JP2518122B2 - Construction method of joint between pile and foundation slab - Google Patents

Construction method of joint between pile and foundation slab

Info

Publication number
JP2518122B2
JP2518122B2 JP4051359A JP5135992A JP2518122B2 JP 2518122 B2 JP2518122 B2 JP 2518122B2 JP 4051359 A JP4051359 A JP 4051359A JP 5135992 A JP5135992 A JP 5135992A JP 2518122 B2 JP2518122 B2 JP 2518122B2
Authority
JP
Japan
Prior art keywords
pile
foundation slab
concrete
steel pipe
foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4051359A
Other languages
Japanese (ja)
Other versions
JPH05255940A (en
Inventor
正道 安永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP4051359A priority Critical patent/JP2518122B2/en
Publication of JPH05255940A publication Critical patent/JPH05255940A/en
Application granted granted Critical
Publication of JP2518122B2 publication Critical patent/JP2518122B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は基礎杭とプレストレス
を導入したコンクリート基礎スラブの接合部の施工法に
関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a joint between a foundation pile and a concrete foundation slab in which prestress is introduced.

【0002】[0002]

【従来技術とこの発明の解決しようとする課題】杭の上
部にフーチング等基礎コンクリートスラブを設けた基礎
構造は多く実施されている。ところでこの基礎構造にお
いて図4に示すように地上タンクの基礎のように多数の
杭を一つの基礎スラブで結ぶような場合、杭の拘束力が
大きいため、基礎スラブのコンクリートに乾燥収縮によ
るクラックKが生じやすい。またLNG,LPGタンク
など低温液化ガスタンクとして用いられる場合、基礎ス
ラブのコンクリートが冷却されることにより収縮しよう
とするのを杭が拘束するため、基礎スラブにクラックが
生じたり、基礎スラブの鉄筋量が多く必要となる。
2. Description of the Related Art There are many foundation structures in which a foundation concrete slab such as a footing is provided on the top of a pile. By the way, in this foundation structure, when a large number of piles are connected with one foundation slab like the foundation of an aboveground tank as shown in Fig. 4, the concrete of the foundation slab is cracked due to drying shrinkage because the restraining force of the piles is large. Is likely to occur. When used as a low temperature liquefied gas tank such as an LNG or LPG tank, the pile restrains the concrete slab from shrinking as it cools, causing cracks in the foundation slab and the amount of reinforcement in the foundation slab. Many are needed.

【0003】さらに従来一般に実施されている杭と基礎
スラブとの接合に際しては鉄筋篭を杭と基礎スラブの間
に配置し、杭の上部に間詰コンクリートを打設する方法
が多い。ところでこの方法によってえられた構造では基
礎スラブコンクリート打設時から、変位拘束条件となり
乾燥、収縮、温度低下により引張力が生じ、クラックが
発生することが多い。
Further, when joining a pile and a foundation slab, which have been generally practiced in the past, there is often a method in which a reinforced cage is arranged between the pile and the foundation slab and a filling concrete is placed on the upper portion of the pile. By the way, in the structure obtained by this method, from the time of placing the foundation slab concrete, displacement restraint conditions are applied, and tensile forces are often generated due to drying, shrinkage, and temperature decrease, and cracks often occur.

【0004】前記問題点を解消する対策として基礎スラ
ブのコンクリートにプレストレスを導入しておく方法が
考えられる。しかし前記従来の杭と基礎スラブの結合方
法では杭の拘束力により基礎スラブのコンクリート中に
効果的にプレストレスを導入することはできない。そこ
でこの発明は施工過程においては杭と基礎スラブの拘束
を解除しておき、完成後において杭と基礎スラブとを完
全に剛結合しうる方法を開発した。
As a measure for solving the above problems, a method of introducing prestress into the concrete of the foundation slab can be considered. However, the conventional method of connecting the pile and the foundation slab cannot effectively introduce prestress into the concrete of the foundation slab due to the restraining force of the pile. Therefore, the present invention has developed a method in which the constraint between the pile and the foundation slab is released during the construction process, and the pile and the foundation slab can be completely rigidly connected after the completion.

【0005】[0005]

【課題を解決するための手段】この発明に係る基礎スラ
ブの接合部の施工法は、杭の上部外周で、基礎スラブの
下端位置に支持プレートを設け、前記杭の上部内に挿入
される鉄筋篭を組み込んだ蓋付き鋼管を杭上端に被せ、
鋼管の下端を支持プレート上にスライド可能に支承さ
せ、次いで基礎スラブのコンクリートを打設し、コンク
リートの硬化後コンクリート中に配筋したPC鋼材を緊
張して基礎スラブのコンクリートにプレストレスを導入
し、次いで杭上部内および杭上部外周と前記鋼管との間
隙にグラウト材を注入して固定する。
A method of constructing a joint portion of a foundation slab according to the present invention is to install a support plate at the lower end position of the foundation slab on the outer periphery of the upper portion of a pile, and to insert a reinforcing bar to be inserted into the upper portion of the pile. Cover the top of the pile with a steel pipe with a lid that incorporates a basket,
The lower end of the steel pipe is slidably supported on the supporting plate, then the concrete of the foundation slab is placed, and after hardening of the concrete, the PC steel material reinforced in the concrete is tensioned to introduce prestress to the concrete of the foundation slab. Then, a grout material is injected and fixed in the gap between the inside of the pile upper portion and the outer periphery of the pile upper portion and the steel pipe.

【0006】[0006]

【実施例】鋼管杭等中空既製杭からなる杭Aの上部外周
で、基礎スラブBの下端位置にリング状の支持プレート
1が溶接によって設けてある。また杭Aの上部内に下半
部が挿入される鉄筋篭2を組み込んだ蓋付き鋼管3を杭
Aの上端に被せ、鋼管3の下端を支持プレート1上に横
方向にスライド可能に支承させてある。
EXAMPLE A ring-shaped support plate 1 is provided by welding at the lower end position of a foundation slab B on the outer periphery of the upper portion of a pile A made of a hollow ready-made pile such as a steel pipe pile. Further, a steel pipe 3 with a lid in which a lower half portion is inserted in the upper part of the pile A is covered with a steel pipe 3 with a lid, and the lower end of the steel pipe 3 is supported on the support plate 1 so as to be slidable in the lateral direction. There is.

【0007】次いで基礎スラブBのコンクリート4を打
設し、コンクリート中に配置したPC鋼材5を緊張して
基礎スラブAのコンクリート4中にプレストレスを導入
し、次いで予め配置しておいた注入管6を利用して杭A
の上部内と杭Aの上部外周と鋼管3との間隙にグラウト
材を注入して固定する。
Next, the concrete 4 of the foundation slab B is cast, the PC steel material 5 arranged in the concrete is tensioned to introduce prestress into the concrete 4 of the foundation slab A, and then the injection pipe arranged in advance. Pile A using 6
The grout material is injected and fixed in the gap between the upper portion of the steel pipe 3, the outer periphery of the upper portion of the pile A, and the steel pipe 3.

【0008】[0008]

【発明の効果】この発明は以上の構成からなり、基礎ス
ラブのコンクリートにプレストレスを導入される際には
杭上部の蓋付き鋼管が杭上部外周の支持プレートにスラ
イド可能に支承されていて杭がコンクリートの変位を拘
束しないので所要のプレストレスを導入することができ
る。また施工が完了した状態ではこのプレストレスが基
礎スラブのコンクリートにクラックを生じさせないよう
に作用させることができる。
EFFECTS OF THE INVENTION The present invention has the above-described structure. When prestressing is introduced into the concrete of the foundation slab, the steel pipe with the lid on the upper part of the pile is slidably supported on the support plate on the outer periphery of the upper part of the pile. Since does not restrain the displacement of concrete, the required prestress can be introduced. Further, when the construction is completed, this prestress can act so as not to cause cracks in the concrete of the foundation slab.

【図面の簡単な説明】[Brief description of drawings]

【図1】要部の断面図である。FIG. 1 is a sectional view of a main part.

【図2】要部の分解状態の断面図である。FIG. 2 is a cross-sectional view of a main part in an exploded state.

【図3】基礎全体の断面図である。FIG. 3 is a sectional view of the entire foundation.

【図4】従来例の断面図である。FIG. 4 is a sectional view of a conventional example.

【符号の説明】[Explanation of symbols]

A…杭、B…基礎スラブ、K…クラック 1…支持プレート、2…鉄筋篭、3…鋼管、4…コンク
リート、5…PC鋼材、6…注入管
A ... Pile, B ... Foundation slab, K ... Crack 1 ... Support plate, 2 ... Reinforcing cage, 3 ... Steel pipe, 4 ... Concrete, 5 ... PC steel, 6 ... Injection pipe

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 杭の上部外周で、基礎スラブの下端位置
に支持プレートを設け、前記杭の上部内に挿入される鉄
筋篭を組み込んだ蓋付き鋼管を杭上端に被せ、鋼管の下
端を支持プレート上にスライド可能に支承させ、次いで
基礎スラブのコンクリートを打設し、コンクリートの硬
化後コンクリート中に配筋したPC鋼材を緊張して基礎
スラブのコンクリートにプレストレスを導入し、次いで
杭上部内および杭の上部外周と前記鋼管との間隙にグラ
ウト材を注入して固定することを特徴とする杭と基礎ス
ラブの接合部の施工法。
1. A support plate is provided at a lower end position of a foundation slab on an outer periphery of an upper portion of a pile, and a steel pipe with a lid incorporating a rebar cage inserted into an upper portion of the pile is covered on the upper end of the pile to support a lower end of the steel pipe. It is slidably supported on the plate, then the concrete of the foundation slab is placed, and after hardening of the concrete, the PC steel material reinforced in the concrete is tensioned to introduce prestress into the concrete of the foundation slab, and then inside the pile top. And a method for constructing a joint between a pile and a foundation slab, characterized by injecting and fixing a grout material into a gap between an upper outer periphery of the pile and the steel pipe.
JP4051359A 1992-03-10 1992-03-10 Construction method of joint between pile and foundation slab Expired - Fee Related JP2518122B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4051359A JP2518122B2 (en) 1992-03-10 1992-03-10 Construction method of joint between pile and foundation slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4051359A JP2518122B2 (en) 1992-03-10 1992-03-10 Construction method of joint between pile and foundation slab

Publications (2)

Publication Number Publication Date
JPH05255940A JPH05255940A (en) 1993-10-05
JP2518122B2 true JP2518122B2 (en) 1996-07-24

Family

ID=12884743

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4051359A Expired - Fee Related JP2518122B2 (en) 1992-03-10 1992-03-10 Construction method of joint between pile and foundation slab

Country Status (1)

Country Link
JP (1) JP2518122B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6546686B2 (en) * 1996-04-10 2003-04-15 Charles J. Mackarvich Balanced stabilization system
JP5200925B2 (en) * 2008-12-26 2013-06-05 株式会社大林組 Construction method of prestressed concrete structure
JP2011080226A (en) * 2009-10-06 2011-04-21 Ihi Corp Pile joint structure
CN106988333B (en) * 2017-05-11 2023-10-10 江苏九如建设有限公司 Prefabricated bearing platform with dowel bar filling core and construction process thereof
CN109797767A (en) * 2018-12-25 2019-05-24 广州市市政集团设计院有限公司 A kind of pinpoint cushion cap and pile foundation connection method

Also Published As

Publication number Publication date
JPH05255940A (en) 1993-10-05

Similar Documents

Publication Publication Date Title
US10106973B1 (en) Precast concrete building elements and assemblies thereof, and related methods
JP4512899B2 (en) Construction method of large cylindrical concrete structures for LNG storage tanks.
JP2518122B2 (en) Construction method of joint between pile and foundation slab
JP5348559B2 (en) Above-ground cryogenic tank and its construction method
JP4127933B2 (en) Construction method of prestressed concrete floor slab with closed section box girder.
JP2531038B2 (en) Pillar PC structure
JP2831934B2 (en) How to build substructure
JPH04261934A (en) Building frame construction method using form member made of pre-cast concrete
JP4349508B2 (en) Construction method of prestressed concrete structure
JP3832312B2 (en) Girder structure constructed by split construction of prestressed concrete multi-span continuous girder structure and its construction method
JP2002235453A (en) Pre-stressed concrete storage tank
JPH0320548B2 (en)
JP7373975B2 (en) How to build a wall
JP6753061B2 (en) PC tank and how to build it
JP2922731B2 (en) How to connect slabs and concrete columns
JP2831514B2 (en) Joining method for hollow PC members on upper and lower floors
JP2700852B2 (en) Construction method of building
JP2677174B2 (en) Column base structure of steel column
JPH01125416A (en) Concrete pile
JP3289163B2 (en) How to build underground structures
JPH10299008A (en) Method for building hollow floor
JPH0618158Y2 (en) Arched concrete plug
JPH11293764A (en) Precast embedded formwork for column
JPS6111380A (en) Prestressed concrete cylindrical structure and construction method thereof
JP2603395B2 (en) Slope protection method and structure

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19960319

LAPS Cancellation because of no payment of annual fees