JPH0744641Y2 - Unit room connection structure - Google Patents

Unit room connection structure

Info

Publication number
JPH0744641Y2
JPH0744641Y2 JP9255891U JP9255891U JPH0744641Y2 JP H0744641 Y2 JPH0744641 Y2 JP H0744641Y2 JP 9255891 U JP9255891 U JP 9255891U JP 9255891 U JP9255891 U JP 9255891U JP H0744641 Y2 JPH0744641 Y2 JP H0744641Y2
Authority
JP
Japan
Prior art keywords
unit room
floor
nut
bolt
frame member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP9255891U
Other languages
Japanese (ja)
Other versions
JPH0535903U (en
Inventor
信夫 根塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Misawa Homes Co Ltd
Original Assignee
Misawa Homes Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Misawa Homes Co Ltd filed Critical Misawa Homes Co Ltd
Priority to JP9255891U priority Critical patent/JPH0744641Y2/en
Publication of JPH0535903U publication Critical patent/JPH0535903U/en
Application granted granted Critical
Publication of JPH0744641Y2 publication Critical patent/JPH0744641Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】本考案は、工業化住宅におけるユ
ニットルームの連結構造に関し、特に階上及び階下のユ
ニットルーム同士を連結するに適したユニットルームの
連結構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a unit room connecting structure in an industrialized house, and more particularly to a unit room connecting structure suitable for connecting upper and lower unit rooms.

【0002】[0002]

【従来の技術】近年、建築物等においては、工業化が進
められている。
2. Description of the Related Art In recent years, industrialization has been promoted in buildings and the like.

【0003】特に工期の短縮、現場施工の容易性などか
ら、ユニット工法が広く取り入れられ、このユニット工
法においては、予め工場で組み立て生産した箱状のユニ
ットルームを現場に搬送して、現場で複数のユニットル
ームを組み付けることによって、住宅などを建築するよ
うにしている。
In particular, the unit construction method is widely adopted in order to shorten the construction period and facilitate site construction. In this unit construction method, a box-shaped unit room preassembled and produced in a factory is transported to the construction site, and a plurality of units are constructed on the construction site. By assembling the unit room of, the house is constructed.

【0004】そして、従来ではこのようなユニットルー
ム同士を積み重ねて上下に連結固定する場合、階下のユ
ニットルームの壁パネル上端と階上のユニットルームの
床パネルとをボルト・ナットを用いて室内側から締付け
操作して連結固定するようにしていた。
Conventionally, when stacking such unit rooms and vertically connecting and fixing them, the upper end of the wall panel of the lower unit room and the floor panel of the upper unit room are connected to the indoor side by using bolts and nuts. It was designed to be connected and fixed by tightening from.

【0005】[0005]

【考案が解決しようとする課題】前記従来例において
は、階上及び階下のユニットルームを積み重ねた状態に
おいて、階下のユニットルームの壁パネルと、階上のユ
ニットルームの床パネルとをユニットルームの室内側か
らボルト・ナットにて締付け固定するようにしていたた
め、取り付けようとする階上のユニットルームを階下の
ユニットルーム上に載置位置決めした後、作業者がユニ
ットルーム内に入り込んでボルト・ナットの締付け作業
を行なわなければならず、ユニットルームの載置位置決
め作業と、ボルト・ナットの締付け作業とを別々の段階
で行なわなければならないため、作業に手間がかかり、
それだけ作業時間も延びることとなるという問題があっ
た。
In the above conventional example, in the state where the upper and lower unit rooms are stacked, the wall panel of the lower unit room and the floor panel of the upper unit room are combined in the unit room. Since the bolts and nuts were tightened and fixed from the indoor side, after placing and positioning the upstairs unit room to be installed on the downstairs unit room, the worker enters the unit room and bolts and nuts. Since it is necessary to perform the tightening work of the unit room and the mounting and positioning work of the unit room and the tightening work of the bolts and nuts at different stages, the work is troublesome.
There was a problem that the work time would be extended accordingly.

【0006】また、連結用のボルト・ナットは、工場出
荷段階で予め各ユニットルームに取付けておくのが、部
品管理上、現場施工工程の省略上有利であるが、座金や
ナット等を予め取付ける場合、接着によると、接着剤の
固化までに時間がかかり、しかも接着のための圧締作業
が必要となって面倒であり、更にはユニットルームの搬
送時の衝撃や連結時のボルトの当接により脱落してしま
う恐れがあった。
Further, it is advantageous to attach the connecting bolts and nuts to each unit room in advance at the factory shipment stage, in terms of parts management and omitting the on-site construction process. However, washers and nuts are attached in advance. In that case, it takes a lot of time for the adhesive to solidify, and it is troublesome to perform a pressure-tightening work for the adhesion. There was a risk of falling out.

【0007】本考案は、前記問題点に鑑みてなされたも
のであって、その目的は、予め階上及び階下のユニット
ルームの連結部分にボルト・ナットを取付けておき、階
上のユニットルームの設置時に、ユニットルームの外側
から、ボルト・ナットを締付け固定することにより、簡
単にかつ短時間で連結可能とすると共に、搬送時や連結
時にボルト・ナットが脱落することのないユニットルー
ムの連結構造を提供することにある。
The present invention has been made in view of the above problems, and an object thereof is to attach bolts and nuts to the connecting portions of the upper and lower unit rooms in advance, and to install the bolts and nuts in the upper unit room. At the time of installation, by tightening and fixing the bolts and nuts from the outside of the unit room, it is possible to connect easily and in a short time, and the connection structure of the unit room does not drop the bolts and nuts during transportation or connection. To provide.

【0008】[0008]

【課題を解決するための手段】前記目的を達成するため
に、本考案のユニットルームの連結構造は、少なくとも
下部に貫通形成したボルト挿入用の連結孔と、全面を開
口して形成したボルト締付け操作部とを含む箱状の連結
金物を、上下に連結する上方のユニットルームの床パネ
ル側端面に形成した凹部内に固定し、前記連結金物に形
成した下部の連結孔に挿入して下方に突出させたボルト
を、下方のユニットルームの壁パネル上端に位置する枠
材に貫通させ、前記枠材の下面側に設けたナットに螺合
させて連結するユニットルームの連結構造であって、前
記ナットは、ナット本体に複数の掛け止め具を一体に取
付け、この掛け止め具を前記枠材に形成した貫通孔に貫
通させて、前記ナット本体を前記枠材の下面側に固定さ
れることを特徴としている。
To achieve the above object, the unit room connection structure of the present invention has a bolt insertion connection hole formed at least in the lower portion and a bolt tightening formed by opening the entire surface. The box-shaped connecting metal object including the operation part is fixed in the recess formed in the floor panel side end surface of the upper unit room which is vertically connected, and is inserted into the lower connecting hole formed in the connecting metal object to move downward. A connecting structure of a unit room, in which a protruding bolt penetrates a frame material located at an upper end of a wall panel of a lower unit room and is screwed and connected to a nut provided on a lower surface side of the frame material, As for the nut, a plurality of latches are integrally attached to the nut main body, and the latch main body is fixed to the lower surface side of the frame member by penetrating the latch stoppers through the through holes formed in the frame member. Features and To have.

【0009】[0009]

【作用】予め工場出荷段階において、階上のユニットル
ームの床パネル側端面に凹部を形成し、この凹部内に連
結金物の開口を外側に向けて挿入し固定する。この場
合、連結金物の下部の連結孔にボルトを挿入しておけ
ば、脱落することはない。
In the factory shipment stage, a recess is formed in advance on the floor panel side end face of the unit room on the upper floor, and the opening of the connecting metal object is inserted and fixed in the recess. In this case, if the bolt is inserted into the connecting hole at the bottom of the connecting metal object, it will not fall off.

【0010】また、階下のユニットルームの壁パネル上
端には、前記ボルトと螺合するナットを取付けておく。
この場合、前記ナットは、ナット本体に複数の掛け止め
具を一体に取付け、この掛け止め具を前記枠材に形成し
た貫通孔に貫通させて、前記ナット本体を前記枠材の下
面側に固定する。従って、ナットは、簡単かつ短時間で
壁パネルに確実に固定され、脱落するようなことはな
い。
Further, a nut screwed with the bolt is attached to the upper end of the wall panel of the unit room downstairs.
In this case, in the nut, a plurality of latches are integrally attached to the nut body, and the latches are passed through the through holes formed in the frame member to fix the nut body to the lower surface side of the frame member. To do. Therefore, the nut is securely fixed to the wall panel easily and in a short time and does not fall off.

【0011】次に、各ユニットルームに連結金物、ボル
ト・ナット等を取付けた状態で、各ユニットルームをト
ラック等の搬送手段により、建築現場に搬送する。
Next, each unit room is transported to the construction site by a transporting means such as a truck with the connecting hardware, bolts and nuts, etc. attached to each unit room.

【0012】次いで、建築現場において、基礎上に1階
のユニットルームを載置固定し、この1階のユニットル
ーム上に2階のユニットルームを載置する。この場合、
2階のユニットルームに取付けた連結金物の下部より突
出させたボルトを、1階のユニットルームの壁パネル上
端に取付けたナットに対して位置決めし、連結金物の締
付け操作部からボルトを操作して締め付ければ、ユニッ
トルームの外側から、ユニットルームの位置合わせと同
時に連結固定もなし得、施工時間も短縮化し得ることと
なるものである。
Next, at the construction site, the unit room on the first floor is placed and fixed on the foundation, and the unit room on the second floor is placed on the unit room on the first floor. in this case,
Position the bolt that protrudes from the bottom of the metal fitting installed in the unit room on the second floor with respect to the nut installed on the upper end of the wall panel of the unit room on the first floor, and operate the bolt from the tightening operation part of the metal fitting. If tightened, the unit room can be aligned and connected and fixed from the outside of the unit room at the same time, and the construction time can be shortened.

【0013】[0013]

【実施例】以下、本考案の好適な実施例について図面を
参照しながら詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENT A preferred embodiment of the present invention will now be described in detail with reference to the drawings.

【0014】図1〜図3は、本考案の一実施例を示す図
である。
1 to 3 are views showing an embodiment of the present invention.

【0015】この実施例では、基礎10上に1階のユニ
ットルーム12を設置し、その1階のユニットルーム1
2の上に2階のユニットルーム14を設置するもので、
前記1階のユニットルーム12と2階のユニットルーム
14との連結に連結金物16及びボルト18、ナット2
0を用いるようにしている。
In this embodiment, the unit room 12 on the first floor is installed on the foundation 10, and the unit room 1 on the first floor is installed.
The unit room 14 on the second floor will be installed on top of 2,
For connecting the unit room 12 on the first floor and the unit room 14 on the second floor, a connecting hardware 16 and a bolt 18, a nut 2
0 is used.

【0016】1階及び2階のユニットルーム12、14
は、床パネル22上に壁パネル24を立設固定し、これ
ら壁パネル24にて形成される壁部の上開口部分には天
井材26を取付け、予め工場で箱状に組み付けられた状
態で建築現場に搬送されるようになっている。なお、2
階のユニットルーム14の上部には、図示せぬ屋根パネ
ルが取付けられるようになっている。
Unit rooms 12 and 14 on the first and second floors
In the state where the wall panel 24 is erected and fixed on the floor panel 22 and the ceiling material 26 is attached to the upper opening portion of the wall portion formed by these wall panels 24, the ceiling material 26 is assembled in a box shape at the factory in advance. It is designed to be transported to the construction site. 2
A roof panel (not shown) can be attached to the upper part of the unit room 14 on the floor.

【0017】連結金物16は、前面を開口して形成した
箱状のもので、左右両側の側部28と、上下部30、3
2と、これら側部28、上下部30、32を連結する奥
壁部34とを曲折形成した状態となっている。
The connecting hardware 16 is a box-shaped member having an open front surface, and has side portions 28 on both left and right sides and upper and lower portions 30, 3 and 3.
2 and a back wall portion 34 connecting the side portion 28 and the upper and lower portions 30 and 32 are bent and formed.

【0018】側部28には、それぞれ予め工場等におい
て床パネル22に取付けておくための2つのネジ止め用
の取付孔36が形成されるようになっている。
The side portion 28 is provided with two mounting holes 36 for screwing, which are mounted on the floor panel 22 in advance in a factory or the like.

【0019】上下部30、32には、ボルト18等を挿
入させるための連結孔38、40が貫通形成されるよう
になっている。
Connection holes 38 and 40 for inserting the bolts 18 and the like are formed through the upper and lower portions 30 and 32, respectively.

【0020】側部28、上下部30、32及び奥壁部3
4に囲まれる部分は前面を開口にした空間として形成さ
れ、前記上下部30、32の連結孔38、40を貫通し
たボルト18等を前面側より締付けるための締付け操作
部42として形成されるようになっている。
The side portion 28, the upper and lower portions 30, 32 and the back wall portion 3
A portion surrounded by 4 is formed as a space having an opening on the front surface, and is formed as a tightening operation portion 42 for tightening the bolt 18 or the like penetrating the connecting holes 38, 40 of the upper and lower portions 30, 32 from the front surface side. It has become.

【0021】また、この連結金物16は、予め工場にお
いて2階のユニットルーム14の床パネル22側端部に
取付けられるもので、この床パネル22の外周側端に位
置する芯材44は、壁パネル24のほぼ半分の厚さに設
定され、さらにその側端面には、連結金物16を取り付
ける凹部46を形成し、その凹部46内に開口を外側に
向けた状態で、かつ左右両側の取付孔36を介して連結
金物16をネジ止めするようにしている。
The connecting hardware 16 is attached in advance to the floor panel 22 side end of the unit room 14 on the second floor in the factory, and the core material 44 located at the outer peripheral side end of the floor panel 22 is a wall. The thickness of the panel 24 is set to about half, and a concave portion 46 for mounting the connecting metal piece 16 is formed on the side end surface of the panel 24. The concave portion 46 has mounting holes on both left and right sides with the opening facing outward. The connecting hardware 16 is screwed via 36.

【0022】なお、2階のユニットルーム14の壁パネ
ル24の下辺に位置する枠材48には、予め工場におい
て上部側の連結孔38よりボルト50が挿通され、枠材
48の上面側よりナット52にて締付けることにより、
連結金物16が連結されるようになっている。
In the frame member 48 located on the lower side of the wall panel 24 of the unit room 14 on the second floor, bolts 50 are previously inserted through the connecting holes 38 on the upper side in the factory, and nuts are inserted from the upper surface side of the frame member 48. By tightening at 52,
The connecting hardware 16 is connected.

【0023】そして、前記連結金物16の下部側の連結
孔40に、締付け操作部42側から、ボルト18が挿入
され、この状態で工場から建築現場に搬送されるように
なっている。
Then, the bolt 18 is inserted into the connecting hole 40 on the lower side of the connecting metal piece 16 from the tightening operation portion 42 side, and in this state, the bolt 18 is transferred to the construction site from the factory.

【0024】また、1階のユニットルーム12側には、
前記2階のユニットルーム14の連結金物16より垂下
させたボルト18と対応する位置の壁パネル24の上端
部に、前記ボルト18と螺合するナット20を、予め工
場において取付けるようにしている。
On the side of the unit room 12 on the first floor,
At the factory, a nut 20 to be screwed with the bolt 18 is attached to the upper end of the wall panel 24 at a position corresponding to the bolt 18 hung from the connecting metal piece 16 of the unit room 14 on the second floor.

【0025】このナット20は、ナット本体54と、こ
のナット本体54の上端部にかしめ等によって一体に形
成した一対の掛け止め具56とから構成されるようにな
っている。ナット本体54は、通常の六角ナットの上面
にかしめ用の凹溝58を形成した状態となっている。掛
け止め具56は、ピアノ線をほぼL字状に曲折して先端
部に1階のユニットルーム12の壁パネル24を構成す
る上端部の枠材60上面に係合するフック部62を形成
するようになっている。また、掛け止め具56は、前記
枠材60を貫通し得る長さに設定され、前記枠材60の
貫通孔64に挿通させるようになっている。更に、ナッ
ト本体54と枠材60の下面との間には、座金66が取
付けられるようになっている。
The nut 20 is composed of a nut body 54 and a pair of latches 56 integrally formed on the upper end of the nut body 54 by caulking or the like. The nut body 54 is in a state in which a concave groove 58 for caulking is formed on the upper surface of a normal hexagonal nut. The hook 56 is formed by bending a piano wire into a substantially L-shape and forming a hook portion 62 at the tip end thereof, which engages with the upper surface of the frame member 60 at the upper end of the wall panel 24 of the unit room 12 on the first floor. It is like this. Further, the latch 56 is set to have a length that can penetrate the frame member 60, and is inserted into the through hole 64 of the frame member 60. Further, a washer 66 is attached between the nut body 54 and the lower surface of the frame member 60.

【0026】そして、これら1階のユニットルーム12
及び2階のユニットルーム14を施工現場に搬送し、施
工現場において連結固定するもので、その連結は次の様
にして行なう。
Then, these unit rooms 12 on the first floor
Also, the unit room 14 on the second floor is transported to the construction site and connected and fixed at the construction site. The connection is performed as follows.

【0027】先ず、1階のユニットルーム12をクレー
ン等にて吊り下げ、基礎10上迄移動させて、基礎10
上に載置固定する。
First, the unit room 12 on the first floor is hung by a crane or the like and moved to above the foundation 10 so that the foundation 10
Place and fix on top.

【0028】次に、2階のユニットルーム14をクレー
ン等にて吊り上げ、1階のユニットルーム12上まで移
動させ、1階のユニットルーム12の壁パネル40上端
部に取付けたナット20と、2階のユニットルーム14
の床パネル22に取り付けた連結金物16の下部側の連
結孔40より突出させたボルト18との位置合せを行な
いながら、2階のユニットルーム14を1階のユニット
ルーム12の壁パネル24上に載置する。
Next, the unit room 14 on the second floor is lifted by a crane or the like and moved to above the unit room 12 on the first floor, and the nut 20 attached to the upper end of the wall panel 40 of the unit room 12 on the first floor and the nut 20 Unit room 14 on the first floor
The unit room 14 on the second floor is placed on the wall panel 24 of the unit room 12 on the first floor while aligning with the bolts 18 protruding from the connection holes 40 on the lower side of the connecting hardware 16 attached to the floor panel 22 of. Place it.

【0029】そして、この状態で、連結金物16より突
出させたボルト18が1階のユニットルーム12の壁パ
ネル24に取付けたナット20と一致し、かつ連結金物
16の開口が外側に向いているので、その締め付け操作
部42よりボルト18を締め付ければ1階のユニットル
ーム12と2階のユニットルーム14との連結固定が容
易になし得るものである。
Then, in this state, the bolt 18 protruding from the connecting metal piece 16 coincides with the nut 20 attached to the wall panel 24 of the unit room 12 on the first floor, and the opening of the connecting metal piece 16 faces outward. Therefore, if the bolt 18 is tightened from the tightening operation portion 42, the unit room 12 on the first floor and the unit room 14 on the second floor can be easily connected and fixed.

【0030】このように、1階のユニットルーム12及
び2階のユニットルーム14との連結固定を連結金物1
6を用いてそれぞれ外側から容易に行なうことができ、
かつ施工時間の短縮化にもつながるものである。また、
1階のユニットルーム12側のナット20は、壁パネル
24に確実に固定されているので、衝撃によって脱落す
るような恐れもない。
In this way, the connecting and fixing of the unit room 12 on the first floor and the unit room 14 on the second floor is performed by the connecting hardware 1.
6 can be easily done from the outside,
In addition, it also leads to shortening of construction time. Also,
Since the nut 20 on the side of the unit room 12 on the first floor is securely fixed to the wall panel 24, there is no fear of falling off due to impact.

【0031】前記実施例においては、1階のユニットル
ーム及び2階のユニットルームの連結固定について説明
したが、この例に限られるものではなく、例えば2階以
上のユニットルームの連結にも適応し得るものである。
In the above embodiment, the connection and fixation of the unit room on the first floor and the unit room on the second floor have been described. However, the present invention is not limited to this example, and is applicable to the connection of unit rooms on the second floor and above. I will get it.

【0032】[0032]

【考案の効果】以上説明したように、本考案は、予め工
場出荷段階において、階上のユニットルームの床パネル
側端面に連結金物の開口を外側に向けて固定し、その下
部の連結孔にボルトを挿入すると共に、階下のユニット
ルームの壁パネル上端に、前記ボルトと螺合するナット
を取付けることとしたため、ユニットルームの外側か
ら、ユニットルームの位置合わせと同時に連結固定もな
し得、施工時間も短縮化し得るという効果がある。
As described above, according to the present invention, at the factory shipment stage, the opening of the connecting metal piece is fixed to the end face of the floor panel side of the unit room on the upper floor so that the opening is fixed to the connecting hole at the lower part. As well as inserting the bolts, the nuts that screw with the bolts are attached to the upper end of the wall panel of the unit room below, so it is possible to align and fix the unit room from the outside of the unit room. Also has the effect that it can be shortened.

【0033】また、前記ナットは、ナット本体を、前記
ナット本体と一体に形成した掛け止め具にて前記壁パネ
ル上端の枠材に固定するため、簡単かつ短時間で壁パネ
ルに確実に固定され、搬送時や連結時の衝撃による脱落
を防止することができるという効果がある。
Further, the nut is fixed to the wall panel easily and in a short time because the nut body is fixed to the frame member at the upper end of the wall panel by the latching member formed integrally with the nut body. In addition, there is an effect that it can be prevented from falling off due to an impact during transportation or connection.

【図面の簡単な説明】[Brief description of drawings]

【図1】本考案の一実施例に係るユニットルームの連結
構造を示す斜視図である。
FIG. 1 is a perspective view showing a unit room connection structure according to an embodiment of the present invention.

【図2】図1の連結部分の断面図である。FIG. 2 is a cross-sectional view of a connecting portion of FIG.

【図3】ナットの分解斜視図である。FIG. 3 is an exploded perspective view of a nut.

【符号の説明】[Explanation of symbols]

12 1階のユニットルーム 14 2階のユニットルーム 16 連結金物 18 ボルト 20 ナット 24 壁パネル 40 連結孔 42 締付け操作部 54 ナット本体 56 掛け止め具 60 枠材
MH016902
12 Unit room on the first floor 14 Unit room on the second floor 16 Connecting hardware 18 Bolts 20 Nuts 24 Wall panel 40 Connecting hole 42 Tightening operation part 54 Nut body 56 Latch 60 Frame material
MH016902

Claims (1)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 少なくとも下部に貫通形成したボルト挿
入用の連結孔と、全面を開口して形成したボルト締付け
操作部とを含む箱状の連結金物を、上下に連結する上方
のユニットルームの床パネル側端面に形成した凹部内に
固定し、前記連結金物に形成した下部の連結孔に挿入し
て下方に突出させたボルトを、下方のユニットルームの
壁パネル上端に位置する枠材に貫通させ、前記枠材の下
面側に設けたナットに螺合させて連結するユニットルー
ムの連結構造であって、 前記ナットは、ナット本体に複数の掛け止め具を一体に
取付け、この掛け止め具を前記枠材に形成した貫通孔に
貫通させて、前記ナット本体を前記枠材の下面側に固定
されることを特徴とするユニットルームの連結構造。
1. A floor of an upper unit room in which a box-shaped connecting metal article including a bolt insertion connecting hole formed at least in a lower portion and a bolt tightening operation portion formed by opening the entire surface is vertically connected. Fix the bolt in the recess formed on the end face on the panel side, insert it into the lower connecting hole formed in the connecting metal object and project it downwards, and penetrate the frame material located at the upper end of the wall panel of the lower unit room. A connecting structure of a unit room that is screwed into a nut provided on a lower surface side of the frame member to be connected, wherein the nut has a plurality of latches integrally attached to a nut body, and the latch is A connecting structure for a unit room, characterized in that the nut body is fixed to the lower surface side of the frame member by penetrating through a through hole formed in the frame member.
JP9255891U 1991-10-15 1991-10-15 Unit room connection structure Expired - Lifetime JPH0744641Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP9255891U JPH0744641Y2 (en) 1991-10-15 1991-10-15 Unit room connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP9255891U JPH0744641Y2 (en) 1991-10-15 1991-10-15 Unit room connection structure

Publications (2)

Publication Number Publication Date
JPH0535903U JPH0535903U (en) 1993-05-18
JPH0744641Y2 true JPH0744641Y2 (en) 1995-10-11

Family

ID=14057751

Family Applications (1)

Application Number Title Priority Date Filing Date
JP9255891U Expired - Lifetime JPH0744641Y2 (en) 1991-10-15 1991-10-15 Unit room connection structure

Country Status (1)

Country Link
JP (1) JPH0744641Y2 (en)

Also Published As

Publication number Publication date
JPH0535903U (en) 1993-05-18

Similar Documents

Publication Publication Date Title
JPH0744641Y2 (en) Unit room connection structure
JPH0744642Y2 (en) Unit room connection structure
JP2612658B2 (en) Panel structure connection structure
JPH0356569Y2 (en)
JPH0120410Y2 (en)
JPH0334972Y2 (en)
JP2612664B2 (en) Connection structure between foundation and wall panel
JPH0453383Y2 (en)
JP2590796Y2 (en) Fixed structure of floor panel
JP2807602B2 (en) Panel connection structure
JPH0427931Y2 (en)
JP2539687Y2 (en) Eaves mounting structure of unit type building
JP3119701B2 (en) Concrete panel
JPH0748801Y2 (en) Balcony mounting device
JPH0729127Y2 (en) Ceiling panel mounting structure
JPH0334968Y2 (en)
JPH0137046Y2 (en)
JPS60107202U (en) Lower house for unit house
JP3040925U (en) Wood unit building
JPH03287935A (en) Structure for mounting overhang balcony
JPS5814728Y2 (en) panel connection device
JPS62244947A (en) Outer wall panel with beam
JPS62160360A (en) Outer wall panel mount structure
JPH0742230A (en) Mounting structure of bay window floor panel
JPH01116135A (en) Mounting structure of external wall panel

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960326