect fittings, etc.
従って、かかる建造物の完全且つ安全の使用の維持を図
るためには、既に沈下が生している場合には沈下そのも
のの進行を停止させて当該建造物を補強あるいは沈下修
正することか必要であり、沈下か未だに生していない場
合でも将来沈下の発生が懸念される場合には予め沈下発
生の防止手段を講じておくことが好ましい。Therefore, in order to maintain the complete and safe use of such buildings, if subsidence has already occurred, it is necessary to stop the progress of subsidence and to reinforce the structure or correct the subsidence. Even if subsidence has not yet occurred, if there is a concern that subsidence may occur in the future, it is preferable to take measures to prevent subsidence in advance.
従来、かかる建造物の補強並びに沈下防止及び沈下修正
する方法として第10図に示すように、基礎n′の真下
に杭m′を打って核粒m′で基礎n′を直接受けるいわ
ゆる直接受粒法がある。Conventionally, as shown in Fig. 10, as a method for reinforcing such buildings, preventing settlement, and correcting settlement, a pile m' is driven directly under the foundation n' and the core grain m' directly receives the foundation n'. There is a particle method.
これは、基礎n′の部分の真下に作業空間としての杭孔
H′を掘り、該杭孔H′により露出された基礎n′の下
面に油圧ジヤツキ5′を逆に取り付け、建造物の重さを
利用して油圧ジヤツキ5′を逆に取り付け、建造物の重
さを利用して油圧ジヤツキ5′で約1mの長さの杭m′
を地中に圧入し、電気溶接で鋼管を溶接して順次繋けて
所望の長さ、耐力を有する受粒とするものである。This is done by digging a pile hole H' as a work space directly under the foundation n' part, and installing a hydraulic jack 5' in reverse on the lower surface of the foundation n' exposed by the pile hole H'. Using the weight of the building, install the hydraulic jack 5' in reverse, and using the weight of the building, use the hydraulic jack 5' to install a pile m' with a length of approximately 1 m.
The steel pipes are press-fitted into the ground, and steel pipes are welded using electric welding to connect them one after another to create a pellet with the desired length and yield strength.
(発明か解決しようとする課題)
しかし、こσ)方法は杭の長さとジヤツキの長さとて約
2m程度の作業空間か必要てあり、大きな杭孔の掘削及
び該掘削に伴う土砂の搬出に労力を要するほか、建造物
を支持する仮受台か必要であり、該仮受台の設置に手間
と経費を要し、又人か狭い杭社内に入りそこで高圧の油
圧シャツA・の操作及び杭の溶接作業その細粒の圧入作
業をするため、安全性、作業性、経済性等に多くの問題
かあった。(Problem to be solved by the invention) However, this method requires a working space of about 2 m in terms of the length of the pile and the length of the jack. In addition to requiring labor, a temporary cradle is required to support the structure, and installing the temporary cradle requires time and expense, and it also requires a person to enter the narrow pile interior and operate the high-pressure hydraulic shirt A. Pile welding involves press-fitting fine particles, which poses many problems in terms of safety, workability, economy, etc.
本発明は以上の様な問題に鑑みてなされたものであり、
その目的は、作業者か入らなくてすむ比較的小さい杭孔
の掘削により工事をなし得、掘削量があまり大でないた
め仮受台を設ける必要がなく、高圧ジヤツキの操作及び
杭の溶接作業その細粒の圧入作業等を杭孔の中てする必
要かなく、安全性、経済性、作業性等に優れた杭の圧入
方法及びその装置を提供することである。The present invention was made in view of the above problems, and
The purpose of this is to allow construction work to be carried out by excavating relatively small pile holes that do not require workers to enter, and because the amount of excavation is not very large, there is no need to set up temporary supports, and the work can be done by operating high-pressure jacks and welding the piles. It is an object of the present invention to provide a method for press-fitting piles that does not require press-fitting fine grains into pile holes, and is excellent in safety, economy, workability, etc., and an apparatus therefor.
(課題を達成するための手段)
以上の課題を達成するための本発明の手段は、第一に建
造物における基礎の側面下部の地中に適宜大きさの杭孔
を掘削形成し、該杭孔にジヤツキを備えた上部ガイド枠
と基礎用係止板を突設した下部ガイド枠とが連結部で折
曲可能に形成された圧入装置を、前記基礎用係止板が基
礎下面に係止されるように建造物の側面に沿って起立固
定し、該圧入装置に杭を建込んで前記ジヤツキにより地
中へ押圧し、核粒の頭部が前記連結部に位置した状態で
上部ガイド枠を折り曲げて核粒の頭部に他の杭を連結す
るとともに、」一部カイド枠を復帰させて核粒を再び圧
入することにより前記基礎か支持されてなることを特徴
とする杭の圧入方法に存し、第二に下部背面側に基礎用
係止板が突設された下部ガイド枠に、ガイド板が対向状
に配設されて形成された上部ガイド枠か折曲自在に設け
られ、該上部ガイド枠に逆さにした状態のジヤツキが上
下動自在に設けられてなることを特徴とする杭の圧入装
置に存する。(Means for Achieving the Object) The means of the present invention for achieving the above-mentioned object is, firstly, by excavating and forming a pile hole of an appropriate size in the ground at the lower side of the foundation of a building; A press-fitting device is formed such that an upper guide frame with a jack in the hole and a lower guide frame with a foundation locking plate protruding therefrom can be bent at the connecting portion, and the foundation locking plate locks onto the lower surface of the foundation. The upper guide frame is fixed upright along the side of the building so that it is fixed, and a pile is installed in the press-in device and pressed into the ground by the jack, and with the head of the core grain located in the connection part. A method for press-fitting a pile, characterized in that the pile is supported by the foundation by bending the core and connecting another pile to the head of the core, and partially restoring the guide frame and press-fitting the core again. and secondly, an upper guide frame formed by disposing guide plates facing each other on a lower guide frame having a foundation locking plate protruding from the lower rear side is provided in a bendable manner; The pile press-fitting device is characterized in that an inverted jack is provided on the upper guide frame so as to be movable up and down.
(作用)
而して上記構成によれは、建造物の基礎の側面下部に掘
削形成した杭孔に、圧入装置の下端を挿入して基礎の側
部底面に基礎用係止板が係止されるように圧入装置を収
り付ける。(Function) According to the above configuration, the lower end of the press-fitting device is inserted into the pile hole drilled and formed at the lower side of the foundation of the building, and the foundation locking plate is locked to the bottom of the side of the foundation. Place the press-fitting device so that it fits.
そして、上部ガイド枠内に建込まれた杭の頭部がジヤツ
キにより押圧されると前記基礎用係止板が基礎底面に押
圧され、その反力により杭が地中に圧入され、その頭部
か下部ガイド枠の上部に位置した時に−L部ガイド枠が
前方へ倒伏されて、核粒の頭部に別の杭が溶接して連結
されるとともに、前記上部ガイド枠が復帰して核粒がジ
ヤツキにより再び地中に圧入される。When the head of the pile built in the upper guide frame is pressed by the jack, the foundation locking plate is pressed against the bottom of the foundation, and the reaction force presses the pile into the ground, causing the head of the pile to be pressed into the ground. - When the L part guide frame is located at the top of the lower guide frame, the L section guide frame is lowered forward and another pile is welded and connected to the head of the core grain, and the upper guide frame returns and the core grain is is forced into the ground again by jacks.
(実施例) 以下、本発明の一実施例を図面に基づいて説明する。(Example) Hereinafter, one embodiment of the present invention will be described based on the drawings.
第1図は本発明の杭の圧入装置Aを示したものであり、
上部ガイド枠1と下部ガイド枠2とにより構成されてい
る。FIG. 1 shows a pile press-in device A of the present invention,
It is composed of an upper guide frame 1 and a lower guide frame 2.
上部ガイド枠1は長尺状の鋼製のガイド板3が上端の上
板4により対向状に連結されて門型に形−6〜
成され、これらガイド板3の間にジヤツキ5が逆さの状
態で取り付けられている。The upper guide frame 1 has a gate-shaped structure in which elongated steel guide plates 3 are connected oppositely to each other by a top plate 4 at the upper end. installed in condition.
該ジヤツキ5は油圧及び空気圧等であり、前記ガイド板
3の上下にわたって設けられた取付孔3aに調整金具3
bにより上下動自在に取り付けら。The jacks 5 are hydraulic, pneumatic, etc., and the adjustment fittings 3 are installed in mounting holes 3a provided above and below the guide plate 3.
It is attached so that it can be moved up and down with b.
れ、該調整金具3bによりその取付高さが調整される。The mounting height is adjusted by the adjustment fitting 3b.
また上部ガイド枠1の下部には下部ガイド枠2かガイド
板3の内側に取付ピン6.6′により設けられている。At the lower part of the upper guide frame 1, mounting pins 6,6' are provided inside the lower guide frame 2 or the guide plate 3.
該取付ピン6.6′は両力イト板3の前後部に設けられ
、後部取付ピン6′が取外可能に設けられることにより
、上部ガイド枠1が前部取付ピン6を中心にして前方へ
回動して倒伏される。The mounting pins 6 and 6' are provided at the front and rear of the double force plate 3, and the rear mounting pin 6' is removably provided, so that the upper guide frame 1 can be moved forward with the front mounting pin 6 as the center. It rotates and falls down.
該下部ガイド枠2は平面コ字状で背面下部に基礎用係止
板7が突設されている。The lower guide frame 2 has a U-shaped plan view and has a foundation locking plate 7 protruding from the lower part of the back surface.
該基礎用係止板7は基礎の底面に係止されて杭の圧入装
置Aを起立支持するものてあり、ガイド板3背面の両側
に平行に突設された補強板7aと該補強板7aの上面に
わたって取り付けられた基礎受板7 bとにより形成さ
れている。The foundation locking plate 7 is locked to the bottom of the foundation to support the pile press-in device A in an upright manner, and includes a reinforcing plate 7a protruding parallel to both sides of the back surface of the guide plate 3 and the reinforcing plate 7a. It is formed by a base plate 7b attached over the upper surface of the base plate 7b.
次に、核粒の圧入装置Aを使用した圧入杭mの構築工法
について説明する。Next, a method for constructing a press-in pile m using the core grain press-in device A will be explained.
まず始めに、建造物B下の杭設置箇所に適宜大きさの杭
孔Hを掘削する。First, a pile hole H of an appropriate size is drilled at the pile installation location under the building B.
この杭孔■1は杭mの圧入装置Aの先端が挿入可能であ
りかつ、基礎用係止板7が基礎底面に係止できる大きさ
及び深さてあればよく、杭mを圧入するすく近くの地表
面から掘削して基礎nの底面か露出し、そこに基礎用係
止板7か挿入てきる程度の横孔を+−ンネル状に掘削す
る。This pile hole 1 only needs to be large enough and deep enough for the tip of the press-fitting device A of the pile m to be inserted therein, and that the foundation locking plate 7 can be locked to the bottom of the foundation, and should be close enough to press-fit the pile m. Excavate from the ground surface to expose the bottom of the foundation n, and excavate a horizontal hole in the shape of a +/- tunnel to the extent that the foundation locking plate 7 can be inserted therein.
そして、該杭孔I4内に下部ガイド枠2を挿入してその
基礎用係止板7を基礎n底面に係止させて杭の圧入装置
Aか建造物の基礎nに沿って起立するように取り付け、
地面及び建造物の壁体に固定された支持部材により圧入
装置Aを支持固定する。Then, the lower guide frame 2 is inserted into the pile hole I4, and the foundation locking plate 7 is locked to the bottom surface of the foundation n, so that the pile press-in device A stands up along the foundation n of the building. attachment,
The press-fitting device A is supported and fixed by support members fixed to the ground and the wall of the building.
次に、圧入装置Aに鋼管杭mを建て込むとともにジヤツ
キ5を作動させて鋼管杭mの頭部を下側へ押圧する。Next, the steel pipe pile m is inserted into the press-fitting device A, and the jack 5 is operated to press the head of the steel pipe pile m downward.
このジヤツキ5の押圧力により基礎用係止板7か基礎底
面に押圧され、その反力により鋼管杭mか地中に圧入さ
れる。核粒mか地中へ圧入されてその頭部か前記下部ガ
イド枠2の上端付近に位置したら後部取付ピン6′を取
り外して上部ガイド枠1を前部取付ピン6を中心にして
前方へ回動させて倒伏させ、該鋼管杭mの頭部に他の鋼
管杭Mを重ねて電気溶接により連結する。この鋼管杭m
を連結した後、上部カイ1〜枠1を後側へ回動して起立
させ、後部取付ピン6′により固定する。The foundation locking plate 7 is pressed against the bottom surface of the foundation by the pressing force of the jack 5, and the steel pipe pile m is press-fitted into the ground by the reaction force. When the core grain m is press-fitted into the ground and its head is located near the upper end of the lower guide frame 2, the rear mounting pin 6' is removed and the upper guide frame 1 is rotated forward around the front mounting pin 6. The steel pipe pile M is moved and laid down, and another steel pipe pile M is placed on top of the head of the steel pipe pile M and connected by electric welding. This steel pipe pile m
After connecting the parts, the upper part 1 to the frame 1 are rotated rearward to stand up, and fixed with rear mounting pins 6'.
そして、該鋼管杭mをジヤツキ5により再び地中に圧入
するとともに、この一連の動作を繰り返すことにより規
定の深さまて圧入して所定の支持力を保持させる。Then, the steel pipe pile m is again press-fitted into the ground by the jack 5, and by repeating this series of operations, it is press-fitted to a specified depth and a predetermined supporting force is maintained.
次に該鋼管杭mの杭頭にブラケットm1取り付けるとと
もに、該フラケッJ−m2に修正用ジヤツキ5aを設置
し、これに規定の加重を加えて水平修正する。Next, a bracket m1 is attached to the pile head of the steel pipe pile m, and a correction jack 5a is installed on the flake J-m2, and a specified load is applied to it to correct the horizontal position.
そしてこの水平の修正後、修正用ジヤツキ5aを外して
本受台を設置して建物を受ける。After this horizontal correction, the correction jack 5a is removed and the main pedestal is installed to receive the building.
次に該杭頭に鉄筋を配筋、補強して仮枠を作成し、そこ
に充填コンクリートを打設して固定するとともに杭孔H
に土砂を埋戻して整地する。Next, a temporary frame is created by arranging and reinforcing reinforcing bars on the pile head, and filling concrete is poured into the frame to fix it, and the pile hole H
The land will be leveled by backfilling with earth and sand.
(発明の効果)
本発明は以上の様な構成にしたことにより下記の効果を
有する。(Effects of the Invention) The present invention has the following effects by having the above configuration.
■ 杭の圧入装置を逆にしたジヤツキを備えた上部ガイ
ド枠と、基礎用゛係止板を備えた下部ガイド枠とで形成
するとともに、該上部ガイド枠が下部ガイド枠の上部て
前方へ回動して起伏自在に形成したことにより、建造物
におりる基礎の下側を深く掘らなくても杭を圧入するこ
とかてきるので、労働力を少なくかつ工期を短縮するこ
とがてき、作業性及び経済性の向」二を図ることができ
る。■ It is formed by an upper guide frame equipped with a jack that is an inverted version of the pile press-in device, and a lower guide frame equipped with a foundation locking plate, and the upper guide frame is rotated forward by the upper part of the lower guide frame. By moving and forming the foundation so that it can rise and fall freely, piles can be press-fitted without having to dig deep under the foundation of the building, which reduces labor and shortens the construction period. It is possible to improve both gender and economic efficiency.
■ 建造物における基礎の側面下部の地中に適宜大きさ
の杭孔を掘削形成し、該杭孔にジヤツキを備えた上部ガ
イド枠と基礎用係止板を突設した下部カイ1〜枠とか連
結部で折曲可能に形成された圧入装置を、前記基礎用係
止板か基礎下面に係止されるように建造物の側面に沿っ
て起立固定し、該圧入装置に杭を建込んで前記ジヤツキ
により地中へ押圧し、核粒の頭部か前記連結部に位置し
た状態で上部ガイド枠を折り曲けて核粒の頭部に他の杭
を連結することにより、杭の連結が地上においてするこ
とかできるので、従来の杭孔内における溶接作業に伴う
弊害を除去することかでき、安全性の向上を図ることが
できる。■ A pile hole of an appropriate size is excavated in the ground at the bottom of the side of the foundation of a building, and an upper guide frame with jacks and a foundation locking plate are protruded into the pile hole to form a lower frame. A press-fitting device formed to be bendable at the connecting portion is fixed upright along the side of the building so as to be locked to the foundation locking plate or the lower surface of the foundation, and a pile is erected in the press-fitting device. The piles are connected by pressing into the ground with the jack, bending the upper guide frame while the head of the core grain is located at the connecting part, and connecting another pile to the head of the core grain. Since it can be carried out above ground, it is possible to eliminate the harmful effects associated with conventional welding work inside pile holes, and it is possible to improve safety.
第1図は本発明の杭の圧入装置の使用状態を示す正面図
、第2図は同側面図、第3図は斜視図、第4図〜第7図
は杭の圧入装置を使用した杭の横築工法の作動図、第8
図は従来例を示す断面図である。
A・杭の圧入装置 B:建造物
H:杭孔 m:杭
n、基礎 1:上部ガイド枠2・下部ガイ
ド枠 3・ガイド板
5:シャッキ 7・基礎用係止板手続補正書
昭和63年9月6日Fig. 1 is a front view showing how the pile press-in device of the present invention is used, Fig. 2 is a side view of the same, Fig. 3 is a perspective view, and Figs. 4 to 7 show piles using the pile press-in device. Operation diagram of the horizontal construction method, No. 8
The figure is a sectional view showing a conventional example. A: Pile press-in device B: Building H: Pile hole m: Pile n, foundation 1: Upper guide frame 2, lower guide frame 3, Guide plate 5: Shackle 7, Foundation locking plate procedure amendment book 1988 September 6th
Claims (2)
さの杭孔を掘削形成し、該杭孔にジャッキを備えた上部
ガイド枠と基礎用係止板を突設した下部ガイド枠とが連
結部で折曲可能に形成された圧入装置を、前記基礎用係
止板が基礎下面に係止されるように建造物の側面に沿っ
て起立固定し、該圧入装置に杭を建込んで前記ジャッキ
により地中へ押圧し、該杭の頭部が前記連結部に位置し
た状態で上部ガイド枠を折り曲げて該杭の頭部に他の杭
を連結するとともに、上部ガイド枠を復帰させて該杭を
再び圧入することにより前記基礎が支持されてなること
を特徴とする杭の圧入方法。(1) A pile hole of an appropriate size is excavated in the ground at the lower side of the foundation of a building, and an upper guide frame with a jack and a lower guide frame with a foundation locking plate protruding into the pile hole. A press-fitting device, which is formed to be bendable at the connecting portion, is fixed upright along the side of the building so that the foundation locking plate is locked to the lower surface of the foundation, and a pile is erected in the press-fitting device. Press the pile into the ground with the jack, bend the upper guide frame with the head of the pile located at the connecting part, connect another pile to the head of the pile, and return the upper guide frame. A method for press-fitting piles, characterized in that the foundation is supported by press-fitting the piles again.
ド枠に、ガイド板が対向状に配設されて形成された上部
ガイド枠が折曲自在に設けられ、該上部ガイド枠に逆さ
にした状態のジャッキが上下動自在に設けられてなるこ
とを特徴とする杭の圧入装置。(2) A lower guide frame with a foundation locking plate protruding from the lower back side is provided with an upper guide frame formed by opposing guide plates, and the upper guide frame is provided with a bendable upper guide frame. A pile press-fitting device characterized in that a jack in an upside down state is provided so as to be movable up and down.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13042388A JPH0621456B2 (en) | 1988-05-30 | 1988-05-30 | Pile press-fitting method and press-fitting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13042388A JPH0621456B2 (en) | 1988-05-30 | 1988-05-30 | Pile press-fitting method and press-fitting device |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH01304217A true JPH01304217A (en) | 1989-12-07 |
JPH0621456B2 JPH0621456B2 (en) | 1994-03-23 |
Family
ID=15033893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP13042388A Expired - Fee Related JPH0621456B2 (en) | 1988-05-30 | 1988-05-30 | Pile press-fitting method and press-fitting device |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0621456B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0827829A (en) * | 1994-07-14 | 1996-01-30 | Fujio Itagaki | Settlement correction method of building |
JP2008144499A (en) * | 2006-12-12 | 2008-06-26 | Tama Kayaku Kiko Kk | Weight dropping device |
JP2017190635A (en) * | 2016-04-14 | 2017-10-19 | 清水建設株式会社 | Construction method for steel pipe pile |
KR102170886B1 (en) * | 2020-07-21 | 2020-10-28 | 김창재 | Building repair method |
-
1988
- 1988-05-30 JP JP13042388A patent/JPH0621456B2/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0827829A (en) * | 1994-07-14 | 1996-01-30 | Fujio Itagaki | Settlement correction method of building |
JP2008144499A (en) * | 2006-12-12 | 2008-06-26 | Tama Kayaku Kiko Kk | Weight dropping device |
JP2017190635A (en) * | 2016-04-14 | 2017-10-19 | 清水建設株式会社 | Construction method for steel pipe pile |
KR102170886B1 (en) * | 2020-07-21 | 2020-10-28 | 김창재 | Building repair method |
Also Published As
Publication number | Publication date |
---|---|
JPH0621456B2 (en) | 1994-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2007182741A (en) | Differentially settled foundation correcting and reinforcing method by underpinning | |
KR101793037B1 (en) | Construction method of permanent wall with retaining wall combined PHC pile and steel pipe | |
KR101511265B1 (en) | Construction method for supporting structure of temporary bridge tayp | |
JP5698405B1 (en) | Ground improvement solid foundation method | |
JPH01304217A (en) | Jack method of pile and jack device thereof | |
JP3029797B2 (en) | Building horizontal restoration method and steel pipe pile joint | |
JP4868610B2 (en) | Building subsidence restoration method | |
KR102307510B1 (en) | Temporary earth retaining structure and Construction method using the same | |
JP5739051B1 (en) | Liquefaction countermeasure structure for ground improvement solid foundation and correction method for occurrence of uneven settlement due to liquefaction | |
JPH0559728A (en) | Sheathing work above underground structure | |
KR100652525B1 (en) | The land-side protection bar setting apparatus | |
KR20140116695A (en) | The underground structure and pressing device | |
JP4097853B2 (en) | Building horizontal restoration method and bracket used therefor | |
JP2613417B2 (en) | Construction method of underground structure | |
JP3824384B2 (en) | Construction method of shaft and apparatus used in the method | |
JP4879582B2 (en) | How to extend the basement floor under the foundation of an existing building | |
JPH0813494A (en) | Fixing method of earth retaining wall and timbering | |
JPH0366456B2 (en) | ||
JPH10266209A (en) | Locking structure of cut beam for sheathing/timbering | |
JP2001336151A (en) | Ground excavation method using shore strut type earth retaining timbering | |
JPH0520531B2 (en) | ||
JPS6095027A (en) | Building method of underground press-in pile | |
JPS6145023B2 (en) | ||
JPH04315610A (en) | Steel pile driving method and steel pile | |
JP2024092112A (en) | EARTH HOLE DUCTILIZER AND EARTH HOLE CONSTRUCTION METHOD |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |