Auxiliary screed attachment / detachment device for asphalt finisher

Info

Publication number
JP2553606Y2
JP2553606Y2 JP4007692U JP4007692U JP2553606Y2 JP 2553606 Y2 JP2553606 Y2 JP 2553606Y2 JP 4007692 U JP4007692 U JP 4007692U JP 4007692 U JP4007692 U JP 4007692U JP 2553606 Y2 JP2553606 Y2 JP 2553606Y2
Authority
JP
Japan
Prior art keywords
screed
auxiliary
bolt shaft
hole
eccentric shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4007692U
Other languages
Japanese (ja)
Other versions
JPH0594311U (en
Inventor
直 矢倉
利一 井上
政信 八尾
Original Assignee
新キャタピラー三菱株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 新キャタピラー三菱株式会社 filed Critical 新キャタピラー三菱株式会社
Priority to JP4007692U priority Critical patent/JP2553606Y2/en
Publication of JPH0594311U publication Critical patent/JPH0594311U/en
Application granted granted Critical
Publication of JP2553606Y2 publication Critical patent/JP2553606Y2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【考案の詳細な説明】[Detailed description of the invention]

【0001】[0001]

【産業上の利用分野】本考案は、アスファルトフィニッ
シャおよびリペーバ・ミキサ等の道路舗装・補修機械の
補助スクリード着脱装置に関し、特に、アスファルトフ
ィニッシャの補助スクリード着脱装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an auxiliary screed attaching / detaching apparatus for a road paving / repair machine such as an asphalt finisher and a repeaver / mixer, and more particularly to an auxiliary screed attaching / detaching apparatus for an asphalt finisher.

【0002】[0002]

【従来の技術】従来から、道路舗装・道路補修等の施行
工事には、アスファルトフィニッシャおよびリペーバ・
ミキサ等の道路舗装・補修機械が使用されてきた。とこ
ろが、道路の幅がいろいろであるから、その異なる道路
の幅に合わせるためアスファルトフィニッシャの主スク
リードに添って幅方向に伸縮させうるように伸縮スクリ
ードを形成したのである。そしてさらに伸縮スクリード
の外側に補助スクリードを配設して、主スクリードおよ
び伸縮スクリードおよび補助スクリード等のそれぞれの
スクリードの長さを幅方向に加減調整してスクリードの
長さを道路の幅に合わせることになるがスクリードの長
さを道路の幅方向に伸縮させる作業が非常にわずらわし
い作業であった。また、従来のアスファルトフィニッシ
ャの伸縮スクリードと補助スクリードの接続用の調整金
具は、図6および図7に示すようにボルトナット式の締
め付け手段であって、そのボルトのねじをねじ廻しで廻
して補助スクリードを上下させていたので作業時間がか
かった。さらに、従来のアスファルトフィニッシャの構
成を図5のアスファルトフィニッシャ全体の平面図で説
明するとアスファルトフィニッシャの進行方向に向かっ
て先頭部の位置にあるホッパ1にアスファルト舗装のた
めの合材2を受け、その合材をバーコンベア3により後
方へ送り、そしてその合材をコンベアスクリュウ4によ
り施工幅に拡大し、デフレクタ10により前記コンベア
スクリュウ4で施工幅に拡大させられた合材を所望の一
定厚さにひき均し、スクリード5により敷き固めて、舗
装面の成形を行ない一連のアスファルト舗装のための施
工作業は完了する。ところで、スクリード5には、中央
ベースとして主スクリード6があり、その主スクリード
6の両側に、その外端部を施工幅に合わせて左右に移動
できる伸縮スクリード7を設け、その伸縮スクリード7
の外側にボルト接続で補助スクリード8を接続し、前記
伸縮スクリード7の外側に向けてわずかの幅を延長させ
うるようにし、前記スクリード5の内部にバイブレータ
9とデフレクタ10を取り付けうるようにしてなるアス
ファルトフィニッシャである。また、図5のアスファル
トフィニッシャ全体の平面図で示された補助スクリード
8の接続部A−A,A−Aの部分を拡大して図
6および図7で示めすと伸縮スクリード7と補助スクリ
ード8または補助スクリード8同士の接続は相互の当て
板23を接触させて3本の接続ボルト12によってスク
リード同士を当て板の接触部分でボルト接続させるので
ある。このボルト接続作業において、舗装仕上げ面の平
坦性を確保する必要性があり、また伸縮スクリード7と
補助スクリード8との下底面が同一平面になるようにし
て円滑性を確保する必要性がある。そこで接続させる側
の補助スクリード8にあらかじめ調整金具13をボルト
止めしておいて補助スクリード8の接続板面より突き出
している前記調整金具13の顎部を、補助スクリード8
の接続相手である伸縮スクリード7または補助スクリー
ド8の開口部の縁に引っ掛けることにより、接続すべき
補助スクリード8の重量を補助スクリード8の接続相手
である伸縮スクリード7または補助スクリード8に預け
るようにする。それから接続ボルト12を仮締めの状態
にして、左右の調整金具13のボルト15を用い上下の
レベルと傾斜を調整することによりスクリード下面を均
一にし、調整がすめばナット16によりロックをするよ
うにしたのである。
2. Description of the Related Art Conventionally, construction work such as road pavement and road repair has been carried out by asphalt finishers and repavers.
Road paving and repair machines such as mixers have been used. However, since the width of the road varies, the telescopic screed is formed so as to be able to expand and contract in the width direction along the main screed of the asphalt finisher in order to match the width of the different road. Further, an auxiliary screed is arranged outside the telescopic screed, and the length of each screed such as the main screed, the telescopic screed and the auxiliary screed is adjusted in the width direction to adjust the screed length to the width of the road. However, the task of expanding and contracting the length of the screed in the width direction of the road was very troublesome. The conventional adjusting metal fitting for connecting the telescopic screed of the asphalt finisher and the auxiliary screed is a bolt-nut type fastening means as shown in FIGS. It took time to move the screed up and down. Further, the configuration of the conventional asphalt finisher will be described with reference to a plan view of the entire asphalt finisher in FIG. 5. The asphalt paving mix 2 is received by the hopper 1 at the leading position in the traveling direction of the asphalt finisher. The mixture is sent backward by the bar conveyor 3, and the mixture is expanded to the working width by the conveyor screw 4, and the mixture expanded to the working width by the conveyer screw 4 by the deflector 10 to a desired constant thickness. It is leveled and screeded 5 to form a pavement surface, and a series of asphalt pavement work is completed. By the way, the screed 5 has a main screed 6 as a central base, and on both sides of the main screed 6, there is provided a telescopic screed 7 whose outer end can be moved left and right according to the working width.
The auxiliary screed 8 is connected to the outside of the screed by a bolt connection so that the width of the auxiliary screed 8 can be slightly extended toward the outside of the expandable screed 7, and the vibrator 9 and the deflector 10 can be mounted inside the screed 5. It is an asphalt finisher. Also, when the connecting portions A 1 -A 1 and A 2 -A 2 of the auxiliary screed 8 shown in a plan view of the entire asphalt finisher in FIG. 5 are enlarged and shown in FIGS. The connection between the screed and the auxiliary screed 8 or between the auxiliary screeds 8 is made by contacting the backing plates 23 with each other and connecting the screeds to each other at the contact portions of the backing plates by three connecting bolts 12. In this bolt connection work, it is necessary to ensure the flatness of the pavement finished surface, and it is necessary to ensure smoothness by making the lower bottom surfaces of the telescopic screed 7 and the auxiliary screed 8 coplanar. Then, the adjusting bracket 13 is bolted in advance to the auxiliary screed 8 to be connected, and the jaw of the adjusting bracket 13 projecting from the connection plate surface of the auxiliary screed 8 is attached to the auxiliary screed 8.
The weight of the auxiliary screed 8 to be connected is stored in the telescopic screed 7 or the auxiliary screed 8 which is the connection partner of the auxiliary screed 8 by hooking the auxiliary screed 8 on the edge of the opening of the telescopic screed 7 or the auxiliary screed 8 which is the connection partner. I do. Then, the connection bolts 12 are temporarily tightened, and the upper and lower levels and the inclination are adjusted by using the bolts 15 of the left and right adjustment brackets 13 to make the screed lower surface uniform. It was done.

【0003】[0003]

【考案が解決しようとする課題】前述のように、従来の
調整金具13による補助スクリード着脱装置では、その
補助スクリード着脱装置を使用して補助スクリード着脱
作業を行なう際に、その作業を容易に行なうことと、安
全に行なうことが必要である。そのためには、外側に位
置する補助スクリード8の重量を、その補助スクリード
8と接続するためにその内側に位置する伸縮スクリード
7または補助スクリード8にあずけるようにすることが
必要である。ところが、調整金具13の顎部の大きさは
その周囲の種々の制約により十分大きくすることができ
ないようになっている。そのため、引っ掛かり代を十分
とりにくくなるのである。その結果は、調整金具13の
顎部を引っ掛けても、補助スクリード8の重量をあずけ
ている伸縮スクリード7または補助スクリード8に対し
て補助スクリード8が滑って落ちる恐れもあるので危険
である。ところが、そのような危険を未然に防止するこ
とへの配慮は十分でなく、安全を考慮したものとは言え
ない。また、スクリード下面の均一性をだすために、伸
縮スクリード7または補助スクリード8の下面を互いに
揃えることが必要になる。ところが、そのようにするた
めに左右の調整金具13のボルト15を廻して調整する
作業は熟練者であっても非常に時間を要する作業であっ
て、そのことが、本来、作業性を高めなければならない
アスファルト舗装のための施工作業現場において苦痛で
あり、また、わずらわしいことになるのである。以上説
明してきたように、従来のアスファルトフィニッシャに
は、その中央ベースとして主スクリード6を設け、その
主スクリード6の両側に、その外端部を施工幅に合わせ
て左右に移動できる伸縮スクリード7を設け、その伸縮
スクリード7の外側にボルト接続で補助スクリード8を
接続し、前記伸縮スクリード7の外側に向けてわずかの
幅を延長させうるようにしたアスファルトフィニッシャ
の補助スクリード着脱装置が設けられているが、その補
助スクリード着脱装置により補助スクリードを着脱させ
る作業、特に、施工幅延長のための補助スクリード接続
作業などにおいては、安全面と機能面に必ずしも十分な
配慮をなしているとは言えず、そのような点では問題が
ないではなかった。本考案は上記の問題を解決すること
を目的とするものである。
As described above, in the conventional auxiliary screed attaching / detaching apparatus using the adjusting bracket 13, when the auxiliary screed attaching / detaching operation is performed using the auxiliary screed attaching / detaching apparatus, the operation is easily performed. And it is necessary to do it safely. For this purpose, it is necessary that the weight of the auxiliary screed 8 located on the outside be allocated to the telescopic screed 7 or the auxiliary screed 8 located on the inside in order to connect with the auxiliary screed 8. However, the size of the jaw of the adjusting bracket 13 cannot be made sufficiently large due to various restrictions around the jaw. For this reason, it is difficult to take a sufficient allowance. As a result, even if the jaws of the adjustment fitting 13 are hooked, there is a danger that the auxiliary screed 8 may slip and fall on the telescopic screed 7 or the auxiliary screed 8 which keeps the weight of the auxiliary screed 8. However, there is not enough consideration to prevent such danger beforehand, and it cannot be said that safety is considered. Further, in order to obtain uniformity of the lower surface of the screed, it is necessary to align the lower surfaces of the elastic screed 7 and the auxiliary screed 8 with each other. However, the work of turning the bolts 15 of the left and right adjustment brackets 13 to perform such adjustment is a very time-consuming operation even for a skilled worker. It is painful and annoying at the construction site for asphalt pavement that must be done. As described above, the conventional asphalt finisher is provided with the main screed 6 as its central base, and on both sides of the main screed 6, telescopic screeds 7 whose outer ends can be moved to the left and right according to the working width. The auxiliary screed 8 is connected to the outside of the telescopic screed 7 by bolt connection, and an auxiliary screed attaching / detaching device of an asphalt finisher is provided so that the width can be slightly extended toward the outside of the telescopic screed 7. However, in the work of attaching and detaching the auxiliary screed by the auxiliary screed attaching and detaching device, especially in the work of connecting the auxiliary screed to extend the construction width, it can not be said that sufficient consideration has been given to safety and function, At that point was not without problems. The purpose of the present invention is to solve the above problems.

【0004】[0004]

【課題を解決するための手段】本考案は、伸縮スクリー
ドと補助スクリードまたは補助スクリード同士の接続部
分に偏心軸構造部分を有するボルト軸を配設し、そのボ
ルト軸を介して前記スクリード同士を着脱可能にしてな
るアスファルトフィニッシャの補助スクリード着脱装置
である。
According to the present invention, a bolt shaft having an eccentric shaft structure portion is provided at a connecting portion between a telescopic screed and an auxiliary screed or an auxiliary screed, and the screeds are attached and detached via the bolt shaft. This is an auxiliary screed attachment / detachment device for an asphalt finisher that becomes possible.

【0005】[0005]

【作用】本考案は、伸縮スクリードと補助スクリードま
たは補助スクリード同士の接続部分に配設したボルト軸
の偏心軸構造部分を回動させることによりスクリード相
互の上下方向の位置関係を微量調節しうるようにし、互
いに隣接して接続するスクリード同士の下面部分を同一
平面にして舗装面を均一面にさせうるようにしてなるア
スファルトフィニッシャの補助スクリード着脱装置であ
るから、特に、伸縮スクリードの下面部分と補助スクリ
ードの下面部分とのいずれの下面部分も同一平面にして
均一な平面部分にすることができる。また、本考案は、
相手スクリードに接続する伸縮スクリードの接続面板
に、ボルト軸の端部と結合するための通口を設け、その
通口の上部の形状を前記ボルト軸の先端部のつば部の外
径よりわずか大きくして前記つば部が前記通口を通り抜
けうるようにし、その通口の下部の形状を偏心軸構造部
分の直径よりわずか小さくして前記偏心軸構造部分が前
記通口の下部の部分に嵌まり得るようにしてなるアスフ
ァルトフィニッシャにおいて、相手スクリードに接続す
るスクリードの接続面の左右2か所に調整金具を備えた
補助スクリードを持ち上げ、ボルト軸先端のつば部を前
記伸縮スクリードの接続面板に設けた前記通口に差し込
み、下方に下げた状態で、前記ボルト軸の最先端部に設
けられた並行部分などの把持部をスパナなどの旋回工具
により旋回させ、偏心軸構造部分の偏心軸の偏心量だけ
補助スクリードが伸縮スクリードに対して上下動しうる
のである。また、本考案は、そのアスファルトフィニッ
シャの主スクリードの両側に、その外端部を施工幅に合
わせて左右に移動できる伸縮スクリードを設け、その伸
縮スクリードの外側に偏心軸構造部分を有するボルト軸
を介して補助スクリードを接続し、前記伸縮スクリード
の外側に向けてわずかの幅を伸長させうるようにしたの
で所望の道路の幅に簡単に適応させ得る効果がある。ま
た、従来のアスファルトフィニッシャの主スクリードお
よび伸縮スクリードおよび補助スクリード等のそれぞれ
のスクリードの長さを幅方向に加減調整してスクリード
の長さを道路の幅に合わせることになるがスクリードの
長さを道路の幅方向に伸縮させる作業が非常にわずらわ
しい作業であった。ところが、本考案は、伸縮スクリー
ドを簡単に左右に移動できるばかりでなくボルト軸の最
先端部に設けられた並行部分などの把持部をスパナなど
の旋回工具により旋回させ、偏心軸構造部分の偏心軸の
偏心量だけ補助スクリードを伸縮スクリードに対して上
下動させうるのである。また、本考案は、相手スクリー
ドに接続する伸縮スクリードの接続面板に、ボルト軸端
部と結合するための通口を設け、その通口の上部の形状
を前記ボルト軸の先端部のつば部の外径よりわずか大き
くして前記つば部が前記通口を通り抜けうるようにし、
その通口の下部の形状を偏心軸構造部分の直径よりわず
か小さくして前記偏心軸構造部分が前記通口の下部の部
分に嵌まり得るようにし、接続されるべき補助スクリー
ドはその重量を伸縮スクリードにあずけた状態になるよ
うにしたので、偏心軸構造部分を有するボルト軸をスパ
ナなどの旋回工具により旋回させるだけで、補助スクリ
ードを簡単にかつ確実に偏心軸構造部分の偏心軸の偏心
量だけ伸縮スクリードに対して上下動させうるととも
に、補助スクリードを伸縮スクリードに対して簡単にか
つ確実に着脱しうるのである。
According to the present invention, the vertical positional relationship between the screeds can be finely adjusted by rotating the eccentric shaft structure of the bolt shaft disposed at the connection between the telescopic screed and the auxiliary screed or between the auxiliary screeds. And an auxiliary screed attaching / detaching device for an asphalt finisher in which the lower surfaces of the screeds connected adjacent to each other are made to be flush with each other so that the pavement surface can be made uniform. Any lower surface portion with the lower surface portion of the screed can be made the same plane to be a uniform flat portion. Also, the present invention
In the connection face plate of the telescopic screed to be connected to the mating screed, a through hole for coupling with the end of the bolt shaft is provided, and the shape of the upper portion of the through hole is slightly larger than the outer diameter of the flange at the tip of the bolt shaft. Then, the collar portion can pass through the opening, the shape of the lower portion of the opening is slightly smaller than the diameter of the eccentric shaft structure portion, and the eccentric shaft structure portion fits into the lower portion of the opening. In the asphalt finisher to be obtained, auxiliary screeds having adjustment metal fittings are lifted at two places on the left and right sides of the connection surface of the screed to be connected to the mating screed, and the flange at the tip of the bolt shaft is provided on the connection face plate of the telescopic screed. In the state of being inserted into the through hole and being lowered, a gripping portion such as a parallel portion provided at the foremost portion of the bolt shaft is turned with a turning tool such as a wrench to bias the bolt shaft. It is the can move vertically with respect to only the amount of eccentricity of the eccentric shaft of the shaft structure part auxiliary screed extendable screed. In addition, the present invention provides a telescopic screed that can move its outer end to the left and right according to the working width on both sides of the main screed of the asphalt finisher, and a bolt shaft having an eccentric shaft structure portion outside the telescopic screed. Since the auxiliary screed is connected via the auxiliary screed so as to be able to extend a small width toward the outside of the telescopic screed, there is an effect that it can be easily adapted to a desired road width. In addition, the length of each screed such as the main screed, telescopic screed, and auxiliary screed of the conventional asphalt finisher is adjusted in the width direction to adjust the screed length to the width of the road. The work of expanding and contracting in the width direction of the road was very troublesome. However, according to the present invention, not only can the telescopic screed be easily moved to the left and right, but also a gripping part such as a parallel part provided at the foremost part of the bolt shaft is turned with a turning tool such as a wrench, so that the eccentric shaft structure part is eccentric. The auxiliary screed can be moved up and down relative to the telescopic screed by the amount of eccentricity of the shaft. In addition, the present invention provides a connection surface plate of an elastic screed to be connected to a mating screed, and a through hole for coupling with a bolt shaft end portion, and a shape of an upper portion of the through hole is formed by a flange portion at a tip portion of the bolt shaft. Slightly larger than the outer diameter so that the collar can pass through the opening,
The shape of the lower part of the passage is slightly smaller than the diameter of the eccentric shaft structure so that the eccentric shaft structure can fit into the lower part of the passage, and the auxiliary screed to be connected expands and contracts its weight. The auxiliary screed is simply and reliably swiveled with a swivel tool such as a wrench so that the eccentric amount of the eccentric shaft of the eccentric shaft structure can be easily and reliably achieved by simply turning the bolt shaft having the eccentric shaft structure with a swivel tool. Only the screed can be moved up and down with respect to the telescopic screed, and the auxiliary screed can be easily and reliably attached to and detached from the telescopic screed.

【0006】[0006]

【実施例1】本考案は、本考案は伸縮スクリードと補助
スクリードまたは補助スクリード同士の接続部分に配設
したボルト軸の偏心軸構造部分を回動させることにより
スクリード相互の上下方向の位置関係を微量調節しうる
ようにしてなるアスファルトフィニッシャの補助スクリ
ード着脱装置である。
[Embodiment 1] In the present invention, the eccentric shaft structure portion of a bolt shaft provided at a connection portion between a telescopic screed and an auxiliary screed or an auxiliary screed is rotated to change the positional relationship between the screeds in the vertical direction. This is an auxiliary screed attachment / detachment device for an asphalt finisher that can be finely adjusted.

【0007】[0007]

【実施例2】本考案は、伸縮スクリードと補助スクリー
ドまたは補助スクリード同士の接続部分に配設したボル
ト軸の偏心軸構造部分を回動させることによりスクリー
ド相互の上下方向の位置関係を微量調節しうるように
し、互いに隣接して接続するスクリード同士の下面部分
を同一面にして舗装面を均一面にさせうるようにしてな
るアスファルトフィニッシャの補助スクリード着脱装置
である。
Embodiment 2 In the present invention, the eccentric shaft structure of a bolt shaft provided at a connection portion between a telescopic screed and an auxiliary screed or between auxiliary screeds is used to finely adjust the vertical positional relationship between the screeds. An auxiliary screed attaching / detaching device for an asphalt finisher, wherein a lower surface portion of screeds connected adjacent to each other is made the same so as to make a pavement surface uniform.

【0008】[0008]

【実施例3】本考案は、その主スクリードの両側に、そ
の外端部を施工幅に合わせて左右に移動できる伸縮スク
リードを設け、その伸縮スクリードの外側に偏心軸構造
部分を有するボルト軸を介して補助スクリードを接続
し、前記伸縮スクリードの外側に向けてわずかの幅を伸
長させうるようにしてなるアスファルトフィニッシャの
補助スクリード着脱装置である。
[Embodiment 3] The present invention provides a bolt screed having an eccentric shaft structure outside the telescopic screed on both sides of the main screed. An auxiliary screed attachment / detachment device for an asphalt finisher, wherein an auxiliary screed is connected to the expansion screed by a small width toward the outside of the telescopic screed.

【0009】[0009]

【実施例4】本考案は、互いに隣接して接続するスクリ
ード同士の接続部分に通口を設け、それらの通口に偏心
軸構造部分を有する回動可能なボルト軸を挿通し、前記
通口に対して前記ボルト軸を着脱自在にしてなるアスフ
ァルトフィニッシャの補助スクリード着脱装置である。
Embodiment 4 In the present invention, openings are provided at connecting portions of screeds which are adjacently connected to each other, and a rotatable bolt shaft having an eccentric shaft structure portion is inserted into these openings, and And an auxiliary screed attachment / detachment device for an asphalt finisher in which the bolt shaft is made detachable.

【0010】[0010]

【実施例5】本考案は、互いに接続関係にあるスクリー
ドに設けた通口に挿通したボルト軸を回動可能にし、互
いに接続関係にあるスクリードの一方のスクリードに設
けた通口の一部を前記ボルト軸に設けたつば部に係止し
うるようにし、前記通口の他部を前記ボルト軸に設けた
つば部から離脱させうるようにしてなるアスファルトフ
ィニッシャの補助スクリード着脱装置である。
Embodiment 5 In the present invention, a bolt shaft inserted into a passage provided in a screed connected to each other is made rotatable, and a part of the passage provided in one screed of the screed connected to each other is formed. An asphalt finisher auxiliary screed attachment / detachment device which can be engaged with a collar provided on the bolt shaft, and can detach the other part of the opening from the collar provided on the bolt shaft.

【0011】[0011]

【実施例6】本考案は、ボルト軸の先端部に偏心軸構造
部分を設け、その偏心軸構造部分の先端と中間胴部との
それぞれにつば部を設け、前記ボルト軸の先端部にねじ
部を設け、前記ボルト軸の最先端部に並行部分などの把
持部を設けて旋回工具などにより旋回させうるようにし
てなるアスファルトフィニッシャの補助スクリード着脱
装置である。
[Embodiment 6] In the present invention, an eccentric shaft structure is provided at the tip of a bolt shaft, a flange is provided at each of the tip of the eccentric shaft structure and an intermediate body, and a screw is provided at the tip of the bolt shaft. An auxiliary screed attaching / detaching device for an asphalt finisher, wherein a gripping portion such as a parallel portion is provided at the foremost portion of the bolt shaft so that the bolt can be turned by a turning tool or the like.

【0012】[0012]

【実施例7】本考案は、相手スクリードに接続する伸縮
スクリードの接続面板に、ボルト軸端部と結合するため
の通口を設け、その通口の上部の形状を前記ボルト軸の
先端部のつば部の外径よりわずか大きくして前記つば部
が前記通口を通り抜けうるようにし、その通口の下部の
形状を偏心軸構造部分の直径よりわずか小さくして前記
偏心軸構造部分が前記通口の下部の部分に嵌まり得るよ
うにしてなるアスファルトフィニッシャの補助スクリー
ド着脱装置である。
[Embodiment 7] In the present invention, the connection face plate of the telescopic screed to be connected to the mating screed is provided with a through hole for coupling with the end of the bolt shaft, and the shape of the upper part of the through hole is changed to the shape of the tip of the bolt shaft. The collar is slightly larger than the outer diameter of the collar so that the collar can pass through the through hole, and the shape of the lower part of the through hole is slightly smaller than the diameter of the eccentric shaft structure, and the eccentric shaft structure has the through hole. This is an auxiliary screed attachment / detachment device for an asphalt finisher that can be fitted to a lower part of a mouth.

【0013】[0013]

【実施例8】本考案は、相手スクリードに接続する伸縮
スクリードの接続面板に、ボルト軸端部と結合するため
の通口を設け、その通口の上部の形状を前記ボルト軸の
先端部のつば部の外径よりわずか大きくして前記つば部
が前記通口を通り抜けうるようにし、その通口の下部の
形状を偏心軸構造部分の直径よりわずか小さくして前記
偏心軸構造部分が前記通口の下部の部分に嵌まり得るよ
うにし、接続されるべき補助スクリードはその重量を伸
縮スクリードにあずけた状態になるようにしたアスファ
ルトフィニッシャの補助スクリード着脱装置である。
Eighth Embodiment The present invention provides a connecting face plate of a telescopic screed to be connected to a mating screed, which is provided with a through hole for coupling with an end of a bolt shaft. The collar is slightly larger than the outer diameter of the collar so that the collar can pass through the through hole, and the shape of the lower part of the through hole is slightly smaller than the diameter of the eccentric shaft structure, and the eccentric shaft structure has the through hole. An auxiliary screed attachment / detachment device for an asphalt finisher in which the auxiliary screed to be connected can be fitted to the lower part of the mouth and the weight of the auxiliary screed is allocated to the telescopic screed.

【0014】[0014]

【実施例9】本考案は、相手スクリードに接続する伸縮
スクリードの接続面板に、ボルト軸の端部と結合するた
めの通口を設け、その通口の上部の形状を前記ボルト軸
の先端部のつば部の外径よりわずか大きくして前記つば
部が前記通口を通り抜けうるようにし、その通口の下部
の形状を偏心軸構造部分の直径よりわずか小さくして前
記偏心軸構造部分が前記通口の下部の部分に嵌まり得る
ようにしてなるアスファルトフィニッシャにおいて、相
手スクリードに接続するスクリードの接続面の左右2か
所に調整金具を備えた補助スクリードを持ち上げ、ボル
ト軸先端のつば部を前記伸縮スクリードの接続面板に設
けた前記通口に差し込み、下方に下げた状態で、前記ボ
ルト軸の最先端部に設けられた並行部分などの把持部を
スパナなどの旋回工具により旋回させ、偏心軸構造部分
の偏心軸の偏心量だけ補助スクリードが伸縮スクリード
に対して上下動しうるようにしてなるアスファルトフィ
ニッシャの補助スクリード着脱装置である。
Embodiment 9 The present invention provides a connecting face plate of a telescopic screed to be connected to a mating screed, which is provided with a through hole for coupling with an end of a bolt shaft. The collar is slightly larger than the outer diameter of the collar so that the collar can pass through the opening, and the shape of the lower part of the opening is slightly smaller than the diameter of the eccentric shaft structure, and the eccentric shaft structure has the eccentric shaft structure. In an asphalt finisher that can be fitted into a lower portion of a through hole, an auxiliary screed provided with adjusting metal fittings is provided at two places on the left and right sides of a connection surface of a screed to be connected to a mating screed, and a flange at a tip of a bolt shaft is removed. Insert it into the through-hole provided on the connection face plate of the telescopic screed, and lower it downward, while turning a gripping part such as a parallel part provided at the foremost part of the bolt shaft with a spanner or the like. Pivoted by immediately, an auxiliary screed attachment apparatus asphalt finisher comprising as can move vertically with respect to only the amount of eccentricity of the eccentric shaft of the eccentric shaft structure portion auxiliary screed extendable screed.

【0015】[0015]

【実施例10】本考案は、本考案は、相手スクリードに
接続するスクリードの接続面の左右2か所に調整金具1
6を備えた補助スクリードを持ち上げ、ボルト軸先端の
つば部を前記伸縮スクリードの接続面板に設けた前記通
口に差し込み、下方に下げた状態で、前記ボルト軸の最
先端部に設けられた並行部分などの把持部をスパナなど
の旋回工具により旋回させ、偏心軸構造部分の偏心軸の
偏心量だけ補助スクリードが伸縮スクリードに対して上
下動しうるようにし、前記調整金具16の働きで補助ス
クリードの下面のレベルを上下方向に移動させて微調整
しうるようにし、かつ補助スクリードの傾斜度を加減調
整しうるようにしてなるアスファルトフィニッシャの補
助スクリード着脱装置である。
[Embodiment 10] The present invention is directed to a screed connecting surface which is connected to a mating screed.
6. Lift the auxiliary screed provided with 6 and insert the brim at the tip of the bolt shaft into the through hole provided in the connection face plate of the telescopic screed, and lower it in the parallel state provided at the foremost end of the bolt shaft. The auxiliary screed can be moved up and down with respect to the telescopic screed by the amount of eccentricity of the eccentric shaft of the eccentric shaft structure portion by turning a gripping portion such as a wrench with a turning tool such as a wrench. An auxiliary screed attachment / detachment device for an asphalt finisher in which the level of the lower surface of the asphalt finisher can be finely adjusted by moving the level of the lower surface of the asphalt finisher, and the inclination of the auxiliary screed can be adjusted.

【0016】[0016]

【効果】本考案は、伸縮スクリードと補助スクリードま
たは補助スクリード同士の接続部分に配設した調整金具
16のボルト軸の偏心軸構造部分を回動させることによ
りスクリード相互の上下方向の位置関係を微量調節しう
るようにし、互いに隣接して接続するスクリード同士の
下面部分を同一平面にして舗装面を均一面にさせうるよ
うにしてなるアスファルトフィニッシャの補助スクリー
ド着脱装置であるから、特に、伸縮スクリードの下面部
分と補助スクリードの下面部分とのいずれの下面部分も
同一平面にして均一な平面部分にすることができる効果
がある。また、本考案は、相手スクリードに接続する伸
縮スクリードの接続面板に、ボルト軸の端部と結合する
ための通口を設け、その通口の上部の形状を前記ボルト
軸の先端部のつば部の外径よりわずか大きくして前記つ
ば部が前記通口を通り抜けうるようにし、その通口の下
部の形状を偏心軸構造部分の直径よりわずか小さくして
前記偏心軸構造部分が前記通口の下部の部分に嵌まり得
るようにしてなるアスファルトフィニッシャにおいて、
相手スクリードに接続するスクリードの接続面の左右2
か所に調整金具を備えた補助スクリードを持ち上げ、ボ
ルト軸先端のつば部を前記伸縮スクリードの接続面板に
設けた前記通口に差し込み、下方に下げた状態で、前記
ボルト軸の最先端部に設けられた並行部分などの把持部
をスパナなどの旋回工具により旋回させ、偏心軸構造部
分の偏心軸の偏心量だけ補助スクリードが伸縮スクリー
ドに対して上下動しうる効果がある。また、本考案は、
そのアスファルトフィニッシャの主スクリードの両側
に、その外端部を施工幅に合わせて左右に移動できる伸
縮スクリードを設け、その伸縮スクリードの外側に偏心
軸構造部分を有するボルト軸を介して補助スクリードを
接続し、前記伸縮スクリードの外側に向けてわずかの幅
を伸長させうるようにしたので所望の道路の幅に簡単に
適応させ得る効果がある。また、従来のアスファルトフ
ィニッシャの主スクリードおよび伸縮スクリードおよび
補助スクリード等のそれぞれのスクリードの長さを幅方
向に加減調整してスクリードの長さを道路の幅に合わせ
ることになるがスクリードの長さを道路の幅方向に伸縮
させる作業が非常にわずらわしい作業であった。ところ
が、本考案は、伸縮スクリードを簡単に左右に移動でき
るばかりでなくボルト軸の最先端部に設けられた並行部
分などの把持部をスパナなどの旋回工具により旋回さ
せ、偏心軸構造部分の偏心軸の偏心量だけ補助スクリー
ドを伸縮スクリードに対して上下動させうる効果があ
る。また、本考案は、相手スクリードに接続する伸縮ス
クリードの接続面板に、ボルト軸端部と結合するための
通口を設け、その通口の上部の形状を前記ボルト軸の先
端部のつば部の外径よりわずか大きくして前記つば部が
前記通口を通り抜けうるようにし、その通口の下部の形
状を偏心軸構造部分の直径よりわずか小さくして前記偏
心軸構造部分が前記通口の下部の部分に嵌まり得るよう
にし、接続されるべき補助スクリードはその重量を伸縮
スクリードにあずけた状態になるようにしたので、偏心
軸構造部分を有するボルト軸をスパナなどの旋回工具に
より旋回させるだけで、補助スクリードを簡単にかつ確
実に偏心軸構造部分の偏心軸の偏心量だけ伸縮スクリー
ドに対して上下動させうるとともに、補助スクリードを
伸縮スクリードに対して簡単にかつ確実に着脱しうる効
果がある。
According to the present invention, the vertical eccentricity of the screed is reduced by rotating the eccentric shaft structure of the bolt shaft of the adjusting bracket 16 provided at the connection between the telescopic screed and the auxiliary screed or the auxiliary screed. It is an auxiliary screed attaching / detaching device of an asphalt finisher that can be adjusted and makes the lower surface portion of the screeds connected adjacent to each other the same plane so that the pavement surface can be made uniform. There is an effect that both the lower surface portion of the lower surface portion and the lower surface portion of the auxiliary screed can be made the same plane to be a uniform plane portion. Further, according to the present invention, the connection face plate of the telescopic screed to be connected to the mating screed is provided with a through hole for coupling with the end of the bolt shaft, and the shape of the upper portion of the through hole is changed to the flange at the tip of the bolt shaft. The outer diameter of the eccentric shaft structure is slightly larger than the diameter of the eccentric shaft structure portion by making the shape of the lower part of the mouth slightly smaller than the diameter of the eccentric shaft structure portion. In an asphalt finisher that can fit into the lower part,
Left and right 2 of the screed connection surface to be connected to the mating screed
Lift the auxiliary screed provided with the adjustment bracket in place, insert the collar at the tip of the bolt shaft into the through hole provided in the connection face plate of the telescopic screed, and lower it to the top end of the bolt shaft. There is an effect that the gripping portion such as the provided parallel portion is turned by a turning tool such as a spanner, and the auxiliary screed can move up and down with respect to the telescopic screed by the amount of eccentricity of the eccentric shaft of the eccentric shaft structure portion. Also, the present invention
On both sides of the main screed of the asphalt finisher, telescopic screeds whose outer ends can be moved to the left and right according to the construction width are provided, and auxiliary screeds are connected via bolt shafts having eccentric shaft structure parts outside the telescopic screeds However, since a slight width can be extended toward the outside of the telescopic screed, there is an effect that it can be easily adapted to a desired road width. In addition, the length of each screed such as the main screed, telescopic screed, and auxiliary screed of the conventional asphalt finisher is adjusted in the width direction to adjust the screed length to the width of the road. The work of expanding and contracting in the width direction of the road was very troublesome. However, according to the present invention, not only can the telescopic screed be easily moved to the left and right, but also a gripping part such as a parallel part provided at the foremost part of the bolt shaft is turned with a turning tool such as a wrench, so that the eccentric shaft structure part is eccentric. There is an effect that the auxiliary screed can be moved up and down with respect to the telescopic screed by the amount of eccentricity of the shaft. In addition, the present invention provides a connection surface plate of an elastic screed to be connected to a mating screed, and a through hole for coupling with a bolt shaft end portion, and a shape of an upper portion of the through hole is formed by a flange portion at a tip portion of the bolt shaft. The collar is slightly larger than the outer diameter to allow the collar to pass through the opening, and the shape of the lower portion of the opening is slightly smaller than the diameter of the eccentric shaft structure so that the eccentric shaft structure is lower than the opening. The auxiliary screed to be connected has its weight given to the telescopic screed, so the bolt shaft having the eccentric shaft structure can be turned only by a turning tool such as a spanner. The auxiliary screed can be easily and surely moved up and down with respect to the telescopic screed by the amount of eccentricity of the eccentric shaft of the eccentric shaft structure part, and the auxiliary screed can be moved with respect to the telescopic screed. There are easily and reliably can detachably effect.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本考案を施したアスファルトフィニッシャの要
部である調整金具の部分の平面図である。
FIG. 1 is a plan view of a part of an adjustment fitting which is a main part of an asphalt finisher according to the present invention.

【図2】本考案を施したアスファルトフィニッシャの要
部である調整金具の部分の正面図である。
FIG. 2 is a front view of a part of an adjustment fitting which is a main part of the asphalt finisher according to the present invention.

【図3】本考案を施したアスファルトフィニッシャの要
部である調整金具による伸縮スクリードの部分と補助ス
クリードの部分の接続状態を示した側面図である。
FIG. 3 is a side view showing a connection state of a portion of a telescopic screed and a portion of an auxiliary screed by an adjustment fitting which is a main part of the asphalt finisher according to the present invention.

【図4】本考案を施したアスファルトフィニッシャの要
部である調整金具による伸縮スクリードの部分と補助ス
クリードの部分の接続状態を示した後面図である。
FIG. 4 is a rear view showing a connection state of a telescopic screed portion and an auxiliary screed portion by an adjustment fitting which is a main part of the asphalt finisher according to the present invention.

【図5】従来のアスファルトフィニッシャの全体構造を
示した平面図である。
FIG. 5 is a plan view showing the entire structure of a conventional asphalt finisher.

【図6】従来のアスファルトフィニッシャの要部である
調整金具による伸縮スクリードの部分と補助スクリード
の部分の接続状態を示した側面図である。
FIG. 6 is a side view showing a connection state of a portion of a telescopic screed and a portion of an auxiliary screed by an adjustment fitting which is a main part of a conventional asphalt finisher.

【図7】従来のアスファルトフィニッシャの要部である
調整金具による伸縮スクリードの部分と補助スクリード
の部分の接続状態を示した後面図である。
FIG. 7 is a rear view showing a connection state of a portion of a telescopic screed and a portion of an auxiliary screed by an adjustment fitting which is a main part of a conventional asphalt finisher.

【符号の説明】[Explanation of symbols]

1. ホッパ 2. 合材 3. バーコンベア 4. コンベア
スクリュウ 5. スクリード 6. 主スクリ
ード 7. 伸縮スクリード 7a. 伸縮スク
リード接続面板 8. 補助スクリード 8a. 補助スク
リード接続面板 9. バイブレータ 10. デフレク
タ 11. ドライブシャフト 12. 接続ボル
ト 13. 調整金具 14. ボルト 15. ボルト 16. 調整金具 17. ボルト軸 17a.ねじ部 17b.六角部 17c.つば 17d.偏心軸構造部分 17e.円形つば 18. ナット 19. ピン 20. 平座金 21. ばね座金 22. 平座金 23. 当て板 23a.伸縮スクリード側当て板 23b.補助スク
リード側当て板 24. 加工穴 25. 加工穴
1. Hopper 2. Mixture 3. Bar conveyor 4. Conveyor screw 5. Screed 6. Main screed 7. Telescopic screed 7a. 7. Expansion screed connection face plate Auxiliary screed 8a. 8. Auxiliary screed connection face plate Vibrator 10. Deflector 11. Drive shaft 12. Connection bolt 13. Adjustment bracket 14. Bolt 15. Bolt 16. Adjustment bracket 17. Bolt shaft 17a. Screw part 17b. Hex 17c. Spit 17d. Eccentric shaft structure part 17e. Circular collar 18. Nut 19. Pin 20. Flat washer 21. Spring washer 22. Flat washer 23. Backing plate 23a. Telescopic screed side patch 23b. 23. Auxiliary screed side patch plate Processing hole 25. Machining hole

Claims (11)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】伸縮スクリードと補助スクリードまたは補
助スクリード同士の接続部分に偏心軸構造部分を有する
ボルト軸を配設し、そのボルト軸を介して前記スクリー
ド同士を着脱可能にしてなるアスファルトフィニッシャ
の補助スクリード着脱装置。
An asphalt finisher comprising: a bolt shaft having an eccentric shaft structure disposed at a connecting portion between a telescopic screed and an auxiliary screed or between auxiliary screeds, and the screeds being detachable via the bolt shaft. Screed attachment / detachment device.
【請求項2】伸縮スクリードと補助スクリードまたは補
助スクリード同士の接続部分に配設したボルト軸の偏心
軸構造部分を回動させることによりスクリード相互の上
下方向の位置関係を微量調節しうるようにしてなる請求
項1記載のアスファルトフィニッシャの補助スクリード
着脱装置。
2. An eccentric shaft structure portion of a bolt shaft provided at a connection portion between a telescopic screed and an auxiliary screed or between auxiliary screeds so that a vertical positional relationship between screeds can be finely adjusted. The auxiliary screed attachment / detachment device for an asphalt finisher according to claim 1.
【請求項3】伸縮スクリードと補助スクリードまたは補
助スクリード同士の接続部分に配設したボルト軸の偏心
軸構造部分を回動させることによりスクリード相互の上
下方向の位置関係を微量調節しうるようにし、互いに隣
接して接続するスクリード同士の下面部分を同一面にし
て舗装面を均一面にさせうるようにしてなる請求項1記
載のアスファルトフィニッシャの補助スクリード着脱装
置。
3. An eccentric shaft structure portion of a bolt shaft provided at a connection portion between an extendable screed and an auxiliary screed or between auxiliary screeds, so that a vertical positional relationship between the screeds can be finely adjusted. The auxiliary screed attachment / detachment device for an asphalt finisher according to claim 1, wherein the lower surfaces of the screeds connected adjacent to each other are made the same so that the pavement surface can be made uniform.
【請求項4】その主スクリードの両側に、その外端部を
施工幅に合わせて左右に移動できる伸縮スクリードを設
け、その伸縮スクリードの外側に偏心軸構造部分を有す
るボルト軸を介して補助スクリードを接続し、前記伸縮
スクリードの外側に向けてわずかの幅を伸長させうるよ
うにしてなる請求項1記載のアスファルトフィニッシャ
の補助スクリード着脱装置。
4. An expandable screed on both sides of the main screed, the outer end of which can be moved left and right according to the working width, and an auxiliary screed via a bolt shaft having an eccentric shaft structure outside the expandable screed. The auxiliary screed attaching / detaching apparatus for an asphalt finisher according to claim 1, wherein the auxiliary screed is attached so that a slight width can be extended toward the outside of the telescopic screed.
【請求項5】互いに隣接して接続するスクリード同士の
接続部分に通口を設け、それらの通口に偏心軸構造部分
を有する回動可能なボルト軸を挿通し、前記通口に対し
て前記ボルト軸を着脱自在にしてなる請求項1記載のア
スファルトフィニッシャの補助スクリード着脱装置。
5. A connecting portion between screeds which are connected to each other adjacently to each other, and a through hole is provided, and a rotatable bolt shaft having an eccentric shaft structure portion is inserted into the through hole, and said through hole is inserted into said through hole. The auxiliary screed attaching / detaching device for an asphalt finisher according to claim 1, wherein the bolt shaft is detachable.
【請求項6】互いに接続関係にあるスクリードに設けた
通口に挿通したボルト軸を回動可能にし、互いに接続関
係にあるスクリードの一方のスクリードに設けた通口の
一部を前記ボルト軸に設けたつば部に係止しうるように
し、前記通口の他部を前記ボルト軸に設けたつば部から
離脱させうるようにしてなる請求項1記載のアスファル
トフィニッシャの補助スクリード着脱装置。
6. A bolt shaft inserted into a passage provided in a screed connected to each other is rotatable, and a part of a passage provided in one screed of the screed connected to each other is connected to the bolt shaft. The auxiliary screed attaching / detaching apparatus for an asphalt finisher according to claim 1, wherein the auxiliary screed attachment / detachment device is configured to be able to be locked to a provided collar portion and to allow another portion of the opening to be detached from a collar portion provided to the bolt shaft.
【請求項7】ボルト軸の先端部に偏心軸構造部分を設
け、その偏心軸構造部分の先端と中間胴部とのそれぞれ
につば部を設け、前記ボルト軸の先端部にねじ部を設
け、前記ボルト軸の最先端部に並行部分などの把持部を
設けて旋回工具などにより旋回させうるようにしてなる
請求項1記載のアスファルトフィニッシャの補助スクリ
ード着脱装置。
7. An eccentric shaft structure portion is provided at a tip portion of a bolt shaft, a flange portion is provided at each of a tip of the eccentric shaft structure portion and an intermediate body portion, and a screw portion is provided at a tip portion of the bolt shaft. The auxiliary screed attachment / detachment device for an asphalt finisher according to claim 1, wherein a grip portion such as a parallel portion is provided at a leading end portion of the bolt shaft so that the bolt shaft can be turned by a turning tool or the like.
【請求項8】相手スクリードに接続する伸縮スクリード
の接続面板に、ボルト軸端部と結合するための通口を設
け、その通口の上部の形状を前記ボルト軸の先端部のつ
ば部の外径よりわずか大きくして前記つば部が前記通口
を通り抜けうるようにし、その通口の下部の形状を偏心
軸構造部分の直径よりわずか小さくして前記偏心軸構造
部分が前記通口の下部の部分に嵌まり得るようにしてな
る請求項1記載のアスファルトフィニッシャの補助スク
リード着脱装置。
8. A connecting face plate of a telescopic screed to be connected to a mating screed is provided with a through hole for coupling with a bolt shaft end portion, and the shape of the upper portion of the through hole is formed outside the flange portion at the tip end portion of the bolt shaft. Slightly larger than the diameter so that the collar part can pass through the through hole, the shape of the lower portion of the through hole is slightly smaller than the diameter of the eccentric shaft structure portion, the eccentric shaft structure portion of the lower portion of the through hole The auxiliary screed attachment / detachment device for an asphalt finisher according to claim 1, wherein the auxiliary screed attachment / detachment device can be fitted to the portion.
【請求項9】相手スクリードに接続する伸縮スクリード
の接続面板に、ボルト軸端部と結合するための通口を設
け、その通口の上部の形状を前記ボルト軸の先端部のつ
ば部の外径よりわずか大きくして前記つば部が前記通口
を通り抜けうるようにし、その通口の下部の形状を偏心
軸構造部分の直径よりわずか小さくして前記偏心軸構造
部分が前記通口の下部の部分に嵌まり得るようにし、接
続されるべき補助スクリードはその重量を伸縮スクリー
ドにあずけた状態になるようにした請求項1記載のアス
ファルトフィニッシャの補助スクリード着脱装置。
9. A connecting face plate of an extendable screed to be connected to a mating screed is provided with a through hole for coupling with a bolt shaft end portion, and the shape of the upper portion of the through hole is formed outside the flange portion at the tip end portion of the bolt shaft. Slightly larger than the diameter so that the collar part can pass through the through hole, the shape of the lower portion of the through hole is slightly smaller than the diameter of the eccentric shaft structure portion, the eccentric shaft structure portion of the lower portion of the through hole 2. The auxiliary screed attaching / detaching apparatus for an asphalt finisher according to claim 1, wherein the auxiliary screed to be connected is adapted to be fitted to the portion, and the weight of the auxiliary screed to be connected is allocated to the telescopic screed.
【請求項10】相手スクリードに接続する伸縮スクリー
ドの接続面板に、ボルト軸の端部と結合するための通口
を設け、その通口の上部の形状を前記ボルト軸の先端部
のつば部の外径よりわずか大きくして前記つば部が前記
通口を通り抜けうるようにし、その通口の下部の形状を
偏心軸構造部分の直径よりわずか小さくして前記偏心軸
構造部分が前記通口の下部の部分に嵌まり得るようにし
てなるアスファルトフィニッシャにおいて、相手スクリ
ードに接続するスクリードの接続面の左右2か所に調整
金具を備えた補助スクリードを持ち上げ、ボルト軸先端
のつば部を前記伸縮スクリードの接続面板に設けた前記
通口に差し込み、下方に下げた状態で、前記ボルト軸の
最先端部に設けられた並行部分などの把持部をスパナな
どの旋回工具により旋回させ、偏心軸構造部分の偏心軸
の偏心量だけ補助スクリードが伸縮スクリードに対して
上下動しうるようにしてなる請求項1記載のアスファル
トフィニッシャの補助スクリード着脱装置。
10. A connection face plate of a telescopic screed to be connected to a mating screed is provided with a through hole for coupling with an end of a bolt shaft, and the shape of the upper part of the through hole is formed by a flange at the tip of the bolt shaft. The collar is slightly larger than the outer diameter to allow the collar to pass through the opening, and the shape of the lower portion of the opening is slightly smaller than the diameter of the eccentric shaft structure so that the eccentric shaft structure is lower than the opening. In the asphalt finisher that can be fitted to the portion of the screed, the auxiliary screed provided with the adjustment metal fittings at two places on the left and right sides of the connection surface of the screed to be connected to the mating screed is lifted, and the collar at the tip of the bolt shaft is moved to the extension screed. In the state of being inserted into the through hole provided in the connection face plate and being lowered, a gripping portion such as a parallel portion provided at the foremost portion of the bolt shaft is rotated by a turning tool such as a spanner. Pivoted, asphalt finisher auxiliary screed attachment apparatus of way constituted claim 1, wherein the eccentric weight by the auxiliary screed eccentric shaft of the eccentric shaft structure part can be moved up and down relative to the extendable screed.
【請求項11】相手スクリードに接続するスクリードの
接続面の左右2か所に調整金具を備えた補助スクリード
を持ち上げ、ボルト軸先端のつば部を前記伸縮スクリー
ドの接続面板に設けた前記通口に差し込み、下方に下げ
た状態で、前記ボルト軸の最先端部に設けられた並行部
分などの把持部をスパナなどの旋回工具により旋回さ
せ、偏心軸構造部分の偏心軸の偏心量だけ補助スクリー
ドが伸縮スクリードに対して上下動しうるようにし、前
記調整金具の働きで補助スクリードの下面のレベルを上
下方向に移動させて微調整しうるようにし、かつ補助ス
クリードの傾斜度を加減調整しうるようにしてなる請求
項1記載のアスファルトフィニッシャの補助スクリード
着脱装置。
11. An auxiliary screed provided with adjusting metal fittings at two positions on the left and right sides of a connection surface of a screed to be connected to a mating screed, and a flange at a tip end of a bolt shaft is inserted into the through hole provided on a connection face plate of the telescopic screed. In the state of being inserted and lowered, the holding portion such as the parallel portion provided at the foremost portion of the bolt shaft is turned by a turning tool such as a spanner, and the auxiliary screed is moved by the amount of eccentricity of the eccentric shaft of the eccentric shaft structure portion. It can be moved up and down with respect to the telescopic screed, the level of the lower surface of the auxiliary screed can be moved up and down by the function of the adjusting bracket, and the inclination of the auxiliary screed can be adjusted. The auxiliary screed attachment / detachment device for an asphalt finisher according to claim 1, wherein:
JP4007692U 1992-04-28 1992-04-28 Auxiliary screed attachment / detachment device for asphalt finisher Expired - Fee Related JP2553606Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4007692U JP2553606Y2 (en) 1992-04-28 1992-04-28 Auxiliary screed attachment / detachment device for asphalt finisher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4007692U JP2553606Y2 (en) 1992-04-28 1992-04-28 Auxiliary screed attachment / detachment device for asphalt finisher

Publications (2)

Publication Number Publication Date
JPH0594311U JPH0594311U (en) 1993-12-24
JP2553606Y2 true JP2553606Y2 (en) 1997-11-12

Family

ID=12570835

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4007692U Expired - Fee Related JP2553606Y2 (en) 1992-04-28 1992-04-28 Auxiliary screed attachment / detachment device for asphalt finisher

Country Status (1)

Country Link
JP (1) JP2553606Y2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109682668B (en) * 2019-02-28 2024-03-26 长安大学 A examination mould base for on bituminous mixture wheel grinds shaper

Also Published As

Publication number Publication date
JPH0594311U (en) 1993-12-24

Similar Documents

Publication Publication Date Title
US7458747B2 (en) Frame raising multi-use paving tractor with blind mateable quick connecting tool attachments
US6860676B2 (en) Machine for leveling materials on the ground
US8591145B1 (en) Extension mounting system and method for attaching screed extension to screed
US11479928B2 (en) Screed accessory for levelling uncured concrete surfaces
US3702578A (en) Quick change screed extension for paving machines
US6481925B1 (en) Paving work machine and method of transforming the same
US5217320A (en) Vehicle mounted vibrating tamper
JP2553606Y2 (en) Auxiliary screed attachment / detachment device for asphalt finisher
US6190087B1 (en) Screed for a paver
JP3312293B2 (en) Self-propelled concrete finishing machine
US5871302A (en) Truss assembly system
US10577758B2 (en) Road paver with quick coupling apparatus for the transverse distribution device, and method
US11767655B2 (en) Cutting assembly mounted on rear of mouldboard
US11208769B2 (en) Screed extension attachment system
US11085195B2 (en) Blade arrangement
JP2002500297A (en) Runway maintenance device
JPH0731909U (en) Asphalt finisher with swing type auxiliary screen
JPH053526Y2 (en)
CN109577145A (en) Screed and paver
JPH0327049Y2 (en)
JPH0538091Y2 (en)
JPS6126409Y2 (en)
JPH11247240A (en) Mounting device for bucket of hydraulic shovel
CN218263329U (en) Paver hopper locking device and paver
JPS6215289Y2 (en)

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19970603

LAPS Cancellation because of no payment of annual fees