JP2000302375A - Concrete conveying and placing device - Google Patents

Concrete conveying and placing device

Info

Publication number
JP2000302375A
JP2000302375A JP11109407A JP10940799A JP2000302375A JP 2000302375 A JP2000302375 A JP 2000302375A JP 11109407 A JP11109407 A JP 11109407A JP 10940799 A JP10940799 A JP 10940799A JP 2000302375 A JP2000302375 A JP 2000302375A
Authority
JP
Japan
Prior art keywords
mast
jib
bucket
concrete
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11109407A
Other languages
Japanese (ja)
Inventor
Haruo Komatsu
晴夫 小松
Sunao Sakuma
直 佐久間
Kimio Nishifuji
喜美雄 西藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP11109407A priority Critical patent/JP2000302375A/en
Publication of JP2000302375A publication Critical patent/JP2000302375A/en
Pending legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a concrete conveying and placing device capable of improving the moving speed of a bucket in the radial working direction. SOLUTION: This concrete conveying and placing device comprises a mast 4 formed of a plurality of split masts 3 which are successively stacked on each other, an elevating/lowering frame 5 which is elevated along the mast 4, a turning frame 19 provided on the elevating/lowering frame 5, a jib 20 which is projected from the turning frame 19 in a substantially horizontal manner, a main rope 24 extended from a base end of the jib 20 to a forward end, and a trolley 27 which is transversely movable along the main rope 24, and capable of suspending a bucket 9 for conveying the concrete in an elevating/lowering manner, and increases the moving speed of the bucket 9 in the radial working direction.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、コンクリート搬送
打設装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete conveying and placing apparatus.

【0002】[0002]

【従来の技術】近年、RCD工法(Roller Co
macted Concrete)によってダム堤体を
構築することが実施されている。
2. Description of the Related Art In recent years, the RCD method (Roller Co.
Construction of a dam embankment has been carried out by using a "mated concrete".

【0003】このRCD工法では、コンクリートを面状
に打設することを順次繰り返し、コンクリート打設層を
積み重ねてダム堤体を構築する。
[0003] In this RCD method, concrete is cast in the form of a plane repeatedly, and a concrete embankment layer is stacked to construct a dam embankment.

【0004】図2乃至図4はRCD工法を用いる従来の
コンクリート搬送打設装置の一例を示すもので、このコ
ンクリート搬送打設装置は、河床部1に設置される脚部
材2と、該脚部材2に順次積み重ねられる複数の分割マ
スト3によって構成されるマスト4と、該マスト4に外
嵌し且つ分割マスト3の積み重ねに応じて順次上昇し得
る昇降フレーム5と、該昇降フレーム5上に設けられ且
つマスト4を中心として旋回し得る旋回フレーム6と、
旋回フレーム6に立設した支持台7と、基端部が支持台
7の上部に枢支されたジブ8と、コンクリート搬送用の
バケット9と、旋回フレーム6の後部に設置され且つ起
伏索10の巻き取り及び繰り出しによりジブ8を起伏さ
せる起伏用ドラム11と、旋回フレーム6の後部に設置
され且つ昇降索12の巻き取り及び繰り出しによりジブ
8先端に対してバケット9を昇降させる昇降用ドラム1
3とを備えている。
FIGS. 2 to 4 show an example of a conventional concrete conveying and casting apparatus using the RCD method. The concrete conveying and casting apparatus includes a leg member 2 installed on a riverbed 1 and a leg member 2. A mast 4 composed of a plurality of divided masts 3 sequentially stacked on the mast 2, an elevating frame 5 which is fitted to the mast 4 and which can be sequentially raised according to the stacking of the divided masts 3, and provided on the elevating frame 5 A swivel frame 6 that is swiveled about the mast 4 and
A support 7 standing upright on the revolving frame 6, a jib 8 whose base end is pivotally supported on the upper part of the support 7, a bucket 9 for transporting concrete, and a hoisting cable 10 installed at the rear of the revolving frame 6 And a raising / lowering drum 1 installed at the rear of the revolving frame 6 for raising and lowering the bucket 9 with respect to the tip of the jib 8 by winding and unwinding the lifting cable 12.
3 is provided.

【0005】昇降フレーム5は、マスト4に固定され得
る上部ロック機構14及びその下側でマスト4に固定さ
れ得る下部ロック機構15と、上部ロック機構14に対
して下部ロック機構15を近接離反させる昇降機構16
とを有している。
The elevating frame 5 has an upper lock mechanism 14 that can be fixed to the mast 4, a lower lock mechanism 15 that can be fixed to the mast 4 below the upper mast 4, and moves the lower lock mechanism 15 toward and away from the upper lock mechanism 14. Lifting mechanism 16
And

【0006】旋回フレーム6には、分割マスト3が挿通
される開口が設けられており、マスト4を伸張させると
きは、ジブ8を起立させて前記の開口を通して最上段に
位置する既設の分割マスト3上に新たなる分割マスト3
を載置し連結する。
The revolving frame 6 is provided with an opening through which the split mast 3 is inserted. When the mast 4 is extended, the jib 8 is raised and the existing split mast positioned at the uppermost stage through the opening is opened. New split mast 3 on 3
And connect them.

【0007】また、昇降フレーム5をマスト4に対して
上昇させるときには、上部ロック機構14をマスト4に
固定した状態で下部ロック機構15を開放し、昇降機構
16により下部ロック機構15を上部ロック機構14に
近接させる動作と、下部ロック機構15をマスト4に固
定した状態で、上部ロック機構14を開放し、昇降機構
16によって上部ロック機構14を下部ロック機構15
に対して離反させる動作とを繰り返す。
When the lifting frame 5 is raised with respect to the mast 4, the lower locking mechanism 15 is opened with the upper locking mechanism 14 fixed to the mast 4, and the lower locking mechanism 15 is moved by the lifting mechanism 16 to the upper locking mechanism. 14 and with the lower lock mechanism 15 fixed to the mast 4, the upper lock mechanism 14 is opened, and the upper lock mechanism 14 is moved by the elevating mechanism 16 to the lower lock mechanism 15.
Is repeated.

【0008】また、河床部1には、バッチャプラントか
ら脚部材2の近傍へ延びるバンカー線17が敷設されて
おり、該バンカー線17を走行するトランスファカー1
8によってコンクリート搬送打設装置へコンクリートが
送給される。
A bunker line 17 extending from the batcher plant to the vicinity of the leg member 2 is laid on the riverbed 1, and the transfer car 1 traveling on the bunker line 17 is provided.
8 feeds the concrete to the concrete conveying and placing device.

【0009】図2乃至図4に示すコンクリート搬送打設
装置では、旋回フレーム6の旋回、バケット9の昇降、
及びジブ8の起伏の組合せによって、トランスファカー
18からバケット9に移載されたコンクリートを所定の
打設位置まで搬送する。
In the concrete conveying and casting apparatus shown in FIGS. 2 to 4, turning of the turning frame 6, lifting and lowering of the bucket 9,
The concrete transferred from the transfer car 18 to the bucket 9 is transported to a predetermined casting position by a combination of the undulation of the jib 8.

【0010】[0010]

【発明が解決しようとする課題】しかしながら、図2乃
至図4に示すコンクリート搬送打設装置では、ジブ8及
びバケット9の重量を、ジブ8の先端部のシーブに複数
条にわたって巻き掛けた起伏索10によって支持してい
るので、バケット9の昇降動作やジブ8の旋回動作に比
べると、ジブ8の起伏動作が緩やかであり、作業半径方
向へのバケット9の移動速度が遅い。
However, in the concrete conveying and casting device shown in FIGS. 2 to 4, the weight of the jib 8 and the bucket 9 is undulated over a sheave at the tip of the jib 8 by a plurality of lines. Since it is supported by 10, the up-and-down operation of the jib 8 is slower than the up-and-down operation of the bucket 9 and the turning operation of the jib 8, and the moving speed of the bucket 9 in the working radius direction is slow.

【0011】本発明は上述した実情に鑑みてなしたもの
で、作業半径方向へのバケットの移動速度の向上を図る
ことができるコンクリート搬送打設装置を提供すること
を目的とするものである。
The present invention has been made in view of the above-mentioned circumstances, and has as its object to provide a concrete conveying and placing apparatus capable of improving a moving speed of a bucket in a working radial direction.

【0012】[0012]

【課題を解決するための手段】上記目的を達成するた
め、本発明のコンクリート搬送打設装置では、順次積み
重ねられる複数の分割マストによって構成されるマスト
と、該マストに沿って上昇し得る昇降フレームと、該昇
降フレーム上に設けた旋回フレームと、該旋回フレーム
から略水平に突出するジブと、該ジブの基端部から先端
部へ張設した主索と、該主索に沿って横行移動し得られ
且つコンクリート搬送用のバケットを昇降可能に吊り下
げるトロリとを備えている。
In order to achieve the above object, a concrete conveying and casting apparatus according to the present invention comprises a mast constituted by a plurality of divided masts which are sequentially stacked, and a lifting frame which can be raised along the mast. A turning frame provided on the elevating frame, a jib projecting substantially horizontally from the turning frame, a main rope extending from a base end to a distal end of the jib, and traversing along the main rope. And a trolley for suspending the concrete transport bucket so as to be able to move up and down.

【0013】本発明のコンクリート搬送打設装置におい
ては、コンクリート搬送用のバケットを、旋回フレーム
から略水平に突出するジブの基端部から先端部へ張設し
た主索に沿って横行可能なトロリに吊り下げて、作業半
径方向へのバケットの移動速度の向上とジブの重量の軽
減とを図る。
[0013] In the concrete transport casting device according to the present invention, the concrete transport bucket is provided with a trolley capable of traversing along a main rope extending from a base end to a distal end of a jib projecting substantially horizontally from the turning frame. To improve the moving speed of the bucket in the working radius direction and reduce the weight of the jib.

【0014】[0014]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づき説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0015】図1は本発明のコンクリート搬送打設装置
の実施の形態の一例であり、図中、図2乃至図4と同一
の符号を付した部分は同一物を表している。
FIG. 1 shows an example of an embodiment of a concrete conveying and placing apparatus according to the present invention. In the drawings, the portions denoted by the same reference numerals as in FIGS. 2 to 4 represent the same components.

【0016】このコンクリート搬送打設装置は、河床部
1に設置された脚部材2と、該脚部材2に順次積み重ね
る複数の分割マスト3によって構成されるマスト4と、
該マスト4に沿って上昇し得る昇降フレーム5と、該昇
降フレーム5上に設けた旋回フレーム19と、該旋回フ
レーム19から略水平に突出するジブ20と、該ジブ2
0に付帯するケーブルクレーン機構21と、昇降フレー
ム5から図1の紙面に対し直交方向へ突出する略水平な
分割マスト置台22とを備えている。
The concrete conveying and casting apparatus includes a mast 4 composed of a leg member 2 installed on a riverbed 1 and a plurality of divided masts 3 sequentially stacked on the leg member 2.
An elevating frame 5 capable of ascending along the mast 4, a turning frame 19 provided on the elevating frame 5, a jib 20 projecting substantially horizontally from the turning frame 19, and a jib 2
1 and a substantially horizontal split mast table 22 projecting from the lifting frame 5 in a direction perpendicular to the plane of FIG.

【0017】ケーブルクレーン機構21は、一端がジブ
20の基端部に係止され且つ他端がジブ20の先端部に
係止されたジブ20突出方向へ延びる主索24と、旋回
フレーム19上に設置した横行用ドラム25から繰り出
され且つ巻き取られる横行索26により牽引され且つ主
索24に沿って横行可能なトロリ27と、旋回フレーム
19上に設置した昇降用ドラム13から繰り出され且つ
巻き取られる昇降索12によりトロリ27に対して昇降
可能に吊り下げられた搬器28とで構成されており、搬
器28には、コンクリート搬送用のバケット9あるいは
分割マスト3が吊り下げられるようになっている。
The cable crane mechanism 21 has a main rope 24 extending in the projecting direction of the jib 20, one end of which is locked at the base end of the jib 20 and the other end of which is locked at the tip of the jib 20. A trolley 27 which is pulled by a traversing drum 25 installed and wound up by a traversing rope 26 and which can be traversed along a main rope 24, and a trolley 27 which is extended and wound from a lifting drum 13 installed on a revolving frame 19. The transport device 28 is configured to be suspended from the trolley 27 by the lifting cable 12 to be taken up and down. The transport device 28 is configured to suspend the concrete transport bucket 9 or the divided mast 3. I have.

【0018】図1に示す本発明のコンクリート搬送打設
装置では、旋回フレーム19の旋回によるジブ20の水
平方向の回動、搬器28の昇降、及びトロリ27の横行
移動の組合わせによって、トランスファカー18から搬
器28に吊り下げられているバケット9に移載されたコ
ンクリートを所定の打設位置まで搬送する。
In the concrete transporting / casting apparatus of the present invention shown in FIG. 1, the transfer car is driven by a combination of the horizontal rotation of the jib 20 by the rotation of the revolving frame 19, the lifting and lowering of the transporter 28, and the lateral movement of the trolley 27. The concrete transferred from the bucket 18 to the bucket 9 suspended from the carrier 28 is transported to a predetermined casting position.

【0019】また、マスト4を伸張させる際には、マス
ト4の伸張用に用いる分割マスト3を搬器28によって
吊り上げ、旋回フレーム19を旋回してジブ20を回動
して分割マスト置台22に載置した後、分割マスト3を
ホイスト(図示せず)などの手段により吊り上げて旋回
フレーム19上に引き込み、更に、当該分割マスト3を
旋回フレーム19の開口を通して吊り下ろし、最上段に
位置する既設の分割マスト3上に載置して連結する。
When the mast 4 is to be extended, the divided mast 3 used for extending the mast 4 is lifted by the transporter 28, the swivel frame 19 is swung, the jib 20 is turned, and the mast 4 is placed on the split mast table 22. After being placed, the divided mast 3 is lifted by means of a hoist (not shown) or the like and pulled into the revolving frame 19, and the divided mast 3 is further suspended through the opening of the revolving frame 19, and the existing mast located at the uppermost stage It is mounted on the split mast 3 and connected.

【0020】このように、図1に示すコンクリート搬送
打設装置においては、旋回フレーム19から略水平に突
出するジブ20に沿って横行移動し得るトロリ27に吊
り下げられている搬器28にコンクリート搬送用のバケ
ット9を吊り下げ、バケット9の横行移動を、ジブ20
の旋回とトロリ27の横行とによって行うので、作業半
径方向へのバケット9の移動速度の向上を図ることがで
きる。
As described above, in the concrete conveying and casting apparatus shown in FIG. 1, concrete is transferred to the transporter 28 suspended on the trolley 27 which can traverse along the jib 20 projecting substantially horizontally from the revolving frame 19. Hanging the bucket 9 and moving the bucket 9 in traverse
Is performed and the trolley 27 is traversed, so that the moving speed of the bucket 9 in the working radial direction can be improved.

【0021】また、マスト4の伸張用に用いる分割マス
ト3を、トロリ27によって吊り上げ且つ旋回フレーム
19を回動させて分割マスト置台22に載置した後、ホ
イスト(図示せず)などの手段によって、分割マスト置
台22上の分割マスト3を旋回フレーム19上に引き上
げるので、マスト伸張作業の能率向上を図ることができ
る。
The divided mast 3 used for extending the mast 4 is lifted by the trolley 27 and mounted on the divided mast mounting table 22 by rotating the revolving frame 19 and then by means of a hoist (not shown) or the like. Since the divided mast 3 on the divided mast table 22 is lifted above the revolving frame 19, the efficiency of the mast extension operation can be improved.

【0022】更に、トロリ27、搬器28、及び搬器2
8で吊り下げるコンクリート搬送用のバケット9あるい
は分割マスト3の重量を主索24により支持するので、
ジブ20の負担が軽減されて、その構造の簡易化が可能
になる。
Further, the trolley 27, the carrier 28, and the carrier 2
8 supports the weight of the concrete transport bucket 9 or the divided mast 3 suspended by the main rope 24.
The load on the jib 20 is reduced, and the structure can be simplified.

【0023】なお、本発明のコンクリート搬送打設装置
は、上述した実施の形態のみに限定されるものではな
く、本発明の要旨を逸脱しない範囲内において種々変更
を加え得ることは勿論である。
It should be noted that the concrete conveying and casting apparatus of the present invention is not limited to the above-described embodiment, and it is needless to say that various modifications can be made without departing from the spirit of the present invention.

【0024】[0024]

【発明の効果】以上述べたように本発明のコンクリート
搬送打設装置によれば、下記のような種々の優れた効果
を奏し得る。
As described above, according to the concrete conveying and placing apparatus of the present invention, various excellent effects as described below can be obtained.

【0025】(1)本発明のコンクリート搬送打設装置
においては、コンクリート搬送用のバケットを、旋回フ
レームから略水平に突出するジブの基端部から先端部へ
張設した主索に沿って横行可能なトロリに吊り下げてい
るので、作業半径方向へのバケットの移動速度の向上を
図ることができる。
(1) In the concrete conveying and casting apparatus of the present invention, the concrete conveying bucket is traversed along the main cable extending from the base end to the distal end of the jib projecting substantially horizontally from the turning frame. Since the bucket is suspended on a possible trolley, the moving speed of the bucket in the working radial direction can be improved.

【0026】(2)また、ジブの重量が軽減されるの
で、ジブの基端部及び先端部に主索を係止するための小
改造を施工すれば、既存のクレーンをコンクリート搬送
打設装置に転用することができる。
(2) Also, since the weight of the jib is reduced, if a small remodeling is carried out to lock the main rope at the base end and the tip end of the jib, the existing crane can be transported to the concrete transporting and placing apparatus. Can be diverted to

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明のコンクリート搬送打設装置の実施の形
態の一例を示す側面図である。
FIG. 1 is a side view showing an example of an embodiment of a concrete conveying and placing device of the present invention.

【図2】従来のコンクリート搬送打設装置を用いたRC
D工法を示す全体図である。
FIG. 2 shows RC using a conventional concrete conveying and placing device.
It is the whole figure which shows the D construction method.

【図3】図2に関連する平面図である。FIG. 3 is a plan view related to FIG. 2;

【図4】図3に関連する従来のコンクリート搬送打設装
置の一例を示す側面図である。
FIG. 4 is a side view showing an example of a conventional concrete conveying and placing device related to FIG.

【符号の説明】[Explanation of symbols]

3 分割マスト 4 マスト 5 昇降フレーム 9 バケット 19 旋回フレーム 20 ジブ 22 分割マスト置台 23 吊り込み用マスト 24 主索 27 トロリ 3 Split Mast 4 Mast 5 Elevating Frame 9 Bucket 19 Swivel Frame 20 Jib 22 Divided Mast Stand 23 Mast for Suspension 24 Main Cable 27 Trolley

フロントページの続き (72)発明者 西藤 喜美雄 東京都千代田区大手町二丁目2番1号 石 川島播磨重工業株式会社本社内 Fターム(参考) 3F205 AB04 AB07 CA05 CA06 CA09Continuation of the front page (72) Inventor Kimio Nishito 2-2-1 Otemachi, Chiyoda-ku, Tokyo Ishikawajima-Harima Heavy Industries, Ltd. F-term (reference) 3F205 AB04 AB07 CA05 CA06 CA06 CA09

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 順次積み重ねられる複数の分割マストに
よって構成されるマストと、該マストに沿って上昇し得
る昇降フレームと、該昇降フレーム上に設けた旋回フレ
ームと、該旋回フレームから略水平に突出するジブと、
該ジブの基端部から先端部へ張設した主索と、該主索に
沿って横行移動し得られ且つコンクリート搬送用のバケ
ットを昇降可能に吊り下げるトロリとを備えてなること
を特徴とするコンクリート搬送打設装置。
1. A mast comprising a plurality of divided masts which are sequentially stacked, an elevating frame capable of ascending along the mast, a turning frame provided on the elevating frame, and projecting substantially horizontally from the turning frame. Jib to
A main rope extending from a base end to a distal end of the jib, and a trolley capable of traversing along the main rope and suspending a concrete transport bucket so as to be able to move up and down. Concrete transfer and casting equipment.
JP11109407A 1999-04-16 1999-04-16 Concrete conveying and placing device Pending JP2000302375A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11109407A JP2000302375A (en) 1999-04-16 1999-04-16 Concrete conveying and placing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11109407A JP2000302375A (en) 1999-04-16 1999-04-16 Concrete conveying and placing device

Publications (1)

Publication Number Publication Date
JP2000302375A true JP2000302375A (en) 2000-10-31

Family

ID=14509478

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11109407A Pending JP2000302375A (en) 1999-04-16 1999-04-16 Concrete conveying and placing device

Country Status (1)

Country Link
JP (1) JP2000302375A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103420277A (en) * 2012-05-18 2013-12-04 李宜君 Climbing cage structure of tower crane
CN103420274A (en) * 2012-05-18 2013-12-04 李宜君 Tower crane with liftable climbing cage structure
CN103420278A (en) * 2012-05-18 2013-12-04 李宜君 Transmission rope clutch structure of tower crane

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103420277A (en) * 2012-05-18 2013-12-04 李宜君 Climbing cage structure of tower crane
CN103420274A (en) * 2012-05-18 2013-12-04 李宜君 Tower crane with liftable climbing cage structure
CN103420278A (en) * 2012-05-18 2013-12-04 李宜君 Transmission rope clutch structure of tower crane
CN103420277B (en) * 2012-05-18 2015-04-08 李宜君 Climbing cage structure of tower crane

Similar Documents

Publication Publication Date Title
JP3039445B2 (en) Container crane
US20020070186A1 (en) Mobile crane
JP2000302375A (en) Concrete conveying and placing device
WO2008047471A1 (en) Jib crane
JP2852951B2 (en) Lifting crane
JPH07315766A (en) Shuttle jib type climbing crane
CN216038321U (en) Large-tonnage mast crane
JP2819990B2 (en) Hoist type tower crane
JP2000191280A (en) Concrete transport and placing device
JPH05147884A (en) Dismountable jib crane
US4762240A (en) Articulating crane
JPH04266397A (en) Crane with jib
JP3234536B2 (en) Multipurpose crane
JP2833439B2 (en) Hoist type tower crane
JPH08216772A (en) Electric pole transport vehicle
JP7365794B2 (en) jib crane
CN214570251U (en) Derrick mast lifting mechanism convenient to operate
JP2000336632A (en) Concrete conveying device and construction method therefor
JPH10331599A (en) Carrying system of lining segment for tunnel construction
JPH0636049Y2 (en) Horizontal jib crane
JPH11157777A (en) Container crane
JP3268062B2 (en) crane
JP3278771B2 (en) Equipment for transporting materials
JP2920015B2 (en) Lifting equipment
CN116119516A (en) Hoisting device for heavy cover plate of square cable trench of converter transformer

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20050929

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20051125

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20051125

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060411

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090203

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090210

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090609