JP2023079536A - Construction management method, system, program, apparatus, and recording medium - Google Patents
Construction management method, system, program, apparatus, and recording medium Download PDFInfo
- Publication number
- JP2023079536A JP2023079536A JP2021193040A JP2021193040A JP2023079536A JP 2023079536 A JP2023079536 A JP 2023079536A JP 2021193040 A JP2021193040 A JP 2021193040A JP 2021193040 A JP2021193040 A JP 2021193040A JP 2023079536 A JP2023079536 A JP 2023079536A
- Authority
- JP
- Japan
- Prior art keywords
- information
- task
- management
- construction
- task management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009430 construction management Methods 0.000 title claims abstract description 110
- 238000000034 method Methods 0.000 title claims abstract description 83
- 238000007726 management method Methods 0.000 claims abstract description 308
- 238000012545 processing Methods 0.000 claims abstract description 97
- 230000010365 information processing Effects 0.000 claims abstract description 26
- 230000007704 transition Effects 0.000 claims abstract description 4
- 238000010276 construction Methods 0.000 claims description 74
- 230000008569 process Effects 0.000 claims description 61
- 238000003860 storage Methods 0.000 claims description 13
- 238000007689 inspection Methods 0.000 abstract description 107
- 230000006870 function Effects 0.000 abstract description 104
- 230000000737 periodic effect Effects 0.000 abstract description 14
- 230000008439 repair process Effects 0.000 abstract description 2
- 238000012423 maintenance Methods 0.000 description 69
- 238000012790 confirmation Methods 0.000 description 27
- 238000010586 diagram Methods 0.000 description 18
- 238000012544 monitoring process Methods 0.000 description 15
- 238000005516 engineering process Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 6
- 230000004044 response Effects 0.000 description 5
- 238000004891 communication Methods 0.000 description 4
- 238000004886 process control Methods 0.000 description 4
- 239000000284 extract Substances 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000003908 quality control method Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 230000001939 inductive effect Effects 0.000 description 2
- 239000004973 liquid crystal related substance Substances 0.000 description 2
- 238000005504 petroleum refining Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000012905 input function Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 235000021190 leftovers Nutrition 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000007670 refining Methods 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 238000011179 visual inspection Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
Abstract
Description
本開示は、たとえば石油精製プラントの定修工事や検査を含む工事計画などの管理を行う管理技術に関する。
The present disclosure relates to a management technique for managing construction plans including regular maintenance work and inspections of oil refining plants, for example.
熱交換システムを含む石油精製プラント設備における定修工事、もしくは定修工事に必要な準備工事がプラントを運用するオーナー会社から協力会社に発注される。斯かる定修工事ではプラントの運転を停止して実行するため、迅速な処理が必要である上、工事の進捗、定修後の検査などを含む安心・安全のための管理が不可欠である。 Regular maintenance work for petroleum refining plant facilities including heat exchange systems, or preparatory work necessary for regular maintenance work, is ordered from the owner company that operates the plant to the cooperating company. In such periodic maintenance work, the operation of the plant is stopped before it is executed, so prompt processing is required, and in addition, management for security and safety, including the progress of the construction work and inspections after the periodic maintenance, is essential.
保守点検などの進捗管理に関し、リスト作成要求を受けたリスト作成手段が確認事項データベースにある保守点検事項を選出してチェックリストを作成し、このチェックリストを端末装置に配信し、このチェックリストに従って実施した保守点検や測定事項などの確認事項について端末装置を通してサーバ装置に取り込んで確認事項データベースに記憶し、要求により端末装置に配信することが知られている(たとえば、特許文献1)。 Regarding progress management of maintenance and inspection, the list creation means that receives the list creation request selects the maintenance and inspection items in the check item database, creates a checklist, distributes this checklist to the terminal device, and follows this checklist. It is known that confirmation items such as performed maintenance inspections and measurement items are taken into a server device through a terminal device, stored in a confirmation item database, and distributed to the terminal device upon request (for example, Patent Document 1).
工事の進捗管理に関し、建設工事にあっては、記憶手段が複数の工程からなる工事計画、工事計画の進捗情報、人または重機を含むリソースの投入計画を蓄積し、実績情報取得手段が各工程の進捗率と、リソースの投入実績とを取得し、歩掛り検討手段がリソースの投入実績から換算される実績歩掛りとリソースの投入計画から換算される計画歩掛りとを比較して工事の今後の歩掛りを決定し、仕事量算出手段が今後の歩掛りに基づいて残り物量や作業量を算出することが知られている(たとえば、特許文献2)。 Regarding construction progress management, in construction work, the storage means accumulates a construction plan consisting of a plurality of processes, progress information on the construction plan, and resource input plans including people and heavy machinery, and the actual information acquisition means accumulates each process. The progress rate and the resource input result are acquired, and the rate review means compares the actual rate converted from the resource input result and the planned rate converted from the resource input plan, and determines the future rate of construction. It is known that the amount of work is determined and the amount of work calculation means calculates the amount of leftovers and the amount of work based on the future commission (for example, Patent Document 2).
建設工事の進捗管理に関し、工事計画支援システムと、検査予定に関するデータを蓄積する検査予定データベース、検査予定と実績を統合した検査進捗データを蓄積する検査予実データベースとを有し、検査の進捗状況を工事進捗の物量に換算した工事進捗データを、工事計画支援システムに伝送する進捗確認システムとを組み合わせ、区画別工程と前事進捗データを統合させ、工事進捗を表すチャート稲妻表示を付した工程表を表示することが知られている(たとえば、特許文献3)。 Regarding the progress management of construction work, we have a construction plan support system, an inspection schedule database that accumulates data related to inspection schedules, and an inspection schedule actual database that accumulates inspection progress data that integrates inspection schedules and actual results. Combined with a progress confirmation system that transmits construction progress data converted to physical quantity of construction progress to the construction plan support system, integrates the process by section and preliminary progress data, and charts showing construction progress A process chart with a lightning bolt display. is known (for example, Patent Document 3).
石油精製プラントに含まれる熱交換システムの定修工事等では、発注者がプラントを運用するオーナー会社、その受注者が工事処理およびその管理を請け負う協力会社である。定修工事の対象が熱交換システムであれば、そのシステムには仕様が異なるなどの複数の熱交換器の他、多数の併設機器が含まれる。定修工事は熱交換システムを停止して行うことから、その停止期間を最小化するための工事期間が求められる。その他、システム仕様、定修のためのコストなどの要素も検討事項として加わる。 In regular maintenance work of a heat exchange system included in a petroleum refining plant, the orderer is the owner company that operates the plant, and the contractor is the cooperating company that undertakes construction processing and management. If the target of regular maintenance work is a heat exchange system, the system includes multiple heat exchangers with different specifications, as well as a large number of parallel devices. Since turnaround work is carried out with the heat exchange system stopped, a construction period is required to minimize the period of stoppage. In addition, factors such as system specifications and costs for regular maintenance are added as considerations.
定修工事の発注者においては、その進捗管理に加え、その進捗に応じた検査などが主要な処理事項である。これに対し、受注者は、発注者のコンセプト、定修対象であるシステムの全体像を把握し、定修計画を策定して工事処理を実行し、発注者の検査を随時に受けて定修工事を完了することが求められる。
定修工事には工事の進捗、報告、検査許可、確認などの複数の工程が存在する。たとえば、ひとつの機器の定修工事が完了すれば、その完了の報告を受けた受注者から検査許可を受け、その検査結果が基準を満たすなど、合格域に達しなければ、次の工程に進むことができない。これは安全面からすれば優れた管理であるが、発注者の検査担当に工事の進捗が委ねられるなどの課題もある。発注者と受注者との間での情報共有が不可欠であるが、これが不十分であると、検査機器の位置の探索などのベーシックな点で工程間の時間的ロスを誘発するという課題がある。
For the orderer of regular maintenance work, in addition to the progress management, inspections according to the progress are major items to be handled. In response to this, the contractor grasps the concept of the ordering party and the overall picture of the system that is subject to periodic maintenance, formulates a periodic maintenance plan, executes the construction process, and undergoes periodic inspections by the ordering party at any time. Construction is required to be completed.
Regular maintenance work includes multiple processes such as progress of construction, reporting, permission for inspection, and confirmation. For example, when regular maintenance work for one piece of equipment is completed, inspection permission is obtained from the contractor who received the completion report. I can't. This is excellent management from a safety point of view, but there are also issues such as entrusting the progress of construction to the person in charge of inspection by the ordering party. Information sharing between the ordering party and the contractor is essential, but if this is insufficient, there is a problem of inducing time loss between processes in basic points such as searching for the location of inspection equipment. .
定修工事の管理では、たとえば工程、進捗状況、工事の品質などの管理種別があり、これらについてそれぞれ作成した管理シートを利用している。そのため1の作業項目に対する管理を行う場合でも、管理種別ごとの管理シートを探し出し、それぞれに同一または関連する事項を記入する必要があった。また、このように別々に作成された管理シートに対して関連付けを行うには手作業で多数の工程を経る必要がある。石油生成プラントにある多数の設備や機器もしくは管理箇所ごとに管理シートが用いられるため、これらの関連性の探索や設定には膨大な労力が必要となる。
また定修工事の管理には、多数の作業項目があるため、複数の管理シートの読み出しにおいて人為的なミスが生じる可能性が高くなるという課題がある。
そして、工事者や管理者が工事の進捗などのステータス情報の他、工事の進捗に関して確認に手間取ると、工事を遅延化させてしまうという課題がある。
In the management of regular maintenance work, for example, there are management types such as process, progress, and construction quality, and management sheets created for each of these are used. Therefore, even when managing one work item, it is necessary to find a management sheet for each management type and enter the same or related items in each sheet. In addition, it is necessary to manually go through a large number of steps to associate the separately created management sheets. Since a management sheet is used for each of a large number of facilities and devices in the petroleum production plant or for each management point, an enormous amount of labor is required to search for and set relationships between these.
In addition, since there are many work items in the management of regular maintenance work, there is a problem that there is a high possibility that human error will occur in reading multiple management sheets.
In addition, if the construction worker or manager takes time to check the status information such as the progress of the construction work as well as the progress of the construction work, there is a problem of delaying the construction work.
斯かる課題について、特許文献1ないし特許文献3に開示された構成では本開示が提示する課題を解決することはできない。
With respect to such problems, the structures disclosed in
本開示の発明者は、熱交換システムなどの定修工事の管理に関し、複数の管理機能の間でタスクごとの実績情報を共有させることで、進捗管理などの負荷の軽減、定修の時間短縮とともに、信頼性を高めることができるとの知見を得た。 The inventor of the present disclosure relates to the management of regular maintenance work such as a heat exchange system, and by sharing performance information for each task among multiple management functions, it is possible to reduce the load such as progress management and shorten the time required for regular maintenance. In addition, the knowledge that the reliability can be improved was obtained.
そこで、本開示の目的は、上記課題及び上記知見に鑑み、定修工事や検査などの効率化とともに作業品質の向上を図ることにある。
Therefore, in view of the above problems and findings, an object of the present disclosure is to improve the efficiency of regular maintenance work, inspections, and the like, and to improve work quality.
上記目的を達成するため、本開示の工事管理方法の一側面は、コンピュータを用いた工事管理方法であって、情報処理部が、データベースに記録されたタスク情報を利用して、管理機能で特定した二以上のタスク管理テーブルを作成する工程と、情報入力部が、特定の前記タスク管理テーブルにタスクごとの実績情報を入力する工程と、前記情報処理部が、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる工程と、情報提示部が、前記実績情報の変遷を表す前記タスク管理テーブルの何れかまたは二以上を提示する工程とを含む。 In order to achieve the above object, one aspect of the construction management method of the present disclosure is a construction management method using a computer, in which an information processing unit uses task information recorded in a database to specify a task specified by a management function. an information input unit inputting performance information for each task into the specific task management table; and an information processing unit acquiring the including a step of reflecting performance information in one or more of the other task management tables; and a step of an information presenting unit presenting one or more of the task management tables representing changes in the performance information. .
この工事管理方法において、前記情報処理部は、前記タスク管理テーブルに対する少なくとも閲覧、入力、改定の処理を許可する権限を設定し、該権限と管理者の階級情報とを関連付ける工程を含む。 In this construction management method, the information processing section includes a step of setting authority for permitting at least viewing, inputting, and revision processing for the task management table, and associating the authority with manager's rank information.
この工事管理方法において、前記情報処理部が、特定の前記タスク管理テーブル内のタスク情報に関連付けられた他の前記タスク管理テーブル内のタスク情報に対し、前記実績情報または前記実績情報に基づいて生成された情報を入力する工程を含む。 In this construction management method, the information processing unit generates the task information in the other task management table associated with the task information in the specific task management table based on the performance information or the performance information. entering the information provided.
上記目的を達成するため、本開示の工事管理システムの一側面は、二以上のタスク情報が格納されたデータベースと、前記データベースに記録されたタスク情報を利用して、管理機能で特定した二以上のタスク管理テーブルを作成する情報処理部と、特定の前記タスク管理テーブルにタスクごとの実績情報を入力する情報入力部とを備え、前記情報処理部が、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる。
この工事管理システムにおいて、さらに、前記情報処理部が、前記タスク管理テーブルに対する少なくとも閲覧、入力、改定を許可する権限を設定し、該権限と管理者の階級とを関連付ける。
In order to achieve the above object, one aspect of the construction management system of the present disclosure is a database storing two or more pieces of task information, and using the task information recorded in the database, the two or more pieces specified by the management function and an information input unit for inputting performance information for each task into the specific task management table, wherein the information processing unit receives the performance information acquired from the information input unit is reflected in one or more of the other task management tables.
In this construction management system, the information processing section further sets authority to permit at least viewing, inputting, and revision of the task management table, and associates the authority with the rank of the manager.
この工事管理システムにおいて、さらに、前記実績情報の変遷を表す前記タスク管理テーブルの何れかまたは二以上を提示する情報提示部を備える。 This construction management system further includes an information presenting unit that presents one or more of the task management tables representing changes in the performance information.
上記目的を達成するため、本開示のプログラムの一側面は、コンピュータによって実行されるプログラムであって、データベースに記録されたタスク情報を利用して、管理機能で特定した二以上のタスク管理テーブルを作成する機能と、情報入力部により入力された特定の前記タスク管理テーブルにタスクごとの実績情報を取得する機能と、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる機能と、前記実績情報の変遷を表す前記タスク管理テーブルの何れかまたは二以上を情報提示部に提示する機能とを前記コンピュータに実行させる。 In order to achieve the above object, one aspect of the program of the present disclosure is a program executed by a computer, which uses task information recorded in a database to create two or more task management tables specified by the management function. a function to acquire performance information for each task in the specific task management table input by the information input unit; and a function to store the performance information acquired from the information input unit in any of the other task management tables Alternatively, the computer is caused to execute a function of reflecting on two or more and a function of presenting one or more of the task management tables representing changes in the performance information to the information presenting unit.
このプログラムにおいて、前記タスク管理テーブルに対する少なくとも閲覧、入力、改定の処理を許可する権限を設定し、該権限と管理者の階級情報とを関連付ける機能を前記コンピュータに実行させる。 This program causes the computer to execute a function of setting authority for permitting at least viewing, inputting, and revision processing for the task management table, and associating the authority with manager's rank information.
このプログラムにおいて、特定の前記タスク管理テーブル内のタスク情報に関連付けられた他の前記タスク管理テーブル内のタスク情報を読み出す機能と、前記実績情報を読み出し、または前記実績情報に基づいて入力情報を生成する機能と、他の前記タスク管理テーブルに対して前記実績情報または前記入力情報を入力する機能とを前記コンピュータに実行させる。 In this program, a function of reading task information in other task management tables associated with task information in a specific task management table, and reading the performance information or generating input information based on the performance information and a function of inputting the performance information or the input information to the other task management table.
上記目的を達成するため、本開示の工事管理装置の一側面は、コンピュータにより工事を管理する工事管理装置であって、装置筐体と、二以上のタスク情報が格納されたデータベースを備える記憶部と、前記データベースに記録されたタスク情報を利用して、管理機能で特定した二以上のタスク管理テーブルを作成する情報処理部と、特定の前記タスク管理テーブルにタスクごとの実績情報を入力する情報入力部とを備え、前記情報処理部が、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる。 In order to achieve the above object, one aspect of the construction management device of the present disclosure is a construction management device that manages construction work using a computer, and includes a device housing and a storage unit that includes a database that stores two or more pieces of task information. an information processing unit that uses the task information recorded in the database to create two or more task management tables specified by the management function; and information that inputs performance information for each task into the specified task management table. an input unit, wherein the information processing unit reflects the performance information acquired from the information input unit in one or more of the other task management tables.
上記目的を達成するため、本開示の記録媒体の一側面によれば、上記の工事管理方法に含まれる前記データベースおよび前記タスク管理テーブル、上記工事管理システムに含まれる前記データベースおよび前記タスク管理テーブル、上記プログラムの何れかまたは二以上を格納している。
To achieve the above object, according to one aspect of the recording medium of the present disclosure, the database and the task management table included in the construction management method, the database and the task management table included in the construction management system, Any one or two or more of the above programs are stored.
本発明によれば、次のような効果が得られる。 ADVANTAGE OF THE INVENTION According to this invention, the following effects are acquired.
(1) 自動生成した管理機能ごとのタスク管理テーブル間において、特定のタスク管理テーブルに対して入力した実績情報を他のタスク管理テーブルに反映させることで、情報入力の作業負荷が軽減でき、プラントの定修工事や検査のタスク間の時間ロスの解消、作業の効率化を図ることができる。 (1) Between the automatically generated task management tables for each management function, by reflecting the performance information entered for a specific task management table in other task management tables, the information input work load can be reduced and the plant It is possible to eliminate time loss between regular maintenance work and inspection tasks and improve work efficiency.
(2) 1つのタスクの管理結果を関連付けられたタスク管理テーブル間に自動で反映させることで、タスク管理テーブルの探索処理や入力対象の確認作業負荷などを軽減できる。 (2) By automatically reflecting the management results of one task between the associated task management tables, it is possible to reduce the workload of searching the task management tables and checking the input targets.
(3) 定修工事や検査の準備に要する時間を短縮でき、工程における進捗情報などの把握が容易になり、その迅速化によって工事および検査の作業品質を高めることができる。
(3) The time required for regular maintenance work and preparation for inspection can be shortened, making it easier to grasp progress information in the process, and the speed up can improve the work quality of construction and inspection.
〔第1の実施形態〕
図1は、第1の実施形態に係る工事管理システムの構成例を示している。図1に示す構成は一例であり、本開示の技術は斯かる構成に限定されない。
[First embodiment]
FIG. 1 shows a configuration example of a construction management system according to the first embodiment. The configuration shown in FIG. 1 is an example, and the technology of the present disclosure is not limited to such a configuration.
この工事管理システム2は、たとえば石油精製プラントに設置される熱交換システムの定修工事などにおいて、検査前の工事や検査処理、その後の復旧処理などの工程、進捗、検査結果の記録などの管理に用いる帳票類の生成や、工事や検査などを実行する管理者への通知機能を備える。またこの工事管理システム2は、生成された複数の帳票類間の関連するタスクに対し、管理者によって入力された工事の進捗や検査結果などの実績情報を自動的に反映させる機能を備える。これらの帳票類の生成処理や実績情報の反映処理、管理者間での情報共有管理処理は、管理サーバ4を構成するコンピュータによって実行される。この工事管理システム2は、たとえば図1に示すように、管理サーバ4と情報端末6がネットワーク8を利用して通信し、工事管理処理に必要な入力情報と管理情報などの通知情報のやりとりを行っている。
This
<管理サーバ4>
管理サーバ4は、本開示の工事管理装置の一例であり、定修工事やプラント設備の検査処理などに用いる複数の管理テーブルを生成するとともに、これらの管理テーブル間で工事情報や検査情報などを含む実績情報の反映処理を行う装置である。この管理サーバ4は、プロセッサやメモリ、入出力部(I/O)、通信部などを備えたコンピュータであって、たとえば処理部10や記憶部12、情報入力部14、情報提示部16が構成されている。
プロセッサは、メモリに格納されたOS(Operating System)や工事管理プログラムなど、各種プログラムの演算処理を実行する機能部であり、処理部10を構成する。
メモリは、ROM(Read-Only Memory)、RAM(Random-Access Memory)などの記憶素子で構成されており、本開示の記録媒体の一例である。メモリは、たとえばOSや工事管理プログラムなどの演算処理を行うワークエリアが構成されるほか、生成するテーブルやデータベースなどを格納する記憶部12が構成される。
入出力部(I/O)は、情報入力部14や情報提示部16が接続され、プロセッサの制御により管理サーバ4への入力情報の取込みや情報の出力を行うインターフェースである。
通信部は、プロセッサの制御により情報端末6との通信や、図示しない情報源との通信を行う。この通信は無線または有線の何れであってもよい。
<
The
The processor is a functional unit that executes arithmetic processing of various programs such as an OS (Operating System) and a construction management program stored in the memory, and constitutes the
The memory is composed of storage elements such as ROM (Read-Only Memory) and RAM (Random-Access Memory), and is an example of the recording medium of the present disclosure. The memory includes, for example, a work area for performing arithmetic processing such as an OS and a construction management program, and also includes a
The input/output unit (I/O) is an interface to which the
The communication unit communicates with the
処理部10は、たとえば工事管理プログラムの演算処理により、管理テーブルの自動生成処理を行うテーブル生成機能部20と、情報端末6を通じて入力される情報を特定の管理テーブル内に格納するとともに、この情報を関連する管理テーブルに反映させる機能を含む工事管理機能部22が構成される。
記憶部12には、たとえば定修工事や検査の工程やその項目を表すタスク情報が格納されたタスク情報データベース(DB)24や、テーブル生成機能部20で生成され、工事や検査の進捗や品質などをタスク情報ごとに管理するタスク管理テーブル26が格納される。
The
The
情報入力部14は、管理サーバ4に対して直接または情報端末6を介して入力する情報、管理者のID番号などの認証情報を入力する手段の一例であり、たとえばキーボードやタッチパネルなどの操作手段や情報端末6と通信する機能部を含む。
情報提示部16は、工事管理の進捗や結果情報などの表示やタスク管理テーブル26などの通知情報を表示する手段の一例であり、たとえばLCD(Liquid Crystal Display)などの情報提示機器を構成する。
The
The
<情報端末6>
情報端末6は割り当てられた機能を以て、第1の端末30と複数の第2の端末32(=作業者端末32-1、32-2、・・・、32-m)とに分類できる。この情報端末6には、たとえば携帯電話機やモバイルPC(Personal Computer)、その他、検査作業に利用する専用端末装置などが含まれる。第1の端末30は工事の品質管理や検査処理を担当する第1の管理者に割り当てられ、第2の端末32は工事の施工を担当する第2の管理者に割り当てられる。これらの管理者はたとえば、プラントオーナーや定修工事や検査を担当する協力会社にあって、その管理権限を有する企業、人などである。
<
The
第1の端末30は、処理部302、情報提示部304、情報入力部306などを装置筐体内に備える。処理部302はプロセッサ、記憶部および入出力部を備え、管理サーバ4と連係して記憶部にあるOSや工事管理プログラムを実行する。情報提示部304は、管理サーバ4から通知されたタスク管理テーブル26などの通知情報を表示させる液晶モニタなどを備える。情報入力部306は、キーボードやマウスなどの他、タッチセンサなどを含む。
The
第2の端末32には、たとえば処理部322、情報入力・提示部324などを装置筐体内に備える。処理部322はプロセッサ、記憶部および入出力部を備え、管理サーバ4と連係して記憶部にあるOSや工事管理プログラムを実行する。情報入力・提示部324は情報選択などの情報入力や情報提示に用いられる。情報入力・提示部324の画面部には第1の端末30と同様に、工事・検査に関わる通知情報などが表示される。
The
<ネットワーク8>
ネットワーク8は、たとえば有線または無線により管理サーバ4と管理者の情報端末6との間でデータ通信させる手段の一例である。このネットワーク8は、たとえば公衆回線を利用してもよく、またはプラント内のみでアクセス可能に制限されたプライベート回線などを利用すればよい。
<
The
<テーブル生成機能部について>
図2は、テーブル生成機能部の構成例を示している。
テーブル生成機能部20は、たとえば図2に示すように、タスク情報DB24に格納されたタスク情報を利用して、設定された管理機能ごとにタスク管理テーブル26を生成する。この工事管理処理では、たとえば4つの管理機能について、4つのタスク管理テーブル(I~IV)26-1、26-2、26-3、26-4を生成する。タスク管理テーブル26は、プラント設備にある機器、または機器を構成する部品もしくは機能構成部など、工事の管理対象ごとにそれぞれ生成される。
タスク情報は、たとえば脚場組立や保温解体、防食塗装、補修など、定修工事において行う作業工程や、プラント設備の検査処理項目などであり、工事や検査の開始や完了、進捗状況などのチェックを行う管理項目の一例である。
<Regarding the table generation function part>
FIG. 2 shows a configuration example of the table generation function unit.
For example, as shown in FIG. 2, the table
Task information includes, for example, work processes to be performed in regular maintenance work, such as scaffolding assembly, thermal insulation dismantling, anti-corrosion coating, and repairs, and inspection processing items for plant equipment. This is an example of a management item for performing
タスク情報DB24は、定修工事や検査で行う全てのタスク情報が格納されるとともに、タスク情報に対して対応する機器情報、管理機能情報などが関連付けられて格納されている。そしてタスク管理テーブル26の作成処理において、テーブル生成機能部20は、たとえば入力もしくは設定された機器情報および管理機能情報に関連するタスク情報を読み出し、その情報を各タスク管理テーブル26に格納していく。
The
なお、ここでは、4つの管理機能について、対応するタスク管理テーブル(I~IV)26-1、26-2、26-3、26-4が生成される場合を示したがこれに限らない。管理機能は、プラント設備ごとに設定してもよく、またはプラントオーナーや工事の施工会社が任意に設定するほか、法律の規定などに基づいて義務化された工事や検査内容に基づいて管理機能の数を設定すればよい。
そのほか、テーブル生成機能部20には、たとえば図示しないタスク情報テーブルやタスク情報の選択処理に利用する実行タスク選択テーブルを備えてもよい。このタスク情報テーブルは、たとえば実行するタスク情報が管理機能ごとに収集されており、タスク管理テーブル26の自動生成に利用するデータテーブルの一例である。
実行タスク選択テーブルは、タスク情報テーブルに格納されたタスク情報に対して、機器ごとにタスク情報を選択させるテーブルの一例である。
It should be noted that although the case where the corresponding task management tables (I to IV) 26-1, 26-2, 26-3, and 26-4 are generated for the four management functions is shown here, the present invention is not limited to this. The management function may be set for each plant facility, or may be set arbitrarily by the plant owner or the construction company. You can set the number.
In addition, the table
The execution task selection table is an example of a table for selecting task information for each device from the task information stored in the task information table.
<工事管理機能部について>
図3は、工事管理機能部による実績情報の反映機能を示している。図3に示すタスク管理テーブルの数や実績情報の内容および反映先情報などは一例である。
工事管理機能部22は、定修工事や検査において生じる実績情報について情報を共有させる機能を備える。この工事管理処理では、たとえば図3に示すように、工事管理処理の対象として、特定の機器について設定された4つのタスク管理テーブル(I~IV)26-11、26-21、26-31、26-41間で実績情報を反映させる状態を示している。
各タスク管理テーブル(I~IV)26-11、26-21、26-31、26-41には、たとえばタスク情報に対して入力された実績情報について、反映先を示す指示情報が設定されている。この指示情報は、テーブル生成機能部20に予め設定されるほか、タスク情報に設定されてもよい。
<About the construction management function department>
FIG. 3 shows the performance information reflecting function by the construction management function unit. The number of task management tables, the contents of performance information, the reflection destination information, and the like shown in FIG. 3 are examples.
The construction
In each of the task management tables (I to IV) 26-11, 26-21, 26-31, and 26-41, for example, instruction information indicating where to reflect performance information input for task information is set. there is This instruction information is preset in the table
工事管理機能部22は、たとえば設定された指示情報に基づき、タスク管理テーブルI26-11に対して入力された実績情報である検査・許可情報をタスク管理テーブル(II~IV)26-21、26-31、26-41のいずれか、または全部に反映させる。また工事管理機能部22は、たとえばタスク管理テーブルIV26-41に対して入力された実績情報である工事情報をタスク管理テーブル(I~III)26-11、26-21、26-31のいずれか、または全部に反映させる。
For example, based on the set instruction information, the construction
<管理者の権限情報について>
図4は、管理者の認証処理および権限情報の付与について示している。図4に示す構成は一例である。
この工事管理システム2では、たとえばプラント施設の敷地内の入場時などに名前や所属会社名などのID(Identification)の入力や身分証などの提示により認証処理を行うとともに、定修工事や検査の対象機器もしくは対象機能部においても認証処理を行う。この認証処理では、管理者が定修工事や検査などの実施を行える者か、タスク管理テーブル26に対して実績情報の入力を行う権限を有する者かの判断を行う。
<Regarding administrator authority information>
FIG. 4 shows administrator authentication processing and granting of authority information. The configuration shown in FIG. 4 is an example.
In this
作業対象の機器34には、たとえば図4Aに示すように、機器34の筐体などに直接またはその付近にIDタグ36が設置されている。このIDタグ36は、たとえば二次元コードなどで構成されており、端末32のカメラなどで読み取ることで、管理サーバ4や図示しないデータベースなどにアクセスして、機器情報やこの機器情報に関連付けられた作業情報などを取得可能になっている。
工事管理機能部22では、たとえばIDタグ36を読み取った端末32が管理サーバ4にアクセスすると、端末32に格納された管理者のID情報などを参照するほか、あらためて管理者に対して認証に必要な情報を入力させる。そして工事管理機能部22は、たとえば認証処理が完了すると、管理者の階級に応じた権限を付与する。この権限の付与では、たとえば図4Bに示すように権限テーブル38を利用すればよい。この権限テーブル38には、たとえば認証した管理者の階級情報と工事管理処理の権限情報が関係付けられている。この権限情報は、たとえば少なくとも定修工事や検査において実行可能な処理の範囲やタスク管理テーブル26に対して実績情報の入力が可能か否かを表している。
For example, as shown in FIG. 4A, an
For example, when the terminal 32 that has read the
次に、定修工事や検査において利用される機能ごとのタスク管理テーブルの構成について説明する。 Next, the configuration of the task management table for each function used in regular maintenance work and inspection will be described.
<タスク管理テーブルI>
図5は、タスク管理テーブルIの構成例を示している。図5に示す構成は一例である。
このタスク管理テーブルIは、たとえば検査の進捗状態の管理に用いられる検査進捗管理表の一例であり、機器やプラント設備ごとに複数のデータ26-11、26-12、・・・26-1Nを備える。タスク管理テーブルIには、たとえばタスク情報部40、装置名部41、反映部42、工事情報部43、管理情報入力部44、完了監視部45、権限部46が含まれる。
<Task management table I>
FIG. 5 shows a configuration example of the task management table I. As shown in FIG. The configuration shown in FIG. 5 is an example.
This task management table I is an example of an inspection progress management table used for managing the progress of inspection, for example, and a plurality of data 26-11, 26-12, . . . Prepare. The task management table I includes, for example, a
タスク情報部40は、検査対象となる1または複数のタスク情報が格納される領域である。このタスク情報部40には、たとえば検査を行う工程順序で、タスク情報B2、B3、「前検査」、C1、D1・・・などが並べて配置されている。さらにタスク情報部40には、たとえばタスク情報を分類する分類情報が設定されてもよい。
The
装置名部41には、検査進捗管理の対象となる機器の装置名が格納される。
反映部42には、同一の装置に対して生成された他のタスク管理テーブルII、III、IVとの間で入力情報を相互に連動させるか否かを設定指示する情報が格納される。反映部42は、たとえばII、III、IVに対して「○」が設定されることで、検査進捗管理の判断結果や日付情報などを他のタスク管理テーブルII、III、IVに反映させる。
工事情報部43は、管理者により管理サーバ4の情報入力部14や各情報端末6の入力機能を利用して、テキスト情報や写真などのデータを入力可能な領域となっている。この工事情報部43には、たとえば定修工事における具体的な作業内容や検査の手順や注意点などのほか、機器特有の伝達情報などが格納されればよい。
The
The
The
管理情報入力部44は、設定されたタスク情報に対し、その進捗状況やタスクが完了したか否か、その日付などの情報が格納される領域である。この管理情報入力部44は、たとえばタスク情報ごとに、他のタスク管理テーブルII、III、IVから実績情報が反映される部分については、「空白」となっており、実績情報を直接入力する部分についてはチェックボックスなどが設定されればよい。
The management
完了監視部45は、タスク管理テーブルIに設定された全てもしくは所定数のタスク情報の処理が完了したか否かについて、管理者によるチェック結果が入力される領域である。
権限部46は、タスクの完了判断や、管理情報入力部44および完了監視部45に対するチェック結果の入力処理を行える担当者に必要な権限情報が設定される。工事管理処理では、たとえばタスク管理テーブルIに対する情報入力において、その担当者が必要な権限を有していない場合には、入力情報の無効化もしくは情報の入力を禁止する処理を実行すればよい。
The
The
<タスク管理テーブルII>
図6は、タスク管理テーブルIIの構成例を示している。
このタスク管理テーブルII26-2は、たとえば定修工事や検査処理の作業予定の管理に用いる工程表であって、機器やプラント設備ごとに複数のデータ26-21、26-22、・・・26-2Nが含まれる。タスク管理テーブルIIには、たとえば日付部50、装置名部51、分類部52、タスク情報部53、工程管理部54が含まれる。
<Task management table II>
FIG. 6 shows a configuration example of the task management table II.
This task management table II 26-2 is a process chart used, for example, for managing work schedules such as regular maintenance work and inspection processing, and includes a plurality of data 26-21, 26-22, . -2N is included. The task management table II includes, for example, a
日付部50は、定修工事や検査を行うカレンダー情報が設定されており、たとえば月日の記入枠を備える。
装置名部51は、監視対象の装置名を設定する領域である。
分類部52は、タスク情報の分類情報が格納される領域の一例であり、定修工事や検査の段階を示す情報が含まれる。
The
The
The
タスク情報部53は、定修工事や検査の工程情報が格納される領域である。このタスク情報部53には、たとえば設定された順序を維持しつつ、処理内容に基づいて同時に実行可能なタスク情報を縦方向に配列するように調整処理が行われてもよい。
工程管理部54は、タスク情報部53に配列されたタスク情報に対して設定される処理の実行スケジュールについて、日ごと、または半日ごとの工程がカレンダー情報に表示される。この工程管理部54は、日数を表す枠内にタスク情報を表示する場合を示したが、斯かる表示状態に限らない。タスク管理テーブルIIでは、たとえばタスク情報部53のタスク情報を色分けや模様分けをするとともに、各タスク情報に対応した工程管理部54の枠内に同一の色や模様を付して表示してもよい。また工程管理部54には、工程およびカレンダー情報に沿って情報入力エリア55を備える。斯かる情報入力エリア55は、作業工程の実績情報として、工程開始日や完了日、進捗状況などが記入可能となっている。
The
The
<タスク管理テーブルIII>
図7は、タスク管理テーブルIIIの構成例を示している。
このタスク管理テーブルIII26-3は、たとえば定修工事や検査処理の日毎の工程情報を通知するとともにその作業結果を格納して作業の進捗状況などを管理する日報の一例であって、機器やプラント設備ごとに複数のデータ26-31、26-32、・・・26-3Nで構成される。タスク管理テーブルIIIには、たとえばヘッダー部60、装置名部61、タスク情報部62、管理情報部63を備える。
<Task Management Table III>
FIG. 7 shows a configuration example of the task management table III.
This task management table III26-3 is an example of a daily report that notifies, for example, daily process information of regular maintenance work and inspection processing, stores the work results, and manages the progress of the work. Each facility is composed of a plurality of data 26-31, 26-32, . . . 26-3N. The task management table III includes a
ヘッダー部60は、日報の見出し情報を格納する領域であって、たとえば管理者もしくは日報に情報入力を行う担当者情報や日付情報、日報に表示される情報の説明などが含まれる。
装置名部61は、監視対象の装置名が格納される領域である。
タスク情報部62は、定修工事や検査の工程情報、タスクの分類情報が格納される領域である。
管理情報部63は、タスク情報の進捗状況を格納する領域であり、管理者により予定情報として工事結果や検査結果の情報、完了日のほか、プラントオーナーからの着工許可情報などが格納される。予定情報には、たとえば工程の開始である「新規」、工程の進行中である「継続」、工程の終了である「完了」について、それぞれ符号が割当てられている。
The
The
The
The
<タスク管理テーブルIV>
図8は、タスク管理テーブルIVの構成例を示している。
このタスク管理テーブルIV26-4は、たとえば定修工事や検査処理の監視結果を格納する工事品質管理表であって、機器やプラント設備ごとに複数のデータ26-41、26-42、・・・26-4Nが含まれる。タスク管理テーブルIVには、たとえば分類部70、タスク情報部71、確認内容部72、検査内容部73、開始情報部74、監視結果部75、権限部76を備える。
<Task Management Table IV>
FIG. 8 shows a configuration example of the task management table IV.
This task management table IV26-4 is a construction quality management table that stores, for example, monitoring results of regular maintenance work and inspection processing, and includes a plurality of data 26-41, 26-42, . 26-4N included. The task management table IV includes, for example, a
分類部70は、タスク情報の分類情報が格納される領域の一例であり、定修工事や検査の段階を示す情報が含まれる。
タスク情報部71は、定修工事や検査の工程情報が格納される領域である。
確認内容部72は、定修工事、検査での処理内容や注意事項などを記入可能な情報伝達領域である。この確認内容部72には、たとえば管理者が作業の担当者に対して与える指示内容や、過去の定修工事、検査での指摘事項などのテキスト情報が格納される。
The
The
The
検査内容部73は、検査処理における実行手段を指定する指示情報が格納される。この指示情報には、たとえば管理者が直接見る、もしくは情報端末6のカメラを起動させ、撮影した画像を確認するなどの指示である「目視」や、報告書などで確認する「書類」などが含まれる。また検査内容部73の情報は、たとえばタスク管理テーブルIVを読み込んだ情報端末6への指示情報が含まれており、「目視」の情報である場合に、自動的にカメラアプリケーションを起動させてもよい。
開始情報部74は、定修工事、検査の着工開始日などを格納する領域であり、チェックした日付情報が格納されるほか、担当者や管理者の社名などが記録されてもよい。
監視結果部75は、定修工事、検査のチェック結果を格納する領域である。この監視結果部75には、たとえば管理者が直接入力するものや、他のタスク管理テーブルI、II、IIIに入力された情報が反映するものがある。
権限部76は、タスクの完了判断や、監視結果部75に対するチェック結果の入力処理を行える担当者の権限情報が設定される。工事管理処理では、たとえばタスク管理テーブルIVに対する情報入力において、その担当者が必要な権限を有していない場合には、入力情報の無効化もしくは情報入力を禁止する処理を実行すればよい。
The
The
The
The
<実績情報の入力>
図9は、実績情報の入力および他のタスク管理テーブルへの反映状態を示している。図9に示す処理内容は一例である。
ここでは、特定の工程における品質チェックおよび完了の実績情報をタスク管理テーブルIVに入力する場合を示している。
工事管理機能部22は、たとえば定修工事の施工およびタスク情報ごとの品質確認および完了確認を行う管理者が第2の端末32を通じてアクセスしてくると、タスク管理テーブルIVを通知して、タスク情報ごとの情報入力を可能にする。タスク管理テーブルIVには、たとえば図9Aに示すように、タスク情報ごとに開始情報部74に工事の着工開始日が入力されるとともに、監視結果部75に工事の品質確認の完了を表す情報や日付などの実績情報RA、RBなどが入力される。この定修工事に対する品質管理処理は、設定されているタスク情報順に実行されており、1のタスク情報に対する工事や検査が完了すると次のタスク情報に移行していく。
また品質確認では、タスク情報ごとに、検査内容部73の指示情報80を読み出し、この指定された内容で監視処理を行う。ここでは、「目視」の指示に基づき、管理者が肉眼で品質確認するとともに、第2の端末32のカメラを起動させて機器またはその機能部などの監視対象の画像を記録する。
<Enter performance information>
FIG. 9 shows how performance information is input and how it is reflected in other task management tables. The processing content shown in FIG. 9 is an example.
Here, a case is shown in which quality check and completion record information in a specific process are input to the task management table IV.
The construction
In the quality check, the
工事管理機能部22は、たとえばタスク管理テーブルIVに入力された品質確認の実績情報RAやRBなどを読み出すとともに、予め設定された反映先の指示情報に基づいて工事の工程を管理するタスク管理テーブルIIを読み出す。そして工事管理機能部22は、たとえば図9Bに示すように、取得した実績情報RAやRBを解析し、期間情報を棒グラフ状で表す実績情報を生成して、情報入力エリア55に反映させる。この期間情報は、たとえばタスク情報ごとの品質管理で入力した着工開始日と実績情報RA、RBの完了日を利用して生成すればよい。さらに工事管理機能部22は、実績情報RA、RBに基づく期間情報を反映させると、カレンダー機能などの日付もしくは曜日情報を利用して、同日もしくは同じ曜日に実行予定の次のタスク情報同士を連結して示す、所謂稲妻線81を生成して表示してもよい。
The construction
また工事管理機能部22は、たとえば予め設定された反映先の指示情報に基づき、作業の進捗状況などの管理に利用するタスク管理テーブルIIIを読み出し、品質確認の実績情報RA、RBを反映させる。工事管理機能部22は、たとえば図9Cに示すように、タスク情報部62に設定されたタスク情報を参照し、取得した実績情報RA、RBなどを管理情報部63に入力する。
Further, the construction
品質確認の実績情報RA、RBには、日付情報とともに検査内容部73の指示情報に基づいて生成された付属情報82を備える。付属情報82は、たとえば図10に示すように、第2の端末32によって撮影した画像部84や、対象となる機器の装置名やタスク情報、日付、管理者名などを含む情報部86で構成される。この付属情報82は、たとえば第2の端末32、または第2の端末32から取得したデータを利用して工事管理機能部22が生成してもよい。
The quality confirmation record information RA and RB includes date information and attached
<他の実績情報の入力>
図11は、他のタスク管理テーブルに入力した実績情報の反映処理を示している。図11に示す処理内容や構成は一例である。
ここでは、たとえば検査結果の実績情報をタスク管理テーブルI26-1に入力する場合を示している。
工事管理機能部22は、たとえば検査を行う管理者が第1の端末30を通じてアクセスしてくると、タスク管理テーブルIを通知して、タスク情報ごとの情報入力を可能にする。タスク管理テーブルIには、たとえば図11Aに示すように、タスク情報ごとに検査の完了を表すチェックボックスのクリックなどの実績情報RCが入力される。
<Enter other performance information>
FIG. 11 shows the reflection processing of performance information input to another task management table. The processing contents and configuration shown in FIG. 11 are examples.
Here, for example, the case of inputting performance information of inspection results to the task management table I26-1 is shown.
The construction
工事管理機能部22は、たとえばタスク管理テーブルIに入力された検査完了の実績情報RCを読み出すとともに、予め設定された反映先の指示情報に基づいて工事の工程を管理するタスク管理テーブルIVを読み出す。また工事管理機能部22は、たとえば管理サーバ4や外部データベースにあるカレンダー機能やタイマー機能などを利用し、タスク管理テーブルIに実績情報RCが入力された日付や時間情報を取得している。そして、工事管理機能部22は、たとえば図11Bに示すように、取得した実績情報RCを解析し、タスク管理テーブルIVに設定された同一または関連付けられたタスク情報を特定するとともに、その監視結果部75に対して実績情報RCによる日付や時間情報、検査を行った管理者情報などを自動入力する。
The construction
工事管理機能部22は、管理者により特定のタスク管理テーブルに実績情報RA、RB、RCが入力されるとともに、斯かる実績情報実績情報RA、RB、RCが他のタスク管理テーブル反映した場合、内容に変遷のあったタスク管理テーブルや全てのタスク管理テーブルについて、設定された管理者の情報端末6に対して通知情報を送信する。
When performance information RA, RB, RC is input to a specific task management table by an administrator, and the performance information RA, RB, RC is reflected in another task management table, the construction
<工事管理処理について>
図12は、工事管理処理の処理手順を示している。図12に示す処理は、本開示の工事管理方法、プログラムの一例であり、本開示の技術は斯かる処理内容や処理手順に限定されない。
この工事管理処理には、たとえば図12に示すように、タスク情報の読み出し処理(S101)、タスク管理テーブルの生成処理(S102)、管理者の認証処理(S103)、管理者に対する権限の関係付け処理(S104)、実績情報の入力確認処理(S105)、入力権限の確認処理(S106)、反映指示の確認処理(S107)、実績情報の反映処理(S108)、タスク管理テーブルの通知および表示処理(S109)、タスクの完了確認処理(S110)を含む。
<About construction management processing>
FIG. 12 shows the processing procedure of construction management processing. The processing shown in FIG. 12 is an example of the construction management method and program of the present disclosure, and the technology of the present disclosure is not limited to such processing contents and processing procedures.
For example, as shown in FIG. 12, this construction management processing includes task information reading processing (S101), task management table generation processing (S102), manager authentication processing (S103), authority association with the manager. processing (S104), input confirmation processing of performance information (S105), confirmation processing of input authority (S106), confirmation processing of reflection instruction (S107), reflection processing of performance information (S108), notification and display processing of task management table (S109) and task completion confirmation processing (S110).
管理サーバ4は、定修工事や検査について設定された情報、もしくは管理者による入力操作を契機に工事管理プログラムを実行し、テーブル生成機能部20を立ち上げる。テーブル生成機能部20は、たとえばタスク情報DB24にアクセスすると、設定された監視対象である機器名やその種別情報、プラント情報などに関係付けられた定修工事や検査のタスク情報を読み出し(S101)、このタスク情報や機器情報、および管理機能T1~Tnの種類や数などの設定条件を利用してタスク管理テーブル(I~IV)26-1、26-2、26-3、26-4を生成する(S102)。
The
管理サーバ4は、定修工事、検査の開始指示に基づいて工事管理プログラムを実行し、工事管理機能部22を立ち上げる。工事管理機能部22は、情報端末6を通じて取得した管理者の識別情報や階級情報などを利用して管理者を認証する(S103)とともに、権限テーブル38を読み出し、管理者の階級情報に対して権限の付与を含む関係付けを行う(S104)。
工事管理機能部22は、管理者の情報端末6から特定のタスク管理テーブルに対し、工事の内容監視や検査結果などの実績情報が入力されたか否かを監視する(S105)。工事管理機能部22は、特定のタスク管理テーブルに対して実績情報が入力されたと判断した場合(S105のYES)、その実績情報を入力した管理者の識別情報を取込み、入力操作に対する権限の有無を確認する(S106)。入力権限が無い場合(S106のNO)は、入力された実績情報を無効にし、入力権限を有する者による実績情報の入力があるまで待機する。
工事管理機能部22は、管理者の入力権限を確認すると(S106のYES)、実績情報が入力されたタスク情報、またはタスク管理テーブルに情報の反映指示が設定されているかを確認する(S107)。反映指示が設定されている場合(S107のYES)、工事管理機能部22は、その指示情報と、指示情報に設定された他のタスク管理テーブルを読み出すとともに、反映先の他のタスク管理テーブル26を利用した管理内容に基づいて、実績情報に基づく情報を生成し、他のタスク管理テーブル26に反映させる(S108)。そして工事管理機能部22は、たとえばタスク管理テーブル26に反映指示が設定されていない場合(S107のNO)または他のタスク管理テーブル26に対する実績情報の反映が完了すると、管理者の情報端末6に対してタスク管理テーブル26の通知や更新の表示処理を行う(S109)。
The
The construction
When confirming the administrator's input authority (YES in S106), the construction
工事管理処理では、全てのタスクについての定修工事、検査が終わったか否かを判断し(S110)、全てのタスクについて完了していれば(S110のYES)、この処理を終了する。これに対し工事管理処理では、特定のタスク管理テーブルにおいて次の工程を示すタスク情報が有る場合、つまり全てのタスクが完了していなければ(S110のNO)、実績情報の入力まで待機状態となる。 In the construction management process, it is determined whether or not regular maintenance work and inspection have been completed for all tasks (S110). If all tasks have been completed (YES in S110), this process ends. On the other hand, in the construction management process, if there is task information indicating the next process in a specific task management table, that is, if all tasks have not been completed (NO in S110), the process waits until the performance information is input. .
〔第1の実施形態の効果〕
斯かる構成によれば、以下のいずかの効果が得られる。
[Effect of the first embodiment]
According to such a configuration, one of the following effects can be obtained.
(1) 管理機能ごとのタスク管理テーブルを自動生成できるとともに、特定のタスク管理テーブルに入力した実績情報を、関連する他のタスク管理テーブルに自動で反映させることができる。 (1) It is possible to automatically generate a task management table for each management function, and to automatically reflect performance information entered in a specific task management table in other related task management tables.
(2) タスク情報やタスク管理テーブルに設定された指示情報を読み取り、管理サーバ4によって自動で他のタスク管理テーブルに実績情報を反映させることができるので、タスク管理テーブルの探索やタスク情報の照合などの作業負荷の軽減が図れる。
(2) Task information and instruction information set in the task management table can be read, and the performance information can be automatically reflected in other task management tables by the
(3) 実績情報をタスク管理テーブル間で自動的に反映させることで、タスク情報の照合作業や実績情報の入力作業において、選択ミスや入力ミスなどの人為的なミスを防止できるので、工事管理処理に対する信頼性が向上する。 (3) By automatically reflecting performance information between task management tables, it is possible to prevent human errors such as selection errors and input errors in task information collation work and performance information input work, so construction management is improved. Improves process reliability.
〔第2の実施形態〕
図13は、第2の実施形態に係る工事管理システムの構成例を示している。図13に示す構成は一例であり、斯かる内容に本開示の技術が限定されない。また、図13において、図1と同一構成に対しては同一の符号を付し、説明を省略する。
この工事管理システム2では、たとえば図13に示すように、定修工事や検査処理において、それぞれのタスク情報に対し、第1の管理者および第2の管理者の両者により品質確認および完了確認、または検査処理を行い、それぞれ実績情報を入力することでタスクを完了させる場合を示している。そこで、工事管理システム2では、端末30、32からそれぞれ入力情報や認証情報を取得するとともに、各端末30、32に対してタスク管理テーブル26を含む管理画面の提示やタスクの実行を促すアラート情報を通知する。このアラート情報は、たとえば管理者ごとに保有するメールアドレスに通知するほか、端末30、32に格納された時計やスケジュールアプリなどのアラーム機能を利用してもよく、または工事管理処理の順序になったときにタスク管理テーブル26を通知して表示部に表示させてもよい。
[Second embodiment]
FIG. 13 shows a configuration example of a construction management system according to the second embodiment. The configuration shown in FIG. 13 is an example, and the technology of the present disclosure is not limited to such content. In addition, in FIG. 13, the same reference numerals are assigned to the same configurations as in FIG. 1, and the description thereof is omitted.
In this
<実績情報の入力>
図14は、実績情報の入力状態を示している。図14に示す処理内容は一例である。
ここでは、特定の工程における品質チェックおよび完了の実績情報をタスク管理テーブルIVに入力する場合を示している。
工事管理機能部22は、たとえば定修工事の施工およびタスク情報ごとの品質確認および完了確認を行う第2の管理者が端末32を通じてアクセスしてくると、タスク管理テーブルIV26-4を通知して、タスク情報ごとの情報入力を可能にする。タスク管理テーブルIVには、たとえば図14Aに示すように、タスク情報ごとに開始情報部74に工事の着工開始日が入力されるとともに、監視結果部75に工事の品質確認の完了を表す情報や日付などの実績情報RA、RBなどが入力される。またこのタスク管理テーブルIVには、たとえば第1の管理者に実績情報を入力させる入力部90が形成されている。この入力部90は、たとえば第2の管理者が実績情報RBを入力すると、管理権限の変移を示す処理として、入力部90の一部や全部の点滅表示や変色表示をさせてもよい。
<Enter performance information>
FIG. 14 shows the input state of performance information. The processing content shown in FIG. 14 is an example.
Here, a case is shown in which quality check and completion record information in a specific process are input to the task management table IV.
The construction
工事管理機能部22は、たとえば第2の管理者による実績情報RBの入力を確認すると、第1の端末30に対してアラート情報を通知してタスク情報の確認処理を行う旨を知らせるとともに、タスク管理テーブルIVを第1の端末30に表示させる。
工事管理機能部22は、たとえばアラート通知に応じて第1の管理者が端末30を通じてアクセスしてくると、認証処理を行った後にタスク管理テーブルIVを通知して、タスク情報ごとの情報入力を可能にする。タスク管理テーブルIVには、たとえば図14Bに示すように、第1の管理者によって入力部90に対して実績情報RDが入力される。この実績情報RDは、たとえば他の実績情報RA、RBと同様に工事の品質確認の完了を表す情報や日付でもよく、またはこれに加えて現在のタスク情報が完了したことや次のタスク情報への移行を示すチェック記号などであってもよい。
For example, when confirming the input of the performance information RB by the second manager, the construction
For example, when the first manager accesses through the terminal 30 in response to the alert notification, the construction
なお、ここでは、工事の確認または検査結果の入力処理について、第2の管理者の次に第1の管理者の順序で実績情報を入力する場合を示したがこれに限らない。第1の管理者が先に実績情報を入力するようにしてもよい。 Here, regarding the input processing of confirmation of construction work or inspection results, a case is shown in which performance information is input in the order of the second manager and then the first manager, but the present invention is not limited to this. The first administrator may enter the performance information first.
そして工事管理処理では、第1の管理者および第2の管理者による実績情報RB、RDが入力されると、これらの情報のいずれかまたは両方が他のタスク管理テーブルに入力され、情報が共有される。実績情報RB、RDの反映先は、たとえば既述のように、タスク管理テーブルI、II、IIIのいずれか、または2以上の組み合せであればよい。 In the construction management process, when the performance information RB and RD by the first manager and the second manager are input, either or both of these information are input to another task management table, and the information is shared. be done. The result information RB and RD may be reflected in any one of the task management tables I, II, and III, or a combination of two or more, as described above.
<工事管理処理について>
図15は、工事管理処理の処理手順を示している。図15に示す処理は、本開示の工事管理方法、プログラムの一例であり、本開示の技術は斯かる処理内容や処理手順に限定されない。図15において、図12に示す処理内容と同一の部分については詳細な説明を割愛する。
<About construction management processing>
FIG. 15 shows the processing procedure of construction management processing. The processing shown in FIG. 15 is an example of the construction management method and program of the present disclosure, and the technology of the present disclosure is not limited to such processing contents and processing procedures. In FIG. 15, detailed description of the same parts as the processing contents shown in FIG. 12 is omitted.
この工事管理処理には、たとえば図15に示すように、タスク管理テーブルの生成処理(S201)、第2の管理者の認証処理(S202)、タスク管理テーブルの通知処理(S203)、実績情報の取得処理(S204)、入力権限の確認処理(S205)、第1の端末30への通知処理(S206)、第1の管理者の認証処理(S207)、タスク管理テーブルの通知処理(S208)、実績情報の取得処理(S209)、他のタスク管理テーブルへの反映処理(S210)、タスク管理テーブルの通知および表示処理(S211)、次のタスクへの移行処理(S212)を含む。 For example, as shown in FIG. 15, this construction management processing includes task management table generation processing (S201), second manager authentication processing (S202), task management table notification processing (S203), performance information Acquisition processing (S204), input authority confirmation processing (S205), notification processing to the first terminal 30 (S206), first administrator authentication processing (S207), task management table notification processing (S208), It includes a process of acquiring performance information (S209), a process of reflecting to another task management table (S210), a notification and display process of the task management table (S211), and a process of shifting to the next task (S212).
管理サーバ4は、テーブル生成機能部20を立ち上げ、設定された監視対象である機器名やその種別情報、タスク情報DB24に格納されたタスク情報を利用してタスク管理テーブル(I~IV)を生成する(S201)。
管理サーバ4は、工事管理プログラムの実行により工事管理機能部22を立ち上げると、第2の端末32を通じて取得した第2の管理者の識別情報や階級情報などにより認証する(S202)とともに、設定された管理機能のタスク管理テーブルを通知する(S203)。この認証処理には、管理者の識別情報に含まれる階級情報に応じた、実績情報の入力権限の付与も含む。
工事管理機能部22は、第2の端末32から入力された実績情報を取得し(S204)、入力権限を有する管理者が入力したことを確認すると(S205のYES)、第1の端末30に対してアラート情報などの通知処理を行う(S206)。また、工事管理機能部22は、入力権限が無い者により入力された場合(S205のNO)は、入力された実績情報を無効にし、入力権限を有する者による実績情報の入力があるまで待機すればよい。
The
When the
The construction
工事管理機能部22は、第1の端末30を通じて取得した第1の管理者の識別情報や階級情報などにより認証する(S207)とともに、設定された管理機能のタスク管理テーブルを通知する(S208)。工事管理機能部22は、第1の端末30から入力された実績情報を取得すると(S209)、反映の指示情報に基づき、一方または両方の実績情報もしくはこれらの実績情報を利用して生成した情報を他のタスク管理テーブルに反映させる(S210)。
工事管理機能部22は、第1の端末30、第2の端末32のいずれか一方または両方に対して、実績情報が入力されたタスク管理テーブルの通知や表示処理を行った(S211)後、定修工事、検査処理の次のタスクに移行する(S212)。
The construction
The construction
〔第2の実施形態の効果〕
斯かる構成によれば、以下のような効果が得られる。
[Effect of Second Embodiment]
According to such a configuration, the following effects are obtained.
(1) 第1の実施形態と同様の効果が得られる。
(2) 定修工事や検査について、複数の管理者により内容および完了確認を行う場合であっても、一方の管理者による実績情報の入力を契機に他の管理者にアラート情報を通知して管理処理の実行を促すことで、処理の迅速性を高めることができる。
(3) 複数の管理者により工事や検査の内容を確認し、実績情報を入力させることで、タスク処理の実施状態を精緻に管理でき、工事や検査のタスクの品質が高められる。
(1) An effect similar to that of the first embodiment can be obtained.
(2) Even if more than one manager confirms the content and completion of regular maintenance work and inspections, the input of performance information by one manager will trigger alert information to be sent to the other managers. Prompt execution of the management process can improve the speed of the process.
(3) By allowing multiple administrators to confirm the details of construction work and inspections and input performance information, it is possible to precisely manage the execution status of task processing and improve the quality of construction and inspection tasks.
〔他の実施の形態〕
以上説明した実施形態について、変形例を以下に列挙する。
[Other embodiments]
Modifications of the embodiment described above are listed below.
(1) 上記の実施形態では、プラント設備の定修工事や検査について記載しているが、本開示の技術は各種の工事や検査などに幅広く活用でき、上記実施の形態の内容に限定されない。 (1) In the above embodiments, regular maintenance work and inspections of plant equipment are described, but the technology of the present disclosure can be widely used in various constructions and inspections, and is not limited to the contents of the above embodiments.
(2) 本開示の工事管理システムは、管理サーバ4を情報端末6と独立させているが、これに限らない。工事管理システム2では、たとえばひとつの装置筐体にシステムを構成する処理部、入出力部、情報提示部を搭載し、既述の情報端末6を以て工事管理システムを構成してもよい。
(2) In the construction management system of the present disclosure, the
(3) 上記実施では、第1の管理者がプラントオーナーであり、第2の管理者が工事を行う協力会社の場合を示したがこれに限らない。プラント設備の定修工事や検査について、第1の管理者および第2の管理者が共に協力会社であってもよい。これらの協力会社は、たとえばともに定修工事や検査を行う権限を有する場合や、それぞれが定修工事または検査のいずれか一方のみを行う場合、または一方の管理者は工事や検査の確認処理のみを行うものであってもよい。 (3) In the above implementation, the case where the first manager is the plant owner and the second manager is the cooperating company that performs the construction was shown, but this is not the only option. Both the first manager and the second manager may be cooperating companies for regular maintenance work and inspection of plant equipment. For example, if both of these subcontractors have the authority to perform periodic maintenance work and inspections, or if each performs only one of periodic maintenance work or inspections, or if one of the managers only performs confirmation processing for construction or inspection may be performed.
以上説明したように、本開示の技術の最も好ましい実施形態等について説明した。本開示の技術は、上記記載に限定されるものではない。特許請求の範囲に記載され、または発明を実施するための形態に開示された要旨に基づき、当業者において様々な変形や変更が可能である。斯かる変形や変更が、本開示の技術の範囲に含まれることは言うまでもない。
As described above, the most preferred embodiments and the like of the technology of the present disclosure have been described. The technology of the present disclosure is not limited to the above description. Various modifications and changes can be made by those skilled in the art based on the gist described in the claims or disclosed in the detailed description. It goes without saying that such modifications and changes are included in the technical scope of the present disclosure.
本開示の構成によれば、プラント設備や機器に対する定修工事や検査処理において、管理機能ごとに複数のタスク管理テーブルが自動生成できるとともに、特定の管理テーブルに対して入力した実績情報が、他のタスク管理テーブルに対して自動で反映させることができるので、関連するタスク情報の探索や複数のタスク管理テーブルへの入力などの作業負荷を軽減でき、かつ実績情報の誤入力などを防止でき、有用である。
According to the configuration of the present disclosure, it is possible to automatically generate a plurality of task management tables for each management function in regular maintenance work and inspection processing for plant equipment and equipment, and the performance information entered into a specific management table can be used by other Since it can be automatically reflected in the task management table of , it is possible to reduce the workload such as searching for related task information and inputting to multiple task management tables, and to prevent incorrect input of performance information. Useful.
2 工事管理システム
4 管理サーバ
6 情報端末
8 ネットワーク
10、302、322 処理部
12 記憶部
14、306 情報入力部
16、304 情報提示部
20 テーブル生成機能部
22 工事管理機能部
24 タスク情報DB
26、26-1、26-2、26-3、26-4、26-11、26-12、・・・26-1N、26-21、26-22、・・・26-2N、26-31、26-32、・・・26-3N、26-41、26-42、・・・26-4N タスク管理テーブル
30 第1の端末
32、32-1、32-m 第2の端末
324 情報入力・提示部
34 機器
36 IDタグ
38 権限テーブル
40、53、62、71 タスク情報部
41、51、61 装置名部
42 反映部
43 工事情報部
44 管理情報入力部
45 完了監視部
46 権限部
50 日付部
52、70 分類部
54 工程管理部
55 情報入力エリア
60 ヘッダー部
63 管理情報部
72 確認内容部
73 検査内容部
74 開始情報部
75 監視結果部
76 権限部
80 指示情報
81 稲妻線
82 付属情報
84 画像部
86 情報部
90 入力部
2
26, 26-1, 26-2, 26-3, 26-4, 26-11, 26-12, ... 26-1N, 26-21, 26-22, ... 26-2N, 26- 31, 26-32, ... 26-3N, 26-41, 26-42, ... 26-4N Task management table 30
建設工事の進捗管理に関し、工事計画支援システムと、検査予定に関するデータを蓄積する検査予定データベース、検査予定と実績を統合した検査進捗データを蓄積する検査予実データベースとを有し、検査の進捗状況を工事進捗の物量に換算した工事進捗データを、工事計画支援システムに伝送する進捗確認システムとを組み合わせ、区画別工程と工事進捗データを統合させ、工事進捗を表すチャート稲妻表示を付した工程表を表示することが知られている(たとえば、特許文献3)。 Regarding the progress management of construction work, we have a construction plan support system, an inspection schedule database that accumulates data related to inspection schedules, and an inspection schedule actual database that accumulates inspection progress data that integrates inspection schedules and actual results. Combined with a progress confirmation system that transmits construction progress data converted to physical quantity of construction progress to the construction plan support system, integrates the construction progress data with the process by section, and charts the progress chart with a lightning bolt display that shows the construction progress. is known (for example, Patent Document 3).
定修工事の発注者においては、その進捗管理に加え、その進捗に応じた検査などが主要な処理事項である。これに対し、受注者は、発注者のコンセプト、定修対象であるシステムの全体像を把握し、定修計画を策定して工事処理を実行し、発注者の検査を随時に受けて定修工事を完了することが求められる。
定修工事には工事の進捗、報告、検査許可、確認などの複数の工程が存在する。たとえば、ひとつの機器の定修工事が完了すれば、その完了の報告を受けた発注者から検査許可を受け、その検査結果が基準を満たすなど、合格域に達しなければ、次の工程に進むことができない。これは安全面からすれば優れた管理であるが、発注者の検査担当に工事の進捗が委ねられるなどの課題もある。発注者と受注者との間での情報共有が不可欠であるが、これが不十分であると、検査機器の位置の探索などのベーシックな点で工程間の時間的ロスを誘発するという課題がある。
For the orderer of regular maintenance work, in addition to the progress management, inspections according to the progress are major items to be handled. In response to this, the contractor grasps the concept of the ordering party and the overall picture of the system that is subject to periodic maintenance, formulates a periodic maintenance plan, executes the construction process, and undergoes periodic inspections by the ordering party at any time. Construction is required to be completed.
Regular maintenance work includes multiple processes such as progress of construction, reporting, permission for inspection, and confirmation. For example, when regular maintenance work for one piece of equipment is completed, inspection permission is obtained from the ordering party who received the completion report. I can't. This is excellent management from a safety point of view, but there are also issues such as entrusting the progress of construction to the person in charge of inspection by the ordering party. Information sharing between the ordering party and the contractor is essential, but if this is insufficient, there is a problem of inducing time loss between processes in basic points such as searching for the location of inspection equipment. .
上記目的を達成するため、本開示のプログラムの一側面は、コンピュータによって実行されるプログラムであって、データベースに記録されたタスク情報を利用して、管理機能で特定した二以上のタスク管理テーブルを作成する機能と、情報入力部により特定の前記タスク管理テーブルに入力されたタスクごとの実績情報を取得する機能と、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる機能と、前記実績情報の変遷を表す前記タスク管理テーブルの何れかまたは二以上を情報提示部に提示する機能とを前記コンピュータに実行させる。 In order to achieve the above object, one aspect of the program of the present disclosure is a program executed by a computer, which uses task information recorded in a database to create two or more task management tables specified by the management function. a function to acquire performance information for each task input to a specific task management table by an information input unit; and a function of presenting, to the information presenting unit, any one or more of the task management tables representing changes in the performance information.
(3) 上記実施形態では、第1の管理者がプラントオーナーであり、第2の管理者が工事を行う協力会社の場合を示したがこれに限らない。プラント設備の定修工事や検査について、第1の管理者および第2の管理者が共に協力会社であってもよい。これらの協力会社は、たとえばともに定修工事や検査を行う権限を有する場合や、それぞれが定修工事または検査のいずれか一方のみを行う場合、または一方の管理者は工事や検査の確認処理のみを行うものであってもよい。
(3) In the above embodiment , the first manager is the plant owner, and the second manager is the cooperating company that performs the construction work, but this is not the only option. Both the first manager and the second manager may be cooperating companies for regular maintenance work and inspection of plant equipment. For example, if both of these subcontractors have the authority to perform periodic maintenance work and inspections, or if each performs only one of periodic maintenance work or inspections, or if one of the managers only performs confirmation processing for construction or inspection may be performed.
上記目的を達成するため、本開示の工事管理方法の一側面は、コンピュータにより実行される工事管理方法であって、前記コンピュータの情報処理部が、データベースに記録されたタスク情報の中から、管理機能ごとに管理対象として特定したタスク情報を抽出して、二以上のタスク管理テーブルを作成する工程と、前記コンピュータの情報入力部が、特定の前記タスク管理テーブルにタスクごとの実績情報を入力する工程と、前記情報処理部が、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる工程と、前記コンピュータの情報提示部が、前記実績情報の変遷を表す前記タスク管理テーブルの何れかまたは二以上を提示する工程とを含む。 In order to achieve the above object, one aspect of the construction management method of the present disclosure is a construction management method executed by a computer, wherein an information processing unit of the computer selects a management task from task information recorded in a database. a step of extracting task information specified as a management target for each function and creating two or more task management tables; a step in which the information processing unit reflects the performance information acquired from the information input unit in one or more of the other task management tables; and a step in which the information presentation unit of the computer reflects the performance information presenting one or more of the task management tables representing the transition.
上記目的を達成するため、本開示の工事管理システムの一側面は、二以上のタスク情報が格納されたデータベースと、前記データベースに記録されたタスク情報の中から、管理機能ごとに管理対象として特定したタスク情報を抽出して、二以上のタスク管理テーブルを作成する情報処理部と、特定の前記タスク管理テーブルにタスクごとの実績情報を入力する情報入力部とを備え、前記情報処理部が、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる。
この工事管理システムにおいて、さらに、前記情報処理部が、前記タスク管理テーブルに対する少なくとも閲覧、入力、改定を許可する権限を設定し、該権限と管理者の階級とを関連付ける。
In order to achieve the above object, one aspect of the construction management system of the present disclosure includes a database storing two or more pieces of task information, and among the task information recorded in the database, specified as a management target for each management function. an information processing unit that extracts the task information obtained and creates two or more task management tables; and an information input unit that inputs performance information for each task into a specific task management table, wherein the information processing unit The performance information acquired from the information input unit is reflected in one or more of the other task management tables.
In this construction management system, the information processing section further sets authority to permit at least viewing, inputting, and revision of the task management table, and associates the authority with the rank of the manager.
上記目的を達成するため、本開示のプログラムの一側面は、コンピュータによって実行されるプログラムであって、データベースに記録されたタスク情報の中から、管理機能ごとに管理対象として特定したタスク情報を抽出して、二以上のタスク管理テーブルを作成する機能と、情報入力部により特定の前記タスク管理テーブルに入力されたタスクごとの実績情報を取得する機能と、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる機能と、前記実績情報の変遷を表す前記タスク管理テーブルの何れかまたは二以上を情報提示部に提示する機能とを前記コンピュータに実行させる。 In order to achieve the above object, one aspect of the program of the present disclosure is a program executed by a computer, which extracts task information specified as a management target for each management function from task information recorded in a database. a function of creating two or more task management tables by doing so , a function of acquiring performance information for each task input to a specific task management table by an information input unit, and the performance information acquired from the information input unit to one or more of the other task management tables, and a function of presenting one or more of the task management tables representing changes in the performance information to an information presentation unit. Let
上記目的を達成するため、本開示の工事管理装置の一側面は、コンピュータにより工事を管理する工事管理装置であって、装置筐体と、二以上のタスク情報が格納されたデータベースを備える記憶部と、前記データベースに記録されたタスク情報の中から、管理機能ごとに管理対象として特定したタスク情報を抽出して、二以上のタスク管理テーブルを作成する情報処理部と、特定の前記タスク管理テーブルにタスクごとの実績情報を入力する情報入力部とを備え、前記情報処理部が、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる。 In order to achieve the above object, one aspect of the construction management device of the present disclosure is a construction management device that manages construction work using a computer, and includes a device housing and a storage unit that includes a database that stores two or more pieces of task information. an information processing unit that extracts task information specified as a management target for each management function from among the task information recorded in the database, and creates two or more task management tables; and a specific task management table. and an information input unit for inputting performance information for each task, and the information processing unit reflects the performance information acquired from the information input unit in one or more of the other task management tables.
上記目的を達成するため、本開示の記録媒体の一側面によれば、上記プログラムの何れかを格納している。
In order to achieve the above object, according to one aspect of the recording medium of the present disclosure, any one of the above programs is stored.
Claims (11)
情報処理部が、データベースに記録されたタスク情報を利用して、管理機能で特定した二以上のタスク管理テーブルを作成する工程と、
情報入力部が、特定の前記タスク管理テーブルにタスクごとの実績情報を入力する工程と、
前記情報処理部が、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる工程と、
情報提示部が、前記実績情報の変遷を表す前記タスク管理テーブルの何れかまたは二以上を提示する工程と、
を含むことを特徴とする工事管理方法。 A construction management method using a computer,
a step in which the information processing unit uses the task information recorded in the database to create two or more task management tables specified by the management function;
an information input unit inputting performance information for each task into the specific task management table;
a step in which the information processing unit reflects the performance information acquired from the information input unit in one or more of the other task management tables;
an information presenting unit presenting one or more of the task management tables representing changes in the performance information;
A construction management method comprising:
を含む、請求項1または請求項2に記載の工事管理方法。 The information processing unit inputs the performance information or information generated based on the performance information to the task information in the other task management table associated with the task information in the specific task management table. process and
The construction management method according to claim 1 or 2, comprising:
前記データベースに記録されたタスク情報を利用して、管理機能で特定した二以上のタスク管理テーブルを作成する情報処理部と、
特定の前記タスク管理テーブルにタスクごとの実績情報を入力する情報入力部と、
を備え、前記情報処理部が、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させることを特徴とする工事管理システム。 a database storing two or more pieces of task information;
an information processing unit that uses the task information recorded in the database to create two or more task management tables specified by the management function;
an information input unit for inputting performance information for each task into the specific task management table;
wherein the information processing unit reflects the performance information acquired from the information input unit in one or more of the other task management tables.
データベースに記録されたタスク情報を利用して、管理機能で特定した二以上のタスク管理テーブルを作成する機能と、
情報入力部により入力された特定の前記タスク管理テーブルにタスクごとの実績情報を取得する機能と、
前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させる機能と、
前記実績情報の変遷を表す前記タスク管理テーブルの何れかまたは二以上を情報提示部に提示する機能と、
を前記コンピュータに実行させるためのプログラム。 A program executed by a computer,
A function to create two or more task management tables specified by the management function using task information recorded in the database;
a function of acquiring performance information for each task in the specific task management table input by the information input unit;
a function of reflecting the performance information acquired from the information input unit in one or more of the other task management tables;
a function of presenting one or more of the task management tables representing transitions of the performance information to an information presentation unit;
A program for causing the computer to execute.
前記実績情報を読み出し、または前記実績情報に基づいて入力情報を生成する機能と、
他の前記タスク管理テーブルに対して前記実績情報または前記入力情報を入力する機能と、
を前記コンピュータに実行させるための請求項7または請求項8に記載のプログラム。 a function of reading task information in other task management tables associated with task information in a specific task management table;
a function of reading the performance information or generating input information based on the performance information;
a function of inputting the performance information or the input information to the other task management table;
9. The program according to claim 7 or 8, for causing said computer to execute:
装置筐体と、
二以上のタスク情報が格納されたデータベースを備える記憶部と、
前記データベースに記録されたタスク情報を利用して、管理機能で特定した二以上のタスク管理テーブルを作成する情報処理部と、
特定の前記タスク管理テーブルにタスクごとの実績情報を入力する情報入力部と、
を備え、前記情報処理部が、前記情報入力部から取得した前記実績情報を他の前記タスク管理テーブルの何れかまたは二以上に反映させることを特徴とする工事管理装置。 A construction management device for managing construction by a computer,
a device housing;
a storage unit comprising a database storing two or more pieces of task information;
an information processing unit that uses the task information recorded in the database to create two or more task management tables specified by the management function;
an information input unit for inputting performance information for each task into the specific task management table;
wherein the information processing unit reflects the performance information acquired from the information input unit in one or more of the other task management tables.
The database and the task management table included in the construction management method according to any one of claims 1 to 3, and the database and the task management table included in the construction management system according to claims 4 to 6. A recording medium storing a task management table and one or more of the programs according to claims 7 to 9.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2021193040A JP7411623B2 (en) | 2021-11-29 | 2021-11-29 | Construction management methods, systems, programs, devices and recording media |
TW111140627A TW202324228A (en) | 2021-11-29 | 2022-10-26 | Method, system, program, device, and recording medium for construction management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2021193040A JP7411623B2 (en) | 2021-11-29 | 2021-11-29 | Construction management methods, systems, programs, devices and recording media |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2023079536A true JP2023079536A (en) | 2023-06-08 |
JP7411623B2 JP7411623B2 (en) | 2024-01-11 |
Family
ID=86647219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2021193040A Active JP7411623B2 (en) | 2021-11-29 | 2021-11-29 | Construction management methods, systems, programs, devices and recording media |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP7411623B2 (en) |
TW (1) | TW202324228A (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006024035A (en) * | 2004-07-08 | 2006-01-26 | Ando Corp | Construction management system using mobile communication equipment |
JP2008065428A (en) * | 2006-09-05 | 2008-03-21 | Nikon Corp | Thumbnail display system |
JP2009003750A (en) * | 2007-06-22 | 2009-01-08 | Fuji Xerox Co Ltd | Project management program and project management system |
JP2009301273A (en) * | 2008-06-12 | 2009-12-24 | Nec Corp | Gantt chart display method, data processor and program |
JP2010055191A (en) * | 2008-08-26 | 2010-03-11 | Fujitsu Ltd | Work management device, display controller, work management method, and work management program |
JP2013134686A (en) * | 2011-12-27 | 2013-07-08 | Maeda Corp | Process management system, management terminal, and process management method |
WO2021005717A1 (en) * | 2019-07-09 | 2021-01-14 | 株式会社日立製作所 | System and method for assisting management of production |
JP2021064265A (en) * | 2019-10-16 | 2021-04-22 | 株式会社 日立産業制御ソリューションズ | Work record analysis server, work record analysis method, and work record analysis program |
JP2021149185A (en) * | 2020-03-16 | 2021-09-27 | 株式会社東芝 | Periodic inspection information cooperation system and periodic inspection information cooperation method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004076404A (en) | 2002-08-19 | 2004-03-11 | Takiya Kensetsu Kogyo Kk | Work management system and work management method using biserial hierarchical structure |
US20090210277A1 (en) | 2008-02-14 | 2009-08-20 | Hardin H Wesley | System and method for managing a geographically-expansive construction project |
JP2015049710A (en) | 2013-09-02 | 2015-03-16 | 株式会社日立システムズ | Project management device, program, and management method |
JP5905146B2 (en) | 2014-07-30 | 2016-04-20 | 明豊ファシリティワークス株式会社 | Project progress management system and computer program |
-
2021
- 2021-11-29 JP JP2021193040A patent/JP7411623B2/en active Active
-
2022
- 2022-10-26 TW TW111140627A patent/TW202324228A/en unknown
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006024035A (en) * | 2004-07-08 | 2006-01-26 | Ando Corp | Construction management system using mobile communication equipment |
JP2008065428A (en) * | 2006-09-05 | 2008-03-21 | Nikon Corp | Thumbnail display system |
JP2009003750A (en) * | 2007-06-22 | 2009-01-08 | Fuji Xerox Co Ltd | Project management program and project management system |
JP2009301273A (en) * | 2008-06-12 | 2009-12-24 | Nec Corp | Gantt chart display method, data processor and program |
JP2010055191A (en) * | 2008-08-26 | 2010-03-11 | Fujitsu Ltd | Work management device, display controller, work management method, and work management program |
JP2013134686A (en) * | 2011-12-27 | 2013-07-08 | Maeda Corp | Process management system, management terminal, and process management method |
WO2021005717A1 (en) * | 2019-07-09 | 2021-01-14 | 株式会社日立製作所 | System and method for assisting management of production |
JP2021064265A (en) * | 2019-10-16 | 2021-04-22 | 株式会社 日立産業制御ソリューションズ | Work record analysis server, work record analysis method, and work record analysis program |
JP2021149185A (en) * | 2020-03-16 | 2021-09-27 | 株式会社東芝 | Periodic inspection information cooperation system and periodic inspection information cooperation method |
Also Published As
Publication number | Publication date |
---|---|
JP7411623B2 (en) | 2024-01-11 |
TW202324228A (en) | 2023-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8041650B2 (en) | Method and system for directed documentation of construction projects | |
JP2021061058A (en) | Methods and systems for providing and receiving information for risk management in field | |
KR101422352B1 (en) | System and method for manageing defect of construction site | |
US20110040660A1 (en) | Monitoring And Management Of Lost Product | |
JP5848276B2 (en) | Information recommendation providing device, program, and communication system | |
CA2337970A1 (en) | Maintenance information management system and method of providing a maintenance plan | |
US20140344181A1 (en) | Construction trade building information management system, software and method | |
CN112184945A (en) | Mobile terminal inspection management method and system | |
TWI242740B (en) | Systems and methods for coordinating QA events | |
KR20020041390A (en) | Method for construction project management using internet and system therefor | |
JP7411623B2 (en) | Construction management methods, systems, programs, devices and recording media | |
JP2007041799A (en) | Project management support system | |
JP2023079537A (en) | Construction management method, system, program, apparatus, and recording medium | |
JP7429217B2 (en) | Report management methods, systems, programs, and devices | |
JP2023046204A (en) | Production management device, production management method, and production management program | |
JP7116218B1 (en) | Work management methods, systems and programs | |
JP5135295B2 (en) | Project personnel selection support management system and program | |
CN115239179A (en) | Chemical production operation flow system | |
JP2018173796A (en) | Technical instructor dispatch support apparatus, technical instructor dispatch support system and technical instructor dispatch support method | |
RU2493596C1 (en) | System and method of managing maintenance of buildings and structures | |
WO2021064877A1 (en) | Work management device, work management method, and recording medium | |
US20240104455A1 (en) | Information processing apparatus, information processing method, and non-transitory computer-readable storage medium | |
US20060004687A1 (en) | Web-based event correction and prevention system | |
WO2022249309A1 (en) | Progress management server and progress management system | |
KR102595680B1 (en) | smart integrated safety management system with versatility |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20230113 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230113 |
|
A871 | Explanation of circumstances concerning accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A871 Effective date: 20230113 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20230328 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20230523 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20230725 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20230925 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20231212 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20231225 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7411623 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |