JP3018921B2 - Earth retaining method and earth retaining device - Google Patents

Earth retaining method and earth retaining device

Info

Publication number
JP3018921B2
JP3018921B2 JP6245198A JP24519894A JP3018921B2 JP 3018921 B2 JP3018921 B2 JP 3018921B2 JP 6245198 A JP6245198 A JP 6245198A JP 24519894 A JP24519894 A JP 24519894A JP 3018921 B2 JP3018921 B2 JP 3018921B2
Authority
JP
Japan
Prior art keywords
vertical
jack
earth retaining
retaining device
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6245198A
Other languages
Japanese (ja)
Other versions
JPH08109634A (en
Inventor
和史 楠瀬
正敏 苫米地
正和 本間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries Ltd filed Critical Sumitomo Metal Industries Ltd
Priority to JP6245198A priority Critical patent/JP3018921B2/en
Publication of JPH08109634A publication Critical patent/JPH08109634A/en
Application granted granted Critical
Publication of JP3018921B2 publication Critical patent/JP3018921B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本願発明は、管の埋設などのため
の開削工事の際に利用する土留工法および同工法に使用
する土留支保装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a soil retaining method used for digging work for burying pipes and the like and a soil retaining device used for the method.

【0002】[0002]

【従来の技術】従来の土留工法においては、地盤内に施
工した掘削溝に軽量鋼矢板を建て込んだ後、この鋼矢板
を掘削溝底部に圧入または打設し、続いて作業員が掘削
溝内に入り、腹起し、切梁を順次取り付けていた。
2. Description of the Related Art In a conventional earth retaining method, a lightweight steel sheet pile is erected in an excavation groove constructed in the ground, and then the steel sheet pile is pressed or driven into the bottom of the excavation groove. He went inside, provoked, and attached cutting beams in sequence.

【0003】しかし、この掘削溝内での土留工事には、
掘削溝壁の崩壊によって作業員が災害に遇う危険があっ
た。
[0003] However, in the earth retaining work in this excavation trench,
Workers were at risk of disaster due to collapse of the excavation wall.

【0004】この問題を解決するため、掘削溝内での土
留工事を必要としない土留工法および土留支保工材とし
て、特開平4−297614号公報記載のものが開発さ
れている。
In order to solve this problem, Japanese Unexamined Patent Publication (Kokai) No. 4-297614 has been developed as an earth retaining method and an earth retaining material which does not require earth retaining work in an excavation trench.

【0005】同公報記載の土留工法および土留支保工材
では、まず吊込部材より懸垂された懸吊部材に、相対す
る一対の腹起し材を着脱自在に支持するとともに、各腹
起し材間に切梁ジャッキを装架してなる土留支保工材を
掘削溝内に吊り込み、掘削溝壁と各腹起し材との間に鋼
矢板を建て込んで圧入した後、地上部からの操作によっ
て切梁ジャッキを伸張して腹起し材に圧接し、次いで各
腹起し材と懸吊部材との係着を解除して、懸吊部材と吊
込部材とを引き上げるようにしている。
In the earth retaining method and the earth retaining material described in the publication, a pair of opposed flaring materials are first detachably supported on a suspending member suspended from a suspending member, and each of the convex members is detachably supported. Soil retaining material, with a girder jack inserted between them, is suspended in the excavation trench, steel sheet piles are inserted between the excavation trench wall and each bulging material, and then press-fitted. The cutting beam jack is extended by operation and pressed against the protruding material, and then the engagement between each protruding material and the suspending member is released, and the suspending member and the suspending member are lifted. .

【0006】[0006]

【発明が解決しようとする課題】しかし、上記特開平4
−297614号公報記載の土留工法および土留支保工
材においても、以下のような問題点がある。
However, the above-mentioned Japanese Patent Application Laid-Open No.
The earth retaining method and the earth retaining material described in Japanese Patent No. 297614 also have the following problems.

【0007】 一度に1対の腹起し材および切梁ジャ
ッキを設置するのみに止まり、2段腹起し(および切
梁)を必要とする場合等には、極めて効率が悪くなる。
[0007] Efficiency is extremely poor when only a pair of belly members and a girder jack are installed at a time, and two-stage girder (and girder) are required.

【0008】 腹起し材と切梁ジャッキが四角形の平
面を構成するが、その平面に対する面外方向の力に対し
ては、構造的に不安定である。
The flared material and the joist jack constitute a square plane, but are structurally unstable against out-of-plane forces on that plane.

【0009】 切梁ジャッキを伸張する際、油圧ポン
プと接続するホースを切梁ジャッキの注水口に装着する
のに、作業員が掘削溝内に身を乗り出さざるを得ない状
況となり、危険である。
[0009] When extending the cutting beam jack, it is dangerous to attach a hose connected to the hydraulic pump to the water inlet of the cutting beam jack, so that the operator must lean out into the excavation groove, which is dangerous. is there.

【0010】 支保工を撤去する際、腹起し材と懸吊
部材との係着を解除する等の煩雑な分解作業を要する。
また、支保工を撤去する時期が腹起し材、鋼矢板、切梁
撤去の時期と異なり、二度手間となる。
[0010] When the support is removed, a complicated disassembling operation such as releasing the engagement between the belly member and the suspension member is required.
In addition, the time to remove the shoring is different from the time to remove the timber, steel sheet pile and girder, and it takes two times.

【0011】本願発明は、上述のような問題点の解決を
図ったものであり、土留工事を地上から安全にしかも効
率良く施工できる土留工法および同工法に使用する土留
支保装置を提供することを目的としている。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and an object of the present invention is to provide an earth retaining method capable of safely and efficiently executing earth retaining work from the ground and an earth retaining device used for the method. The purpose is.

【0012】[0012]

【課題を解決するための手段】本願発明の土留工法は、
掘削溝幅方向に渡される前後1対のビーム材からなる
り治具と、各吊り治具に対しそれぞれ上端を掘削溝幅方
向に摺動自在に連結した左右1対、前後で2対の縦材
と、前後の縦材間に上下2段に配置した左右の腹起し
と、この腹起しに対応させて左右の縦材間に上下2段に
配置した伸縮可能な切梁ジャッキとからなり、これらの
縦材、腹起し、および切梁ジャッキにより直方体のフレ
ームを形成してなる土留支保装置を、組み立てた状態で
一体として吊り治具を介して掘削溝内に吊り込み、掘削
溝の溝壁と土留支保装置の腹起しとの間に矢板を建て込
み、掘削溝底部に圧入または打設した後、切梁ジャッキ
を伸張し、腹起しを矢板に圧接して土圧に抵抗させるこ
とを特徴とする。
The earth retaining method according to the present invention comprises:
A pair of front and rear suspension jigs, which are passed in the width direction of the excavation groove, and a pair of left and right, front and rear, each of which has an upper end slidably connected in the width direction of the excavation groove with respect to each suspension jig With two pairs of vertical members, left and right prongs arranged in two vertical stages between the front and rear vertical members, and expandable and contractible disposed in two vertical stages between the left and right vertical members corresponding to the prominence In the assembled state, an earth retaining device consisting of a cutting beam jack and forming a rectangular parallelepiped frame by these vertical members, protruding, and cutting beam jack is assembled.
It is suspended as a unit in the excavation groove via a suspension jig , a sheet pile is erected between the groove wall of the excavation groove and the bulge of the soil retaining device, and after being press-fitted or driven into the bottom of the excavation groove, the beam is cut off. The jack is stretched and the prong is pressed against the sheet pile to resist earth pressure.

【0013】縦材、腹起し、および切梁ジャッキが直方
体のフレームを形成していることで、構造的に安定して
おり、地上で組み立てたものを一体として掘削溝内に吊
り込むことができ、埋設管の敷設後も、分解することな
く切梁ジャッキを縮めて一体として地上へ吊り上げるこ
とができる。
[0013] Since the vertical members, the uprights, and the cut-off jacks form a rectangular parallelepiped frame, they are structurally stable, and can be hung in the excavation trench as a unit assembled on the ground. Even after the laying of the buried pipe, the cutting beam jack can be shrunk without disassembly and lifted as one piece to the ground.

【0014】また、上下2段の腹起しと切梁ジャッキを
備えているため、2段腹起しを必要とする場合におい
て、効率的に対処することができる。
[0014] Further, since the apparatus includes the upper and lower two-stage bulging and the cutting beam jack, it is possible to efficiently cope with the case where the two-stage bulging is required.

【0015】埋設管等の掘削溝への敷設に関しては、上
述のようにして、切梁ジャッキを伸張し、腹起しを矢板
に圧接して土圧に抵抗させ、安全な状態を作ってから作
業員が掘削溝内に入って管の吊り降ろし、管の接続や溶
接等、所要の作業を行うことができ、施工全体としても
安全性が高い。
Regarding the laying of buried pipes and the like in excavation trenches, as described above, the cutting beam jack is extended, and the bulge is pressed against the sheet pile to resist the earth pressure, and a safe state is established. Workers can enter the excavation trench, perform necessary operations such as hanging and lowering the pipe, connecting and welding the pipe, and the overall construction is highly safe.

【0016】本願発明の土留支保装置は、上記土留工法
に使用するための装置であり、掘削溝幅方向に渡される
前後1対のビーム材からなる吊り治具と、各吊り治具に
対しそれぞれ上端を掘削溝幅方向に摺動自在に連結した
左右1対、前後で2対の縦材と、前後の縦材間に上下2
段に配置した左右の腹起しと、この腹起しに対応させて
左右の縦材間に上下2段に配置した伸縮可能な切梁ジャ
ッキとからなり、これら縦材、腹起し、および切梁ジャ
ッキにより直方体のフレームを形成してなることを特徴
とする。
The earth retaining支保apparatus of the present invention is a device for use in the earth retaining method, the hanging jig consists longitudinal pair of beam members that are passed to the excavation width direction, respectively for each lifting jigs A pair of left and right vertical members with the upper end slidably connected in the width direction of the excavation groove, two pairs of vertical members in front and rear, and two vertical members between front and rear vertical members
It consists of left and right prongs arranged in steps, and stretchable cutting beam jacks arranged in two steps up and down between left and right vertical members corresponding to this prominence. It is characterized in that a rectangular parallelepiped frame is formed by cutting beam jacks.

【0017】なお、切梁ジャッキとしては、例えば水圧
ジャッキあるいは油圧ジャッキ等の流体圧ジャッキを用
いることができ、その場合、流体圧ジャッキの注水口と
地上のポンプを接続するホースを土留支保装置の縦材に
取り付けておき、地上での土留支保装置の組み立ての際
に流体圧ジャッキの注水口にホースをつないでおくこと
で、施工時に、作業員が掘削溝内に身を乗り出すことな
く、地上から切梁ジャッキの伸縮操作を行うことができ
る。
As the cutting beam jack, for example, a hydraulic jack such as a hydraulic jack or a hydraulic jack can be used. In this case, a hose connecting the water inlet of the hydraulic jack and a pump on the ground is connected to the earth retaining device. By attaching a hose to the water inlet of the fluid pressure jack when assembling the earth retaining device on the ground, the worker can lean on the ground without digging into the excavation groove during construction. Can be operated to expand and contract the cutting beam jack.

【0018】[0018]

【実施例】以下、図示した実施例について説明する。BRIEF DESCRIPTION OF THE DRAWINGS FIG.

【0019】図1および図2は、本願発明の土留支保装
置の一実施例について、組立て状態を示したものであ
る。
FIGS. 1 and 2 show an assembled state of an embodiment of the earth retaining device according to the present invention.

【0020】土留支保装置1は、掘削溝幅方向に渡され
る前後1対の吊り治具2と、各吊り治具2に対し掘削溝
幅方向に摺動自在に連結した左右1対、前後で2対の縦
材3と、前後の縦材3間に上下2段に配置した左右の腹
起し4と、腹起し4に対応させて左右の縦材3間に上下
2段に配置した伸縮可能な切梁ジャッキ5とからなる。
The earth retaining device 1 includes a pair of front and rear hanging jigs 2 which are passed in the width direction of the excavation groove, and a pair of right and left suspension jigs which are slidably connected to each of the hanging jigs 2 in the width direction of the excavation groove. Two pairs of vertical members 3, left and right prongs 4 arranged in two vertical stages between the front and rear vertical members 3, and two vertical columns between the left and right vertical members 3 corresponding to the prongs 4. The extensible cutting beam jack 5.

【0021】上述の構成により、縦材3、腹起し4、お
よび切梁ジャッキ5が吊り治具2に吊り支持される直方
体のフレームを形成し、地上で組み立てたものを吊り治
具2を介して一体として掘削溝内に吊り降ろすことがで
き、再び地上に吊り上げる際も直方体のフレームの状態
で一体として吊り上げることができる。
According to the above-described structure, the vertical member 3, the belly 4 and the cutting beam jack 5 form a rectangular parallelepiped frame which is suspended and supported by the suspending jig 2, and assembled on the ground to form the suspending jig 2. It can be hung in the excavation groove as a single unit, and can also be hung in the state of a rectangular parallelepiped frame when hung on the ground again.

【0022】地上での組立てでは、まず、縦材3と切梁
ジャッキ5(本実施例では切梁ジャッキ5として水圧ジ
ャッキを用いている)を接続ピン6で接続する。この
時、切梁ジャッキ5の注水口7が上側にくるように組み
立て、接続ピン6を縦材3の受部のピン孔に上から差し
込む。また、接続ピン6の下部には、接続後、割りピン
8を挿入し、抜け出しを防止する。
In assembling on the ground, first, the vertical member 3 and the cutting beam jack 5 (in this embodiment, a hydraulic jack is used as the cutting beam jack 5) are connected by connecting pins 6. At this time, the assembling is performed so that the water inlet 7 of the cutting beam jack 5 is directed upward, and the connection pin 6 is inserted into the pin hole of the receiving portion of the vertical member 3 from above. After the connection, the split pin 8 is inserted below the connection pin 6 to prevent the connection pin 6 from coming off.

【0023】次に、縦材3に取り付けてあるホース9を
切梁ジャッキ5の注水口7に接続する。
Next, the hose 9 attached to the vertical member 3 is connected to the water inlet 7 of the cutting beam jack 5.

【0024】続いて、縦材3と吊り治具2をボルト10
で接続する。本実施例における吊り治具2は中央に吊り
上げるためのフック11を有するビーム材であり、縦材
3との接続位置にはボルト10を通すための長溝12が
形成されている。一方、縦材3の上端にはボルト孔14
を有する上向きに開口する断面コ字状の受部13が形成
されており、受部13に吊り治具2を載せ、ボルト10
で接続することで、切梁ジャッキ5を伸縮させたとき、
ボルト10が長溝12内で摺動し、吊り治具2に対する
縦材3の掘削溝幅方向の摺動を可能としている。
Subsequently, the vertical member 3 and the hanging jig 2 are
Connect with. The suspension jig 2 in this embodiment is a beam member having a hook 11 for lifting in the center, and a long groove 12 for passing the bolt 10 is formed at a connection position with the vertical member 3. On the other hand, a bolt hole 14 is provided at the upper end of the vertical member 3.
A receiving portion 13 having a U-shaped cross section and having an upward opening is formed, and the hanging jig 2 is placed on the receiving portion 13 and the bolt 10
By connecting with, when the cutting beam jack 5 is expanded and contracted,
The bolt 10 slides in the long groove 12 and enables the vertical member 3 to slide in the excavation groove width direction with respect to the hanging jig 2.

【0025】上述のようにして、吊り治具2、縦材3お
よび切梁ジャッキ5からなる前後のユニットα、βが組
み立てられ、最後に、ユニットα、βを立てて、4本の
腹起し4をボルト15で縦材3に接続することで、直方
体のフレームを構成する土留支保装置1が完成する。
As described above, the front and rear units α and β composed of the hanging jig 2, the vertical member 3 and the cutting beam jack 5 are assembled. By connecting the work 4 to the longitudinal member 3 with the bolt 15, the soil retaining device 1 constituting a rectangular parallelepiped frame is completed.

【0026】図3〜図7は、上記土留支保装置1を用い
た本願発明の土留工法の一実施例における施工手順を示
したもので、以下の手順で作業を行う。
FIGS. 3 to 7 show construction steps in one embodiment of the earth retaining method of the present invention using the earth retaining device 1, and work is performed in the following procedure.

【0027】 バックホウ21で地盤31に掘削溝3
2を掘削する(図3参照)。
The excavation groove 3 is formed on the ground 31 by the backhoe 21.
2 is excavated (see FIG. 3).

【0028】 溝幅より少し小さい幅に地上で組み立
てた土留支保装置1を、掘削溝32に吊り込む(図4参
照)。
The retaining device 1 assembled on the ground to a width slightly smaller than the groove width is hung in the excavation groove 32 (see FIG. 4).

【0029】 土留支保装置1の腹起し4と掘削溝3
2の内壁との間に鋼矢板22を建て込み、圧入あるいは
打設する(図5参照)。
The bulge 4 and the excavation trench 3 of the earth retaining device 1
The steel sheet pile 22 is erected between the inner wall 2 and the inner wall 2 and press-fitted or driven (see FIG. 5).

【0030】 注水口から地上部へ延ばしたホース9
により、土留支保装置1の切梁ジャッキ5を作業員が掘
削溝32内に身を乗り出すことなく操作して伸張し、腹
起し4を介して鋼矢板22を圧着することにより、掘削
溝32の溝壁にかかる土圧、地下水圧を支持する(図6
参照)。
Hose 9 extending from the water inlet to the ground
Accordingly, the cutting beam jack 5 of the earth retaining device 1 is extended by operating the worker without leaning into the excavation groove 32, and the steel sheet pile 22 is crimped through the belly 4 to press the excavation groove 32. To support the earth pressure and the groundwater pressure applied to the ditch wall (Fig. 6
reference).

【0031】 管23の埋設後、鋼矢板22および土
留支保装置1を分解することなく撤去する(図7参
照)。
After the pipe 23 is buried, the steel sheet pile 22 and the earth retaining device 1 are removed without disassembly (see FIG. 7).

【0032】[0032]

【発明の効果】 本願発明においては、土留支保装置の縦材、腹起
し、および切梁ジャッキが直方体のフレームを形成して
いることで、構造的に安定しており、地上で組み立てた
ものを一体として掘削溝内に吊り込むことができ、埋設
管の敷設後も、分解することなく切梁ジャッキを縮めて
一体として地上へ吊り上げることができ、施工性も良
い。
According to the invention of the present application, the vertical members, protruding portions, and cutting beam jacks of the earth retaining device form a rectangular parallelepiped frame, so that they are structurally stable and assembled on the ground. Can be integrally suspended in the excavation trench, and after the laying of the buried pipe, the cutting beam jack can be shrunk without disassembly and lifted as one unit to the ground, and the workability is good.

【0033】 上下2段の腹起しと切梁ジャッキを備
えているため、2段腹起しを必要とする場合において、
効率的に対処することができる。
[0033] Since it is provided with upper and lower two-stage bulging and a cutting beam jack, when two-stage bulging is required,
Can be dealt with efficiently.

【0034】 埋設管等の掘削溝への敷設に際して
は、切梁ジャッキを伸張し、腹起しを矢板に圧接して土
圧に抵抗させ、安全な状態を作ってから作業員が掘削溝
内に入って管の吊り降ろし、管の接続や溶接等、所要の
作業を行うことができ、安全性が高い。
When laying a buried pipe or the like in an excavation trench, a cutting beam jack is extended, and a bulge is pressed against a sheet pile to resist earth pressure. It is possible to perform necessary work such as hanging down the pipe, connecting and welding the pipe, and the safety is high.

【0035】 切梁ジャッキとして流体圧ジャッキを
用い、流体圧ジャッキの注水口と地上のポンプを接続す
るホースを土留支保装置の縦材に取り付け、地上での土
留支保装置の組み立ての際に流体圧ジャッキの注水口に
ホースをつないでおけば、施工時に作業員が掘削溝内に
身を乗り出すことなく、地上から切梁ジャッキの伸縮操
作を行うことができ、その点でも安全性が高い。
A hydraulic jack is used as the cutting beam jack, and a hose connecting the water inlet of the hydraulic jack and the ground pump is attached to a vertical member of the earth retaining device, and the hydraulic pressure is set when the earth retaining device is assembled on the ground. By connecting a hose to the jack's water inlet, workers can extend and retract the girder jack from the ground without having to lean into the excavation groove during construction, which is also highly safe.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本願発明の土留支保装置の一実施例を示す斜
視図である。
FIG. 1 is a perspective view showing one embodiment of a soil retaining device of the present invention.

【図2】 図1の実施例に対応する土留支保装置の掘削
溝幅方向の断面図である。
FIG. 2 is a cross-sectional view in the width direction of the excavation groove of the earth retaining device corresponding to the embodiment of FIG. 1;

【図3】 本願発明の土留方向の一実施例を示す断面図
である。
FIG. 3 is a sectional view showing an embodiment of a retaining direction according to the present invention.

【図4】 図3に続く施工手順を示す断面図である。FIG. 4 is a sectional view showing a construction procedure following FIG. 3;

【図5】 図4に続く施工手順を示す断面図である。FIG. 5 is a sectional view showing a construction procedure following FIG. 4;

【図6】 図5に続く施工手順を示す断面図である。FIG. 6 is a sectional view showing a construction procedure following FIG. 5;

【図7】 図6に続く施工手順を示す断面図である。FIG. 7 is a sectional view showing a construction procedure following FIG. 6;

【符号の説明】[Explanation of symbols]

1…土留支保装置、2…吊り治具、3…縦材、4…腹起
し、5…切梁ジャッキ、6…接続ピン、7…注水口、8
…割りピン、9…ホース、10…ボルト、11…フッ
ク、12…長溝、13…受部、14…ボルト孔、15…
ボルト、21…バックホウ、22…鋼矢板、23…埋設
管、31…地盤、32…掘削溝
DESCRIPTION OF SYMBOLS 1 ... Soil supporting device, 2 ... Hanging jig, 3 ... Vertical member, 4 ... Belly up, 5 ... Cut beam jack, 6 ... Connection pin, 7 ... Water inlet, 8
... split pin, 9 ... hose, 10 ... bolt, 11 ... hook, 12 ... long groove, 13 ... receiving part, 14 ... bolt hole, 15 ...
Bolt, 21: Backhoe, 22: Steel sheet pile, 23: Buried pipe, 31: Ground, 32: Excavation groove

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 平5−98645(JP,A) 特開 平4−297614(JP,A) 実開 平3−50629(JP,U) (58)調査した分野(Int.Cl.7,DB名) E02D 17/08 ────────────────────────────────────────────────── ─── Continuation of the front page (56) References JP-A-5-98645 (JP, A) JP-A-4-297614 (JP, A) JP-A-3-50629 (JP, U) (58) Investigation Field (Int.Cl. 7 , DB name) E02D 17/08

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 掘削溝幅方向に渡される前後1対のビー
ム材からなる吊り治具と、前記各吊り治具に対しそれぞ
れ上端を掘削溝幅方向に摺動自在に連結した左右1対、
前後で2対の縦材と、前後の縦材間に上下2段に配置し
た左右の腹起しと、前記腹起しに対応させて左右の縦材
間に上下2段に配置した伸縮可能な切梁ジャッキとから
なり、前記縦材、腹起し、および切梁ジャッキにより直
方体のフレームを形成してなる土留支保装置を、組み立
てた状態で一体として前記吊り治具を介して掘削溝内に
吊り込み、掘削溝の溝壁と前記土留支保装置の腹起しと
の間に矢板を建て込み、前記矢板を掘削溝底部に圧入ま
たは打設した後、前記切梁ジャッキを伸張し、前記腹起
しを前記矢板に圧接して土圧に抵抗させることを特徴と
する土留工法。
1. A pair of beads before and after passing in a width direction of a digging groove.
A hanging jig consists arm member, whereas each of the lifting jig
A pair of right and left with the upper end slidably connected in the width direction of the excavation groove,
Two pairs of longitudinal members in front and back, left and right prongs arranged in two vertical steps between front and rear longitudinal members, and expandable and contractible disposed in two vertical steps between left and right vertical members corresponding to the prominence The earth retaining device, which comprises a vertical frame, a bulge, and a rectangular parallelepiped frame formed by the cutting beam jack, is integrally assembled in the excavation groove via the hanging jig . The pile is erected between the groove wall of the excavation groove and the ridge of the retaining device, and the sheet pile is press-fitted or driven into the bottom of the excavation groove. An earth retaining method, wherein a belly is pressed against the sheet pile to resist earth pressure.
【請求項2】 掘削溝幅方向に渡される前後1対のビー
ム材からなる吊り治具と、前記各吊り治具に対しそれぞ
れ上端を掘削溝幅方向に摺動自在に連結した左右1対、
前後で2対の縦材と、前後の縦材間に上下2段に配置し
た左右の腹起しと、前記腹起しに対応させて左右の縦材
間に上下2段に配置した伸縮可能な切梁ジャッキとから
なり、前記縦材、腹起し、および切梁ジャッキにより直
方体のフレームを形成してなることを特徴とする土留支
保装置。
2. A pair of beads before and after passing in the width direction of a digging groove.
A hanging jig consists arm member, whereas each of the lifting jig
A pair of right and left with the upper end slidably connected in the width direction of the excavation groove,
Two pairs of longitudinal members in front and back, left and right prongs arranged in two vertical steps between front and rear longitudinal members, and expandable and contractible disposed in two vertical steps between left and right vertical members corresponding to the prominence An earth retaining device, comprising: a vertical cutting frame jack; and a vertical rectangular parallelepiped frame formed by the vertical member, the belly, and the cutting beam jack.
【請求項3】 切梁ジャッキは流体圧ジャッキであり、
流体圧ジャッキの注水口と地上のポンプを接続するホー
スを前記縦材に取り付けてある請求項2記載の土留支保
装置。
3. The cutting beam jack is a hydraulic jack,
The retaining device according to claim 2, wherein a hose connecting a water inlet of a fluid pressure jack and a pump on the ground is attached to the vertical member.
JP6245198A 1994-10-11 1994-10-11 Earth retaining method and earth retaining device Expired - Lifetime JP3018921B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6245198A JP3018921B2 (en) 1994-10-11 1994-10-11 Earth retaining method and earth retaining device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6245198A JP3018921B2 (en) 1994-10-11 1994-10-11 Earth retaining method and earth retaining device

Publications (2)

Publication Number Publication Date
JPH08109634A JPH08109634A (en) 1996-04-30
JP3018921B2 true JP3018921B2 (en) 2000-03-13

Family

ID=17130087

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6245198A Expired - Lifetime JP3018921B2 (en) 1994-10-11 1994-10-11 Earth retaining method and earth retaining device

Country Status (1)

Country Link
JP (1) JP3018921B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101929991B1 (en) * 2018-05-31 2018-12-17 (주)고도이엔씨 Coupling device of scaffolding pipe and coupling method of scaffolding pipe using this

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100808109B1 (en) * 2006-09-06 2008-03-04 고려개발 주식회사 Supporting structure for being used to excavated ground
US20110305528A1 (en) * 2010-06-09 2011-12-15 Riggle Jr John Trench shoring apparatuses and methods
US9033619B2 (en) 2012-12-14 2015-05-19 John Riggle, JR. Trench shoring apparatuses

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101929991B1 (en) * 2018-05-31 2018-12-17 (주)고도이엔씨 Coupling device of scaffolding pipe and coupling method of scaffolding pipe using this

Also Published As

Publication number Publication date
JPH08109634A (en) 1996-04-30

Similar Documents

Publication Publication Date Title
US7537417B2 (en) Corner connection for temporary shoring
JP3018921B2 (en) Earth retaining method and earth retaining device
US20090047074A1 (en) Center beam connection assembly for temporary shoring
US6267538B1 (en) Beam joining cap for trench shield
JPS5873623A (en) Sheathing work for excavated trench and sheeting therefor
GB2053314A (en) Trench shoring
JPH045308A (en) Reinforcing steel cage
JP2622035B2 (en) Earth retaining method and earth retaining material
JP2005240534A (en) Steel-pipe temporary-equipment construction method
JP4346029B2 (en) Protection device for earth retaining method and earth retaining method
CN214653051U (en) Manual hole digging pile lifting device
JP3251529B2 (en) How to form a tunnel support.
JPH0342111Y2 (en)
JPH0529248Y2 (en)
JP3325156B2 (en) Soil support method and structure in excavation trench
JPH082178Y2 (en) Earth retaining plate support device for excavation trench
JP2583830B2 (en) Construction method of concrete deep foundation pile
JPH10331568A (en) Steel segment piece with concrete placed in hollow part thereof and method for constructing sunk body using the same
JPH05287748A (en) Timbering device
JPH08120676A (en) Earth retaining timbering detaching method and device therefor
JPH0310198Y2 (en)
JPH0874257A (en) Earth retaining device for excavated groove
JP2955423B2 (en) Cutting beam device
JPH0776835A (en) Construction of earth retaining support
JPH0711649A (en) Earth retaining method and earth retaining box