JP2024018308A - Earth retaining wall, and construction method of the same - Google Patents

Earth retaining wall, and construction method of the same Download PDF

Info

Publication number
JP2024018308A
JP2024018308A JP2022121558A JP2022121558A JP2024018308A JP 2024018308 A JP2024018308 A JP 2024018308A JP 2022121558 A JP2022121558 A JP 2022121558A JP 2022121558 A JP2022121558 A JP 2022121558A JP 2024018308 A JP2024018308 A JP 2024018308A
Authority
JP
Japan
Prior art keywords
pile
parent
horizontal sheet
auxiliary
piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022121558A
Other languages
Japanese (ja)
Inventor
均 浅野
Hitoshi Asano
靖 柴田
Yasushi Shibata
智志 國分
Satoshi Kokubu
聡一郎 吉田
Soichiro Yoshida
純一 山本
Junichi Yamamoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2022121558A priority Critical patent/JP2024018308A/en
Publication of JP2024018308A publication Critical patent/JP2024018308A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

To provide an earth retaining wall in which a parent pile, an auxiliary pile, and a connecting member are not exposed.SOLUTION: An earth retaining wall 1 comprises: a plurality of parent piles 2 inserted into an earth retaining wall construction ground at predetermined intervals; a plurality of horizontal sheet piles 3 installed between neighboring parent piles 2; and a plurality of auxiliary piles 4 inserted into a rear side ground from a side position of the parent piles 2 and connected to the parent piles 2 via connecting members 5. The horizontal sheet piles 3 include: a first horizontal sheet pile 31 whose both longitudinal ends are supported by the parent pile 2; and a second horizontal sheet pile 32 whose longitudinal ends are supported by the auxiliary pile 4 or the connecting members 5. The first horizontal sheet pile 31 and the second horizontal sheet pile 32 comprise log materials 311, 321 covering front sides of the parent pile 2, the auxiliary pile 4, and the connecting member 5.SELECTED DRAWING: Figure 1

Description

本発明は、親杭、横矢板及び補助杭を備える土留壁及びその施工方法に関する。 The present invention relates to an earth retaining wall including a main pile, a horizontal sheet pile, and an auxiliary pile, and a construction method thereof.

特許文献1には、土留壁施工地盤に所定の間隔で挿入される複数の親杭と、隣接する親杭間に設置される複数の横矢板と、親杭の側部位置から背面側地盤に対して挿入され、かつ親杭に連結部材を介して連結される複数の補助杭(挿入杭)と、を備える土留壁が記載されている。このような土留壁では、補助杭に作用する背面側地盤の土圧が、親杭を背面側地盤に押し付ける方向のモーメントに変換されるので、親杭の根入れ部の長さを短くしたり、親杭の断面寸法を小さくできるという利点がある。 Patent Document 1 describes a plurality of parent piles that are inserted into the earth retaining wall construction ground at predetermined intervals, a plurality of horizontal sheet piles that are installed between adjacent parent piles, and a plurality of side piles that are inserted into the ground on the back side from the side position of the parent pile. An earth retaining wall is described that includes a plurality of auxiliary piles (inserted piles) that are inserted into the main pile and connected to the parent pile via a connecting member. In this type of earth retaining wall, the earth pressure in the ground on the back side acting on the auxiliary pile is converted into a moment in the direction of pressing the parent pile against the ground on the back side, so it is possible to shorten the length of the embedded part of the parent pile. , there is an advantage that the cross-sectional dimension of the parent pile can be reduced.

特開2017-197950号公報Japanese Patent Application Publication No. 2017-197950

しかしながら、特許文献1に記載される土留壁では、親杭、補助杭及び連結部材の前面側が露出状態であるため、景観保護の観点から林道整備などへの適用が困難であった。 However, in the earth retaining wall described in Patent Document 1, the front sides of the main pile, auxiliary pile, and connecting member are exposed, so it is difficult to apply it to forest road maintenance from the viewpoint of landscape protection.

本発明は、上記の如き実情に鑑みこれらの課題を解決することを目的として創作されたものであって、請求項1の発明は、土留壁施工地盤に所定の間隔で挿入される複数の親杭と、隣接する前記親杭間に設置される複数の横矢板と、前記親杭の側部位置から背面側地盤に対して挿入され、かつ前記親杭に連結部材を介して連結される複数の補助杭と、を備える土留壁であって、前記横矢板は、長手方向の両端部が前記親杭によって支持される第1横矢板と、長手方向の両端部が前記補助杭又は前記連結部材によって支持される第2横矢板と、を含み、前記第1横矢板及び前記第2横矢板は、前記親杭、前記補助杭及び前記連結部材の前面側を覆う丸太材を備える。
また、請求項2の発明は、請求項1に記載の土留壁であって、前記第2横矢板は、前記丸太材と、前記丸太材の背面側に沿う支持材と、前記丸太材と前記支持材とを連結する複数の連結ボルトと、を備え、長手方向の両端部を前記補助杭、前記連結部材のいずれかに背面側から係合させた状態の前記支持材と、長手方向の両端部を前記親杭の前面側に添わせた状態の前記丸太材とを複数の前記連結ボルトを介して連結することで、前記第2横矢板の長手方向の両端部が前記補助杭又は前記連結部材によって支持される。
また、請求項3の発明は、請求項1又は2に記載の土留壁であって、前記親杭は、一対のフランジと、一対の前記フランジ同士を連結するウェブと、を一体に有するH形鋼であり、前記第1横矢板の前記丸太材は、長手方向の両端部に前記親杭の前記フランジに係合可能な凹溝を有し、前記凹溝は、前記第1横矢板の前記丸太材を水平姿勢に維持しつつ、隣接する前記親杭に対して前面側から係合可能な形状を有する。
また、請求項4の発明は、請求項1又は2に記載の土留壁であって、前記第1横矢板は、前記丸太材と、前記丸太材の背面側に沿う支持材と、前記丸太材と前記支持材とを連結する複数の連結ボルトと、を備え、長手方向の両端部を前記親杭に背面側から係合させた状態の前記支持材と、長手方向の両端部を前記親杭の前面側に添わせた状態の前記丸太材とを複数の前記連結ボルトを介して連結することで、前記第1横矢板の長手方向の両端部が前記親杭によって支持される。
また、請求項5の発明は、土留壁施工地盤に所定の間隔で挿入される複数の親杭と、隣接する前記親杭間に設置される複数の横矢板と、前記親杭の側部位置から背面側地盤に対して挿入され、かつ前記親杭に連結部材を介して連結される複数の補助杭と、を備える土留壁の施工方法であって、前記横矢板は、長手方向の両端部が前記親杭によって支持される第1横矢板と、長手方向の両端部が前記補助杭又は前記連結部材によって支持される第2横矢板と、を含み、前記土留壁の施工方法は、土留壁施工地盤に所定の間隔で前記親杭を挿入する親杭挿入工程と、土留壁施工地盤を前記親杭の前面側に沿って掘削する掘削工程と、隣接する前記親杭間に前記第1横矢板を設置し、前記第1横矢板が備える丸太材によって前記親杭の前面側を覆う第1横矢板設置工程と、前記親杭の側部位置から背面側地盤に対して前記補助杭を挿入する補助杭挿入工程と、前記連結部材を介して前記補助杭を前記親杭に連結される補助杭連結工程と、隣接する前記親杭間に前記第2横矢板を設置し、前記第1横矢板が備える丸太材によって前記親杭、前記補助杭及び前記連結部材の前面側を覆う第2横矢板設置工程と、を含む。
The present invention was created with the aim of solving these problems in view of the above-mentioned circumstances, and the invention of claim 1 is directed to a plurality of retaining walls inserted at predetermined intervals into the earth retaining wall construction ground. A pile, a plurality of horizontal piles installed between the adjacent parent piles, and a plurality of horizontal sheets inserted from the side position of the parent pile into the ground on the back side and connected to the parent pile via a connecting member. A retaining wall comprising: a first horizontal sheet pile whose longitudinal ends are supported by the parent pile; and a first horizontal sheet pile whose longitudinal ends are supported by the auxiliary pile or the connecting member. the first horizontal sheet pile and the second horizontal sheet pile are provided with log materials that cover the front sides of the parent pile, the auxiliary pile, and the connecting member.
Further, the invention of claim 2 is the earth retaining wall according to claim 1, in which the second horizontal sheet pile includes the log material, a support material along the back side of the log material, and the log material and the support material along the back side of the log material. a plurality of connection bolts that connect the support member, the support member having both longitudinal ends engaged with either the auxiliary pile or the connection member from the back side; and the support member and both longitudinal ends thereof. By connecting the log material with the section attached to the front side of the parent pile via the plurality of connecting bolts, both ends in the longitudinal direction of the second horizontal pile can be attached to the auxiliary pile or the connecting bolt. supported by the member.
Further, the invention of claim 3 is the earth retaining wall according to claim 1 or 2, wherein the parent pile has an H-shape integrally having a pair of flanges and a web connecting the pair of flanges. The log material of the first horizontal sheet pile is made of steel, and the log material of the first horizontal sheet pile has a concave groove that can be engaged with the flange of the parent pile at both ends in the longitudinal direction, and the concave groove is formed of the first horizontal sheet pile. It has a shape that allows it to engage the adjacent parent pile from the front side while maintaining the log in a horizontal position.
Further, the invention of claim 4 is the earth retaining wall according to claim 1 or 2, wherein the first horizontal sheet pile includes the log material, a support material along the back side of the log material, and the log material. and a plurality of connecting bolts connecting the supporting material, the supporting material having both longitudinal ends engaged with the parent pile from the rear side, and the supporting material having both longitudinal ends thereof engaged with the parent pile from the rear side. By connecting the log material attached to the front side of the first horizontal sheet pile through the plurality of connecting bolts, both ends of the first horizontal sheet pile in the longitudinal direction are supported by the parent pile.
Further, the invention of claim 5 provides a plurality of parent piles inserted into the earth retaining wall construction ground at predetermined intervals, a plurality of horizontal piles installed between the adjacent parent piles, and a side position of the parent piles. A method for constructing an earth retaining wall comprising: a plurality of auxiliary piles that are inserted into the ground on the back side and connected to the parent pile via connecting members, the horizontal sheet piles having two ends at both ends in the longitudinal direction; includes a first horizontal sheet pile supported by the parent pile, and a second horizontal sheet pile whose longitudinal ends are supported by the auxiliary pile or the connecting member, and the method for constructing the earth retaining wall includes: a parent pile insertion step of inserting the parent piles into the construction ground at predetermined intervals; an excavation step of excavating the retaining wall construction ground along the front side of the parent piles; A first horizontal sheet pile installation step of installing a sheet pile and covering the front side of the parent pile with a log material included in the first horizontal sheet pile, and inserting the auxiliary pile from the side position of the parent pile to the ground on the back side. an auxiliary pile insertion step in which the auxiliary pile is connected to the parent pile via the connection member; a step in which the second horizontal sheet pile is installed between the adjacent parent piles; The method includes a second horizontal sheet pile installation step of covering the front side of the parent pile, the auxiliary pile, and the connecting member with a log material provided in the sheet pile.

請求項1の発明によれば、横矢板は、長手方向の両端部が親杭によって支持される第1横矢板と、長手方向の両端部が補助杭又は連結部材によって支持される第2横矢板と、を含むので、補助杭や連結部材の設置箇所にも横矢板を適切に設置できるだけでなく、横矢板の支持荷重を分散できる。また、第1横矢板及び第2横矢板は、親杭、補助杭及び連結部材の前面側を覆う丸太材を備えるので、土留壁によって景観が損なわれることを防止し、林道整備などへの適用を促進させることができる。また、丸太材として間伐材を使用すれば、森林資源の有効利用が図れる。
また、請求項2の発明によれば、補助杭や連結部材の設置箇所に第2横矢板をより適切に設置できる。
また、請求項3の発明によれば、長手方向の両端部に凹溝を有する丸太材で第1横矢板を簡易に構成できるだけでなく、第1横矢板を水平姿勢に維持しつつ、隣接する親杭に対して前面側から設置可能とし、第1横矢板の設置性を向上させることができる。
また、請求項4の発明によれば、第1横矢板と第2横矢板の構成を類似させることができるので、丸太材の共通化による施工コストの削減や、施工手順の共通化による施工性の向上が図れる。
また、請求項5の発明によれば、本発明の土留壁を適切に施工できる。
According to the invention of claim 1, the horizontal sheet piles include a first horizontal sheet pile whose longitudinal ends are supported by parent piles, and a second horizontal sheet pile whose longitudinal ends are supported by auxiliary piles or connecting members. Since it includes the following, not only can horizontal sheet piles be appropriately installed at locations where auxiliary piles and connecting members are installed, but also the support load of the horizontal sheet piles can be dispersed. In addition, since the first horizontal sheet pile and the second horizontal sheet pile are equipped with log materials that cover the front side of the main pile, auxiliary pile, and connecting member, it prevents the landscape from being spoiled by retaining walls and is suitable for use in forest road maintenance, etc. can be promoted. Furthermore, if thinned wood is used as log material, forest resources can be used effectively.
Moreover, according to the invention of claim 2, the second horizontal sheet pile can be installed more appropriately at the installation location of the auxiliary pile and the connecting member.
Further, according to the invention of claim 3, not only can the first horizontal sheet pile be easily constructed from a log material having concave grooves at both ends in the longitudinal direction, but also the first horizontal sheet pile can be maintained in a horizontal position while adjoining It is possible to install the first horizontal sheet pile from the front side with respect to the parent pile, and the ease of installing the first horizontal sheet pile can be improved.
Further, according to the invention of claim 4, the configurations of the first horizontal sheet pile and the second horizontal sheet pile can be made similar, so that construction cost can be reduced by using common log materials, and construction efficiency can be improved by standardizing the construction procedure. can be improved.
Moreover, according to the invention of claim 5, the earth retaining wall of the invention can be appropriately constructed.

本発明の一実施形態に係る土留壁の構造を示す概略斜視図である。FIG. 1 is a schematic perspective view showing the structure of an earth retaining wall according to an embodiment of the present invention. 横矢板を省略した土留壁の概略斜視図である。It is a schematic perspective view of the earth retaining wall which abbreviate|omits the horizontal sheet pile. 親杭に連結部材を取り付けた状態を示す斜視図である。It is a perspective view showing the state where a connecting member is attached to a parent pile. 親杭に連結部材を介して補助杭を連結した状態を示す斜視図である。It is a perspective view which shows the state which connected the auxiliary pile to the parent pile via the connection member. 補助杭から掴み代部材を取り外した状態を示す斜視図である。It is a perspective view which shows the state where the grip margin member was removed from the auxiliary pile. 親杭に連結部材を介して補助杭を連結した状態を示す正面図である。It is a front view which shows the state which connected the auxiliary pile to the parent pile via the connection member. 親杭に連結部材を介して補助杭を連結した状態を示す平面図である。It is a top view which shows the state which connected the auxiliary pile to the parent pile via the connection member. 親杭に連結部材を介して補助杭を連結した状態を示す側面図である。It is a side view which shows the state which connected the auxiliary pile to the parent pile via the connection member. (a)は図6のY-Y断面図であり、(b)は補助杭から掴み代部材を取り外した状態を示すY-Y断面図である。(a) is a YY cross-sectional view of FIG. 6, and (b) is a YY cross-sectional view showing a state in which the grip member has been removed from the auxiliary pile. 連結部材の斜視図である。It is a perspective view of a connection member. 第1横矢板の設置状態を示す土留壁の水平断面図である。It is a horizontal sectional view of the retaining wall showing the installed state of the first horizontal sheet pile. 第1横矢板の設置方法を説明する土留壁の水平断面図である。It is a horizontal cross-sectional view of the earth retaining wall explaining the installation method of the 1st horizontal sheet pile. 第2横矢板の設置状態を示す土留壁の水平断面図である。It is a horizontal sectional view of the retaining wall showing the installed state of the second horizontal sheet pile. 第2横矢板の設置方法を説明する土留壁の水平断面図である。It is a horizontal sectional view of the earth retaining wall explaining the installation method of the 2nd horizontal sheet pile. 土留壁の親杭挿入工程の説明図である。It is an explanatory view of the main pile insertion process of the earth retaining wall. 土留壁の1次掘削工程及び第1横矢板設置工程の説明図である。It is an explanatory view of the primary excavation process of the earth retaining wall, and the 1st horizontal sheet pile installation process. 土留壁の2次掘削工程の説明図である。It is an explanatory view of the secondary excavation process of the earth retaining wall. 土留壁の補助杭挿入工程及び補助杭連結工程の説明図である。It is an explanatory view of an auxiliary pile insertion process of an earth retaining wall, and an auxiliary pile connection process. 土留壁の第2横矢板設置工程の説明図である。It is an explanatory view of the second horizontal sheet pile installation process of the earth retaining wall. 土留壁の3次掘削工程の説明図である。It is an explanatory view of the tertiary excavation process of the earth retaining wall. 土留壁の第1横矢板設置工程の説明図である。It is an explanatory view of the first horizontal sheet pile installation process of the earth retaining wall. 変形例に係る第1横矢板の設置状態を示す土留壁の水平断面図である。It is a horizontal cross-sectional view of the earth retaining wall which shows the installation state of the 1st horizontal sheet pile concerning a modification. 変形例に係る第1横矢板の設置方法を説明する土留壁の水平断面図である。It is a horizontal sectional view of the retaining wall explaining the installation method of the 1st horizontal sheet pile concerning a modification.

[土留壁の構成]
以下、本発明の実施の形態について、図面に基づいて説明する。図1及び図2において、1は土留壁であって、該土留壁1は、土留壁施工地盤に所定の間隔で挿入される複数の親杭2と、隣接する親杭2間に設置される複数の横矢板3と、親杭2の側部位置から背面側地盤に対して挿入され、かつ親杭2に連結部材5を介して連結される複数の補助杭4と、を備える。まず、横矢板3を除く土留壁1の構成について、図1~図10を参照して説明する。
[Earth retaining wall configuration]
Embodiments of the present invention will be described below based on the drawings. In FIGS. 1 and 2, 1 is an earth retaining wall, and the earth retaining wall 1 is installed between a plurality of main piles 2 inserted at predetermined intervals into the earth retaining wall construction ground and between adjacent main piles 2. It includes a plurality of horizontal sheet piles 3 and a plurality of auxiliary piles 4 that are inserted into the ground on the back side from the side position of the main pile 2 and connected to the main pile 2 via a connecting member 5. First, the structure of the retaining wall 1 excluding the horizontal sheet piles 3 will be explained with reference to FIGS. 1 to 10.

図1~図9に示すように、親杭2は、通常、土留壁施工地盤に鉛直方向に挿入(打設)される。使用部材としては、親杭横矢板土留壁などに一般的に使用されているH形綱が用いられる。H形鋼からなる親杭2は、一対のフランジ2aと、一対のフランジ2a同士を連結するウェブ2bと、を一体に有するとともに、ウェブ2bを溝底面とし、一対のフランジ2aを溝側面とする一対の溝部2cを有する。ウェブ2bには、第1ボルトB1を介して連結部材5を連結するためのボルト挿通孔(図示せず)が複数加工される。ボルト挿通孔は、親杭2を地盤に挿入する前に加工してもよいし、親杭2を地盤に挿入した後、親杭2に連結部材5を締結するタイミングで加工してもよい。 As shown in FIGS. 1 to 9, the parent pile 2 is normally inserted (driven) into the earth retaining wall construction ground in the vertical direction. The members used are H-shaped ropes that are commonly used for main piles, sheet piles, earth retaining walls, and the like. The parent pile 2 made of H-shaped steel integrally includes a pair of flanges 2a and a web 2b that connects the pair of flanges 2a, with the web 2b serving as the groove bottom and the pair of flanges 2a serving as the groove side. It has a pair of grooves 2c. A plurality of bolt insertion holes (not shown) for connecting the connecting member 5 via the first bolt B1 are formed in the web 2b. The bolt insertion holes may be formed before the main pile 2 is inserted into the ground, or after the main pile 2 is inserted into the ground, the bolt insertion holes may be formed at the timing when the connecting member 5 is fastened to the main pile 2.

親杭2を構成するH形綱の断面寸法は、壁高に応じて選定されるが、概ねH300~H500程度のものが多く使用される。また、親杭2は、土留壁施工地盤の掘削前に、掘削予定地盤の境界線に沿って所定間隔で地盤に挿入される。挿入間隔は、概ね1.0~2.0m程度とされる。 The cross-sectional dimensions of the H-shaped rope constituting the parent pile 2 are selected depending on the wall height, but those of approximately H300 to H500 are often used. Moreover, the parent piles 2 are inserted into the ground at predetermined intervals along the boundary line of the ground to be excavated before excavation of the ground for construction of the retaining wall. The insertion interval is approximately 1.0 to 2.0 m.

補助杭4は、高さ方向に1又は複数段で設置される。図2は、補助杭4を上下方向に2段設置した例を示している。補助杭4としては、概ねH200~H400程度の断面のH形鋼を用いられる。H形鋼からなる補助杭4は、一対のフランジ4aと、一対のフランジ4a同士を連結するウェブ4bと、を一体に有するとともに、ウェブ4bを溝底面とし、一対のフランジ4aを溝側面とする一対の溝部4cを有する。補助杭4の段数及び挿入深さは、親杭2の天端許容変形量を基準とした設計計算によって決定されるが、通常のケースでは、高さ方向に1~4段程度で設置され、挿入深さは概ね2~5m程度である。 The auxiliary piles 4 are installed in one or more stages in the height direction. FIG. 2 shows an example in which the auxiliary piles 4 are installed in two stages in the vertical direction. As the auxiliary pile 4, an H-beam steel having a cross section of approximately H200 to H400 is used. The auxiliary pile 4 made of H-beam steel integrally includes a pair of flanges 4a and a web 4b that connects the pair of flanges 4a, with the web 4b serving as the groove bottom and the pair of flanges 4a serving as the groove side. It has a pair of grooves 4c. The number of stages and the insertion depth of the auxiliary piles 4 are determined by design calculations based on the allowable amount of deformation at the top of the main pile 2, but in normal cases, they are installed in about 1 to 4 stages in the height direction, The insertion depth is approximately 2 to 5 m.

補助杭4は、掘削の進行に伴って、所定の掘削段階毎に各親杭2に対して設置される。1箇所あたりの設置数は1本とすることも可能であるが、図示するように、1箇所あたり、親杭2の両側に左右一組で配置するのがモーメントを大きく確保する上で望ましい。設置は、親杭2の側部位置から略水平方向に沿って背面側地盤中に挿入し、挿入元側を連結部材5を介して親杭2に連結する。補助杭4の挿入方向は、水平方向を基本とするが、施工誤差を含め僅かに傾斜させて設置されていてもよい。 The auxiliary piles 4 are installed for each parent pile 2 at each predetermined excavation stage as the excavation progresses. Although it is possible to install one pile per location, it is preferable to install a set of left and right piles on both sides of the parent pile 2 per location, as shown in the figure, in order to ensure a large moment. For installation, the main pile 2 is inserted into the ground on the back side along a substantially horizontal direction from the side position, and the insertion source side is connected to the main pile 2 via the connecting member 5. The direction in which the auxiliary piles 4 are inserted is basically horizontal, but may be installed at a slight inclination, including construction errors.

図4~図9に示すように、補助杭4の挿入方向基端側には、一対のフランジ4a及びウェブ4bに対して溶着される複数の補強部材41~44が設けられる。これらの補強部材41~44は、補助杭4の挿入方向基端側の変形を抑制し、補助杭4から親杭2に対するモーメントの伝達を確実に行わせる。 As shown in FIGS. 4 to 9, a plurality of reinforcing members 41 to 44 are provided on the base end side of the auxiliary pile 4 in the insertion direction, and are welded to the pair of flanges 4a and web 4b. These reinforcing members 41 to 44 suppress deformation of the base end side of the auxiliary pile 4 in the insertion direction, and ensure the transmission of moment from the auxiliary pile 4 to the main pile 2.

補強部材41~44には、補助杭4の挿入方向基端面を覆う第1補強部材41が含まれる。第1補強部材41は、補助杭4の挿入方向基端面において、補助杭4の一対の溝部4cを塞ぐように溶着されている。また、第1補強部材41には、後述する掴み代部材6を連結するためのボルト挿通孔41aが加工されている。 The reinforcing members 41 to 44 include a first reinforcing member 41 that covers the base end surface of the auxiliary pile 4 in the insertion direction. The first reinforcing member 41 is welded to the base end surface of the auxiliary pile 4 in the insertion direction so as to close the pair of grooves 4c of the auxiliary pile 4. Further, the first reinforcing member 41 is provided with a bolt insertion hole 41a for connecting a gripping margin member 6, which will be described later.

また、補強部材41~44には、補助杭4の一対の溝部4c内であって、連結部材5との締結位置近傍に設けられる複数の第2補強部材42~44が含まれる。 Further, the reinforcing members 41 to 44 include a plurality of second reinforcing members 42 to 44 provided within the pair of grooves 4c of the auxiliary pile 4 and near the fastening position with the connecting member 5.

挿入用重機(図示せず)を用いて補助杭4を背面側地盤に挿入する際には、補助杭4の挿入方向基端側に挿入用重機の掴み代が必要になる。図4~図9に示すように、本実施形態の土留壁施工方法では、補助杭4の挿入方向基端部に着脱可能に装着され、補助杭4を背面側地盤に挿入する際、補助杭4を挿入する挿入用重機の掴み代となり、挿入後は補助杭4から取り外される掴み代部材6が用いられる。 When inserting the auxiliary pile 4 into the ground on the back side using a heavy insertion machine (not shown), a gripping allowance for the heavy insertion machine is required on the base end side of the auxiliary pile 4 in the insertion direction. As shown in FIGS. 4 to 9, in the earth retaining wall construction method of this embodiment, the auxiliary pile 4 is removably attached to the base end in the insertion direction, and when the auxiliary pile 4 is inserted into the ground on the back side, the auxiliary A gripping allowance member 6 is used, which serves as a gripping allowance for the heavy machine for insertion into which the auxiliary pile 4 is inserted, and is removed from the auxiliary pile 4 after insertion.

掴み代部材6は、一対のフランジ6aと、一対のフランジ6a同士を連結するウェブ6bと、を一体に有するH形鋼であり、補助杭4と同一断面のH形鋼が用いられる。掴み代部材6を構成するH形鋼には、挿入方向先端面を覆うように掴み代側継手部材61が溶着されている。掴み代側継手部材61には、複数の第3ボルトB3を介して補助杭4の第1補強部材41に締結するための複数のボルト挿通孔(図示せず)が加工されている。 The grip member 6 is an H-shaped steel integrally having a pair of flanges 6a and a web 6b connecting the pair of flanges 6a, and is an H-shaped steel having the same cross section as the auxiliary pile 4. A gripping allowance side joint member 61 is welded to the H-shaped steel constituting the gripping allowance member 6 so as to cover the distal end surface in the insertion direction. A plurality of bolt insertion holes (not shown) for fastening to the first reinforcing member 41 of the auxiliary pile 4 via a plurality of third bolts B3 are formed in the gripping side joint member 61.

連結部材5は、1本の補助杭4に対して上下一対で使用される。上下一対の連結部材5は、補助杭4の上下幅寸法と同等の間隔を介して上下方向に並ぶように複数の第1ボルトB1及び第1ナットN1を介して親杭2に締結される。上下一対の連結部材5の互いに対向する対向部位は、補助杭4を背面側地盤に挿入する際のガイドとして機能する。また、上下一対の連結部材5の互いに対向する対向部位は、挿入された補助杭4のフランジ4aと複数の第2ボルトB2及び第2ナットN2を介して締結される。 The connecting members 5 are used as a pair, upper and lower, for one auxiliary pile 4. The pair of upper and lower connecting members 5 are fastened to the main pile 2 via a plurality of first bolts B1 and first nuts N1 so as to be lined up in the vertical direction with an interval equal to the vertical width dimension of the auxiliary pile 4. The mutually opposing portions of the pair of upper and lower connecting members 5 function as guides when inserting the auxiliary pile 4 into the ground on the back side. In addition, opposing portions of the pair of upper and lower connecting members 5 that face each other are fastened to the flange 4a of the inserted auxiliary pile 4 via a plurality of second bolts B2 and second nuts N2.

具体的に説明すると、本実施形態の連結部材5は、図10に示すように、親杭2のウェブ2bに締結される親杭締結板部51と、補助杭4のフランジ4aに締結される補助杭締結板部52と、親杭締結板部51と補助杭締結板部52とを一体的に連結する複数の連結板部53と、複数の連結板部53同士を一体的に連結する補強板部58と、によって箱形に形成されている。 Specifically, as shown in FIG. 10, the connecting member 5 of this embodiment has a main pile fastening plate part 51 fastened to the web 2b of the main pile 2, and a flange 4a of the auxiliary pile 4. The auxiliary pile fastening plate part 52, the plurality of connecting plate parts 53 that integrally connect the main pile fastening plate part 51 and the auxiliary pile fastening plate part 52, and the reinforcement that integrally connects the plurality of connecting plate parts 53 to each other. The plate portion 58 is formed into a box shape.

親杭締結板部51には、第1ボルトB1を挿通可能な複数のボルト挿通孔51aが形成され、補助杭締結板部52には、第2ボルトB2を挿通可能な複数のボルト挿通孔52aが形成されている。また、連結部材5は、箱内部に連通する開口部56を有し、この開口部56を介してボルトB1、B2及びナットN1、N2の締結操作が行われる。 The main pile fastening plate part 51 is formed with a plurality of bolt insertion holes 51a through which the first bolts B1 can be inserted, and the auxiliary pile fastening plate part 52 is formed with a plurality of bolt insertion holes 52a through which the second bolts B2 can be inserted. is formed. Further, the connecting member 5 has an opening 56 that communicates with the inside of the box, and the bolts B1, B2 and nuts N1, N2 are fastened through this opening 56.

本実施形態の第2ボルトB2は、上下一対の連結部材5の互いに対向する対向部位(補助杭締結板部52)と、該対向部位間に挿入された補助杭4(上下のフランジ4a)を上下方向に貫通するロングボルトで構成されている。ロングボルトからなる第2ボルトB2によれば、上下一対の連結部材5に対する補助杭4の締結に必要な第2ボルトB2の本数を削減できるだけでなく、上下の連結部材5に対する補助杭4の締結を同時に行うことができる。また、連結作業時に閉空間となる補助杭4のフランジ内側面に事前にナットを配置(溶接)するような作業も不要となるので、土留壁1の施工性を大幅に向上させることができる。 The second bolt B2 of this embodiment connects mutually opposing opposing parts (auxiliary pile fastening plate parts 52) of a pair of upper and lower connecting members 5 and the auxiliary pile 4 (upper and lower flanges 4a) inserted between the opposing parts. It consists of a long bolt that penetrates vertically. According to the second bolt B2 made of a long bolt, it is possible not only to reduce the number of second bolts B2 necessary for fastening the auxiliary pile 4 to the pair of upper and lower connecting members 5, but also to reduce the number of second bolts B2 necessary for fastening the auxiliary pile 4 to the upper and lower connecting members 5. can be done at the same time. Furthermore, work such as placing (welding) a nut in advance on the inner surface of the flange of the auxiliary pile 4, which becomes a closed space during the connection work, is no longer necessary, so the workability of the retaining wall 1 can be greatly improved.

また、図10に示すように、上下一対の連結部材5は、エンドプレート57を介して一体的に連結されて連結ユニットUを構成しており、連結ユニットUの状態で親杭2に締結される。つまり、上下一対の連結部材5は、個別に親杭2に締結されるのではなく、予め間隔を正確に計測してエンドプレート57に溶着されたユニット状態で一体的に親杭2に締結される。 Further, as shown in FIG. 10, the pair of upper and lower connecting members 5 are integrally connected via an end plate 57 to form a connecting unit U, and are fastened to the main pile 2 in the state of the connecting unit U. Ru. In other words, the pair of upper and lower connecting members 5 are not individually fastened to the main pile 2, but are integrally fastened to the main pile 2 as a unit that is welded to the end plate 57 by measuring the interval accurately in advance. Ru.

[横矢板]
つぎに、横矢板3について、図11~図14を参照して説明する。横矢板3は、掘削に伴って隣接する親杭2間に順次設置され、土留めを図る板材である。横矢板3としては、長手方向の両端部が親杭2によって支持される第1横矢板31と、長手方向の両端部が補助杭4又は連結部材5によって支持される第2横矢板32と、が含まれる。第1横矢板31及び第2横矢板32は、いずれも親杭2、補助杭4及び連結部材5の前面側を覆う丸太材311、322を備える。
[Yokoya Sheet]
Next, the horizontal sheet pile 3 will be explained with reference to FIGS. 11 to 14. The horizontal sheet piles 3 are plate materials that are sequentially installed between adjacent parent piles 2 as excavation is performed, and serve as earth retention. The horizontal sheet piles 3 include a first horizontal sheet pile 31 whose longitudinal ends are supported by the parent piles 2, and a second horizontal sheet pile 32 whose longitudinal ends are supported by the auxiliary piles 4 or the connecting members 5. is included. The first horizontal sheet pile 31 and the second horizontal sheet pile 32 each include log materials 311 and 322 that cover the front sides of the main pile 2, the auxiliary pile 4, and the connecting member 5.

具体的に説明すると、本実施形態の第1横矢板31は、断面円形の丸太材311を用いて構成されており、丸太材311の長手方向の両端部には、親杭2のフランジ2aに係合可能な凹溝311aが形成されている。図11に示すように、丸太材311からなる第1横矢板31は、両端部の凹溝311aを親杭2のフランジ2aに係合させて、隣接する親杭2間に設置されると、背面地盤の前面側を覆って土留め材として機能するだけでなく、親杭2の前面側を覆うカバー材として機能させることができる。なお、背面地盤と横矢板3(第1横矢板31、第2横矢板32)との間には、充填材Jを充填してもよい。 To describe it specifically, the first horizontal sheet pile 31 of this embodiment is configured using a log material 311 having a circular cross section, and a flange 2a of the parent pile 2 is provided at both ends of the log material 311 in the longitudinal direction. An engageable groove 311a is formed. As shown in FIG. 11, when the first horizontal sheet pile 31 made of log material 311 is installed between adjacent parent piles 2 by engaging the grooves 311a at both ends with the flanges 2a of the parent piles 2, Not only can it function as an earth retaining material by covering the front side of the back ground, but it can also function as a cover material for covering the front side of the parent pile 2. In addition, you may fill with the filler J between the back ground and the horizontal sheet pile 3 (1st horizontal sheet pile 31, 2nd horizontal sheet pile 32).

このような第1横矢板31は、隣接する親杭2間に設置する際、長手方向の一端側が高く、長手方向の他端側が低くなるように傾斜させた状態で隣接する親杭2間に差し込み、その後に水平姿勢とすることで、両端部の凹溝311aを隣接する親杭2のフランジ2aに係合させることが可能であるが、本実施形態の第1横矢板31の凹溝311aは、第1横矢板31を水平姿勢に維持しつつ、隣接する親杭2に対して前面側から係合可能な形状を有する。これにより、上下方向に傾斜させるスペースがない状況でも、第1横矢板31を隣接する親杭2間に設置することが可能になる。 When such a first horizontal sheet pile 31 is installed between two adjacent parent piles, it is tilted so that one end in the longitudinal direction is higher and the other end in the longitudinal direction is lower. By inserting it and then setting it in a horizontal position, it is possible to engage the grooves 311a at both ends with the flanges 2a of the adjacent parent pile 2, but the grooves 311a of the first horizontal sheet pile 31 of this embodiment has a shape that can be engaged with the adjacent parent pile 2 from the front side while maintaining the first horizontal sheet pile 31 in a horizontal position. Thereby, even in a situation where there is no space for vertically tilting, it becomes possible to install the first horizontal sheet pile 31 between the adjacent parent piles 2.

具体的に説明すると、第1横矢板31の凹溝311aは、溝深さL1がフランジ21aとの係合代L2よりも深くなっている。また、凹溝311aの背面側には、第1横矢板31の背面部の長さL3が第1横矢板31の前面部の長さL4よりも短くするための切り欠き311bが形成されている。さらに、いずれか一方の凹溝311aは、前面側の溝側面が長手方向外側ほど溝幅を広げる傾斜面311cとなっている。 Specifically, the groove depth L1 of the groove 311a of the first horizontal sheet pile 31 is deeper than the engagement length L2 with the flange 21a. Moreover, a notch 311b is formed on the back side of the groove 311a to make the length L3 of the back surface of the first horizontal sheet pile 31 shorter than the length L4 of the front surface of the first horizontal sheet pile 31. . Furthermore, one of the grooves 311a has a groove side surface on the front side that is an inclined surface 311c whose groove width increases toward the outer side in the longitudinal direction.

このような第1横矢板31によれば、図12に示すように、第1横矢板31を水平姿勢に維持しつつ、傾斜面311cが形成される一端側の凹溝311aを一方の親杭2のフランジ2aに深く係合させた後、第1横矢板31の他端側を隣接する親杭2間に押し込み、その後、第1横矢板31を他端側にスライドさせることで、所謂「行って来い」方式で第1横矢板31を隣接する親杭2間に設置することが可能になる。なお、設置された第1横矢板31の水平方向の移動は、水平方向に隣接する第1横矢板31によって規制される。例えば、図12に示す例では、左側の第1横矢板31から順番に設置することで、第1横矢板31の水平方向の位置を規定することができる。 According to the first horizontal sheet pile 31, as shown in FIG. 12, while maintaining the first horizontal sheet pile 31 in a horizontal position, the concave groove 311a on the one end side in which the inclined surface 311c is formed is connected to one of the main piles. After deeply engaging the flange 2a of 2, the other end side of the first horizontal sheet pile 31 is pushed between the adjacent parent piles 2, and then, by sliding the first horizontal sheet pile 31 to the other end side, the so-called " It becomes possible to install the first horizontal sheet pile 31 between the adjacent parent piles 2 using the ``come and go'' method. In addition, the horizontal movement of the installed 1st horizontal sheet pile 31 is regulated by the 1st horizontal sheet pile 31 adjacent to the horizontal direction. For example, in the example shown in FIG. 12, the horizontal position of the first horizontal pile 31 can be defined by sequentially installing the first horizontal pile 31 on the left side.

図13及び図14に示すように、第2横矢板32は、断面半円状の丸太材321と、丸太材321の背面側に沿うアングル材、チャンネル材などの支持材322と、丸太材321と支持材322とを連結する複数の連結ボルト323と、を備える。 As shown in FIGS. 13 and 14, the second horizontal sheet pile 32 includes a log material 321 having a semicircular cross section, a support material 322 such as an angle material or a channel material along the back side of the log material 321, and a log material 321. and a plurality of connection bolts 323 that connect the support member 322 to the support member 322.

このような第2横矢板32は、長手方向の両端部を補助杭4(例えば、第2補強部材43)、連結部材5(例えば、連結板部53)のいずれかに背面側から係合させた状態の支持材322と、長手方向の両端部を親杭2の前面側に添わせた状態の丸太材321とを複数の連結ボルト323を介して連結することで、第2横矢板32の長手方向の両端部が補助杭4又は連結部材5によって支持される。そして、設置された第2横矢板32は、背面地盤の前面側を覆って土留め材として機能するだけでなく、親杭2、補助杭4及び連結部材5の前面側を覆うカバー材として機能させることができる。なお、図14に示すように、第2横矢板32も、支持材322を斜めに差し込むことで、水平姿勢を維持しつつ、所謂「行って来い」方式で設置することができる。 Such a second horizontal sheet pile 32 has both ends in the longitudinal direction engaged with either the auxiliary pile 4 (for example, the second reinforcing member 43) or the connecting member 5 (for example, the connecting plate part 53) from the back side. By connecting the support material 322 in the state of being tilted and the log material 321 in the state of having both longitudinal ends aligned with the front side of the parent pile 2 via a plurality of connection bolts 323, the second horizontal sheet pile 32 is Both ends in the longitudinal direction are supported by auxiliary piles 4 or connecting members 5. The installed second horizontal sheet pile 32 not only functions as an earth retaining material by covering the front side of the back ground, but also functions as a cover material that covers the front side of the main pile 2, auxiliary pile 4, and connecting member 5. can be done. In addition, as shown in FIG. 14, the second horizontal pile 32 can also be installed in a so-called "come and go" method by inserting the support member 322 diagonally, while maintaining the horizontal attitude.

[土留壁の施工方法]
つぎに、林道整備に適用した土留壁1の施工手順について、図15~図21を参照して説明する。なお、図15~図21では、背面地盤の図示を省略する。
[Construction method of earth retaining wall]
Next, the construction procedure of the earth retaining wall 1 applied to forest road maintenance will be explained with reference to FIGS. 15 to 21. Note that illustration of the back ground is omitted in FIGS. 15 to 21.

図15~図21に示す土留壁1の施工手順には、親杭挿入工程(図15参照)、1次掘削工程(図16参照)、第1横矢板設置工程(図16参照)、2次掘削工程(図17参照)、補助杭挿入工程(図18参照)、補助杭連結工程(図18参照)、第2横矢板設置工程(図19参照)、3次掘削工程(図20参照)及び2回目の第1横矢板設置工程(図21参照)が含まれる。 The construction procedure for the retaining wall 1 shown in Figures 15 to 21 includes a parent pile insertion process (see Figure 15), a primary excavation process (see Figure 16), a first horizontal sheet pile installation process (see Figure 16), a secondary Excavation process (see Figure 17), auxiliary pile insertion process (see Figure 18), auxiliary pile connection process (see Figure 18), second horizontal sheet pile installation process (see Figure 19), tertiary excavation process (see Figure 20), A second first horizontal sheet pile installation process (see FIG. 21) is included.

図15に示すように、親杭設置工程では、杭打ち機などの施工機械を用いて、掘削境界線に沿って所定の間隔で親杭2を地盤に挿入する。 As shown in FIG. 15, in the parent pile installation process, parent piles 2 are inserted into the ground at predetermined intervals along the excavation boundary line using a construction machine such as a pile driver.

図16に示すように、1次掘削工程では、油圧ショベルなど掘削機械を用いて、親杭2に沿って掘削予定地盤を掘削する。掘削の進行に伴い、親杭2間に第1横矢板31を設置する第1横矢板設置工程を実施し、土留めを図りながら徐々に掘り下げていく。設置された第1横矢板31は、土留め材として機能するだけでなく、親杭2の前面側を覆うカバー材としても機能する。 As shown in FIG. 16, in the primary excavation step, the ground to be excavated is excavated along the parent pile 2 using an excavating machine such as a hydraulic excavator. As the excavation progresses, a first horizontal sheet pile installation step is carried out in which the first horizontal sheet piles 31 are installed between the parent piles 2, and the excavation is gradually carried out while retaining the earth. The installed first horizontal sheet pile 31 not only functions as an earth retaining material, but also functions as a cover material that covers the front side of the parent pile 2.

図17に示すように、2次掘削工程では、掘削予定地盤を補助杭4の設置位置よりもやや掘り下げた位置まで掘削する。 As shown in FIG. 17, in the secondary excavation process, the ground to be excavated is excavated to a position slightly deeper than the installation position of the auxiliary pile 4.

図18に示すように、補助杭挿入工程では、挿入用重機を用いて、背面地盤に補助杭4を挿入する。具体的に説明すると、補助杭4の挿入に先立ち、まず、親杭2の左右両側部に、それぞれ上下一対の連結部材5(連結ユニットU)を固定する。この作業は、親杭2のウェブ2bを挟むように、左右一組の連結ユニットUを配置し、複数の第1ボルトB1及び第1ナットN1を用いて、左右一組の連結ユニットUを親杭2のウェブ2bに締結することにより行われる。また、挿入する補助杭4の挿入方向基端部には、複数の第3ボルトB3及び第3ナットN3を用いて、掴み代部材6を装着する。 As shown in FIG. 18, in the auxiliary pile insertion step, the auxiliary pile 4 is inserted into the back ground using heavy insertion equipment. Specifically, prior to inserting the auxiliary pile 4, first, a pair of upper and lower connecting members 5 (connecting units U) are fixed to the left and right sides of the parent pile 2, respectively. This work involves arranging a pair of left and right connecting units U to sandwich the web 2b of the parent stake 2, and using a plurality of first bolts B1 and first nuts N1 to connect the left and right pair of connecting units U to the parent pile. This is done by fastening to the web 2b of the pile 2. Further, the gripping member 6 is attached to the base end of the auxiliary pile 4 to be inserted in the insertion direction using a plurality of third bolts B3 and third nuts N3.

補助杭4の挿入は、挿入用重機で掴み代部材6のウェブ6bを掴みながら行われる。補助杭4の挿入中は、補助杭4を上下一対の連結部材5間に位置させることにより、上下一対の連結部材5を挿入ガイドとして機能させる。挿入が完了したら、複数の第2ボルトB2及び第2ナットN2によって、補助杭4を連結部材5に締結させる補助杭連結工程を実施する。その後、掴み代部材6を補助杭4から取り外す。 Insertion of the auxiliary pile 4 is performed while gripping the web 6b of the gripping allowance member 6 with a heavy insertion machine. During insertion of the auxiliary stake 4, the auxiliary stake 4 is positioned between the pair of upper and lower connecting members 5, thereby causing the pair of upper and lower connecting members 5 to function as an insertion guide. After the insertion is completed, an auxiliary pile connecting step is performed in which the auxiliary pile 4 is fastened to the connecting member 5 using the plurality of second bolts B2 and second nuts N2. Thereafter, the grip member 6 is removed from the auxiliary stake 4.

図19に示すように、第2横矢板設置工程では、親杭2間に第2横矢板32を設置する。このとき、第2横矢板32は、補助杭4又は連結部材5に係合する状態で設置される。そして、設置された第2横矢板32は、土留め材として機能するだけでなく、親杭2、補助杭4及び連結部材5の前面側を覆うカバー材としても機能する。 As shown in FIG. 19, in the second horizontal sheet pile installation process, the second horizontal sheet piles 32 are installed between the parent piles 2. At this time, the second horizontal sheet pile 32 is installed in a state where it engages with the auxiliary pile 4 or the connecting member 5. The installed second horizontal sheet pile 32 not only functions as an earth retaining material, but also functions as a cover material that covers the front side of the main pile 2, the auxiliary pile 4, and the connecting member 5.

図20に示すように、3次掘削工程では、掘削予定地盤の底面(林道施工面)まで掘り下げる。その後、図21に示すように、2回目の第1横矢板設置工程を実施することで、土留壁1が完成する。 As shown in FIG. 20, in the tertiary excavation process, the ground is dug to the bottom (the forest road construction surface) of the ground to be excavated. Thereafter, as shown in FIG. 21, the retaining wall 1 is completed by carrying out the second first horizontal sheet pile installation process.

[実施形態の効果]
叙述の如く構成された本実施形態によれば、土留壁施工地盤に所定の間隔で挿入される複数の親杭2と、隣接する親杭2間に設置される複数の横矢板3と、親杭2の側部位置から背面側地盤に対して挿入され、かつ親杭2に連結部材5を介して連結される複数の補助杭4と、を備える土留壁1であって、横矢板3は、長手方向の両端部が親杭2によって支持される第1横矢板31と、長手方向の両端部が補助杭4又は連結部材5によって支持される第2横矢板32と、を含むので、補助杭4や連結部材5の設置箇所にも横矢板3を適切に設置できるだけでなく、横矢板3の支持荷重を分散できる。
[Effects of embodiment]
According to the present embodiment configured as described above, a plurality of main piles 2 are inserted into the earth retaining wall construction ground at predetermined intervals, a plurality of horizontal sheet piles 3 are installed between adjacent main piles 2, The earth retaining wall 1 includes a plurality of auxiliary piles 4 that are inserted into the ground on the back side from the side positions of the piles 2 and connected to the main piles 2 via connecting members 5, and the horizontal sheet piles 3 are , includes a first horizontal sheet pile 31 whose longitudinal ends are supported by the parent pile 2, and a second horizontal sheet pile 32 whose longitudinal ends are supported by the auxiliary piles 4 or the connecting members 5. Not only can the horizontal sheet piles 3 be appropriately installed at the installation locations of the piles 4 and the connecting members 5, but also the supporting load of the horizontal sheet piles 3 can be dispersed.

また、第1横矢板31及び第2横矢板32は、親杭2、補助杭4及び連結部材5の前面側を覆う丸太材311、321を備えるので、土留壁1によって景観が損なわれることを防止し、林道整備などへの適用を促進させることができる。また、丸太材311、321として間伐材を使用すれば、森林資源の有効利用が図れる。 Moreover, since the first horizontal sheet pile 31 and the second horizontal sheet pile 32 are provided with log materials 311 and 321 that cover the front sides of the main pile 2, the auxiliary pile 4, and the connecting member 5, the landscape is not spoiled by the retaining wall 1. can be prevented and its application to forest road maintenance etc. can be promoted. Furthermore, if thinned wood is used as the logs 311 and 321, forest resources can be used effectively.

また、第2横矢板32は、丸太材321と、丸太材321の背面側に沿う支持材322と、丸太材321と支持材322とを連結する複数の連結ボルト323と、を備え、長手方向の両端部を補助杭4、連結部材5のいずれかに背面側から係合させた状態の支持材322と、長手方向の両端部を親杭2の前面側に添わせた状態の丸太材321とを複数の連結ボルト323を介して連結することで、第2横矢板32の長手方向の両端部が補助杭4又は連結部材5によって支持されるので、補助杭4や連結部材5の設置箇所に第2横矢板32をより適切に設置できる。 Further, the second horizontal sheet pile 32 includes a log material 321, a support material 322 along the back side of the log material 321, and a plurality of connection bolts 323 that connect the log material 321 and the support material 322, and A supporting member 322 whose both ends are engaged with either the auxiliary pile 4 or the connecting member 5 from the back side, and a log material 321 whose longitudinal ends are aligned with the front side of the main pile 2 By connecting them via a plurality of connecting bolts 323, both ends of the second horizontal sheet pile 32 in the longitudinal direction are supported by the auxiliary piles 4 or the connecting members 5, so that the installation locations of the auxiliary piles 4 and the connecting members 5 can be changed. The second horizontal sheet pile 32 can be installed more appropriately.

また、親杭2は、一対のフランジ2aと、一対のフランジ2a同士を連結するウェブ2bと、を一体に有するH形鋼であり、第1横矢板31の丸太材311は、長手方向の両端部に親杭2のフランジ2aに係合可能な凹溝311aを有し、凹溝311aは、第1横矢板31の丸太材311を水平姿勢に維持しつつ、隣接する親杭2に対して前面側から係合可能な形状を有するので、長手方向の両端部に凹溝311aを有する丸太材311で第1横矢板31を簡易に構成できるだけでなく、第1横矢板31を水平姿勢に維持しつつ、隣接する親杭2に対して前面側から設置可能とし、第1横矢板31の設置性を向上させることができる。 Moreover, the parent pile 2 is an H-beam steel integrally having a pair of flanges 2a and a web 2b that connects the pair of flanges 2a, and the log material 311 of the first horizontal sheet pile 31 is formed at both ends in the longitudinal direction. The groove 311a has a groove 311a that can be engaged with the flange 2a of the main pile 2, and the groove 311a maintains the log material 311 of the first horizontal sheet pile 31 in a horizontal position, and Since it has a shape that can be engaged from the front side, not only can the first horizontal sheet pile 31 be easily constructed from the log material 311 having grooves 311a at both ends in the longitudinal direction, but also the first horizontal sheet pile 31 can be maintained in a horizontal position. At the same time, it is possible to install the first horizontal sheet pile 31 from the front side with respect to the adjacent main pile 2, thereby improving the ease of installing the first horizontal sheet pile 31.

[第2実施形態]
つぎに、本発明の変形例に係る第1横矢板33について、図22及び図23を参照して説明する。ただし、前述した実施形態と共通の構成については、前述した実施形態と同じ符号を用いることで、前述した実施形態の説明を援用する場合がある。
[Second embodiment]
Next, the first horizontal sheet pile 33 according to a modified example of the present invention will be explained with reference to FIGS. 22 and 23. However, for configurations common to the embodiments described above, the same reference numerals as in the embodiments described above may be used, and the explanation of the embodiments described above may be used.

変形例の第1横矢板33は、断面半円状の丸太材331と、丸太材331の背面側に沿うアングル材、チャンネル材などの支持材332と、丸太材331と支持材332とを連結する複数の連結ボルト333と、を備える。 The first horizontal sheet pile 33 of the modified example connects a log material 331 having a semicircular cross section, a supporting material 332 such as an angle material or a channel material along the back side of the log material 331, and the log material 331 and the supporting material 332. A plurality of connecting bolts 333 are provided.

このような変形例の第1横矢板33は、長手方向の両端部を親杭2のフランジ部2aに背面側から係合させた状態の支持材332と、長手方向の両端部を親杭2の前面側に添わせた状態の丸太材331とを複数の連結ボルト333を介して連結することで、第1横矢板33の長手方向の両端部が親杭2によって支持される。このような変形例の第1横矢板33によれば、第1横矢板33と第2横矢板32の構成を類似させることができるので、丸太材311、331の共通化による施工コストの削減や、施工手順の共通化による施工性の向上が図れる。なお、図23に示すように、変形例の第1横矢板33も、支持材332を斜めに差し込むことで、水平姿勢を維持しつつ、所謂「行って来い」方式で設置することができる。 The first horizontal sheet pile 33 of such a modified example includes a support member 332 whose longitudinal ends are engaged with the flange portion 2a of the main pile 2 from the back side, and a support member 332 whose longitudinal ends are engaged with the flange portion 2a of the main pile 2 from the back side. Both ends of the first horizontal sheet pile 33 in the longitudinal direction are supported by the parent pile 2 by connecting the log material 331 which is attached to the front side of the first horizontal sheet pile 33 via a plurality of connecting bolts 333. According to the first horizontal sheet pile 33 of such a modified example, the configurations of the first horizontal sheet pile 33 and the second horizontal sheet pile 32 can be made similar, so the construction cost can be reduced by making the log materials 311 and 331 common. , construction efficiency can be improved by standardizing construction procedures. In addition, as shown in FIG. 23, the first horizontal pile 33 of the modified example can also be installed in a so-called "come and go" method while maintaining the horizontal posture by inserting the support member 332 diagonally.

1 土留壁
2 親杭
2a フランジ
2b ウェブ
2c 溝部
3 横矢板
31 第1横矢板
311 丸太材
311a 凹溝
311b 切り欠き
311c 傾斜面
32 第2横矢板
321 丸太材
322 支持材
323 連結ボルト
33 第1横矢板
331 丸太材
332 支持材
333 連結ボルト
4 補助杭
4a フランジ
4b ウェブ
4c 溝部
41 第1補強部材
41a ボルト挿通孔
42~44 第2補強部材
5 連結部材
51 親杭締結板部
52 補助杭締結板部
53 連結板部
56 開口部
57 エンドプレート
58 補強板部
6 掴み代部材
6a フランジ
6b ウェブ
61 掴み代側継手部材
U 連結ユニット
B1 第1ボルト
B2 第2ホルト
B3 第3ボルト
1 Retaining wall 2 Main pile 2a Flange 2b Web 2c Groove 3 Horizontal sheet pile 31 First horizontal sheet pile 311 Log material 311a Groove 311b Notch 311c Inclined surface 32 Second horizontal sheet pile 321 Log material 322 Support material 323 Connection bolt 33 First horizontal sheet pile Sheet pile 331 Log material 332 Support material 333 Connecting bolt 4 Auxiliary pile 4a Flange 4b Web 4c Groove 41 First reinforcing member 41a Bolt insertion hole 42 to 44 Second reinforcing member 5 Connecting member 51 Main pile fastening plate part 52 Auxiliary pile fastening plate part 53 Connecting plate portion 56 Opening portion 57 End plate 58 Reinforcement plate portion 6 Grip allowance member 6a Flange 6b Web 61 Grip allowance side joint member U Connection unit B1 First bolt B2 Second bolt B3 Third bolt

Claims (5)

土留壁施工地盤に所定の間隔で挿入される複数の親杭と、
隣接する前記親杭間に設置される複数の横矢板と、
前記親杭の側部位置から背面側地盤に対して挿入され、かつ前記親杭に連結部材を介して連結される複数の補助杭と、を備える土留壁であって、
前記横矢板は、
長手方向の両端部が前記親杭によって支持される第1横矢板と、
長手方向の両端部が前記補助杭又は前記連結部材によって支持される第2横矢板と、を含み、
前記第1横矢板及び前記第2横矢板は、前記親杭、前記補助杭及び前記連結部材の前面側を覆う丸太材を備える土留壁。
A plurality of parent piles are inserted into the earth retaining wall construction ground at predetermined intervals,
A plurality of horizontal sheet piles installed between the adjacent parent piles,
An earth retaining wall comprising a plurality of auxiliary piles that are inserted into the ground on the rear side from a side position of the main pile and connected to the main pile via a connecting member,
The horizontal sheet pile is
a first horizontal sheet pile whose longitudinal ends are supported by the parent pile;
a second horizontal sheet pile whose longitudinal ends are supported by the auxiliary pile or the connecting member,
The first horizontal sheet pile and the second horizontal sheet pile are earth retaining walls including log materials that cover the front sides of the parent pile, the auxiliary pile, and the connecting member.
前記第2横矢板は、
前記丸太材と、
前記丸太材の背面側に沿う支持材と、
前記丸太材と前記支持材とを連結する複数の連結ボルトと、を備え、
長手方向の両端部を前記補助杭、前記連結部材のいずれかに背面側から係合させた状態の前記支持材と、長手方向の両端部を前記親杭の前面側に添わせた状態の前記丸太材とを複数の前記連結ボルトを介して連結することで、前記第2横矢板の長手方向の両端部が前記補助杭又は前記連結部材によって支持される請求項1に記載の土留壁。
The second horizontal sheet pile is
The log material;
a support material along the back side of the log;
A plurality of connection bolts connecting the log material and the support material,
The support member has both longitudinal ends engaged with either the auxiliary pile or the connecting member from the back side, and the support member has both longitudinal ends aligned with the front side of the parent pile. The earth retaining wall according to claim 1, wherein both ends of the second horizontal sheet pile in the longitudinal direction are supported by the auxiliary pile or the connecting member by connecting the logs with the plurality of connecting bolts.
前記親杭は、一対のフランジと、一対の前記フランジ同士を連結するウェブと、を一体に有するH形鋼であり、
前記第1横矢板の前記丸太材は、長手方向の両端部に前記親杭の前記フランジに係合可能な凹溝を有し、
前記凹溝は、前記第1横矢板の前記丸太材を水平姿勢に維持しつつ、隣接する前記親杭に対して前面側から係合可能な形状を有する請求項1又は2に記載の土留壁。
The parent pile is an H-beam that integrally includes a pair of flanges and a web that connects the pair of flanges,
The log material of the first horizontal sheet pile has grooves that can be engaged with the flanges of the parent pile at both ends in the longitudinal direction,
The earth retaining wall according to claim 1 or 2, wherein the groove has a shape that allows it to engage with the adjacent parent pile from the front side while maintaining the log material of the first horizontal sheet pile in a horizontal position. .
前記第1横矢板は、
前記丸太材と、
前記丸太材の背面側に沿う支持材と、
前記丸太材と前記支持材とを連結する複数の連結ボルトと、を備え、
長手方向の両端部を前記親杭に背面側から係合させた状態の前記支持材と、長手方向の両端部を前記親杭の前面側に添わせた状態の前記丸太材とを複数の前記連結ボルトを介して連結することで、前記第1横矢板の長手方向の両端部が前記親杭によって支持される請求項1又は2に記載の土留壁。
The first horizontal sheet pile is
The log material;
a support material along the back side of the log;
A plurality of connection bolts connecting the log material and the support material,
A plurality of the support members have both longitudinal ends engaged with the parent pile from the back side, and the logs have both longitudinal ends aligned with the front side of the parent pile. The earth retaining wall according to claim 1 or 2, wherein both ends of the first horizontal sheet pile in the longitudinal direction are supported by the parent pile by connecting via a connecting bolt.
土留壁施工地盤に所定の間隔で挿入される複数の親杭と、
隣接する前記親杭間に設置される複数の横矢板と、
前記親杭の側部位置から背面側地盤に対して挿入され、かつ前記親杭に連結部材を介して連結される複数の補助杭と、を備える土留壁の施工方法であって、
前記横矢板は、
長手方向の両端部が前記親杭によって支持される第1横矢板と、
長手方向の両端部が前記補助杭又は前記連結部材によって支持される第2横矢板と、を含み、
前記土留壁の施工方法は、
土留壁施工地盤に所定の間隔で前記親杭を挿入する親杭挿入工程と、
土留壁施工地盤を前記親杭の前面側に沿って掘削する掘削工程と、
隣接する前記親杭間に前記第1横矢板を設置し、前記第1横矢板が備える丸太材によって前記親杭の前面側を覆う第1横矢板設置工程と、
前記親杭の側部位置から背面側地盤に対して前記補助杭を挿入する補助杭挿入工程と、
前記連結部材を介して前記補助杭を前記親杭に連結される補助杭連結工程と、
隣接する前記親杭間に前記第2横矢板を設置し、前記第1横矢板が備える丸太材によって前記親杭、前記補助杭及び前記連結部材の前面側を覆う第2横矢板設置工程と、を含む土留壁の施工方法。
A plurality of parent piles are inserted into the earth retaining wall construction ground at predetermined intervals,
A plurality of horizontal sheet piles installed between the adjacent parent piles,
A method for constructing an earth retaining wall comprising: a plurality of auxiliary piles inserted into the ground on the rear side from a side position of the parent pile and connected to the parent pile via a connecting member,
The horizontal sheet pile is
a first horizontal sheet pile whose longitudinal ends are supported by the parent pile;
a second horizontal sheet pile whose longitudinal ends are supported by the auxiliary pile or the connecting member,
The construction method of the earth retaining wall is as follows:
a parent pile insertion step of inserting the parent piles at predetermined intervals into the earth retaining wall construction ground;
an excavation step of excavating the earth retaining wall construction ground along the front side of the parent pile;
A first horizontal sheet pile installation step of installing the first horizontal sheet pile between the adjacent parent piles, and covering the front side of the parent pile with a log material included in the first horizontal sheet pile;
an auxiliary pile insertion step of inserting the auxiliary pile from a side position of the parent pile to the ground on the back side;
an auxiliary pile connecting step in which the auxiliary pile is connected to the parent pile via the connecting member;
installing the second horizontal sheet pile between the adjacent parent piles, and covering the front side of the parent pile, the auxiliary pile, and the connecting member with the log material included in the first horizontal sheet pile; Construction methods for retaining walls, including:
JP2022121558A 2022-07-29 2022-07-29 Earth retaining wall, and construction method of the same Pending JP2024018308A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022121558A JP2024018308A (en) 2022-07-29 2022-07-29 Earth retaining wall, and construction method of the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022121558A JP2024018308A (en) 2022-07-29 2022-07-29 Earth retaining wall, and construction method of the same

Publications (1)

Publication Number Publication Date
JP2024018308A true JP2024018308A (en) 2024-02-08

Family

ID=89807591

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022121558A Pending JP2024018308A (en) 2022-07-29 2022-07-29 Earth retaining wall, and construction method of the same

Country Status (1)

Country Link
JP (1) JP2024018308A (en)

Similar Documents

Publication Publication Date Title
US6416259B1 (en) Corner connection for temporary shoring
US5158398A (en) Method and apparatus for an excavation support system for trenches
JP2024018308A (en) Earth retaining wall, and construction method of the same
JP6434590B1 (en) Stabilization design method of laying box in open shield method
KR101273788B1 (en) The Construction Method of Shield Tunneling
KR102476068B1 (en) Retaining wall structure with multidirectional anchor fixtures and construction method thereof
CN115977111A (en) Environment-friendly foundation pit supporting structure with double rows of steel sheet piles of inclined front and straight back and construction method
JP6710999B2 (en) Temporary receiving method for existing structures
JP2022175684A (en) earth retaining wall
JP2022176041A (en) earth retaining wall
JP3353200B2 (en) Earth retaining method
JP4537358B2 (en) Connection method of concrete box
JP2022175685A (en) Earth retaining wall and construction method thereof
JP4394097B2 (en) Connection method of concrete box
KR101218825B1 (en) Method of land-side protection wall using bracing
JP4993132B2 (en) Foundation reinforcement method for existing structures
KR101736009B1 (en) Top-Down Construction Method For Underground Structure
JP3116098B2 (en) Construction method for underground structures
JP2860750B2 (en) Underground structure propulsion guide member and underground structure embedding method
JPS6038759Y2 (en) pipe panel
JP4598728B2 (en) Concrete box
JP7397933B1 (en) Earth retaining device for shallow excavation trenches
JP2613417B2 (en) Construction method of underground structure
JP7256911B1 (en) Yamadome method
KR102714426B1 (en) Temporary slab constructed at the top of a vertical sphere and construction method of ground concrete structure using the same