JPH0538091Y2 - - Google Patents
Info
- Publication number
- JPH0538091Y2 JPH0538091Y2 JP13379888U JP13379888U JPH0538091Y2 JP H0538091 Y2 JPH0538091 Y2 JP H0538091Y2 JP 13379888 U JP13379888 U JP 13379888U JP 13379888 U JP13379888 U JP 13379888U JP H0538091 Y2 JPH0538091 Y2 JP H0538091Y2
- Authority
- JP
- Japan
- Prior art keywords
- screed
- adapter
- paving
- asphalt
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000010426 asphalt Substances 0.000 claims description 23
- 125000006850 spacer group Chemical group 0.000 claims description 8
- 239000000203 mixture Substances 0.000 description 3
- 229910000746 Structural steel Inorganic materials 0.000 description 2
- 102100025490 Slit homolog 1 protein Human genes 0.000 description 1
- 101710123186 Slit homolog 1 protein Proteins 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Road Paving Machines (AREA)
Description
この考案はアスフアルトフイニツシヤのスクリ
ードの舗装作用幅を狭めて幅狭の溝等を舗装する
ことのできるスクリードアダプタに関する。
This invention relates to a screed adapter that can narrow the paving width of the screed of an asphalt finisher and pave narrow grooves.
例えば雪国等においてアスフアルト道路がタイ
ヤチエーンやスパイクタイヤの轍などにより傷つ
いた場合には、通常、この傷ついた道路を幅1m、
溝高10cmで切削して幅狭な溝を作つて道路から上
記損傷を取り除き、次いで該溝を多層(通常は二
層)に舗装している。
ここで道路等の舗装にはアスフアルトフイニツ
シヤが用いられているが、アスフアルトフイニツ
シヤに設けられたスクリードの舗装作用幅は上記
溝幅を超えるので、該アスフアルトフイニツシヤ
だけでは上記のような幅狭な溝を多層に舗装する
ことはできず、第一層の舗装は人手に頼つてい
た。
ここで、第7図及び第8図に示すごとく、アス
フアルトフイニツシヤ30は、ダンプトラツク等
によりホツパ35内に供給されたアスフアルト合
材をバーコンベア装置34で後方へ送り、スクリ
ード15の前方に設置されたスクリユコンベア3
3によつてスクリード15の前面左右に拡げる。
この拡げられたアスフアルト合材を、シツクネ
スハンドル31及びサイドアーム32により高さ
方向に調整されたスクリード15の底面(舗装作
用面)により所定の舗装巾員及び舗装厚に敷き均
している。
しかし、前述の如くスクリード15の横幅は幅
広な舗装面を効率よく舗装できるよう汎用性を考
慮して設定されており前述のような幅狭な溝には
対応していない。
従つて、前述の如く、従来の道路作業にあつて
は上記溝の中の第一層目は人力により仕上げ、そ
の後に第2層目をアスフアルトフイニツシヤによ
つて通常の舗装作業で仕上げているのが実情であ
る。
For example, if an asphalt road in a snowy country is damaged by tire chains or spiked tire ruts, the damaged road is usually 1m wide.
The damage is removed from the road by cutting a narrow groove with a groove height of 10 cm, which is then paved in multiple layers (usually two layers). Here, asphalt finishers are used for paving roads, etc., but since the paving width of the screed provided on the asphalt finishers exceeds the above-mentioned groove width, the asphalt finishers alone cannot handle the narrow widths mentioned above. It was not possible to pave the grooves in multiple layers, and the first layer had to be paved manually. As shown in FIGS. 7 and 8, the asphalt finisher 30 sends the asphalt mixture supplied into the hopper 35 by a dump truck or the like to the rear using the bar conveyor device 34, and sets it in front of the screed 15. Screw Conveyor 3
3, the front surface of the screed 15 is expanded to the left and right. The expanded asphalt mixture is spread to a predetermined paving width and paving thickness by the bottom surface (paving surface) of the screed 15, which is adjusted in the height direction by the thickness handle 31 and side arm 32. However, as described above, the width of the screed 15 is set in consideration of versatility so that wide paved surfaces can be efficiently paved, and it is not compatible with narrow grooves as described above. Therefore, as mentioned above, in conventional road work, the first layer in the groove is finished manually, and then the second layer is finished using an asphalt finisher using normal paving work. That is the reality.
この考案は上記事情に鑑みて鋭意研究の結果案
出したものであつて、その主たる課題は、スクリ
ードの舗装作用面よりも幅狭な溝をアスフアルト
フイニツシヤで舗装できるようにしたスクリード
アダプタを提供するにある。
This idea was devised as a result of intensive research in view of the above circumstances, and its main objective was to provide a screed adapter that allows an asphalt finisher to pave grooves that are narrower than the paving surface of the screed. There is something to do.
この考案は上記課題を解決するために、
(a) アスフアルトフイニツシヤに設けられたスク
リードの舗装作用幅よりも幅狭な舗装作用幅に
設定された底面を有し所定の高さに設定され
た、スクリードアダプタを設ける、
(b) 該スクリードアダプタの前端はスクリードの
フオーミングエツジ側に掛止められ、後端側は
連結手段を介してスクリードに着脱可能に連結
される、という技術的手段を講じている。
In order to solve the above problems, this invention (a) has a bottom surface set to a paving width narrower than the paving width of the screed provided on the asphalt finisher, and is set at a predetermined height; , a screed adapter is provided; (b) the front end of the screed adapter is latched to the forming edge side of the screed, and the rear end is removably connected to the screed via a connecting means; ing.
スクリードアダプタは前端がスクリードのフオ
ーミングエツジに掛止められ、後端は連結手段に
よりスクリードに着脱可能に取り付けられる。
このスクリードに取り付けられたスクリードア
ダプタはスクリードの舗装作用幅よりも狭い幅
で、且つ所定の高さに設定されているので、スク
リードの舗装作用幅よりも狭い溝であつてもスク
リードアダプタを該溝に嵌め込んで舗装すること
ができる。
従つて、アスフアルトフイニツシヤは、スクリ
ードアダプタを取付けた場合と取外した場合の二
つの態様で舗装することができるので、幅狭な溝
であつても多層に舗装することができる。
The screed adapter is latched at its front end to a forming edge of the screed and its rear end is removably attached to the screed by means of a coupling means. The screed adapter attached to this screed has a width narrower than the paving width of the screed and is set at a predetermined height, so even if the groove is narrower than the paving width of the screed, the screed adapter can be attached to the groove. It can be inserted into the pavement and paved. Therefore, since the asphalt finish can be paved in two ways, with and without the screed adapter attached, even narrow grooves can be paved in multiple layers.
以下にこの考案のスクリードアダプタの好適実
施例を図面を参照しつつ説明する。
ここで、スクリードアダプタを取り付けるスク
リード15乃至アスフアルトフイニツシヤ30は
第7図及び第8図示の従来構成に用いた場合を例
示するので、そのものについての説明は省略す
る。
なお、スクリードが左右幅方向に伸縮する伸縮
スクリードと中央に固定された本体スクリードと
の組合せからなる場合には、スクリードアダプタ
は本体スクリードに取り付けることが好ましい。
第1図に示すスクリードアダプタ1は、先端に
掛止め片4を有するアダプタ本体2と、該アダプ
タ本体2を着脱自在にスクリード15に連結する
連結杆10とからなつている。
即ち、アダプタ本体2は、先端を上向きに屈折
した同一幅の鋼板の上面に略立方体の構造鋼5を
一体に固着している。
このアダプタ本体2の底面が舗装作用面となつ
ており、前記スクリード15の舗装作用面となる
底面と連結した際に平行となるように、主要部を
水平面とし、先端側を漸次上向きに傾斜させる傾
斜面5Aを介して上方に折り曲げて掛止片4と
し、該掛止片4の表面側を前記スクリード15の
フオーミングエツジの湾曲面15Aに対応する湾
曲面3に形成した図示例構成からなつている。
従つて、第5図に示すアスフアルトフイニツシ
ヤ30のホツパ35から搬送されたアスフアルト
合材がスクリユコンベア33によつてスクリード
15の前方に堆積されても、掛止片4の表面に形
成された湾曲面3で押しながら傾斜面5Aで押圧
して道路等の舗装面を効率よく仕上げることがで
きる。
このスクリードアダプタ1の後端には第3図に
示す如く左右一対のブラケツト7が突設されてい
る。
該ブラケツト7には棒状の連結杆10の基端が
ピン8で枢着されており、この連結杆10の先端
にはネジが刻設してある。
次にスクリード15の後方に一体突設されたフ
エンダ14には、第4図に示すごとく、前記連結
杆10の先端を嵌込むスリツト13Aを有する取
付片13が、前記連結杆10の配設位置に対応し
て左右一対設けられている。
この取付片13にはチヤンネル材が一体となつ
て前記フエンダ14の内側で倒立して固着し、前
記連結杆10の上方を覆うように配設されている
(第3図参照)。
スクリードアダプタ1は上記構成からなつてい
るので、先端の掛止片4をスクリード15のフオ
ーミングエツジ15Aに掛止め、アダプタ本体2
をスクリード15の底面に沿わせる。
そして、前記連結杆10を後方に延出して、フ
エンダ14に設けられた取付片13のスリツト1
3Aに下から嵌込み、その外部に突出した先端に
ナツト11を締着する。
これにより、アスフアルトフイニツシヤ30
は、第5図に示す如く、スクリードアダプタ1を
装着することによつて、スクリード15にその舗
装作用面と実質的に同一で横幅の狭い所定厚みを
持つた舗装作用面を形成することができる。
次ぎに、第6図に示すスクリードアダプタ1
は、溝高の深い幅狭の溝を舗装する場合の異なる
実施例を示す。
このスクリードアダプタ1は、適宜高さを有す
る立方体のスペーサ6をアダプタ本体2の上面に
取付けた構成からなつているので、スクリード底
面からアダプタ本体2の底面までの高さを高く設
定することができ、従つて溝高の深い溝であつて
も嵌め込んで舗装することができる。
このスペーサ6は、均一の高さのブロツク体ま
たは枠体等であればよい。
そして、スペーサ6の取付時にはアダプタ本体
2(図示例では構造鋼5)の上面と平行な上面を
形成するもので、アダプタ本体2に単に載置して
スクリード15との間で挟圧して取付けられるも
のであつてもよいが、該スペーサ6とアダプタ本
体2との衝合部分に公知の係合手段を設けて着脱
可能に係合しうる構成としてもよい。
このようにして、第2図に示す如く、幅狭な溝
20を舗装する際には、前述の如くスクリード1
5にスクリードアダプタ1を取付けて上記溝20
の第一層21の舗装を行ない、次にスクリードア
ダプタ1を取外して溝20の第二層目の舗装を行
なうことにより、上記溝20を二層で舗装するこ
とが出来る。
また、前述のように適宜高さのスペース6を介
設することにより、溝高の深い溝を、二層ないし
それ以上の多層に舗装することもできる。
なお、本実施例ではアダプタ本体の連結手段と
して連結杆を用いたネジ止め構成を示し、ナツト
の緊締は車体外側で行なうことができるようにし
たので着脱作業が容易となるが、この考案での連
結構成は、フツクによる係合、ワイヤ等により締
付等、その他適宜構成を用いてもよい。
Preferred embodiments of the screed adapter of this invention will be described below with reference to the drawings. Here, since the screed 15 to the asphalt finisher 30 to which the screed adapter is attached are used in the conventional configuration shown in FIGS. 7 and 8, the description thereof will be omitted. In addition, when the screed is composed of a combination of an extensible screed that expands and contracts in the left-right width direction and a main body screed fixed at the center, it is preferable that the screed adapter is attached to the main body screed. The screed adapter 1 shown in FIG. 1 consists of an adapter body 2 having a latching piece 4 at its tip, and a connecting rod 10 that connects the adapter body 2 to a screed 15 in a detachable manner. That is, the adapter main body 2 has a substantially cubic structural steel 5 fixed integrally to the upper surface of a steel plate having the same width with its tip bent upward. The bottom surface of this adapter main body 2 is a paving surface, and the main part is a horizontal surface, and the tip side is gradually inclined upward so that it is parallel to the bottom surface of the screed 15, which is the paving surface. The illustrated example has a configuration in which the hooking piece 4 is bent upward through the inclined surface 5A, and the surface side of the hooking piece 4 is formed into a curved surface 3 corresponding to the curved surface 15A of the forming edge of the screed 15. ing. Therefore, even if the asphalt mixture conveyed from the hopper 35 of the asphalt finisher 30 shown in FIG. Paved surfaces such as roads can be efficiently finished by pressing with the curved surface 3 and pressing with the inclined surface 5A. A pair of left and right brackets 7 are provided protruding from the rear end of the screed adapter 1, as shown in FIG. The base end of a rod-shaped connecting rod 10 is pivotally attached to the bracket 7 with a pin 8, and a screw is cut into the tip of this connecting rod 10. Next, as shown in FIG. 4, a mounting piece 13 having a slit 13A into which the tip of the connecting rod 10 is fitted is attached to the fender 14 integrally projecting from the rear of the screed 15. There are two pairs on the left and right corresponding to the A channel material is integrally fixed to the mounting piece 13 in an inverted manner inside the fender 14, and is disposed so as to cover the upper part of the connecting rod 10 (see FIG. 3). Since the screed adapter 1 has the above-mentioned structure, the hooking piece 4 at the tip is hooked to the forming edge 15A of the screed 15, and the adapter body 2
along the bottom surface of the screed 15. Then, the connecting rod 10 is extended rearward, and the slit 1 of the mounting piece 13 provided on the fender 14 is opened.
3A from below, and tighten the nut 11 to the externally protruding tip. As a result, asphalt finisher 30
As shown in FIG. 5, by attaching the screed adapter 1, it is possible to form a paving surface on the screed 15 that is substantially the same as the paving surface, has a narrow width, and has a predetermined thickness. . Next, the screed adapter 1 shown in FIG.
shows a different embodiment in the case of paving a narrow groove with a deep groove height. This screed adapter 1 has a configuration in which a cubic spacer 6 having an appropriate height is attached to the top surface of the adapter body 2, so that the height from the bottom surface of the screed to the bottom surface of the adapter body 2 can be set high. Therefore, even if the groove height is deep, it can be inserted into the groove and paved. This spacer 6 may be a block or a frame of uniform height. When the spacer 6 is installed, it forms an upper surface parallel to the upper surface of the adapter body 2 (structural steel 5 in the illustrated example), and is installed by simply placing it on the adapter body 2 and pressing it between it and the screed 15. However, a known engaging means may be provided at the abutting portion of the spacer 6 and the adapter body 2 so that the spacer 6 and the adapter body 2 can be detachably engaged. In this way, when paving a narrow groove 20 as shown in FIG.
Attach the screed adapter 1 to the groove 20
The groove 20 can be paved in two layers by paving the first layer 21 of the groove, then removing the screed adapter 1 and paving the second layer of the groove 20. Further, by providing the space 6 of an appropriate height as described above, a deep groove can be paved in two or more layers. In addition, in this example, a screwing structure using a connecting rod is shown as a means for connecting the adapter body, and the nut can be tightened on the outside of the vehicle body, making attachment and detachment work easier. The connection structure may be engaged by a hook, tightened by a wire or the like, or any other suitable structure may be used.
この考案は上記構成からなつているので、従
来、アスフアルトフイニツシヤのスクリードでは
舗装できない幅狭な溝を、スクリードアダプタを
着脱することにより多層に舗装することができる
ようになり舗装作業の効率化及びコスト低減を大
幅に図ることができる。
また、前端はスクリードのフオーミングエツジ
に係合させ後端側だけを連結手段を介して連結し
ているので、後端側の連結手段をスクリード側か
ら外し、アスフアルトフイニツシヤを後進させれ
ばスクリードアダプタを簡単に取り外すことがで
きる。
Since this invention has the above structure, narrow grooves that could not be paved with conventional asphalt finishing screeds can be paved in multiple layers by attaching and detaching the screed adapter, improving the efficiency of paving work. Cost reduction can be achieved significantly. In addition, the front end is engaged with the forming edge of the screed, and only the rear end is connected via the connecting means, so if the connecting means on the rear end side is removed from the screed side and the asphalt finisher is moved backward, the screed will be connected. The adapter can be easily removed.
第1図は、この考案のスクリードアダプタの好
適実施例を示す斜視図、第2図はスクリードアダ
プタを用いて幅狭な溝を舗装する場合の説明図、
第3図はスクリードアダプタの取付状態を示す側
面図、第4図は同背面図、第5図はスクリードア
ダプタを取付けた状態を示すアスフアルトフイニ
ツシヤの側面図、第6図はスクリードアダプタに
スペーサを設けた異なる実施例を示す側面図、第
7図は従来のアスフアルトフイニツシヤを示す側
面図、第8図は同平面図である。
1……スクリードアダプタ、2……アダプタ本
体、4……掛止め部、6……スペーサ、10……
連結杆、13……取付片、14……フエンダ、1
5……スクリード、20……幅狭な溝、30……
アスフアルトフイニツシヤ。
FIG. 1 is a perspective view showing a preferred embodiment of the screed adapter of this invention, and FIG. 2 is an explanatory diagram of paving a narrow groove using the screed adapter.
Figure 3 is a side view showing the screed adapter installed, Figure 4 is a rear view of the same, Figure 5 is a side view of the asphalt finisher with the screed adapter installed, and Figure 6 is a spacer attached to the screed adapter. FIG. 7 is a side view showing a conventional asphalt finisher, and FIG. 8 is a plan view thereof. 1...Screed adapter, 2...Adapter body, 4...Latching part, 6...Spacer, 10...
Connecting rod, 13...Mounting piece, 14...Fender, 1
5...screed, 20...narrow groove, 30...
Asphalt finish.
Claims (1)
リードの舗装作用幅よりも幅狭な舗装作用幅に
設定された底面を有し所定の高さに設定され
て、スクリードのフオーミングエツジ側に前端
を掛止め後端側は連結手段を介してスクリード
に着脱可能に連結して、スクリードの舗装作用
面と実質的に平行に配置されることを特徴とす
るスクリードアダプタ。 (2) 連結手段の操作部分がアスフアルトフイニツ
シヤの車外で操作可能に設けられていることを
特徴とする請求項1記載のスクリードアダプ
タ。 (3) スクリードアダプタとスクリードの底面との
間に、均一の高さに設定されたスペーサを着脱
可能に介設してなることを特徴とする請求項1
記載のスクリードアダプタ。[Claims for Utility Model Registration] (1) The screed has a bottom surface set to a paving width narrower than the paving width of the screed provided on the asphalt finisher, and is set at a predetermined height. A screed adapter characterized in that the front end is hooked to the forming edge side, and the rear end side is removably connected to the screed via a connecting means, and is arranged substantially parallel to the paving surface of the screed. (2) The screed adapter according to claim 1, wherein the operating portion of the connecting means is provided so as to be operable outside the asphalt finisher. (3) Claim 1 characterized in that a spacer set at a uniform height is removably interposed between the screed adapter and the bottom surface of the screed.
Screed adapter listed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13379888U JPH0538091Y2 (en) | 1988-10-13 | 1988-10-13 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13379888U JPH0538091Y2 (en) | 1988-10-13 | 1988-10-13 |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0254808U JPH0254808U (en) | 1990-04-20 |
JPH0538091Y2 true JPH0538091Y2 (en) | 1993-09-27 |
Family
ID=31391995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP13379888U Expired - Lifetime JPH0538091Y2 (en) | 1988-10-13 | 1988-10-13 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0538091Y2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2018127809A (en) * | 2017-02-08 | 2018-08-16 | 株式会社ガイアート | Longitudinal groove forming tool for paving, paving method, and evaluation method for asphalt paving construction |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6419561B2 (en) * | 2014-12-09 | 2018-11-07 | 住友建機株式会社 | Screw support structure and road machine equipped with screw support structure |
-
1988
- 1988-10-13 JP JP13379888U patent/JPH0538091Y2/ja not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2018127809A (en) * | 2017-02-08 | 2018-08-16 | 株式会社ガイアート | Longitudinal groove forming tool for paving, paving method, and evaluation method for asphalt paving construction |
Also Published As
Publication number | Publication date |
---|---|
JPH0254808U (en) | 1990-04-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5590977A (en) | Four track paving machine and process of transport | |
US6325708B1 (en) | Device for sanding a drywall corner | |
US4068969A (en) | Gutter attachment for asphalt spreader | |
US7540687B2 (en) | Skid steer loader attachment for performing road widening and shouldering jobs | |
US5377766A (en) | Apparatus for cleaning excess roadstone away from a gutter | |
JPH0538091Y2 (en) | ||
US3230845A (en) | Spreader | |
KR100827564B1 (en) | A road pave car | |
JP4034127B2 (en) | Paving material leveling equipment | |
JP2002138411A (en) | Device and method for laying and leveling asphalt | |
JP3723895B2 (en) | Road leveling equipment for construction | |
JPS6143483B2 (en) | ||
JPH10298914A (en) | Concrete paving device | |
US3732024A (en) | Leveler for paving machine | |
JP3949258B2 (en) | Pavement material leveling equipment | |
JPS60325Y2 (en) | Step mechanism in leveling equipment such as asphalt finishers | |
JPS6126409Y2 (en) | ||
US20050050774A1 (en) | Sidewalk maintenance vehicle and system for clearing snow and ice from a surface | |
US2319664A (en) | Splash guard | |
JP2594711Y2 (en) | Pavement compaction equipment | |
JP2553758Y2 (en) | Slope pavement compactor | |
JP3071078U (en) | Finisher end plate for paving | |
JPH05311615A (en) | Asphalt finisher | |
JPH05195510A (en) | Method and device for compacting end of pavement material | |
JPH0712417Y2 (en) | Snow plow |