JP2612658B2 - Panel structure connection structure - Google Patents

Panel structure connection structure

Info

Publication number
JP2612658B2
JP2612658B2 JP4037162A JP3716292A JP2612658B2 JP 2612658 B2 JP2612658 B2 JP 2612658B2 JP 4037162 A JP4037162 A JP 4037162A JP 3716292 A JP3716292 A JP 3716292A JP 2612658 B2 JP2612658 B2 JP 2612658B2
Authority
JP
Japan
Prior art keywords
panel
floor
plate portion
wall panel
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP4037162A
Other languages
Japanese (ja)
Other versions
JPH05202563A (en
Inventor
俊彦 奥津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP4037162A priority Critical patent/JP2612658B2/en
Publication of JPH05202563A publication Critical patent/JPH05202563A/en
Application granted granted Critical
Publication of JP2612658B2 publication Critical patent/JP2612658B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【産業上の利用分野】本発明は、工業化住宅におけるパ
ネル構造体の連結構造に関する
The present invention relates, on the consolidated structure of the panel structure in the industrialized housing.

【従来の技術】近年、建築物等においては、工業化が進
められている。特に工期の短縮、現場施工の容易性など
から、例えばユニット工法が取り入れられている。この
ユニット工法においては、予め工場で組み立て生産した
箱状のユニットルームを現場に搬送して、現場で複数の
ユニットルームを組み付けることによって、住宅などを
建築するようにしている。そして、従来ではこのような
ユニットルームを基礎上に固定する場合、或はユニット
ルーム同士を積み重ねて上下に連結固定する場合、基礎
上に取り付けたアンカボルト或は階下のユニットルーム
の壁パネルに取り付けたボルトをユニットルームの床パ
ネルに貫通させ、ユニットルームの室内側からこれらア
ンカボルト或はボルトにナットを取付け、これを締付け
て連結固定するようにしていた。
2. Description of the Related Art In recent years, industrialization of buildings and the like has been promoted. In particular, for example, a unit construction method has been adopted because of a shortened construction period and ease of on-site construction. In this unit construction method, a house or the like is constructed by transporting a box-shaped unit room assembled and produced in a factory in advance to a site and assembling a plurality of unit rooms on the site. Conventionally, when such a unit room is fixed on a foundation, or when unit rooms are stacked and connected and fixed vertically, an anchor bolt attached on the foundation or a wall panel of a unit room below the floor is attached. The bolts are passed through the floor panel of the unit room, nuts are attached to the anchor bolts or bolts from the room side of the unit room, and the nuts are tightened and connected and fixed.

【発明が解決しようとする課題】前記従来例において
は、基礎に配設したアンカボルト或は階下のユニットル
ームの壁パネルより突出させたボルトを、直接取り付け
ようとするユニットルームの床パネルに貫通させ、室内
側からナットを締付け固定するようにしていたため、取
り付けようとするユニットルームを基礎上又はユニット
ルーム上に載置して位置決めし、アンカボルト又は階下
のユニットルームの壁パネルより突出させたボルトを床
パネルに形成した貫通孔を挿通させた後、作業者がユニ
ットルーム内に入り込んでナットの締付け作業を行なわ
なければならず、ユニットルームの載置位置決め作業
と、ナットの締付け作業とを別々の段階で行なわなけれ
ばならないため、作業に手間がかかり、それだけ作業時
間も延びることとなるという問題があった。また、ユニ
ットルームの室内側からボルト・ナットの締付け作業を
行うためには、壁パネル内側に締付け作業用の開口部を
形成する必要がある。そして、この開口部を覆いかくす
とともにクロスなどの内装仕上げ材を取付ける作業は、
ボルト・ナットの締付け作業が終了した後に行なわなけ
ればならず、現場での内装仕上げ作業が必要であった。
このような現場での内装仕上げ作業がパネル工法あるい
はユニット工法の工業化を図るうえで障害のひとつとな
っていた。以上の問題は、ユニットルームのみならず、
壁パネルなどのパネル構造体を連結するときにも生じ
る。本発明は、前記問題点に鑑みてなされたものであっ
て、その目的は、基礎や階下のユニットルームの設置時
に、ユニットルームまたは壁パネルなどのパネル構造体
の外側から、アンカボルトや壁パネルより突出させたボ
ルトを締付け固定することにより、簡単にかつ短時間で
連結可能とするパネル構造体の連結構造を提供すること
にある。
In the above-mentioned prior art, an anchor bolt provided on a foundation or a bolt protruding from a wall panel of a unit room downstairs penetrates a floor panel of a unit room to be directly mounted. Because the nut was tightened and fixed from the indoor side, the unit room to be mounted was placed on the foundation or the unit room, positioned and projected from the anchor bolt or the wall panel of the unit room downstairs. After the bolts are inserted through the through holes formed in the floor panel, the operator must enter the unit room and tighten the nut, and the work of placing and positioning the unit room and tightening the nut must be performed. The work has to be done in separate stages, which is time-consuming and requires extra time There has been a problem to say. In addition, in order to perform the tightening work of the bolts and nuts from the room side of the unit room, it is necessary to form an opening for the tightening work inside the wall panel. And work to cover this opening and to install interior finishing materials such as cloth,
It must be performed after the bolt and nut tightening work is completed, and interior finishing work on site is required.
Such interior finishing work on site has been one of the obstacles in industrializing the panel method or the unit method. The above problems are not only in the unit room,
It also occurs when connecting panel structures such as wall panels.
You. The present invention has been made in view of the above problems, and an object thereof is to provide an anchor bolt or a wall panel from the outside of a panel structure such as a unit room or a wall panel when a foundation or a unit room below the floor is installed. An object of the present invention is to provide a panel structure connecting structure that can be connected easily and in a short time by tightening and fixing bolts that are more protruded.

【課題を解決するための手段】前記目的を達成するため
に、請求項1のパネル構造体の連結構造は、床パネルと
その下位に位置する基礎または壁パネルとを連結し、か
つ、前記床パネルとその上位に位置する壁パネルとを連
結する連結構造であって、前記床パネルは外周側端に凹
部が形成されてなり、前記上位に位置する壁パネルは下
端から第1のボルトが突出してなり、前記下位に位置す
る基礎または壁パネルは上端から第2のボルトが突出し
てなり、前記凹部の内面に取り付けられる板状の側板部
と、この側板部の上端から直角に延設されて前記凹部の
上側に配置される板状をなして連結孔が形成されてなる
上板部と、前記側板部の下端から直角に延設されて前記
凹部の下側に配置される板状をなして連結孔が形成され
てなる下板部と、が一体的に形成され、前記側板部と上
板部と下板部とで囲まれる操作領域が前記床パネルの側
方に開口する連結金物を含み、前記連結金物は、前記側
板部が前記床パネルの前記凹部の内面に固定されること
で前記床パネルに固定されてなり、前記上位に位置する
壁パネルは、前記第1のボルトが前記上板部の連結孔に
挿通されて、前記操作領域側で第1のナットが締め付け
られて、前記上板部に固定され、前記下位に位置する基
礎または壁パネルは、前記第2のボルトが前記下板部の
連結孔に挿通されて、前記操作領域側で第2のナットが
締め付けられて、前記下板部に固定されてなることを特
徴とする。また、請求項2記載のパネル構造体の連結構
造は、請求項1において、前記壁パネルの内壁にクロス
などの内装仕上げ材が取付けられていることを特徴とす
る。
According to a first aspect of the present invention, there is provided a panel structure connecting structure for connecting a floor panel to a foundation or a wall panel located below the floor panel, and A connection structure for connecting a panel and an upper wall panel thereof, wherein the floor panel has a recess formed at an outer peripheral end thereof, and the upper wall panel has a first bolt protruding from a lower end thereof. The lower foundation or wall panel has a second bolt projecting from an upper end thereof, a plate-like side plate portion attached to the inner surface of the recess, and a right angle extending from an upper end of the side plate portion. An upper plate portion having a plate-shaped connection hole formed on the upper side of the recess, and a plate shape extending at a right angle from a lower end of the side plate portion and disposed on the lower side of the recess; A lower plate portion in which a connection hole is formed, An operation area formed integrally and surrounded by the side plate portion, the upper plate portion, and the lower plate portion includes a connection hardware that opens to the side of the floor panel, and the connection hardware is such that the side plate portion has the floor panel. Is fixed to the floor panel by being fixed to the inner surface of the concave portion, and the first bolt is inserted into the connection hole of the upper plate portion in the upper wall panel. The first nut is tightened on the side and fixed to the upper plate, and the lower foundation or wall panel is inserted into the connection hole of the lower plate by the second bolt. A second nut is fastened on the region side and fixed to the lower plate portion. The panel structure connecting structure according to a second aspect is characterized in that, in the first aspect, an interior finishing material such as a cloth is attached to an inner wall of the wall panel.

【作用】前記連結金物の側板部を床パネルの凹部の内面
に取り付けることで、連結金物を床パネルに固定するこ
とができる。具体的には、例えば側板部に取付孔を形成
しておき、この取付孔からネジ等を挿通して取り付け
る。次に、上板部及び下板部に形成された連結孔に、上
位に位置する壁パネルあるいは下位に位置する基礎又は
壁パネルから突出した第1又は第2のボルトを挿入す
る。そして、連結金物に形成されるた操作領域側で、前
記第1及び第2のボルトに、第1又は第2のナットを螺
合させて締付け固定すれば、上位に位置する壁パネルあ
るいは下位に位置する基礎又は壁パネルと、連結金物
と、を簡単に連結できる。しかも、操作領域は、床パネ
ルの側方に開口しているので、ナットの締め付け作業を
外側から行うことができる。こうして、連結金物を介し
て、床パネルとその下位に位置する基礎または壁パネル
とを連結し、かつ、前記床パネルとその上位に位置する
壁パネルとを連結することができる。しかも、連結金物
は、予め工場出荷段階に置いて取付け部材に取り付けて
おくことができるので、現場での施工固定が省略され、
それだけ施工時間も短縮化できるものである。また、こ
の連結金物を用いてパネル工法に用いられる各パネルや
ユニトルームなどのパネル構造体を連結する場合には、
ユニットルームの場合を例にとって説明すると、予め工
場出荷段階において、ユニットルームの床パネルの凹部
に、複数の連結金物の側板部を固定する。次に、このユ
ニットルームの壁パネルから突出させた第1のボルトを
連結金物の上板部の連結孔に挿通させて第1のナットに
て締付け、この状態で建築現場に搬送する。次に、基礎
又は連結する下位のユニットルームの壁パネルから突出
させた第2のボルトを連結金物の下板部の連結孔に位置
合せをして挿通させ、ユニットルームの外側から操作領
域内に第2のナットを挿入して第2のボルトに螺合させ
締付ければ、ユニットルームの位置合わせと同時に連結
固定もなし得、施工時間も短縮化し得ることとなるもの
である。また、上述のように壁パネルの外側からパネル
相互間の連結を行なうことができるため、壁パネルの内
壁面に予め工場でクロス等の内装仕上げを行なうことが
でき、仕上げ工事の大幅な効率化を図ることができる。
The connecting hardware can be fixed to the floor panel by attaching the side plate of the connecting hardware to the inner surface of the recess of the floor panel. Specifically, for example, a mounting hole is formed in the side plate portion, and a screw or the like is inserted through the mounting hole to mount. Next, the first or second bolts protruding from the upper wall panel or the lower foundation or wall panel are inserted into the connection holes formed in the upper plate portion and the lower plate portion. When the first or second nut is screwed and fixed to the first and second bolts on the operation area side formed on the connection hardware, the upper wall panel or the lower wall panel is positioned. The underlying foundation or wall panel and the connecting hardware can be easily connected. Moreover, since the operation area is open to the side of the floor panel, the operation of fastening the nut can be performed from the outside. In this way, it is possible to connect the floor panel and the foundation or wall panel located therebelow, and to connect the floor panel and the wall panel located thereabove via the connection hardware. In addition, since the connecting hardware can be attached to the mounting member in advance at the factory shipment stage, construction fixation on site is omitted,
The construction time can be shortened accordingly. In addition, when connecting panel structures such as panels and unit rooms used in the panel construction method using this connection hardware,
Taking the case of a unit room as an example, at the factory shipment stage, side plates of a plurality of connecting hardware are fixed to recesses of the floor panel of the unit room in advance. Next, the first bolt protruding from the wall panel of the unit room is inserted into the connection hole of the upper plate of the connection hardware, fastened with the first nut, and transported to the building site in this state. Next, the second bolt protruding from the wall panel of the lower unit room to be connected to the foundation is aligned and inserted into the connection hole of the lower plate portion of the connection hardware, and is inserted into the operation area from outside the unit room. If the second nut is inserted, screwed into the second bolt and tightened, the unit room can be aligned and connected and fixed at the same time, and the construction time can be shortened. In addition, since the panels can be connected to each other from the outside of the wall panel as described above, the interior wall of the wall panel can be finished with a cloth or the like in advance at the factory, thereby greatly improving the efficiency of the finishing work. Can be achieved.

【実施例】以下、本発明の好適な実施例について図面を
参照しながら詳細に説明する。図1〜図6は本発明の一
実施例を示す図であり、パネル構造体にて構成されたユ
ニットルームの連結構造に本発明を適用した例を示す
本実施例の連結金物10は、図1に示すように、前面を
開口して形成した箱状のもので、左右両側部12と、上
下部14、16と、これら左右両側部12、上下部1
4、16を連結する奥壁部18とを有している。左右両
側部12には、それぞれ予め工場等において床パネル等
の取付け対象物に取付けておくための2つのネジ止め用
の取付孔20が形成されている。上下部14、16に
は、壁パネルなどの上下の連結対象物より突出させたボ
ルトを挿入させるための連結孔22、23が貫通形成さ
れている。また、左右両側部12、上部14、下部16
及び奥壁部18に囲まれる部分は前面を開口にした空間
として形成され、前記上下部14、16の連結孔22、
23を貫通したボルトに対して前面側よりナットを装着
し締付けるためのボルト締付け操作部24として形成さ
れるようになっている。次に、前記連結金物10を用い
たユニットルームの連結構造について図2〜図6を参照
して説明する。この実施例では、図2に示すように、基
礎30上に1階のユニツトルーム32を設置し、その1
階のユニットルーム32の上に2階のユニットルーム3
4を設置するもので、前記基礎30と1階のユニットル
ーム32及び1階のユニットルーム32と2階のユニッ
トルーム34との連結に前記連結金物10を複数カ所に
おいて用いるようにしている。基礎30は予め現場にお
いて施工され、その上面の適宜位置より複数のアンカボ
ルト36が突出した状態となっている。1階のユニット
ルーム32は、基礎30上に設置可能な床パネル38上
に壁パネル40を立設固定し、これら壁パネル40にて
形成される壁部の上開口部分には天井材43を取付け、
さらに、壁パネル40の内壁に仕上げ材としてのクロス
40aを取付け、予め工場で箱状に組み付けられた状態
で建築現場に搬送されるようになっている。図3および
図4に示すように、床パネル38の外周側端に位置する
枠材42は、 壁パネル40のほぼ半分の厚さに設定さ
れ、さらにその側端面には基礎30より突出したアンカ
ボルト36と対応する位置に、連結金物10を取り付け
る凹部44を形成し、その凹部44内に、開口を外側に
向けた状態でかつ左右両側の取付孔20を介して連結金
物10をネジ止めするようにしている。また、壁パネル
40の下辺に位置する枠材46には上方からボルト48
が挿通され、予め工場において、このボルト48を前記
床パネル38に取り付けた連結金物10の上部側の連結
孔22に挿通させ、ナット50にて締付け連結するよう
にしている。さらに、図5に示すように、壁パネル40
の上辺部にある枠材52には、下方側から上方に向けて
連結用のボルト54を突出させ、かつ脱落防止用のリン
グ56を装着している。尚、このボルト54は、予め工
場において装着されるものである。2階のユニットルー
ム34は、前記1階のユニットルーム32と同様に1階
のユニットルーム32の壁パネル40上に載置される床
パネル58と、この床パネル58上に立設される壁パネ
ル40と、この壁パネル40の上開口部分に取り付けら
れた天井材60と、壁パネル40の内壁に取付けたクロ
ス40aとを有し、予め工場において箱状に形成されて
いる。また、必要に応じ、工場において、壁パネル40
の外壁に外壁材を取付けておくこともできる。このよう
に、壁パネルの内外壁に仕上げ材を取付けておくことに
より、現場での複雑で手間のかかる内外装作業を行なう
必要がなくなり、施行効率を高めることができる。な
お、この2階のユニットルーム34の壁パネル40上部
には、図示せぬ屋根パネルが取り付けられるようになっ
ている。又、床パネル58の外枠を構成する枠材62
は、壁パネル40のほぼ半分の厚さに設定され、その枠
材62の前記ボルト54対応位置下部側には、凹部64
が形成され、この凹部64内に、外側を開口させた状態
で、左右両側部12の取付孔20を介して連結金物10
をネジ等にて固定するようにしている。この連結金具1
0は、1階のユニットルーム32と同様に壁パネル40
下辺側の枠材46を貫通させたボルト48及びナット5
0を介し、予め工場において上部14の連結孔22を介
し連結金物10と連結一体化されるようになっている。
なお、ボルト48、54にはそれそれ締付け時の空転を
防止するための座金66が取り付けられている。なお、
床パネル38、58外周の露出部分には胴差しあるいは
幕板68、70が取付けられるようになっている。そし
て、これら1階のユニットルーム32及び2階のユニッ
トルーム34を施工現場に搬送し、施工現場において連
結固定するもので、その連結は次の様にして行なう。先
ず、1階のユニットルーム32をクレーン等にて吊り下
げ基礎30上迄移動させる。次いで、図4に示すよう
に、基礎30より突出させたアンカボルト36と、1階
のユニットルーム32の床パネル38の取り付けた連結
金物10の下部16側の連結孔23との位置合せを行な
いつつ、1階のユニットルーム32を基礎30上に載置
する。この状態で、連結金物10の連結孔23にアンカ
ボルト36が挿通した状態となっており、しかも連結金
物10の外側が開口してアンカボルト36の先端部が外
側から見得る状態となっているため、連結金物10のボ
ルト締め付け操作部24より、アンカボルト36にナッ
トを装着して締め付ければ1階のユニットルーム32の
連結固定が外部から容易になし得ることとなるものであ
る。次に、2階のユニットルーム34をクレーン等にて
吊り上げ、1階のユニットルーム32上まで移動させ
る。次いで、図6に示すように、1階のユニットルーム
32の壁パネル40上辺部より突出させたボルト54
と、2階のユニットルーム34の床パネル58に取り付
けた連結金物10の下部16側の連結孔23との位置合
せを行ないながら、2階のユニットルーム34を1階の
ユニットルーム32の壁パネル40上に載置する。そし
て、この状態で、連結金物10の連結孔23に1階のユ
ニットルーム32のボルト54が挿通し、かつ連結金物
10の開口が外側に向いているので、そのボルト締め付
け操作部24よりナットをボルト54に装着し、締め付
ければ1階のユニットルーム32と2階のユニットルー
ム34との連結固定が容易になし得るものである。この
ように、基礎30と1階のユニットルーム32及び1階
のユニットルーム32と2階のユニットルーム34との
連結固定を連結金物10を用いてそれそれ外側から容易
に行なうことができ、かつ施工時間の短縮化にもつなが
るものである。前記実施例においては、基礎30と1階
のユニットルーム32及び1階のユニットルーム32と
2階のユニットルーム34の連結固定について説明した
が、この例に限られるものではなく、例えば2階以上の
ユニットルームの連結にも適応し得るものである。ま
た、前記実施例においては、ユニットルームとユニット
ルームとの連結構造について説明したが、この例に限ら
れるものではなく、例えば、床パネルと壁パネル単体と
を連結する構造にも適用することができる。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the present invention will be described below in detail with reference to the drawings. Figures 1-6 Ri FIG der showing an embodiment of the present invention, Yu configured by the panel structure
The example which applied this invention to the connection structure of a knit room is shown .
As shown in FIG. 1, the connecting hardware 10 of this embodiment is a box-shaped member having an open front surface, and includes left and right side portions 12, upper and lower portions 14 and 16, and left and right side portions 12, upper and lower portions. 1
And an inner wall portion 18 connecting the inner and outer walls 4 and 16. Two mounting holes 20 for screwing are formed in the left and right side portions 12 in advance to be mounted on a mounting object such as a floor panel in a factory or the like in advance. The upper and lower portions 14 and 16 are formed with connection holes 22 and 23 through which bolts protruding from upper and lower objects to be connected such as wall panels are inserted. Also, left and right sides 12, upper part 14, lower part 16
And a portion surrounded by the back wall portion 18 is formed as a space having an open front surface, and the connection holes 22 of the upper and lower portions 14 and 16 are formed.
The bolt is formed as a bolt tightening operation section 24 for mounting and tightening a nut from the front side with respect to the bolt passing through 23. Next, a unit room connection structure using the connection hardware 10 will be described with reference to FIGS. In this embodiment, as shown in FIG. 2, a unit room 32 on the first floor is installed on a foundation 30,
Unit room 3 on the second floor above unit room 32 on the floor
The connecting hardware 10 is used at a plurality of locations to connect the foundation 30 and the unit room 32 on the first floor and the unit room 32 on the first floor and the unit room 34 on the second floor. The foundation 30 is constructed in advance on the site, and a plurality of anchor bolts 36 project from an appropriate position on the upper surface thereof. In the unit room 32 on the first floor, a wall panel 40 is erected and fixed on a floor panel 38 that can be installed on the foundation 30, and a ceiling material 43 is provided in an upper opening portion of a wall formed by the wall panel 40. Mounting,
Further, a cloth 40a as a finishing material is attached to the inner wall of the wall panel 40, and is transported to a building site in a state where it is assembled in a box shape in advance at a factory. As shown in FIGS. 3 and 4, the frame member 42 located at the outer peripheral end of the floor panel 38 is set to have a thickness approximately half that of the wall panel 40, and further has an anchor projecting from the foundation 30 on its side end surface. At a position corresponding to the bolt 36, a concave portion 44 for attaching the connecting hardware 10 is formed, and in the concave portion 44, the connecting hardware 10 is screwed through the mounting holes 20 on both left and right sides with the opening facing outward. Like that. A frame member 46 located on the lower side of the wall panel 40 has bolts 48 from above.
At the factory, the bolt 48 is inserted in advance into the connection hole 22 on the upper side of the connection hardware 10 attached to the floor panel 38, and tightened and connected with the nut 50. Further, as shown in FIG.
On the frame member 52 on the upper side of the, a connecting bolt 54 is projected upward from the lower side, and a ring 56 for preventing falling off is mounted. The bolt 54 is mounted in a factory in advance. The unit room 34 on the second floor has a floor panel 58 placed on the wall panel 40 of the unit room 32 on the first floor, similarly to the unit room 32 on the first floor, and a wall standing on the floor panel 58. It has a panel 40, a ceiling material 60 attached to the upper opening of the wall panel 40, and a cloth 40a attached to the inner wall of the wall panel 40, and is formed in a box shape in a factory in advance. If necessary, a wall panel 40 may be provided at the factory.
An outer wall material can be attached to the outer wall of the vehicle. In this way, by attaching finishing materials to the inner and outer walls of the wall panel, it is not necessary to perform complicated and time-consuming interior and exterior work on site, and the execution efficiency can be increased. A roof panel (not shown) is attached to the upper part of the wall panel 40 of the unit room 34 on the second floor. Further, a frame member 62 constituting an outer frame of the floor panel 58
Is set to approximately half the thickness of the wall panel 40, and a recess 64 is provided below the frame member 62 at a position corresponding to the bolt 54.
Is formed in the recess 64, with the outside opened, through the mounting holes 20 in the left and right side portions 12.
Is fixed with screws or the like. This connection fitting 1
0 is a wall panel 40 similar to the unit room 32 on the first floor.
Bolt 48 and nut 5 penetrating lower frame member 46
The connection hardware 10 is connected to the connection hardware 10 via the connection hole 22 of the upper part 14 in advance in the factory.
The bolts 48 and 54 are provided with washers 66 for preventing slipping during tightening. In addition,
At the exposed portions on the outer periphery of the floor panels 38, 58, a body insert or curtain plates 68, 70 are attached. The unit room 32 on the first floor and the unit room 34 on the second floor are transported to the construction site and connected and fixed at the construction site. The connection is performed as follows. First, the unit room 32 on the first floor is moved to a position above the suspended foundation 30 by a crane or the like. Then, as shown in FIG. 4, the anchor bolt 36 protruding from the foundation 30 is aligned with the connection hole 23 on the lower part 16 side of the connection hardware 10 to which the floor panel 38 of the unit room 32 on the first floor is attached. Meanwhile, the unit room 32 on the first floor is placed on the foundation 30. In this state, the anchor bolt 36 is inserted into the connecting hole 23 of the connecting hardware 10, and the outer side of the connecting hardware 10 is open so that the tip of the anchor bolt 36 can be seen from the outside. Therefore, if a nut is attached to the anchor bolt 36 and tightened by the bolt tightening operation section 24 of the connection hardware 10, the unit room 32 on the first floor can be easily connected and fixed from the outside. Next, the unit room 34 on the second floor is lifted by a crane or the like and moved to the unit room 32 on the first floor. Next, as shown in FIG. 6, a bolt 54 protruding from the upper side of the wall panel 40 of the unit room 32 on the first floor.
While aligning with the connection hole 23 on the lower part 16 side of the connection hardware 10 attached to the floor panel 58 of the unit room 34 on the second floor, the unit room 34 on the second floor is replaced with the wall panel of the unit room 32 on the first floor. Place on 40. Then, in this state, the bolt 54 of the unit room 32 on the first floor is inserted into the connection hole 23 of the connection hardware 10, and the opening of the connection hardware 10 faces outward. By attaching and tightening the bolts 54, the unit room 32 on the first floor and the unit room 34 on the second floor can be easily connected and fixed. In this manner, the connection and fixing between the foundation 30 and the unit room 32 on the first floor and between the unit room 32 on the first floor and the unit room 34 on the second floor can be easily performed from the outside using the connection hardware 10, and This also leads to shortening of construction time. In the above embodiment, the connection and fixing of the foundation 30 and the unit room 32 on the first floor and the unit room 32 on the first floor and the unit room 34 on the second floor have been described. However, the present invention is not limited to this example. It can also be applied to the connection of unit rooms. Further, in the above-described embodiment, the connection structure between the unit rooms is described. However, the present invention is not limited to this example, and may be applied to, for example, a structure connecting the floor panel and the wall panel alone. it can.

【発明の効果】以上説明したように、本発明によれば、
床パネルとその下位に位置する基礎または壁パネルとを
連結し、かつ、前記床パネルとその上位に位置する壁パ
ネルとを連結する作業を簡略化することができる。ま
た、壁パネルあるいはユニットルームを構成する壁パネ
ルの外側から、基礎と床パネルあるいは床パネルと壁パ
ネルとの連結操作を行なうことができるため、壁パネル
の内壁のクロスなどの内装仕上げ材の取り付けを工場で
行なうことができ、工業化住宅の工業化を更に高度に達
成することができる。
As described above, according to the present invention,
It is possible to simplify the work of connecting the floor panel and the foundation or wall panel located thereunder, and connecting the floor panel and the wall panel located thereabove. In addition, since the connection operation between the foundation and the floor panel or the floor panel and the wall panel can be performed from outside of the wall panel or the wall panel constituting the unit room, an interior finishing material such as a cloth for the inner wall of the wall panel is attached. Can be carried out in a factory, and industrialization of an industrialized house can be achieved at a higher level.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例に係る連結金物を示す斜視図
である。
FIG. 1 is a perspective view showing a connecting hardware according to an embodiment of the present invention.

【図2】本発明の一実施例に係るユニットルームの連結
構造を示す斜視図である。
FIG. 2 is a perspective view showing a unit room connection structure according to an embodiment of the present invention.

【図3】基礎と1階のユニットルームの連結状態を示す
分解斜視図である。
FIG. 3 is an exploded perspective view showing a connection state between a foundation and a unit room on the first floor.

【図4】図3の縦断面図である。FIG. 4 is a longitudinal sectional view of FIG.

【図5】1階のユニットルームと2階のユニットルーム
の連結構造を示す斜視図である。
FIG. 5 is a perspective view showing a connection structure between a unit room on the first floor and a unit room on the second floor.

【図6】図5の縦断面である。FIG. 6 is a longitudinal section of FIG.

【符号の説明】[Explanation of symbols]

10 連結金物 12 左右両側部 14 上部 16 下部 20 取付孔 22、23 連結孔 24 ボルト締付け操作部 30 基礎 32 1階のユニットルーム 34 2階のユニットルーム 36 アンカボルト 38、58 床パネル 40 壁パネル 44、64 凹部 48、54 ボルト 50、66 ナット DESCRIPTION OF SYMBOLS 10 Connection hardware 12 Right and left both sides 14 Upper part 16 Lower part 20 Mounting hole 22, 23 Connection hole 24 Bolt tightening operation part 30 Foundation 32 Unit room on the first floor 34 Unit room on the second floor 36 Anchor bolt 38, 58 Floor panel 40 Wall panel 44 , 64 recess 48, 54 bolt 50, 66 nut

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 床パネルとその下位に位置する基礎また
は壁パネルとを連結し、かつ、前記床パネルとその上位
に位置する壁パネルとを連結する連結構造であって、 前記床パネルは外周側端に凹部が形成されてなり、前記
上位に位置する壁パネルは下端から第1のボルトが突出
してなり、前記下位に位置する基礎または壁パネルは上
端から第2のボルトが突出してなり、 前記凹部の内面に取り付けられる板状の側板部と、この
側板部の上端から直角に延設されて前記凹部の上側に配
置される板状をなして連結孔が形成されてなる上板部
と、前記側板部の下端から直角に延設されて前記凹部の
下側に配置される板状をなして連結孔が形成されてなる
下板部と、が一体的に形成され、前記側板部と上板部と
下板部とで囲まれる操作領域が前記床パネルの側方に開
口する連結金物を含み、 前記連結金物は、前記側板部が前記床パネルの前記凹部
の内面に固定されることで前記床パネルに固定されてな
り、 前記上位に位置する壁パネルは、前記第1のボルトが前
記上板部の連結孔に挿通されて、前記操作領域側で第1
のナットが締め付けられて、前記上板部に固定され、 前記下位に位置する基礎または壁パネルは、前記第2の
ボルトが前記下板部の連結孔に挿通されて、前記操作領
域側で第2のナットが締め付けられて、前記下板部に固
定されてなることを特徴とするパネル構造体の連結構
造。
1. A connection structure for connecting a floor panel and a foundation or wall panel located thereunder, and connecting the floor panel and a wall panel located thereabove, wherein the floor panel has an outer periphery A concave portion is formed at a side end, the upper wall panel has a first bolt protruding from a lower end, and the lower foundation or wall panel has a second bolt protruding from an upper end, A plate-shaped side plate portion attached to the inner surface of the concave portion, and an upper plate portion formed at a right angle from the upper end of the side plate portion and formed in a plate shape arranged above the concave portion to form a connection hole. A lower plate portion formed at a right angle from a lower end of the side plate portion and formed in a plate shape and disposed below the concave portion and formed with a connection hole; and the side plate portion and the lower plate portion are integrally formed. The operation area surrounded by the upper plate and the lower plate is the floor pad. A connecting hardware that opens to the side of the floor, wherein the connecting hardware is fixed to the floor panel by fixing the side plate portion to the inner surface of the recess of the floor panel, and the upper-level wall The panel is configured such that the first bolt is inserted into the connection hole of the upper plate portion, and the first bolt is provided on the operation area side.
The nuts are tightened and fixed to the upper plate portion. The lower foundation or wall panel has a second bolt inserted into a connection hole of the lower plate portion, and a second bolt is inserted in the operation region side. A connection structure for a panel structure, wherein the second nut is fastened and fixed to the lower plate portion.
【請求項2】 請求項1において、前記壁パネルの内壁
に内装仕上げ材が取付けられていることを特徴とするパ
ネル構造体の連結構造。
2. The panel structure connecting structure according to claim 1, wherein an interior finishing material is attached to an inner wall of the wall panel.
JP4037162A 1992-01-27 1992-01-27 Panel structure connection structure Expired - Lifetime JP2612658B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4037162A JP2612658B2 (en) 1992-01-27 1992-01-27 Panel structure connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4037162A JP2612658B2 (en) 1992-01-27 1992-01-27 Panel structure connection structure

Publications (2)

Publication Number Publication Date
JPH05202563A JPH05202563A (en) 1993-08-10
JP2612658B2 true JP2612658B2 (en) 1997-05-21

Family

ID=12489905

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4037162A Expired - Lifetime JP2612658B2 (en) 1992-01-27 1992-01-27 Panel structure connection structure

Country Status (1)

Country Link
JP (1) JP2612658B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3761282B2 (en) * 1997-04-24 2006-03-29 積水化学工業株式会社 Building installation structure, building unit and unit building, and floor hardware
KR101278983B1 (en) * 2012-02-16 2013-07-15 주식회사 포스코에이앤씨건축사사무소 Modular unit and modular construction using the same

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6183788A (en) * 1984-09-27 1986-04-28 ミサワホ−ム株式会社 Clamp structure of upstair and downstair opening unit

Also Published As

Publication number Publication date
JPH05202563A (en) 1993-08-10

Similar Documents

Publication Publication Date Title
JP2612658B2 (en) Panel structure connection structure
JP3153300B2 (en) Window sash mounting structure
JPH0744642Y2 (en) Unit room connection structure
JP2807602B2 (en) Panel connection structure
JP3458977B2 (en) Unit type building with balcony and its construction method
JP2590796Y2 (en) Fixed structure of floor panel
JP2612664B2 (en) Connection structure between foundation and wall panel
JPH0356569Y2 (en)
JP2587569B2 (en) How to attach corner panels
JPH0516330Y2 (en)
JPH0744641Y2 (en) Unit room connection structure
JP3180144B2 (en) Panel mounting structure
JP4047784B2 (en) Building structure with wall panels
JP2593789Y2 (en) Mounting structure of overhang
JP2667621B2 (en) Bay window 2nd floor hanging wall bay window unit mounting structure
JP2601641Y2 (en) Floor panel structure
JP3222549B2 (en) Multi-storey building structure
JPS6172150A (en) Mount structure of girth part
JPH0518404Y2 (en)
JPH06212718A (en) Attaching structure of wall panel
JP2511498B2 (en) Elevator cage structure
JP2537341Y2 (en) Building ceiling joist fastening structure and joist receiving bracket
JPH0334968Y2 (en)
JPS6335941A (en) Construction structure of accessory construction
JPH0430074A (en) Setting board of shaft chamber of building