JP2555908Y2 - Segment exchange equipment for continuous casting equipment - Google Patents

Segment exchange equipment for continuous casting equipment

Info

Publication number
JP2555908Y2
JP2555908Y2 JP1990125572U JP12557290U JP2555908Y2 JP 2555908 Y2 JP2555908 Y2 JP 2555908Y2 JP 1990125572 U JP1990125572 U JP 1990125572U JP 12557290 U JP12557290 U JP 12557290U JP 2555908 Y2 JP2555908 Y2 JP 2555908Y2
Authority
JP
Japan
Prior art keywords
segment
tilting
fixed guide
shaft
guide rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1990125572U
Other languages
Japanese (ja)
Other versions
JPH0483456U (en
Inventor
伸之 副島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Ltd
Original Assignee
Sumitomo Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Ltd filed Critical Sumitomo Heavy Industries Ltd
Priority to JP1990125572U priority Critical patent/JP2555908Y2/en
Publication of JPH0483456U publication Critical patent/JPH0483456U/ja
Application granted granted Critical
Publication of JP2555908Y2 publication Critical patent/JP2555908Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Continuous Casting (AREA)

Description

【考案の詳細な説明】 〔産業上の利用分野〕 この考案は、連続鋳造設備におけるセグメント交換装
置の内、連続鋳造機のストランド上で鋳片をガイドする
ロールセグメント(以下、単にセグメントという)をス
トランド湾曲中心方向に出し入れして交換する方式のセ
グメント交換装置に関するものである。
[Detailed description of the invention] [Industrial application field] In the invention, a roll segment (hereinafter simply referred to as a segment) for guiding a slab on a strand of a continuous casting machine is used in a segment exchange device in a continuous casting facility. The present invention relates to a segment exchanging device of a type in which a strand is exchanged by taking in and out a strand bending center direction.

〔従来の技術〕[Conventional technology]

従来、この方式のセグメント交換装置では、各セグメ
ント設置位置毎にセグメント設置位置からストランド湾
曲中心方向に延在してから鉛直上方に延在する屈曲した
左右2本一組の固定ガイドレールが設けられ、この固定
ガイドレールにセグメントの両サイドに設けたガイド車
輪が係合している。固定ガイドレールに沿ってセグメン
トを搬出入させるために、天井クレーンとリンクチェー
ン構造の専用の吊具が使用されている。この吊具は後端
部にて天井クレーンに吊持可能で、かつ、リンクピン端
部に取り付けたガイド車輪にて固定ガイドレールと係合
して屈曲可能となっている。また、セグメントの両サイ
ドに設けたガイド車輪取付け用軸部のうちの上側の軸部
にハンガーが前後に揺動可能に取り付けられ、かつ、前
記吊具の先端部の左右両サイドには夫々一対のブラケッ
ト及び該ブラケットの一方から他方にスライド貫通可能
な連結ピンが設けられている。そして、吊具を天井クレ
ーンによりガイドレールに沿ってセグメントのハンガー
位置まで吊り下ろし、セグメント側のハンガーを吊具側
のブラケット間に挿入した後、連結ピンを手動で軸方向
に押し込んでブラケット及びハンガーに貫通係合させ、
セグメントの上部に吊具の先端部を連結できるようにな
っている。
Conventionally, in this type of segment exchange device, a set of two fixed left and right fixed guide rails that extend from the segment installation position in the direction of the strand curvature center and then extend vertically upward are provided for each segment installation position. Guide wheels provided on both sides of the segment are engaged with the fixed guide rail. In order to carry the segments in and out along the fixed guide rails, overhead cranes and dedicated hanging devices having a link chain structure are used. This hanging tool can be hung by an overhead crane at the rear end, and can be bent by engaging with a fixed guide rail by a guide wheel attached to the end of the link pin. Further, a hanger is attached to the upper shaft portion of the guide wheel mounting shaft portions provided on both sides of the segment so as to be able to swing back and forth, and a pair of hanger is provided on each of the left and right sides of the tip of the hanging tool. And a connecting pin that can slide through from one of the brackets to the other. Then, the hanging tool is hung by the overhead crane along the guide rail to the hanger position of the segment, and the hanger on the segment side is inserted between the brackets on the hanging tool side. To penetrate into
The tip of the hanging tool can be connected to the upper part of the segment.

〔考案が解決しようとする課題〕[Problems to be solved by the invention]

セグメントの上部に吊具の先端部を連結する場合、オ
ペレーターがセグメントの上部に乗って連結ピンを押し
込む作業が必要となるが、特に、連続鋳造設備の湾曲ゾ
ーンにあるセグメントでは、セグメントと吊具の連結部
所の付近に固定ガイドレールの外、機外配管、セグメン
ト上方の機内配管があり、足場が悪い。しかも高所であ
る。このため安全作業用として階段、デッキ等を数多く
設置すれば、それでなくとも狭い作業スペースが更に狭
くなり、作業がし難い。その作業もセグメントの両サイ
ドで行う必要がある。従って、作業には危険が伴う上に
操作性が非常に悪く、時間がかかる。また、セグメント
上部に設けたハンガーがセグメントの運搬・芯出し作業
の邪魔となるばかりでなく、設備費の高騰を招くという
不都合を免れなかった。
When connecting the tip of the hanger to the top of the segment, the operator must work on the top of the segment and push in the connecting pin, especially for segments in the curved zone of continuous casting equipment. There is a pipe outside the fixed guide rail, pipe outside the machine, and pipe inside the machine above the segment in the vicinity of the connecting point of, and the scaffold is poor. And it's high. For this reason, if a large number of stairs, decks, etc. are installed for safety work, the narrow work space becomes narrower even if it is not so, making it difficult to work. That work also needs to be done on both sides of the segment. Therefore, the work involves dangers, has very poor operability, and takes time. In addition, the hanger provided at the upper part of the segment not only hinders the transportation and centering of the segment, but also inevitably causes a rise in facility costs.

〔考案の目的〕[Purpose of the invention]

この考案は前記課題を解決するためになしたもので、
セグメントの上方に突出するハンガーを省略すると共
に、セグメントの上部に吊具の先端部を確実かつ迅速に
連結できるようにすることを目的とする。
This invention was made to solve the above-mentioned problem,
An object of the present invention is to omit a hanger projecting above a segment and to reliably and quickly connect a tip end of a hanger to an upper portion of the segment.

〔課題を解決するための手段〕[Means for solving the problem]

この考案に係る連続鋳造設備のセグメント交換装置
は、図面に示すように、各セグメント設置位置毎にセグ
メント設置位置からストランド湾曲中心方向に延在して
から鉛直上方に延在する屈曲した左右2本一組の固定ガ
イドレール8を設け、この固定ガイドレール8にセグメ
ント1の両サイドに突設したガイド車輪6を係合させる
と共に、前記固定ガイドレール8群の上方を走行可能な
天井クレーン11と、この天井クレーン11に吊持可能で、
かつ、リンクピン16の両端部に取り付けたガイド車輪17
にて各々の固定ガイドレール8と係合して屈曲可能なリ
ンクチェーン構造の吊具12とを設けたセグメント交換装
置において、セグメント1の両サイドに突設され、先端
部においてガイド車輪6が取り付けられた軸体5と、吊
具12の先端部に回転可能に取付けられて前記軸体に係合
可能な2個の傾動フック23と、これらの傾動フック23を
連動して傾動させる傾動装置とを設けてなり、この傾動
装置は、両端部が左右のチェーンリンク13に回転支持さ
れた連結軸19を有し、該連結軸19に前記両傾動フック23
を連結軸19と連動可能に連結し、かつ、前記連結軸19を
回転させる回転作動装置21,22を吊具12に設けて構成さ
れていることを特徴としており、かかる構成によって前
記目的を達成するものである。
As shown in the drawing, the segment exchanging device of the continuous casting equipment according to the present invention has two bent right and left pieces that extend from the segment installation position toward the center of the strand curve and then extend vertically upward for each segment installation position. A pair of fixed guide rails 8 is provided, and guide wheels 6 protruding from both sides of the segment 1 are engaged with the fixed guide rails 8, and an overhead crane 11 that can travel above the fixed guide rails 8 group is provided. Can be hung on this overhead crane 11,
And guide wheels 17 attached to both ends of the link pin 16
In the segment exchanging device provided with a hanging device 12 having a link chain structure which can be bent by engaging with each fixed guide rail 8, the guide wheels 6 are attached at both ends of the segment 1 and mounted at the tip end. A shaft 5 provided, two tilt hooks 23 rotatably attached to the tip of the hanging tool 12 and engageable with the shaft, and a tilt device for tilting the tilt hooks 23 in conjunction with each other. This tilting device has a connecting shaft 19 whose both ends are rotatably supported by left and right chain links 13, and the connecting shaft 19 has the two tilting hooks 23.
Are connected to the connecting shaft 19 so as to be interlocked with each other, and the rotary operating devices 21 and 22 for rotating the connecting shaft 19 are provided on the hanging member 12, and the above-described object is achieved by such a configuration. Is what you do.

〔実施例〕〔Example〕

以下、この考案の一実施例を図面に沿って説明する。 An embodiment of the present invention will be described below with reference to the drawings.

図中1は複数個のセグメントで、ストラクチャ2に設
けた支持ベース3上に設置されて連続鋳造機のストラン
ド4を構成している。
In the figure, reference numeral 1 denotes a plurality of segments which are installed on a support base 3 provided on a structure 2 to constitute a strand 4 of a continuous casting machine.

セグメント1の両サイドには上部と下部に夫々1組ず
つ軸体5(実施例では1本)が突設され、この軸体5の
先端部にはガイド車輪6が回転可能に取り付けられてい
る。また、ガイド車輪取付け用軸体5の内、上側の軸体
5の中間部には吊環7が回転可能に装着されている。
On both sides of the segment 1, a pair of shafts 5 (one in the present embodiment) is protrudingly provided on each of the upper and lower portions, and a guide wheel 6 is rotatably attached to the tip of the shaft 5. . Further, a suspension ring 7 is rotatably mounted at an intermediate portion of the upper shaft body 5 among the guide wheel mounting shaft bodies 5.

吊環7の周部には後述の傾動フックに位置決め用突起
が付設されている。
A positioning projection is provided on a tilting hook, which will be described later, around the periphery of the suspension ring 7.

8は屈曲した左右2本一組の固定ガイドレールで、ス
トラクチャ2に各セグメント設置位置毎に設けられ、セ
グメント設置位置からストランド湾曲中心方向に延在し
てから鉛直上方に延在している。そして、各固定ガイド
レール8の上端部はストラクチャ2の上部に揃えられて
いる。
Reference numeral 8 denotes a pair of bent right and left fixed guide rails, which are provided on the structure 2 for each segment installation position, extend from the segment installation position in the direction of the strand bending center, and then extend vertically upward. The upper end of each fixed guide rail 8 is aligned with the upper part of the structure 2.

固定ガイドレール8にはレール対向側に開口する溝9
が連続して形成されている。
A groove 9 opening on the opposite side of the fixed guide rail 8
Are formed continuously.

セグメント1は左右の固定ガイドレール8間に配置さ
れ、該セグメント1の両サイドに設けたガイド車輪6は
固定ガイドレール8の溝内に係合しており、固定ガイド
レール8に沿ってセグメント1を移動可能となってい
る。
The segment 1 is disposed between the left and right fixed guide rails 8, and guide wheels 6 provided on both sides of the segment 1 are engaged in the grooves of the fixed guide rail 8, and the segments 1 are moved along the fixed guide rail 8. Is movable.

11は天井クレーンで、前記固定ガイドレール8群の上
方を走行可能に設けられている。
An overhead crane 11 is provided so as to be able to travel above the fixed guide rails 8 group.

12は屈曲可能なリンクチェーン構造の専用の吊具で、
基端の左右のリンク13間を跨いで吊ビーム14を設け、こ
の吊ビーム14の上部にフック引掛け用吊部15を突設して
おり、吊部15を介して天井クレーン11により吊持可能と
なっている。各リンクピン16の端部には、固定ガイドレ
ール8の溝内に係合させるガイド車輪17を回転可能に取
り付けている。また、先端の左右のリンク13には両端の
リンクピン16を結ぶ線より一外方に偏位させて軸受18を
介して連結軸19を回転可能に枢架し、この連結軸19の両
端部にロープドラム20をキー止め等して装着すると共
に、先端の左右のリンク13の一方に前記ロープドラム20
を連結軸19を介して回転させるウォームギア機構21及び
ハンドル22を設けている。一方、先端の左右のリンク13
に枢支された最下段のリンクピン16にはリンク列に各1
個ずつ2個の傾動フック23を固設している。これらの傾
動フック23の反引掛け側部には前記ロープドラム20に巻
回されたロープ24の先端を連結している。そして、天井
クレーン11により固定ガイドレール8に沿い移動される
際に屈曲して凹む側に傾動フック23をロープ24を介して
吊り上げ可能となっている。更に、先端の左右のリンク
13を連結するリンクピン16の下方に、セグメント1との
干渉を防止するためのストッパー25を突設している。
12 is a dedicated hanging tool with a bendable link chain structure,
A hanging beam 14 is provided across the right and left links 13 at the base end, and a hook hanging portion 15 is projected above the hanging beam 14, and is suspended by the overhead crane 11 via the hanging portion 15. It is possible. A guide wheel 17 to be engaged with the groove of the fixed guide rail 8 is rotatably attached to an end of each link pin 16. In addition, the left and right links 13 at the ends are deviated outwardly from the line connecting the link pins 16 at both ends, and the connection shaft 19 is rotatably pivoted via bearings 18. Attach the rope drum 20 to the end of the left and right links 13 and attach the rope drum 20
A worm gear mechanism 21 and a handle 22 for rotating the worm gear via a connecting shaft 19 are provided. On the other hand, the left and right links 13 at the tip
The lowermost link pin 16 pivoted to the
Two tilt hooks 23 are fixedly provided one by one. The tip of a rope 24 wound around the rope drum 20 is connected to the anti-hook side of these tilt hooks 23. The tilting hook 23 can be lifted via the rope 24 to the side bent and recessed when being moved along the fixed guide rail 8 by the overhead crane 11. In addition, the left and right links at the tip
A stopper 25 for preventing interference with the segment 1 is provided below the link pin 16 connecting the link 13.

26は円弧デッキで、ストランド1に沿って両サイドに
林立した固定ガイドレール8をセグメント1のストラン
ド湾曲中心方向側で連結するように設けられている。
Reference numeral 26 denotes an arc deck, which is provided so as to connect fixed guide rails 8 erected on both sides along the strand 1 on the side of the center of the strand curve of the segment 1.

以上の構成において、マシン整備場から鋳込ヤードま
で運搬されてきた新セグメント1をストランド4まで搬
入する場合、次の手順で作業を行う。
In the above configuration, when the new segment 1 transported from the machine maintenance yard to the casting yard is carried into the strand 4, the work is performed in the following procedure.

吊具12の先端に設けられた2個の傾動フック23を新セ
グメント1の両サイドに設けられた吊環7に係合させ、
該吊具12を介して天井クレーン11に新セグメント1を吊
持させた後、天井クレーン11の横行、走行により新セグ
メント1の設置位置に対応して設けられた固定ガイドレ
ール8の直上位置まで運搬する。
The two tilting hooks 23 provided at the tip of the hanging tool 12 are engaged with the hanging rings 7 provided on both sides of the new segment 1,
After hanging the new segment 1 on the overhead crane 11 via the hanging tool 12, the overhead crane 11 traverses and travels to a position immediately above the fixed guide rail 8 provided corresponding to the installation position of the new segment 1. Transport.

天井クレーン11の巻下げで、固定ガイドレール8の溝
(鉛直溝10)内にまず新セグメント1のガイド車輪6を
係合させ、次いで専用吊具12のガイド車輪17を係合させ
てセグメント1及び専用吊具12を固定ガイドレール8に
沿って吊り込む。
When the overhead crane 11 is lowered, the guide wheel 6 of the new segment 1 is first engaged in the groove (vertical groove 10) of the fixed guide rail 8, and then the guide wheel 17 of the special hanging device 12 is engaged. And the exclusive hanging tool 12 is suspended along the fixed guide rail 8.

新セグメント1をストラクチャ2に設けられた支持ベ
ース3上に上架した後、更に吊具12を約200mm下げる。
新セグメント1はその後に支持ベース3に固定される。
After the new segment 1 is mounted on the support base 3 provided on the structure 2, the hanging tool 12 is further lowered by about 200 mm.
The new segment 1 is subsequently fixed to the support base 3.

円弧デッキ26において吊具12の先端部に設けられた傾
動装置のハンドル22を回転操作し、ウォームギア機構21
及び連結軸19を介しロープドラム20をロープ巻取り方向
に回転させてロープ24で傾動フック23を吊り上げ、枢着
ピン(リンクピン16)で支持された2個の傾動フック23
を枢着ピンを中心として反鋳込方向側に開き傾動させて
新セグメント1の上部両サイドに設けられた吊環7から
外す。
By rotating the handle 22 of the tilting device provided at the tip of the hanging tool 12 on the arc deck 26, the worm gear mechanism 21 is rotated.
Then, the tilting hook 23 is lifted by the rope 24 by rotating the rope drum 20 in the rope winding direction via the connecting shaft 19, and the two tilting hooks 23 supported by the pivot pin (link pin 16).
Is opened in the anti-casting direction side around the pivot pin and tilted to remove it from the suspension rings 7 provided on both upper sides of the new segment 1.

天井クレーン11の巻上げで吊具12を固定ガイドレール
8から引き出して所定の仮置き場まで運搬する。
When the overhead crane 11 hoists, the lifting tool 12 is pulled out from the fixed guide rail 8 and transported to a predetermined temporary storage place.

旧セグメント1をストランド4から搬出する場合、次
の手順で作業を行う。
When unloading the old segment 1 from the strand 4, work is performed in the following procedure.

仮置き場で吊具12の先端部に設けられた傾動フック23
が開いていることを確認した後、吊具12を天井クレーン
11に吊持させ、該天井クレーン11の横行、走行により旧
セグメント1の設置位置に対応して設けられた固定ガイ
ドレール8の直上位置まで運搬する。
The tilting hook 23 provided at the tip of the hanging tool 12 in the temporary storage area
After confirming that the opening is open,
The overhead crane 11 is transported to the position just above the fixed guide rail 8 provided corresponding to the installation position of the old segment 1 by traversing and traveling of the overhead crane 11.

天井クレーン11の巻下げで、固定ガイドレール8の溝
(鉛直溝10)内に吊具12のガイド車輪17を係合させて該
吊具12を固定ガイドレール8に沿って所定位置まで吊り
込む。
When the overhead crane 11 is lowered, the guide wheel 17 of the hanging tool 12 is engaged in the groove (vertical groove 10) of the fixed guide rail 8, and the hanging tool 12 is suspended along the fixed guide rail 8 to a predetermined position. .

円弧デッキ26において吊具12の先端部に設けられた傾
動装置のハンドル22を前記とは逆方向に回転操作し、ロ
ープドラム20をロープ巻戻し方向に回転させてロープ24
を弛め、2個の傾動フック23を自重により枢着ピン(リ
ンクピン16)を中心として鋳込方向側に閉じ傾動させて
旧セグメント1の上部両サイドに設けられた吊環7に係
合させる。
In the arc deck 26, the handle 22 of the tilting device provided at the tip of the hanging tool 12 is rotated in the opposite direction to that described above, and the rope drum 20 is rotated in the rope rewinding direction to rotate the rope 24.
And the two tilting hooks 23 are closed and tilted toward the casting direction side about the pivot pin (link pin 16) by their own weight to engage with the suspension rings 7 provided on both upper sides of the old segment 1. .

傾動フック23が吊環7に係合したことを確認した後、
天井クレーン11の巻上げで、旧セグメント1及び吊具12
を固定ガイドレール8に沿い吊り上げて固定ガイドレー
ル8から引き出し、次いで、天井クレーン11の横行、走
行により旧セグメント1をマシン整備場まで運搬した
後、吊具12を所定の仮置き場まで運搬する。
After confirming that the tilting hook 23 is engaged with the suspension ring 7,
When the overhead crane 11 is hoisted, the old segment 1 and
Is lifted along the fixed guide rail 8 and pulled out from the fixed guide rail 8, and then the old segment 1 is transported to the machine maintenance yard by traversing and traveling of the overhead crane 11, and then the lifting tool 12 is transported to a predetermined temporary storage place.

尚、上記実施例ではセグメントから突出の軸体5に吊
環を遊嵌させており、係合時にその周部に付設された位
置決め用突起に案内されて傾動フックを容易に位置決め
するようにしているが、人手をその他の外力で位置決め
するものでよければ突起なしの吊環に係合させたり、吊
環を省略し、直接軸体に係合するものでもよい。
In the above embodiment, the suspension ring is loosely fitted to the shaft body 5 protruding from the segment, and is guided by the positioning projection provided on the peripheral portion thereof when engaged to easily position the tilting hook. However, if it is sufficient that the positioning is performed manually by other external force, the suspension ring may be engaged with a projection ring without projection, or the suspension ring may be omitted and directly engaged with the shaft body.

〔考案の効果〕[Effect of the invention]

以上の通り、この考案は、吊具先端部に設けた2個の
傾動フックをセグメントの両サイドに設けられた軸体又
は吊環に係合させるから、吊具とセグメントとの連結が
容易かつ迅速に行え、しかも一人のオペレーターで操作
可能となる。従って、作業の能率向上及び高所作業での
危険性の軽減が図れる。
As described above, according to the present invention, the two tilting hooks provided at the tip of the hanging tool are engaged with the shafts or the hanging rings provided on both sides of the segment, so that the connection between the hanging tool and the segment is easy and quick. And can be operated by one operator. Therefore, the work efficiency can be improved and the danger of working at a high place can be reduced.

また、左右のフックを連動させることにより吊具を迅
速にセグメントに連結することができると共に、左右の
フックを簡単で安価な装置により連動回転させることが
できる。
In addition, by interlocking the left and right hooks, the hanging tool can be quickly connected to the segment, and the left and right hooks can be interlocked and rotated by a simple and inexpensive device.

【図面の簡単な説明】[Brief description of the drawings]

第1図、第2図はこの考案の一実施例をセグメント搬入
前の状態で示す正面図、側面図、第3図、第4図はセグ
メント搬入後の状態で示す吊具の正面図、側面図、第5
図、第6図は第3図、第4図の要部を夫々拡大して示し
た正面図、側面図である。 1……セグメント、2……ストラクチャ、3……支持ベ
ース、4……ストランド、5……軸体、6……ガイド車
輪、7……吊環、8……固定ガイドレール、9……溝、
11……天井クレーン、12……吊具、13……リンク、14…
…吊ビーム、16……リンクピン、17……ガイド車輪、18
……軸受、19……連結軸、20……ロープドラム、21……
ウォームギア機構、22……ハンドル、23……傾動フッ
ク、24……ロープ、25……ストッパー、26……円弧デッ
キ.
1 and 2 are a front view and a side view showing an embodiment of the present invention before a segment is loaded, and FIGS. 3 and 4 are front views and side views of a hanging tool after the segment is loaded. Figure, fifth
FIG. 6 and FIG. 6 are an enlarged front view and a side view, respectively, of the main parts of FIG. 3 and FIG. DESCRIPTION OF SYMBOLS 1 ... Segment, 2 ... Structure, 3 ... Support base, 4 ... Strand, 5 ... Shaft, 6 ... Guide wheel, 7 ... Suspension ring, 8 ... Fixed guide rail, 9 ... Groove,
11 ... overhead crane, 12 ... hanging equipment, 13 ... link, 14 ...
... suspension beam, 16 ... link pin, 17 ... guide wheel, 18
…… Bearing, 19 …… Connection shaft, 20 …… Rope drum, 21 ……
Worm gear mechanism, 22 ... handle, 23 ... tilting hook, 24 ... rope, 25 ... stopper, 26 ... arc deck.

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】各セグメント設置位置毎にセグメント設置
位置からストランド湾曲中心方向に延在してから鉛直上
方に延在する屈曲した左右2本一組の固定ガイドレール
を設け、この固定ガイドレールにセグメントの両サイド
に設けたガイド車輪を係合させると共に、前記固定ガイ
ドレール群の上方を走行可能な天井クレーンと、この天
井クレーンに吊持可能で、かつ、リンクピンの両端部に
設けたガイド車輪にて各々の固定ガイドレールと係合し
て屈曲可能なリンクチェーン構造の吊具とを設けたセグ
メント交換装置において、セグメントの両サイドに突設
され、先端部にガイド車輪が取り付けられた軸体と、吊
具の先端部に回転可能に取付けられて前記軸体に係合可
能な2個の傾動フックと、これらの傾動フックを連動し
て傾動させる傾動装置とを設けてなり、この傾動装置
は、両端部が左右のチェーンリンクに回転支持された連
結軸を有し、該連結軸に前記両傾動フックを連結軸と連
動可能に連結し、かつ、前記連結軸を回転させる回転作
動装置を吊具に設けて構成されていることを特徴とする
連続鋳造設備のセグメント交換装置。
1. A set of two fixed left and right fixed guide rails extending from the segment installation position toward the center of the strand curve and then extending vertically upward at each segment installation position. An overhead crane capable of engaging guide wheels provided on both sides of the segment and traveling above the fixed guide rail group, and guides which can be suspended by the overhead crane and provided at both ends of link pins In a segment exchanging device provided with a link chain structure suspending tool that can be bent by engaging with each fixed guide rail by a wheel, a shaft protruding from both sides of the segment and having a guide wheel attached to a distal end portion. Body, two tilting hooks rotatably attached to the tip of the hanging tool and engageable with the shaft, and tilting for tilting the tilting hooks in conjunction with each other This tilting device has a connecting shaft whose both ends are rotatably supported by left and right chain links, and connects the tilting hooks to the connecting shaft so as to be able to interlock with the connecting shaft, and A segment exchanging device for a continuous casting facility, wherein a rotation operating device for rotating the connection shaft is provided on a hanging tool.
JP1990125572U 1990-11-28 1990-11-28 Segment exchange equipment for continuous casting equipment Expired - Lifetime JP2555908Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1990125572U JP2555908Y2 (en) 1990-11-28 1990-11-28 Segment exchange equipment for continuous casting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1990125572U JP2555908Y2 (en) 1990-11-28 1990-11-28 Segment exchange equipment for continuous casting equipment

Publications (2)

Publication Number Publication Date
JPH0483456U JPH0483456U (en) 1992-07-21
JP2555908Y2 true JP2555908Y2 (en) 1997-11-26

Family

ID=31873165

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1990125572U Expired - Lifetime JP2555908Y2 (en) 1990-11-28 1990-11-28 Segment exchange equipment for continuous casting equipment

Country Status (1)

Country Link
JP (1) JP2555908Y2 (en)

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5462521U (en) * 1977-10-12 1979-05-01
JPS59169657A (en) * 1983-03-15 1984-09-25 Sumitomo Heavy Ind Ltd Segment exchanger for continuous casting installation

Also Published As

Publication number Publication date
JPH0483456U (en) 1992-07-21

Similar Documents

Publication Publication Date Title
JPH058682A (en) Traveling trolley for coil shaped article
JPH07125969A (en) Hoisting accessory
US3550788A (en) Overhead traveling crane and hoist mechanism therefor
JP2555908Y2 (en) Segment exchange equipment for continuous casting equipment
JP2008094526A (en) Lifting body supporting turning device
JPH05147884A (en) Dismountable jib crane
JPH0978842A (en) Crane for scaffold
JPH09164456A (en) Device used both for ladle turret and mold assembly changing and method for changing mold assembly
JPH0912263A (en) Roll lifter
JPH0214851Y2 (en)
KR102546300B1 (en) Crane
JPH08259177A (en) Handling device of pipe
JP6956627B2 (en) Lifting device with horizontal jib
JPS6340293Y2 (en)
JP3007801B2 (en) Roll segment exchange equipment in continuous casting equipment
JP2002224806A (en) Exchanger and exchange method for roll segment
JP2002154795A (en) Track traveling vehicle
JP2920015B2 (en) Lifting equipment
SU925535A1 (en) Apparatus for mounting and dismounting secondary cooling zone section guides
JPH0512224Y2 (en)
SU914493A1 (en) Arrangement for hoisting elongated structure
JPS6127900Y2 (en)
JPH0542543B2 (en)
JP2000302375A (en) Concrete conveying and placing device
JP3188559U (en) Hook release stopper