JP2615080B2 - Construction method of inner wall of existing underground tank - Google Patents

Construction method of inner wall of existing underground tank

Info

Publication number
JP2615080B2
JP2615080B2 JP62260590A JP26059087A JP2615080B2 JP 2615080 B2 JP2615080 B2 JP 2615080B2 JP 62260590 A JP62260590 A JP 62260590A JP 26059087 A JP26059087 A JP 26059087A JP 2615080 B2 JP2615080 B2 JP 2615080B2
Authority
JP
Japan
Prior art keywords
underground tank
existing underground
side wall
scaffold
hoist crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP62260590A
Other languages
Japanese (ja)
Other versions
JPH01102175A (en
Inventor
憲哉 甘田
芳郎 多田
三郎 谷貝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP62260590A priority Critical patent/JP2615080B2/en
Publication of JPH01102175A publication Critical patent/JPH01102175A/en
Application granted granted Critical
Publication of JP2615080B2 publication Critical patent/JP2615080B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】 『産業上の利用分野』 本発明は既設地下タンクの内壁構築工法に関するもの
で、さらに詳しくは、既設地下タンクの内側に補修用の
鉄筋コンクリート壁、鉄板ライニング壁等を構築する既
設地下タンクの内壁構築工法に関するものである。
The present invention relates to a method for constructing an inner wall of an existing underground tank, and more specifically, to construct a reinforced concrete wall, a steel plate lining wall, etc. for repair inside an existing underground tank. This is related to the method of constructing the inner wall of an existing underground tank.

『従来の技術』 従来、地下タンクの新設は多数実施されているが、既
設地下タンクの内壁を補修する工事はその施工例が無
く、初期に構築された地下タンクは近時補修の必要性が
生じ始めている。
[Conventional technology] Conventionally, many new underground tanks have been constructed, but there is no example of repairing the inner wall of an existing underground tank. Is beginning to occur.

『発明が解決しようとする問題点』 地下タンクの新設の場合は、基礎工事から始まり、底
板工事、側壁工事、屋根工事と、順次工程を進行するた
め、地上にて各種大型クレーンを使用して構築資材を所
望位置に直接搬入することができたが、既設地下タンク
の補修のために側壁を新な鉄筋コンクリート壁や鉄板ラ
イニング壁で補修せんとすると、それらの資材は屋根に
設けておいた特定の搬入口よりの搬入に限定されるた
め、資材を一度既設地下タンク内に下して所定位置まで
搬送しなくてはならないことになり、既設地下タンク内
での資材の搬送が大型搬送機器を使用できないため大変
困難なことが予想される。
[Problems to be Solved by the Invention] In the case of a new underground tank, starting with foundation work, bottom plate work, side wall work, and roof work, in order to proceed sequentially, using various large cranes on the ground Although the building materials could be carried directly to the desired location, if the side walls were not to be repaired with new reinforced concrete walls or steel lining walls to repair the existing underground tank, those materials would have been specified on the roof. Is limited to being carried in from the entrance of the container, the material must be once lowered into the existing underground tank and transported to a predetermined position, and the transport of the material in the existing underground tank requires large transport equipment. It is expected to be very difficult because it cannot be used.

そこで本発明は上記に鑑み、地上よりタンク内に搬入
した鉄筋、鉄板等の資材を既設地下タンク内周面に沿っ
た所望の位置に容易に搬入することができ、作業性を向
上し工期を短縮することのできる既設地下タンクの内壁
構築工法を提供することを目的としたものである。
In view of the above, in view of the above, the present invention can easily carry materials such as reinforcing bars and steel plates carried into the tank from the ground to a desired position along the inner peripheral surface of the existing underground tank, thereby improving workability and shortening the construction period. The purpose of the present invention is to provide a method of constructing an inner wall of an existing underground tank that can be shortened.

『問題点を解決するための手段』 上記の目的に沿い、先述特許請求の範囲を要旨とする
本発明の構成は前述問題点を解決するために、既設地下
タンク1の側癖1aの上部に内側に向うブラケット2,2,2
・・・を突設し、夫々のブラケット2には途中にターン
バックル3を介在せしめた吊り具4を上端を連結し、該
吊り具4,4,4・・・によって側壁1aの内周面に沿う走行
レール5を吊り下げ、この走行レール5には該走行レー
ル5を案内に移動可能となしたホイストクレーン6を配
設し、また、上記既設地下タンク1の側壁1aの内側で走
行レール5よりは更に内側には該側壁1aに沿う足場7を
配設し、この足場7の下部適所には門型枠8により資材
搬入口9を設け、屋根10を搬入口11より既設以下タンク
1内に吊り下したライニング板等の構築資材を、上記資
材搬入口9より足場7と既設地下タンク1の側壁1aとの
間に取り入れた後、ホイストクレーン6の巻上げ及び走
行で所望部位に搬送するよになしたことを特徴とする技
術的手段を講じたものである。
[Means for Solving the Problems] In order to solve the above-mentioned problems, the configuration of the present invention, which is based on the above-mentioned claims, is provided on the upper part of the side habit 1a of the existing underground tank 1 in accordance with the above objects. Bracket 2,2,2 facing inward
Are connected to the upper end of a hanging member 4 having a turnbuckle 3 interposed in the middle of each bracket 2, and the inner peripheral surface of the side wall 1a is connected by the hanging members 4, 4, 4. A hoist crane 6 capable of moving the traveling rail 5 for guiding is disposed on the traveling rail 5, and the traveling rail 5 is provided inside the side wall 1a of the existing underground tank 1. A scaffold 7 along the side wall 1a is disposed further inside than the scaffold 5, a material entrance 9 is provided by a gate frame 8 at an appropriate position below the scaffold 7, and a roof 10 is attached to the existing tank 1 below the entrance 11 by the entrance 11. After building materials such as lining boards suspended inside are taken in between the scaffold 7 and the side wall 1a of the existing underground tank 1 from the material entrance 9, the hoist crane 6 hoists and travels to transport it to a desired site. Technical measures characterized by what we did That.

『作用』 それ故、本発明既設地下タンクの内壁構築工法は、た
とえば既設地下タンク1内の中央に搬入した資材を台車
等に載せて資材搬入口9より足場7と既設地下タンク1
の側壁1aとの間に搬入し、この資材搬入口9の上方部位
にホイストクレーン6を位置させて該ホイストクレーン
6で資材を吊り上げた後、ホイストクレーン6の巻き上
げ及び走行により該資材を足場7と既設地下タンク1の
側壁1aとの間を通して所望の回転位置方向(横方向)と
高さ方向とに搬送し、資材を足場7上に下すか、ホイス
トクレーン6に保持せしめたまま第3図に示すように設
置位置に保持し溶接等の設置作業を行なうことができ
る。
[Operation] Therefore, in the method of constructing the inner wall of the existing underground tank according to the present invention, for example, the material carried into the center of the existing underground tank 1 is placed on a truck or the like, and the scaffold 7 and the existing underground tank 1
The hoist crane 6 is positioned above the material carry-in port 9 and the material is lifted by the hoist crane 6. 3 is transported in a desired rotational position direction (lateral direction) and a height direction through the space between the base and the side wall 1a of the existing underground tank 1, and the material is lowered on the scaffold 7 or held by the hoist crane 6 in FIG. As shown in (1), installation work such as welding can be performed while being held at the installation position.

一般に足場7の内側から外側に資材を搬入することは
困難な作業で、大型の資材であると足場7の上方または
側方を通して資材を搬入することを強いられる。しかし
屋根が設置されている場合は足場の上方を通して資材を
搬入すると屋根近くでは資材の搬入が不可能となるため
足場は所定幅のみ配しておいて順次移動する方法もある
が、この方法は補修部の点検、不良部の除去等の複雑な
工程において再度同じ場所に足場を移動してこなくては
ならない場合が生じて無駄な工程を要することになる
が、本発明は資材搬入口9を設置したことで全周にあら
かじめ足場7を設置しておいても資材の搬入が可能とな
るものである。
In general, it is difficult to carry in the material from the inside to the outside of the scaffold 7. If the material is a large-sized material, it is forced to carry in the material through the upper side or the side of the scaffold 7. However, when the roof is installed, if the material is brought in above the scaffold, it is impossible to carry in the material near the roof.Therefore, there is a method in which the scaffold is arranged only in a predetermined width and moves sequentially. In a complicated process such as inspection of a repaired part, removal of a defective part, etc., a scaffold must be moved to the same place again, and a wasteful process is required. With the installation, even if the scaffold 7 is installed in advance on the entire circumference, it is possible to carry in the material.

さらに本発明は、ブラケット2に途中にターンバック
ル3を介在せしめた吊り具4の上端を着脱可能に連結
し、該吊り具4,4,4・・・によって側壁1aの内周面に沿
う走行レール5を吊り下げなるため、このブラケット2,
2,2・・・の側壁1aより突出長によって側壁1aより所定
距離内側に寄った部位をホイストクレーン6乃至該ホイ
ストクレーン6によって搬送される構築資材が移動され
て円滑な搬送ができ、さらに走行レール5は着脱可能な
吊り下げ式でターンバックル3の高さ調整が可能である
ため設置及び撤去の作業性が向上・簡易化されるという
作用を呈するものである。
The present invention further relates to a bracket 2 in which a turnbuckle 3 is interposed in the middle and a removably connected upper end of a hanger 4 to travel along the inner peripheral surface of the side wall 1a by the hanger 4,4,4. Since the rail 5 is suspended, the bracket 2,
The hoist crane 6 or the construction material conveyed by the hoist crane 6 is moved by a portion protruding from the side wall 1a by a length protruding from the side wall 1a of 2, 2,. Since the rail 5 is a detachable hanging type and the height of the turnbuckle 3 can be adjusted, the workability of installation and removal is improved and simplified.

『実施例』 次に、本発明の実施例を第1図乃至第4図に示す既設
地下タンク1内に鋼鉄板をライニングする例従って説明
すれば以下の通りである。
Embodiment Next, an embodiment of the present invention will be described with reference to an example in which a steel plate is lined in the existing underground tank 1 shown in FIGS. 1 to 4.

図中、1が既設地下タンクで、1aがその側壁、1bが底
板、1c′が既設ライニング鉄鋼板、1cがライニング中の
鋼鉄板である。
In the figure, 1 is an existing underground tank, 1a is its side wall, 1b is a bottom plate, 1c 'is an existing lining steel plate, and 1c is a lining steel plate.

上記既設地下タンク1は通常側壁1aを鉄筋コンクリー
トで構成しその内面に鋼鉄板よりなる底板1bと既設ライ
ニング鉄鋼板1c′ライニングしその頂部には複数個所の
屋根トラス12を載置して屋根10が配されており、この屋
根10には適所に搬入口11(人や資材の出し入れ口として
使用するために配設されたもの)及びその他の連結口1
1′,11′,11′・・・(収納物の出し入れ用、換気用、
計測用等)が設けられてなるものである。
The existing underground tank 1 usually has a side wall 1a made of reinforced concrete, a bottom plate 1b made of a steel plate and an existing lining steel plate 1c 'lined on its inner surface, and a roof truss 12 at a plurality of places is placed on the top thereof to form a roof 10. The roof 10 has a carry-in entrance 11 (placed for use as a doorway for people and materials) and other connection openings 1 in place.
1 ', 11', 11 '・ ・ ・ (for putting in and out of storage, for ventilation,
For measurement, etc.).

本発明法は、先ず第2図に示されるごとく、既設地下
タンク1の側壁1aの上部に内側に向うブラケット2,2,2
・・・を突設し、夫々のブラケット2には途中にターン
バックル3を介在せしめた吊り具4の上端を着脱可能に
連結し、該吊り具4,4,4・・・によって側壁1aの内周面
に沿う走行レール5を吊り下げ、この走行レール5には
該走行レール5を案内に移動可能となしたホイストクレ
ーン6を配設しする。
According to the method of the present invention, first, as shown in FIG. 2, the brackets 2, 2, 2 facing inwardly above the side wall 1a of the existing underground tank 1.
, And the upper end of a hanging member 4 having a turnbuckle 3 interposed on the bracket 2 is detachably connected to each bracket 2, and the side walls 1a of the side wall 1a are connected by the hanging members 4, 4, 4,. A traveling rail 5 is suspended along the inner peripheral surface, and a hoist crane 6 is provided on the traveling rail 5 so as to be movable with the traveling rail 5 as a guide.

上記ブラケット2,2,2・・・は、H型鋼等を使用し
て、その基端部を側壁1aの上面で屋根トラス12が載置さ
れていない部位を選定して固定し、先端を側壁1aの内面
より既設地下タンク1の中心側に突出せしめている。こ
のブラケット2の固定に際しては本実施例ではアンカー
ボルト21を使用している。このアンカーボルト21はケミ
カルアンカーと称されるもので、あらかじめ穿った孔22
内に固化剤を分離収納した充填剤23を充填しておき、ア
ンカーボルト21を挿入すると充填剤23に固化剤が混合さ
れて急速に該充填剤23が固化されるようになっている。
このケミカルアンカーは、硬化後において優れた固着力
・引き抜き強度を有するばかりか、上記孔22内面に水滴
が付着したり、タンク内の油類が浸透していても充分な
強度を得ることができ既設近タンク1内で使用するのに
最適であり、さらには、硬化後においても充分な耐振動
性を有しているもので、後述するホイストクレーン6を
走行による振動にも耐久性が大きいものである。
The brackets 2, 2, 2,... Are made of H-shaped steel or the like, and the base end thereof is fixed by selecting a portion where the roof truss 12 is not placed on the upper surface of the side wall 1a, and the tip end is formed by the side wall It protrudes from the inner surface of 1a toward the center of the existing underground tank 1. In fixing the bracket 2, the anchor bolt 21 is used in this embodiment. This anchor bolt 21 is called a chemical anchor, and has a hole 22 previously drilled.
When the filler 23 in which the solidifying agent is separated and stored is filled, and the anchor bolt 21 is inserted, the solidifying agent is mixed with the filler 23 so that the filler 23 is rapidly solidified.
This chemical anchor not only has excellent fixation and pull-out strength after curing, but also can obtain sufficient strength even when water droplets adhere to the inner surface of the hole 22 or oils in the tank have penetrated. Suitable for use in the existing near tank 1 and has sufficient vibration resistance even after curing, and has high durability against vibrations caused by running the hoist crane 6 described later. It is.

また上吊り具4は、ブラケット2の下面に引掛孔(図
示せず)を有したブラケット片2aを突設し、このブラケ
ット片2aに自在継手片4aを掛止め吊り下げ、該自在継手
片4aには途中にターンバックル3を介した吊り棒4b,4c
を連結してなるが、このブラケット片2aは省略してブラ
ケット2に直接引掛孔を開穿したり、自在継手片4aを省
略して吊り棒4aの上端をフック状に折り曲げて直接ブラ
ケット2またはブラケット片2aに引掛けるようになして
もよい。
The upper hanging member 4 has a bracket piece 2a having a hooking hole (not shown) protrudingly provided on the lower surface of the bracket 2, and a universal joint piece 4a is hung and suspended from the bracket piece 2a. Is a hanging rod 4b, 4c with a turnbuckle 3
The bracket piece 2a is omitted, and a hook hole is directly formed in the bracket 2 or the universal joint piece 4a is omitted, and the upper end of the hanging rod 4a is bent into a hook shape to directly connect the bracket 2 or You may make it hook on the bracket piece 2a.

また、上記吊り具4の吊り棒4cの下端は、走行レール
5の上面にブラケット片5aを介して連結したUボルト4d
に連結されてなるが、このブラケット片5aとUボルト4d
は共に省略して吊り棒4cの下端を走行レール5に溶接し
たり、フック状に引掛止めするようになしてもよい。な
お、この吊り具4は上端を軸に揺動することが有るた
め、走行レール5と側壁1aとの距離が変動しないように
止腕2′を側壁1aとの間に連結しておくとよい。
The lower end of the hanging rod 4c of the hanging tool 4 is connected to a U-bolt 4d connected to the upper surface of the traveling rail 5 via a bracket piece 5a.
The bracket piece 5a and the U bolt 4d
May be omitted, and the lower end of the hanging rod 4c may be welded to the traveling rail 5 or hooked. Since the hanging member 4 may swing about the upper end as an axis, the arm 2 'may be connected to the side wall 1a so that the distance between the traveling rail 5 and the side wall 1a does not change. .

さらに、上記ホイストクレーン6は車輪6a,6a,6a・・
・で該走行レール5に吊下され、この車輪6a,6a,6a・・
・のいずれかが図示しない駆動源で回転せしめられて走
行レール5を案内に自走するようになしてある。
Further, the hoist crane 6 has wheels 6a, 6a, 6a,.
・ The wheels 6a, 6a, 6a
Is rotated by a drive source (not shown) so as to run on the traveling rail 5 for guidance.

次に、本発明は上記既設地下タンク1の側壁1aの内側
で走行レール5よりは更に内側には該側壁1aに沿う足場
7を配設し、この足場7の下部適所には門型枠8により
資材搬入口9を設ける。
Next, according to the present invention, a scaffold 7 is provided along the side wall 1a inside the side wall 1a of the existing underground tank 1 and further inside the traveling rail 5, and a gate form 8 is provided at an appropriate position below the scaffold 7. Material entrance 9 is provided.

この足場7の配設と、前記走行レール5乃至ホイスト
クレーン6の配設とは、いずれを先になしてもよいが、
足場7を配設しないと走行レール5等の配設が不可能な
場合は先に足場7を配設し、足場7を設けなくても走行
レール5等の配設が可能な場合は先ず走行レール5等を
配設してホイストクレーン6を足場7の組立に際して足
場7構成部材の搬送装置として使用するとよい。
Any of the arrangement of the scaffold 7 and the arrangement of the traveling rail 5 to the hoist crane 6 may be performed first.
If it is not possible to dispose the traveling rails 5 and the like without disposing the scaffold 7, the scaffold 7 is disposed first, and if the traveling rails 5 and the like can be disposed without the scaffold 7, the traveling is performed first. The hoist crane 6 may be used as a transfer device for the components of the scaffold 7 when assembling the scaffold 7 by disposing the rails 5 and the like.

上記足場7は枠組足場を使用し、既設地下タンク1の
側壁1aの内側全周に、さらに、図示では省略してあるが
側壁1aの上端近く配設する。また上記門型枠8は支保梁
8aを柱8b,8bで保持せしめてなり、図からは必ずしも明
確ではないが支保梁8aの上面には鋼製四角柱を横ににし
て敷設するかまたは木製足場板を敷設してその上に枠組
足場を配設する。
The scaffold 7 uses a framed scaffold, and is disposed on the entire inner periphery of the side wall 1a of the existing underground tank 1, and further, although not shown, near the upper end of the side wall 1a. The gate form 8 is a support beam
8a is held by pillars 8b, 8b, and although it is not always clear from the figure, on the upper surface of the support beam 8a, lay a steel square pillar sideways or lay a wooden scaffold board and lay it on it A scaffold will be provided.

次いで、本発明は屋根10の搬入口11より既設地下タン
ク1内に吊り下したライニング板等の構築資材を、上記
資材搬入口9より足場7と既設地下タンク1の側壁1aと
の間に取り入れた後、ホイストクレーン6の巻上げ及び
走行で所望部位に搬送する。このホイストクレーン6の
巻上げと走行は無論同時に行なえるため、構築資材は側
壁1aに沿う最短距離を移送することができ、所定位置に
移送した後は第3図に示すごとく、ホイストクレーン6
の吊り下げたまま設置作業を行ない、設置固定が終了す
ると構築資材の吊り下げを解き再度走行と巻き上げ巻き
戻しを行なって新たな構築資材を搬送するものである。
Next, according to the present invention, construction materials such as lining boards suspended in the existing underground tank 1 from the entrance 11 of the roof 10 are introduced between the scaffold 7 and the side wall 1a of the existing underground tank 1 from the material entrance 9 described above. Then, the hoist crane 6 is conveyed to a desired site by hoisting and traveling. Since the hoisting crane 6 can be lifted and run at the same time, the building material can be transported the shortest distance along the side wall 1a. After being transported to a predetermined position, as shown in FIG.
When the installation is fixed, the suspension of the building material is released, the running and the rewinding are performed again, and the new building material is transported.

『発明の効果』 本発明は上記のごときで、走行レール5をブラケット
2,2,2・・・を介して吊り下げてなるため、既設地下タ
ンク1の上部構造物(屋根トラス等)によって支障を受
ることなく必要な高さ及び位置に該走行レール5を設置
することができ、また、資材搬入口9より側壁1aと該足
場7との間に取り込んだ構築資材は、該走行レール5に
配したホイストクレーン6で作業性よく所望場所に移送
することができる既設地下タンクの内壁構築工法を提供
することができるものである。
[Effect of the Invention] The present invention is as described above.
The traveling rail 5 is installed at the required height and position without being hindered by the upper structure (roof truss, etc.) of the existing underground tank 1 because it is suspended via 2, 2, 2, ... Further, the construction material taken in between the side wall 1a and the scaffold 7 from the material entrance 9 can be transferred to a desired place with good workability by the hoist crane 6 arranged on the traveling rail 5. It is possible to provide a method for constructing the inner wall of an existing underground tank.

また、本発明は夫々のブラケット2に、途中にターン
バックル3を介在せしめた吊り具4の上端を着脱可能に
連結し、該吊り具4,4,4・・・によって側壁1aの内周面
に沿う走行レール5を吊り下げてあるため、この走行レ
ール5の設置、及び撤去は吊り具4の着脱で容易に行な
え付帯工事の困難性を伴なうことがない既設地下タンク
の内壁構築工法を提供することができるものである。
In addition, the present invention detachably connects the upper end of a hanging member 4 with a turnbuckle 3 interposed to each bracket 2 and the inner peripheral surface of the side wall 1a by the hanging members 4, 4, 4. Since the traveling rail 5 along the road is suspended, the installation and removal of the traveling rail 5 can be easily performed by attaching and detaching the hanging member 4, and there is no accompanying difficulty in the construction of the existing underground tank. Can be provided.

【図面の簡単な説明】[Brief description of the drawings]

第1図は本発明工法をを施工中の既設地下タンクの縦断
面図、第2図は本発明に使用される装置の要部断面図、
第3図は作用説明要部斜視図、第4図は本発明に使用さ
れる足場の部分正面図である。 1〜既設地下タンク、2〜ブラケット、3〜ターンバッ
クル、4〜吊り具、5〜走行レール、6〜ホイストクレ
ーン、7〜足場、8〜門型枠、9〜資材搬入口
FIG. 1 is a longitudinal sectional view of an existing underground tank under construction of the present invention, FIG. 2 is a sectional view of a main part of an apparatus used in the present invention,
FIG. 3 is a perspective view of an essential part of the operation, and FIG. 4 is a partial front view of a scaffold used in the present invention. 1-Existing underground tank, 2-Bracket, 3-Turnbuckle, 4-Hanging tool, 5-Traveling rail, 6-Hoist crane, 7-Scaffold, 8-Gate form, 9-Material entrance

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】既設地下タンク1の側壁1aの上部に内側に
向うブラケット2,2,2・・・を突設し、夫々のブラケッ
ト2には途中にターンバックル3を介在せしめた吊り具
4の上端を着脱可能に連結し、該吊り具4,4,4・・・に
よって側壁1aの内周面に沿う走行レール5を吊り下げ、
この走行レール5には該走行レール5を案内に移動可能
となしたホイストクレーン6を配設し、 また、上記既設地下タンク1の側壁1aの内側で走行レー
ル5よりは更に内側に該側壁1aに沿う足場7の配設し、
この足場7の下部適所には門型枠8により資材搬入口9
を設け、 屋根10の搬入口11より既設地下タンク1内に吊り下した
ライニング板等の構築資材を、上記資材搬入口9より足
場7と既設地下タンク1の側壁1aとの間に取り入れた
後、ホイストクレーン6の巻上げ及び走行で所望部位に
搬送するよになしたことを特徴とする既設地下タンクの
内壁構築工法。
1. An inwardly extending bracket 2, 2, 2,... Protrudes from an upper portion of a side wall 1a of an existing underground tank 1, and a suspending tool 4 having a turnbuckle 3 interposed on each bracket 2 is provided. Are detachably connected to each other, and the traveling rails 5 along the inner peripheral surface of the side wall 1a are suspended by the suspenders 4, 4, 4.
A hoist crane 6 capable of moving the traveling rail 5 for guiding is provided on the traveling rail 5. The hoist crane 6 is provided inside the side wall 1 a of the existing underground tank 1 and further inside the traveling rail 5. Of scaffolding 7 along
At the lower part of the scaffold 7, a gate form 8 is used to load materials 9.
After introducing construction materials such as a lining board suspended from the entrance 11 of the roof 10 into the existing underground tank 1 through the material entrance 9 between the scaffold 7 and the side wall 1a of the existing underground tank 1 And a hoist crane 6 for hoisting and transporting the hoist crane 6 to a desired site by hoisting and traveling.
JP62260590A 1987-10-15 1987-10-15 Construction method of inner wall of existing underground tank Expired - Fee Related JP2615080B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62260590A JP2615080B2 (en) 1987-10-15 1987-10-15 Construction method of inner wall of existing underground tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62260590A JP2615080B2 (en) 1987-10-15 1987-10-15 Construction method of inner wall of existing underground tank

Publications (2)

Publication Number Publication Date
JPH01102175A JPH01102175A (en) 1989-04-19
JP2615080B2 true JP2615080B2 (en) 1997-05-28

Family

ID=17350061

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62260590A Expired - Fee Related JP2615080B2 (en) 1987-10-15 1987-10-15 Construction method of inner wall of existing underground tank

Country Status (1)

Country Link
JP (1) JP2615080B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6534938B2 (en) * 2016-01-20 2019-06-26 日立Geニュークリア・エナジー株式会社 Lining plate installation and rain curing jig and lining plate installation method using the jig

Also Published As

Publication number Publication date
JPH01102175A (en) 1989-04-19

Similar Documents

Publication Publication Date Title
WO2013110126A1 (en) Automated formwork climbing system
GB2107777A (en) Process and apparatus for the installation of curtain walls
WO2020098394A1 (en) Gob-side entry confined concrete supporting construction device and mechanized construction method
JP2006028881A (en) Self-propelled pc floor slab erecting machine and pc floor slab erecting method
JPH09158470A (en) Prefabricated scaffolding for bridge pier
JP4284225B2 (en) Mobile scaffolding system
JP2615080B2 (en) Construction method of inner wall of existing underground tank
JPH06173339A (en) Constructing method for joining section for column/beam
JP2768282B2 (en) Bridge construction method
JPH09195228A (en) Build-up trestle for bridge pier reinforcing work and its using method
JPH09195227A (en) Built-up trestle for bridge pier reinforcing work and using method thereof
JP6944900B2 (en) Construction method of linear structure
JP3115544B2 (en) Loading method of abutment bearing device
JPH09195230A (en) Construction method of reinforcing existing bridge floor system
JP3032052U (en) Construction equipment for pier reinforcement work
JP3671061B2 (en) Suspension staircase and its temporary method
JP2017128907A (en) Jig for installation and covering from weather of lining plate and method for installation of lining plate using the jig
JP3160199B2 (en) A laying device and a laying method of a slab for vibration isolation in a subway.
CN213707530U (en) Adopt truss structure's prefabricated stair hoist device of assembled
JPH0390777A (en) Concrete placement method and device
CN209066300U (en) A kind of negative bending moment construction bracket
JP3030556U (en) Construction equipment for pier reinforcement work
JP2001146842A (en) Building device for and building method of sidewall panel
JPS6323519Y2 (en)
JP2533047Y2 (en) Unit scaffold

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees