JP2022073190A - Budget/actual result management device, budget/actual result management method and budget/actual result management program - Google Patents

Budget/actual result management device, budget/actual result management method and budget/actual result management program Download PDF

Info

Publication number
JP2022073190A
JP2022073190A JP2020183018A JP2020183018A JP2022073190A JP 2022073190 A JP2022073190 A JP 2022073190A JP 2020183018 A JP2020183018 A JP 2020183018A JP 2020183018 A JP2020183018 A JP 2020183018A JP 2022073190 A JP2022073190 A JP 2022073190A
Authority
JP
Japan
Prior art keywords
order
budget
data
execution budget
execution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2020183018A
Other languages
Japanese (ja)
Inventor
智裕 稲垣
Tomohiro Inagaki
剛光 上野
Takemitsu Ueno
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obic Co Ltd
Original Assignee
Obic Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obic Co Ltd filed Critical Obic Co Ltd
Priority to JP2020183018A priority Critical patent/JP2022073190A/en
Publication of JP2022073190A publication Critical patent/JP2022073190A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a budget/actual result management device, a budget/actual result management method and a budget/actual result management program that make persons in charge aware of whether an order is not included in an operational budget while a project is in process.SOLUTION: A budget/actual result management device comprises: an operational budget input part which inputs and registers operational budget data including construction identification information, articles or service, unit prices, quantities, and amounts in a storage part when an order for construction is accepted; and an order placement processing part which inputs order placement data including the construction identification information, articles or service, order placement unit prices, quantities, order placement amounts, and an order date as operated by a person in charge on an order placement inquiry screen, refers to the operational budget data to indicate that an order is not included in the budget if the order which is not included in the operational budget is input, and determines and registers the order placement data in the storage part when an approver approves the input order placement data on an order placement inquiry screen.SELECTED DRAWING: Figure 1

Description

本発明は、予実管理装置、予実管理方法、及び予実管理プログラムに関する。 The present invention relates to a forecast / actual management device, a forecast / actual management method, and a forecast / actual management program.

例えば、建設工事業界では、発注を受けた際に実行予算を立て、完成時に実際発生原価を計上して予実管理を行っている。原価の予実管理を行うシステムとして、例えば、特許文献1がある。 For example, in the construction work industry, an execution budget is set when an order is received, and the actual cost incurred is recorded at the time of completion for budget management. For example, Patent Document 1 is a system for managing cost forecasts and actual costs.

特開2014-211710号公報Japanese Unexamined Patent Publication No. 2014-221710

しかしながら、上記特許文献1では、実行予算外の発注かどうかをプロジェクト進行中に常に意識づけることに関して何等記載されていない。 However, Patent Document 1 does not describe anything about always being aware of whether or not an order is out of the execution budget while the project is in progress.

本発明は、上記に鑑みてなされたものであって、実行予算外の発注かどうかをプロジェクト進行中に常に意識づけることが可能な予実管理装置、予実管理方法、及び予実管理プログラムを提供することを目的とする。 The present invention has been made in view of the above, and provides a forecast / actual management device, a forecast / actual management method, and a forecast / actual management program that can always be aware of whether or not an order is out of the execution budget while the project is in progress. With the goal.

上述した課題を解決し、目的を達成するために、本発明は、記憶部及び制御部を備えた予実管理装置であって、前記制御部は、工事の受注があった場合に、工事識別情報、商品又は役務、単価、数、金額を含む実行予算データを入力して、前記記憶部に登録する実行予算入力手段と、発注伺入力画面において、担当者の操作に応じて、工事識別情報、商品又は役務、発注単価、数、発注日を含む発注データを入力し、前記実行予算データを参照して、実行予算外の発注が入力された場合は予算外である旨を表示し、また、当該入力された発注データについて、発注照会画面において、承認者の承認が得られた場合に、当該発注データを確定して前記記憶部に登録する発注処理手段と、を備えたことを特徴とする。 In order to solve the above-mentioned problems and achieve the object, the present invention is a forecast / actual management device including a storage unit and a control unit, and the control unit is used for construction identification information when an order for construction is received. , Execution budget input means for inputting execution budget data including goods or services, unit price, number, and amount, and registering in the storage unit, and construction identification information according to the operation of the person in charge on the order inquiry input screen. Enter the order data including goods or services, order unit price, quantity, order date, refer to the execution budget data, and if an order outside the execution budget is entered, display that it is out of budget, and also The input order data is provided with an order processing means for confirming the order data and registering it in the storage unit when the approval of the approver is obtained on the order inquiry screen. ..

また、本発明の一態様によれば、前記実行予算外の発注は、実行予算の金額を超える発注及び実行予算にない商品又は役務の発注を含むことにしてもよい。 Further, according to one aspect of the present invention, the order outside the execution budget may include an order exceeding the amount of the execution budget and an order for goods or services not included in the execution budget.

また、本発明の一態様によれば、前記発注照会画面では、実行予算内の発注に関しては一括での承認が可能に構成されていることにしてもよい。 Further, according to one aspect of the present invention, the ordering inquiry screen may be configured so that the ordering within the execution budget can be collectively approved.

また、本発明の一態様によれば、前記発注照会画面では、実行予算外の発注に対して個別の承認が必要に構成されていることにしてもよい。 Further, according to one aspect of the present invention, the order inquiry screen may be configured to require individual approval for orders outside the execution budget.

また、本発明の一態様によれば、前記制御部は、さらに、前記記憶部に登録された発注データを参照して、実行予算外の実績の一覧である実行予算外発注一覧表を作成して出力する実績出力手段を備えていてもよい。 Further, according to one aspect of the present invention, the control unit further creates an order list outside the execution budget, which is a list of actual results outside the execution budget, with reference to the order data registered in the storage unit. It may be provided with a performance output means for outputting.

また、上述した課題を解決し、目的を達成するために、本発明は、記憶部及び制御部を備えた情報処理装置で実行される予実管理方法であって、前記制御部において実行される、工事の受注があった場合に、工事識別情報、商品又は役務、単価、数、金額を含む実行予算データを入力して、前記記憶部に登録する実行予算入力工程と、発注伺入力画面において、担当者の操作に応じて、工事識別情報、商品又は役務、発注単価、数、発注日を含む発注データを入力し、前記実行予算データを参照して、実行予算外の発注が入力された場合は予算外である旨を表示し、また、当該入力された発注データについて、発注照会画面において、承認者の承認が得られた場合に、当該発注データを確定して前記記憶部に登録する発注処理工程と、を含むことを特徴とする。 Further, in order to solve the above-mentioned problems and achieve the object, the present invention is a forecast / actual management method executed by an information processing apparatus including a storage unit and a control unit, and is executed by the control unit. When there is an order for construction, the execution budget input process including the construction identification information, goods or services, unit price, number, and amount of money is input and registered in the storage unit, and in the order inquiry input screen. When order data including construction identification information, goods or services, order unit price, quantity, and order date is input according to the operation of the person in charge, and an order outside the execution budget is input with reference to the execution budget data. Displays that it is out of budget, and when the approval of the approver is obtained on the order inquiry screen for the entered order data, the order data is confirmed and registered in the storage unit. It is characterized by including a processing step.

また、上述した課題を解決し、目的を達成するために、本発明は、制御部及び記憶部を備えた情報処理装置に実行させるための予実管理プログラムであって、前記制御部において、工事の受注があった場合に、工事識別情報、商品又は役務、単価、数、金額を含む実行予算データを入力して、前記記憶部に登録する実行予算入力工程と、発注伺入力画面において、担当者の操作に応じて、工事識別情報、商品又は役務、発注単価、数、発注日を含む発注データを入力し、前記実行予算データを参照して、実行予算外の発注が入力された場合は予算外である旨を表示し、また、当該入力された発注データについて、発注照会画面において、承認者の承認が得られた場合に、当該発注データを確定して前記記憶部に登録する発注処理工程と、を実行するための予実管理プログラムであることを特徴とする。 Further, in order to solve the above-mentioned problems and achieve the object, the present invention is a forecast / actual management program for causing an information processing apparatus provided with a control unit and a storage unit to execute, and the control unit is used for construction work. When there is an order, the person in charge in the execution budget input process that inputs the execution budget data including construction identification information, goods or services, unit price, number, and amount and registers it in the storage unit, and the order inquiry input screen. According to the operation of, input the order data including the construction identification information, the product or service, the order unit price, the number, and the order date, refer to the execution budget data, and if an order outside the execution budget is input, the budget. An order processing process that displays the fact that it is outside and, when the approval of the approver is obtained on the order inquiry screen for the input order data, confirms the order data and registers it in the storage unit. It is characterized by being a forecast / actual management program for executing.

本発明によれば、実行予算外の発注かどうかをプロジェクト進行中に常に意識づけることが可能になるという効果を奏する。 According to the present invention, it is possible to always be aware of whether or not the order is out of the execution budget while the project is in progress.

図1は、本実施の形態に係る予実管理装置の構成の一例を示すブロック図である。FIG. 1 is a block diagram showing an example of the configuration of the forecast / actual management device according to the present embodiment. 図2は、工事データ、実行予算データ、及び発注データの構成例を示す図である。FIG. 2 is a diagram showing a configuration example of construction data, execution budget data, and ordering data. 図3は、本実施の形態に係る予実管理装置の制御部の全体の処理の概略を説明するためのフローを示す図である。FIG. 3 is a diagram showing a flow for explaining an outline of the entire processing of the control unit of the budget management device according to the present embodiment. 図4は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 4 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図5は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 5 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図6は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 6 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図7は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 7 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図8は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 8 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図9は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 9 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図10は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 10 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図11は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 11 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図12は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 12 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図13は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 13 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図14は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 14 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment. 図15は、本実施の形態に係る予実管理装置の制御部の処理の具体例を説明するための図である。FIG. 15 is a diagram for explaining a specific example of processing of the control unit of the forecast / actual management device according to the present embodiment.

本発明の実施形態を図面に基づいて詳細に説明する。なお、本発明は本実施形態により限定されるものではない。 Embodiments of the present invention will be described in detail with reference to the drawings. The present invention is not limited to the present embodiment.

[1:概要]
例えば、建設工事業界では、発注を受けた際に実行予算を立て、完成時に実際発生原価を計上して予実管理を行っている。
[1: Overview]
For example, in the construction work industry, an execution budget is set when an order is received, and actual costs incurred are recorded at the time of completion for budget management.

しかしながら、工事受注時に実行予算を組むが、現場の予算外発注に対しての意識の低さから予実の管理を正しく行えていない。具体的には、建設工事業界全体として、現場の社員の予実管理に対する意識が低く、さらに一つの案件毎の工期が長く、プロジェクトの途中で予実管理をすることが難しいため、実行予算から乖離した発注を行ってしまい、最終的に赤字になってしまうことや利益率が低くなることが問題となっている。 However, although an execution budget is set at the time of receiving a construction order, the forecast and actual management cannot be performed correctly due to the low awareness of on-site orders outside the budget. Specifically, the construction industry as a whole has a low awareness of on-site employees regarding forecast and actual management, and the construction period for each project is long, making it difficult to manage forecasts and actuals in the middle of a project. The problems are that the order is placed and the product is eventually in the red and the profit margin is low.

また、工事の規模が大きくなり、発注が増えることで誤発注や承認者の負荷が大きな課題となっている。さらに、新規工事受注時に、過去の類似した予実情報を反映させることができておらず精度の低い予実管理を繰り返し行っている。 In addition, as the scale of construction increases and the number of orders increases, erroneous orders and the burden on approvers have become major issues. Furthermore, when receiving an order for new construction, it is not possible to reflect similar forecast / actual information in the past, and low-precision forecast / actual management is repeated.

そこで、本実施の形態では、担当者や承認者に実行予算外の発注かどうかをプロジェクト進行中に常に意識づけることを可能とする仕組みを構築した。より具体的には、本実施の形態では、(1)発注時・発注承認時に実行予算内か実行予算外かを常に確認できる機能、(2)実行予算内の発注に関しては一括での承認を可能とする機能、(3)実行予算外の発注に対して必ず個別の承認を必須とする機能、(4)実行予算外の発注を一覧で取得し、予実管理の分析に利用できる機能を搭載した。 Therefore, in this embodiment, we have constructed a mechanism that enables the person in charge and the approver to always be aware of whether or not the order is outside the execution budget while the project is in progress. More specifically, in this embodiment, (1) a function that can always confirm whether the order is within the execution budget or outside the execution budget at the time of ordering / approval, and (2) collectively approving the order within the execution budget. Equipped with functions that enable it, (3) a function that requires individual approval for orders outside the execution budget, and (4) a function that obtains a list of orders outside the execution budget and can be used for analysis of forecast and actual management. bottom.

本実施の形態によれば、(1)実行予算外の発注かどうかをプロジェクト進行中常に意識づけることが可能となる。(2)実行予算内の発注に関しては一括での承認を可能とすることで、承認作業にかかる負荷を低減することが可能となる。(3)実行予算外の発注は必ず個別での承認を必須とすること誤発注を防止することが可能となる。(4)過去の類似案件の予実管理の情報を参考にして、受注時に予算を組むことによって実行予算の精度を高めることが可能となる。以下の説明では、商品の実行予算入力・発注について説明するが、本発明は、これに限られるものではなく、例えば、外注作業等(例えば、壁紙貼り等)の工事に伴う各種役務についても適用可能である。そのため、以下の説明で、「商品」の記載は、「商品又は役務」を意味するものとする。 According to this embodiment, (1) it is possible to always be aware of whether or not the order is out of the execution budget while the project is in progress. (2) By enabling batch approval for orders within the execution budget, it is possible to reduce the load on the approval work. (3) Orders outside the execution budget must be individually approved to prevent erroneous orders. (4) It is possible to improve the accuracy of the execution budget by making a budget at the time of receiving an order by referring to the information on the budget management of similar projects in the past. In the following explanation, the execution budget input / ordering of the product will be described, but the present invention is not limited to this, and is also applied to various services associated with the construction such as outsourcing work (for example, wallpapering). It is possible. Therefore, in the following description, the description of "goods" shall mean "goods or services".

[2.構成]
本実施形態に係る予実管理装置の構成の一例について、図1を参照して説明する。図1は、予実管理装置の構成の一例を示すブロック図である。
[2. Constitution]
An example of the configuration of the forecast / actual management device according to the present embodiment will be described with reference to FIG. FIG. 1 is a block diagram showing an example of the configuration of the forecast / actual management device.

予実管理装置100は、市販のデスクトップ型パーソナルコンピュータである。なお、予実管理装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。 The budget management device 100 is a commercially available desktop personal computer. The forecast / actual management device 100 is not limited to a stationary information processing device such as a desktop personal computer, but is a portable type such as a commercially available notebook personal computer, a PDA (Personal Digital Assistants), a smartphone, or a tablet personal computer. It may be an information processing device.

予実管理装置100は、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。予実管理装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。 The budget management device 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each part of the budget management device 100 is connected so as to be able to communicate with each other via an arbitrary communication path.

通信インターフェース部104は、ルータ等の通信装置及び専用線等の有線又は無線の通信回線を介して、予実管理装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、予実管理装置100と、サーバ200や端末400・・・とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。端末400・・・は、担当者や承認者等が使用する端末装置である。担当者や承認者等は、端末400・・・を使用して、予実管理装置100とデータ通信を行うことができ、例えば、予実管理装置100に対してデータの入力や照会等(例えば、工事データ入力、実行予算データ入力、発注データ入力、これらのデータの照会等)が可能になっている。 The communication interface unit 104 connects the budget management device 100 to the network 300 so as to be communicable via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with another device via a communication line. Here, the network 300 has a function of connecting the budget management device 100 to the server 200, the terminal 400, and the like so as to be communicable with each other, and is, for example, the Internet, a LAN (Local Area Network), or the like. The terminal 400 ... Is a terminal device used by a person in charge, an approver, or the like. The person in charge, the approver, etc. can perform data communication with the forecast / actual management device 100 by using the terminal 400 ... For example, data input or inquiry to the forecast / actual management device 100 (for example, construction work). Data entry, execution budget data entry, ordering data entry, inquiry of these data, etc.) are possible.

入出力インターフェース部108には、入力装置112及び出力装置114が接続されている。出力装置114には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、及びマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114をモニタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。 An input device 112 and an output device 114 are connected to the input / output interface unit 108. As the output device 114, a speaker or a printer can be used in addition to a monitor (including a home television). In addition to the keyboard, mouse, and microphone, the input device 112 can use a monitor that realizes a pointing device function in cooperation with the mouse. In the following, the output device 114 may be referred to as a monitor 114, and the input device 112 may be referred to as a keyboard 112 or a mouse 112.

記憶部106には、各種のデータベース、テーブル、及びファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、及び光ディスク等を用いることができる。 Various databases, tables, files, and the like are stored in the storage unit 106. In the storage unit 106, a computer program for giving an instruction to a CPU (Central Processing Unit) in cooperation with an OS (Operating System) to perform various processes is recorded. As the storage unit 106, for example, a memory device such as a RAM (Random Access Memory) / ROM (Read Only Memory), a fixed disk device such as a hard disk, a flexible disk, an optical disk, or the like can be used.

また、記憶部106は、工事データファイル106aと、実行予算データファイル106bと、発注データファイル106cとを備えている。図2は、工事データ、実行予算データ、及び発注データの構成例を示す図である。 Further, the storage unit 106 includes a construction data file 106a, an execution budget data file 106b, and an ordering data file 106c. FIG. 2 is a diagram showing a configuration example of construction data, execution budget data, and ordering data.

工事データファイル106aは、工事データを格納するためのファイルである。工事データは、図2に示すように、工事番号、請求先、合計受注金額、及び工事完了日等のデータを含んでいてもよい。 The construction data file 106a is a file for storing construction data. As shown in FIG. 2, the construction data may include data such as a construction number, a billing address, a total order amount, and a construction completion date.

実行予算データファイル106bは、実行予算データを格納するためのファイルである。実行予算データは、図2に示すように、工事番号、連番、商品、予算単価、予算数量、予算金額、実行予算残数量(=予算数量-発注数量)、及び実行予算残金額(=予算金額-発注金額)のデータを含んでいてもよい。 The execution budget data file 106b is a file for storing the execution budget data. As shown in Fig. 2, the execution budget data includes construction number, serial number, product, budget unit price, budget quantity, budget amount, execution budget remaining quantity (= budget quantity-order quantity), and execution budget remaining amount (= budget). Amount-order amount) data may be included.

発注データファイル106cは、発注データを格納するためのファイルである。発注データは、図2に示すように、工事番号、商品、発注単価、発注数量、値引き金額、発注日、及び予算内外区分(予算内又は予算外)のデータを含んでいてもよい。 The order data file 106c is a file for storing order data. As shown in FIG. 2, the order data may include data of a construction number, a product, an order unit price, an order quantity, a discount amount, an order date, and an inside / outside budget classification (within or out of budget).

制御部102は、予実管理装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。制御部102は、機能概念的に、工事データ入力部102aと、実行予算入力部202bと、発注処理部102cと、実績出力部102dと、画面表示制御部102eと、を備えている。 The control unit 102 is a CPU or the like that comprehensively controls the forecast / actual management device 100. The control unit 102 has an internal memory for storing a control program such as an OS, a program that defines various processing procedures, required data, and the like, and performs various information processing based on these stored programs. Run. The control unit 102 is functionally conceptually provided with a construction data input unit 102a, an execution budget input unit 202b, an order processing unit 102c, a performance output unit 102d, and a screen display control unit 102e.

工事データ入力部102aは、例えば、担当者の端末400からのリクエストに応じて、不図示の工事データ入力画面を担当者の端末400に提供し、端末400の工事データ入力画面上での担当者の操作等に応じて、工事データを入力して、工事データファイル106aに格納する。 For example, the construction data input unit 102a provides a construction data input screen (not shown) to the terminal 400 of the person in charge in response to a request from the terminal 400 of the person in charge, and the person in charge on the construction data input screen of the terminal 400. The construction data is input and stored in the construction data file 106a according to the operation of.

実行予算入力部102bは、例えば、担当者の端末400からのリクエストに応じて、
実行予算入力画面を担当者の端末400に提供し、端末400の実行予算入力画面(例えば、図5,図6参照)上での担当者の操作等に応じて、工事識別情報(工事番号)、商品、予算単価、予算数量を含む実行予算データを入力して、実行予算データファイル106bに格納する。
The execution budget input unit 102b receives, for example, a request from the terminal 400 of the person in charge.
The execution budget input screen is provided to the terminal 400 of the person in charge, and the construction identification information (construction number) is performed according to the operation of the person in charge on the execution budget input screen of the terminal 400 (see, for example, FIGS. 5 and 6). , Product, budget unit price, and execution budget data including budget quantity are input and stored in the execution budget data file 106b.

発注処理部102cは、例えば、発注伺入力画面(例えば、図5,図6参照)において、担当者の端末400の操作に応じて、工事識別情報、商品、発注単価、発注数量、発注金額、発注日を含む発注データを入力し、実行予算データファイル106bの実行予算データを参照して、実行予算外の発注が入力された場合は予算外である旨を表示し、また、当該入力された発注データについて、発注照会画面(例えば、図10,図11参照)において、承認者の端末400の操作で承認が得られた場合に、当該発注データを確定して発注データファイル106cに格納する。発注処理部102cは、確定した発注データに基づいた発注を行う。 The order processing unit 102c, for example, on the order inquiry input screen (see, for example, FIGS. 5 and 6), depending on the operation of the terminal 400 of the person in charge, the construction identification information, the product, the order unit price, the order quantity, the order amount, Enter the order data including the order date, refer to the execution budget data in the execution budget data file 106b, and if an order outside the execution budget is entered, it is displayed that it is out of budget, and the input is made. Regarding the order data, when approval is obtained by the operation of the approver's terminal 400 on the order inquiry screen (see, for example, FIGS. 10 and 11), the order data is confirmed and stored in the order data file 106c. The order processing unit 102c places an order based on the confirmed order data.

この場合、実行予算外の発注は、実行予算の金額を超える発注及び実行予算にない商品の発注を含むことにしてもよい。また、発注照会画面では、実行予算内の発注に関しては一括での承認が可能に構成されていることにしてもよい。また、発注照会画面では、実行予算外の発注に対して個別の承認が必要に構成されていることにしてもよい。 In this case, the order outside the execution budget may include the order exceeding the amount of the execution budget and the order of the product not in the execution budget. Further, on the order inquiry screen, it may be configured so that the order within the execution budget can be approved in a lump sum. Further, the order inquiry screen may be configured to require individual approval for orders outside the execution budget.

実績出力部102dは、例えば、担当者の端末400からのリクエストに応じて、実行予算外発注一覧表画面を担当者の端末400に提供し、端末400の実行予算外発注一覧表画面(例えば、図13,図14参照)上での担当者の操作等に応じて、発注データファイル106cを参照して、実行予算外の実績の一覧である実行予算外発注一覧表(例えば、図15参照)を作成して表示(出力)する。 For example, the performance output unit 102d provides the execution budget non-execution order list screen to the person in charge terminal 400 in response to a request from the person in charge terminal 400, and the execution budget non-execution order list screen of the terminal 400 (for example, Refer to the order data file 106c according to the operation of the person in charge on (see FIGS. 13 and 14). Is created and displayed (output).

画面表示制御部102eは、例えば、モニタ114に表示する各種画面の表示及びその入力の受付を制御する。 The screen display control unit 102e controls, for example, the display of various screens to be displayed on the monitor 114 and the reception of input thereof.

[3.具体例]
図1~図15を参照して、本実施の形態における予実管理装置100の処理の具体例を説明する。図3は、本実施の形態における予実管理装置100の制御部102の全体の処理の概略を説明するためのフローを示す図である。図3を参照して、本実施の形態における予実管理装置100の制御部102の全体の処理の概略を説明する。
[3. Concrete example]
A specific example of the processing of the estimation / actual management device 100 in the present embodiment will be described with reference to FIGS. 1 to 15. FIG. 3 is a diagram showing a flow for explaining an outline of the entire processing of the control unit 102 of the forecast / actual management device 100 in the present embodiment. With reference to FIG. 3, the outline of the entire processing of the control unit 102 of the forecast / actual management device 100 in the present embodiment will be described.

(全体の処理)
図3において、まず、工事データ入力部102aは、工事データ入力処理を実行する(ステップS1)。具体的には、工事データ入力処理では、工事データ入力部102aは、例えば、担当者の端末400からのリクエストに応じて、不図示の工事データ入力画面を担当者の端末400に提供し、端末400の工事データ入力画面上での担当者の操作等に応じて、工事データを入力して、工事データファイル106aに格納する。
(Overall processing)
In FIG. 3, first, the construction data input unit 102a executes the construction data input processing (step S1). Specifically, in the construction data input process, the construction data input unit 102a provides, for example, a construction data input screen (not shown) to the terminal 400 of the person in charge in response to a request from the terminal 400 of the person in charge. According to the operation of the person in charge on the construction data input screen of 400, the construction data is input and stored in the construction data file 106a.

実績出力部102dは、実行予算外発注出力処理を実行する(ステップS2)。具体的には、実行予算外発注出力処理では、実績出力部102dは、例えば、担当者の端末400からのリクエストに応じて、実行予算外発注一覧表画面を担当者の端末400に提供し、端末400の実行予算入力画面上での担当者の操作等に応じて、発注データファイル106cを参照して、実行予算外の実績の一覧である実行予算外発注一覧表を作成して表示(出力)する。 The actual output unit 102d executes an order output process outside the execution budget (step S2). Specifically, in the non-execution budget order output process, the actual output unit 102d provides, for example, a non-execution budget order list screen to the person in charge terminal 400 in response to a request from the person in charge terminal 400. According to the operation of the person in charge on the execution budget input screen of the terminal 400, the order data file 106c is referred to to create and display (output) an order list outside the execution budget, which is a list of actual results outside the execution budget. )do.

実行予算入力部102bは、実行予算入力処理を実行する(ステップS3)。具体的には、実行予算入力処理では、実行予算入力部102bは、例えば、担当者の端末400からのリクエストに応じて、実行予算入力画面を担当者の端末400に提供し、端末400の実行予算入力画面上での担当者の操作等に応じて、工事識別情報(工事番号)、商品、予算単価、予算数量、予算金額を含む実行予算データを入力して、実行予算データファイル106bに格納する。担当者は、例えば、類似した案件についての実行予算外発注一覧表を参考にしながら実行予算データを入力することができる。 The execution budget input unit 102b executes the execution budget input process (step S3). Specifically, in the execution budget input process, the execution budget input unit 102b provides, for example, an execution budget input screen to the terminal 400 of the person in charge in response to a request from the terminal 400 of the person in charge, and executes the terminal 400. Input execution budget data including construction identification information (construction number), product, budget unit price, budget quantity, and budget amount according to the operation of the person in charge on the budget input screen, and store it in the execution budget data file 106b. do. The person in charge can input the execution budget data while referring to the non-execution budget order list for similar projects, for example.

発注処理部102cは、発注処理を実行する(ステップS4)。具体的には、発注処理では、発注処理部102cは、以下の処理を行う。実行予算入力部102bは、例えば、担当者の端末400からのリクエストに応じて、発注伺入力画面を担当者の端末400に提供し、端末400の発注伺入力画面上での担当者の操作等に応じて、商品、単価、数量、値引き金額、発注日、及び予算内外区分のデータを含む発注データを入力する。発注処理部102cは、実行予算外の発注が入力された場合は、予算外である旨を表示する。この場合、実行予算外の発注は、実行予算の金額を超える発注及び実行予算にない商品の発注を含むことにしてもよい。 The order processing unit 102c executes the order processing (step S4). Specifically, in the order processing, the order processing unit 102c performs the following processing. The execution budget input unit 102b provides, for example, an order inquiry input screen to the person in charge's terminal 400 in response to a request from the person in charge's terminal 400, and operates the person in charge on the order inquiry input screen of the terminal 400, etc. According to, input the order data including the data of the product, the unit price, the quantity, the discount amount, the order date, and the budget internal / external classification. When an order outside the execution budget is input, the order processing unit 102c displays that it is out of the budget. In this case, the order outside the execution budget may include the order exceeding the amount of the execution budget and the order of the product not in the execution budget.

発注処理部102cは、発注伺入力画面において、発注データを入力後、承認ボタンが押下されると、承認者の端末400に発注照会画面を送信し、端末400の発注照会画面上で承認者の操作により承認が行われた場合は、発注番号を自動生成して、発注データを発注先に送信及び発注データファイル106cに格納する。発注照会画面では、実行予算内の発注に関しては一括での承認が可能に構成されていることにしてもよい。また、発注照会画面では、実行予算外の発注に対して個別の承認が必要に構成されていることにしてもよい。 When the approval button is pressed after inputting the order data on the order inquiry input screen, the order processing unit 102c sends an order inquiry screen to the approver's terminal 400, and the approver's order inquiry screen is displayed on the terminal 400. If approval is obtained by the operation, the order number is automatically generated, the order data is transmitted to the supplier, and the order data file 106c is stored. The order inquiry screen may be configured to enable batch approval for orders within the execution budget. Further, the order inquiry screen may be configured to require individual approval for orders outside the execution budget.

図4~図15は、本実施の形態における予実管理装置100の制御部102の処理を具体例を説明するための図である。図4~図15を参照して、本実施の形態における予実管理装置100の制御部102の処理の具体例を説明する。 4 to 15 are diagrams for explaining a specific example of the processing of the control unit 102 of the forecast / actual management device 100 in the present embodiment. A specific example of the processing of the control unit 102 of the forecast / actual management device 100 in the present embodiment will be described with reference to FIGS. 4 to 15.

(工事データ入力処理)
工事データ入力処理では、工事データ入力部102aは、工事データを入力して、工事データファイル106aに格納する。
(Construction data input processing)
In the construction data input processing, the construction data input unit 102a inputs construction data and stores it in the construction data file 106a.

図4は、工事データの一例を示す図である。図4に示す工事データの例では、1行目は、工事番号「1」、請求先「〇〇建設」、合計受注金額「2,000,000」、工事完了日「2020/6/1」、工事番号「2」、請求先「××会社」、合計受注金額「5,000,000」、工事完了日「2020/6/10」となっている。 FIG. 4 is a diagram showing an example of construction data. In the example of construction data shown in FIG. 4, the first line is the construction number "1", the billing address "○○ construction", the total order amount "2,000,000", and the construction completion date "2020/6/1". , Construction number "2", billing address "XX company", total order amount "5,000,000", construction completion date "2020/6/10".

(実行予算入力処理)
実行予算入力処理では、実行予算入力部102bは、実行予算入力画面上での担当者の端末400の操作に応じて、工事番号、連番、商品、単価、数量、金額を含む実行予算データを入力して、実行予算データファイル106bに格納する。担当者は、例えば、実行予算外発注一覧表を参考にしながら実行予算データを入力することができる。
(Execution budget input processing)
In the execution budget input process, the execution budget input unit 102b inputs the execution budget data including the construction number, serial number, product, unit price, quantity, and amount according to the operation of the terminal 400 of the person in charge on the execution budget input screen. Input and store in the execution budget data file 106b. The person in charge can input the execution budget data while referring to, for example, the order list outside the execution budget.

図5は、実行予算入力画面の表示例を示す図である。図6は、実行予算入力画面の内訳入力画面の表示例を示す図である。(1)工事の受注後、営業予算をもとに実行予算を立てる。実行予算外発注一覧表を用いて、過去の同規模・同内容の工事の予算外発注を確認しながら予算を立てる。(2)実行予算を立てると受注金額に対して粗利額や粗利率が自動的に計算され、確認できる。 FIG. 5 is a diagram showing a display example of the execution budget input screen. FIG. 6 is a diagram showing a display example of the breakdown input screen of the execution budget input screen. (1) After receiving an order for construction work, make an execution budget based on the operating budget. Use the out-of-budget order list to make a budget while checking past out-of-budget orders for works of the same scale and content. (2) When the execution budget is set, the gross profit amount and the gross profit rate are automatically calculated and confirmed with respect to the order amount.

図7は、実行予算入力画面で登録される実行予算データの例を示す図である。実行予算作成時はまだ発注のデータがないので実行予算残数量・金額は実行予算データの数量・金額と等しい値が設定される。 FIG. 7 is a diagram showing an example of execution budget data registered on the execution budget input screen. Since there is no order data yet when the execution budget is created, the value equal to the quantity and amount of the execution budget data is set for the remaining quantity and amount of the execution budget.

図7に示す実行予算データの例では、1行目は、工事番号「1」、連番「1」、商品「壁紙」、単価「2,000」、数量「50」、金額「100,000」、実行予算残数量「50」、実行予算残金額「100,000」、2行目は、工事番号「1」、連番「2」、商品「釘」、単価「16,000」、数量「2」、金額「32,000」、実行予算残数量「2」、実行予算残金額「32,000」、3行目は、工事番号「2」、連番「1」、商品「鉄」、単価「15,000」、数量「10」、金額「150,000」、実行予算残数量「10」、実行予算残金額「150,000」となっている。 In the example of the execution budget data shown in FIG. 7, the first line is the construction number "1", the serial number "1", the product "wallpaper", the unit price "2,000", the quantity "50", and the amount "100,000". , Execution budget remaining quantity "50", Execution budget remaining amount "100,000", second line is construction number "1", serial number "2", product "nail", unit price "16,000", quantity "2", amount of money "32,000", remaining amount of execution budget "2", remaining amount of execution budget "32,000", third line is construction number "2", serial number "1", product "iron" , Unit price "15,000", quantity "10", amount "150,000", execution budget remaining quantity "10", execution budget remaining amount "150,000".

(発注処理)
発注処理では、発注処理部102cは、例えば、発注伺入力画面において、担当者の端末400の操作に応じて、工事識別情報、商品、発注単価、発注数量、発注金額、発注日を含む発注データを入力し、工事識別情報をキーとして実行予算データファイル106bの実行予算データを参照して、実行予算外の発注が入力された場合は予算外である旨を表示し、また、当該入力された発注データについて、発注照会画面において、承認者の端末400の操作で承認が得られた場合に、当該発注データを確定して発注データファイル106cに格納する。発注処理部102cは、確定した発注データに基づいた発注を行う。
発注照会画面では、実行予算内の発注に関しては一括での承認が可能となっており、実行予算外の発注に対して個別の承認を行う。
(Order processing)
In the order processing, the order processing unit 102c, for example, on the order inquiry input screen, according to the operation of the terminal 400 of the person in charge, the order data including the construction identification information, the product, the order unit price, the order quantity, the order amount, and the order date. Is entered, and the execution budget data in the execution budget data file 106b is referred to using the construction identification information as a key, and if an order outside the execution budget is entered, it is displayed that the order is out of the budget, and the input is made. When the order data is approved by the operation of the approver's terminal 400 on the order inquiry screen, the order data is confirmed and stored in the order data file 106c. The order processing unit 102c places an order based on the confirmed order data.
On the order inquiry screen, orders within the execution budget can be approved collectively, and orders outside the execution budget are individually approved.

図8は、発注伺入力画面の表示例を示す図である。発注伺入力画面では、(1)実行予算で登録した明細が一覧で表示される。(2)行番号を選択し、実行予算に基づいた発注データを入力する。(3)実行予算にない商品を発注する場合は行番後を空で登録する。その場合「予算外」として登録される。(4)値引きに関しては個別の商品に対してではなく発注毎にまとめて値引きを行う場合、新しい行を作成するが、値引きは実行予算と違う商品を発注するわけではない為予算外にはならない。(5)入力内容を確認して承認ボタンを押して承認に回す。このタイミングで発注番号は自動で採番される。 FIG. 8 is a diagram showing a display example of the order inquiry input screen. On the order inquiry input screen, the details registered in (1) Execution budget are displayed in a list. (2) Select the line number and enter the order data based on the execution budget. (3) When ordering a product that is not within the execution budget, register it empty after the line number. In that case, it is registered as "out of budget". (4) Regarding discounts, if you want to discount for each order instead of for individual products, create a new line, but the discount does not mean that you are ordering products that are different from the execution budget, so it will not be outside the budget. .. (5) Confirm the input contents and press the approval button to send it for approval. The order number is automatically assigned at this timing.

図9(A)は、発注伺入力画面で登録される発注データの例を示す図である。1行目は、工事番号「1」、発注番号「10001」、商品「壁紙」、単価「2,000」、数量「40」、金額「80,000」、予算内外区分「予算内」となっている。当初予算「10,000」内の発注なので予算内となる。 FIG. 9A is a diagram showing an example of order data registered on the order inquiry input screen. The first line is the construction number "1", the order number "10001", the product "wallpaper", the unit price "2,000", the quantity "40", the amount "80,000", and the budget internal / external classification "within budget". ing. Since the order is within the initial budget of "10,000", it is within the budget.

2行目は、工事番号「1」、発注番号「10001」、商品「釘」、単価「17,000」、数量「2」、金額「34,000」、予算内外区分「予算外」となっている。実行予算「32,000」を超えた発注のため予算外となる。 The second line is the construction number "1", order number "10001", product "nail", unit price "17,000", quantity "2", amount "34,000", budget inside / outside classification "outside budget". ing. It is out of the budget because the order exceeds the execution budget "32,000".

3行目は、工事番号「1」、発注番号「10001」、商品「値引き」、単価「-3,000」、数量「1」、予算内外区分「予算内」となっている。値引き行は予算内とする。 The third line is the construction number "1", the order number "10001", the product "discount", the unit price "-3,000", the quantity "1", and the inside / outside budget classification "within budget". The discount line is within the budget.

4行目は、工事番号「1」、発注番号「10001」、商品「木材」、単価「10,000」、数量「5」、金額「50,000」、予算内区分「予算外」となっている。実行予算時にはなかった商品のため予算外となる。 The 4th line is the construction number "1", the order number "10001", the product "wood", the unit price "10,000", the quantity "5", the amount "50,000", and the budget category "out of budget". ing. It is out of the budget because it is a product that was not available at the time of the execution budget.

5行目は、工事番号「2」、発注番号「10002」、商品「鉄」、単価「15,000」、数量「10」、金額「150,000」、予算内区分「予算内」となっている。当初予算「150,000」にあった発注なので予算内となる。 The fifth line is the construction number "2", the order number "10002", the product "iron", the unit price "15,000", the quantity "10", the amount "150,000", and the budget category "within budget". ing. The order was within the initial budget of "150,000", so it is within the budget.

発注データの登録により、図9(B)に示す実行予算データの実行予算残数量(=実行予算数量-発注数量)・実行予算残金額(=実行予算金額-発注金額)は、図9(C)に示すように更新される。 By registering the order data, the execution budget remaining quantity (= execution budget quantity-order quantity) and execution budget balance (= execution budget amount-order amount) of the execution budget data shown in FIG. 9 (B) are shown in FIG. 9 (C). ) Is updated.

図10は、発注照会画面の表示例を示す図である。図11は、個別の明細確認・承認画面を示している。図10に示す発注照会画面は、発注日や仕入先を入力する欄と、一括承認ONボタンと、一括承認OFFボタンと、発注データを承認する承認エリアと、承認ボタンと、一括承認ボタンとを備えている。 FIG. 10 is a diagram showing a display example of the order inquiry screen. FIG. 11 shows an individual detail confirmation / approval screen. The order inquiry screen shown in FIG. 10 includes a field for inputting an order date and a supplier, a batch approval ON button, a batch approval OFF button, an approval area for approving order data, an approval button, and a batch approval button. It is equipped with.

承認エリアには、チェックボックス、発注番号、予算外の有無、件名、発注金額の明細が表示される。 In the approval area, a check box, an order number, whether or not the budget is out of budget, a subject, and details of the order amount are displayed.

一括承認ONボタンは、承認エリアのチェックボックスを一括でONに設定するためのボタンである。予算外が1つでもある発注番号はONにされない。一括承認OFFボタンは、承認エリアのチェックボックスを一括でOFFに設定するためのボタンである。 The batch approval ON button is a button for setting the check boxes of the approval area to ON in a batch. Order numbers that are out of budget are not turned on. The batch approval OFF button is a button for collectively setting the check boxes of the approval area to OFF.

一括承認ボタンは、チェックボックスがONされている明細を纏めて承認するためのボタンである。承認ボタンは、個別の明細確認・承認画面(立ち上がる画面は発注伺入力画面と同じ)を立ち上げ、一明細ずつ確認して承認を行うためのボタンである。 The batch approval button is a button for collectively approving the details for which the check box is ON. The approval button is a button for launching an individual detail confirmation / approval screen (the screen to be launched is the same as the order inquiry input screen), and confirming and approving the details one by one.

(1)承認したい発注データを一括で承認したい場合は、一括承認ONボタンを押すと、予算外を除く全チェックボタンがONされ、一括承認ボタンを押すと、チェックボックスがONの全ての発注データが承認される。 (1) If you want to approve the order data you want to approve in a batch, press the batch approval ON button to turn on all check buttons except outside the budget, and press the batch approval button to turn on all the order data with the check box ON. Is approved.

(2)実行算外の発注データに関しては承認ボタンを押して、図11に示す個別の明細確認・承認画面を立ち上げ、一明細ずつ確認して承認を行う(立ち上がる画面は発注伺入力画面と同じ)。予算外ではないデータに関しても承認ボタンで一明細ずつ詳細に確認して承認することができる。 (2) For order data that is not included in the execution calculation, press the approval button to launch the individual detail confirmation / approval screen shown in Fig. 11, and confirm and approve the details one by one (the screen to be launched is the same as the order inquiry input screen). ). Even for data that is not out of budget, you can check and approve each item in detail with the approval button.

図12は、発注データの一例を示す図である。図12において、発注番号「10001」について、1行目は実行予算に含まれており、3行目は値引き行のため予算内である。2行目は、実行予算の金額を超えており、4行目はそもそも実行予算に含まれていなかった商品のため予算外である。このように、発注番号「10001」について、予算外が含まれているので、発注照会画面では、一括承認はできず、明細確認・承認画面で個別の承認が必要である。 FIG. 12 is a diagram showing an example of ordering data. In FIG. 12, regarding the order number "10001", the first line is included in the execution budget, and the third line is within the budget because of the discount line. The second line exceeds the amount of the execution budget, and the fourth line is out of the budget because the product was not included in the execution budget in the first place. As described above, since the order number "10001" includes out-of-budget, batch approval cannot be performed on the order inquiry screen, and individual approval is required on the detail confirmation / approval screen.

発注番号「10002」については、5行目は実行予算に含まれているので予算内である。予算内の行だけなので、発注照会画面において一括での承認が可能である。 Regarding the order number "10002", the fifth line is included in the execution budget, so it is within the budget. Since only the rows are within the budget, it is possible to approve them all at once on the order inquiry screen.

(実行予算外発注出力処理)
実行予算外発注出力処理では、実績出力部102dは、実行予算外発注一覧表画面上での担当者の端末300の操作に応じて、発注データファイル106cを参照して、実行予算外の実績の一覧である実行予算外発注一覧表を作成して表示(出力)する。実行予算外発注一覧表では、実行予算外の実績を月次など任意のタイミングで出力することで分析可能である。
(Order output processing outside the execution budget)
In the non-execution budget order output process, the actual output unit 102d refers to the order data file 106c according to the operation of the terminal 300 of the person in charge on the non-execution budget order list screen, and the actual non-execution budget actual results. Create and display (output) a list of orders outside the execution budget, which is a list. In the non-execution budget order list, it is possible to analyze by outputting the actual results outside the execution budget at any timing such as monthly.

図13は、実行予算外発注一覧表画面の表示例を示す図である。図14は、並び順変更画面の表示例を示す図である。図15は、実行予算外発注一覧表の出力例を示す図である。 FIG. 13 is a diagram showing a display example of the order list screen outside the execution budget. FIG. 14 is a diagram showing a display example of the arrangement order change screen. FIG. 15 is a diagram showing an output example of an order list outside the execution budget.

図13に示す実行予算外発注一覧表画面の例では、事業所、対象期間、プロジェクト種別、工期日数、工事番号、合計受注金額等の抽出条件を設定するエリアと、並び順を変更するための並び順変更画面を表示するための「並び順ボタン」と、画面の表示を印刷するための「印刷ボタン」と、抽出条件に合致したデータを発注データファイル106cから抽出して実行予算外発注一覧表を出力するための「出力ボタン」と、を備えている。図14に示す並び順変更画面の例では、ソートをかけたい項目の「並び順」になるように数値を入力し、昇順・降順を変更可能になっている。 In the example of the order list screen outside the execution budget shown in FIG. 13, the area for setting the extraction conditions such as the establishment, the target period, the project type, the number of construction days, the construction number, and the total order amount, and the order for changing the order. A "order button" for displaying the sort order change screen, a "print button" for printing the screen display, and a list of orders outside the execution budget by extracting data that matches the extraction conditions from the order data file 106c. It has an "output button" for outputting a table. In the example of the sort order change screen shown in FIG. 14, it is possible to change the ascending order / descending order by inputting a numerical value so as to be the “sorting order” of the items to be sorted.

処理手順を説明すると、(1)実行予算外発注一覧表画面で抽出条件を設定し、(2)並び順変更画面で並び順を変更し、(3)抽出条件に合致する実行予算外発注一覧表を出力(表示・印刷等)して確認する。 To explain the processing procedure, (1) set the extraction conditions on the non-execution budget order list screen, (2) change the order on the sort order change screen, and (3) list the non-execution budget orders that match the extraction conditions. Check by outputting (displaying, printing, etc.) the table.

プロジェクト種別毎や工事の規模(受注金額)毎にどのような予算外発注が多いか確認することで、同様の案件で反映させ、実行予算の精度を高めることができる。 By confirming what kind of out-of-budget orders are common for each project type and construction scale (order amount), it can be reflected in similar projects and the accuracy of the execution budget can be improved.

以上説明したように、本実施の形態によれば、工事の受注があった場合に、工事識別情報、商品、単価、数量、金額を含む実行予算データを入力して、実行予算データファイル106bに登録する実行予算入力部102bと、発注伺入力画面において、担当者の操作に応じて、工事識別情報、商品、発注単価、数量、発注金額、発注日を含む発注データを入力し、実行予算データを参照して、実行予算外の発注が入力された場合は予算外である旨を表示し、また、当該入力された発注データについて、発注照会画面において、承認者の承認が得られた場合に、当該発注データを確定して発注データファイル106cに登録する発注処理部102cと、を備えているので、実行予算外の発注かどうかをプロジェクト進行中に常に意識づけることが可能となる。 As described above, according to the present embodiment, when an order for construction is received, the execution budget data including the construction identification information, the product, the unit price, the quantity, and the amount of money is input to the execution budget data file 106b. In the execution budget input unit 102b to be registered and the order inquiry input screen, input the order data including construction identification information, product, order unit price, quantity, order amount, and order date according to the operation of the person in charge, and execute budget data. If an order outside the execution budget is entered, it will be displayed that it is out of budget, and if the approval of the approver is obtained on the order inquiry screen for the entered order data. Since the order processing unit 102c for confirming the order data and registering it in the order data file 106c is provided, it is possible to always be aware of whether or not the order is out of the execution budget while the project is in progress.

[4.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[4. Other embodiments]
In addition to the above-described embodiments, the present invention may be implemented in various different embodiments within the scope of the technical idea described in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。 For example, among the processes described in the embodiments, all or part of the processes described as being automatically performed may be performed manually, or all the processes described as being performed manually may be performed. Alternatively, a part thereof can be automatically performed by a known method.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。 In addition, processing procedures, control procedures, specific names, information including parameters such as registration data and search conditions for each processing, screen examples, and database configurations shown in this specification and drawings are not specified unless otherwise specified. Can be changed arbitrarily.

また、予実管理装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。 Further, with respect to the forecast / actual management device 100, each component shown in the figure is a functional concept and does not necessarily have to be physically configured as shown in the figure.

例えば、予実管理装置100が備える処理機能、特に制御部にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて予実管理装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。 For example, with respect to the processing functions included in the budget management device 100, particularly each processing function performed by the control unit, even if all or any part thereof is realized by the CPU and a program interpreted and executed by the CPU. Well, it may be realized as hardware by wired logic. The program is recorded on a non-temporary computer-readable recording medium including a programmed instruction for causing the information processing apparatus to execute the process described in the present embodiment, and is recorded on a non-temporary computer-readable recording medium. Read mechanically to 100. That is, a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded in a storage unit such as a ROM or an HDD (Hard Disk Drive). This computer program is executed by being loaded into RAM, and cooperates with the CPU to form a control unit.

また、このコンピュータプログラムは、予実管理装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。 Further, this computer program may be stored in an application program server connected to the budget management device 100 via an arbitrary network, and all or part of the computer program may be downloaded as needed. be.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム製品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD-ROM(Compact Disk Read Only Memory)、MO(Magneto-Optical disk)、DVD(Digital Versatile Disk)、および、Blu-ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 Further, the program for executing the process described in the present embodiment may be stored in a non-temporary computer-readable recording medium, or may be configured as a program product. Here, the "recording medium" includes a memory card, a USB (Universal Serial Bus) memory, an SD (Secure Digital) card, a flexible disk, a magneto-optical disk, a ROM, an EPROM (Erasable Programmable Read Only Memory), and an EEPROM (registration). Trademarks) (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magnet-Optical Disc), MO (Magnet-Optical Disc), DVD (Digital), DVD (Digital) It shall include any "portable physical medium".

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。 Further, the "program" is a data processing method described in any language or description method, regardless of the format such as source code or binary code. The "program" is not necessarily limited to a single program, but is distributed as multiple modules or libraries, or cooperates with a separate program represented by the OS to achieve its function. Including things. It should be noted that well-known configurations and procedures can be used for specific configurations and reading procedures for reading the recording medium in each apparatus shown in the embodiment, installation procedures after reading, and the like.

記憶部に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、及び、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、及び、ウェブページ用ファイル等を格納する。 Various databases and the like stored in the storage unit are memory devices such as RAM and ROM, fixed disk devices such as hard disks, flexible disks, and storage means such as optical disks, and are used for various processes and website provision. Stores programs, tables, databases, files for web pages, etc.

また、予実管理装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、予実管理装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。 Further, the forecast / actual management device 100 may be configured as an information processing device such as a known personal computer or workstation, or may be configured as the information processing device to which an arbitrary peripheral device is connected. Further, the forecast / actual management device 100 may be realized by mounting software (including a program or data) that realizes the processing described in the present embodiment on the device.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。 Furthermore, the specific form of distribution / integration of the device is not limited to that shown in the figure, and all or part of the device may be functionally or physically in any unit according to various additions or functional loads. It can be distributed and integrated. That is, the above-described embodiments may be arbitrarily combined and implemented, or the embodiments may be selectively implemented.

100 予実管理装置
102 制御部
102a 工事データ入力部
102b 実行予算入力部
102c 発注処理部
102d 実績出力部
102e 画面表示制御部
104 通信インターフェース部
106 記憶部
106a 工事データファイル
106b 実行予算データファイル
106c 発注データファイル
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
400 端末
100 Forecast management device 102 Control unit 102a Construction data input unit 102b Execution budget input unit 102c Order processing unit 102d Actual output unit 102e Screen display control unit 104 Communication interface unit 106 Storage unit 106a Construction data file 106b Execution budget data file 106c Order data file 108 Input / output interface unit 112 Input device 114 Output device 200 Server 300 Network 400 Terminal

Claims (7)

記憶部及び制御部を備えた予実管理装置であって、
前記制御部は、
工事の受注があった場合に、工事識別情報、商品又は役務、単価、数、金額を含む実行予算データを入力して、前記記憶部に登録する実行予算入力手段と、
発注伺入力画面において、担当者の操作に応じて、工事識別情報、商品又は役務、発注単価、数、発注金額、発注日を含む発注データを入力し、前記実行予算データを参照して、実行予算外の発注が入力された場合は予算外である旨を表示し、また、当該入力された発注データについて、発注照会画面において、承認者の承認が得られた場合に、当該発注データを確定して前記記憶部に登録する発注処理手段と、
を備えたことを特徴とする予実管理装置。
It is a forecast / actual management device equipped with a storage unit and a control unit.
The control unit
An execution budget input means for inputting execution budget data including construction identification information, goods or services, unit price, number, and amount of money and registering it in the storage unit when an order for construction is received.
On the order inquiry input screen, input the order data including construction identification information, goods or services, order unit price, number, order amount, order date according to the operation of the person in charge, and execute with reference to the execution budget data. If an order outside the budget is entered, it is displayed that it is out of budget, and if the approval of the approver is obtained on the order inquiry screen for the entered order data, the order data is confirmed. And the order processing means to be registered in the storage unit,
A forecast and actual management device characterized by being equipped with.
前記実行予算外の発注は、実行予算の金額を超える発注及び実行予算にない商品又は役務の発注を含むことを特徴とする請求項1に記載の予実管理装置。 The forecast / actual management device according to claim 1, wherein the order outside the execution budget includes an order exceeding the amount of the execution budget and an order for goods or services not included in the execution budget. 前記発注照会画面では、実行予算内の発注に関しては一括での承認が可能に構成されていることを特徴とする請求項1又は請求項2に記載の予実管理装置。 The forecast / actual management device according to claim 1, wherein the order inquiry screen is configured to enable batch approval of orders within the execution budget. 前記発注照会画面では、実行予算外の発注に対して個別の承認が必要に構成されていることを特徴とする請求項1又は請求項2に記載の予実管理装置。 The forecast / actual management device according to claim 1, wherein the order inquiry screen is configured to require individual approval for an order outside the execution budget. 前記制御部は、さらに、
前記記憶部に登録された発注データを参照して、実行予算外の実績の一覧である実行予算外発注一覧表を作成して出力する実績出力手段を備えたことを特徴とする請求項1~請求項4のいずれか1つに記載の予実管理装置。
The control unit further
Claims 1 to 1 include a performance output means for creating and outputting a non-execution budget order list, which is a list of non-execution budget results, with reference to the order data registered in the storage unit. The budget management device according to any one of claims 4.
記憶部及び制御部を備えた情報処理装置で実行される予実管理方法であって、
前記制御部において実行される、
工事の受注があった場合に、工事識別情報、商品又は役務、単価、数、金額を含む実行予算データを入力して、前記記憶部に登録する実行予算入力工程と、
発注伺入力画面において、担当者の操作に応じて、工事識別情報、商品又は役務、発注単価、数、発注金額、発注日を含む発注データを入力し、前記実行予算データを参照して、実行予算外の発注が入力された場合は予算外である旨を表示し、また、当該入力された発注データについて、発注照会画面において、承認者の承認が得られた場合に、当該発注データを確定して前記記憶部に登録する発注処理工程と、
を含むことを特徴とする予実管理方法。
It is a forecast / actual management method executed by an information processing device equipped with a storage unit and a control unit.
Executed in the control unit,
When there is an order for construction, the execution budget input process that inputs the execution budget data including the construction identification information, goods or services, unit price, number, and amount and registers it in the storage unit, and the execution budget input process.
On the order inquiry input screen, input the order data including construction identification information, goods or services, order unit price, number, order amount, order date according to the operation of the person in charge, and execute with reference to the execution budget data. If an order outside the budget is entered, it is displayed that it is out of budget, and if the approval of the approver is obtained on the order inquiry screen for the entered order data, the order data is confirmed. And the order processing process to be registered in the storage unit,
A budget management method characterized by including.
制御部及び記憶部を備えた情報処理装置に実行させるための予実管理プログラムであって、
前記制御部において、
工事の受注があった場合に、工事識別情報、商品又は役務、単価、数、金額を含む実行予算データを入力して、前記記憶部に登録する実行予算入力工程と、
発注伺入力画面において、担当者の操作に応じて、工事識別情報、商品又は役務、発注単価、数、発注金額、発注日を含む発注データを入力し、前記実行予算データを参照して、実行予算外の発注が入力された場合は予算外である旨を表示し、また、当該入力された発注データについて、発注照会画面において、承認者の承認が得られた場合に、当該発注データを確定して前記記憶部に登録する発注処理工程と、
を実行するための予実管理プログラム。
It is a forecast / actual management program to be executed by an information processing device equipped with a control unit and a storage unit.
In the control unit
When there is an order for construction, the execution budget input process that inputs the execution budget data including the construction identification information, goods or services, unit price, number, and amount and registers it in the storage unit, and the execution budget input process.
On the order inquiry input screen, input the order data including construction identification information, goods or services, order unit price, number, order amount, order date according to the operation of the person in charge, and execute with reference to the execution budget data. If an order outside the budget is entered, it is displayed that it is out of budget, and if the approval of the approver is obtained on the order inquiry screen for the entered order data, the order data is confirmed. And the order processing process to be registered in the storage unit,
A budget management program for running.
JP2020183018A 2020-10-30 2020-10-30 Budget/actual result management device, budget/actual result management method and budget/actual result management program Pending JP2022073190A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020183018A JP2022073190A (en) 2020-10-30 2020-10-30 Budget/actual result management device, budget/actual result management method and budget/actual result management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020183018A JP2022073190A (en) 2020-10-30 2020-10-30 Budget/actual result management device, budget/actual result management method and budget/actual result management program

Publications (1)

Publication Number Publication Date
JP2022073190A true JP2022073190A (en) 2022-05-17

Family

ID=81604784

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020183018A Pending JP2022073190A (en) 2020-10-30 2020-10-30 Budget/actual result management device, budget/actual result management method and budget/actual result management program

Country Status (1)

Country Link
JP (1) JP2022073190A (en)

Similar Documents

Publication Publication Date Title
JP7220263B2 (en) Information processing device, information processing method and program
JP2022073190A (en) Budget/actual result management device, budget/actual result management method and budget/actual result management program
JP2022104542A (en) Fee processing apparatus, fee processing method and fee processing program
JP6978830B2 (en) Shipping control device, shipping control method, and shipping control program
JP7084800B2 (en) Difference management device, difference management method, and difference management program
JP7280931B2 (en) Information processing device, information processing method, and information processing program
JP2020004246A (en) Order status management device, order status management method, and order status management program
JP7458256B2 (en) Inventory management device, inventory management method, and inventory management program
JP7453923B2 (en) Packaging conversion device, packaging conversion method, and packaging conversion program
JP7257766B2 (en) Product profit/loss management device, product profit/loss management method, and product profit/loss management program
JP2019211956A (en) Unit price estimation device, unit price estimation method, and unit price estimation program
JP7336362B2 (en) Order management device, order management method, and order management program
JP7308629B2 (en) Scrap processing device, scrap processing method, and scrap processing program
JP2021149914A (en) Forecast/actual management device, forecast/actual management method and forecast/actual management program
JP2023176736A (en) Order reception input apparatus, order reception input method, and order reception input program
JP2022041261A (en) Analysis code based balance management system, analysis cade based balance management method, and analysis code based balance management program
JP2023043714A (en) Information generation device, information generation method, and information generation program
JP2021144623A (en) Transaction analysis apparatus, transaction analysis method, and transaction analysis program
JP2022042880A (en) Conversion rate management device, conversion rate management method, and conversion rate management program
JP2022084284A (en) Fee allocation data generation device, fee allocation data generation method and fee allocation data generation program
JP2021144695A (en) Document output device, document output method and document output program
JP2021144344A (en) Cost output device, cost output method, and cost output program
JP2023122288A (en) Order reception management device, order reception management method, and order reception management program
JP2023110731A (en) Sales management device, sales management program, and sales management method
JP2022082056A (en) Manufacturing instruction/repair instruction slip creation device, manufacturing instruction/repair instruction slip creation method, and manufacturing instruction/repair instruction slip creation program